KitLog pro

Powered By Kitlog Pro v2.0

Roberts Web Site
Work Logs Found: 77
Category Work Time: 375 Hours
 Date
Hours
Work Log Summary

Details

 10-15-2015
2.00
Joining main spar and Installing seat rails
Details
       

 10-09-2015
5.00
Floor and AP servo bracket
Details
       

 10-08-2015
3.00
Lower center fuselage skins
Details
       

 10-08-2015
2.00
Drilling out gear holes
Details
       

 10-08-2015
3.00
Adding inspection panel to baggage floor
Details
     

 10-06-2015
6.00
Rudder cable run
Details
       

 10-05-2015
7.00
Wiring
Details
       

 10-03-2015
8.00
Finish riveting the lower fuselage
Details
       

 10-02-2015
8.00
Riveting lower fuselage skins
Details
       

 10-01-2015
6.00
Fitting top skins
Details
       

 09-30-2015
5.00
Seat rails
Details
       

 09-26-2015
6.00
Clecoing skins
Details
       

 09-24-2015
7.00
Riviting aft fusalage components
Details
       

 09-22-2015
5.00
Aft fusalage prep for wiring
Details
       

 09-20-2015
6.00
Aft fusalage
Details
       

 09-19-2015
7.00
Aft Fusalage construction
Details
       

 09-15-2015
3.00
Rib 9 aft fusalage
Details
       

 09-15-2015
1.00
Center fusalage assembly
Details
       

 09-07-2015
5.00
Center fuselage rear spar
Details
       

 09-01-2015
6.00
Finishing riveting the fusalage ribs
Details
       

 08-25-2015
4.00
Riveting ribs to the gear channel
       

 08-24-2015
7.00
Center fusalage ribs
Details
       

 08-04-2015
5.00
Riveting the landing gear attach fittings.
Details
       

 07-31-2015
3.00
Parts attached to main spar boc
Details
       

 07-31-2015
5.00
Getting center fuselage clecoed
Details
       

 07-30-2015
4.00
Both wings finished.
Details
     

 07-28-2015
8.00
Riveting top left skin
Details
       

 07-27-2015
5.00
Pitot system final tweeks
Details
       

 07-12-2015
5.00
Fuselage rib assemblies riveted
Details
       

 07-11-2015
8.00
Pitot-AOA install
Details
       

 07-10-2015
6.00
Wiring left wing
       

 07-07-2015
7.00
Riveting bottom left wing
       

 06-25-2015
2.00
Left wing rivnuts
Details
       

 06-24-2015
2.00
Fuel Tank "Z" brackets
Details
       

 06-22-2015
5.00
Left wing pitot tube fitting
Details
       

 06-17-2015
3.00
Installing elevator tips
Details
       

 06-04-2015
6.00
Left Wing Ribs Riveted
Details
       

 05-22-2015
6.00
Right wing completed
Details
       

 05-21-2015
7.00
Preparing top right wing skin for riveting
Details
       

 05-20-2015
5.00
Securing wiring harness on right wing
Details
       

 05-19-2015
6.00
Right wing bottom skins riveted
Details
       

 05-18-2015
5.00
Clecoing the right wing bottom skins
Details
       

 05-17-2015
5.00
Wire harness ready for lower wing skin riveting
Details
       

 05-15-2015
5.00
Fitting wiring harness in right wing
Details
       

 05-14-2015
6.00
Right Wing Wiring
Details
       

 05-14-2015
3.00
Right Wing landing light wire bracket
Details
       

 03-28-2015
6.00
Right wing. Riveting Ribs
Details
       

 03-26-2015
7.00
Right Wing. Fitting ribs and skins
Details
       

 03-19-2015
3.00
Right Wing Assembly
Details
     

 03-12-2015
8.00
Right wing sub assemblies
Details
       

 03-10-2015
6.00
Left Wing
       

 03-05-2015
8.00
Left wing
Details
       

 02-25-2015
4.00
Finishing elevator
Details
       

 02-24-2015
3.00
Riveting elevator
Details
       

 02-23-2015
6.00
Clecoing the skins
Details
       

 02-21-2015
5.00
Rivet Flaps
Details
       

 02-18-2015
4.00
Riveting wing rib subassemblies
Details
       

 02-17-2015
2.00
Left wing subassemblies
Details
       

 02-16-2015
1.00
ready for skin
Details
     

 02-16-2015
6.00
Framing the elevator
Details
       

 02-16-2015
4.00
Finishing framework
Details
       

 02-07-2015
6.00
Rack for finished parts
Details
       

 02-05-2015
6.00
Riveting the ailerons
       

 02-04-2015
6.00
Flap subassemblies
Details
       

 02-03-2015
2.00
Skins were tight but all went well
Details
       

 02-03-2015
5.00
Left and right ailerons built
       

 02-02-2015
3.50
Riveting the H/S
Details
       

 02-02-2015
2.00
Fitting the skins
Details
       

 02-02-2015
2.00
Cleco the H/S
Details
       

 01-29-2015
4.00
Riveting the rudder
Details
       

 01-27-2015
3.00
Framing the rudder
Details
       

 01-27-2015
4.00
Clecoing the rudder
Details
       

 01-26-2015
4.00
Framing the Horizontal Stab
Details
       

 01-22-2015
4.00
Skinning the VS
Details
       

 01-21-2015
2.50
Trim Tab Assembly
Details
       

 01-21-2015
4.00
Framing vert stab
Details
       

 01-16-2015
10.00
Up and ready
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.