Date
|
Hours
|
Work Log Summary
|
Details
|
06-14-2020
|
1.50
|
Run #4. Amp ok; prop ok, mag chk ok
|
Details
|
|
|
06-13-2020
|
3.00
|
Install new shunt; install new pitot controller
|
Details
|
|
|
06-07-2020
|
3.00
|
removed and reclock prop governor control arm
|
Details
|
|
|
06-07-2020
|
2.00
|
3rd engine run
|
Details
|
|
|
06-06-2020
|
4.00
|
2nd engine run; finished interior
|
Details
|
|
|
06-03-2020
|
1.50
|
installed upper cowl; re-installed rear harness
|
Details
|
|
|
06-02-2020
|
1.50
|
cut upper cowl and re-fiberglassed; Pitot troubles
|
Details
|
|
|
06-01-2020
|
4.00
|
install interior
|
|
|
|
06-01-2020
|
1.50
|
install cowl. still interferance with flywheel. r
|
|
|
|
05-31-2020
|
0.00
|
Xpdr, Servo pictures
|
|
|
|
05-31-2020
|
0.00
|
xpdr ant, battery, GN 625 pictures
|
|
|
|
05-31-2020
|
0.00
|
wiring pictures
|
|
|
|
05-31-2020
|
0.00
|
Regulator, ADSB, Radio COM
|
|
|
|
05-31-2020
|
4.00
|
Re-install of interior; install cowling (interfere
|
Details
|
|
|
05-31-2020
|
0.00
|
MT Prop gov, battery pic
|
|
|
|
05-31-2020
|
0.00
|
Fuel Servo, Alt, starter pic
|
|
|
|
05-31-2020
|
0.00
|
ELT ID / Hex picture
|
|
|
|
05-31-2020
|
0.00
|
ELT equipment pictures
|
|
|
|
05-31-2020
|
0.00
|
ELT box, Aero LED, Pitot
|
|
|
|
05-31-2020
|
0.00
|
backup batt, EMS, Aero LED
|
|
|
|
05-31-2020
|
0.00
|
ADAHRS, SV GPS, CO monitor
|
|
|
|
05-30-2020
|
4.50
|
Corrected EGT and Radio issue
|
Details
|
|
|
05-27-2020
|
3.00
|
Removed interior and spar panels to troubleshoot p
|
|
|
|
05-26-2020
|
2.00
|
FIRST ENGINE START
|
Details
|
|
|
05-23-2020
|
1.50
|
record all EMS sensor settings; calibrate AP
|
|
|
|
05-23-2020
|
2.00
|
prep for first start; note radio transmit not work
|
Details
|
|
|
05-22-2020
|
4.00
|
weight and balance complete and put in airframe lo
|
Details
|
|
|
05-22-2020
|
0.10
|
submit airworthiness paperwork to FAA
|
Details
|
|
|
05-22-2020
|
3.00
|
check slick mag timing; install tempest plugs
|
Details
|
|
|
05-21-2020
|
4.00
|
install interior
|
|
|
|
05-18-2020
|
1.75
|
set PMag timing; check prop gov control; install l
|
Details
|
|
|
05-18-2020
|
4.00
|
install interior
|
Details
|
|
|
05-17-2020
|
3.00
|
install interior
|
Details
|
|
|
05-17-2020
|
3.00
|
First turn-over of engine;check prop tip tracking
|
Details
|
|
|
05-16-2020
|
6.50
|
install Flap sensor; wing walk anti-slip; baggage
|
Details
|
|
|
05-15-2020
|
3.50
|
Tap 3/8' tie down bolts; pack wheel bearings
|
|
|
|
05-15-2020
|
1.00
|
re-install snorkle to servo using longer bolts
|
|
|
|
05-15-2020
|
3.00
|
IFR transponder certification; entered in Airframe
|
Details
|
|
|
05-09-2020
|
3.50
|
Install R wing fairing; securefuel line; safetywir
|
Details
|
|
|
05-08-2020
|
9.00
|
RTVBaffles; install slick mag plug wires; safety w
|
|
|
|
05-05-2020
|
2.00
|
secure R brake line to gear leg; work tail wheel c
|
|
|
|
05-05-2020
|
2.00
|
Install fuel valve, fwd spar covers,left wing wiri
|
|
|
|
05-04-2020
|
3.00
|
Replace fuel filter; secure left brake line to gea
|
|
|
|
05-03-2020
|
2.50
|
Secure right wing AP wires; install aeleron trim h
|
|
|
|
05-02-2020
|
3.00
|
Calibrate Left wing tank fuel float. Changed K val
|
Details
|
|
|
04-30-2020
|
1.50
|
Fuel flow test right wing tank
|
Details
|
|
|
04-30-2020
|
3.00
|
Conduct fuel flow test left wing
|
Details
|
|
|
04-29-2020
|
2.50
|
Trouble shoot boost pump wiring
|
Details
|
|
|
04-29-2020
|
3.00
|
Calibrate Left fuel tank resistance float
|
Details
|
|
|
04-26-2020
|
4.50
|
Secure L wing wires; Re-run right wing wires
|
Details
|
|
|
04-25-2020
|
1.00
|
secure and adjust elev trim tab
|
Details
|
|
|
04-25-2020
|
1.50
|
EAA tech counselor visit
|
Details
|
|
|
04-25-2020
|
1.25
|
adjust elevator travel
|
Details
|
|
|
04-24-2020
|
1.75
|
adjust aeleron and flap travel
|
Details
|
|
|
04-21-2020
|
1.50
|
Torque all spar bolts; Wings attached complete
|
|
|
|
04-21-2020
|
1.50
|
safety wire prop;install spinner
|
|
|
|
04-21-2020
|
2.50
|
fix left OAT wiring; safety wire Pitch AP
|
Details
|
|
|
04-20-2020
|
2.50
|
torque prop bolts (70 ft-lb)
|
Details
|
|
|
04-19-2020
|
1.00
|
re-install left wingtip
|
|
|
|
04-16-2020
|
7.50
|
Install Left wing
|
|
|
|
04-15-2020
|
6.50
|
finish R wing wiring; install pitot; prep L wing
|
|
|
|
04-10-2020
|
6.50
|
Install right wing
|
|
|
|
04-07-2020
|
4.50
|
install emag wires; install trim clip on stick; pa
|
|
|
|
04-06-2020
|
1.00
|
paint cowl interior; teststick switches
|
|
|
|
04-06-2020
|
3.50
|
install sticks; secure rudder pedal cables w/cotte
|
|
|
|
04-02-2020
|
2.50
|
finish breather tube routing; tighten lower oil co
|
|
|
|
04-01-2020
|
2.00
|
install alt air cable; trim and tighten spinner pr
|
|
|
|
04-01-2020
|
1.50
|
fix brake reservour seep
|
Details
|
|
|
03-29-2020
|
4.00
|
fab and install spinner prop gap filler
|
|
|
|
03-28-2020
|
3.50
|
install Hartell Prop; install snorkle
|
|
|
|
03-27-2020
|
5.50
|
called B&C Alt bracket misalign; more securement
|
|
|
|
03-24-2020
|
7.00
|
more securement of wires and hoses
|
|
|
|
03-23-2020
|
6.50
|
complete rudder glass and install; more fwf secure
|
|
|
|
03-22-2020
|
1.50
|
conect EMS sensor #1(P4) to battery
|
Details
|
|
|
03-21-2020
|
6.50
|
set prop gov hose; secure hoses/wires FWF
|
Details
|
|
|
03-15-2020
|
7.00
|
more glass work on rudder; install aionics
|
Details
|
|
|
03-14-2020
|
6.00
|
rivet seat floor; install flap/center brace
|
Details
|
|
|
03-14-2020
|
2.50
|
glass rudder bottom
|
|
|
|
03-13-2020
|
7.00
|
finish emp trim; more rudder glass; install nutpla
|
|
|
|
03-08-2020
|
3.50
|
Fit emp trim seal; rework rudder bottom dueto conf
|
Details
|
|
|
03-07-2020
|
1.50
|
glass L H stab tip
|
|
|
|
03-02-2020
|
0.50
|
sand R H stab tip
|
|
|
|
02-29-2020
|
1.00
|
add glass to H stab tip
|
|
|
|
02-20-2020
|
1.00
|
More glass work on emp tips
|
|
|
|
02-19-2020
|
1.50
|
glass H stabgap filler; add glass to elevator tip
|
|
|
|
02-18-2020
|
2.50
|
Temp installrudder; stab glass work
|
|
|
|
02-18-2020
|
2.50
|
install canopy supertracks; move fiberglass workon
|
|
|
|
02-17-2020
|
1.00
|
Installed H stab tips;emp gap cover
|
|
|
|
02-16-2020
|
2.00
|
riveted elevator fiberglass tips
|
|
|
|
02-10-2020
|
6.00
|
finished elev/H stab fiberglass-ready to rivet
|
Details
|
|
|
02-09-2020
|
2.00
|
trim and drill elev fiberglass tips
|
|
|
|
02-08-2020
|
6.50
|
finish rudderfiberglass bottom
|
Details
|
|
|
02-07-2020
|
3.50
|
emp fairing and gap sealalmost complete
|
Details
|
|
|
02-05-2020
|
2.50
|
drill out longeron rivets for gap seal trim
|
Details
|
|
|
02-02-2020
|
2.50
|
Begin installing emp fairing nut plates
|
|
|
|
02-01-2020
|
2.00
|
match drill empannage fairing
|
Details
|
|
|
01-31-2020
|
2.50
|
install and torque H + V stabilizer; run wires
|
|
|
|
01-30-2020
|
1.00
|
drilled tail strobe wire passthrough
|
|
|
|
01-26-2020
|
2.50
|
Started attaching empenage to fuselage in hanger
|
|
|
|
01-25-2020
|
1.00
|
Fab new control bracket
|
Details
|
|
|
01-11-2020
|
6.00
|
Moved everything to hanger
|
Details
|
|
|
01-04-2020
|
3.00
|
Throttle cable hole to big. ordered new attach bra
|
Details
|
|
|
01-02-2020
|
3.50
|
Install control cables. Throttle, Prop, Mixture
|
Details
|
|
|
12-29-2019
|
2.50
|
Finish cabin heat install; wire compass lt, secure
|
Details
|
|
|
12-28-2019
|
6.00
|
Install cabin vent hose; Install cabin heat cable
|
|
|
|
12-26-2019
|
1.00
|
Secure R wing lights and attach wingtip w/screws
|
|
|
|
12-24-2019
|
1.00
|
secure wires in L wingtip and attach wingtip w/scr
|
|
|
|
12-22-2019
|
3.00
|
wire ldg and strobe lights in right wing
|
|
|
|
12-21-2019
|
9.50
|
Finish r and L wingtip attach nutplates
|
Details
|
|
|
12-07-2019
|
3.00
|
Install R wingtip rib;Wire Left Ldg Lt and stobe m
|
|
|
|
12-06-2019
|
1.50
|
Install L and R aileron and notch aft edge of wing
|
Details
|
|
|
12-01-2019
|
4.00
|
finish riveting right and Left wing bottom skin
|
|
|
|
11-30-2019
|
1.00
|
Wire OAT sensor in Right wing
|
|
|
|
11-30-2019
|
1.75
|
start riveting left wing bottom skin
|
|
|
|
11-29-2019
|
2.00
|
Pick up keys to Hanger; wire OAT in Left wing
|
|
|
|
11-10-2019
|
2.50
|
install left wing pitot+set-up for riveting skin
|
Details
|
|
|
11-10-2019
|
2.00
|
finish riveting right wing bottom skin
|
Details
|
|
|
11-09-2019
|
3.50
|
start rivetig right wing bottom skin
|
Details
|
|
|
11-02-2019
|
1.50
|
Install earthX battery
|
Details
|
|
|
10-14-2019
|
3.00
|
open canopy after glassing windscreen; install rol
|
Details
|
|
|
10-14-2019
|
3.50
|
Dehydrate plugs; Install dynon GPS antenna, avioni
|
Details
|
|
|
10-13-2019
|
1.00
|
sand windscreen to one thickness of tape
|
Details
|
|
|
10-13-2019
|
1.00
|
install safety wire on AP roll-servo 9 pin
|
Details
|
|
|
10-06-2019
|
3.50
|
finish left wingtip lights; matchdrill right wingt
|
Details
|
|
|
10-05-2019
|
3.00
|
sand windscreen; apply first coat of rage gold fil
|
Details
|
|
|
10-05-2019
|
3.50
|
Complete install of left wingtip aerosun and strob
|
Details
|
|
|
09-29-2019
|
2.00
|
Finish right wingtip light + cover
|
Details
|
|
|
09-28-2019
|
1.00
|
sand and add glass to left aft corner of windscree
|
Details
|
|
|
09-28-2019
|
5.00
|
install right wingtip aerosun light +Strobe
|
Details
|
|
|
09-25-2019
|
1.00
|
sand windscreen
|
Details
|
|
|
09-22-2019
|
1.50
|
start sanding windscreen
|
Details
|
|
|
09-21-2019
|
6.50
|
finish layup of fiberglass on windscreen
|
Details
|
|
|
09-18-2019
|
1.00
|
Dehydrate plugs
|
|
|
|
09-01-2019
|
1.50
|
cut fiberglass cloth to templates
|
Details
|
|
|
08-31-2019
|
3.50
|
retape canopy prep for fiberglass layup. re-cut te
|
Details
|
|
|
08-25-2019
|
1.50
|
Cut templates forwinscreen fiberglass layups
|
Details
|
|
|
08-22-2019
|
3.00
|
Sand and apply second coat of epoxy to windscreen
|
Details
|
|
|
08-21-2019
|
2.00
|
Apply epoxy filler to edge of windscreen
|
Details
|
|
|
08-20-2019
|
1.00
|
Finish installing windscreen clips
|
Details
|
|
|
08-17-2019
|
3.50
|
Install canopy windscreen + prep clip attachments
|
Details
|
|
|
08-16-2019
|
2.00
|
Dehydrate plugs; Secure adel clamps under fwd fuse
|
Details
|
|
|
08-11-2019
|
3.00
|
Install mag compass, Dynon Skyview GPS antenna
|
Details
|
|
|
07-15-2019
|
1.50
|
Rivet cowl hinge to firewall; rivet main spar cove
|
Details
|
|
|
07-15-2019
|
1.50
|
paint inside of cowl white
|
Details
|
|
|
07-15-2019
|
3.00
|
Finish riveting cowl hinge to firewall; tighten lo
|
Details
|
|
|
07-14-2019
|
3.00
|
start riveting fwd fuse top skin
|
Details
|
|
|
07-13-2019
|
2.00
|
rehydrate plugs; cleco front skin, ready to rivet
|
Details
|
|
|
07-13-2019
|
2.00
|
Finish Bleed; Finish cowl RV7 cover; secure subpan
|
Details
|
|
|
07-13-2019
|
1.50
|
Bleed brakes
|
Details
|
|
|
07-09-2019
|
1.00
|
2 x bleed brakes
|
Details
|
|
|
07-07-2019
|
2.00
|
re-glass left RV7 cowl hinge cover
|
Details
|
|
|
07-07-2019
|
1.00
|
bleed brakes-still has air in line
|
|
|
|
07-05-2019
|
2.50
|
epoxy cowl interior; install park brake TS flightl
|
Details
|
|
|
07-03-2019
|
3.00
|
Finish rage on cowl. cut oil door latch holes
|
Details
|
|
|
07-01-2019
|
2.50
|
add/sand rage gold. Start cowl oil door
|
Details
|
|
|
06-30-2019
|
2.50
|
sand and add rage gold to cowl
|
Details
|
|
|
06-29-2019
|
1.50
|
Install/sand/epoxy cowl
|
Details
|
|
|
06-29-2019
|
7.00
|
complete spinner construction
|
Details
|
|
|
06-28-2019
|
2.50
|
complete and attache wires to aft fuse securements
|
Details
|
|
|
06-24-2019
|
2.00
|
Install wire securements in aft fuselage
|
Details
|
|
|
06-22-2019
|
1.50
|
install adel clamps to ADAHRS wire harness
|
Details
|
|
|
06-20-2019
|
0.00
|
ordered FWF fuel line from TSflightlines
|
Details
|
|
|
06-16-2019
|
0.00
|
dehydrate spark plugs
|
|
|
|
06-15-2019
|
4.00
|
pre-fit installation of interior panels
|
Details
|
|
|
06-11-2019
|
1.00
|
Final fit front center fuel and wire pass-through
|
Details
|
|
|
06-09-2019
|
6.00
|
Rebuild park brake attach. install seatback hinges
|
Details
|
|
|
06-08-2019
|
3.00
|
Received and test fit interior
|
Details
|
|
|
05-26-2019
|
3.00
|
complete wire wrap fwd tunnel
|
Details
|
|
|
05-18-2019
|
0.00
|
Dehydrate plugs
|
|
|
|
04-21-2019
|
1.00
|
start final wire bundle wrap under forward fuse
|
Details
|
|
|
04-20-2019
|
3.00
|
cut holes and install defrost fans
|
Details
|
|
|
04-14-2019
|
0.50
|
replace spark plug dehyrators
|
|
|
|
04-06-2019
|
1.00
|
Install silicone grommet for fuel pass through
|
Details
|
|
|
03-31-2019
|
1.00
|
Install platenut per EAA tech counselor
|
Details
|
|
|
03-30-2019
|
1.00
|
clean-up shop-order silicone fuel/baffle pass- thr
|
|
|
|
02-03-2019
|
1.00
|
Remove and trim left fuselage parking brake attach
|
Details
|
|
|
01-26-2019
|
1.50
|
Rewire diode to "I" and starter Keywire to "S" on
|
Details
|
|
|
01-26-2019
|
0.50
|
Re-bleed brakes
|
Details
|
|
|
01-26-2019
|
3.50
|
Install aileron trim box and wire.
|
Details
|
|
|
01-21-2019
|
1.00
|
Re-bleedbrakes
|
Details
|
|
|
01-21-2019
|
1.00
|
Get dimensions for interior carpet tunnel, etc
|
|
|
|
01-19-2019
|
1.00
|
EAA Tech Advisor visit
|
|
|
|
01-13-2019
|
1.00
|
stick grip switch test- Flap up/down reversed
|
Details
|
|
|
01-13-2019
|
1.00
|
correct stick flap wiring.test intercom OK
|
Details
|
|
|
01-12-2019
|
4.00
|
wire 9 pin DSUB for both stick grips
|
Details
|
|
|
01-11-2019
|
1.00
|
contacted AFS about shunt to master relay
|
Details
|
|
|
01-09-2019
|
1.00
|
Drill seat rib pass through for stick grip wires
|
Details
|
|
|
01-07-2019
|
1.00
|
repaired right wheel brake leak
|
Details
|
|
|
01-06-2019
|
2.00
|
Garmin GTN 625 ops check; bleed brakes
|
Details
|
|
|
01-05-2019
|
3.50
|
start wire routing for stick grip
|
Details
|
|
|
01-04-2019
|
1.00
|
start to charge b/u battery via HDX
|
Details
|
|
|
01-01-2019
|
3.50
|
work on stick grip installation
|
Details
|
|
|
12-30-2018
|
2.00
|
Fab to install right stick grip
|
Details
|
|
|
12-29-2018
|
2.00
|
ALT-ANL-Shunt-Master wiring error corrected
|
Details
|
|
|
12-28-2018
|
2.00
|
FIRST AVIONICS POWER-ON TEST
|
Details
|
|
|
12-28-2018
|
3.00
|
Confirm and attach all ACM harnesses
|
Details
|
|
|
12-27-2018
|
1.00
|
Shop clean-up
|
|
|
|
12-27-2018
|
4.00
|
Research and install PMag wiring
|
Details
|
|
|
12-27-2018
|
5.00
|
Install brackets for Comm ant wires
|
Details
|
|
|
12-26-2018
|
5.00
|
Misc FWF wiring; work on static line installation
|
Details
|
|
|
12-24-2018
|
2.00
|
Wire panel Pwr relay; Battery; Aileron trim/ Fans
|
Details
|
|
|
12-24-2018
|
1.50
|
install static line mounts
|
Details
|
|
|
12-23-2018
|
1.50
|
Wire Reiff sump heat
|
Details
|
|
|
12-15-2018
|
2.50
|
Wire strobe +tail + ldg light molex
|
Details
|
|
|
12-15-2018
|
3.50
|
Complete CHT/EGT wire connectors
|
Details
|
|
|
11-11-2018
|
1.00
|
Install L wing landing light molex
|
Details
|
|
|
11-10-2018
|
4.50
|
wire seat heat and CO2 monitor to ACM
|
Details
|
|
|
10-30-2018
|
1.00
|
Complete Rt wing light/strobe molex, fuel sender m
|
Details
|
|
|
10-29-2018
|
2.00
|
Complete ACM rear harness; Run R wing strobe wire
|
Details
|
|
|
10-28-2018
|
3.50
|
Completed ACM stick harness; L+r wing light molex
|
Details
|
|
|
10-24-2018
|
0.50
|
Received New AEROLEDS
|
Details
|
|
|
10-22-2018
|
2.50
|
Complete ACM Flap/trim harness; Prep ACM rear/stic
|
Details
|
|
|
10-20-2018
|
2.00
|
Run Landing light wires to panel; re-run cables
|
Details
|
|
|
10-13-2018
|
5.00
|
Re-install strobe molex with ground;Pitot+Flap Mol
|
Details
|
|
|
10-08-2018
|
1.50
|
Install Flap motor molex
|
Details
|
|
|
10-08-2018
|
1.50
|
determined Stobe wire shielding ground
|
Details
|
|
|
10-08-2018
|
5.00
|
completed cable routing and install
|
Details
|
|
|
10-07-2018
|
1.50
|
Run fuel/stall wires
|
Details
|
|
|
10-07-2018
|
0.50
|
Install ELT antenna doubler
|
Details
|
|
|
10-07-2018
|
2.50
|
Install AMP connects on wing tail wires
|
Details
|
|
|
10-07-2018
|
1.00
|
Fab ELT antenna doubler
|
Details
|
|
|
10-06-2018
|
3.50
|
Wire bundle path through spar
|
Details
|
|
|
10-06-2018
|
1.00
|
Stert running wing wires from panel
|
Details
|
|
|
10-06-2018
|
1.00
|
Run Stick wires, Flap Position wire
|
Details
|
|
|
10-06-2018
|
1.00
|
install GPS antenna
|
Details
|
|
|
10-06-2018
|
1.50
|
Install ELT
|
Details
|
|
|
10-01-2018
|
1.50
|
Fab doubler for GPS antenna
|
Details
|
|
|
09-30-2018
|
2.00
|
run,installADS-B, XPDR, Comm wires
|
Details
|
|
|
09-30-2018
|
3.00
|
AP pitch dsub, fwd center tunnel cover
|
Details
|
|
|
09-29-2018
|
3.00
|
complete install of ADS-B, xpdr, comm antenna
|
Details
|
|
|
09-29-2018
|
1.00
|
complete ADS-B standoff install
|
Details
|
|
|
09-29-2018
|
4.50
|
begin xpdr and comm antenna install
|
Details
|
|
|
09-22-2018
|
3.00
|
research and seek tech support AP/PMag/Stick
|
Details
|
|
|
09-22-2018
|
2.00
|
repair fuel pump drain / drill main spare pass thr
|
Details
|
|
|
09-22-2018
|
2.00
|
more roll-bar handle repair and start stick grip
|
Details
|
|
|
09-22-2018
|
2.00
|
Flap motor and pitch AP wire routing
|
Details
|
|
|
09-22-2018
|
1.00
|
built subpanel standoff for ADS-B box
|
Details
|
|
|
09-21-2018
|
2.50
|
removed roll-bar handles
|
Details
|
|
|
09-21-2018
|
1.50
|
re-route tail strobe wire
|
Details
|
|
|
09-09-2018
|
1.00
|
Install roll bar handles
|
Details
|
|
|
09-08-2018
|
3.50
|
lable wires
|
|
|
|
09-08-2018
|
3.00
|
Install #2 +#4 CHT, EGT wires
|
|
|
|
08-26-2018
|
1.50
|
Install LR3-14 Voltage regulator
|
|
|
|
08-26-2018
|
2.00
|
complete ACM front connector harness, Run ADAHRS a
|
|
|
|
08-25-2018
|
6.00
|
wire front connector harness, P-leads
|
|
|
|
08-25-2018
|
2.00
|
more wiring
|
|
|
|
08-19-2018
|
0.50
|
wire red cube
|
|
|
|
08-19-2018
|
3.00
|
wire oil press/temp, MP press, Fuel Press sensors
|
|
|
|
08-13-2018
|
1.00
|
run more wires
|
|
|
|
08-12-2018
|
2.50
|
run and label EMS engine sensor harness
|
|
|
|
08-08-2018
|
3.00
|
install aux bus, install ACM ground, pwr and batt
|
|
|
|
08-06-2018
|
2.50
|
Run strobe wires to tail. install spark pug wires,
|
|
|
|
08-03-2018
|
9.50
|
install subpanel nutplates, Adel clamps fwd fuse
|
|
|
|
07-22-2018
|
4.00
|
Fabricate subpanel and panel cable guides
|
Details
|
|
|
07-21-2018
|
1.00
|
Run AP servo wire bundle
|
|
|
|
07-21-2018
|
3.00
|
Install ADAHRS in rear fuse
|
Details
|
|
|
07-11-2018
|
1.00
|
finish parking brake cable, install GPS subpanel a
|
|
|
|
07-10-2018
|
2.00
|
rivet panel vent angle attach, install parking bra
|
|
|
|
07-08-2018
|
2.00
|
install CO and ELT in panel
|
Details
|
|
|
07-08-2018
|
1.50
|
Fabricate parking brake cable attachment, prime, p
|
|
|
|
07-07-2018
|
2.00
|
sand snorkle inlet to fit
|
|
|
|
07-07-2018
|
1.75
|
rebuild panel vent attach angles
|
|
|
|
07-07-2018
|
2.00
|
install PMag blast tube
|
|
|
|
07-07-2018
|
1.00
|
complete panel vent angles, prime
|
|
|
|
07-05-2018
|
1.00
|
install EGT probes
|
|
|
|
07-05-2018
|
3.00
|
fiberglass build-up snorkle inlet. Install CHT pro
|
|
|
|
07-04-2018
|
3.00
|
install subpanel avionics boxes
|
|
|
|
07-04-2018
|
1.00
|
install engine heater electrical cord
|
|
|
|
07-04-2018
|
3.00
|
fiberglass cowl air inlet ramp dams
|
|
|
|
07-03-2018
|
0.50
|
remove and drill left cowl inlet baffle strap
|
|
|
|
07-01-2018
|
1.50
|
build up left inlet air seal
|
|
|
|
06-30-2018
|
4.50
|
fiberglass R inlet air seal
|
|
|
|
06-12-2018
|
1.00
|
start R inlet air seal
|
|
|
|
06-11-2018
|
1.50
|
rivet L+R aft air seal fabric
|
|
|
|
06-10-2018
|
1.00
|
finish FAB, cut l+r aft baffle seal
|
|
|
|
06-09-2018
|
4.50
|
more finish work on left ramp and filter bypass
|
|
|
|
06-06-2018
|
3.50
|
complete left ramp and snorkle
|
|
|
|
06-04-2018
|
12.00
|
build left ramp and snorkle
|
|
|
|
06-03-2018
|
2.00
|
start buiding new left ramp
|
|
|
|
05-29-2018
|
1.50
|
paint baffles, remove cowl pin cover emblem blanks
|
|
|
|
05-28-2018
|
1.00
|
prime baffles; order new left ramp
|
|
|
|
05-28-2018
|
2.00
|
install subpanel platenuts for batt and ADS-B
|
|
|
|
05-28-2018
|
3.00
|
install shunt and ANL on firewall. plan subpanel
|
|
|
|
05-28-2018
|
1.00
|
install right cowl pin emblem
|
|
|
|
05-28-2018
|
1.50
|
install left cowl emblem (start process)
|
|
|
|
05-28-2018
|
1.50
|
dissassemble baffles, sand cylinder fins
|
|
|
|
05-28-2018
|
1.00
|
cut GPS hole in subpanel
|
|
|
|
05-27-2018
|
2.00
|
cut cowl pin holes
|
|
|
|
05-26-2018
|
2.00
|
STOP - left ramp cut too short for snorkle
|
|
|
|
05-26-2018
|
1.00
|
start baffle rubber seal
|
|
|
|
05-26-2018
|
9.00
|
complete baffle metal work
|
|
|
|
05-11-2018
|
0.00
|
received Advaced flight systems quick panel
|
|
|
|
05-08-2018
|
1.50
|
install oil cooler brace, fab and install cyl #4 b
|
|
|
|
05-07-2018
|
1.50
|
Fabricate oil cooler angle brace
|
|
|
|
05-05-2018
|
2.00
|
rivet oil cooler doubler. Drill heat hole
|
|
|
|
05-04-2018
|
2.50
|
finsh baffle trim, dissassemble, debur
|
|
|
|
05-02-2018
|
1.50
|
trim baffles for cowl airguide ramps
|
|
|
|
04-30-2018
|
1.00
|
fiberglass L inlet airguide to top cowl
|
|
|
|
04-29-2018
|
2.00
|
trim baffles to top cowl
|
|
|
|
04-29-2018
|
1.00
|
fiberglass R inlet airguide to top cowl
|
|
|
|
04-28-2018
|
2.00
|
rivet fwd baffles
|
|
|
|
04-28-2018
|
9.00
|
more baffle construction
|
|
|
|
04-23-2018
|
1.50
|
trim ramp baffles
|
|
|
|
04-22-2018
|
4.00
|
more baffle construction
|
|
|
|
04-21-2018
|
1.50
|
start on baffles again
|
|
|
|
04-21-2018
|
1.00
|
review installation of snorkle
|
|
|
|
04-21-2018
|
1.50
|
more baffle work
|
|
|
|
04-21-2018
|
1.00
|
install sniffle valve drain tube
|
|
|
|
04-21-2018
|
1.00
|
install fwd cowl inlet nut plates
|
|
|
|
04-21-2018
|
2.00
|
design/install firewall - cowl pin holder
|
|
|
|
04-20-2018
|
3.00
|
rivet upper cowl side hinges to fuse
|
|
|
|
04-15-2018
|
3.00
|
rivet lower col hinge
|
|
|
|
04-15-2018
|
0.00
|
dehydrate engine plugs
|
|
|
|
04-14-2018
|
1.00
|
prep all hinges
|
|
|
|
04-14-2018
|
2.00
|
drill upper cowl hinge
|
|
|
|
04-14-2018
|
2.50
|
countersink cowl-prep hinges; prep inlet ducts
|
|
|
|
04-08-2018
|
2.50
|
drill lower cowl side hinges L+R
|
|
|
|
04-08-2018
|
1.00
|
drill cowl to firewall
|
|
|
|
04-07-2018
|
5.50
|
trim top/bottom cowl, start drilling bottom hinge
|
|
|
|
04-07-2018
|
3.00
|
trim gear leg holes in cowl
|
|
|
|
04-06-2018
|
2.00
|
cut upper cowl and oil door
|
|
|
|
03-28-2018
|
0.00
|
Test demo seats
|
|
|
|
03-10-2018
|
1.00
|
start baffle construction
|
|
|
|
03-10-2018
|
2.00
|
finish spinner bulkhead
|
|
|
|
03-10-2018
|
4.00
|
continue baffle const., prime spinner bulkhead
|
|
|
|
02-25-2018
|
4.50
|
finish cowl hinges on Firewall, start spinner
|
|
|
|
02-24-2018
|
1.25
|
start cowl hinges
|
|
|
|
02-24-2018
|
2.50
|
install seat tube, breather oil scavenge, fuel lin
|
|
|
|
02-24-2018
|
2.25
|
install right brake line
|
|
|
|
02-24-2018
|
2.50
|
drill upper cowl hinge, rehydrate engine plugs
|
|
|
|
02-11-2018
|
2.00
|
install Manifold press sensor. research engine wir
|
|
|
|
02-08-2018
|
2.00
|
started install oil seperator
|
Details
|
|
|
02-08-2018
|
2.50
|
finish installing exhaust and hangers
|
|
|
|
02-07-2018
|
1.50
|
start installing exhaust
|
|
|
|
02-06-2018
|
1.50
|
measure hoses for new order
|
|
|
|
02-05-2018
|
1.50
|
install tailwheel, measure fuel line
|
|
|
|
02-04-2018
|
3.50
|
install tailwheel zirk, ELT bracket
|
|
|
|
02-03-2018
|
1.50
|
install sniffle valve, alternator
|
|
|
|
02-03-2018
|
1.50
|
install new mix arm hdw + throttle bracket
|
|
|
|
02-03-2018
|
1.00
|
install fuel vent line
|
|
|
|
01-22-2018
|
0.00
|
received Hartzell CS prop
|
|
|
|
01-22-2018
|
2.50
|
install oil press line and sensor. test fit fuel i
|
|
|
|
01-21-2018
|
0.75
|
test fit prop gov cable. test good
|
|
|
|
01-21-2018
|
2.00
|
start install oil temp, fuel press sensors
|
|
|
|
01-15-2018
|
2.00
|
STOP. can't figure out mixture geometry
|
Details
|
|
|
01-15-2018
|
1.00
|
start install mixture brackets
|
|
|
|
01-15-2018
|
1.50
|
research throttle and mixture brackets
|
|
|
|
01-15-2018
|
1.50
|
final torque and cotter pin engine mount bolts
|
|
|
|
01-14-2018
|
2.00
|
Hang engine
|
Details
|
|
|
01-13-2018
|
4.50
|
prep engine install. start cowl hinge install
|
|
|
|
01-13-2018
|
2.00
|
install cowl hinges on bottom of firewall
|
|
|
|
01-08-2018
|
1.50
|
install tailwheel
|
Details
|
|
|
01-07-2018
|
2.00
|
install prop governor and rod end bearing
|
|
|
|
01-06-2018
|
2.50
|
work on prop governor, cable bracket
|
|
|
|
01-01-2018
|
2.00
|
instal D9 on Pitch servo
|
|
|
|
12-31-2017
|
1.50
|
install master + starter solinoid
|
|
|
|
12-30-2017
|
0.50
|
torque all fwd fuse blue fitings
|
|
|
|
12-30-2017
|
1.00
|
move brake pedals back one hole
|
Details
|
|
|
12-30-2017
|
3.00
|
Install Reiff cylinder heater bands
|
|
|
|
12-30-2017
|
2.00
|
install left main brake line
|
|
|
|
12-29-2017
|
2.00
|
paint tailwheel hardware.start engine build-up
|
|
|
|
12-26-2017
|
1.70
|
finish install right main gear wheel
|
|
|
|
12-25-2017
|
1.00
|
finish install of left main wheel
|
Details
|
|
|
12-24-2017
|
1.00
|
start install of wheels/brakes/tires
|
|
|
|
12-23-2017
|
1.00
|
seal firewall recess
|
|
|
|
12-23-2017
|
0.50
|
rivet firewall recess
|
|
|
|
12-23-2017
|
1.00
|
install right main gear leg
|
|
|
|
12-23-2017
|
3.00
|
install engine mount start gear legs
|
Details
|
|
|
12-20-2017
|
1.00
|
heat canopy to finish riveting. organize garage
|
|
|
|
12-20-2017
|
3.00
|
finish riveting canopy canopy complete
|
|
|
|
12-18-2017
|
1.00
|
Recieved engine
|
|
|
|
11-22-2017
|
1.50
|
rivet center spine and forward canopy plexi to fra
|
Details
|
|
|
11-19-2017
|
2.50
|
install l/r/rudder access inspect covers
|
Details
|
|
|
11-18-2017
|
4.50
|
re-install elevator pushrod. start canopy assy
|
|
|
|
11-18-2017
|
3.00
|
Install roll bar. Rivet left F791 canopy skirt bra
|
Details
|
|
|
11-18-2017
|
0.50
|
fab canopy finger tabs on canopy side skirt
|
|
|
|
11-17-2017
|
2.00
|
reshape center fuselage pushrod pass through
|
Details
|
|
|
11-13-2017
|
1.00
|
replace two brake lines with longer tube
|
|
|
|
11-13-2017
|
1.50
|
drill and final assembly of canopy rear slide rail
|
|
|
|
11-12-2017
|
3.00
|
paint all canopy parts with enamel
|
|
|
|
11-11-2017
|
1.00
|
replace battery box with earth x box
|
|
|
|
11-11-2017
|
2.00
|
prime canopy frame and roll bar
|
|
|
|
11-11-2017
|
2.00
|
disassemble roll bar. sand for paint
|
|
|
|
11-10-2017
|
2.50
|
finish side skirts. prime and paint
|
|
|
|
11-10-2017
|
2.50
|
disassemble canopy- sand frame for paint
|
|
|
|
11-09-2017
|
4.00
|
trim aft skirt. replace left side skirt
|
Details
|
|
|
10-29-2017
|
1.00
|
screw on side skirts
|
|
|
|
10-29-2017
|
4.00
|
drill aft skirts
|
|
|
|
10-28-2017
|
1.00
|
paint canopy side skirt
|
Details
|
|
|
10-25-2017
|
1.50
|
prime side skirts. continue aft skirt shaping
|
|
|
|
10-23-2017
|
1.50
|
shape left aft skirt
|
|
|
|
10-23-2017
|
2.00
|
build up main tire/wheel assembly
|
|
|
|
10-21-2017
|
1.50
|
start aft skirt measuring
|
Details
|
|
|
10-21-2017
|
1.00
|
prep skirt brace to drill. trim rear skirt
|
Details
|
|
|
10-21-2017
|
3.50
|
drill left and right side skirt/skirt brace
|
|
|
|
10-20-2017
|
2.00
|
fab and drill left F791 canopy skirt brace
|
|
|
|
10-16-2017
|
1.00
|
trim rear pin mount to clear skirt brace
|
|
|
|
10-16-2017
|
1.00
|
drill right skirt brace to canopy side skirt
|
|
|
|
10-15-2017
|
1.50
|
fab and drill right skirt brace
|
|
|
|
10-14-2017
|
1.50
|
complete canopy latch
|
|
|
|
10-14-2017
|
5.00
|
canopy skirts and braces
|
Details
|
|
|
09-25-2017
|
2.00
|
start canopy side skirts
|
|
|
|
09-25-2017
|
1.50
|
finish supertracks
|
|
|
|
09-25-2017
|
5.00
|
complete canopy aft pin mounts. supertracks
|
Details
|
|
|
09-24-2017
|
3.00
|
countersink and drill windshield
|
Details
|
|
|
09-24-2017
|
2.00
|
canopy aft pin mount
|
|
|
|
09-23-2017
|
4.00
|
start install of canopy latch
|
|
|
|
09-16-2017
|
3.50
|
fab nutplate strip for canopy side rail
|
|
|
|
09-16-2017
|
2.00
|
drill canopy plexi to 5/32" frame to #30
|
|
|
|
09-16-2017
|
2.00
|
countersink canopy plexi
|
|
|
|
09-04-2017
|
5.50
|
trim and drill winshield. install canopy rollers
|
|
|
|
09-04-2017
|
1.00
|
start forming windshield
|
|
|
|
09-03-2017
|
2.50
|
trim canopy sides and front
|
|
|
|
09-03-2017
|
1.50
|
drill and cleco canopy to frame
|
|
|
|
09-03-2017
|
1.00
|
backdrill canopy center cover strip
|
|
|
|
09-02-2017
|
2.50
|
mask and cut canopy sides to bottom of frame
|
|
|
|
09-02-2017
|
4.00
|
Canopy BIG CUT
|
Details
|
|
|
08-27-2017
|
1.00
|
drill canopy latch hole in plexi
|
Details
|
|
|
08-27-2017
|
2.00
|
cut fwd and aft molding flanges
|
Details
|
|
|
08-26-2017
|
1.50
|
prep workspace for canopy bubble
|
|
|
|
08-25-2017
|
1.50
|
replace bad rivet in fwd top fuse rib
|
Details
|
|
|
08-25-2017
|
2.00
|
bend canopy frame
|
|
|
|
08-20-2017
|
2.00
|
drill fwd/aft canopy side rail holes
|
Details
|
|
|
08-17-2017
|
2.00
|
make initial measurements-cut canopy frame fwd tub
|
Details
|
|
|
08-16-2017
|
2.00
|
adjust canopy frame to longeron shape
|
|
|
|
08-14-2017
|
3.00
|
rivet aft top skin
|
|
|
|
08-13-2017
|
3.50
|
rivet rear top skin
|
Details
|
|
|
08-13-2017
|
1.00
|
fab rail deck spacer
|
Details
|
|
|
08-12-2017
|
1.00
|
study plan on canopy construction
|
|
|
|
08-12-2017
|
2.50
|
rivet side canopy rails. touch-up paint
|
|
|
|
08-12-2017
|
1.00
|
rivet canopy slider rail/spacer
|
|
|
|
08-12-2017
|
2.50
|
build canopy slide rail and spacer
|
|
|
|
08-11-2017
|
2.00
|
rivet canopy deck, cabin vent angle attachment
|
|
|
|
08-11-2017
|
3.50
|
prep aft top fuse skin for install
|
Details
|
|
|
08-09-2017
|
4.00
|
fab cabin vent panel attach, prime
|
|
|
|
08-08-2017
|
3.00
|
install brake lines
|
|
|
|
08-07-2017
|
2.00
|
read instructions, remove roll bar, fwd fuse skin
|
|
|
|
08-06-2017
|
3.50
|
finish riveting fwd fuse.
|
Details
|
|
|
08-06-2017
|
3.00
|
drill roll bar brace. start canopy rails
|
|
|
|
08-06-2017
|
1.50
|
Attach roll bar
|
|
|
|
08-05-2017
|
1.00
|
start drilling roll bar attach holes
|
|
|
|
08-05-2017
|
5.00
|
rivet fwd upper fuselage structure
|
|
|
|
08-05-2017
|
3.50
|
fab/install Pbrake cable bracket. Start Canopy rol
|
|
|
|
08-04-2017
|
2.00
|
install...then remove firewall recess
|
|
|
|
08-02-2017
|
3.00
|
reorient cabin heat valve
|
Details
|
|
|
07-31-2017
|
3.00
|
drill mixture+prop pass throughs
|
Details
|
|
|
07-30-2017
|
1.00
|
drill throttle pass through
|
|
|
|
07-16-2017
|
1.00
|
replace red cube nutplate. Plan ground plate locat
|
|
|
|
07-16-2017
|
1.50
|
install parking brake valve and tubing
|
|
|
|
07-16-2017
|
2.50
|
install firwall passthrough (2)
|
|
|
|
07-15-2017
|
1.00
|
install nutplates on red cube brace
|
|
|
|
06-19-2017
|
1.00
|
start riveting brake doubler/red cube shelf to fir
|
|
|
|
06-17-2017
|
4.00
|
install brake doubler, red cube shelf
|
|
|
|
06-17-2017
|
1.50
|
complete doubler and red cube shelf
|
|
|
|
06-11-2017
|
3.50
|
install fuel vent. fab fuel line-pump to firewall
|
|
|
|
06-11-2017
|
1.50
|
fabricate firewall fuel line doubler
|
|
|
|
06-11-2017
|
2.00
|
biuld park brake mount doubler
|
|
|
|
06-10-2017
|
1.00
|
install (pro seal) heater box, transducer manifold
|
|
|
|
06-10-2017
|
10.00
|
drill NACA air vents to fuse
|
Details
|
|
|
06-08-2017
|
3.50
|
remove vert stab. rivet stab spar
|
Details
|
|
|
06-07-2017
|
1.00
|
finish painting cabin
|
|
|
|
06-06-2017
|
2.50
|
Paint center fuse (enamal). start battery box
|
|
|
|
06-05-2017
|
1.50
|
cut rudder stop to short! start painting Cabin
|
|
|
|
06-04-2017
|
3.00
|
begin trimming rudder stop
|
Details
|
|
|
06-03-2017
|
1.00
|
adjust rudder bearings
|
|
|
|
06-02-2017
|
2.50
|
fab and drill UP elevator stop
|
|
|
|
05-31-2017
|
1.00
|
Inventory firewall forward kit
|
|
|
|
05-17-2017
|
1.00
|
prep for final cabin paint
|
|
|
|
05-13-2017
|
2.00
|
start installing vertical stab
|
|
|
|
05-13-2017
|
2.00
|
install oil seperator doubler on firewall
|
Details
|
|
|
05-09-2017
|
3.00
|
finish brake pedals, trim gear leg holes in firewa
|
Details
|
|
|
05-07-2017
|
3.00
|
complete Horiz stab install
|
|
|
|
05-06-2017
|
2.00
|
Drilled Horiz elevator horn-start install
|
|
|
|
05-06-2017
|
1.00
|
complete install of engine mount
|
|
|
|
05-05-2017
|
3.50
|
Begin install Engine Mount
|
|
|
|
05-04-2017
|
2.50
|
install left brake pedals
|
|
|
|
04-24-2017
|
2.00
|
rivet aft fuse stiffner web
|
Details
|
|
|
04-24-2017
|
2.50
|
complete install of ADAHRS shelf
|
|
|
|
04-23-2017
|
1.00
|
start to fab/install ADAHRS shelf
|
|
|
|
04-21-2017
|
2.50
|
finish installing wing root plate nuts
|
|
|
|
04-20-2017
|
2.50
|
continue install of wing root plate nuts
|
|
|
|
04-18-2017
|
1.00
|
start install of wing root plate nuts
|
|
|
|
04-18-2017
|
2.00
|
install TS fuel lines. Tighten flap blocks
|
|
|
|
04-09-2017
|
2.00
|
remove left wing, rivet right wing aileron brace s
|
Details
|
|
|
04-02-2017
|
0.25
|
remove right wing
|
|
|
|
04-01-2017
|
1.00
|
rig right aileron to stick
|
|
|
|
04-01-2017
|
1.00
|
rig left aileron to stick
|
|
|
|
03-19-2017
|
1.25
|
install left flap. adjusted range of motion
|
|
|
|
03-18-2017
|
1.50
|
install right flap and adjust range of motion
|
|
|
|
03-18-2017
|
6.00
|
complete install of wing root fairings
|
Details
|
|
|
03-17-2017
|
1.00
|
install right fuel tank attach bracket
|
|
|
|
03-17-2017
|
2.00
|
begin install right wing root fairing
|
|
|
|
03-15-2017
|
2.50
|
install left fuel tank attach bracket
|
|
|
|
03-15-2017
|
1.00
|
drill fuse center/wing skin screw holes
|
|
|
|
03-13-2017
|
1.00
|
recheck fwd sweep
|
Details
|
|
|
03-13-2017
|
1.00
|
drill rear spar holes to final size
|
|
|
|
03-13-2017
|
2.00
|
check flaps (OK), recheck incidence.pilot hole in
|
Details
|
|
|
03-12-2017
|
1.25
|
square wings to fuselage
|
Details
|
|
|
03-12-2017
|
0.75
|
install right Wing! level fuselage
|
|
|
|
03-11-2017
|
2.00
|
twist left, right wing red/blk wingtip light wires
|
|
|
|
03-11-2017
|
1.00
|
rivet center fuel pump cover attach angles
|
|
|
|
03-11-2017
|
3.00
|
Install left wing!
|
|
|
|
02-12-2017
|
5.00
|
complete fabrication of fuel pump cover, Prime
|
|
|
|
02-11-2017
|
1.00
|
start fabrication of fuel pump cover
|
|
|
|
02-11-2017
|
2.50
|
run heated pitot wiring in left wing
|
Details
|
|
|
02-06-2017
|
1.50
|
run left wingtip wires, stall and fuel sender wire
|
Details
|
|
|
02-05-2017
|
3.00
|
prep,prime,install left flap hinge/pin
|
Details
|
|
|
02-04-2017
|
1.50
|
set neutral position of left aileron
|
Details
|
|
|
02-04-2017
|
3.00
|
install left fuel tank on wing
|
Details
|
|
|
01-30-2017
|
1.00
|
remove rudder cable exit covers
|
Details
|
|
|
01-29-2017
|
1.50
|
shrink wrap stall warning wires
|
Details
|
|
|
01-29-2017
|
1.00
|
Prime fwd fuse ctr tunnel parts
|
|
|
|
01-28-2017
|
3.00
|
trim right and left wing aft spar attach
|
Details
|
|
|
01-25-2017
|
1.00
|
prep fwd fuse ctr tunnel for primer
|
|
|
|
01-23-2017
|
1.00
|
design fuel pump cover. fab wing drift pins
|
|
|
|
01-22-2017
|
3.50
|
complete fab of fwd ctr fuse tunnel for pump
|
|
|
|
01-21-2017
|
3.00
|
test right fuel tank. begin fwd fuse ctr section
|
|
|
|
01-21-2017
|
4.00
|
install EFII fuel pump brackets
|
Details
|
|
|
01-16-2017
|
2.00
|
Install right Flap. bend and drill hinge pin
|
|
|
|
01-16-2017
|
1.00
|
Finish drilling right Flap hinge + Prime
|
|
|
|
01-16-2017
|
1.00
|
drill wiring holes in wing and run wire
|
Details
|
|
|
01-15-2017
|
2.00
|
fab and install right fuel vent line
|
|
|
|
01-15-2017
|
2.00
|
begin install of right Flap
|
|
|
|
01-14-2017
|
2.50
|
seal fuel tanks
|
|
|
|
01-07-2017
|
2.00
|
reorganize garage
|
|
|
|
01-07-2017
|
2.00
|
install roll AP servo in Right wing
|
|
|
|
01-07-2017
|
3.50
|
fab fuel vent lines. install left vent line
|
Details
|
|
|
01-05-2017
|
2.00
|
reroute static line
|
|
|
|
12-10-2016
|
5.00
|
Prep tank for sealing. Install ailerons
|
Details
|
|
|
12-05-2016
|
3.00
|
Install aileron brackets to ailerons
|
Details
|
|
|
12-04-2016
|
2.50
|
Fab and install L+R skin access panels
|
Details
|
|
|
12-03-2016
|
2.50
|
re-fab antihangup strap. build R fuel sender
|
Details
|
|
|
12-03-2016
|
1.00
|
Completed inventory of finish kit
|
|
|
|
12-01-2016
|
1.00
|
Received Finish kit
|
|
|
|
10-28-2016
|
4.00
|
Complete L wing skin. Drill L tank sender hole
|
Details
|
|
|
10-16-2016
|
1.00
|
Prime left bottom wing skin
|
Details
|
|
|
10-16-2016
|
2.00
|
install trap door and anti-hangup in L fuel tank
|
Details
|
|
|
10-15-2016
|
10.00
|
Install static ports and static lines
|
Details
|
|
|
10-13-2016
|
1.00
|
Fab trap door for inverted fuel tank mod
|
Details
|
|
|
10-12-2016
|
7.00
|
Aileron bracket and fairing, Pitot mast, Complete
|
Details
|
|
|
10-11-2016
|
1.00
|
Remove fuel tank
|
Details
|
|
|
10-08-2016
|
3.50
|
Pitot bracket install
|
Details
|
|
|
09-29-2016
|
1.00
|
match drill L flap brace, C/S rear spar
|
Details
|
|
|
09-28-2016
|
1.00
|
Fab stall warning access panel
|
Details
|
|
|
09-25-2016
|
2.75
|
begin work on left wing
|
Details
|
|
|
09-24-2016
|
3.00
|
finish work on right wing skin
|
Details
|
|
|
09-23-2016
|
1.00
|
debur spar and ribs under skin
|
Details
|
|
|
09-22-2016
|
2.00
|
Prime aileron brace, match drill skin
|
Details
|
|
|
09-21-2016
|
1.00
|
more work on flap bracket and aileron brace
|
Details
|
|
|
09-14-2016
|
2.00
|
Prep work on Right wing Flap brace
|
Details
|
|
|
09-12-2016
|
2.50
|
Rivet aileron brackets to Right wing
|
Details
|
|
|
09-11-2016
|
2.00
|
Finish aileron bracket build-up
|
Details
|
|
|
09-07-2016
|
2.00
|
Finish last piece of fwd top fuselage
|
Details
|
|
|
09-05-2016
|
5.00
|
Install stick controls. start elec. trim install
|
Details
|
|
|
09-05-2016
|
3.00
|
Install R bellcrank, prep aileron attach brackets
|
Details
|
|
|
09-04-2016
|
6.00
|
Complete pushrod Fab (7)
|
Details
|
|
|
09-03-2016
|
3.00
|
finish fwd fuselage parts
|
Details
|
|
|
09-03-2016
|
4.50
|
Begin work on wings. aileron bellcrank
|
Details
|
|
|
08-31-2016
|
1.50
|
debur upper fwd fuse parts
|
Details
|
|
|
08-29-2016
|
13.00
|
Forward top fuselage
|
Details
|
|
|
08-28-2016
|
5.75
|
dimple aft skins, stick boot ring, Fwd seat floor
|
Details
|
|
|
08-27-2016
|
7.50
|
Install aft fuse gusset. prep aft skin and fwd fus
|
Details
|
|
|
08-26-2016
|
2.00
|
finish baggage floor, flap actuator cover
|
Details
|
|
|
08-25-2016
|
1.75
|
Install right side baggage floor
|
Details
|
|
|
08-19-2016
|
5.00
|
install conduit holders, rudder cables, baggage si
|
Details
|
|
|
08-14-2016
|
2.00
|
Fab wire conduit holders
|
Details
|
|
|
08-06-2016
|
5.00
|
Flap bearing and covers
|
Details
|
|
|
08-03-2016
|
5.00
|
Install Pitot and AOA lines
|
Details
|
|
|
07-30-2016
|
2.00
|
built fuse rotiserie
|
Details
|
|
|
07-10-2016
|
0.00
|
EAA Tech Counselor vist
|
Details
|
|
|
07-07-2016
|
0.00
|
Inventory QB Wing crates
|
|
|
|
07-06-2016
|
0.00
|
Recieved QB wing crates
|
|
|
|
07-04-2016
|
4.50
|
Flap motor interior cover
|
Details
|
|
|
07-03-2016
|
4.00
|
Interior Flap motor install
|
Details
|
|
|
07-02-2016
|
6.00
|
forward fuselage interior covers
|
Details
|
|
|
06-27-2016
|
10.25
|
seat backs. Fwd fuselage covers
|
Details
|
|
|
06-26-2016
|
6.00
|
tunnel cover
|
Details
|
|
|
06-25-2016
|
1.50
|
baggage bulkhead
|
Details
|
|
|
06-24-2016
|
3.00
|
Baggage bulkhead
|
Details
|
|
|
06-23-2016
|
3.00
|
baggage bulkhead shoulder harness cable guide
|
Details
|
|
|
06-22-2016
|
3.00
|
baggage bulkhead
|
Details
|
|
|
06-14-2016
|
1.75
|
baggage area
|
Details
|
|
|
06-12-2016
|
2.00
|
fuselage baggage bulkhead
|
Details
|
|
|
06-11-2016
|
8.50
|
Fuselage assembly
|
Details
|
|
|
06-10-2016
|
2.25
|
fuselage assembly
|
Details
|
|
|
06-08-2016
|
3.50
|
fuselage assembly
|
Details
|
|
|
06-06-2016
|
2.00
|
fuselage
|
Details
|
|
|
06-05-2016
|
3.00
|
fuselage
|
Details
|
|
|
06-04-2016
|
3.00
|
fuselage
|
Details
|
|
|
06-01-2016
|
5.00
|
fuselage aft deck
|
Details
|
|
|
05-31-2016
|
2.00
|
Leveled fuselage
|
Details
|
|
|
05-30-2016
|
9.50
|
Fuselage assembly
|
Details
|
|
|
05-29-2016
|
5.00
|
fuselage assembly
|
Details
|
|
|
05-28-2016
|
8.50
|
fuselage assembly
|
Details
|
|
|
05-27-2016
|
11.00
|
fuselage assembly
|
Details
|
|
|
05-18-2016
|
1.50
|
fuselage assembly
|
Details
|
|
|
05-16-2016
|
2.50
|
fuselage assembly
|
Details
|
|
|
05-15-2016
|
3.00
|
fuselage assembly
|
Details
|
|
|
05-12-2016
|
1.00
|
fuselage assembly
|
Details
|
|
|
05-10-2016
|
3.00
|
fuselage assembly
|
Details
|
|
|
04-18-2016
|
2.00
|
interior
|
Details
|
|
|
04-17-2016
|
2.00
|
interior
|
Details
|
|
|
04-16-2016
|
2.00
|
interior
|
Details
|
|
|
03-13-2016
|
1.00
|
fuselage
|
Details
|
|
|
03-12-2016
|
3.50
|
fuselage
|
Details
|
|
|
03-06-2016
|
3.00
|
fuselage
|
Details
|
|
|
03-05-2016
|
6.50
|
fuselage assy
|
Details
|
|
|
02-29-2016
|
1.50
|
fuselage
|
Details
|
|
|
02-28-2016
|
3.00
|
fuselage
|
Details
|
|
|
02-27-2016
|
2.50
|
fuselage
|
Details
|
|
|
02-20-2016
|
2.50
|
fuselage
|
Details
|
|
|
02-06-2016
|
1.50
|
fuselage
|
Details
|
|
|
01-30-2016
|
5.00
|
fuselage
|
Details
|
|
|
12-12-2015
|
3.25
|
Center + Forward fuselage
|
Details
|
|
|
12-05-2015
|
7.00
|
center section
|
Details
|
|
|
12-04-2015
|
4.00
|
forward fuselage section
|
Details
|
|
|
12-03-2015
|
4.50
|
forward fuselage section
|
Details
|
|
|
12-02-2015
|
6.00
|
forward fuselage section
|
Details
|
|
|
11-22-2015
|
2.00
|
Forward Fuselage section
|
Details
|
|
|
11-21-2015
|
2.00
|
forward Fuselage section
|
Details
|
|
|
11-18-2015
|
1.25
|
Forward Fuselage section
|
Details
|
|
|
11-17-2015
|
2.00
|
forward Fuselage section
|
Details
|
|
|
11-16-2015
|
1.50
|
forward fuelage section
|
Details
|
|
|
11-15-2015
|
3.50
|
forward fuselage section
|
Details
|
|
|
11-14-2015
|
8.00
|
fwd fuselage section
|
Details
|
|
|
11-11-2015
|
6.75
|
aft + center fuselage section
|
Details
|
|
|
11-09-2015
|
2.50
|
install firewall to fuselage
|
Details
|
|
|
11-08-2015
|
6.50
|
aft+center section
|
Details
|
|
|
11-07-2015
|
3.50
|
aft + center section
|
Details
|
|
|
11-06-2015
|
1.00
|
aft + center fuselage section
|
Details
|
|
|
11-04-2015
|
0.50
|
aft fuselage section
|
Details
|
|
|
10-29-2015
|
2.50
|
aft fuselage section
|
Details
|
|
|
10-25-2015
|
2.50
|
aft fuselage section
|
Details
|
|
|
10-24-2015
|
2.00
|
center section
|
Details
|
|
|
10-12-2015
|
4.00
|
aft fuselage sectioin + center section
|
Details
|
|
|
09-19-2015
|
6.50
|
aft fuselage section
|
Details
|
|
|
09-18-2015
|
7.75
|
aft fuselage section
|
Details
|
|
|
09-12-2015
|
7.75
|
aft fuselage section
|
Details
|
|
|
09-07-2015
|
6.75
|
aft fuselage section
|
Details
|
|
|
09-05-2015
|
4.25
|
center section + aft fuselage
|
Details
|
|
|
09-04-2015
|
2.00
|
center section
|
Details
|
|
|
08-31-2015
|
2.00
|
center section
|
Details
|
|
|
08-23-2015
|
1.50
|
center section
|
Details
|
|
|
08-22-2015
|
1.50
|
center section
|
Details
|
|
|
08-21-2015
|
1.00
|
center section
|
Details
|
|
|
08-19-2015
|
1.00
|
center section
|
Details
|
|
|
08-08-2015
|
6.50
|
center section
|
Details
|
|
|
08-03-2015
|
1.00
|
center section
|
Details
|
|
|
08-02-2015
|
0.50
|
Rivet Crotch Strap Bracket
|
|
|
|
08-02-2015
|
0.50
|
center section
|
Details
|
|
|
07-29-2015
|
2.50
|
center section
|
Details
|
|
|
07-28-2015
|
3.00
|
center section
|
Details
|
|
|
06-23-2015
|
2.50
|
center section
|
Details
|
|
|
06-21-2015
|
0.50
|
center section
|
Details
|
|
|
06-20-2015
|
2.25
|
center section
|
Details
|
|
|
06-14-2015
|
4.00
|
center section
|
Details
|
|
|
06-13-2015
|
3.00
|
center section
|
Details
|
|
|
06-12-2015
|
4.00
|
center section
|
Details
|
|
|
06-02-2015
|
2.00
|
move construction to big garage
|
|
|
|
05-30-2015
|
1.00
|
center section
|
Details
|
|
|
03-14-2015
|
3.50
|
center section
|
Details
|
|
|
03-13-2015
|
0.50
|
center section
|
Details
|
|
|
03-07-2015
|
1.00
|
Center Section
|
Details
|
|
|
03-02-2015
|
7.00
|
center section
|
Details
|
|
|
03-01-2015
|
3.00
|
Center Section
|
Details
|
|
|
02-28-2015
|
1.50
|
tailcone + aft fuselage
|
Details
|
|
|
02-27-2015
|
6.00
|
tailcone + aft fuselage
|
Details
|
|
|
02-21-2015
|
6.75
|
Longerons. tail cone
|
Details
|
|
|
02-18-2015
|
1.50
|
Longerons
|
Details
|
|
|
02-15-2015
|
1.00
|
Longerons
|
Details
|
|
|
02-14-2015
|
4.50
|
710 bulkhead. Longerons
|
Details
|
|
|
02-13-2015
|
3.00
|
706 FWD Fuselage Bulkhead. 707-712 bulkheads
|
Details
|
|
|
02-08-2015
|
3.00
|
706 FWD Fuselage Bulkhead. 707-712 bulkheads
|
Details
|
|
|
02-07-2015
|
6.50
|
706 FWD Fuselage Bulkhead. 707-710 bulkheads
|
Details
|
|
|
01-28-2015
|
2.75
|
706 FWD Fuselage Bulkhead
|
Details
|
|
|
01-27-2015
|
2.50
|
705 Bulkhead
|
Details
|
|
|
01-25-2015
|
2.00
|
705 Bulkhead
|
Details
|
|
|
01-24-2015
|
5.00
|
705 Bulkhead
|
Details
|
|
|
12-22-2014
|
5.00
|
705 Bulkhead
|
Details
|
|
|
12-16-2014
|
3.00
|
705 Bulkhead
|
Details
|
|
|
12-15-2014
|
3.50
|
705 Bulkhead
|
Details
|
|
|
12-12-2014
|
5.50
|
Center Bulkead
|
Details
|
|
|
12-12-2014
|
2.00
|
Center Bulkead
|
Details
|
|
|
12-10-2014
|
1.50
|
Center Bulkead
|
Details
|
|
|
12-08-2014
|
3.00
|
Center Bulkead
|
Details
|
|
|
12-06-2014
|
2.00
|
Center Bulkead
|
Details
|
|
|
12-06-2014
|
4.00
|
Center Bulkead
|
Details
|
|
|
12-05-2014
|
4.00
|
Center Bulkead
|
Details
|
|
|
11-22-2014
|
1.25
|
Firewall
|
Details
|
|
|
11-22-2014
|
2.00
|
Firewall
|
Details
|
|
|
11-22-2014
|
4.00
|
Firewall
|
Details
|
|
|
11-18-2014
|
3.50
|
Firewall
|
Details
|
|
|
11-17-2014
|
4.00
|
Firewall
|
Details
|
|
|
11-17-2014
|
1.75
|
Fabricate firewall parts
|
Details
|
|
|
11-16-2014
|
2.00
|
Inventory and begin fuselage construction
|
Details
|
|
|
11-16-2014
|
1.00
|
Fab parts
|
Details
|
|
|
11-15-2014
|
5.00
|
Inventory Parts
|
Details
|
|
|
11-11-2014
|
2.50
|
recieved fuselage crate
|
Details
|
|
|
11-11-2014
|
2.50
|
inventory parts
|
Details
|
|
|
10-26-2014
|
3.50
|
Elevator
|
Details
|
|
|
10-24-2014
|
1.50
|
Elevator
|
Details
|
|
|
10-24-2014
|
2.50
|
Elevator
|
Details
|
|
|
10-23-2014
|
1.00
|
Elevator
|
Details
|
|
|
10-19-2014
|
2.50
|
Elevator
|
Details
|
|
|
10-18-2014
|
4.00
|
Elevator
|
Details
|
|
|
10-18-2014
|
2.50
|
Elevator
|
Details
|
|
|
09-29-2014
|
3.50
|
Elevator
|
Details
|
|
|
09-29-2014
|
3.25
|
Elevator
|
Details
|
|
|
09-27-2014
|
6.50
|
Elevator
|
Details
|
|
|
09-27-2014
|
2.00
|
Elevator
|
Details
|
|
|
09-25-2014
|
1.25
|
Elec trim plate
|
Details
|
|
|
09-21-2014
|
3.50
|
Elevator
|
Details
|
|
|
09-21-2014
|
2.00
|
Elevator
|
Details
|
|
|
09-20-2014
|
4.50
|
Elevator
|
Details
|
|
|
09-20-2014
|
4.00
|
Elevator
|
Details
|
|
|
09-19-2014
|
1.00
|
Elevator
|
Details
|
|
|
09-18-2014
|
2.50
|
Elevator
|
Details
|
|
|
09-18-2014
|
0.75
|
Elevator
|
Details
|
|
|
09-07-2014
|
0.50
|
Rudder
|
Details
|
|
|
09-06-2014
|
1.50
|
Rudder
|
Details
|
|
|
09-06-2014
|
4.50
|
Rudder
|
Details
|
|
|
08-30-2014
|
1.00
|
Rudder
|
Details
|
|
|
08-30-2014
|
5.50
|
Rudder
|
Details
|
|
|
08-27-2014
|
2.00
|
Elevator
|
Details
|
|
|
08-24-2014
|
1.00
|
Elevator
|
Details
|
|
|
08-23-2014
|
2.25
|
Elevator
|
Details
|
|
|
08-23-2014
|
6.00
|
Elevator
|
Details
|
|
|
08-18-2014
|
2.50
|
Elevator
|
Details
|
|
|
08-18-2014
|
2.00
|
Elevator
|
Details
|
|
|
08-17-2014
|
1.75
|
Elevator
|
Details
|
|
|
08-17-2014
|
2.25
|
Elevator
|
Details
|
|
|
08-15-2014
|
2.50
|
Rudder
|
Details
|
|
|
08-15-2014
|
3.50
|
Rudder
|
Details
|
|
|
08-14-2014
|
1.50
|
Rudder
|
Details
|
|
|
08-11-2014
|
1.00
|
Rudder
|
Details
|
|
|
08-09-2014
|
6.00
|
Rudder
|
Details
|
|
|
08-08-2014
|
8.00
|
Rudder
|
Details
|
|
|
08-02-2014
|
3.25
|
Verticle Stabilizer
|
Details
|
|
|
07-21-2014
|
1.50
|
Horizontal stabilizer
|
Details
|
|
|
07-20-2014
|
3.00
|
horizontal stabilizer
|
Details
|
|
|
07-19-2014
|
2.00
|
Rivet horizontal stabilizer skins
|
Details
|
|
|
07-18-2014
|
5.25
|
rivet horizontal stabilizer
|
Details
|
|
|
07-12-2014
|
1.00
|
tool box project
|
Details
|
|
|
07-11-2014
|
4.75
|
tool box project
|
Details
|
|
|
06-21-2014
|
2.50
|
tool box project
|
Details
|
|
|
06-20-2014
|
2.00
|
tool box project
|
Details
|
|
|
06-20-2014
|
1.25
|
Practice riveting skins
|
Details
|
|
|
06-12-2014
|
2.50
|
Finish riveting spars, prep H.S to rivit skins
|
Details
|
|
|
06-09-2014
|
7.50
|
Vertical Stab- debur, finish parts, prime, rivet r
|
Details
|
|
|
06-08-2014
|
4.50
|
Start Vertical Stab
|
Details
|
|
|
06-07-2014
|
7.50
|
Horizontal Stab dimple and prime. Begin assembly
|
Details
|
|
|
06-06-2014
|
2.00
|
dimpling L and R Horizontal stab parts
|
Details
|
|
|
06-01-2014
|
3.00
|
debur, finish right horizontal stab ribs, spars
|
Details
|
|
|
05-31-2014
|
3.50
|
Horizontal Stab debur left side flanges and spars
|
Details
|
|
|
05-26-2014
|
4.00
|
left stab matchdrilled
|
Details
|
|
|
05-25-2014
|
2.50
|
plan
|
Details
|
|
|
05-24-2014
|
11.50
|
Project start
|
Details
|
|
|
04-30-2014
|
0.00
|
|
Details
|
|