Work Logs Found: 758
Category Work Time: 1970 Hours
 Date
Hours
Work Log Summary

Details

 06-14-2020
1.50
Run #4. Amp ok; prop ok, mag chk ok
Details
       

 06-13-2020
3.00
Install new shunt; install new pitot controller
Details

 06-07-2020
3.00
removed and reclock prop governor control arm
Details
       

 06-07-2020
2.00
3rd engine run
Details
       

 06-06-2020
4.00
2nd engine run; finished interior
Details
     

 06-03-2020
1.50
installed upper cowl; re-installed rear harness
Details

 06-02-2020
1.50
cut upper cowl and re-fiberglassed; Pitot troubles
Details
     

 06-01-2020
4.00
install interior

 06-01-2020
1.50
install cowl. still interferance with flywheel. r

 05-31-2020
0.00
Xpdr, Servo pictures
       

 05-31-2020
0.00
xpdr ant, battery, GN 625 pictures
       

 05-31-2020
0.00
wiring pictures
       

 05-31-2020
0.00
Regulator, ADSB, Radio COM
       

 05-31-2020
4.00
Re-install of interior; install cowling (interfere
Details
       

 05-31-2020
0.00
MT Prop gov, battery pic
       

 05-31-2020
0.00
Fuel Servo, Alt, starter pic
       

 05-31-2020
0.00
ELT ID / Hex picture
       

 05-31-2020
0.00
ELT equipment pictures
       

 05-31-2020
0.00
ELT box, Aero LED, Pitot
       

 05-31-2020
0.00
backup batt, EMS, Aero LED
       

 05-31-2020
0.00
ADAHRS, SV GPS, CO monitor
       

 05-30-2020
4.50
Corrected EGT and Radio issue
Details
       

 05-27-2020
3.00
Removed interior and spar panels to troubleshoot p
       

 05-26-2020
2.00
FIRST ENGINE START
Details
       

 05-23-2020
1.50
record all EMS sensor settings; calibrate AP

 05-23-2020
2.00
prep for first start; note radio transmit not work
Details

 05-22-2020
4.00
weight and balance complete and put in airframe lo
Details

 05-22-2020
0.10
submit airworthiness paperwork to FAA
Details
       

 05-22-2020
3.00
check slick mag timing; install tempest plugs
Details
       

 05-21-2020
4.00
install interior

 05-18-2020
1.75
set PMag timing; check prop gov control; install l
Details
       

 05-18-2020
4.00
install interior
Details

 05-17-2020
3.00
install interior
Details

 05-17-2020
3.00
First turn-over of engine;check prop tip tracking
Details
       

 05-16-2020
6.50
install Flap sensor; wing walk anti-slip; baggage
Details

 05-15-2020
3.50
Tap 3/8' tie down bolts; pack wheel bearings
     

 05-15-2020
1.00
re-install snorkle to servo using longer bolts

 05-15-2020
3.00
IFR transponder certification; entered in Airframe
Details

 05-09-2020
3.50
Install R wing fairing; securefuel line; safetywir
Details

 05-08-2020
9.00
RTVBaffles; install slick mag plug wires; safety w

 05-05-2020
2.00
secure R brake line to gear leg; work tail wheel c
     

 05-05-2020
2.00
Install fuel valve, fwd spar covers,left wing wiri

 05-04-2020
3.00
Replace fuel filter; secure left brake line to gea

 05-03-2020
2.50
Secure right wing AP wires; install aeleron trim h

 05-02-2020
3.00
Calibrate Left wing tank fuel float. Changed K val
Details

 04-30-2020
1.50
Fuel flow test right wing tank
Details

 04-30-2020
3.00
Conduct fuel flow test left wing
Details

 04-29-2020
2.50
Trouble shoot boost pump wiring
Details

 04-29-2020
3.00
Calibrate Left fuel tank resistance float
Details

 04-26-2020
4.50
Secure L wing wires; Re-run right wing wires
Details

 04-25-2020
1.00
secure and adjust elev trim tab
Details

 04-25-2020
1.50
EAA tech counselor visit
Details

 04-25-2020
1.25
adjust elevator travel
Details

 04-24-2020
1.75
adjust aeleron and flap travel
Details

 04-21-2020
1.50
Torque all spar bolts; Wings attached complete

 04-21-2020
1.50
safety wire prop;install spinner

 04-21-2020
2.50
fix left OAT wiring; safety wire Pitch AP
Details

 04-20-2020
2.50
torque prop bolts (70 ft-lb)
Details

 04-19-2020
1.00
re-install left wingtip
     

 04-16-2020
7.50
Install Left wing

 04-15-2020
6.50
finish R wing wiring; install pitot; prep L wing
       

 04-10-2020
6.50
Install right wing
     

 04-07-2020
4.50
install emag wires; install trim clip on stick; pa

 04-06-2020
1.00
paint cowl interior; teststick switches

 04-06-2020
3.50
install sticks; secure rudder pedal cables w/cotte

 04-02-2020
2.50
finish breather tube routing; tighten lower oil co

 04-01-2020
2.00
install alt air cable; trim and tighten spinner pr

 04-01-2020
1.50
fix brake reservour seep
Details

 03-29-2020
4.00
fab and install spinner prop gap filler

 03-28-2020
3.50
install Hartell Prop; install snorkle
     

 03-27-2020
5.50
called B&C Alt bracket misalign; more securement
     

 03-24-2020
7.00
more securement of wires and hoses

 03-23-2020
6.50
complete rudder glass and install; more fwf secure

 03-22-2020
1.50
conect EMS sensor #1(P4) to battery
Details

 03-21-2020
6.50
set prop gov hose; secure hoses/wires FWF
Details

 03-15-2020
7.00
more glass work on rudder; install aionics
Details

 03-14-2020
6.00
rivet seat floor; install flap/center brace
Details

 03-14-2020
2.50
glass rudder bottom

 03-13-2020
7.00
finish emp trim; more rudder glass; install nutpla

 03-08-2020
3.50
Fit emp trim seal; rework rudder bottom dueto conf
Details

 03-07-2020
1.50
glass L H stab tip

 03-02-2020
0.50
sand R H stab tip

 02-29-2020
1.00
add glass to H stab tip

 02-20-2020
1.00
More glass work on emp tips

 02-19-2020
1.50
glass H stabgap filler; add glass to elevator tip

 02-18-2020
2.50
Temp installrudder; stab glass work

 02-18-2020
2.50
install canopy supertracks; move fiberglass workon

 02-17-2020
1.00
Installed H stab tips;emp gap cover
     

 02-16-2020
2.00
riveted elevator fiberglass tips

 02-10-2020
6.00
finished elev/H stab fiberglass-ready to rivet
Details

 02-09-2020
2.00
trim and drill elev fiberglass tips

 02-08-2020
6.50
finish rudderfiberglass bottom
Details

 02-07-2020
3.50
emp fairing and gap sealalmost complete
Details

 02-05-2020
2.50
drill out longeron rivets for gap seal trim
Details

 02-02-2020
2.50
Begin installing emp fairing nut plates

 02-01-2020
2.00
match drill empannage fairing
Details

 01-31-2020
2.50
install and torque H + V stabilizer; run wires

 01-30-2020
1.00
drilled tail strobe wire passthrough

 01-26-2020
2.50
Started attaching empenage to fuselage in hanger

 01-25-2020
1.00
Fab new control bracket
Details

 01-11-2020
6.00
Moved everything to hanger
Details
       

 01-04-2020
3.00
Throttle cable hole to big. ordered new attach bra
Details

 01-02-2020
3.50
Install control cables. Throttle, Prop, Mixture
Details

 12-29-2019
2.50
Finish cabin heat install; wire compass lt, secure
Details

 12-28-2019
6.00
Install cabin vent hose; Install cabin heat cable

 12-26-2019
1.00
Secure R wing lights and attach wingtip w/screws

 12-24-2019
1.00
secure wires in L wingtip and attach wingtip w/scr

 12-22-2019
3.00
wire ldg and strobe lights in right wing
       

 12-21-2019
9.50
Finish r and L wingtip attach nutplates
Details

 12-07-2019
3.00
Install R wingtip rib;Wire Left Ldg Lt and stobe m
     

 12-06-2019
1.50
Install L and R aileron and notch aft edge of wing
Details
       

 12-01-2019
4.00
finish riveting right and Left wing bottom skin
     

 11-30-2019
1.00
Wire OAT sensor in Right wing

 11-30-2019
1.75
start riveting left wing bottom skin

 11-29-2019
2.00
Pick up keys to Hanger; wire OAT in Left wing
     

 11-10-2019
2.50
install left wing pitot+set-up for riveting skin
Details

 11-10-2019
2.00
finish riveting right wing bottom skin
Details

 11-09-2019
3.50
start rivetig right wing bottom skin
Details

 11-02-2019
1.50
Install earthX battery
Details

 10-14-2019
3.00
open canopy after glassing windscreen; install rol
Details

 10-14-2019
3.50
Dehydrate plugs; Install dynon GPS antenna, avioni
Details

 10-13-2019
1.00
sand windscreen to one thickness of tape
Details

 10-13-2019
1.00
install safety wire on AP roll-servo 9 pin
Details

 10-06-2019
3.50
finish left wingtip lights; matchdrill right wingt
Details

 10-05-2019
3.00
sand windscreen; apply first coat of rage gold fil
Details

 10-05-2019
3.50
Complete install of left wingtip aerosun and strob
Details

 09-29-2019
2.00
Finish right wingtip light + cover
Details
     

 09-28-2019
1.00
sand and add glass to left aft corner of windscree
Details

 09-28-2019
5.00
install right wingtip aerosun light +Strobe
Details

 09-25-2019
1.00
sand windscreen
Details

 09-22-2019
1.50
start sanding windscreen
Details

 09-21-2019
6.50
finish layup of fiberglass on windscreen
Details
       

 09-18-2019
1.00
Dehydrate plugs

 09-01-2019
1.50
cut fiberglass cloth to templates
Details

 08-31-2019
3.50
retape canopy prep for fiberglass layup. re-cut te
Details

 08-25-2019
1.50
Cut templates forwinscreen fiberglass layups
Details

 08-22-2019
3.00
Sand and apply second coat of epoxy to windscreen
Details
       

 08-21-2019
2.00
Apply epoxy filler to edge of windscreen
Details
       

 08-20-2019
1.00
Finish installing windscreen clips
Details

 08-17-2019
3.50
Install canopy windscreen + prep clip attachments
Details
       

 08-16-2019
2.00
Dehydrate plugs; Secure adel clamps under fwd fuse
Details

 08-11-2019
3.00
Install mag compass, Dynon Skyview GPS antenna
Details

 07-15-2019
1.50
Rivet cowl hinge to firewall; rivet main spar cove
Details

 07-15-2019
1.50
paint inside of cowl white
Details

 07-15-2019
3.00
Finish riveting cowl hinge to firewall; tighten lo
Details
     

 07-14-2019
3.00
start riveting fwd fuse top skin
Details
     

 07-13-2019
2.00
rehydrate plugs; cleco front skin, ready to rivet
Details

 07-13-2019
2.00
Finish Bleed; Finish cowl RV7 cover; secure subpan
Details
     

 07-13-2019
1.50
Bleed brakes
Details

 07-09-2019
1.00
2 x bleed brakes
Details

 07-07-2019
2.00
re-glass left RV7 cowl hinge cover
Details

 07-07-2019
1.00
bleed brakes-still has air in line

 07-05-2019
2.50
epoxy cowl interior; install park brake TS flightl
Details

 07-03-2019
3.00
Finish rage on cowl. cut oil door latch holes
Details

 07-01-2019
2.50
add/sand rage gold. Start cowl oil door
Details

 06-30-2019
2.50
sand and add rage gold to cowl
Details

 06-29-2019
1.50
Install/sand/epoxy cowl
Details

 06-29-2019
7.00
complete spinner construction
Details

 06-28-2019
2.50
complete and attache wires to aft fuse securements
Details

 06-24-2019
2.00
Install wire securements in aft fuselage
Details

 06-22-2019
1.50
install adel clamps to ADAHRS wire harness
Details

 06-20-2019
0.00
ordered FWF fuel line from TSflightlines
Details

 06-16-2019
0.00
dehydrate spark plugs

 06-15-2019
4.00
pre-fit installation of interior panels
Details

 06-11-2019
1.00
Final fit front center fuel and wire pass-through
Details
     

 06-09-2019
6.00
Rebuild park brake attach. install seatback hinges
Details

 06-08-2019
3.00
Received and test fit interior
Details
     

 05-26-2019
3.00
complete wire wrap fwd tunnel
Details
     

 05-18-2019
0.00
Dehydrate plugs

 04-21-2019
1.00
start final wire bundle wrap under forward fuse
Details

 04-20-2019
3.00
cut holes and install defrost fans
Details
       

 04-14-2019
0.50
replace spark plug dehyrators

 04-06-2019
1.00
Install silicone grommet for fuel pass through
Details

 03-31-2019
1.00
Install platenut per EAA tech counselor
Details

 03-30-2019
1.00
clean-up shop-order silicone fuel/baffle pass- thr

 02-03-2019
1.00
Remove and trim left fuselage parking brake attach
Details

 01-26-2019
1.50
Rewire diode to "I" and starter Keywire to "S" on
Details

 01-26-2019
0.50
Re-bleed brakes
Details

 01-26-2019
3.50
Install aileron trim box and wire.
Details

 01-21-2019
1.00
Re-bleedbrakes
Details
     

 01-21-2019
1.00
Get dimensions for interior carpet tunnel, etc

 01-19-2019
1.00
EAA Tech Advisor visit

 01-13-2019
1.00
stick grip switch test- Flap up/down reversed
Details

 01-13-2019
1.00
correct stick flap wiring.test intercom OK
Details

 01-12-2019
4.00
wire 9 pin DSUB for both stick grips
Details

 01-11-2019
1.00
contacted AFS about shunt to master relay
Details

 01-09-2019
1.00
Drill seat rib pass through for stick grip wires
Details
     

 01-07-2019
1.00
repaired right wheel brake leak
Details

 01-06-2019
2.00
Garmin GTN 625 ops check; bleed brakes
Details
       

 01-05-2019
3.50
start wire routing for stick grip
Details

 01-04-2019
1.00
start to charge b/u battery via HDX
Details
       

 01-01-2019
3.50
work on stick grip installation
Details

 12-30-2018
2.00
Fab to install right stick grip
Details
     

 12-29-2018
2.00
ALT-ANL-Shunt-Master wiring error corrected
Details

 12-28-2018
2.00
FIRST AVIONICS POWER-ON TEST
Details
       

 12-28-2018
3.00
Confirm and attach all ACM harnesses
Details

 12-27-2018
1.00
Shop clean-up

 12-27-2018
4.00
Research and install PMag wiring
Details

 12-27-2018
5.00
Install brackets for Comm ant wires
Details

 12-26-2018
5.00
Misc FWF wiring; work on static line installation
Details

 12-24-2018
2.00
Wire panel Pwr relay; Battery; Aileron trim/ Fans
Details

 12-24-2018
1.50
install static line mounts
Details

 12-23-2018
1.50
Wire Reiff sump heat
Details

 12-15-2018
2.50
Wire strobe +tail + ldg light molex
Details

 12-15-2018
3.50
Complete CHT/EGT wire connectors
Details

 11-11-2018
1.00
Install L wing landing light molex
Details

 11-10-2018
4.50
wire seat heat and CO2 monitor to ACM
Details

 10-30-2018
1.00
Complete Rt wing light/strobe molex, fuel sender m
Details

 10-29-2018
2.00
Complete ACM rear harness; Run R wing strobe wire
Details

 10-28-2018
3.50
Completed ACM stick harness; L+r wing light molex
Details

 10-24-2018
0.50
Received New AEROLEDS
Details
     

 10-22-2018
2.50
Complete ACM Flap/trim harness; Prep ACM rear/stic
Details

 10-20-2018
2.00
Run Landing light wires to panel; re-run cables
Details

 10-13-2018
5.00
Re-install strobe molex with ground;Pitot+Flap Mol
Details
       

 10-08-2018
1.50
Install Flap motor molex
Details

 10-08-2018
1.50
determined Stobe wire shielding ground
Details

 10-08-2018
5.00
completed cable routing and install
Details

 10-07-2018
1.50
Run fuel/stall wires
Details

 10-07-2018
0.50
Install ELT antenna doubler
Details

 10-07-2018
2.50
Install AMP connects on wing tail wires
Details

 10-07-2018
1.00
Fab ELT antenna doubler
Details

 10-06-2018
3.50
Wire bundle path through spar
Details

 10-06-2018
1.00
Stert running wing wires from panel
Details

 10-06-2018
1.00
Run Stick wires, Flap Position wire
Details

 10-06-2018
1.00
install GPS antenna
Details

 10-06-2018
1.50
Install ELT
Details

 10-01-2018
1.50
Fab doubler for GPS antenna
Details

 09-30-2018
2.00
run,installADS-B, XPDR, Comm wires
Details

 09-30-2018
3.00
AP pitch dsub, fwd center tunnel cover
Details

 09-29-2018
3.00
complete install of ADS-B, xpdr, comm antenna
Details

 09-29-2018
1.00
complete ADS-B standoff install
Details

 09-29-2018
4.50
begin xpdr and comm antenna install
Details

 09-22-2018
3.00
research and seek tech support AP/PMag/Stick
Details

 09-22-2018
2.00
repair fuel pump drain / drill main spare pass thr
Details

 09-22-2018
2.00
more roll-bar handle repair and start stick grip
Details

 09-22-2018
2.00
Flap motor and pitch AP wire routing
Details

 09-22-2018
1.00
built subpanel standoff for ADS-B box
Details

 09-21-2018
2.50
removed roll-bar handles
Details

 09-21-2018
1.50
re-route tail strobe wire
Details

 09-09-2018
1.00
Install roll bar handles
Details

 09-08-2018
3.50
lable wires

 09-08-2018
3.00
Install #2 +#4 CHT, EGT wires

 08-26-2018
1.50
Install LR3-14 Voltage regulator
     

 08-26-2018
2.00
complete ACM front connector harness, Run ADAHRS a
     

 08-25-2018
6.00
wire front connector harness, P-leads
       

 08-25-2018
2.00
more wiring

 08-19-2018
0.50
wire red cube

 08-19-2018
3.00
wire oil press/temp, MP press, Fuel Press sensors

 08-13-2018
1.00
run more wires

 08-12-2018
2.50
run and label EMS engine sensor harness
     

 08-08-2018
3.00
install aux bus, install ACM ground, pwr and batt
       

 08-06-2018
2.50
Run strobe wires to tail. install spark pug wires,

 08-03-2018
9.50
install subpanel nutplates, Adel clamps fwd fuse

 07-22-2018
4.00
Fabricate subpanel and panel cable guides
Details

 07-21-2018
1.00
Run AP servo wire bundle

 07-21-2018
3.00
Install ADAHRS in rear fuse
Details

 07-11-2018
1.00
finish parking brake cable, install GPS subpanel a
       

 07-10-2018
2.00
rivet panel vent angle attach, install parking bra

 07-08-2018
2.00
install CO and ELT in panel
Details

 07-08-2018
1.50
Fabricate parking brake cable attachment, prime, p

 07-07-2018
2.00
sand snorkle inlet to fit

 07-07-2018
1.75
rebuild panel vent attach angles
       

 07-07-2018
2.00
install PMag blast tube

 07-07-2018
1.00
complete panel vent angles, prime

 07-05-2018
1.00
install EGT probes
       

 07-05-2018
3.00
fiberglass build-up snorkle inlet. Install CHT pro
     

 07-04-2018
3.00
install subpanel avionics boxes
       

 07-04-2018
1.00
install engine heater electrical cord
     

 07-04-2018
3.00
fiberglass cowl air inlet ramp dams
       

 07-03-2018
0.50
remove and drill left cowl inlet baffle strap

 07-01-2018
1.50
build up left inlet air seal
     

 06-30-2018
4.50
fiberglass R inlet air seal

 06-12-2018
1.00
start R inlet air seal

 06-11-2018
1.50
rivet L+R aft air seal fabric

 06-10-2018
1.00
finish FAB, cut l+r aft baffle seal

 06-09-2018
4.50
more finish work on left ramp and filter bypass

 06-06-2018
3.50
complete left ramp and snorkle
       

 06-04-2018
12.00
build left ramp and snorkle
       

 06-03-2018
2.00
start buiding new left ramp

 05-29-2018
1.50
paint baffles, remove cowl pin cover emblem blanks

 05-28-2018
1.00
prime baffles; order new left ramp

 05-28-2018
2.00
install subpanel platenuts for batt and ADS-B
     

 05-28-2018
3.00
install shunt and ANL on firewall. plan subpanel
     

 05-28-2018
1.00
install right cowl pin emblem
     

 05-28-2018
1.50
install left cowl emblem (start process)
     

 05-28-2018
1.50
dissassemble baffles, sand cylinder fins

 05-28-2018
1.00
cut GPS hole in subpanel
     

 05-27-2018
2.00
cut cowl pin holes

 05-26-2018
2.00
STOP - left ramp cut too short for snorkle

 05-26-2018
1.00
start baffle rubber seal

 05-26-2018
9.00
complete baffle metal work

 05-11-2018
0.00
received Advaced flight systems quick panel
       

 05-08-2018
1.50
install oil cooler brace, fab and install cyl #4 b
     

 05-07-2018
1.50
Fabricate oil cooler angle brace
     

 05-05-2018
2.00
rivet oil cooler doubler. Drill heat hole

 05-04-2018
2.50
finsh baffle trim, dissassemble, debur

 05-02-2018
1.50
trim baffles for cowl airguide ramps

 04-30-2018
1.00
fiberglass L inlet airguide to top cowl

 04-29-2018
2.00
trim baffles to top cowl

 04-29-2018
1.00
fiberglass R inlet airguide to top cowl

 04-28-2018
2.00
rivet fwd baffles
     

 04-28-2018
9.00
more baffle construction
     

 04-23-2018
1.50
trim ramp baffles

 04-22-2018
4.00
more baffle construction
       

 04-21-2018
1.50
start on baffles again

 04-21-2018
1.00
review installation of snorkle

 04-21-2018
1.50
more baffle work

 04-21-2018
1.00
install sniffle valve drain tube

 04-21-2018
1.00
install fwd cowl inlet nut plates

 04-21-2018
2.00
design/install firewall - cowl pin holder

 04-20-2018
3.00
rivet upper cowl side hinges to fuse
     

 04-15-2018
3.00
rivet lower col hinge

 04-15-2018
0.00
dehydrate engine plugs

 04-14-2018
1.00
prep all hinges

 04-14-2018
2.00
drill upper cowl hinge
       

 04-14-2018
2.50
countersink cowl-prep hinges; prep inlet ducts

 04-08-2018
2.50
drill lower cowl side hinges L+R
     

 04-08-2018
1.00
drill cowl to firewall

 04-07-2018
5.50
trim top/bottom cowl, start drilling bottom hinge
     

 04-07-2018
3.00
trim gear leg holes in cowl

 04-06-2018
2.00
cut upper cowl and oil door
     

 03-28-2018
0.00
Test demo seats
     

 03-10-2018
1.00
start baffle construction

 03-10-2018
2.00
finish spinner bulkhead

 03-10-2018
4.00
continue baffle const., prime spinner bulkhead

 02-25-2018
4.50
finish cowl hinges on Firewall, start spinner
     

 02-24-2018
1.25
start cowl hinges

 02-24-2018
2.50
install seat tube, breather oil scavenge, fuel lin

 02-24-2018
2.25
install right brake line

 02-24-2018
2.50
drill upper cowl hinge, rehydrate engine plugs

 02-11-2018
2.00
install Manifold press sensor. research engine wir

 02-08-2018
2.00
started install oil seperator
Details

 02-08-2018
2.50
finish installing exhaust and hangers
       

 02-07-2018
1.50
start installing exhaust

 02-06-2018
1.50
measure hoses for new order

 02-05-2018
1.50
install tailwheel, measure fuel line

 02-04-2018
3.50
install tailwheel zirk, ELT bracket
     

 02-03-2018
1.50
install sniffle valve, alternator
     

 02-03-2018
1.50
install new mix arm hdw + throttle bracket
     

 02-03-2018
1.00
install fuel vent line
     

 01-22-2018
0.00
received Hartzell CS prop
       

 01-22-2018
2.50
install oil press line and sensor. test fit fuel i

 01-21-2018
0.75
test fit prop gov cable. test good

 01-21-2018
2.00
start install oil temp, fuel press sensors

 01-15-2018
2.00
STOP. can't figure out mixture geometry
Details
       

 01-15-2018
1.00
start install mixture brackets

 01-15-2018
1.50
research throttle and mixture brackets

 01-15-2018
1.50
final torque and cotter pin engine mount bolts

 01-14-2018
2.00
Hang engine
Details
       

 01-13-2018
4.50
prep engine install. start cowl hinge install

 01-13-2018
2.00
install cowl hinges on bottom of firewall
     

 01-08-2018
1.50
install tailwheel
Details
     

 01-07-2018
2.00
install prop governor and rod end bearing
       

 01-06-2018
2.50
work on prop governor, cable bracket
       

 01-01-2018
2.00
instal D9 on Pitch servo

 12-31-2017
1.50
install master + starter solinoid

 12-30-2017
0.50
torque all fwd fuse blue fitings

 12-30-2017
1.00
move brake pedals back one hole
Details

 12-30-2017
3.00
Install Reiff cylinder heater bands

 12-30-2017
2.00
install left main brake line

 12-29-2017
2.00
paint tailwheel hardware.start engine build-up
     

 12-26-2017
1.70
finish install right main gear wheel
       

 12-25-2017
1.00
finish install of left main wheel
Details

 12-24-2017
1.00
start install of wheels/brakes/tires

 12-23-2017
1.00
seal firewall recess

 12-23-2017
0.50
rivet firewall recess

 12-23-2017
1.00
install right main gear leg
     

 12-23-2017
3.00
install engine mount start gear legs
Details

 12-20-2017
1.00
heat canopy to finish riveting. organize garage

 12-20-2017
3.00
finish riveting canopy canopy complete
       

 12-18-2017
1.00
Recieved engine
       

 11-22-2017
1.50
rivet center spine and forward canopy plexi to fra
Details

 11-19-2017
2.50
install l/r/rudder access inspect covers
Details
     

 11-18-2017
4.50
re-install elevator pushrod. start canopy assy

 11-18-2017
3.00
Install roll bar. Rivet left F791 canopy skirt bra
Details

 11-18-2017
0.50
fab canopy finger tabs on canopy side skirt

 11-17-2017
2.00
reshape center fuselage pushrod pass through
Details

 11-13-2017
1.00
replace two brake lines with longer tube

 11-13-2017
1.50
drill and final assembly of canopy rear slide rail

 11-12-2017
3.00
paint all canopy parts with enamel

 11-11-2017
1.00
replace battery box with earth x box

 11-11-2017
2.00
prime canopy frame and roll bar

 11-11-2017
2.00
disassemble roll bar. sand for paint

 11-10-2017
2.50
finish side skirts. prime and paint

 11-10-2017
2.50
disassemble canopy- sand frame for paint

 11-09-2017
4.00
trim aft skirt. replace left side skirt
Details
       

 10-29-2017
1.00
screw on side skirts
     

 10-29-2017
4.00
drill aft skirts
       

 10-28-2017
1.00
paint canopy side skirt
Details

 10-25-2017
1.50
prime side skirts. continue aft skirt shaping
       

 10-23-2017
1.50
shape left aft skirt

 10-23-2017
2.00
build up main tire/wheel assembly

 10-21-2017
1.50
start aft skirt measuring
Details

 10-21-2017
1.00
prep skirt brace to drill. trim rear skirt
Details

 10-21-2017
3.50
drill left and right side skirt/skirt brace

 10-20-2017
2.00
fab and drill left F791 canopy skirt brace

 10-16-2017
1.00
trim rear pin mount to clear skirt brace

 10-16-2017
1.00
drill right skirt brace to canopy side skirt

 10-15-2017
1.50
fab and drill right skirt brace

 10-14-2017
1.50
complete canopy latch
     

 10-14-2017
5.00
canopy skirts and braces
Details
       

 09-25-2017
2.00
start canopy side skirts

 09-25-2017
1.50
finish supertracks
     

 09-25-2017
5.00
complete canopy aft pin mounts. supertracks
Details
     

 09-24-2017
3.00
countersink and drill windshield
Details

 09-24-2017
2.00
canopy aft pin mount

 09-23-2017
4.00
start install of canopy latch

 09-16-2017
3.50
fab nutplate strip for canopy side rail

 09-16-2017
2.00
drill canopy plexi to 5/32" frame to #30
     

 09-16-2017
2.00
countersink canopy plexi

 09-04-2017
5.50
trim and drill winshield. install canopy rollers
       

 09-04-2017
1.00
start forming windshield

 09-03-2017
2.50
trim canopy sides and front

 09-03-2017
1.50
drill and cleco canopy to frame

 09-03-2017
1.00
backdrill canopy center cover strip
     

 09-02-2017
2.50
mask and cut canopy sides to bottom of frame
     

 09-02-2017
4.00
Canopy BIG CUT
Details
       

 08-27-2017
1.00
drill canopy latch hole in plexi
Details

 08-27-2017
2.00
cut fwd and aft molding flanges
Details
       

 08-26-2017
1.50
prep workspace for canopy bubble

 08-25-2017
1.50
replace bad rivet in fwd top fuse rib
Details
     

 08-25-2017
2.00
bend canopy frame
     

 08-20-2017
2.00
drill fwd/aft canopy side rail holes
Details

 08-17-2017
2.00
make initial measurements-cut canopy frame fwd tub
Details
     

 08-16-2017
2.00
adjust canopy frame to longeron shape
     

 08-14-2017
3.00
rivet aft top skin
     

 08-13-2017
3.50
rivet rear top skin
Details
       

 08-13-2017
1.00
fab rail deck spacer
Details

 08-12-2017
1.00
study plan on canopy construction

 08-12-2017
2.50
rivet side canopy rails. touch-up paint

 08-12-2017
1.00
rivet canopy slider rail/spacer

 08-12-2017
2.50
build canopy slide rail and spacer

 08-11-2017
2.00
rivet canopy deck, cabin vent angle attachment

 08-11-2017
3.50
prep aft top fuse skin for install
Details
       

 08-09-2017
4.00
fab cabin vent panel attach, prime

 08-08-2017
3.00
install brake lines
       

 08-07-2017
2.00
read instructions, remove roll bar, fwd fuse skin

 08-06-2017
3.50
finish riveting fwd fuse.
Details

 08-06-2017
3.00
drill roll bar brace. start canopy rails
       

 08-06-2017
1.50
Attach roll bar
     

 08-05-2017
1.00
start drilling roll bar attach holes

 08-05-2017
5.00
rivet fwd upper fuselage structure
     

 08-05-2017
3.50
fab/install Pbrake cable bracket. Start Canopy rol

 08-04-2017
2.00
install...then remove firewall recess

 08-02-2017
3.00
reorient cabin heat valve
Details
     

 07-31-2017
3.00
drill mixture+prop pass throughs
Details
       

 07-30-2017
1.00
drill throttle pass through

 07-16-2017
1.00
replace red cube nutplate. Plan ground plate locat

 07-16-2017
1.50
install parking brake valve and tubing

 07-16-2017
2.50
install firwall passthrough (2)

 07-15-2017
1.00
install nutplates on red cube brace

 06-19-2017
1.00
start riveting brake doubler/red cube shelf to fir

 06-17-2017
4.00
install brake doubler, red cube shelf

 06-17-2017
1.50
complete doubler and red cube shelf

 06-11-2017
3.50
install fuel vent. fab fuel line-pump to firewall

 06-11-2017
1.50
fabricate firewall fuel line doubler

 06-11-2017
2.00
biuld park brake mount doubler
       

 06-10-2017
1.00
install (pro seal) heater box, transducer manifold
     

 06-10-2017
10.00
drill NACA air vents to fuse
Details
     

 06-08-2017
3.50
remove vert stab. rivet stab spar
Details

 06-07-2017
1.00
finish painting cabin

 06-06-2017
2.50
Paint center fuse (enamal). start battery box

 06-05-2017
1.50
cut rudder stop to short! start painting Cabin

 06-04-2017
3.00
begin trimming rudder stop
Details
     

 06-03-2017
1.00
adjust rudder bearings

 06-02-2017
2.50
fab and drill UP elevator stop

 05-31-2017
1.00
Inventory firewall forward kit

 05-17-2017
1.00
prep for final cabin paint

 05-13-2017
2.00
start installing vertical stab
       

 05-13-2017
2.00
install oil seperator doubler on firewall
Details

 05-09-2017
3.00
finish brake pedals, trim gear leg holes in firewa
Details
       

 05-07-2017
3.00
complete Horiz stab install

 05-06-2017
2.00
Drilled Horiz elevator horn-start install
       

 05-06-2017
1.00
complete install of engine mount
     

 05-05-2017
3.50
Begin install Engine Mount

 05-04-2017
2.50
install left brake pedals

 04-24-2017
2.00
rivet aft fuse stiffner web
Details
     

 04-24-2017
2.50
complete install of ADAHRS shelf
     

 04-23-2017
1.00
start to fab/install ADAHRS shelf

 04-21-2017
2.50
finish installing wing root plate nuts

 04-20-2017
2.50
continue install of wing root plate nuts

 04-18-2017
1.00
start install of wing root plate nuts

 04-18-2017
2.00
install TS fuel lines. Tighten flap blocks
       

 04-09-2017
2.00
remove left wing, rivet right wing aileron brace s
Details
       

 04-02-2017
0.25
remove right wing

 04-01-2017
1.00
rig right aileron to stick

 04-01-2017
1.00
rig left aileron to stick

 03-19-2017
1.25
install left flap. adjusted range of motion
     

 03-18-2017
1.50
install right flap and adjust range of motion

 03-18-2017
6.00
complete install of wing root fairings
Details

 03-17-2017
1.00
install right fuel tank attach bracket

 03-17-2017
2.00
begin install right wing root fairing
     

 03-15-2017
2.50
install left fuel tank attach bracket
       

 03-15-2017
1.00
drill fuse center/wing skin screw holes

 03-13-2017
1.00
recheck fwd sweep
Details
     

 03-13-2017
1.00
drill rear spar holes to final size
     

 03-13-2017
2.00
check flaps (OK), recheck incidence.pilot hole in
Details
     

 03-12-2017
1.25
square wings to fuselage
Details
     

 03-12-2017
0.75
install right Wing! level fuselage
       

 03-11-2017
2.00
twist left, right wing red/blk wingtip light wires

 03-11-2017
1.00
rivet center fuel pump cover attach angles
     

 03-11-2017
3.00
Install left wing!
       

 02-12-2017
5.00
complete fabrication of fuel pump cover, Prime
       

 02-11-2017
1.00
start fabrication of fuel pump cover
       

 02-11-2017
2.50
run heated pitot wiring in left wing
Details

 02-06-2017
1.50
run left wingtip wires, stall and fuel sender wire
Details

 02-05-2017
3.00
prep,prime,install left flap hinge/pin
Details
     

 02-04-2017
1.50
set neutral position of left aileron
Details
     

 02-04-2017
3.00
install left fuel tank on wing
Details

 01-30-2017
1.00
remove rudder cable exit covers
Details

 01-29-2017
1.50
shrink wrap stall warning wires
Details

 01-29-2017
1.00
Prime fwd fuse ctr tunnel parts

 01-28-2017
3.00
trim right and left wing aft spar attach
Details
     

 01-25-2017
1.00
prep fwd fuse ctr tunnel for primer

 01-23-2017
1.00
design fuel pump cover. fab wing drift pins

 01-22-2017
3.50
complete fab of fwd ctr fuse tunnel for pump

 01-21-2017
3.00
test right fuel tank. begin fwd fuse ctr section
     

 01-21-2017
4.00
install EFII fuel pump brackets
Details
     

 01-16-2017
2.00
Install right Flap. bend and drill hinge pin

 01-16-2017
1.00
Finish drilling right Flap hinge + Prime

 01-16-2017
1.00
drill wiring holes in wing and run wire
Details
       

 01-15-2017
2.00
fab and install right fuel vent line
     

 01-15-2017
2.00
begin install of right Flap
       

 01-14-2017
2.50
seal fuel tanks

 01-07-2017
2.00
reorganize garage

 01-07-2017
2.00
install roll AP servo in Right wing
     

 01-07-2017
3.50
fab fuel vent lines. install left vent line
Details
       

 01-05-2017
2.00
reroute static line

 12-10-2016
5.00
Prep tank for sealing. Install ailerons
Details

 12-05-2016
3.00
Install aileron brackets to ailerons
Details
       

 12-04-2016
2.50
Fab and install L+R skin access panels
Details

 12-03-2016
2.50
re-fab antihangup strap. build R fuel sender
Details
     

 12-03-2016
1.00
Completed inventory of finish kit

 12-01-2016
1.00
Received Finish kit
     

 10-28-2016
4.00
Complete L wing skin. Drill L tank sender hole
Details

 10-16-2016
1.00
Prime left bottom wing skin
Details

 10-16-2016
2.00
install trap door and anti-hangup in L fuel tank
Details
     

 10-15-2016
10.00
Install static ports and static lines
Details
     

 10-13-2016
1.00
Fab trap door for inverted fuel tank mod
Details

 10-12-2016
7.00
Aileron bracket and fairing, Pitot mast, Complete
Details

 10-11-2016
1.00
Remove fuel tank
Details

 10-08-2016
3.50
Pitot bracket install
Details
       

 09-29-2016
1.00
match drill L flap brace, C/S rear spar
Details

 09-28-2016
1.00
Fab stall warning access panel
Details
     

 09-25-2016
2.75
begin work on left wing
Details

 09-24-2016
3.00
finish work on right wing skin
Details

 09-23-2016
1.00
debur spar and ribs under skin
Details

 09-22-2016
2.00
Prime aileron brace, match drill skin
Details
       

 09-21-2016
1.00
more work on flap bracket and aileron brace
Details

 09-14-2016
2.00
Prep work on Right wing Flap brace
Details

 09-12-2016
2.50
Rivet aileron brackets to Right wing
Details

 09-11-2016
2.00
Finish aileron bracket build-up
Details

 09-07-2016
2.00
Finish last piece of fwd top fuselage
Details

 09-05-2016
5.00
Install stick controls. start elec. trim install
Details

 09-05-2016
3.00
Install R bellcrank, prep aileron attach brackets
Details

 09-04-2016
6.00
Complete pushrod Fab (7)
Details

 09-03-2016
3.00
finish fwd fuselage parts
Details

 09-03-2016
4.50
Begin work on wings. aileron bellcrank
Details
     

 08-31-2016
1.50
debur upper fwd fuse parts
Details

 08-29-2016
13.00
Forward top fuselage
Details
     

 08-28-2016
5.75
dimple aft skins, stick boot ring, Fwd seat floor
Details

 08-27-2016
7.50
Install aft fuse gusset. prep aft skin and fwd fus
Details
     

 08-26-2016
2.00
finish baggage floor, flap actuator cover
Details
       

 08-25-2016
1.75
Install right side baggage floor
Details
     

 08-19-2016
5.00
install conduit holders, rudder cables, baggage si
Details
     

 08-14-2016
2.00
Fab wire conduit holders
Details
     

 08-06-2016
5.00
Flap bearing and covers
Details
     

 08-03-2016
5.00
Install Pitot and AOA lines
Details

 07-30-2016
2.00
built fuse rotiserie
Details

 07-10-2016
0.00
EAA Tech Counselor vist
Details

 07-07-2016
0.00
Inventory QB Wing crates
       

 07-06-2016
0.00
Recieved QB wing crates
     

 07-04-2016
4.50
Flap motor interior cover
Details

 07-03-2016
4.00
Interior Flap motor install
Details

 07-02-2016
6.00
forward fuselage interior covers
Details
     

 06-27-2016
10.25
seat backs. Fwd fuselage covers
Details
     

 06-26-2016
6.00
tunnel cover
Details
       

 06-25-2016
1.50
baggage bulkhead
Details

 06-24-2016
3.00
Baggage bulkhead
Details

 06-23-2016
3.00
baggage bulkhead shoulder harness cable guide
Details

 06-22-2016
3.00
baggage bulkhead
Details
       

 06-14-2016
1.75
baggage area
Details

 06-12-2016
2.00
fuselage baggage bulkhead
Details
       

 06-11-2016
8.50
Fuselage assembly
Details
       

 06-10-2016
2.25
fuselage assembly
Details
       

 06-08-2016
3.50
fuselage assembly
Details
       

 06-06-2016
2.00
fuselage
Details
     

 06-05-2016
3.00
fuselage
Details
       

 06-04-2016
3.00
fuselage
Details

 06-01-2016
5.00
fuselage aft deck
Details

 05-31-2016
2.00
Leveled fuselage
Details
       

 05-30-2016
9.50
Fuselage assembly
Details
       

 05-29-2016
5.00
fuselage assembly
Details
     

 05-28-2016
8.50
fuselage assembly
Details
       

 05-27-2016
11.00
fuselage assembly
Details
       

 05-18-2016
1.50
fuselage assembly
Details

 05-16-2016
2.50
fuselage assembly
Details
     

 05-15-2016
3.00
fuselage assembly
Details
       

 05-12-2016
1.00
fuselage assembly
Details

 05-10-2016
3.00
fuselage assembly
Details

 04-18-2016
2.00
interior
Details

 04-17-2016
2.00
interior
Details

 04-16-2016
2.00
interior
Details

 03-13-2016
1.00
fuselage
Details
     

 03-12-2016
3.50
fuselage
Details

 03-06-2016
3.00
fuselage
Details

 03-05-2016
6.50
fuselage assy
Details

 02-29-2016
1.50
fuselage
Details

 02-28-2016
3.00
fuselage
Details

 02-27-2016
2.50
fuselage
Details

 02-20-2016
2.50
fuselage
Details

 02-06-2016
1.50
fuselage
Details

 01-30-2016
5.00
fuselage
Details

 12-12-2015
3.25
Center + Forward fuselage
Details
     

 12-05-2015
7.00
center section
Details
       

 12-04-2015
4.00
forward fuselage section
Details

 12-03-2015
4.50
forward fuselage section
Details
     

 12-02-2015
6.00
forward fuselage section
Details

 11-22-2015
2.00
Forward Fuselage section
Details
     

 11-21-2015
2.00
forward Fuselage section
Details

 11-18-2015
1.25
Forward Fuselage section
Details

 11-17-2015
2.00
forward Fuselage section
Details

 11-16-2015
1.50
forward fuelage section
Details

 11-15-2015
3.50
forward fuselage section
Details

 11-14-2015
8.00
fwd fuselage section
Details
       

 11-11-2015
6.75
aft + center fuselage section
Details
     

 11-09-2015
2.50
install firewall to fuselage
Details

 11-08-2015
6.50
aft+center section
Details

 11-07-2015
3.50
aft + center section
Details
     

 11-06-2015
1.00
aft + center fuselage section
Details
     

 11-04-2015
0.50
aft fuselage section
Details

 10-29-2015
2.50
aft fuselage section
Details

 10-25-2015
2.50
aft fuselage section
Details

 10-24-2015
2.00
center section
Details
     

 10-12-2015
4.00
aft fuselage sectioin + center section
Details

 09-19-2015
6.50
aft fuselage section
Details
       

 09-18-2015
7.75
aft fuselage section
Details

 09-12-2015
7.75
aft fuselage section
Details

 09-07-2015
6.75
aft fuselage section
Details
       

 09-05-2015
4.25
center section + aft fuselage
Details
     

 09-04-2015
2.00
center section
Details

 08-31-2015
2.00
center section
Details

 08-23-2015
1.50
center section
Details

 08-22-2015
1.50
center section
Details

 08-21-2015
1.00
center section
Details

 08-19-2015
1.00
center section
Details

 08-08-2015
6.50
center section
Details
 

 08-03-2015
1.00
center section
Details

 08-02-2015
0.50
Rivet Crotch Strap Bracket

 08-02-2015
0.50
center section
Details
     

 07-29-2015
2.50
center section
Details
     

 07-28-2015
3.00
center section
Details
     

 06-23-2015
2.50
center section
Details

 06-21-2015
0.50
center section
Details

 06-20-2015
2.25
center section
Details

 06-14-2015
4.00
center section
Details

 06-13-2015
3.00
center section
Details

 06-12-2015
4.00
center section
Details

 06-02-2015
2.00
move construction to big garage
     

 05-30-2015
1.00
center section
Details

 03-14-2015
3.50
center section
Details
       

 03-13-2015
0.50
center section
Details

 03-07-2015
1.00
Center Section
Details
     

 03-02-2015
7.00
center section
Details
       

 03-01-2015
3.00
Center Section
Details

 02-28-2015
1.50
tailcone + aft fuselage
Details
     

 02-27-2015
6.00
tailcone + aft fuselage
Details
       

 02-21-2015
6.75
Longerons. tail cone
Details
     

 02-18-2015
1.50
Longerons
Details

 02-15-2015
1.00
Longerons
Details

 02-14-2015
4.50
710 bulkhead. Longerons
Details
       

 02-13-2015
3.00
706 FWD Fuselage Bulkhead. 707-712 bulkheads
Details

 02-08-2015
3.00
706 FWD Fuselage Bulkhead. 707-712 bulkheads
Details
     

 02-07-2015
6.50
706 FWD Fuselage Bulkhead. 707-710 bulkheads
Details

 01-28-2015
2.75
706 FWD Fuselage Bulkhead
Details

 01-27-2015
2.50
705 Bulkhead
Details
       

 01-25-2015
2.00
705 Bulkhead
Details

 01-24-2015
5.00
705 Bulkhead
Details

 12-22-2014
5.00
705 Bulkhead
Details

 12-16-2014
3.00
705 Bulkhead
Details
       

 12-15-2014
3.50
705 Bulkhead
Details
       

 12-12-2014
5.50
Center Bulkead
Details
       

 12-12-2014
2.00
Center Bulkead
Details

 12-10-2014
1.50
Center Bulkead
Details

 12-08-2014
3.00
Center Bulkead
Details

 12-06-2014
2.00
Center Bulkead
Details

 12-06-2014
4.00
Center Bulkead
Details

 12-05-2014
4.00
Center Bulkead
Details

 11-22-2014
1.25
Firewall
Details

 11-22-2014
2.00
Firewall
Details

 11-22-2014
4.00
Firewall
Details

 11-18-2014
3.50
Firewall
Details
     

 11-17-2014
4.00
Firewall
Details
       

 11-17-2014
1.75
Fabricate firewall parts
Details

 11-16-2014
2.00
Inventory and begin fuselage construction
Details

 11-16-2014
1.00
Fab parts
Details

 11-15-2014
5.00
Inventory Parts
Details

 11-11-2014
2.50
recieved fuselage crate
Details
       

 11-11-2014
2.50
inventory parts
Details

 10-26-2014
3.50
Elevator
Details
       

 10-24-2014
1.50
Elevator
Details
       

 10-24-2014
2.50
Elevator
Details

 10-23-2014
1.00
Elevator
Details
     

 10-19-2014
2.50
Elevator
Details

 10-18-2014
4.00
Elevator
Details

 10-18-2014
2.50
Elevator
Details

 09-29-2014
3.50
Elevator
Details
       

 09-29-2014
3.25
Elevator
Details
       

 09-27-2014
6.50
Elevator
Details

 09-27-2014
2.00
Elevator
Details

 09-25-2014
1.25
Elec trim plate
Details

 09-21-2014
3.50
Elevator
Details

 09-21-2014
2.00
Elevator
Details

 09-20-2014
4.50
Elevator
Details
     

 09-20-2014
4.00
Elevator
Details
     

 09-19-2014
1.00
Elevator
Details

 09-18-2014
2.50
Elevator
Details

 09-18-2014
0.75
Elevator
Details

 09-07-2014
0.50
Rudder
Details
     

 09-06-2014
1.50
Rudder
Details
     

 09-06-2014
4.50
Rudder
Details

 08-30-2014
1.00
Rudder
Details

 08-30-2014
5.50
Rudder
Details

 08-27-2014
2.00
Elevator
Details
       

 08-24-2014
1.00
Elevator
Details

 08-23-2014
2.25
Elevator
Details

 08-23-2014
6.00
Elevator
Details

 08-18-2014
2.50
Elevator
Details

 08-18-2014
2.00
Elevator
Details
       

 08-17-2014
1.75
Elevator
Details

 08-17-2014
2.25
Elevator
Details

 08-15-2014
2.50
Rudder
Details

 08-15-2014
3.50
Rudder
Details

 08-14-2014
1.50
Rudder
Details

 08-11-2014
1.00
Rudder
Details

 08-09-2014
6.00
Rudder
Details
     

 08-08-2014
8.00
Rudder
Details
     

 08-02-2014
3.25
Verticle Stabilizer
Details
     

 07-21-2014
1.50
Horizontal stabilizer
Details
       

 07-20-2014
3.00
horizontal stabilizer
Details

 07-19-2014
2.00
Rivet horizontal stabilizer skins
Details

 07-18-2014
5.25
rivet horizontal stabilizer
Details
     

 07-12-2014
1.00
tool box project
Details

 07-11-2014
4.75
tool box project
Details

 06-21-2014
2.50
tool box project
Details

 06-20-2014
2.00
tool box project
Details

 06-20-2014
1.25
Practice riveting skins
Details

 06-12-2014
2.50
Finish riveting spars, prep H.S to rivit skins
Details

 06-09-2014
7.50
Vertical Stab- debur, finish parts, prime, rivet r
Details
     

 06-08-2014
4.50
Start Vertical Stab
Details

 06-07-2014
7.50
Horizontal Stab dimple and prime. Begin assembly
Details
     

 06-06-2014
2.00
dimpling L and R Horizontal stab parts
Details

 06-01-2014
3.00
debur, finish right horizontal stab ribs, spars
Details

 05-31-2014
3.50
Horizontal Stab debur left side flanges and spars
Details

 05-26-2014
4.00
left stab matchdrilled
Details
       

 05-25-2014
2.50
plan
Details

 05-24-2014
11.50
Project start
Details
       

 04-30-2014
0.00

Details