KitLog pro

Powered By Kitlog Pro v2.0

ERIC'S WEB SITE
Work Logs Found: 62
Category Work Time: 365 Hours
 Date
Hours
Work Log Summary

Details

 04-17-2019
1.00
test only
Details
     

 04-17-2019
0.00
TEST ONLY
Details

 09-08-2015
3.00
Continue sealing tank ribs.
Details

 09-06-2015
12.00
Complete left aileron
Details
       

 09-02-2015
2.50
First assemble of left aileron
Details
       

 09-01-2015
5.00
Rivet left leading edge to spar.
Details
       

 08-29-2015
3.00
Seal left tank together.
Details

 08-28-2015
3.00
Seal left tank together.
Details

 08-27-2015
3.00
Seal left tank together.
Details

 08-25-2015
3.00
Seal left tank together.
Details
       

 08-24-2015
10.00
Final assemble left outside leading edge.
Details
       

 08-20-2015
8.00
Fit left fuel tank skins to ribs.
Details
       

 08-17-2015
4.00
Fit leading edge assyemble to wing.
Details
       

 08-16-2015
4.00
Fit leading edge skins to ribs.
Details
       

 08-15-2015
2.00
Fit bottom left skins to left wing.
Details
     

 08-14-2015
3.00
Fit top left wing skins.
Details
       

 08-12-2015
6.00
Final prep ribs and attach to spars.
Details
       

 08-11-2015
4.00
Fit left wing ribs to spars.
Details
       

 08-10-2015
12.00
Prep all ribs
Details
       

 08-09-2015
2.00
Complete left rear spar
Details
       

 08-08-2015
3.00
Left rear spar
Details
       

 08-07-2015
3.00
Rear wing spar
Details
       

 08-06-2015
8.00
Wing spar prep
Details
       

 07-27-2015
4.00
Install trim tab.
Details
       

 07-26-2015
4.00
Trim tab
Details
       

 07-25-2015
3.00
Elevator trim tab
Details
       

 03-31-2015
7.00
Study wing plans & prep L spar with platenuts.
Details
       

 03-30-2015
3.00
Install Right elevator on horizontal stabilizer
Details
     

 03-29-2015
8.00
Final rivet Left elevator
Details
       

 03-27-2015
5.00
Alodine internal L elevator parts & start riveting
Details
       

 03-24-2015
8.00
Prep L elevator parts
Details
       

 03-13-2015
1.00
Left elevator stiffners
Details
     

 03-12-2015
8.00
Final assyemble and rivet R elevator.
Details
       

 03-10-2015
2.00
Apply alodine process to internal R elevator compo
Details
     

 02-12-2015
4.00
Debur and dimple rib tib, spar, and skin.
Details
       

 02-11-2015
2.00
Match drill rib tip and spar on Right elevator.
Details
       

 02-10-2015
5.00
Dimple elevator stiffners/assemble rib tip
Details
       

 02-04-2015
5.50
Elevator stiffeners
Details
       

 02-02-2015
3.50
Finished rudder
Details
       

 01-22-2015
8.00
Final assy of rudder
Details
       

 11-25-2014
4.00
De-burr all rudder parts and dimple.
Details
       

 11-19-2014
2.50
Cleco rudder
Details
       

 11-19-2014
2.00
Cleco on rudder skins
Details
       

 11-18-2014
3.00
Rivet Rudder stiffeners
Details
       

 11-17-2014
4.00
Rudder stiffeners
Details
       

 11-15-2014
6.00
Final assy of VS
Details
       

 11-12-2014
0.50
Cleco on the VS skin
Details
       

 11-11-2014
2.00
First assy of VS
Details
       

 11-07-2014
5.00
Finish HS!
Details
       

 11-07-2014
2.00
Final HS
Details
       

 11-03-2014
8.00
Riveting HS
Details
       

 10-31-2014
4.00
Final assy of HS
Details
       

 10-29-2014
1.75
Rivet nose ribs
Details
     

 10-27-2014
2.00
Spar rivets
Details
       

 10-27-2014
1.00
Complete HS spar assy.
Details
       

 10-25-2014
2.00
Alodine all the ribs and spars
Details
     

 10-24-2014
3.00
Dimple and counter sink drill right side HS
Details
       

 10-23-2014
11.30
First assembly of HS
Details
       

 10-21-2014
1.00
HS skeleton
Details
       

 10-14-2014
2.50
First parts made
Details
     

 09-22-2014
2.00
inventory
Details
       

 09-01-2014
110.00
Building the shop
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.