Date
|
Hours
|
Work Log Summary
|
Details
|
01-10-2022
|
3.00
|
Installation of jury strut fairings
|
Details
|
|
|
01-03-2022
|
1.00
|
Adding pitot tube and shock fairings
|
Details
|
|
|
07-05-2021
|
2.00
|
Installed OAT thermocouple
|
Details
|
|
|
05-11-2021
|
2.00
|
Installed TK! "Monster" shocks
|
Details
|
|
|
04-25-2021
|
1.40
|
Installed vent in door
|
Details
|
|
|
04-25-2021
|
2.80
|
Engine baffle modification
|
Details
|
|
|
02-07-2021
|
0.50
|
Added aero fairings to HS lift struts
|
Details
|
|
|
12-29-2020
|
1.20
|
Main power fuse
|
Details
|
|
|
11-13-2020
|
0.50
|
New regulator
|
Details
|
|
|
10-03-2020
|
4.80
|
Fuselage to wing fairings
|
Details
|
|
|
09-21-2020
|
2.00
|
Engine heater connection
|
Details
|
|
|
07-13-2020
|
1.00
|
Installed stick boots and oil cooler baffle
|
Details
|
|
|
06-29-2020
|
1.00
|
First flight
|
Details
|
|
|
06-24-2020
|
2.00
|
DAR grants airworthiness certificate
|
Details
|
|
|
06-23-2020
|
6.50
|
Fitted turtle deck
|
Details
|
|
|
06-22-2020
|
5.00
|
Door strut install
|
Details
|
|
|
06-21-2020
|
8.00
|
Engine run
|
Details
|
|
|
06-20-2020
|
8.00
|
Weight and Balance
|
Details
|
|
|
06-19-2020
|
8.00
|
Fuel flow test
|
Details
|
|
|
06-16-2020
|
4.80
|
Rigged the flapperons
|
Details
|
|
|
06-15-2020
|
6.20
|
Fitted the prop flange to the hub
|
Details
|
|
|
06-14-2020
|
1.80
|
HS installation comleted
|
Details
|
|
|
06-13-2020
|
1.00
|
Installed empennage and flaperons
|
Details
|
|
|
06-12-2020
|
1.50
|
Moved the plane to George's Hangar
|
Details
|
|
|
06-11-2020
|
1.00
|
Installed the wing drains
|
Details
|
|
|
06-10-2020
|
3.20
|
Completed a door lock for the pilot's door
|
Details
|
|
|
06-08-2020
|
3.60
|
Installed the magnatometer
|
Details
|
|
|
06-07-2020
|
5.00
|
Completed wiring the wing lights
|
Details
|
|
|
06-06-2020
|
6.50
|
Wired right wing
|
Details
|
|
|
06-05-2020
|
4.10
|
Wired the right wing
|
Details
|
|
|
06-04-2020
|
3.00
|
Painted the inside of the lower cowl
|
Details
|
|
|
06-03-2020
|
4.90
|
Installed the fuel lines
|
Details
|
|
|
06-02-2020
|
5.00
|
Fabricated transport struts
|
Details
|
|
|
05-31-2020
|
2.50
|
Installed the wings
|
Details
|
|
|
05-30-2020
|
2.50
|
Painted the lift struts
|
Details
|
|
|
05-29-2020
|
5.20
|
Various small tasks
|
Details
|
|
|
05-27-2020
|
5.10
|
Moved carb vent line to the air filter
|
Details
|
|
|
05-25-2020
|
7.00
|
Painted stripe on upper cowl and spinner
|
Details
|
|
|
05-24-2020
|
5.10
|
Installation of aero fairings on lift struts
|
Details
|
|
|
05-23-2020
|
3.10
|
More lift strut fairing work
|
Details
|
|
|
05-22-2020
|
2.50
|
Started installation of the aero fairings on the l
|
Details
|
|
|
05-21-2020
|
3.80
|
Finished the turtle deck hinge installation
|
Details
|
|
|
05-20-2020
|
2.50
|
More work on turtle deck hinge
|
Details
|
|
|
05-19-2020
|
7.90
|
Began installing the turtle deck hinge
|
Details
|
|
|
05-17-2020
|
3.80
|
Repainted the elevator
|
Details
|
|
|
05-16-2020
|
5.00
|
Assembled the plane to take measurements
|
Details
|
|
|
05-15-2020
|
4.10
|
Painted the bottom of the left wing panel
|
Details
|
|
|
05-14-2020
|
2.80
|
Prepped the top cowl for the blue stripe
|
Details
|
|
|
05-13-2020
|
4.30
|
Painted the top of the left wing
|
Details
|
|
|
05-12-2020
|
4.20
|
Prepared the paint shop to spray the wing
|
Details
|
|
|
05-11-2020
|
7.20
|
Closed out several part installations
|
Details
|
|
|
05-10-2020
|
4.00
|
Painted the wing tips and gray on top cowl
|
Details
|
|
|
05-09-2020
|
5.10
|
Finished console and throttle cable installations
|
Details
|
|
|
05-08-2020
|
1.30
|
More installation of the console effort
|
Details
|
|
|
05-07-2020
|
3.80
|
Painted the cowls
|
Details
|
|
|
05-06-2020
|
4.80
|
Started center console install and sanded cowls
|
Details
|
|
|
05-05-2020
|
5.80
|
Completed Tanis wire routing, installed new choke
|
Details
|
|
|
05-04-2020
|
3.50
|
Painted first coats of yellow on cowls
|
Details
|
|
|
05-03-2020
|
2.50
|
Mounted the engine heater
|
Details
|
|
|
05-02-2020
|
3.00
|
Painted the 2nd flaperon
|
Details
|
|
|
05-01-2020
|
3.00
|
Painted the first flaperon
|
Details
|
|
|
04-30-2020
|
3.50
|
Gray on cowls and carb mandatory service bulletin
|
Details
|
|
|
04-29-2020
|
5.00
|
Painted the seat pan and center console
|
Details
|
|
|
04-28-2020
|
2.50
|
More labels and worked on choke cable
|
Details
|
|
|
04-27-2020
|
5.30
|
Tied brake lines, SB on carb and installed wheels
|
Details
|
|
|
04-26-2020
|
2.50
|
Sprayed primer on 3 parts and installed heat shiel
|
Details
|
|
|
04-25-2020
|
4.20
|
Painted the lower cowl and console side panels.
|
Details
|
|
|
04-24-2020
|
4.10
|
Decals and glare shield
|
Details
|
|
|
04-23-2020
|
5.10
|
fuel pump drain line, propeller spinner, glare shi
|
Details
|
|
|
04-22-2020
|
3.50
|
Completed paint stands
|
Details
|
|
|
04-21-2020
|
3.00
|
Built support stands
|
Details
|
|
|
04-20-2020
|
4.00
|
Fabricated the data plate
|
Details
|
|
|
04-19-2020
|
3.80
|
Primed flaperon and wing tips
|
Details
|
|
|
04-18-2020
|
4.50
|
More primer prep and spraying
|
Details
|
|
|
04-17-2020
|
5.50
|
More primer, installed heat shield
|
Details
|
|
|
04-16-2020
|
6.00
|
Painted various, installed baggage flange
|
Details
|
|
|
04-15-2020
|
7.10
|
More prep and paint, bleed brakes
|
Details
|
|
|
04-12-2020
|
3.60
|
More paint prep work
|
Details
|
|
|
04-11-2020
|
2.00
|
Sprayed the top cowl with primer
|
Details
|
|
|
04-10-2020
|
3.00
|
Finished prepping and primered the lower cowl
|
Details
|
|
|
04-09-2020
|
2.00
|
Prepped lower cowl and elevator
|
Details
|
|
|
04-08-2020
|
6.20
|
Applied insignias
|
Details
|
|
|
04-07-2020
|
6.50
|
Sprayed last coat in the port wing panel
|
Details
|
|
|
04-06-2020
|
4.10
|
Sanded the port wing panel
|
Details
|
|
|
04-05-2020
|
1.00
|
Installed the pneumatic lines
|
Details
|
|
|
04-04-2020
|
3.80
|
Worked on door latches
|
Details
|
|
|
04-02-2020
|
4.50
|
Installed the door springs on the right door
|
Details
|
|
|
03-29-2020
|
6.20
|
Worked on door latch install
|
Details
|
|
|
03-26-2020
|
2.50
|
Second coat of primer left wing
|
Details
|
|
|
03-25-2020
|
2.10
|
Sanded the left wing panel
|
Details
|
|
|
03-23-2020
|
0.50
|
Installed fuselage drain holes
|
Details
|
|
|
03-22-2020
|
1.50
|
Installed correct fastners
|
Details
|
|
|
03-21-2020
|
0.50
|
Installed correct nuts
|
Details
|
|
|
03-20-2020
|
3.10
|
Sprayed first coat of primer
|
Details
|
|
|
03-17-2020
|
2.50
|
Added instrument panel labels
|
Details
|
|
|
03-15-2020
|
7.10
|
Final oil cooling line, manifold pressure install
|
Details
|
|
|
03-14-2020
|
3.50
|
Installed cooling system
|
Details
|
|
|
03-13-2020
|
4.50
|
Installed carb filter extension
|
Details
|
|
|
03-11-2020
|
3.10
|
Body work
|
Details
|
|
|
03-10-2020
|
2.90
|
Body work
|
Details
|
|
|
03-09-2020
|
4.20
|
Installed the seat pan doors
|
Details
|
|
|
03-07-2020
|
0.50
|
Check out instrument panel/radio
|
Details
|
|
|
03-06-2020
|
1.00
|
Installed the PTT switches
|
Details
|
|
|
03-05-2020
|
2.90
|
Put on the last finishing touches on the panel
|
Details
|
|
|
03-04-2020
|
7.00
|
Finished the instrument panel installation
|
Details
|
|
|
02-29-2020
|
6.20
|
Finished installation of all but 3 short wires
|
Details
|
|
|
02-28-2020
|
3.20
|
More wiring
|
Details
|
|
|
02-26-2020
|
2.50
|
Installed battery ground wire
|
Details
|
|
|
02-25-2020
|
3.00
|
More wiring
|
Details
|
|
|
02-24-2020
|
4.10
|
More wiring
|
Details
|
|
|
02-23-2020
|
2.50
|
Tying the wiring
|
Details
|
|
|
02-22-2020
|
2.80
|
Installed the instrument panel
|
Details
|
|
|
02-21-2020
|
5.20
|
Installation of the headset jacks
|
Details
|
|
|
02-20-2020
|
4.80
|
Installed headset jacks
|
Details
|
|
|
02-15-2020
|
7.10
|
Installed more of electrical system
|
Details
|
|
|
02-14-2020
|
1.00
|
Started fabrication of back up battery hold downs
|
Details
|
|
|
02-11-2020
|
5.80
|
More wiring
|
Details
|
|
|
02-10-2020
|
4.40
|
More wiring
|
Details
|
|
|
02-09-2020
|
2.80
|
More wiring
|
Details
|
|
|
02-08-2020
|
2.00
|
More wiring
|
Details
|
|
|
02-05-2020
|
5.00
|
More wiring
|
Details
|
|
|
02-04-2020
|
6.80
|
More wiring activity
|
Details
|
|
|
02-03-2020
|
4.80
|
Began wiring activities
|
Details
|
|
|
02-02-2020
|
2.80
|
Installed the main power components
|
Details
|
|
|
01-30-2020
|
1.00
|
Fitted radiator tubing
|
Details
|
|
|
01-29-2020
|
4.00
|
Began wiring the engine to the panel
|
Details
|
|
|
01-24-2020
|
3.00
|
Fabricated battery hold down
|
Details
|
|
|
01-21-2020
|
4.10
|
Added brake fluid
|
Details
|
|
|
01-20-2020
|
3.20
|
Fabricated instrument panel rear shelves
|
Details
|
|
|
01-19-2020
|
2.00
|
Fixed the seat pan interference issue
|
Details
|
|
|
01-18-2020
|
4.50
|
Fuel line fab and routing
|
Details
|
|
|
01-17-2020
|
6.00
|
Installed strakes
|
Details
|
|
|
01-16-2020
|
7.50
|
Install choke and throttle cables
|
Details
|
|
|
01-14-2020
|
6.10
|
Various under the cowl
|
Details
|
|
|
01-13-2020
|
3.40
|
Fabricated the oil tank vent line
|
Details
|
|
|
01-12-2020
|
2.20
|
Fine tuning the oil line and radiator shield
|
Details
|
|
|
01-11-2020
|
3.10
|
Oil cooler torque wrench and mount bracket
|
Details
|
|
|
01-10-2020
|
4.90
|
Installed exhaust and oil cooler
|
Details
|
|
|
01-09-2020
|
4.80
|
Completed cooling system installation
|
Details
|
|
|
01-08-2020
|
4.50
|
Completed canopy and heater installation
|
Details
|
|
|
01-07-2020
|
4.50
|
Glare shield install and started finish work on wi
|
Details
|
|
|
01-06-2020
|
3.20
|
More glare shield activity
|
Details
|
|
|
01-05-2020
|
3.80
|
More fit activity to fit the glare shield
|
Details
|
|
|
01-04-2020
|
5.00
|
First rough install of glare shield
|
Details
|
|
|
01-03-2020
|
6.70
|
Final fit and assembly of doors
|
Details
|
|
|
01-02-2020
|
5.50
|
Rough install both doors
|
Details
|
|
|
01-01-2020
|
6.10
|
Various
|
Details
|
|
|
12-31-2019
|
2.50
|
Install brake line
|
Details
|
|
|
12-30-2019
|
3.80
|
First oil and brake lines installed
|
Details
|
|
|
12-29-2019
|
1.50
|
Oil cooler final fit
|
Details
|
|
|
12-27-2019
|
2.90
|
Rough installed the oil cooler.
|
Details
|
|
|
12-26-2019
|
3.20
|
Installedl brake lines and more oil cooler design
|
Details
|
|
|
12-24-2019
|
3.80
|
Installed brake fluid reservoir
|
Details
|
|
|
12-22-2019
|
4.00
|
Various
|
Details
|
|
|
12-20-2019
|
1.00
|
EAA Tech Counselor Inspection
|
Details
|
|
|
12-19-2019
|
1.90
|
Fabricated inside plate matching outside fairing
|
Details
|
|
|
12-18-2019
|
3.20
|
Installed half of the radiator plumbing
|
Details
|
|
|
12-17-2019
|
3.50
|
Installed the muffler
|
Details
|
|
|
12-16-2019
|
5.00
|
Fabricate exhaust pipe close outs
|
Details
|
|
|
12-14-2019
|
3.90
|
Fixed yesterday's discoveries
|
Details
|
|
|
12-13-2019
|
3.00
|
Started installing engine baffle
|
Details
|
|
|
12-12-2019
|
2.80
|
Located and cut the exhaust pipe pass thru hole
|
Details
|
|
|
12-11-2019
|
3.00
|
Installed the exhaust system
|
Details
|
|
|
12-07-2019
|
5.50
|
Completed rudder cable installation
|
Details
|
|
|
12-06-2019
|
3.00
|
Began setting up for rudder cable completion
|
Details
|
|
|
11-30-2019
|
1.90
|
Completed fitting the firewall to the top cowl
|
Details
|
|
|
11-28-2019
|
1.50
|
Installed the oil tank access door
|
Details
|
|
|
11-27-2019
|
5.50
|
Laid up the last glass tape on the cowl flange
|
Details
|
|
|
11-26-2019
|
2.00
|
Installed the oil tank
|
Details
|
|
|
11-24-2019
|
2.90
|
Laid up cowling to windshield flange
|
Details
|
|
|
11-20-2019
|
6.80
|
Installed the turtle deck
|
Details
|
|
|
11-19-2019
|
4.60
|
Installed rear port window and roughed in turtlede
|
Details
|
|
|
11-18-2019
|
7.00
|
Installed rear window, transponder, header tank
|
Details
|
|
|
11-17-2019
|
1.50
|
Prep for and added cowling fix
|
Details
|
|
|
11-16-2019
|
1.50
|
Fabricated in installed spacers
|
Details
|
|
|
11-14-2019
|
6.50
|
Installed 5th camloc and top cowl windshield flang
|
Details
|
|
|
11-13-2019
|
7.20
|
Bolt clearance improved, water pump housing replac
|
Details
|
|
|
11-12-2019
|
5.20
|
Completed final fit cuts and installed the windshi
|
Details
|
|
|
11-11-2019
|
1.20
|
Cut the forward length of the windshield
|
Details
|
|
|
11-10-2019
|
4.20
|
Drilled windshield mounting hole
|
Details
|
|
|
11-09-2019
|
6.00
|
Installed camlocs
|
Details
|
|
|
11-08-2019
|
4.20
|
Made final cuts to windshield and top cowl
|
Details
|
|
|
11-04-2019
|
8.00
|
Windshield and top cowling final placement
|
Details
|
|
|
11-03-2019
|
2.00
|
More cutting and fitting on the windshield
|
Details
|
|
|
11-02-2019
|
4.00
|
More cutting on the windshield
|
Details
|
|
|
11-01-2019
|
4.60
|
Began fitting the upper cowl
|
Details
|
|
|
10-31-2019
|
2.50
|
Continued fitting the lower cowl
|
Details
|
|
|
10-29-2019
|
2.90
|
Began fitting the lower cowl
|
Details
|
|
|
10-28-2019
|
5.00
|
Painted the bottom of the right wing panel
|
Details
|
|
|
10-26-2019
|
2.50
|
Fitted the cowling together
|
Details
|
|
|
10-25-2019
|
5.00
|
Painted the top surface of the right wing
|
Details
|
|
|
10-24-2019
|
5.50
|
Sanded the right wing panel
|
Details
|
|
|
10-23-2019
|
5.00
|
Sent the water pump to Kitfox for reclocking
|
Details
|
|
|
10-22-2019
|
6.20
|
Mounted engine to engine ring
|
Details
|
|
|
10-21-2019
|
6.30
|
Sanded the primer on the right wing panel
|
Details
|
|
|
10-20-2019
|
4.10
|
Installed radiators
|
Details
|
|
|
10-19-2019
|
3.00
|
Sprayed white primer on wing panel
|
Details
|
|
|
10-16-2019
|
7.00
|
Installed the butt ribs
|
Details
|
|
|
10-15-2019
|
7.00
|
Painted H/T and added wet coat on the elevator
|
Details
|
|
|
10-14-2019
|
6.50
|
Prepped and painted empennage pieces
|
Details
|
|
|
10-11-2019
|
1.50
|
Installed additional hangars
|
|
|
|
10-10-2019
|
3.50
|
Finished installing the undercarriage and sanded e
|
Details
|
|
|
10-07-2019
|
1.00
|
Added the final nuts and washers
|
Details
|
|
|
10-06-2019
|
2.00
|
Install undercarriage
|
Details
|
|
|
10-05-2019
|
1.50
|
Demasked the side stripe and entire fuselage
|
Details
|
|
|
10-04-2019
|
5.10
|
Sprayed the empennage pieces and the side stripe
|
Details
|
|
|
10-01-2019
|
2.20
|
Masked for the side stripe
|
Details
|
|
|
09-29-2019
|
4.00
|
Painted the lower sides (bottom half) of the fusel
|
Details
|
|
|
09-28-2019
|
1.00
|
Prepped and masked the fuse for final gray on side
|
Details
|
|
|
09-27-2019
|
4.20
|
Sprayed the bottom half of the fuse
|
Details
|
|
|
09-26-2019
|
4.20
|
Prepped fuselage for bottom color paint
|
Details
|
|
|
09-25-2019
|
3.60
|
Prepped the rudder for primer
|
Details
|
|
|
09-24-2019
|
5.50
|
Sprayed the prepped area
|
Details
|
|
|
09-23-2019
|
7.20
|
Sanded the port side of the fuselage
|
Details
|
|
|
09-21-2019
|
1.80
|
Re-sprayed the thin area on the fuselage's port si
|
Details
|
|
|
09-20-2019
|
3.20
|
Sanded the "thin" area of the fuselage (yellow)
|
Details
|
|
|
09-19-2019
|
2.10
|
Sprayed undercarriage components
|
Details
|
|
|
09-18-2019
|
5.10
|
Sprayed on the first color
|
Details
|
|
|
09-17-2019
|
2.00
|
Final prep for yellow color coat
|
Details
|
|
|
09-16-2019
|
6.50
|
Prepped fuselage for first color coat
|
Details
|
|
|
09-15-2019
|
1.50
|
Finished sanding the fuselage
|
Details
|
|
|
09-14-2019
|
4.10
|
Sanded the fuselage
|
Details
|
|
|
09-13-2019
|
1.80
|
Sprayed primer on fuselage
|
Details
|
|
|
09-12-2019
|
2.10
|
Prepped the landing gear braces for paint
|
Details
|
|
|
09-11-2019
|
4.60
|
More sanding
|
Details
|
|
|
09-10-2019
|
2.00
|
More sanding on the fuselage.
|
Details
|
|
|
09-09-2019
|
7.00
|
First coats of primer and color
|
Details
|
|
|
09-06-2019
|
4.10
|
Started sanding the 3rd coat of UV primer
|
Details
|
|
|
09-05-2019
|
4.20
|
Finished spraying UV primer on fuse and sprayed pr
|
Details
|
|
|
09-04-2019
|
1.50
|
Finished sanding and prepared for last coat
|
Details
|
|
|
09-02-2019
|
2.50
|
Sanded the pilot's side
|
Details
|
|
|
09-01-2019
|
1.90
|
Sanded the bottom of the fuselage
|
Details
|
|
|
08-31-2019
|
2.80
|
Sprayed first 2 cross coats of UV primer
|
Details
|
|
|
08-30-2019
|
1.50
|
Finished prepping for UV on fuselage
|
Details
|
|
|
08-29-2019
|
2.80
|
More time spent masking off the fuselage
|
Details
|
|
|
08-28-2019
|
4.80
|
Finished painting the EkoBond and started masking
|
Details
|
|
|
08-27-2019
|
2.90
|
Started applying the EkoBond - fuselage
|
Details
|
|
|
08-26-2019
|
4.00
|
Prepped for EkoBond and finished sanding
|
Details
|
|
|
08-25-2019
|
2.50
|
Sanded one side of wing panel
|
Details
|
|
|
08-24-2019
|
5.20
|
Finished painting the wing panel
|
Details
|
|
|
08-23-2019
|
3.00
|
Sanded to prep for UV coat number three
|
Details
|
|
|
08-17-2019
|
5.50
|
Sanded the wing panel
|
Details
|
|
|
08-16-2019
|
1.50
|
Sprayed 2 cross coats of UV primer
|
Details
|
|
|
08-15-2019
|
1.10
|
A slow day
|
Details
|
|
|
08-14-2019
|
6.30
|
Prepped left wing panel for paint
|
Details
|
|
|
08-13-2019
|
4.20
|
Completed sanding the 2nd coat of EkoFill
|
Details
|
|
|
08-12-2019
|
3.10
|
Began sanding the 2nd coat of EkoFill
|
Details
|
|
|
08-09-2019
|
4.10
|
Applied second coat of UV paint
|
Details
|
|
|
08-08-2019
|
1.00
|
Not much to add
|
Details
|
|
|
08-07-2019
|
2.50
|
Sanded the left wing panel
|
Details
|
|
|
08-06-2019
|
2.10
|
Sanded top side of wing panel
|
Details
|
|
|
08-05-2019
|
1.50
|
Sprayed first cross coat of UV protection
|
Details
|
|
|
08-04-2019
|
3.20
|
Epoxied butt ribs, EkoBond top of wing panel, pain
|
Details
|
|
|
08-03-2019
|
2.20
|
Sanded/prepped the HT and rudder for UV paint
|
Details
|
|
|
08-02-2019
|
3.90
|
Closed off the leg fairings
|
Details
|
|
|
08-01-2019
|
4.00
|
Fixed the big opps!
|
Details
|
|
|
07-18-2019
|
9.00
|
Update on paint booth and painting EkoFill - eleva
|
Details
|
|
|
07-02-2019
|
3.50
|
Sprayed EkoFill on the gear legs.
|
Details
|
|
|
07-01-2019
|
2.00
|
Sprayed the test panel with EkoFill
|
Details
|
|
|
06-29-2019
|
0.10
|
Worked on the paint booth
|
Details
|
|
|
06-28-2019
|
1.00
|
Completed paint test panel
|
Details
|
|
|
06-26-2019
|
2.20
|
Complete fabric install on gear legs
|
Details
|
|
|
06-24-2019
|
2.30
|
Paint booth and tape on gear legs
|
Details
|
|
|
06-17-2019
|
0.10
|
Paint booth
|
Details
|
|
|
06-15-2019
|
2.50
|
Covered the top side of the gear legs
|
Details
|
|
|
06-13-2019
|
2.50
|
Covered one side of each gear leg
|
Details
|
|
|
06-12-2019
|
2.50
|
Installed ribs in gear legs
|
Details
|
|
|
06-11-2019
|
5.90
|
Added reinforcement support to gear leg ribs
|
Details
|
|
|
06-10-2019
|
1.50
|
Fabricated the gear leg ribs
|
Details
|
|
|
06-09-2019
|
5.80
|
Began work on the undercarriage
|
Details
|
|
|
06-08-2019
|
2.20
|
Finished the left wing panel
|
Details
|
|
|
06-07-2019
|
4.20
|
Completed covering the left wing panel
|
Details
|
|
|
06-06-2019
|
6.00
|
Add finish tapes to left wing panel
|
Details
|
|
|
06-05-2019
|
5.80
|
Bottom rib and false rib taping
|
Details
|
|
|
06-04-2019
|
3.50
|
Added fabric tape to the bottom of left wing panel
|
Details
|
|
|
06-03-2019
|
5.60
|
Taped top of ribs
|
Details
|
|
|
06-02-2019
|
3.50
|
Rib stitched left wing
|
Details
|
|
|
06-01-2019
|
5.00
|
Rib stitch left wing
|
Details
|
|
|
05-31-2019
|
7.00
|
Ironed down pinked edges and taughtened fabric
|
Details
|
|
|
05-25-2019
|
1.20
|
Installed left wing tip
|
Details
|
|
|
05-24-2019
|
1.00
|
Detailed inboard and outboard ribs
|
Details
|
|
|
05-23-2019
|
4.00
|
Addtional work on bottom skin, left wing panel
|
Details
|
|
|
05-22-2019
|
3.90
|
Taughtened the fabric
|
Details
|
|
|
05-21-2019
|
3.00
|
Glued fabric on bottom left wing panel
|
Details
|
|
|
05-20-2019
|
4.50
|
Prepped left wing panel for covering
|
Details
|
|
|
05-19-2019
|
1.50
|
Right wing is complete
|
Details
|
|
|
05-18-2019
|
2.50
|
Glued the second tape in position
|
Details
|
|
|
05-15-2019
|
3.00
|
Installed leading edge tape
|
Details
|
|
|
05-14-2019
|
3.00
|
Finished glueing trailing edge
|
Details
|
|
|
05-13-2019
|
6.30
|
Installed inspection rings and trailing edge tape
|
Details
|
|
|
05-12-2019
|
2.00
|
Installed bottom false rib tape
|
Details
|
|
|
05-11-2019
|
8.00
|
Final install right wing tip and tape on false rib
|
Details
|
|
|
05-08-2019
|
4.30
|
More taping on the right wing
|
Details
|
|
|
05-07-2019
|
3.90
|
Started taping the right wing panel
|
Details
|
|
|
05-05-2019
|
2.50
|
Completed rib stitching - right wing
|
Details
|
|
|
05-04-2019
|
2.50
|
Spent a little time rib stitching the right wing
|
Details
|
|
|
05-03-2019
|
5.50
|
Prepped for rib stitching
|
Details
|
|
|
05-02-2019
|
5.50
|
Finished shrinking starboard wing panel
|
Details
|
|
|
05-01-2019
|
6.10
|
More prep work on the right wing
|
Details
|
|
|
04-30-2019
|
5.10
|
More detail work on the top of the right wing pane
|
Details
|
|
|
04-29-2019
|
7.50
|
Completed bottom of right wing
|
Details
|
|
|
04-28-2019
|
2.10
|
First shrink on bottom right wing
|
Details
|
|
|
04-27-2019
|
2.50
|
Started covering the first wing panel
|
Details
|
|
|
04-26-2019
|
7.50
|
Completed covering rudder
|
Details
|
|
|
04-25-2019
|
2.10
|
Added tape to rudder
|
Details
|
|
|
04-24-2019
|
2.90
|
Completed covering the rudder
|
Details
|
|
|
04-23-2019
|
3.50
|
Started covering the rudder
|
Details
|
|
|
04-22-2019
|
2.00
|
Completed the elevator
|
Details
|
|
|
04-21-2019
|
3.00
|
Completed final shrink on elevator and added 1 inc
|
Details
|
|
|
04-20-2019
|
8.00
|
Finished covering the elevator
|
Details
|
|
|
04-19-2019
|
2.90
|
Covered bottom of elevator
|
Details
|
|
|
04-18-2019
|
2.50
|
Completed HS and prepped the elevator
|
Details
|
|
|
04-17-2019
|
3.20
|
More taping on HS
|
Details
|
|
|
04-16-2019
|
3.10
|
Shrunk HS and started install of 1 inch finishing
|
Details
|
|
|
04-15-2019
|
2.10
|
FINISHED finish taping the fuselage!!
|
Details
|
|
|
04-14-2019
|
1.90
|
Added 1 inch finishing tape to VS
|
Details
|
|
|
04-13-2019
|
6.00
|
Covered the bottom of the HS
|
Details
|
|
|
04-12-2019
|
3.80
|
Covered the bottom of the HS
|
Details
|
|
|
04-11-2019
|
2.10
|
Added bias tape to the VS
|
Details
|
|
|
04-10-2019
|
4.00
|
Added reinforcement tape
|
Details
|
|
|
03-31-2019
|
6.50
|
Fuselage covering catch up report
|
Details
|
|
|
03-20-2019
|
1.00
|
Installed inspection and access rings
|
Details
|
|
|
03-18-2019
|
2.10
|
Cut and installed grommets
|
Details
|
|
|
03-17-2019
|
3.60
|
Tighten fuselage fabric to 250 F
|
Details
|
|
|
03-16-2019
|
4.50
|
Covered the vertical stabilizer
|
Details
|
|
|
03-15-2019
|
2.10
|
Shrunk the top right fabric panel
|
Details
|
|
|
03-14-2019
|
2.30
|
Installed the top right fuselage fabric panel
|
Details
|
|
|
03-13-2019
|
0.70
|
Added more epoxy to the bottom VS rib
|
Details
|
|
|
03-12-2019
|
2.80
|
Finished Top Left Panel
|
Details
|
|
|
03-02-2019
|
1.10
|
Installed the right side fabric panel
|
Details
|
|
|
03-01-2019
|
2.30
|
Prepped right side for fabric install
|
Details
|
|
|
02-28-2019
|
6.80
|
Covered left side of fuselage
|
Details
|
|
|
02-27-2019
|
6.50
|
Finished bottom and started left side panels
|
Details
|
|
|
02-26-2019
|
5.60
|
Fianl glue on bottom fabric
|
Details
|
|
|
02-25-2019
|
4.00
|
Rough installed fabric on fuselage bottom
|
Details
|
|
|
02-23-2019
|
2.80
|
Re-routed and re-tie the wiring in the fuselage
|
Details
|
|
|
02-18-2019
|
3.80
|
Cut and dry fit rear window
|
Details
|
|
|
02-17-2019
|
5.50
|
Install rear windows
|
Details
|
|
|
02-15-2019
|
3.50
|
Fabricated and installed nut plates
|
Details
|
|
|
02-14-2019
|
4.50
|
Right side empennage inspection panel
|
Details
|
|
|
02-13-2019
|
4.20
|
Finished the left panel and started the right one
|
Details
|
|
|
02-12-2019
|
4.00
|
Begin forming inspection panel
|
Details
|
|
|
02-09-2019
|
1.50
|
Another Coat of EkoFill
|
Details
|
|
|
02-02-2019
|
1.00
|
Mount fuselage to rotisserie
|
Details
|
|
|
01-31-2019
|
1.70
|
Test panel first coat of fabric sealer
|
Details
|
|
|
01-30-2019
|
2.50
|
Finished the Stewart System Test Panel
|
Details
|
|
|
01-29-2019
|
3.50
|
Finished the instrument panel
|
Details
|
|
|
01-28-2019
|
2.20
|
Map Box Construction
|
Details
|
|
|
01-25-2019
|
7.00
|
Map Box modification and install
|
Details
|
|
|
01-23-2019
|
1.10
|
Continued cutting instrument panel
|
Details
|
|
|
01-22-2019
|
5.00
|
Cut instrument panel
|
Details
|
|
|
01-21-2019
|
3.90
|
Instrument panel layout, fabric frame
|
Details
|
|
|
01-19-2019
|
4.50
|
Antenna cable install
|
Details
|
|
|
01-10-2019
|
4.00
|
Antenna completion
|
Details
|
|
|
01-09-2019
|
5.70
|
Continued setting control stops
|
Details
|
|
|
01-08-2019
|
3.00
|
Begn setting control linkages
|
Details
|
|
|
01-07-2019
|
4.50
|
Installed antennas
|
Details
|
|
|
01-05-2019
|
2.00
|
Installed the HT in prep for setting control stops
|
Details
|
|
|
01-03-2019
|
3.00
|
More antenna/ground plane install
|
Details
|
|
|
01-02-2019
|
3.50
|
More antenna and ground plane work
|
Details
|
|
|
01-01-2019
|
5.80
|
More transmitter/antenna install
|
Details
|
|
|
12-31-2018
|
4.20
|
Continued transmitter/antenna installation activit
|
Details
|
|
|
12-29-2018
|
4.50
|
Began installing antennas and ELT
|
Details
|
|
|
12-23-2018
|
2.50
|
Installed tilt feature for instrument panel
|
Details
|
|
|
12-21-2018
|
2.50
|
Installed the wheels
|
Details
|
|
|
12-20-2018
|
6.10
|
Installed the cabane gear and axles
|
Details
|
|
|
12-19-2018
|
1.00
|
Verified planned cuts
|
Details
|
|
|
12-18-2018
|
4.50
|
Continued assembly of cabane gear
|
Details
|
|
|
12-17-2018
|
4.50
|
Drilled missing holes in spring strut
|
Details
|
|
|
12-16-2018
|
3.50
|
More work on gear installation
|
Details
|
|
|
12-15-2018
|
2.50
|
Began installation of cabane gear components
|
Details
|
|
|
12-14-2018
|
8.00
|
Began installation of undercarriage components
|
Details
|
|
|
12-13-2018
|
1.50
|
Prepped parts for tail wheel installation
|
Details
|
|
|
12-11-2018
|
2.50
|
Applied 2nd coat of varnish
|
Details
|
|
|
12-04-2018
|
2.10
|
Fit landing light
|
Details
|
|
|
12-03-2018
|
7.10
|
ASI line, Mag line, Pitot tube orientation, routin
|
Details
|
|
|
12-02-2018
|
4.50
|
Completed pitot tube install and installed the mag
|
Details
|
|
|
12-01-2018
|
5.20
|
Installed strengthening additions to the trailing
|
Details
|
|
|
11-29-2018
|
1.50
|
finished magnetometer mount
|
Details
|
|
|
11-28-2018
|
6.00
|
Removed flaperons and started magnetometer install
|
Details
|
|
|
11-27-2018
|
2.30
|
Completed install of right flaperon
|
Details
|
|
|
11-24-2018
|
5.80
|
Install flaperon mounting reinforcement
|
Details
|
|
|
11-23-2018
|
2.00
|
Final drill and alodine flaperon reinforcement
|
Details
|
|
|
11-22-2018
|
6.50
|
Bellcrank install, begin flaperon install
|
Details
|
|
|
11-21-2018
|
1.90
|
Continued assemblying flaperon bellcranks
|
Details
|
|
|
11-20-2018
|
4.00
|
Began flaperon belcrank assembly
|
Details
|
|
|
11-19-2018
|
3.50
|
Finished the mass balance and built pitot tube
|
Details
|
|
|
11-18-2018
|
2.10
|
Installed mass balance weights
|
Details
|
|
|
11-17-2018
|
1.70
|
Began fitting mass balance
|
Details
|
|
|
11-16-2018
|
3.50
|
Finished ends of flaperons
|
Details
|
|
|
11-15-2018
|
5.60
|
Rivet trailing edge, add end rib
|
Details
|
|
|
11-13-2018
|
4.80
|
Finished NSP light install and rivet flaperon
|
Details
|
|
|
11-09-2018
|
4.50
|
More on preparing the wings for covering
|
Details
|
|
|
11-08-2018
|
6.10
|
Finished wing tips and contoured fuel tanks
|
Details
|
|
|
11-07-2018
|
3.10
|
Wing tip prep and contour improvement
|
Details
|
|
|
11-06-2018
|
2.30
|
More wing profiling and tip preparation
|
Details
|
|
|
11-03-2018
|
4.00
|
Contoured rib profile and more work on tip
|
Details
|
|
|
11-02-2018
|
3.00
|
Installed last of wing tip mounting flanges
|
Details
|
|
|
11-01-2018
|
3.50
|
Install left wing leading edge
|
Details
|
|
|
10-31-2018
|
1.00
|
Installed the leading edge, right wing
|
Details
|
|
|
10-29-2018
|
2.00
|
Prepped leading edge extrusion
|
Details
|
|
|
10-28-2018
|
1.50
|
Rough fit leading edges
|
Details
|
|
|
10-27-2018
|
3.00
|
Installed trailing edge pieces
|
Details
|
|
|
10-25-2018
|
2.50
|
Installed the end rib standoff/supports
|
Details
|
|
|
10-20-2018
|
2.50
|
Installed false ribs under fuel tanks
|
Details
|
|
|
10-17-2018
|
3.10
|
Installed thel #2 Ribs
|
Details
|
|
|
10-16-2018
|
2.00
|
Fitted #2 ribs
|
Details
|
|
|
10-14-2018
|
2.00
|
Varnish and tank install
|
Details
|
|
|
10-12-2018
|
6.50
|
Install fuel tanks and varnsh coat #2
|
|
|
|
10-11-2018
|
7.00
|
Fuel tank final fitting and fuel backing plates
|
Details
|
|
|
10-10-2018
|
1.50
|
Continued installation of fuel tanks
|
Details
|
|
|
10-09-2018
|
5.50
|
Completed fuel tank install and leak checked right
|
Details
|
|
|
10-08-2018
|
3.50
|
More work on fuel tanks, varnish prep and instrume
|
Details
|
|
|
10-07-2018
|
0.75
|
More sanding
|
Details
|
|
|
10-06-2018
|
1.50
|
Trimmed and fitted tanks and sanded ribs
|
Details
|
|
|
10-05-2018
|
1.50
|
Started fitting the fuel tanks
|
Details
|
|
|
10-03-2018
|
2.50
|
The last of varnish activity
|
Details
|
|
|
10-02-2018
|
3.00
|
More on the varnishing front
|
Details
|
|
|
10-01-2018
|
4.50
|
More epoxy varnishing
|
Details
|
|
|
09-30-2018
|
1.50
|
Fabricated wing rotisserie
|
Details
|
|
|
09-25-2018
|
1.00
|
Installed bottom false ribs
|
Details
|
|
|
09-24-2018
|
5.30
|
Install false ribs
|
Details
|
|
|
09-23-2018
|
1.50
|
Fabricated and installed reinforcement strip
|
Details
|
|
|
09-22-2018
|
5.50
|
Installed jury struts
|
Details
|
|
|
09-19-2018
|
1.00
|
Bond #1 ribs
|
Details
|
|
|
09-17-2018
|
6.00
|
Installed wings and set root rib
|
Details
|
|
|
09-15-2018
|
4.50
|
Rough install #1 and root ribs
|
Details
|
|
|
09-14-2018
|
7.30
|
Finished install of wing strut attach brackets
|
Details
|
|
|
09-13-2018
|
4.50
|
Finish install of forward strut attach right wing
|
Details
|
|
|
09-12-2018
|
5.00
|
Set up and drilled strut attach brackets
|
Details
|
|
|
09-11-2018
|
6.00
|
Final fit of the spar attach fittings
|
Details
|
|
|
09-10-2018
|
4.50
|
Fixed the mistake
|
Details
|
|
|
09-09-2018
|
3.00
|
Re-did the wing set up
|
Details
|
|
|
09-08-2018
|
6.00
|
Wing install and begin jigging
|
Details
|
|
|
09-07-2018
|
3.90
|
Added strut mount weldments and completed tires
|
Details
|
|
|
09-06-2018
|
4.00
|
Set up for wing rigging
|
Details
|
|
|
08-27-2018
|
3.50
|
Completed wing and fuse stands
|
Details
|
|
|
08-24-2018
|
2.00
|
Prepped the wing struts for installation
|
Details
|
|
|
08-17-2018
|
2.80
|
Fabricated parts for the large baffle
|
Details
|
|
|
08-16-2018
|
5.00
|
More on radiator install
|
Details
|
|
|
08-13-2018
|
0.50
|
Re-painted the firewall support tubes
|
Details
|
|
|
08-12-2018
|
4.10
|
Completed engine radiator installation
|
Details
|
|
|
08-11-2018
|
3.50
|
Continued analyzing and installing radiators
|
Details
|
|
|
08-10-2018
|
1.50
|
Install co-pilot radiator mounting plate
|
Details
|
|
|
08-08-2018
|
0.90
|
Refigured the firewall
|
Details
|
|
|
08-07-2018
|
4.50
|
Installed engine mount and luggage sack
|
Details
|
|
|
08-06-2018
|
1.50
|
Finished contouring the tail feathers
|
Details
|
|
|
08-05-2018
|
1.00
|
Added material to top of VS
|
Details
|
|
|
08-03-2018
|
6.00
|
Instrument panel bracing and HT ends
|
Details
|
|
|
08-02-2018
|
3.50
|
Added ends to HT and worked on instrument panel
|
Details
|
|
|
07-31-2018
|
3.30
|
Aero fairings and instrument panel
|
Details
|
|
|
07-25-2018
|
4.00
|
Adding and carving end pieces
|
Details
|
|
|
07-24-2018
|
8.00
|
Installed the cabin heater
|
Details
|
|
|
07-23-2018
|
2.50
|
Completed install of firewall pass-throughs
|
Details
|
|
|
07-22-2018
|
4.30
|
Fabricated overflow bottle bracket
|
Details
|
|
|
07-21-2018
|
6.50
|
Completed firewall
|
Details
|
|
|
07-20-2018
|
6.20
|
Bonded mounting clips and varnished H/T
|
Details
|
|
|
07-19-2018
|
4.00
|
More firewall install activity
|
Details
|
|
|
07-17-2018
|
6.00
|
Firewall assembly
|
Details
|
|
|
07-16-2018
|
8.00
|
Began assemblying the firewall
|
Details
|
|
|
07-15-2018
|
3.50
|
Installed header tank
|
Details
|
|
|
07-14-2018
|
3.50
|
Installed elevator trim
|
Details
|
|
|
07-13-2018
|
1.50
|
Prepped elevator trim motor
|
Details
|
|
|
07-09-2018
|
5.50
|
Finished rib install
|
Details
|
|
|
07-08-2018
|
4.00
|
Installed elevator and HT ribs
|
Details
|
|
|
07-04-2018
|
7.00
|
Began fitting the ribs in the HT
|
Details
|
|
|
07-03-2018
|
0.80
|
Began the rib install process on the HT
|
Details
|
|
|
07-02-2018
|
3.50
|
Finished co-pilot's window and prepped for H/T
|
Details
|
|
|
06-29-2018
|
2.00
|
Finished pilot's window
|
Details
|
|
|
06-28-2018
|
5.20
|
Continued installing the windows
|
Details
|
|
|
06-27-2018
|
4.20
|
Completed rough fit of co-pilot's window
|
Details
|
|
|
06-26-2018
|
5.50
|
Rough install the pilot side window
|
Details
|
|
|
06-22-2018
|
2.00
|
Epoxied last part and fabricated door hinges
|
Details
|
|
|
06-21-2018
|
4.90
|
Finish install door frame and fuse stringer
|
Details
|
|
|
06-20-2018
|
6.20
|
Completed copilot's door frame and right stringer
|
Details
|
|
|
06-18-2018
|
4.60
|
Complete starboard door frame
|
Details
|
|
|
06-17-2018
|
4.50
|
Window and door install
|
Details
|
|
|
06-16-2018
|
2.00
|
Started install of side stringers
|
Details
|
|
|
06-15-2018
|
8.00
|
Installation of rudder cables and seat pan
|
Details
|
|
|
06-14-2018
|
4.50
|
Seat pan final fit and installed bushings on cable
|
Details
|
|
|
06-13-2018
|
4.00
|
Fitting seat pan
|
Details
|
|
|
06-12-2018
|
2.00
|
Loose ends
|
Details
|
|
|
06-11-2018
|
6.50
|
Fixes and started seat pan installation
|
Details
|
|
|
06-10-2018
|
2.00
|
Installed access panel mounting flanges
|
Details
|
|
|
06-09-2018
|
1.00
|
Fabriated mounting flanges
|
|
|
|
06-08-2018
|
2.00
|
Varnished the ribs
|
Details
|
|
|
06-06-2018
|
3.00
|
Continued installing the rudder cables
|
Details
|
|
|
06-05-2018
|
2.50
|
Began installing the rudder cables
|
Details
|
|
|
06-04-2018
|
6.50
|
Finished the VS and rudder
|
Details
|
|
|
06-03-2018
|
4.50
|
Completed rudder and began HT and elevator
|
Details
|
|
|
06-02-2018
|
5.90
|
Prepared the HS and elevator for installation
|
Details
|
|
|
06-01-2018
|
6.10
|
Final install of rudder pedals
|
Details
|
|
|
05-30-2018
|
4.50
|
Finished VS trailing edge and begin rudder LE
|
Details
|
|
|
05-29-2018
|
3.20
|
Installed floor boards and VS coving
|
Details
|
|
|
05-27-2018
|
2.90
|
Installed ribs in rudder
|
Details
|
|
|
05-26-2018
|
2.30
|
Rudder rib install process
|
Details
|
|
|
05-25-2018
|
3.00
|
Applied poly to the floor boards and added to ribs
|
Details
|
|
|
05-24-2018
|
2.50
|
Installed ribs in VS
|
Details
|
|
|
05-23-2018
|
4.50
|
Begine adding VS intermediate ribs
|
Details
|
|
|
05-22-2018
|
8.00
|
Rudder install
|
Details
|
|
|
05-21-2018
|
3.30
|
Installed nut plate on the console side panels
|
Details
|
|
|
05-17-2018
|
3.10
|
Pedal alignment
|
Details
|
|
|
05-16-2018
|
2.20
|
Ruder pedal install and epoxy floorboards
|
Details
|
|
|
05-15-2018
|
5.70
|
Rudder pedal assembly
|
Details
|
|
|
05-14-2018
|
8.50
|
Rudder pedal adjustment levers and rudder pedals
|
Details
|
|
|
05-13-2018
|
5.20
|
Prepared pedal assembly components
|
Details
|
|
|
05-12-2018
|
8.00
|
Completed fitting flap handle
|
Details
|
|
|
05-11-2018
|
1.50
|
Dry fit the flap lever
|
|
|
|
05-10-2018
|
4.10
|
Floorboard install and begin console
|
Details
|
|
|
05-08-2018
|
7.20
|
Completed installing the control system
|
Details
|
|
|
05-07-2018
|
9.00
|
Onward and Upward
|
Details
|
|
|
05-06-2018
|
5.20
|
A crappy day
|
Details
|
|
|
05-05-2018
|
5.10
|
Fixing issues
|
Details
|
|
|
05-04-2018
|
4.50
|
Cont'd assembling control linkage components
|
Details
|
|
|
05-02-2018
|
1.50
|
Cont'd making control linkage assemblies
|
Details
|
|
|
04-30-2018
|
4.10
|
Continued assembly and installation of control lin
|
Details
|
|
|
04-29-2018
|
5.50
|
Continued work on flight control installation
|
Details
|
|
|
04-28-2018
|
5.00
|
Began work on the control system
|
Details
|
|
|
04-27-2018
|
4.00
|
The last of inventory activity
|
Details
|
|
|
04-26-2018
|
2.50
|
Continued inventory
|
Details
|
|
|
04-24-2018
|
8.00
|
Kit arrival
|
Details
|
|
|
03-12-2018
|
1.50
|
Wing Rotisserie
|
Details
|
|
|
01-28-2016
|
2.00
|
Attempted to fit the aileron spar
|
Details
|
|