Date
|
Hours
|
Work Log Summary
|
Details
|
11-10-2017
|
0.25
|
Drill #19 fastener holes in cowl spinner cutout
|
|
|
|
11-09-2017
|
1.50
|
L&R side cowl hinge pins prep
|
|
|
|
11-09-2017
|
3.50
|
Drill top and bott L&R cowl and hinges
|
|
|
|
11-08-2017
|
3.00
|
Match drill bott cowl side hinges
|
|
|
|
11-05-2017
|
1.00
|
Drill bott cowl side for fuse hinges
|
|
|
|
11-04-2017
|
4.00
|
Match drill top and bott side fuse hinges
|
|
|
|
10-31-2017
|
5.00
|
Match drill top cowl fuselage hinges
|
Details
|
|
|
10-31-2017
|
2.00
|
Drill top and bott cowl for side fuselage hinges
|
|
|
|
10-29-2017
|
2.50
|
Drill top cowl for fuselage hinges
|
|
|
|
10-26-2017
|
12.00
|
More lots of fitting etc cowling halves
|
Details
|
|
|
10-16-2017
|
2.00
|
Install L&R shoulder harnesses
|
|
|
|
10-12-2017
|
2.00
|
Prep/assemble canopy hinge cover clip assemblies
|
|
|
|
10-10-2017
|
0.25
|
Prep canopy rear seal strip (C-01450)
|
|
|
|
10-10-2017
|
16.00
|
Lots of fitting, trimming, rebuilding cowling halv
|
|
|
|
10-10-2017
|
1.50
|
Install canopy glare shield defog fans
|
|
|
|
09-04-2017
|
1.00
|
Clean up top and bott cowls at spinner cutout
|
|
|
|
09-01-2017
|
5.75
|
Prep and install Garmin AP roll and pitch servos
|
|
|
|
09-01-2017
|
3.00
|
Install Garmin AP roll servo
|
|
|
|
09-01-2017
|
3.00
|
Install Garmin AP pitch servo
|
|
|
|
09-01-2017
|
5.50
|
Initial trim top and bott cowls to scribe lines
|
|
|
|
08-30-2017
|
0.50
|
Top to bott cowl L&R hinges and pins
|
|
|
|
08-30-2017
|
3.00
|
Top cowl-to-fuse piano hinge and pin prep
|
|
|
|
08-30-2017
|
2.50
|
Flutes and grind side edges of piano hinges
|
Details
|
|
|
08-30-2017
|
1.50
|
Bottom cowl to fuse piano hinge and pin prep
|
|
|
|
08-29-2017
|
1.00
|
Prep, assemble cyl 1 and 3 baffles
|
|
|
|
08-20-2017
|
1.00
|
Prep and install magneto cooling tubing
|
|
|
|
08-20-2017
|
1.00
|
Install 1" dia tubing flanges on rear baffle
|
Details
|
|
|
08-14-2017
|
6.00
|
Purge valve piping and hoses
|
Details
|
|
|
08-14-2017
|
32.00
|
Control cables and through-firewall hardware
|
Details
|
|
|
08-12-2017
|
0.75
|
Sniffle valve, tbing line install
|
|
|
|
08-12-2017
|
1.50
|
Sniffle valve tubing line prep
|
|
|
|
08-12-2017
|
2.50
|
Cabin heat cross-over and SCAT install
|
|
|
|
08-11-2017
|
1.00
|
SCAT ducting to oil cooler, RTV chafe strip
|
|
|
|
08-11-2017
|
2.00
|
Install Garmin engine transducers
|
|
|
|
08-11-2017
|
4.00
|
Exhaust sys SCAT prep and install, heat shields
|
Details
|
|
|
08-10-2017
|
0.25
|
Oil cooler hoses install
|
|
|
|
08-10-2017
|
6.00
|
Install Vetterman's IO-390 cross-over exhaust
|
|
|
|
08-09-2017
|
2.50
|
Prep and attach baffle tension rods
|
|
|
|
08-09-2017
|
2.00
|
Oil cooler install prep
|
|
|
|
08-09-2017
|
1.00
|
Oil cooler hoses install
|
|
|
|
08-09-2017
|
3.00
|
Oil cooler and inlet ramp assembly, install
|
|
|
|
08-09-2017
|
0.25
|
Fuel line, firewall to fuel pump
|
|
|
|
08-09-2017
|
1.50
|
Attach cowling baffle seals
|
|
|
|
08-06-2017
|
1.50
|
Prep and attach right air ramp baffle cone
|
|
|
|
08-06-2017
|
1.50
|
Prep and attach left air ramp baffle cone
|
|
|
|
08-04-2017
|
8.00
|
Snorkel-to-filter flange
|
Details
|
|
|
08-04-2017
|
6.00
|
Snorkel alternate air gate
|
|
|
|
08-04-2017
|
60.00
|
Prep, attach snorkel(s
|
Details
|
|
|
08-04-2017
|
1.50
|
Breather hose prep and install
|
|
|
|
08-03-2017
|
0.01
|
Various engine baffle pics
|
|
|
|
08-03-2017
|
0.01
|
more engine baffle pics
|
|
|
|
08-02-2017
|
1.50
|
Attach forward baffles
|
|
|
|
08-01-2017
|
2.00
|
Apply RTV sealants, ivet left front baffle
|
|
|
|
08-01-2017
|
2.00
|
Apply RTV sealant, attach aft baffles
|
|
|
|
07-30-2017
|
1.50
|
Prep, assemble aft center bracket and attach
|
|
|
|
07-30-2017
|
1.50
|
Prep left air ramp, air filter frame
|
|
|
|
07-30-2017
|
0.50
|
Install right forward baffle
|
|
|
|
07-30-2017
|
1.00
|
Assemble right air ramp
|
|
|
|
07-30-2017
|
1.00
|
Assemble left forward baffle
|
|
|
|
07-29-2017
|
1.00
|
Temp hang the FM-200 throttle body
|
|
|
|
07-29-2017
|
0.75
|
Prep, assemble right aft baffle
|
|
|
|
07-29-2017
|
1.25
|
Prep, assemble left aft baffle, attach cyl 4 baffl
|
|
|
|
07-29-2017
|
1.25
|
Prep, assemble cyl 3 bridge
|
|
|
|
07-28-2017
|
7.00
|
Prep parts
|
Details
|
|
|
07-26-2017
|
1.00
|
Fuel pump connections and hoses
|
|
|
|
07-20-2017
|
2.75
|
Fule flow transducer to servo, oil cooler brackets
|
|
|
|
07-16-2017
|
4.00
|
Install starter, addntl #4 grond cable
|
Details
|
|
|
07-16-2017
|
2.00
|
Install alternator
|
|
|
|
07-15-2017
|
4.00
|
Various senders, cables, cushion clamps
|
|
|
|
07-14-2017
|
3.00
|
Fuel lines, fuel flow transducer, sniffel valve
|
|
|
|
07-14-2017
|
3.00
|
Engine dynafocal mounts, grounding strap
|
|
|
|
07-12-2017
|
3.00
|
Install propeller governor
|
|
|
|
07-11-2017
|
4.00
|
Engine uncrated
|
|
|
|
07-10-2017
|
4.00
|
Install parking brake valve
|
|
|
|
07-09-2017
|
2.00
|
Install various engine fittings
|
|
|
|
07-08-2017
|
5.00
|
Install variuos engine fittings
|
|
|
|
07-07-2017
|
2.50
|
Master relay and starter solenoid, sender mounts
|
|
|
|
07-06-2017
|
2.00
|
Prep. install battery bracket
|
|
|
|
07-06-2017
|
2.50
|
Firewall componenet installs
|
|
|
|
07-05-2017
|
0.75
|
Assemble, install canopy closed micro switch
|
|
|
|
06-28-2017
|
0.01
|
Lyc Tbolt IO-390 engine build pics from Jeff Schan
|
|
|
|
06-10-2017
|
0.01
|
more canopy latch pics
|
|
|
|
06-10-2017
|
0.50
|
Front canopy skin notch
|
|
|
|
06-10-2017
|
3.50
|
Canopy latch
|
|
|
|
06-10-2017
|
6.00
|
Canopy latch
|
|
|
|
05-28-2017
|
16.00
|
Prep rudder/brake pedals, powder coat, install
|
Details
|
|
|
05-22-2017
|
6.00
|
Sand/Fill/Sand - ditto, etc
|
Details
|
|
|
05-21-2017
|
3.00
|
Install canopy glas fairing strips
|
|
|
|
05-20-2017
|
3.00
|
Prep cut glas fabric fairing strips
|
Details
|
|
|
05-14-2017
|
4.00
|
Start canopy glass to frame assembly
|
Details
|
|
|
05-13-2017
|
2.50
|
Canopy wear strip, hinge covers, screw inseritons
|
Details
|
|
|
05-07-2017
|
12.00
|
Side canopy frame and rear seal
|
Details
|
|
|
05-05-2017
|
4.50
|
Prep for canopy fairing glasing
|
Details
|
|
|
03-12-2017
|
0.01
|
Common Fuselage Wiring Harness
|
Details
|
|
|
03-12-2017
|
120.00
|
Common Fuselage Wiring Harness
|
Details
|
|
|
03-05-2017
|
2.00
|
Install Andair fuel pump and filter
|
|
|
|
03-02-2017
|
1.00
|
Install nutplates on panels
|
|
|
|
02-28-2017
|
3.50
|
Installed Beringer wheels and brakes
|
|
|
|
02-27-2017
|
3.50
|
Attach main gear L&R axels
|
Details
|
|
|
02-25-2017
|
7.00
|
Prep, mask inerior cabin, paint
|
Details
|
|
|
02-25-2017
|
2.75
|
Paint interior and canopy frame
|
|
|
|
02-23-2017
|
0.01
|
more main gear leg install pics
|
|
|
|
02-23-2017
|
9.50
|
Install main gear legs
|
Details
|
|
|
02-22-2017
|
2.00
|
Nose gear link assembly install
|
|
|
|
02-22-2017
|
3.00
|
Install upper gear braces to spar carry-through
|
|
|
|
02-22-2017
|
2.00
|
Install nose gear wheel fork
|
|
|
|
02-22-2017
|
1.50
|
Attach nose gear leg
|
|
|
|
02-21-2017
|
1.25
|
Seatback hinge prep
|
|
|
|
02-21-2017
|
2.00
|
Seatback brace, lower hinges
|
|
|
|
02-21-2017
|
1.75
|
Seat back assemblies
|
|
|
|
02-21-2017
|
1.75
|
Prep gear attach angles
|
|
|
|
02-21-2017
|
2.00
|
Install engine mount
|
|
|
|
02-18-2017
|
2.00
|
Seat back hinges and braces prep
|
|
|
|
02-15-2017
|
12.00
|
Prep all interior cabin panels
|
Details
|
|
|
02-09-2017
|
22.50
|
Prep parts
|
Details
|
|
|
02-08-2017
|
2.00
|
Paint glare shield flat black
|
|
|
|
02-08-2017
|
0.75
|
Final drill canopy
|
|
|
|
02-08-2017
|
2.00
|
Drill canopy attach screw holes
|
|
|
|
02-07-2017
|
2.00
|
Prep canopy frame and canopy for mating
|
Details
|
|
|
02-05-2017
|
1.25
|
Canopy pin blocks and switch bracket
|
|
|
|
02-05-2017
|
1.50
|
Canopy installation
|
Details
|
|
|
02-04-2017
|
3.00
|
Rivet canopy assembly
|
|
|
|
02-02-2017
|
6.25
|
Rivet canopy assembly
|
|
|
|
02-02-2017
|
4.00
|
Rivet canopy assembly
|
Details
|
|
|
02-01-2017
|
2.00
|
Canopy rail, handle, forward skin edge
|
|
|
|
02-01-2017
|
2.00
|
Canopy frame aft assembly
|
|
|
|
01-31-2017
|
1.50
|
Canopy rail sides drilling
|
|
|
|
01-30-2017
|
1.00
|
Canopy rail prep
|
|
|
|
01-30-2017
|
2.75
|
Canopy rail assemblies
|
Details
|
|
|
01-29-2017
|
3.00
|
L&R forward canopy frame assembly
|
|
|
|
01-29-2017
|
2.00
|
Canopy frame close-outs
|
|
|
|
01-25-2017
|
4.00
|
Front canopy ribs and rails prep
|
Details
|
|
|
01-23-2017
|
10.25
|
Rear window to fuse prep
|
|
|
|
01-22-2017
|
2.50
|
Rear window prep
|
|
|
|
01-21-2017
|
0.75
|
Roll-Over stiffener
|
Details
|
|
|
01-12-2017
|
15.50
|
Canopy window parts prep
|
Details
|
|
|
12-06-2016
|
12.00
|
Roll Over Structure
|
Details
|
|
|
12-01-2016
|
4.50
|
Flap Accutuation System
|
Details
|
|
|
12-01-2016
|
18.50
|
Aileron and Elevator Control Systems
|
Details
|
|
|
11-17-2016
|
24.00
|
Baggage area panels and seat hinges
|
Details
|
|
|
11-04-2016
|
10.00
|
Rudder and brake pedal preparation assembly,
|
Details
|
|
|
11-04-2016
|
14.00
|
Fuel system piping
|
Details
|
|
|
11-01-2016
|
22.00
|
Construct rotisserie for fuselage
|
Details
|
|
|
10-24-2016
|
18.00
|
Attach Aft Fuselage
|
Details
|
|
|
10-23-2016
|
5.50
|
NACA fresh air vents L & R
|
Details
|
|
|
10-22-2016
|
1.25
|
Steps 4, 7, 9
|
Details
|
|
|
10-22-2016
|
0.25
|
Steps 10, 11
|
Details
|
|
|
10-22-2016
|
1.75
|
Steps 1, 2, 3
|
Details
|
|
|
10-21-2016
|
3.00
|
Steps 2, 4, 5, 9, 12
|
Details
|
|
|
10-11-2016
|
2.00
|
QB Fuselage arrives
|
Details
|
|
|
10-11-2016
|
4.00
|
Inventoried QB Fuselage kit shipment
|
Details
|
|
|
10-11-2016
|
4.00
|
Inventoried Finish kit shipment
|
Details
|
|
|
10-11-2016
|
0.10
|
Inspected - OK for shipment!
|
Details
|
|
|
08-14-2016
|
1.50
|
Torqued L & R tank boltsto Z-flanges
|
Details
|
|
|
08-14-2016
|
0.10
|
More wing tip piano hinges
|
|
|
|
08-13-2016
|
47.75
|
WIng Tips; Piano Hinges
|
Details
|
|
|
08-13-2016
|
7.50
|
WIng tip nav light lenses
|
Details
|
|
|
08-04-2016
|
4.50
|
Fabricated Archer nav antenna
|
|
|
|
08-01-2016
|
7.25
|
All Steps; Install torque tube sub-assemblies
|
|
|
|
07-27-2016
|
17.50
|
Installed bottom wing skins
|
Details
|
|
|
07-23-2016
|
4.50
|
Steps 1 - 10; landing light lenses
|
Details
|
|
|
07-23-2016
|
0.10
|
More wing tip lens prep
|
|
|
|
07-23-2016
|
4.25
|
Installed fuel tanks to wings
|
|
|
|
07-22-2016
|
4.75
|
Wing access plates
|
Details
|
|
|
07-20-2016
|
4.50
|
Installed pitot tube mast.
|
Details
|
|
|
07-16-2016
|
9.75
|
Steps 1 - 4, 1- 4: Assemble ailerons
|
Details
|
|
|
07-16-2016
|
9.75
|
All steps final assembly both ailerons
|
Details
|
|
|
07-15-2016
|
1.50
|
Step 1: Test assemble ailerons
|
Details
|
|
|
07-14-2016
|
6.00
|
Steps 1 - 7: Aileron prep
|
Details
|
|
|
07-11-2016
|
5.50
|
Steps 3 - 4: Bottom skins
|
Details
|
|
|
07-08-2016
|
5.25
|
Steps 6 - 8: Aileron skins
|
Details
|
|
|
07-07-2016
|
6.00
|
Steps 1 - 8: prepping main rib parts
|
Details
|
|
|
07-06-2016
|
14.75
|
Steps 1 - 7: Aileron ribs, stiffeners
|
Details
|
|
|
07-04-2016
|
2.50
|
Steps 1 - 4: Prepping ribs and counter weight.
|
|
|
|
06-29-2016
|
2.00
|
Step 1; Pressure test fuel tanks
|
Details
|
|
|
06-28-2016
|
1.00
|
String thru 4 sets grommets
|
Details
|
|
|
06-28-2016
|
2.75
|
Steps 1 - 4; Torque tube assembly
|
Details
|
|
|
06-28-2016
|
1.50
|
Steps 1 - 4; Assemble torque tube and collars
|
|
|
|
06-28-2016
|
1.80
|
Steps 1 - 4; Aileron Pushrods
|
Details
|
|
|
06-28-2016
|
2.00
|
Steps 1 - 3, Torque Tube
|
Details
|
|
|
06-27-2016
|
2.50
|
Steps 1 - 3
|
Details
|
|
|
06-27-2016
|
0.20
|
Step 1: Stall warning connection
|
|
|
|
06-27-2016
|
1.25
|
Continuity test AP servo connections
|
|
|
|
06-25-2016
|
0.75
|
Steps 1 -3: ADAHRS wirng
|
Details
|
|
|
06-25-2016
|
2.50
|
Steps 1 - 6: Nav light wiring
|
Details
|
|
|
06-25-2016
|
2.50
|
Steps 1 - 6: AP servo wiring
|
Details
|
|
|
06-18-2016
|
8.50
|
Replaced L & R inboard hinge brackets
|
Details
|
|
|
06-17-2016
|
11.30
|
Steps 1 - 8: Assemble flap bottom skins
|
Details
|
|
|
06-16-2016
|
5.80
|
Steps 1 - 2: Flap upper skins installed
|
Details
|
|
|
06-15-2016
|
7.00
|
Steps 1 - 3: Assemble flaps sub-structure
|
Details
|
|
|
06-10-2016
|
0.40
|
Step 1: Press fit hinge braket bushings
|
Details
|
|
|
06-09-2016
|
3.50
|
Steps 1 - 8: Flap hinge assembly
|
Details
|
|
|
06-06-2016
|
5.50
|
Steps1 - 2: Leak test tanks
|
Details
|
|
|
05-29-2016
|
29.00
|
Steps 4;
|
Details
|
|
|
05-29-2016
|
1.50
|
Step 3: Install senders both tanks
|
|
|
|
05-26-2016
|
7.50
|
Steps 1,2,4,5: Fuel tanks - rear baffles
|
Details
|
|
|
05-23-2016
|
15.25
|
Steps 1 - 13: Prep and pre-assemble flaps
|
Details
|
|
|
05-21-2016
|
2.50
|
Steps 1 - 3: Trailing edge prep
|
|
|
|
05-21-2016
|
2.50
|
Steps 1 - 3: Pre-assemble flaps spar, ribs
|
Details
|
|
|
05-20-2016
|
3.50
|
Steps 1 - 9: Flap LE ribs, hinges
|
Details
|
|
|
05-20-2016
|
7.75
|
Steps 1 - 14: Flap LE rib parts prep
|
Details
|
|
|
05-14-2016
|
0.75
|
Step 2 - 3; Fuel tank vent line
|
Details
|
|
|
05-11-2016
|
3.50
|
Steps 1 - 7: Vent lines, ribs, inbrd rib
|
Details
|
|
|
05-08-2016
|
0.10
|
Steps 1 - 4; More fuel tank rib install pics
|
|
|
|
05-08-2016
|
23.00
|
Steps 1 - 4; Fuel tank ribs
|
Details
|
|
|
05-03-2016
|
17.70
|
Steps 1 - 5: Stiffeners, ribs, attach bracket
|
Details
|
|
|
05-03-2016
|
3.00
|
Steps 1 - 2: Sender float wire bends
|
Details
|
|
|
05-01-2016
|
2.00
|
Step 5: Install tank attach bracket
|
Details
|
|
|
03-16-2016
|
2.00
|
Tank rib install assist tools
|
Details
|
|
|
03-15-2016
|
5.00
|
Steps 1 - 4: Fuel tank stiffeners
|
Details
|
|
|
01-17-2016
|
5.00
|
Steps 1 - 5: Flap gap stiffeners
|
Details
|
|
|
01-10-2016
|
1.00
|
Step 1: Prep inboard wing ribs
|
Details
|
|
|
01-03-2016
|
7.00
|
Steps 4 - 13: Prep, assemble brackets parts
|
Details
|
|
|
01-03-2016
|
0.75
|
Step 6; Rivet outbrd aileron hinge brackets
|
|
|
|
12-30-2015
|
0.50
|
Steps 1 - 3: ADAHRS mounting bracket
|
Details
|
|
|
12-26-2015
|
1.50
|
Step 1; rivet nutplates to Z-flanges
|
|
|
|
12-17-2015
|
7.75
|
Steps 6-12; prep tank assembly skin items.
|
Details
|
|
|
12-17-2015
|
0.10
|
Step 1: Final drill drain flange holes
|
|
|
|
12-16-2015
|
3.25
|
Fuel tank baffle rib fuel slip gates.
|
Details
|
|
|
12-15-2015
|
3.50
|
Steps 7-8; assemble tank attach brackets.
|
|
|
|
12-13-2015
|
4.50
|
Steps 3-6; prep all tank bracket assemblies.
|
Details
|
|
|
12-11-2015
|
4.50
|
Steps 2-5; rivet outboard L & R - LE's to spars.
|
Details
|
|
|
12-07-2015
|
1.75
|
Steps 3-5; prep tank j-stiffeners.
|
|
|
|
12-07-2015
|
2.00
|
Step 2-3; final drill and step drill.
|
|
|
|
12-06-2015
|
0.50
|
Step 2; fabricate tank j-channels.
|
|
|
|
12-05-2015
|
5.25
|
Steps 4-5; prep tank ribs.
|
Details
|
|
|
12-05-2015
|
1.25
|
Step 2; prep shims, drill, debur, dimple.
|
|
|
|
12-04-2015
|
2.50
|
Steps 1-6; Wing box J-stiffeners and OB aileron hi
|
|
|
|
12-03-2015
|
2.50
|
Step 10-12; final drill tank Z's, debur.
|
|
|
|
12-02-2015
|
2.50
|
Steps 8-9; prep tanks stiffeners.
|
Details
|
|
|
12-02-2015
|
0.50
|
Step 1; separate and debur shims.
|
|
|
|
12-01-2015
|
0.50
|
Steps 5-6; mount stall warning in LE.
|
|
|
|
12-01-2015
|
9.00
|
Steps 1-6; assemble/rivet L & R LE
|
Details
|
|
|
11-29-2015
|
0.25
|
Step 1; step drill tie down ring holes in skins.
|
|
|
|
11-27-2015
|
0.75
|
Step 11; trim tank attach Z's from stock.
|
|
|
|
11-17-2015
|
4.75
|
Step 3; Rivet right wing
|
Details
|
|
|
11-10-2015
|
5.75
|
Step 3; Rivet top skins.
|
Details
|
|
|
11-09-2015
|
1.50
|
Steps 1-4; stall warning prep, assemble.
|
|
|
|
11-08-2015
|
6.00
|
Step 8; prep, dimple L & R LE skins.
|
|
|
|
11-07-2015
|
2.00
|
Steps 1-4; prep J-Stiffeners L & R
|
|
|
|
11-07-2015
|
0.50
|
Step 9; access hatch doubler
|
|
|
|
11-07-2015
|
0.50
|
Step 6; stall warning tab wing hole
|
|
|
|
11-07-2015
|
4.00
|
Step 6-7; debur and dimple j-stiffeners
|
|
|
|
11-06-2015
|
3.50
|
Steps 1-4; LE backing plates
|
Details
|
|
|
10-21-2015
|
6.00
|
Steps 1 - 2; Left and right wing clecoing.
|
|
|
|
10-20-2015
|
3.00
|
Step 7; Dimple J-channels, prime parts.
|
|
|
|
10-17-2015
|
6.50
|
Steps 1 - 5; Prep wing walk dblrs, inbrd ribs - L
|
|
|
|
10-17-2015
|
3.00
|
Step 7; DImple top wing skins.
|
|
|
|
10-17-2015
|
3.50
|
Step 6; Scarf skins at overlap leading edge.
|
|
|
|
10-12-2015
|
4.00
|
Step 7; Rivet rear spar assemblies to ribs - l & r
|
|
|
|
10-11-2015
|
2.25
|
Steps 5 - 6; Rivet rear spar forks - l and r.
|
|
|
|
10-11-2015
|
1.50
|
Step 4; Dimple flanges of rear spars.
|
|
|
|
10-10-2015
|
3.00
|
Pre-prep top wings skins, L & R.
|
Details
|
|
|
10-06-2015
|
3.50
|
Step 2; Machine C/S rear spar, rear spar dblr plat
|
|
|
|
09-29-2015
|
1.75
|
Step 3;Machine C/S aileron brackets.
|
|
|
|
09-27-2015
|
2.00
|
Step 3; Prep rear spar doubler plates.
|
|
|
|
09-27-2015
|
1.50
|
Step 2;Match drill rear spar doubler plates.
|
|
|
|
09-27-2015
|
3.00
|
Step 1; Rear spar pre assembly, and match drill.
|
|
|
|
09-26-2015
|
3.50
|
Steps 4 - 8; Assemble aileron hinge brackets.
|
Details
|
|
|
09-26-2015
|
1.50
|
Steps 4 - 5; Relieve aileron push rod tube holes i
|
|
|
|
09-26-2015
|
3.50
|
Steps 1 - 2; Prep aileron hinge brackets.
|
|
|
|
09-26-2015
|
0.50
|
Step 3; Snap bushing install left wing
|
|
|
|
09-26-2015
|
0.30
|
Step 2; install snap bushings right wing.
|
|
|
|
09-26-2015
|
0.25
|
Step 1; Prep rear spar doubler plates.
|
|
|
|
09-21-2015
|
9.00
|
Steps 1 - 5; Assemble ribs to spars, left and righ
|
|
|
|
09-20-2015
|
2.00
|
Steps 1 - 4; Assemble flap hinge bracket, torque t
|
|
|
|
09-20-2015
|
2.00
|
Steps 1 - 2; primed ribs left and right wings.
|
|
|
|
09-19-2015
|
3.00
|
Steps 1 - 2;Prep ribs for snap bushings.
|
|
|
|
09-19-2015
|
1.00
|
Step 1;Prep rib snap bushing holes.
|
|
|
|
09-13-2015
|
1.50
|
Steps 5 - 6;Torque tube support assemblies
|
Details
|
|
|
09-13-2015
|
9.00
|
Steps 1 - 4; Flap hinge assemblies and outboard ri
|
|
|
|
08-29-2015
|
30.50
|
Step 3; All wing rib prep
|
Details
|
|
|
08-28-2015
|
2.50
|
Steps 1 - 3; Prepping wing rib flanges
|
|
|
|
08-27-2015
|
2.00
|
Step 4; Wing spar bell cranks
|
Details
|
|
|
08-25-2015
|
2.00
|
Steps 1 - 3; Spar doublers
|
Details
|
|
|
08-23-2015
|
9.50
|
Steps 1 - 4; Prepping spar flanges
|
Details
|
|
|
08-21-2015
|
6.50
|
Step 5; Match drilling J-channels.
|
|
|
|
08-16-2015
|
4.50
|
Step 4; Match drill J-channels
|
|
|
|
07-25-2015
|
2.00
|
Wing skins J-channels prep
|
Details
|
|
|
07-04-2015
|
1.00
|
Mothballed
|
Details
|
|
|
06-21-2015
|
2.50
|
Fitting Elev to HS
|
Details
|
|
|
06-21-2015
|
2.00
|
Finish filling and sanding elevator fairing tips
|
|
|
|
06-20-2015
|
2.25
|
Body-filling elev tip fairings
|
Details
|
|
|
06-15-2015
|
4.00
|
Horiz stab tip fairings
|
Details
|
|
|
06-14-2015
|
1.50
|
Rudder bottom tip fairing attachment
|
Details
|
|
|
06-13-2015
|
3.00
|
Fairing tips filler layups and attach
|
Details
|
|
|
05-31-2015
|
8.50
|
Rudder top tip, elevator tips
|
Details
|
|
|
05-26-2015
|
2.50
|
Rudder tail nav light doubler
|
Details
|
|
|
05-25-2015
|
1.50
|
Prepping fairing flanges
|
Details
|
|
|
05-25-2015
|
1.50
|
Prepping fairing flanges
|
Details
|
|
|
05-16-2015
|
7.50
|
Assembly
|
Details
|
|
|
05-14-2015
|
1.25
|
Assembly
|
Details
|
|
|
05-14-2015
|
2.50
|
Assembly
|
Details
|
|
|
05-13-2015
|
2.00
|
Static port system
|
Details
|
|
|
05-13-2015
|
4.00
|
Assembly
|
Details
|
|
|
05-10-2015
|
6.00
|
Rudder cable/fuselage fairings
|
Details
|
|
|
05-10-2015
|
5.00
|
Assembly
|
Details
|
|
|
05-10-2015
|
3.00
|
Assembly
|
Details
|
|
|
05-08-2015
|
3.50
|
Assembly
|
Details
|
|
|
05-07-2015
|
6.00
|
Assembly
|
Details
|
|
|
05-04-2015
|
1.00
|
Assembly
|
Details
|
|
|
05-03-2015
|
1.75
|
Assembly
|
Details
|
|
|
05-02-2015
|
8.50
|
Assembly
|
Details
|
|
|
04-30-2015
|
4.10
|
Assembly
|
Details
|
|
|
04-29-2015
|
3.75
|
Assembly; bottom skin, bellcrank ribs, and bulkhea
|
Details
|
|
|
04-28-2015
|
5.60
|
Gen'l prep - debur, flute, scuff
|
Details
|
|
|
04-27-2015
|
4.00
|
Gen'l prep - debur, flute, scuff and priming
|
|
|
|
04-26-2015
|
8.50
|
Gen'l prep - debur, flute, scuff and priming
|
|
|
|
04-24-2015
|
3.75
|
Gen'l prep - debur, flute, scuff
|
|
|
|
04-23-2015
|
5.00
|
All parts parts primed thru to here
|
|
|
|
04-18-2015
|
2.00
|
Gen'l prep - debur, flute, scuff
|
|
|
|
04-17-2015
|
17.50
|
Gen'l prep - debur, flute, scuff
|
Details
|
|
|
04-05-2015
|
4.50
|
Rear bulkhead, bottom skin and stab attach parts
|
Details
|
|
|
04-04-2015
|
6.35
|
Preping emp fuse parts
|
Details
|
|
|
04-02-2015
|
1.50
|
Gathered all rear fuselage pieces
|
Details
|
|
|
03-21-2015
|
2.00
|
Elevator trailing edge ribs and TE insert
|
Details
|
|
|
03-20-2015
|
2.60
|
Elevator counter balance ribs
|
|
|
|
03-15-2015
|
4.25
|
Rivet skins, to ribs
|
Details
|
|
|
03-14-2015
|
7.25
|
Assemble rear spars, ribs, skins
|
Details
|
|
|
03-13-2015
|
1.50
|
Front spar assembly
|
Details
|
|
|
03-11-2015
|
2.00
|
Trim tab foam ribs
|
Details
|
|
|
03-08-2015
|
1.75
|
Prime elevator parts and skins
|
Details
|
|
|
03-08-2015
|
1.25
|
Prep inside skins of trim tab for foam ribs
|
|
|
|
03-06-2015
|
2.00
|
More trim tab prep, steps 4 thru 9
|
|
|
|
03-05-2015
|
3.25
|
Prepping spars ribs and parts
|
Details
|
|
|
03-02-2015
|
6.75
|
Prepping for assembly elevator parts
|
Details
|
|
|
03-01-2015
|
1.75
|
09-06 steps 1-4; -07 steps 4 thru 6
|
|
|
|
02-28-2015
|
1.00
|
Elev trim tab hinge prep and riveting
|
Details
|
|
|
02-22-2015
|
3.00
|
Elevator skins prep
|
Details
|
|
|
02-22-2015
|
1.00
|
Elevator parts prep
|
Details
|
|
|
02-21-2015
|
2.50
|
EL Step 1
|
Details
|
|
|
02-16-2015
|
3.00
|
Ready for dimpling/countersinking
|
Details
|
|
|
02-16-2015
|
0.50
|
EL Step 3
|
Details
|
|
|
02-15-2015
|
2.50
|
Ribs1008-A/B
|
Details
|
|
|
02-14-2015
|
22.00
|
Assemble HS
|
Details
|
|
|
01-31-2015
|
2.50
|
Primed HS parts and skins
|
Details
|
|
|
01-17-2015
|
9.00
|
More HS prep
|
Details
|
|
|
01-10-2015
|
11.00
|
Prep HS parts and skins
|
Details
|
|
|
01-10-2015
|
1.00
|
Gather HS parts
|
|
|
|
01-09-2015
|
3.00
|
Rolled and riveted rudder leading edges
|
Details
|
|
|
01-06-2015
|
1.75
|
Rudder top ribs, counter weight
|
|
|
|
01-04-2015
|
1.75
|
Attach rudder spar and lower rib to rudder skins
|
|
|
|
12-27-2014
|
1.00
|
Assemble rudder clecoed
|
|
|
|
12-25-2014
|
2.00
|
Prime rudder parts
|
Details
|
|
|
12-24-2014
|
4.50
|
Final prep rudder parrts
|
Details
|
|
|
12-23-2014
|
2.50
|
Rudder trailing edge prep, countersink
|
|
|
|
12-22-2014
|
2.50
|
Debur rudder skin edges
|
|
|
|
12-21-2014
|
4.00
|
Debur parts edges, flute
|
|
|
|
12-20-2014
|
1.50
|
Remove blue vinyl
|
Details
|
|
|
12-19-2014
|
1.00
|
Rudder parts
|
Details
|
|
|
12-16-2014
|
1.00
|
VS rear spar prep
|
Details
|
|
|
12-14-2014
|
4.50
|
VS assembly
|
|
|
|
12-12-2014
|
2.00
|
VS parts to assemble
|
Details
|
|
|
12-11-2014
|
3.50
|
Primed VS parts
|
Details
|
|
|
12-07-2014
|
2.00
|
VS spar doubler counter sink, ready to prime all p
|
Details
|
|
|
12-06-2014
|
1.50
|
Dimple VS skin
|
|
|
|
11-22-2014
|
3.50
|
Vertical Stabilizer
|
Details
|
|
|
10-23-2014
|
4.50
|
Inventoried box of parts
|
Details
|
|
|
10-21-2014
|
1.00
|
Received empennage kit
|
Details
|
|
|
10-20-2014
|
0.12
|
Reserved N-number on FAA.GOV web site, N14ZT
|
|
|
|
10-20-2014
|
0.05
|
Received notice of shipment and Bill of Lading
|
Details
|
|
|
10-13-2014
|
0.25
|
Placed order for empennage kit
|
Details
|
|
|
10-07-2014
|
2.50
|
Constructed Vans tool box practice kit.
|
Details
|
|
|
12-31-1969
|
1.00
|
Oil pressure sensor hose install
|
|
|
|
12-31-1969
|
2.50
|
More canopy frame to canopy prep for mating
|
|
|