Powered By Kitlog Pro v2.0
Stevens Web Site
RV-7A
All
Work Logs Found:
60
Category Work Time:
245 Hours
Date
Hours
Work Log Summary
Details
06-24-2015
0.50
Changed QB order to slider canopy option
Details
06-09-2015
0.50
Empennage Complete
Details
04-12-2015
1.00
Drilling hole in the horn
Details
04-11-2015
4.00
Interference check
Details
04-08-2015
0.20
Reserved Registration Number
Details
04-07-2015
3.00
Roll left elevator leading edge
Details
04-06-2015
6.00
Rolled leading edges and installed rod end bearing
Details
04-06-2015
1.00
Rivet Trim tab and install on elevator
Details
04-05-2015
3.00
Rivet the trim tab
Details
04-04-2015
7.00
Prepared the trim tab
Details
04-03-2015
2.00
Installed the electric elevator trim servo and riv
Details
04-02-2015
1.00
Complete Trim tab trailing edge
Details
04-01-2015
3.00
Rivet Left Elevator parts
Details
03-30-2015
6.00
Prep the Left Elevator parts.
Details
03-29-2015
6.00
Preparing the left elevator
Details
03-28-2015
4.00
Right Elevator riveting
Details
03-27-2015
7.00
Right Elevator parts prep
Details
03-26-2015
3.00
Prepared to mount the elevator horn.
Details
03-25-2015
3.00
Dimple and countersinking
Details
03-24-2015
5.00
Drilled right elevator skin and counterweight hole
Details
03-23-2015
3.00
Elevator work
Details
03-22-2015
2.00
Back riveted elevator stiffeners to skins
Details
03-21-2015
3.00
Drilled the stiffeners to the elevator skins
Details
03-16-2015
7.00
Completed the Leading Edge of the Rudder
Details
03-14-2015
2.00
Continued to make elevator stiffeners
Details
03-13-2015
8.00
Let sealant cure then rivet rudder trailing edge
Details
03-12-2015
3.00
Preparing Elevator skins - trimming the stiffeners
Details
03-11-2015
6.00
Reassemble rudder trailing edge
Details
03-08-2015
3.00
Drilled rudder training edge
Details
03-07-2015
5.00
Rivet rudder skin to skeleton
Details
03-05-2015
7.00
Rivet rudder components to spar
Details
03-04-2015
6.00
Install rudder components to spar
Details
03-02-2015
3.00
Final Prep of Rudder Skeleton components.
Details
03-01-2015
2.00
Rudder attachment strips
Details
02-27-2015
4.00
Match drilled rudder skeleton components.
Details
02-26-2015
5.00
Building the rudder skeleton
Details
02-24-2015
0.50
Completed Rudder stiffeners
Details
02-21-2015
8.00
Prep/Attach rudder stiffeners
Details
02-20-2015
2.50
Make rudder stiffeners and match drill
Details
02-16-2015
5.00
Riveted the vertical stabilizer skin to skeleton
Details
02-14-2015
1.70
Rivet VS ribs to front spar and cleco on the skin.
Details
02-13-2015
3.00
Rivet the VS rear spar
Details
02-12-2015
2.00
Final Prep of VS parts
Details
02-12-2015
0.50
Clecoed the VS parts together.
Details
02-10-2015
1.00
Match drill VS holes
Details
02-09-2015
1.00
Final drilling VS ribs and spar
Details
02-08-2015
0.50
Prepared the VS ribs
Details
02-08-2015
0.10
Drilled hinge bracket holes
Details
01-28-2015
0.20
Drilling Rear Spar
Details
01-27-2015
20.00
Riveting the HS
Details
12-31-2014
2.00
Riveting the HS rear spar
Details
12-30-2014
16.00
Prepare Horizontal Stabilizer Parts for Assembly
Details
12-03-2014
24.00
Drilling the Horizontal Stabilizer
Details
11-14-2014
1.00
Prepared the Ribs
Details
11-13-2014
8.00
Preparing the front spar assembly
Details
11-06-2014
6.00
Prepared the rear spar assembly components.
Details
10-23-2014
3.50
Inventory of Empennage kit
Details
10-13-2014
0.50
RV-7A empennage kit ordered
Details
10-08-2014
2.00
Van's Tool Box completed
Details
09-22-2014
0.50
Activated Kitlog Pro v2.0
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
60
245
Empennage
55
241
Miscellaneous
1
0
Project Prep
4
4
Copyright © 2001-2024 Matronics. All Rights Reserved.