KitLog pro

Powered By Kitlog Pro v2.0

JOHN'S WEB SITE
Work Logs Found: 165
Category Work Time: 1338 Hours
 Date
Hours
Work Log Summary

Details

 09-28-2014
12.00
Test run engine for one hour.
Details
       

 09-27-2014
14.00
Final checking for inspection
Details
       

 09-25-2014
1.00
Measured for carpeting order
Details
       

 09-24-2014
1.00
SIRS compass/Mindy is gone
Details
     

 09-21-2014
11.00
Shoulder harness, oil door, aileron pushtube seals
Details
       

 09-17-2014
2.50
New arm rests
Details
       

 09-14-2014
11.00
Side panels, wheel pants, carpet measure
Details
       

 09-13-2014
12.00
More fitting on cowling for WW spinner
Details
       

 09-08-2014
12.00
Interior panels cockpit
Details
       

 09-07-2014
9.00
Interior and oil cooler work
Details
       

 09-06-2014
11.00
Oil cooler door and engine mount work
Details
       

 08-31-2014
2.50
Interior wire loom covers
Details
     

 08-30-2014
13.00
Interior panels
Details
     

 08-27-2014
4.00
LED cockpit lights installed.
Details
       

 08-26-2014
1.50
Flooring reinstalled
Details
     

 08-24-2014
12.00
Weight and Balance
Details
       

 08-23-2014
8.00
Panel labeling
Details
       

 06-14-2014
6.00
RV Day display
Details
     

 06-06-2014
5.00
Mounted new Whirlwind 74RV Prop
Details
       

 11-24-2013
12.00
Left Wing Install
Details
     

 11-23-2013
12.00
Right wing and bolts
Details
       

 11-21-2013
3.00
Hartzell Prop Removed and packaged
Details
     

 10-20-2013
8.00
Paint Wings
Details
     

 10-19-2013
16.00
Paint empennage and controls
Details
       

 10-17-2013
14.00
Wing prep before paint
Details
       

 10-15-2013
16.00
Paint fuselage
Details
       

 10-13-2013
13.00
Fuselage prep and into booth
Details
     

 10-12-2013
12.00
Prep and mask fuselage
Details
       

 10-06-2013
12.00
Prep control surfaces and empennage
Details
     

 10-05-2013
12.00
Taking plane apart for paint
Details
       

 09-13-2013
12.00
Closing avionics bay
Details
       

 09-11-2013
12.00
Panel powerup and GPS antenna check
Details
       

 09-11-2013
12.00
Panel power up and check
Details
       

 09-10-2013
12.00
AHRS and static vents
Details
       

 09-07-2013
12.00
Sealed tank sending units
Details
       

 09-02-2013
12.00
Wiring wing and landing lights
Details

 09-01-2013
14.00
Wing wiring and coax upgrade
Details
       

 07-01-2013
12.00
Cockpit floor wiring
Details
     

 05-28-2013
4.00
High School Tour
Details
     

 04-29-2012
12.00
Cockpit wiring
Details
     

 04-21-2012
12.00
Cockpit Control Stick Wiring
Details
     

 04-10-2012
12.00
Panel Wiring to seat pan
Details
     

 04-09-2012
12.00
Cockpit wiring
Details
     

 04-05-2012
12.00
Working on wheel pants and fairings
Details
     

 03-04-2012
12.00
Intersection fairings
Details
     

 02-25-2012
12.00
Pro X Hub and Backup batteries
Details
       

 02-19-2012
12.00
Electrical fuel pump wiring in floor
Details
     

 02-05-2012
12.00
Circuit breaker wiring
Details
       

 01-31-2012
12.00
Panel mounted in airplane with radio stack
Details
     

 01-12-2012
12.00
Panel Fitting
Details
       

 01-11-2012
12.00
Panel painted!
Details
       

 01-10-2012
12.00
Prime interior panels
Details
     

 12-24-2011
5.00
More wirining.
Details

 12-23-2011
12.00
Avionics Power to stack
Details

 12-22-2011
12.00
Avionics Fan
Details

 12-21-2011
12.00
Avionics, XM, adsb
Details

 12-20-2011
12.00
Panel Wiring continues
Details

 12-19-2011
12.00
Avionics wiring
Details

 12-18-2011
12.00
Avionics wiring
Details

 12-17-2011
12.00
Avionics Bus 1, 2
Details

 12-13-2011
12.00
Test fit radios to cut panel
Details
       

 12-09-2011
12.00
Mounting Pro X
Details
     

 12-04-2011
12.00
Engine monitor wiring AFS4500
Details
       

 12-03-2011
12.00
Elevator Servo and ELT
Details
       

 12-02-2011
12.00
Panel cut and test fitting
Details
       

 11-13-2011
12.00
Com antenna and wiring
Details

 11-12-2011
12.00
WAAS antenna
Details
     

 09-10-2011
12.00
Avionics bay shelving
Details
     

 12-04-2010
4.00

Details
       

 12-01-2010
6.00
Checking panel clearance after moving ribs
Details
       

 10-23-2010
10.00
Instrument panel fabrication
Details
       

 10-17-2010
4.00
Reiff Pre Heater installed on oil sump
Details
       

 10-16-2010
12.00
Engine mag harness
Details
       

 10-09-2010
10.00
Air-Oil Separator installation
Details
       

 10-02-2010
8.00
Main gear wheel pants
Details
     

 09-30-2010
8.00
Early steps of panel fabrication and cutting
Details
     

 09-26-2010
10.00
Wiring through wings to Duckworth lights and tips
Details
       

 09-25-2010
12.00
Wing tips Archer Sportcraft Antennas
Details
       

 09-20-2010
10.00
Elevator Servo installation and baggage light
Details
       

 09-19-2010
4.00
Electric flap motor installed
Details
       

 09-18-2010
8.00
Panel Pattern made from poster board
Details
       

 09-14-2010
4.00
Nose gear is back from Langair and Vans new fork.
Details
     

 09-12-2010
10.00
Finalizing fuel selector assembly
Details
       

 09-11-2010
12.00
Fuel selector housing
Details
       

 09-05-2010
11.00
New avionics bay cover and heat scat tubing
Details
       

 09-04-2010
12.00
Brake lines fabricated
Details
       

 08-21-2010
12.00
Wiring and relay mounting on firewall
Details
       

 09-20-2009
6.00
Canopy
Details
       

 08-08-2009
8.00
Wing root fairing and tie down bracket
Details
       

 08-02-2009
10.00
Aileron Travel
Details
       

 08-01-2009
12.00
Setting angle of incidence and wind attach
Details
       

 07-18-2009
6.00

Details
       

 07-11-2009
6.00
Heat control
Details
       

 07-05-2009
6.00
Filtered air box
Details
       

 06-29-2009
6.00
Brake lines
       

 06-28-2009
10.00
Pedals and brake assemblies
Details
       

 06-27-2009
6.00
Rear Windows Fit
Details
     

 06-20-2009
6.00
Engine Baffling
Details
       

 05-24-2009
3.00
Engine Mount on aircraft
Details
       

 05-23-2009
6.00
Control sticks
Details
     

 05-20-2009
6.00
Wing skin install
Details
       

 05-19-2009
8.00
Prime wing skin
Details

 05-18-2009
8.00
Fit wing skin to qb wings
Details
     

 05-16-2009
6.00
External Steps
Details
       

 04-23-2009
6.00
Gretz bracket
Details
       

 04-22-2009
6.00
Pitot mast on inspection cover
Details

 04-21-2009
8.00
Aileron trim servo and land light
Details
       

 04-18-2009
6.00
Wood temp spar
Details

 04-16-2009
8.00
Trim bracket for left aileron
Details

 04-15-2009
8.00
Wing more work
Details

 04-14-2009
8.00
Flap fitting
Details

 04-09-2009
7.00
Flaps
Details

 04-08-2009
7.00
Wing bellcranks
Details
     

 04-07-2009
7.00
Ribs to wing spar
Details
     

 04-05-2009
6.00
Aileron brackets
Details

 04-04-2009
8.00
Made ribs on her birthday
Details

 03-31-2009
6.00
Flap tube
Details
     

 03-13-2009
6.00
Fuse skin debur
Details

 03-12-2009
6.00
Fuselage skin fit and trim
Details
       

 03-05-2009
8.00
Primed fuse skins
Details
     

 03-04-2009
7.00
Fuselage bulkheads
Details
     

 02-27-2009
7.00
Aft fuselage skin
Details
     

 02-25-2009
4.00
Sub panel brace and instrument blank
Details
       

 02-22-2009
4.00
Arm rest fabrication
Details
       

 02-21-2009
6.00
Seat back assembly and fitting
Details
       

 02-20-2009
6.00
Seat back stops
Details

 02-19-2009
6.00
Seat backs continued
Details

 02-12-2009
2.00
Seat backs
Details

 02-07-2009
2.00
Cockpit flooring rib platenuts
Details

 02-06-2009
6.00
HS Elevator tip gaps
Details

 02-05-2009
6.00
HS tips
Details

 01-31-2009
6.00
Cockpit flooring
Details
     

 01-30-2009
6.00
QB uncrated and work started
Details
       

 01-29-2009
8.00
More fiberglass on empennage
Details

 01-23-2009
8.00
Fiberglass tips for empennage
Details

 01-22-2009
6.00
Elevator done and test fitted to hs
Details

 01-18-2009
8.00
Elevator control horns
Details
     

 01-11-2009
6.00
Left elevator stiffeners and trim
Details
     

 01-10-2009
6.00
Left elevator started
Details
     

 01-09-2009
6.00
Right elevator done
Details

 01-08-2009
6.00
Elevator spar continued
Details

 01-07-2009
3.00
Elevator spar
Details

 01-06-2009
3.00
Right elevator
Details

 01-03-2009
6.00
QB inventory and unpack continue
Details
     

 01-01-2009
8.00
QB upbox in garage
Details

 12-24-2008
1.00
Leading edge of rudder pop riveted
Details

 12-23-2008
4.00
Rudder control horn
Details

 12-22-2008
2.00
Bent rudder skin and filled trailing edge
Details

 12-20-2008
3.00
Back rivet rudder skin
Details
     

 12-19-2008
5.00
Rudder skin and stiffeners
Details
       

 12-18-2008
3.00
VS final construction
Details
       

 12-17-2008
5.00
VS initial fit
Details

 12-16-2008
7.00
HS together
Details
       

 12-15-2008
3.00
VS Spar
Details

 12-14-2008
3.00
VS assembly
Details

 11-27-2008
2.00
VS parts organized
Details

 11-23-2008
1.00
Test fit HS skin
Details

 11-20-2008
2.00
Primed HS skin
Details

 11-16-2008
5.00
Drilled HS skins
Details

 11-15-2008
4.00
HS Skin test fit
Details
     

 11-14-2008
5.00
HS jigged
Details

 11-09-2008
6.00
HS Skeleton
Details
     

 11-08-2008
5.00
HS Spar
Details
       

 11-06-2008
6.00
Horizontal Stabilizer Fabrication
Details

 10-15-2008
5.00
Empennage kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.