Date
|
Hours
|
Work Log Summary
|
Details
|
06-04-2005
|
2.50
|
Rivet flap braces and mount aileron bellcranks
|
Details
|
|
|
06-04-2005
|
1.50
|
Flap hinge fitting and drilling
|
Details
|
|
|
06-04-2005
|
0.50
|
Fit, drill and mount auto pilot hardware.
|
Details
|
|
|
06-04-2005
|
0.50
|
Fit Tru-Trak autopilot hardware
|
Details
|
|
|
06-04-2005
|
2.00
|
Countersink, dimple, debur and install wing parts
|
Details
|
|
|
06-04-2005
|
1.00
|
Attach ailerons to brackets
|
Details
|
|
|
06-04-2005
|
1.00
|
Aileron position alignment
|
Details
|
|
|
06-04-2005
|
1.50
|
Aileron bracket install and steel aileron brackets
|
Details
|
|
|
06-03-2005
|
3.00
|
Wing skin & Aileron Bracket install
|
Details
|
|
|
06-03-2005
|
5.00
|
Fit and match drill aileron and flap braces to win
|
Details
|
|
|
03-11-2004
|
1.50
|
Rivet Latch angles
|
Details
|
|
|
03-11-2004
|
2.50
|
Gas Strut assembly
|
Details
|
|
|
03-11-2004
|
2.50
|
Fwd channels to firewall and 704K covers
|
Details
|
|
|
03-10-2004
|
2.00
|
Rivet F644s and Canopy Latch
|
Details
|
|
|
03-10-2004
|
2.00
|
Canopy screws & Handles
|
Details
|
|
|
03-10-2004
|
5.50
|
Canopy latch and F704k Cap strips
|
Details
|
|
|
03-04-2004
|
4.00
|
Canopy and frame work
|
Details
|
|
|
03-03-2004
|
2.00
|
Redo F644
|
Details
|
|
|
03-03-2004
|
2.50
|
Countersink canopy for #6
|
Details
|
|
|
01-08-2004
|
2.00
|
Rear canopy final cut
|
Details
|
|
|
01-08-2004
|
2.00
|
Rear canopy cuts
|
Details
|
|
|
01-08-2004
|
3.00
|
Canopy screw holes
|
Details
|
|
|
01-07-2004
|
9.00
|
Side skirts and canopy fit/cut
|
Details
|
|
|
12-13-2003
|
4.00
|
Fwd Canopy half cuts
|
Details
|
|
|
12-13-2003
|
4.00
|
Canopy side skirts
|
Details
|
|
|
12-13-2003
|
0.50
|
Canopy screw holes
|
Details
|
|
|
11-24-2003
|
4.00
|
Rivet C702 and cut canopy
|
Details
|
|
|
11-23-2003
|
2.00
|
Canopy latch assembly
|
Details
|
|
|
11-23-2003
|
2.00
|
Canopy frame assembly and fit
|
Details
|
|
|
11-23-2003
|
3.00
|
Canopy First Cut
|
Details
|
|
|
11-23-2003
|
4.00
|
Canopy ballstud mounts
|
Details
|
|
|
11-22-2003
|
2.50
|
Rollbar Assembly
|
Details
|
|
|
11-22-2003
|
2.00
|
Canopy frame and skins
|
Details
|
|
|
11-22-2003
|
3.50
|
Canopy Frame
|
Details
|
|
|
11-06-2003
|
2.50
|
Rudder Blocks and Fwd Fuselage
|
Details
|
|
|
11-06-2003
|
2.00
|
Rollbar support assembly
|
Details
|
|
|
11-06-2003
|
3.00
|
Instrument panel
|
Details
|
|
|
11-06-2003
|
4.00
|
Aft Top Skin Install
|
Details
|
|
|
11-05-2003
|
3.50
|
Rollbar support assembly
|
Details
|
|
|
11-05-2003
|
2.00
|
Fastener work on Rollbar angles
|
Details
|
|
|
11-05-2003
|
4.00
|
Canopy backing strip and Channel attach
|
Details
|
|
|
10-30-2003
|
2.00
|
Upper Forward Fuselage Prep
|
Details
|
|
|
10-30-2003
|
3.00
|
Firewall Recess install
|
Details
|
|
|
10-30-2003
|
5.00
|
Center Cabin Cover
|
Details
|
|
|
10-30-2003
|
1.50
|
Battery Box Supports
|
Details
|
|
|
10-25-2003
|
1.00
|
Battery Support Angles
|
Details
|
|
|
10-24-2003
|
4.00
|
Cabin Vents and Tunnel Cover
|
Details
|
|
|
10-24-2003
|
6.50
|
Battery Box Assembly
|
Details
|
|
|
10-01-2003
|
4.00
|
Canopy and rollbar Support
|
Details
|
|
|
10-01-2003
|
4.00
|
Canopy and rollbar support
|
Details
|
|
|
09-30-2003
|
4.00
|
Rollbar assembly
|
Details
|
|
|
09-30-2003
|
5.00
|
Canopy frame and Rollbar
|
Details
|
|
|
09-27-2003
|
8.00
|
Rollbar Assembly
|
Details
|
|
|
09-26-2003
|
6.00
|
Canopy Support Structure
|
Details
|
|
|
09-26-2003
|
4.00
|
Canopy parts
|
Details
|
|
|
05-08-2003
|
4.50
|
Wing work jig
|
Details
|
|
|
05-02-2003
|
7.00
|
Rear Bulk., Fuselage work
|
Details
|
|
|
05-01-2003
|
3.00
|
Rear Bulkhead
|
Details
|
|
|
05-01-2003
|
3.50
|
Elevator attach and Rear Bulkhead
|
Details
|
|
|
05-01-2003
|
4.00
|
Electric Flap install
|
Details
|
|
|
04-30-2003
|
9.50
|
Flap hardware and floors
|
Details
|
|
|
04-29-2003
|
2.00
|
Mounted Wings
|
Details
|
|
|
04-29-2003
|
4.50
|
Control rod fabrication
|
Details
|
|
|
04-29-2003
|
3.00
|
Brake pedal work
|
Details
|
|
|
04-28-2003
|
9.00
|
Rudder pedal work
|
Details
|
|
|
04-27-2003
|
3.50
|
Rudder, Elevator prep for install
|
Details
|
|
|
04-27-2003
|
4.50
|
Empannage prep for installation
|
Details
|
|
|
04-26-2003
|
4.00
|
Prep for Horiz. Stab. Mounting
|
Details
|
|
|
01-11-2003
|
2.00
|
Rudder Pedals and FWD Fusel. assemb.
|
Details
|
|
|
01-05-2003
|
0.75
|
Seatback brace riveting
|
Details
|
|
|
01-05-2003
|
1.50
|
Complete seatbacks and install
|
Details
|
|
|
01-02-2003
|
5.75
|
Cleco and Drill Seatback assemblies
|
Details
|
|
|
01-01-2003
|
4.25
|
Seat Back Parts
|
Details
|
|
|
12-04-2002
|
2.00
|
Dimple and debur Aft Top Skin and parts
|
Details
|
|
|
10-25-2002
|
1.50
|
Make Rudder pedal parts
|
Details
|
|
|
10-25-2002
|
2.75
|
Cleco Fwd top skin and drill
|
Details
|
|
|
10-02-2002
|
2.50
|
Cut Landing Gear Holes
|
Details
|
|
|
10-01-2002
|
1.00
|
Make F688 Gusset
|
Details
|
|
|
10-01-2002
|
1.00
|
Make and ream bushings for Control Stick
|
Details
|
|
|
10-01-2002
|
2.50
|
Elevator Bell Crank Assembly
|
Details
|
|
|
09-21-2002
|
3.00
|
Match drill F705j,k,l Trim F721br and l
|
Details
|
|
|
08-31-2002
|
1.00
|
Firewall recess and Brake line bracket
|
Details
|
|
|
08-30-2002
|
0.50
|
Disassemble parts for seatback assemb.
|
Details
|
|
|
08-29-2002
|
1.50
|
Made Seat-back adjustment parts
|
Details
|
|
|
08-29-2002
|
1.50
|
Finished rudder Assembly (RV9A Repl.)
|
Details
|
|
|
08-28-2002
|
6.00
|
Rudder Assembly (RV9A replacement)
|
Details
|
|
|
08-27-2002
|
1.50
|
RV9 Rudder inventory and stiffeners
|
Details
|
|
|
08-22-2002
|
4.00
|
Built Fuselage Support jigs
|
Details
|
|
|
08-03-2002
|
3.50
|
Quickbuild parts inventory
|
Details
|
|
|
07-31-2002
|
1.50
|
Quickbuild Arrival
|
Details
|
|
|
05-03-2002
|
6.00
|
Final assem. Rudder
|
Details
|
|
|
05-02-2002
|
12.00
|
Assemble Rudder and rivet.
|
Details
|
|
|
05-01-2002
|
12.50
|
Final Ass. HS, Rudder structure
|
Details
|
|
|
04-30-2002
|
12.50
|
Elev. structure Rivet HS
|
Details
|
|
|
04-29-2002
|
12.50
|
HS skins
|
Details
|
|
|
04-28-2002
|
12.50
|
Comp VS, Begin Rudder, Begin HS
|
Details
|
|
|
04-27-2002
|
12.00
|
Inv. Vert. Stab
|
Details
|
|