Powered By Kitlog Pro v2.0
Pauls Web Site
RV-6A
All
Work Logs Found:
579
Category Work Time:
2178 Hours
Date
Hours
Work Log Summary
Details
01-11-2020
0.00
Picked aircraft up from paint
Details
08-04-2019
40.00
Ready for the DAR inspection
Details
08-03-2019
4.00
Determined weight and balance.
Details
07-24-2019
2.00
Determined unusable fuel
Details
07-21-2019
8.00
Wired wings to fuselage
Details
07-20-2019
10.00
Installed spinner
Details
07-17-2019
2.00
Installed wing fuel lines
Details
07-08-2019
5.00
Installed tail
Details
07-06-2019
2.00
Installed wing tank leading edge bolts
Details
07-01-2019
20.00
Installed wing spar bolts
Details
06-30-2019
8.00
Installed tail feathers
Details
06-29-2019
8.00
Aircraft on gear
Details
06-22-2019
16.00
Installed wings
Details
06-14-2019
4.00
Move aircraft to airport
Details
06-09-2019
2.00
Removed gear
Details
06-09-2019
1.00
Installed oil filter
Details
06-09-2019
4.00
Applied cowling heat reflecting material
Details
06-02-2019
1.00
Installed the nameplate
Details
06-02-2019
5.00
Fixing elevator
Details
05-19-2019
10.00
Empennage lower fairings
Details
05-12-2019
2.00
Rudder cable fairings
Details
05-12-2019
3.00
Empennage fairing
Details
05-10-2019
12.00
Empennage fairing
Details
04-20-2019
24.00
Windscreen fairing
Details
04-19-2019
6.00
Shaping the windscreen fillet
Details
04-19-2019
5.00
Applied fiberglass to windscreen fairing
Details
04-18-2019
5.00
Bottom cylinder engine baffle
Details
04-14-2019
3.00
Installed windscreen
Details
04-14-2019
3.00
Continue installation of windscreen
Details
04-14-2019
0.00
Additional windscreen pictures
Details
04-13-2019
16.00
Installing Windscreen
Details
04-06-2019
5.00
Building stabilizer fairing
Details
03-26-2019
0.00
Pictures of center tunnel completed
Details
03-17-2019
8.00
Installing fuselage access door
Details
03-11-2019
3.00
Finished skin over avionics
Details
03-10-2019
7.00
Installing top skin
Details
03-09-2019
3.00
Getting top skin ready to install
Details
03-09-2019
5.00
Finished installing defrost fans
Details
03-07-2019
2.00
Cut access door behind firewall
Details
03-03-2019
2.00
Installed brace on oil door
Details
03-03-2019
3.00
Cutting holes for defrost fans
Details
03-02-2019
3.00
Oil cooler brace
Details
02-28-2019
2.00
Installing oil door
Details
02-19-2019
2.00
Oil door and firewall insulation
Details
02-17-2019
16.00
Front storage locker
Details
02-09-2019
40.00
Wire lacing/Tye wrapping
Details
12-09-2018
10.00
Finished EFII32 upgrade
Details
12-08-2018
10.00
Upgraded EFII32
Details
11-15-2018
2.00
Lacing vertical section of center tunnel
Details
10-28-2018
40.00
Dynon configurations
Details
09-30-2018
8.00
Configuring avionics
Details
09-29-2018
7.00
Dynon backup batteries
Details
09-28-2018
4.00
Installed manifold pressure lines
Details
09-23-2018
16.00
Powered up the avionic panel
Details
09-22-2018
10.00
EGT, CHT, and spark plug wires
Details
09-21-2018
3.00
Installed crankcase breather
Details
09-09-2018
8.00
Wiring avionics
Details
09-08-2018
8.00
Worked on avionics
Details
09-07-2018
2.00
Right side of VPX completed
Details
09-07-2018
1.00
Installed oil pressure sensor line
Details
09-07-2018
3.00
Braced GPS mount
Details
09-06-2018
2.00
Installed J1 on VPX
Details
09-05-2018
1.00
Installed fuel sender hose
Details
08-26-2018
5.00
Installing the avionic wiring harness
Details
08-26-2018
3.00
Completed wiring harness
Details
08-23-2018
4.00
Finished Garmin connectors
Details
08-21-2018
8.00
More work on the wiring harness
Details
08-18-2018
8.00
Worked on avionics wiring harness
08-08-2018
1.00
Remounted ELT buzzer
Details
08-07-2018
4.00
Worked on wiring harnesses
Details
08-05-2018
5.00
Building Skyview Y harness
Details
08-04-2018
8.00
Working on main wiring harness
Details
08-03-2018
3.00
Installed manifold pressure lines
Details
07-30-2018
3.00
Avionics wiring
Details
07-29-2018
0.00
More baggage light pictures
Details
07-29-2018
3.00
Completed baggage light
Details
07-28-2018
1.00
Installed ELT audio alert
Details
07-28-2018
2.00
Installed ADSB 472
Details
07-21-2018
2.00
Installed charging fuses
Details
07-15-2018
4.00
Heater cable bracket
Details
07-14-2018
1.00
Installed EarthX trouble lights
Details
07-13-2018
40.00
Time spent running wiring
Details
07-13-2018
2.00
Accessory batteries for the ACK ELT
Details
06-17-2018
20.00
Flap motor wiring
Details
06-10-2018
3.00
Wired Battery and Fuel selector switch
Details
06-10-2018
1.00
Torqued engine bolts
Details
05-28-2018
2.00
Installed lanyard on C-679
Details
05-27-2018
2.00
Fabricated C-679
Details
05-26-2018
40.00
Wiring aircraft
Details
04-09-2018
5.00
Installed manifold pressure sensors
Details
03-04-2018
3.00
Installed fuse block for heated seat and fuel pump
Details
03-03-2018
5.00
Installed pilot heated seat wiring
Details
02-24-2018
3.00
Fabricated hole saw
Details
02-11-2018
6.00
Top plenum cover
Details
02-11-2018
2.00
Installed heater hose
Details
01-27-2018
3.00
Installing cowling pin covers
Details
01-27-2018
8.00
Forming top plenum
Details
01-18-2018
2.00
Fabricating top plenum
Details
01-17-2018
7.00
Installed Pilot stick grip
Details
01-16-2018
8.00
Installing the Infinity grips
Details
01-15-2018
6.00
Worked on the top plenum
Details
01-13-2018
8.00
Trimming down the baffles
Details
01-06-2018
3.00
More baffle work
Details
01-05-2018
10.00
More baffle work
Details
12-02-2017
8.00
Engine baffles
Details
11-23-2017
2.00
Installed #3 engine baffle
Details
11-22-2017
3.00
Engine baffle cylinder 3
Details
11-19-2017
8.00
Cylinder 4 engine baffle
Details
11-15-2017
2.00
Engine baffles
Details
11-14-2017
2.00
Cleaned up shop
11-13-2017
3.00
Finished alternate air door
Details
11-04-2017
6.00
Air filter
Details
11-03-2017
1.00
Installed heat muff
10-17-2017
1.00
Final fiberglass layer
Details
10-16-2017
1.00
Another layer of fiberglass
Details
10-15-2017
4.00
Laid fiberglass on FAB
Details
10-15-2017
5.00
Continued on FAB
Details
10-02-2017
2.00
EGTs installed
Details
10-02-2017
6.00
Air box
Details
10-02-2017
2.00
#1 exhaust heat shield
Details
09-24-2017
2.00
Stripped valve covers
Details
09-23-2017
18.00
Worked on cowling
Details
08-25-2017
4.00
Modified GPS mounts
Details
08-25-2017
3.00
Lengthened the top cowl
Details
08-22-2017
0.50
Finished canopy repair
Details
08-21-2017
3.00
Still working on the cowl
Details
08-20-2017
0.50
Repaired canopy damage
Details
08-20-2017
1.00
Install AntiSplat Nose Job 2
Details
08-20-2017
4.00
Fitting cowl halves together
Details
08-19-2017
1.00
Resolving fuel line clearance
Details
08-19-2017
6.00
Installing horizontal cowl hinges
Details
08-19-2017
8.00
Cowling continued
Details
08-18-2017
6.00
Cowling installation
Details
08-08-2017
3.00
Installed cowl veritical hinges
Details
08-03-2017
2.50
Working on cowling
Details
08-01-2017
1.00
Starting on the bottom cowl
Details
07-31-2017
2.00
Working on top cowl
Details
07-31-2017
3.00
Installing hinges on upper cowl
Details
07-23-2017
2.00
Working on upper cowl
Details
07-07-2017
2.50
Working on upper cowl
Details
07-07-2017
0.00
More pictures of glareshield trim
07-07-2017
0.50
Installed top skin in preparation for cowl work
Details
07-06-2017
2.00
Measured fuel and brake flex lines
Details
07-05-2017
4.00
Finished heat shield on center wire bundle
Details
07-05-2017
0.00
Additional pictures of the center tunnel heat shie
07-04-2017
2.00
Wiring in forward center tunnel
Details
07-04-2017
4.00
Running wire from rear of aircraft through wing sp
Details
07-02-2017
2.00
Installed COM antennas
Details
07-01-2017
1.00
Installed GPS receivers
Details
07-01-2017
2.00
Installed brake cylinder kits
Details
06-27-2017
0.00
test
06-26-2017
3.00
Alt air cable installed
Details
06-25-2017
8.00
Filtered air box
Details
06-24-2017
2.00
Working on filtered air box
Details
06-24-2017
6.00
Installing GPS receivers under cowl
Details
06-20-2017
0.50
Installed filter on alt static air
Details
06-19-2017
2.00
HDX backup batteries
Details
06-18-2017
3.00
Rudder pedals
Details
06-18-2017
2.00
Installed the SV-EMS-220
Details
06-11-2017
3.00
Reinstalled rudder pedals
Details
06-11-2017
0.00
More pictures of the air vent installation
Details
06-11-2017
3.00
Installed air ducts
Details
06-11-2017
1.00
Canopy latch
Details
06-10-2017
4.00
Installed brake and heater cables
Details
06-10-2017
2.00
Fabricated brackets for side air vents
Details
06-05-2017
6.00
Installed canopy on the supertracks
Details
06-04-2017
3.00
Alternate static air
Details
06-03-2017
5.00
Static and dynamic test ports
Details
05-30-2017
2.00
Installed avionics
Details
05-21-2017
6.00
Installing avionics
Details
05-20-2017
4.00
Installed instrument panel
Details
05-18-2017
5.00
Revisited the propeller governor
Details
05-12-2017
1.00
Fabricated circuit breaker bus bar
Details
05-11-2017
2.00
Painting the side rails
Details
05-11-2017
2.00
Almost 14 mod installation
Details
05-10-2017
3.00
Installing Almost 14 mod
Details
05-08-2017
3.00
Building Garmin stack
Details
05-07-2017
3.00
Installed throttle cable
Details
05-07-2017
1.00
Installed panel
Details
05-02-2017
2.00
Installed propeller cable
Details
04-30-2017
3.00
Routed alternator wiring
Details
04-30-2017
3.00
More starter wiring
Details
04-30-2017
3.00
Finished installation of alternator
Details
04-29-2017
4.00
Installed secondary ADAHRS
Details
04-29-2017
4.00
Installed BU alternator and starter wire
Details
04-27-2017
4.00
Installed starter soleniods
Details
04-22-2017
3.00
Installed two battery boxes
Details
04-21-2017
4.00
Installed EFII computers
Details
04-15-2017
8.00
Installed Vertical Power and Bus Manager
Details
04-14-2017
6.00
Throttle bracket
Details
04-04-2017
5.00
Fuel vent lines installed
Details
04-01-2017
12.00
Installed brake lines
Details
04-01-2017
12.00
Installed brake lines
Details
03-27-2017
2.00
Installed fuel line
Details
03-26-2017
4.00
Glareshield trim
Details
03-19-2017
3.00
Repainting the instrument panel
Details
03-12-2017
7.00
Instrument panel painted
Details
03-11-2017
8.00
Instrument Panel ready for painting
Details
03-08-2017
1.00
Adjusted Governor
Details
03-04-2017
7.00
Instrument panel
Details
02-18-2017
1.00
Measured cable lengths
Details
02-18-2017
6.00
Installed firewall penetrations and instrument pan
Details
02-16-2017
1.00
Fuel return line completed
Details
02-15-2017
2.00
Reinstalled throttle body
Details
02-04-2017
2.00
Finished throttle bracket
Details
02-02-2017
3.00
Throttle bracket
Details
01-29-2017
6.00
Throttle bracket
Details
01-27-2017
2.00
Fuel line leaving pressure regulator
Details
01-26-2017
1.00
Put engine back on firewall
Details
01-26-2017
2.00
Installed fuel pressure regulator
Details
01-25-2017
2.00
Finished parking brake
Details
01-24-2017
4.00
Parking brake fabricated
Details
01-21-2017
2.00
Installed heater valve
Details
01-15-2017
3.00
Fuel tubing completed
Details
01-15-2017
3.00
Fuel lines to right wing
Details
01-09-2017
2.00
Right side fuel line
Details
01-08-2017
6.00
Fabricated fuel return line
Details
01-06-2017
3.00
Installed fuel supply to firewall
Details
01-03-2017
2.00
Installed deadening material below fuel pumps
Details
01-02-2017
6.00
Fuel system penetrations
Details
12-17-2016
4.00
Wired fuel pumps
Details
12-15-2016
24.00
Instrument panel template
Details
12-08-2016
8.00
Parking brake
Details
11-24-2016
3.00
Installed fuel line to prefilter
Details
11-23-2016
1.00
Worked on duplex fuel valve
Details
11-22-2016
3.00
Maintenance brackets for fuel pumps
Details
11-20-2016
4.00
Painted the firewall support angles
Details
11-19-2016
3.00
Modified fuel pump position on center support
Details
11-12-2016
5.00
Changing color of front interior
Details
11-12-2016
0.50
Andair parts
Details
11-06-2016
5.00
Worked on fuel center console
Details
11-06-2016
2.00
Fitting fuel valve
Details
10-30-2016
5.00
Finished tubing between filters and fuel pumps
Details
10-29-2016
4.00
Working of fuel system
Details
10-22-2016
4.00
Completed exhaust
Details
10-22-2016
1.00
Cleaned up shop
Details
10-17-2016
3.00
Installed throttle body
Details
10-16-2016
8.00
Installed crank position sensor
Details
10-15-2016
4.00
Installed starter and alternator
Details
10-15-2016
4.00
Installed intake and exhaust tubes
Details
10-03-2016
3.00
Removing engine mount from airframe
Details
10-02-2016
6.00
Installed engine
Details
10-01-2016
4.00
Working on nose gear
Details
10-01-2016
3.00
Installed main gear
Details
09-30-2016
6.00
Finished up canopy skirts
Details
09-26-2016
3.00
Filling in copilot side canopy skirt
Details
09-25-2016
4.00
Tweeking the canopy skirts
Details
09-25-2016
3.00
Took the canopy back off the aircraft
Details
09-24-2016
2.00
Epoxied canopy skirts to pilots side
Details
09-23-2016
4.00
Epoxying canopy skirt copilot side
Details
09-18-2016
4.00
Prepping canopy skirts
Details
09-14-2016
1.00
Nosegear modification
Details
09-10-2016
4.00
Trimmed up the canopy
Details
09-10-2016
1.00
Made C792
Details
09-10-2016
0.50
Changed out desiccant in spark plugs
09-09-2016
4.00
More work on canopy
Details
09-04-2016
3.00
Filled in some low spots on the canopy skirt
Details
09-03-2016
0.00
More canopy skirt pictures
Details
09-03-2016
3.00
Installed canopy skirts
Details
08-30-2016
3.00
Worked on nose gear service bulletin
Details
08-21-2016
2.00
Making templates for fiberglass
Details
08-21-2016
2.00
Getting ready to fiberglass the canopy skirt
Details
08-20-2016
2.00
Sanded canopy
Details
08-20-2016
0.50
Replaced spark plug desiccant
Details
08-17-2016
2.00
Applied filler to canopy
Details
08-07-2016
6.00
More work on canopy
Details
08-07-2016
1.00
Cleaned shop
Details
08-02-2016
4.00
Installing Supertracks
Details
07-30-2016
0.50
Replaced spark plug desiccant
07-30-2016
3.00
Finished canopy rear slider blocks
Details
07-17-2016
3.00
Worked on canopy
Details
07-17-2016
1.50
Empennage fairing
Details
07-16-2016
2.00
Installed forward brace
Details
07-16-2016
2.00
Fairing on empennage
Details
07-16-2016
4.00
Canopy handle
Details
07-15-2016
3.00
More work on the canopy
Details
07-10-2016
5.00
Roll bar
Details
07-10-2016
0.00
Picture of roll bar shims
07-10-2016
1.50
Painted underside of rear top skin
Details
07-08-2016
1.50
Installed the canopy
Details
07-08-2016
1.50
Fitted canopy latch
Details
07-07-2016
3.00
Worked on canopy
Details
07-06-2016
3.00
Canopy parts
Details
07-05-2016
1.50
Installing Supertracks
Details
07-05-2016
2.00
Canopy rear slide rail
Details
07-04-2016
2.00
Applied fillet coat of Sika
Details
07-03-2016
1.00
Cleaned shop
07-03-2016
3.50
Applied first layer of Sika
Details
07-02-2016
4.00
Preparing canopy for the Sika
Details
07-02-2016
1.00
Changed out desiccant
Details
06-25-2016
4.00
Final cuts on canopy
Details
06-04-2016
8.00
EFII engine components
Details
05-29-2016
3.50
Made the big cut today!
Details
05-29-2016
1.00
Canopy seperated
Details
05-12-2016
3.00
Fitting canopy frame
Details
05-04-2016
2.00
Finished painting the canopy parts
Details
05-01-2016
1.50
Getting the canopy ready to paint
Details
04-30-2016
1.00
Visitor stopped by
Details
04-25-2016
2.00
Ready to paint
Details
04-24-2016
2.50
Finished rough sanding of the canopy frame
Details
04-09-2016
2.00
Prepping for EFII
Details
04-07-2016
1.00
Sanded more on the canopy frame
Details
04-04-2016
3.00
Sanding the canopy frame
Details
03-26-2016
1.00
Installed Pilot seat
Details
03-26-2016
5.00
Finished the seat belt 5th point hardware
Details
03-25-2016
6.00
Installing 5th point seat belt harness
Details
03-20-2016
1.00
Ready for help with top skin
Details
03-20-2016
2.00
Finished top skin
Details
03-19-2016
3.00
Riveting top skin
Details
03-19-2016
1.00
Rivet training for my wife
Details
03-08-2016
2.00
Preparing to rivet top skin
Details
03-07-2016
2.00
Getting canopy ready
Details
03-05-2016
1.00
Finished canopy slide rail
Details
02-16-2016
1.00
Rear canopy slide rail
Details
02-15-2016
3.00
Rear canopy slide rail
Details
02-12-2016
2.00
Empannage fairing
Details
02-10-2016
2.00
Fitting canopy rails
Details
01-05-2016
2.00
Installed F-6111
Details
01-04-2016
2.00
Installed baggage panels
Details
01-01-2016
2.00
Updated the avionics drawings
01-01-2016
2.00
Studying Van's manual
Details
01-01-2016
4.00
Finished all wiring behind the baggage bulkhead
Details
01-01-2016
1.00
Cleaned the shop
12-31-2015
8.00
Worked on avionics and ELT
Details
12-24-2015
1.00
Pulled wire from empennage to front of aircraft
Details
12-23-2015
8.00
Wiring empennage
Details
12-22-2015
8.00
Wiring empennage
Details
12-21-2015
1.00
Finished Skyview network cable
Details
12-20-2015
2.00
Skyview Network Harness
Details
12-20-2015
3.00
ELT wiring harness
Details
12-20-2015
1.00
Cleaned shop
12-18-2015
2.00
Finished installation of ADARHS
Details
12-12-2015
8.00
Finished transponder and ADSB receiver harness
Details
12-11-2015
2.00
Transponder avionics harness
Details
12-10-2015
2.00
Worked on wiring
Details
12-08-2015
3.00
Wiring in empennage
Details
12-06-2015
3.00
Wiring harnes in rear empennage
Details
12-06-2015
4.00
Seat belt harness support
Details
12-05-2015
3.00
Rudder fairing finished
Details
12-04-2015
5.00
Worked on lower rudder fairing
Details
11-29-2015
2.00
Rudder end cap
Details
11-29-2015
2.00
Mounted rear avionics
Details
11-29-2015
1.00
Finished ends of elevators
Details
11-28-2015
2.00
Worked on rear avionics tray
Details
11-28-2015
1.00
Installed transponder and ADSB antennas
Details
11-28-2015
1.00
Elevator end closure
Details
11-28-2015
1.00
Cleaned shop
11-27-2015
8.00
Fabricated rear avionic shelf
Details
11-26-2015
1.00
Worked on smoothing the elevator ends
Details
11-25-2015
1.00
Rudder wire routing
Details
11-25-2015
2.00
Ran rear nav light wire from rudder to vert stab
Details
11-23-2015
2.00
Removed temporary enclosure
Details
11-22-2015
4.00
Routing rear nav light wiring
Details
11-22-2015
3.00
ADAHRS wire loom
Details
11-21-2015
4.00
Redid wiring to the pitch servo
Details
11-20-2015
2.00
Sealing up ends on horizontal stabilizer
Details
11-16-2015
2.00
Sealed ends of horizontal stabilizer
Details
11-16-2015
1.00
Installed electrical connector
Details
11-14-2015
3.00
More work on the elevators
Details
11-14-2015
1.00
Cleaned shop
Details
11-12-2015
2.00
Sealing ends of elevator
Details
11-05-2015
3.00
Installed OAT and made wiring harness
Details
11-01-2015
6.00
Installed ADAHRS bracket and static line
Details
10-31-2015
5.00
Started ADAHRS bracket
Details
10-29-2015
3.00
Worked on electrical schematics
Details
10-28-2015
3.00
Worked on electrical schematics
Details
10-27-2015
4.00
Wired pitch trim
Details
10-25-2015
4.00
Revised flap position sensor brackets
Details
10-25-2015
2.00
Installed tail position/strobe light
Details
10-25-2015
2.00
Cleaned shop
Details
10-12-2015
1.00
Left wing platenuts
Details
10-11-2015
5.00
Installing plate nuts on wings for root fairing
Details
10-09-2015
1.00
Wiring
Details
10-09-2015
2.00
Dimpled skin and installed plate nuts
Details
10-04-2015
1.00
Slotted hole in F-604A
Details
10-04-2015
3.00
Reinstalled wooded spars
Details
10-03-2015
0.50
Removed wings
Details
10-03-2015
4.00
Moving fuselage into main shop
Details
10-03-2015
0.50
More pictures of wing removal
10-02-2015
2.00
Prepped wings for removal
Details
09-30-2015
2.00
Finished right wing fairing
Details
09-29-2015
2.00
Right wing root fairing
Details
09-27-2015
5.00
Fixing minor things
Details
09-25-2015
4.00
Lowered the fuselage
Details
09-24-2015
3.00
Tying up loose ends
Details
09-20-2015
1.00
Sanded down the wing tip filler
Details
09-19-2015
1.00
Worked on gap at front of right wing tip
Details
09-19-2015
4.00
Misc loose ends on gear and wingtip
Details
09-19-2015
1.00
Filled in a low spot on the right pant
Details
09-18-2015
3.00
Installed rear partition in wheel pants
Details
09-13-2015
3.00
Installed air valve door on left wheel pant
Details
09-12-2015
2.00
Lower left gear fairing
Details
09-12-2015
3.00
Left gear fairings
Details
09-09-2015
1.00
Left upper gear fairing
Details
09-08-2015
2.00
Left gear fairings
Details
09-07-2015
4.00
Left upper gear fairing
Details
09-07-2015
2.00
Installed left wing fuel lines
Details
09-06-2015
4.00
Lower gear fairing
Details
09-05-2015
5.00
Left wheel pant fitting up
Details
09-03-2015
1.00
Left wheel pant fiberglass work
Details
09-03-2015
2.00
Cleaned Shop
Details
09-01-2015
4.00
Installed fuel lines on right wing
Details
08-31-2015
1.00
Started left wheel pant
Details
08-28-2015
2.00
Started work on left wheel fairing
Details
08-28-2015
1.00
Finished the right gear leg
Details
08-26-2015
2.00
Installed door for tire air valve
Details
08-24-2015
4.00
Finished upper right gear fairing
Details
08-23-2015
2.00
Installed right brake line
Details
08-23-2015
0.00
Airplane work sidetracked
Details
08-15-2015
2.00
Split right wheel pant fairing
Details
08-13-2015
2.00
Right wheel pant fairing
Details
08-09-2015
3.00
Right gear pant and fairing
Details
08-09-2015
2.00
Painted left gear
Details
08-02-2015
2.00
Right wheel pant and fairing
Details
08-02-2015
1.00
Dried out desiccant
Details
07-19-2015
4.00
Gear fairing again
Details
07-12-2015
3.00
Right gear fairing
Details
07-08-2015
2.00
Right gear fairing
Details
07-06-2015
1.50
Upper right gear leg fairing
Details
07-06-2015
4.00
Right upper gear leg fairing
Details
07-06-2015
1.50
Cleaned shop
Details
07-06-2015
2.00
Bedding in the rear of the wheel pant
Details
07-05-2015
4.00
Right brake line rerouted
Details
07-04-2015
4.00
Right wheel pant fairing
Details
06-28-2015
2.00
Right wheel pant fairing
Details
06-28-2015
2.00
Epoxied fiberglass to left gear leg
Details
06-27-2015
4.00
Fiberglass work on gear and fairing
Details
06-26-2015
4.00
Left gear fairing
Details
06-26-2015
2.00
Laid carbon fiber on left gear leg
Details
06-24-2015
2.00
More work on right gear pant
Details
06-24-2015
4.00
Epoxied foam on left gear leg
Details
06-22-2015
2.00
Installed another couple layers of fiberglass
Details
06-20-2015
3.00
Right gear leg after painting
Details
06-20-2015
6.00
Build right gear leg wheel pant fairing
Details
06-14-2015
3.00
Touch up paint right gear leg
Details
06-14-2015
1.00
Right wheel pant continued
Details
06-14-2015
1.00
Drilling holes on right wheel pant
Details
06-13-2015
5.00
Right wheel pant
Details
06-12-2015
5.00
Right wheel pant
Details
06-12-2015
2.00
Right gear brake line
Details
06-12-2015
1.00
More right brake line pictures
Details
06-11-2015
2.00
Cleaned up right gear leg fairing
Details
06-07-2015
3.00
Right fiberglass gear fairing installed
Details
06-02-2015
2.00
Wrapped right gear leg with carbon fiber
Details
05-31-2015
4.00
Sanded profile of right gear leg
Details
05-31-2015
2.00
Right brake lines
Details
05-30-2015
6.00
Working on right gear leg fairing
Details
05-25-2015
2.00
Drilled holes on bottom of wing skin to fuselage
Details
05-24-2015
3.00
Working on main gear fairings
Details
05-22-2015
5.00
Left wing root fairing
Details
05-17-2015
6.00
Installing main gear
Details
05-14-2015
2.00
Left wing root fairing
Details
05-14-2015
1.00
Finished right wing fairing
Details
05-11-2015
3.00
Right wing root fairing
Details
05-06-2015
1.00
Wing gap seals
Details
05-06-2015
1.00
Changed desiccant in dehydrator plugs
05-05-2015
2.00
Aileron linkage complete
Details
05-04-2015
3.00
Adjusted aileron linkages
Details
05-03-2015
4.00
Installed left aileron
Details
05-02-2015
3.00
Installing aileron
Details
05-01-2015
1.00
Control surfaces
Details
05-01-2015
2.00
Cleaned the shop
Details
04-29-2015
2.00
Aileron control surfaces
Details
04-26-2015
5.00
Work on control surfaces
Details
04-24-2015
1.00
Right flap installed
Details
04-23-2015
4.00
Left wing control surfaces
Details
04-19-2015
4.00
Aileron trim wiring
Details
04-18-2015
2.00
Left wing control surfaces end closures
Details
04-11-2015
2.00
Smoothing right outboard aileron
Details
04-08-2015
0.50
Sanded down end of flap
Details
04-08-2015
0.50
Changed desiccant in dehydrator plugs
Details
04-08-2015
2.00
Aileron hinge details
Details
04-05-2015
2.00
Speed mods on flap end
Details
04-05-2015
4.00
Lowered flap hinge
Details
04-04-2015
4.00
Left flap alignment
Details
03-29-2015
3.00
Installed right wing tank
Details
03-29-2015
3.00
Installed left wing tank
Details
03-29-2015
3.00
Installed fuel supply and return fuselage fittings
Details
03-29-2015
1.00
Fabricated fuel vent inlets
Details
03-22-2015
3.00
Pitot and AOA fuselage penetrations
Details
03-21-2015
5.00
Drilled out holes in wing spars
Details
03-08-2015
2.00
Leak tested tanks
Details
03-08-2015
5.00
Installed last two seat ribs
Details
03-07-2015
5.00
Worked on center tunnel
Details
03-06-2015
4.00
Working on center tunnel
Details
03-06-2015
5.00
Pressure testing left wing tank
Details
03-01-2015
3.00
Installed Fuel Senders
Details
03-01-2015
1.00
Cut slots in wing tank bracket
Details
02-25-2015
1.00
Installed AOA tubing standoffs
Details
02-25-2015
2.00
Install Pitot tubing and wiring
Details
02-20-2015
3.00
Install fuel return line fittings in tank
Details
02-12-2015
2.00
Pitot tube wiring harness
Details
02-11-2015
4.00
Working on pitot tube
Details
02-11-2015
1.00
Pitot installation continued
Details
02-08-2015
4.00
Planned and ordered supplies
Details
02-07-2015
5.00
Mounting pitot control module in wing
Details
02-07-2015
2.00
Attached pitot to mast
Details
02-06-2015
1.00
Finished sealing right wing tip
Details
02-01-2015
3.00
Wing fuel tank brackets
Details
02-01-2015
2.00
Sealed right wing tip trailing edge
Details
01-25-2015
6.00
Still working on the wing attach brackets
Details
01-25-2015
2.00
Cleaned up shop
01-24-2015
6.00
Fabricating wing attach brackets
Details
01-18-2015
4.00
Sealing up left wing tip
Details
01-18-2015
2.00
More pictures of aileron trim installation
Details
01-18-2015
5.00
Installing aileron trim servo
Details
01-17-2015
2.00
Safetied the fuel pickups
Details
01-11-2015
8.00
Replaced connecting rods
Details
01-06-2015
4.00
Installed flap position sensor
Details
01-04-2015
3.00
Left wing tip completed
Details
01-03-2015
4.00
Finished right wing tip
Details
01-03-2015
1.00
Additional picture of finished wing tip
01-01-2015
3.00
Finished aileron belcrank fasteners
Details
12-28-2014
1.00
Cleaned shop
12-27-2014
8.00
Roll servo completed
Details
12-27-2014
0.00
Picture of reinforcement plate under roll servo
Details
12-27-2014
2.00
Flap motor SB complied with
Details
12-26-2014
6.00
Roll servo installation
Details
12-26-2014
2.00
Flap potentiometer bracket
Details
12-24-2014
1.00
Installed limit stop and safety wire on elev servo
Details
12-23-2014
3.00
Started installing flap motor
Details
12-23-2014
5.00
Installed elevator autopilot servo
Details
12-22-2014
8.00
Finished connecting flaps
Details
12-22-2014
0.00
Another flap picture
Details
12-20-2014
1.00
Finished right nav light
Details
12-20-2014
2.00
Cleaned shop
Details
12-19-2014
8.00
Finished left wing tip
Details
12-18-2014
6.00
Rework wing tip
Details
12-17-2014
6.00
Nav light prepartion
Details
12-16-2014
6.00
Set the ailerons
Details
12-15-2014
1.00
Repair aileron
Details
12-15-2014
4.00
Installed ailerons
Details
12-15-2014
2.00
Fabricated flap push rods
Details
12-14-2014
8.00
Aileron linkage and flaps
Details
12-13-2014
8.00
Installing Control Column
Details
12-12-2014
2.00
More sanding on wing tips
Details
12-07-2014
3.00
Sanded wing tips
Details
12-07-2014
3.00
Cleaned shop
Details
12-06-2014
4.00
Installed vertical stabilizer and rudder
Details
12-06-2014
4.00
Drilled rear wing spar bolts
Details
12-05-2014
4.00
Connected linkage to elevator
Details
11-30-2014
4.00
Fiberglass work on wing tip
Details
11-29-2014
2.00
Installed the horizontal stabilizer
Details
11-28-2014
5.00
Still working on wing tips
Details
11-25-2014
3.00
Left wing root rib fitting
Details
11-23-2014
4.00
Right wing root fitting
Details
11-22-2014
2.00
Studied construction manual
Details
11-16-2014
1.00
More pictures of wing installation
Details
11-16-2014
2.00
Installing wings
Details
11-15-2014
3.00
Temporary wing supports
Details
11-15-2014
2.00
Clean shop
Details
11-14-2014
3.00
Added access door to new addition
Details
11-09-2014
4.00
Finished enlarging part of shop
Details
11-04-2014
2.00
Redoing right nav light cover
Details
11-01-2014
4.00
Preparing my shop to assemble aircraft
Details
10-31-2014
2.00
Nice screw up
Details
10-26-2014
3.00
Still working on wingtips
Details
10-25-2014
2.00
Wing tips
Details
10-25-2014
3.00
Right wing tip wiring harness
Details
10-24-2014
3.00
Wing tips
Details
10-18-2014
3.00
Nav wiring harnesses
Details
10-17-2014
3.00
More layers of fiberglass
Details
10-16-2014
2.00
Started closing in old NAV mount hole
Details
10-12-2014
2.00
Landing and Taxi lights installed
Details
10-10-2014
4.00
Nav tips on Wings
Details
10-10-2014
2.00
Left nav tip epoxied to wing tip
Details
10-10-2014
2.00
Landing Light Wiring Harness
Details
10-05-2014
8.00
Still working on Nav wing tip modifications
Details
10-04-2014
3.00
Fitting lens to wing tip kit
Details
10-04-2014
4.00
Cutting in Nav Lights Tip Kit
Details
10-03-2014
5.00
Fabricated and mounted lights in brackets
Details
09-24-2014
4.00
Remake wing light brackets
Details
09-14-2014
1.00
Wing electrical drawings
Details
09-13-2014
3.00
Riveted LED wing light brackets
Details
09-13-2014
1.00
Details
09-12-2014
3.00
Worked on leading edge light brackets
Details
09-11-2014
2.00
Wings being delivered
Details
09-07-2014
2.00
Engine ready to be worked on
Details
09-06-2014
5.00
Fuselage in Shop
Details
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
579
2177
Avionics
91
534
Canopy
63
202
Empennage
28
104
Engine
99
363
Fuselage
94
384
Gear
62
174
Miscellaneous
22
40
None
2
Wings
118
376
Copyright © 2001-2024 Matronics. All Rights Reserved.