KitLog pro

Powered By Kitlog Pro v2.0

TIMOTHY'S WEB SITE
Work Logs Found: 78
Category Work Time: 392 Hours
 Date
Hours
Work Log Summary

Details

 02-02-2019
2.50
Drilling Turtledeck
Details
       

 01-27-2019
1.00
Placed Turtledeck on Aft Fuselage Box
Details
       

 01-26-2019
5.50
Deburring Turtledeck Formers
Details
       

 01-20-2019
1.50
Aft Fuselage Assembly
Details
       

 01-19-2019
3.50
Aft Fuselage Assembly
Details
       

 01-13-2019
6.00
Fuselage Tail Cone Box
Details
       

 01-12-2019
6.50
Aft Fuselage Shear Web, Lower Skin, and Misc.
Details
       

 01-12-2019
1.00
Aft Fuselage Cross Ties
Details
     

 01-11-2019
4.00
Finished SNX-F25
Details

 02-17-2018
7.50
Assembly of Vertical Channels & Splice Plates to A
Details
       

 02-11-2018
3.50
Match Drilling of Longerons to Aft Fuse Side Skins
Details
       

 02-10-2018
6.00
Access & Cable Exit Holes/Longerons & Splice Plate
Details
       

 02-09-2018
3.00
Fairlead Assembly
Details
       

 12-31-2017
3.00
LH Wing Contruction
Details
       

 11-18-2017
16.00
LH Wing Construction.
Details
       

 09-23-2017
10.00
LH Wing Constrution.
Details
       

 08-26-2017
14.00
LH Wing Constrution
Details
       

 06-24-2017
5.00
Built Sonex Wing Holder.
Details
       

 06-17-2017
4.00
Final Skinning of RH Wing.
Details
       

 06-11-2017
1.00
Set Bellcrank Angle/Ran Pitot Tubing/Squared Wing.
Details
       

 06-10-2017
1.00
Attachment of Push Rod Ends to Push Rod & Bellcran
Details
       

 04-15-2017
4.50
Dimpling RH Forward Skin & Forward Ribs/RH Wing Co
Details
       

 04-08-2017
6.00
Removal of RH Wing Skins.
Details

 03-25-2017
2.00
Pitot/Static Installation
Details
       

 03-05-2017
3.50
Positioning & Drilling Flap & Aileron Hinge Halfs
Details
       

 03-04-2017
1.00
Root Doubler
       

 03-04-2017
2.00
Fitting Wing Tip Rib
Details
       

 12-31-2016
4.00
Fitting Fwd Skin Of RH Wing.
Details
       

 12-30-2016
8.00
Fit and Pilot Drill Fwd Skin
Details
       

 12-24-2016
14.00
Rivet Ribs to Spars & Begin Skinning RH Wing
Details
       

 12-11-2016
5.50
Beginning of Right Hand Wing Box Assembly.
Details
       

 12-10-2016
2.50
Pitot/Static Installation.
Details
       

 11-19-2016
0.50
Attachment of Front & Rear RH Root Ribs to Root Ri
     

 11-19-2016
8.00
Aileron Bellcrank Installation/Aft Wing Rib #9 Ass
Details
       

 11-18-2016
3.00
Forming Center Spacers & Web Spacers for Main Spar
Details
       

 02-13-2016
23.00
Forming & Attaching Gussets to The Forward & Aft W
Details
       

 01-24-2016
1.50
Alignment and Mating of Main Spars
Details
       

 01-09-2016
6.00
Solid Riveted the Right & Left Main Spars
Details
       

 12-31-2015
16.00
Left Main Spar
Details
       

 12-30-2015
6.00
Right Main Spar
Details
       

 11-26-2015
6.00
Right Main Spar
Details
       

 08-15-2015
8.00
Right Main Spar
Details
       

 07-04-2015
8.00
Root Rib Attach Angles
Details
       

 06-27-2015
14.00
Fabricated angle parts for main spar
Details
     

 05-10-2015
2.00
Rear Spar Assembly
Details
       

 05-09-2015
6.00
Rear Spar Assembly
Details
       

 02-15-2015
2.50
Aileron Counterbalance
Details
       

 02-08-2015
22.00
Aileron Assembly
Details
       

 02-01-2015
3.50
Channel Assemblies/Aileron Counterbalence Plates
Details
       

 01-31-2015
1.50
Right & Left Aileron Hinges and Drive Ribs
Details
       

 01-02-2015
14.00
Finished Building Flaps.
Details
       

 01-01-2015
3.00
Root Ribs and Hinges for Flaps.
Details
       

 12-31-2014
3.00
Cutting The Flap Skins
Details
       

 11-29-2014
6.00
Completing Horizontal Stab. Tips
Details
       

 11-28-2014
5.00
Completing Elevator
Details
       

 10-26-2014
8.00
Skinning Horizontal Stab.
Details
       

 10-25-2014
3.00
Construction of Horizontal Stab. Frame.
Details
       

 10-24-2014
4.00
Horizontal Main Spar Construction
Details
       

 10-24-2014
3.00
Horizontal Forward Spar Construction
Details
       

 10-19-2014
3.00
Elevator Control Horn.
Details
       

 10-18-2014
3.00
Elevator Construction.
Details
       

 10-17-2014
4.00
Elevator Construction
Details
       

 10-13-2014
1.50
Finished attaching Vertical Tail Surface Tip to Ve
Details
       

 10-12-2014
2.00
Attaching Vertical Tail Surface Tip to the Vertica
Details
       

 10-11-2014
4.50
Skinning Vertical Stab
Details
       

 10-10-2014
1.50
Vertical Stab frame
Details
       

 10-05-2014
2.00
Vertical Tail Main & Forward Spar Assemblies.
Details
       

 10-04-2014
3.00
Vertical Tail Main & Fwd Spar Assemblies.
Details
       

 10-03-2014
1.00
35 Degree bend to Forward Spar Fitting.
Details
       

 10-02-2014
1.50
Making SNX-T12-05 part from angle stock.
Details
       

 09-27-2014
2.00
Completing Rudder
Details
       

 09-20-2014
4.00
Measured, marked, and drilled rivet holes for Rudd
Details
       

 09-07-2014
2.50
Trimed Rudder skin to fit Rudder Drive Horn.
Details
       

 09-06-2014
1.00
Rudder Hinge
Details
       

 08-30-2014
0.50
Rudder Drive Horn
Details
       

 08-30-2014
3.00
Rudder Control Horn
Details
       

 08-23-2014
3.00
Previewing Plans/Instructions
Details
       

 08-11-2014
3.50
Shipping Damage
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.