Date
|
Hours
|
Work Log Summary
|
Details
|
04-21-2017
|
1.00
|
Taxi test plane
|
Details
|
|
|
04-19-2017
|
4.50
|
install headset jacks
|
Details
|
|
|
04-15-2017
|
4.00
|
Finish baggage area
|
Details
|
|
|
03-04-2017
|
4.00
|
Install weight at tail and weigh plane
|
Details
|
|
|
03-02-2017
|
1.50
|
Cast weight for tail
|
Details
|
|
|
02-18-2017
|
3.50
|
weigh plane
|
Details
|
|
|
02-01-2017
|
2.50
|
work on headset jack mounting and seat belts
|
Details
|
|
|
01-31-2017
|
3.00
|
Fit interior panels and headset jacks
|
Details
|
|
|
01-28-2017
|
5.00
|
Cowling, doors, interior work
|
Details
|
|
|
01-26-2017
|
1.50
|
Install muffler
|
Details
|
|
|
01-02-2017
|
5.50
|
Continue skylight installation
|
Details
|
|
|
01-01-2017
|
6.00
|
Continue windshield installation
|
Details
|
|
|
12-31-2016
|
3.50
|
Continue skylight install and bleed brakes
|
Details
|
|
|
12-30-2016
|
3.00
|
Continue windshield and skylight prep
|
Details
|
|
|
12-29-2016
|
4.50
|
continue windshield prep for installation
|
Details
|
|
|
12-28-2016
|
2.50
|
Position windshield for drilling
|
Details
|
|
|
12-27-2016
|
2.50
|
prep windshield and skylight for installation
|
Details
|
|
|
12-26-2016
|
1.50
|
Set blade angle on prop
|
Details
|
|
|
12-25-2016
|
1.50
|
Install prop
|
Details
|
|
|
12-24-2016
|
3.50
|
Set fuel pressure
|
Details
|
|
|
12-24-2016
|
1.50
|
paint wing root panels
|
Details
|
|
|
12-24-2016
|
1.50
|
Install prop on engine
|
Details
|
|
|
12-23-2016
|
2.50
|
Prime wing root panels and mating strips for skyli
|
Details
|
|
|
12-22-2016
|
3.50
|
Windshield installation
|
Details
|
|
|
12-21-2016
|
6.50
|
Fuel lines, skylight braces, tank vents
|
Details
|
|
|
12-20-2016
|
1.50
|
Paint top of boot cowl
|
Details
|
|
|
12-19-2016
|
1.50
|
complete jury strut mounting
|
Details
|
|
|
12-14-2016
|
3.50
|
mount jury struts
|
Details
|
|
|
12-13-2016
|
1.00
|
paint left aileron and flap cable exit covers
|
Details
|
|
|
12-12-2016
|
1.50
|
paint jury struts
|
Details
|
|
|
12-11-2016
|
4.50
|
Work on aileron cables
|
Details
|
|
|
12-10-2016
|
7.50
|
install aileron cables
|
Details
|
|
|
12-04-2016
|
4.00
|
Install wings
|
Details
|
|
|
11-23-2016
|
6.50
|
Wing install preperation
|
Details
|
|
|
11-19-2016
|
3.00
|
Install park brake cable
|
Details
|
|
|
11-06-2016
|
5.50
|
Install ELT panel switch
|
Details
|
|
|
11-05-2016
|
4.50
|
Fabricate transponder antenna bracket
|
Details
|
|
|
11-01-2016
|
3.50
|
Headset wiring
|
Details
|
|
|
10-16-2016
|
3.50
|
Start engine
|
Details
|
|
|
10-03-2016
|
3.50
|
Make coax cables
|
Details
|
|
|
10-02-2016
|
4.50
|
Wire stick grip
|
Details
|
|
|
10-01-2016
|
8.50
|
Final install panel
|
Details
|
|
|
09-27-2016
|
3.00
|
Install radio and transponder in panel
|
Details
|
|
|
09-25-2016
|
5.00
|
Power instrument panel
|
Details
|
|
|
09-24-2016
|
7.50
|
Work on wiring panel
|
Details
|
|
|
09-18-2016
|
6.00
|
Wire instrument panel
|
Details
|
|
|
09-17-2016
|
8.50
|
Hook up instrument panel
|
Details
|
|
|
09-16-2016
|
3.00
|
Work on wiring
|
Details
|
|
|
09-15-2016
|
3.00
|
Work on wiring
|
Details
|
|
|
09-14-2016
|
3.50
|
Work on wiring
|
Details
|
|
|
09-13-2016
|
3.00
|
Work on wiring
|
Details
|
|
|
09-12-2016
|
3.00
|
Work on wiring
|
Details
|
|
|
09-11-2016
|
7.00
|
Cut instrument panel holes
|
Details
|
|
|
09-10-2016
|
7.00
|
Complete cowling mods and prime
|
Details
|
|
|
09-09-2016
|
3.00
|
Work on top cowling
|
Details
|
|
|
09-04-2016
|
8.00
|
Modify second cowling top
|
Details
|
|
|
09-03-2016
|
5.50
|
Paint struts
|
Details
|
|
|
08-29-2016
|
6.50
|
Fabricate battery box
|
Details
|
|
|
08-28-2016
|
6.50
|
Fab radiator side mounts
|
Details
|
|
|
08-27-2016
|
8.00
|
Run engine wiring harness
|
Details
|
|
|
08-25-2016
|
3.00
|
Wire fuel pumps and install fuel line to engine
|
Details
|
|
|
08-24-2016
|
3.00
|
Mount fuel pumps and install hoses
|
Details
|
|
|
08-21-2016
|
6.50
|
Paint black on left wing, bottom cowl and flap
|
Details
|
|
|
08-14-2016
|
5.50
|
Paint red on left wing and flap
|
Details
|
|
|
08-12-2016
|
6.00
|
Fit doors to fuselage
|
Details
|
|
|
08-10-2016
|
6.00
|
Paint left wing, flap and aileron
|
Details
|
|
|
08-09-2016
|
5.50
|
Prime left wing
|
Details
|
|
|
08-06-2016
|
5.50
|
Paint stripes on doors
|
Details
|
|
|
07-31-2016
|
5.50
|
Paint black on right wing and flap
|
Details
|
|
|
07-29-2016
|
6.50
|
Paint red on right wing
|
Details
|
|
|
07-23-2016
|
6.50
|
Paint right wing, flap and aileron
|
Details
|
|
|
07-21-2016
|
3.00
|
Prime right wing
|
Details
|
|
|
07-17-2016
|
6.00
|
Prefit windshield
|
Details
|
|
|
07-16-2016
|
3.50
|
Install windows
|
Details
|
|
|
07-09-2016
|
5.00
|
Paint cowling
|
Details
|
|
|
07-03-2016
|
6.00
|
Prep on cowling
|
Details
|
|
|
07-02-2016
|
6.00
|
Sand and prime on cowling
|
Details
|
|
|
06-24-2016
|
4.00
|
Install camlocs
|
Details
|
|
|
06-21-2016
|
3.00
|
work on cowling
|
Details
|
|
|
06-20-2016
|
3.00
|
Cowling work
|
Details
|
|
|
06-18-2016
|
6.00
|
Work on camlocs for cowling
|
Details
|
|
|
06-16-2016
|
4.00
|
Work on lower cowling
|
Details
|
|
|
06-12-2016
|
3.00
|
work on lower cowling
|
Details
|
|
|
06-10-2016
|
2.00
|
Work on lower cowling
|
Details
|
|
|
06-09-2016
|
3.00
|
Work on lower cowling
|
Details
|
|
|
06-08-2016
|
2.50
|
Work on lower cowling
|
Details
|
|
|
06-06-2016
|
4.00
|
Mount radiator
|
Details
|
|
|
06-05-2016
|
4.50
|
Radiator install
|
Details
|
|
|
06-04-2016
|
7.00
|
work on cowling
|
Details
|
|
|
06-03-2016
|
3.00
|
Work on cowling
|
Details
|
|
|
06-02-2016
|
3.00
|
Cowling work
|
Details
|
|
|
06-01-2016
|
3.00
|
Cowling work
|
Details
|
|
|
05-31-2016
|
4.00
|
Cowling repairs
|
Details
|
|
|
05-30-2016
|
3.00
|
Work on cowling
|
Details
|
|
|
05-29-2016
|
7.00
|
Work on cowling
|
Details
|
|
|
05-28-2016
|
8.00
|
Work on cowling
|
Details
|
|
|
02-20-2016
|
6.00
|
Mount engine to airframe
|
Details
|
|
|
02-09-2016
|
2.00
|
Uncrate engine
|
Details
|
|
|
01-06-2016
|
3.00
|
Work on wiring
|
Details
|
|
|
01-04-2016
|
4.00
|
Install engine mount
|
Details
|
|
|
01-02-2016
|
8.00
|
Work on instrument panel
|
Details
|
|
|
01-01-2016
|
7.00
|
Work on instrument panel
|
Details
|
|
|
12-30-2015
|
4.00
|
Work on instrument panel
|
Details
|
|
|
12-29-2015
|
5.00
|
Work on instrument panel
|
Details
|
|
|
12-27-2015
|
2.50
|
Install clip nuts in baggage area
|
Details
|
|
|
12-26-2015
|
1.00
|
Install elt to frame
|
Details
|
|
|
12-26-2015
|
3.00
|
Install ELT antenna
|
Details
|
|
|
12-24-2015
|
3.50
|
Fabricate fuse block mount
|
Details
|
|
|
11-21-2015
|
2.50
|
Cut hole in instrument panel for Ipad
|
Details
|
|
|
11-20-2015
|
5.00
|
Cover seats
|
Details
|
|
|
11-19-2015
|
6.00
|
Assemble seat frames
|
Details
|
|
|
11-03-2015
|
4.00
|
Install control sticks
|
Details
|
|
|
11-02-2015
|
2.50
|
Hook up trim at elevator
|
Details
|
|
|
11-01-2015
|
7.00
|
Install elevators and rudder return springs
|
Details
|
|
|
10-31-2015
|
8.50
|
Rig horizontal stabilizers & balance right elevato
|
Details
|
|
|
10-30-2015
|
4.00
|
Install horizontal stabilizers
|
Details
|
|
|
10-29-2015
|
6.00
|
Work on right elevator and stabilizer
|
Details
|
|
|
10-28-2015
|
3.00
|
Install trim tab
|
Details
|
|
|
10-27-2015
|
5.00
|
Paint inside doors
|
Details
|
|
|
10-26-2015
|
5.50
|
Paint tail surfaces
|
Details
|
|
|
10-25-2015
|
3.00
|
Modify attach tangs
|
Details
|
|
|
10-24-2015
|
3.00
|
Paint doors
|
Details
|
|
|
10-23-2015
|
4.50
|
Paint right stabilizer and elevator
|
Details
|
|
|
10-22-2015
|
5.00
|
Paint left elevator and stabilizer
|
Details
|
|
|
10-22-2015
|
3.00
|
located parts for empanage
|
Details
|
|
|
10-18-2015
|
5.00
|
Rudder cable installation
|
Details
|
|
|
10-12-2015
|
3.50
|
Fit doors to fuselage
|
Details
|
|
|
10-11-2015
|
4.50
|
Assemble trim on doors
|
Details
|
|
|
10-08-2015
|
3.00
|
Spray prime doors
|
Details
|
|
|
10-07-2015
|
1.50
|
Install rudder
|
Details
|
|
|
10-06-2015
|
5.50
|
Paint rudder
|
Details
|
|
|
10-05-2015
|
4.00
|
tape one side of rudder for checkerboard
|
Details
|
|
|
10-04-2015
|
4.00
|
tape rudder checkerboard
|
Details
|
|
|
10-03-2015
|
6.00
|
make capture ring parts for left door
|
Details
|
|
|
09-30-2015
|
3.00
|
prime door parts
|
Details
|
|
|
09-26-2015
|
3.00
|
make lower inner capture ring for left door
|
Details
|
|
|
09-20-2015
|
5.50
|
Work on brake system
|
Details
|
|
|
09-19-2015
|
7.00
|
Install floorboard and rudder pedals
|
Details
|
|
|
09-15-2015
|
3.00
|
Work on right door
|
Details
|
|
|
09-14-2015
|
4.00
|
Work on right door
|
Details
|
|
|
09-13-2015
|
5.00
|
Complete gear installation
|
Details
|
|
|
09-12-2015
|
5.00
|
Work on main gear
|
Details
|
|
|
09-10-2015
|
4.00
|
Paint stripes on boot cowl
|
Details
|
|
|
09-09-2015
|
3.00
|
Paint red on boot cowl
|
Details
|
|
|
09-07-2015
|
5.00
|
Paint silver on boot cowling
|
Details
|
|
|
09-06-2015
|
5.50
|
Paint boot cowl
|
Details
|
|
|
09-05-2015
|
5.00
|
Prime boot cowl
|
Details
|
|
|
09-01-2015
|
2.50
|
Work on boot cowling
|
Details
|
|
|
08-28-2015
|
5.50
|
Finish riveting boot cowl
|
Details
|
|
|
08-23-2015
|
5.50
|
Work on boot cowl
|
Details
|
|
|
08-22-2015
|
4.00
|
Work on boot cowl skins
|
Details
|
|
|
08-22-2015
|
3.00
|
Install bottom boot cowl skin
|
Details
|
|
|
08-20-2015
|
4.50
|
Paint black stripes on fuselage
|
Details
|
|
|
08-19-2015
|
3.00
|
Prep and paint trim color on fuselage
|
Details
|
|
|
08-18-2015
|
4.50
|
Paint trim color on fuselage
|
Details
|
|
|
08-16-2015
|
5.00
|
Sand and paint fuselage
|
Details
|
|
|
08-15-2015
|
2.50
|
Paint 1st coat on fuselage
|
Details
|
|
|
08-14-2015
|
3.50
|
Sand and tape for paint
|
Details
|
|
|
08-13-2015
|
5.00
|
Sand and prime fuselage
|
Details
|
|
|
08-11-2015
|
5.50
|
Sand and prime fuselage
|
Details
|
|
|
08-09-2015
|
4.50
|
Paint top surfaces of tail group
|
Details
|
|
|
08-08-2015
|
3.00
|
Repaint bottom of tail surfaces
|
Details
|
|
|
08-07-2015
|
3.00
|
Mount main tires
|
Details
|
|
|
07-29-2015
|
2.00
|
Paint main gear legs
|
Details
|
|
|
07-28-2015
|
2.00
|
prep and prime main gear legs
|
Details
|
|
|
07-27-2015
|
2.00
|
Sand bottom of tail surfaces
|
Details
|
|
|
07-25-2015
|
4.00
|
Paint bottom side of tail surfaces
|
Details
|
|
|
07-20-2015
|
4.00
|
Prime top of tail surfaces
|
Details
|
|
|
07-18-2015
|
5.00
|
Prime tail surfaces
|
Details
|
|
|
05-10-2015
|
3.50
|
Add finishing tapes
|
Details
|
|
|
04-25-2015
|
7.00
|
Add inspection rings and exit rings
|
Details
|
|
|
04-22-2015
|
6.00
|
Add tapes over ribs
|
Details
|
|
|
04-18-2015
|
3.50
|
Rivet fabric to ribs on left wing
|
Details
|
|
|
04-16-2015
|
2.00
|
Prime flaps and ailerons
|
Details
|
|
|
04-15-2015
|
2.00
|
Prime tail surfaces
|
Details
|
|
|
04-14-2015
|
2.00
|
Prime tail surfaces
|
Details
|
|
|
04-06-2015
|
5.00
|
Prime tail setion parts
|
Details
|
|
|
04-05-2015
|
7.50
|
Finish cover on right elevator
|
Details
|
|
|
04-04-2015
|
7.50
|
Cover elevators
|
Details
|
|
|
04-03-2015
|
5.50
|
Cover elevators
|
Details
|
|
|
03-30-2015
|
4.00
|
Finish left stabilizer and cover left elevator
|
Details
|
|
|
03-29-2015
|
8.00
|
Cover left flap
|
Details
|
|
|
03-28-2015
|
6.50
|
Cover flaps
|
Details
|
|
|
03-27-2015
|
5.50
|
Cover rudder
|
Details
|
|
|
03-17-2015
|
3.50
|
Prime fusalage fabric
|
Details
|
|
|
03-16-2015
|
3.00
|
Clean fusalage and prime
|
Details
|
|
|
03-15-2015
|
3.50
|
Glue and iron fabric on left wing
|
Details
|
|
|
03-14-2015
|
8.00
|
Cover bottom of left wing
|
Details
|
|
|
03-13-2015
|
5.00
|
Cover top of left wing
|
Details
|
|
|
03-12-2015
|
3.50
|
Switch wings on rotator
|
Details
|
|
|
03-11-2015
|
2.00
|
Prime coat right wing
|
Details
|
|
|
03-10-2015
|
2.00
|
Iron tape edges
|
Details
|
|
|
03-09-2015
|
2.00
|
Finish tapes on right wing
|
Details
|
|
|
03-08-2015
|
6.00
|
Add tapes to top of right wing
|
Details
|
|
|
03-07-2015
|
4.00
|
Glue tapes on bottom of right wing
|
Details
|
|
|
03-06-2015
|
2.00
|
Install cover patches on exit rings
|
Details
|
|
|
03-04-2015
|
2.00
|
Install exit rings on bottom of right wing
|
Details
|
|
|
03-02-2015
|
2.00
|
rivet fabric to bottom of right wing
|
Details
|
|
|
03-01-2015
|
2.00
|
Shrink fabric on right wing
|
Details
|
|
|
03-01-2015
|
2.00
|
rivet fabric to top of wing
|
Details
|
|
|
02-28-2015
|
8.00
|
Right wing bottom fabric installed
|
Details
|
|
|
02-27-2015
|
6.00
|
Cover top of wing
|
Details
|
|
|
02-23-2015
|
2.00
|
prepare right wing for covering
|
Details
|
|
|
02-16-2015
|
4.50
|
install header tank
|
Details
|
|
|
02-12-2015
|
2.00
|
check header tank
|
Details
|
|
|
02-06-2015
|
2.00
|
tapes and re-enforcing patches on flaps
|
Details
|
|
|
01-31-2015
|
5.50
|
cover right door
|
Details
|
|
|
01-27-2015
|
4.00
|
tapes and re-enforcing patches
|
Details
|
|
|
01-24-2015
|
4.50
|
Seats
|
Details
|
|
|
01-22-2015
|
3.00
|
Header tank
|
Details
|
|
|
01-12-2015
|
2.50
|
Install reinforcing tapes
|
Details
|
|
|
01-10-2015
|
3.00
|
Install reinforcing tapes
|
Details
|
|
|
01-04-2015
|
5.50
|
Install tapes on fuselage
|
Details
|
|
|
01-03-2015
|
4.00
|
Install tapes and patches
|
Details
|
|
|
01-01-2015
|
7.50
|
Cover left door
|
Details
|
|
|
12-31-2014
|
6.00
|
Install reinforcing patches and tapes
|
Details
|
|
|
12-30-2014
|
8.50
|
Install reinforcement patches and tapes
|
Details
|
|
|
12-29-2014
|
5.50
|
Install rings and reinforcement patches
|
Details
|
|
|
12-28-2014
|
7.50
|
Cover right side of fuselage
|
Details
|
|
|
12-27-2014
|
7.00
|
Cover left side of fuselage
|
Details
|
|
|
12-26-2014
|
4.50
|
Cover bottom of fuselage
|
Details
|
|
|
12-25-2014
|
4.00
|
Cover stabilizer
|
Details
|
|
|
12-24-2014
|
8.50
|
Cover stabilizer
|
Details
|
|
|
12-22-2014
|
6.00
|
Cover ailerons
|
Details
|
|
|
12-21-2014
|
4.00
|
Cut fabric and prepare ailerons for covering
|
Details
|
|
|
12-19-2014
|
6.50
|
Assemble fuselage sub assemblies
|
Details
|
|
|
12-18-2014
|
2.00
|
Control sticks
|
Details
|
|
|
12-18-2014
|
7.00
|
Assemble lift struts
|
Details
|
|
|
12-17-2014
|
4.50
|
Make rotisserie for fusalage
|
Details
|
|
|
12-15-2014
|
2.00
|
Drill out boot cowl skins
|
Details
|
|
|
12-14-2014
|
7.00
|
Boot cowl skin work
|
Details
|
|
|
12-12-2014
|
7.00
|
Fit boot cowl top skins
|
Details
|
|
|
12-10-2014
|
1.00
|
Make 2 braces for boot cowl side skins
|
Details
|
|
|
12-09-2014
|
3.50
|
Fit boot cowl side skins
|
Details
|
|
|
12-08-2014
|
3.50
|
Fit firewall and bottom boot cowl
|
Details
|
|
|
12-07-2014
|
7.00
|
Assemble baggage compartment
|
Details
|
|
|
12-06-2014
|
6.50
|
Rivet brake pedals, assemble baggage walls
|
Details
|
|
|
12-05-2014
|
2.00
|
Cleco brake pedals
|
Details
|
|
|
12-04-2014
|
5.00
|
Fit floorboard
|
Details
|
|
|
12-03-2014
|
3.00
|
Install com and elt antenna mount plates
|
Details
|
|
|
12-02-2014
|
6.50
|
Fuselage formers installation
|
Details
|
|
|
12-01-2014
|
5.00
|
Open crate and inventory parts
|
Details
|
|
|
10-04-2014
|
5.00
|
build wing rotator
|
Details
|
|
|
09-20-2014
|
2.50
|
Left wing tubing and cable, right wing leading edg
|
Details
|
|
|
09-19-2014
|
1.50
|
Work on right wing
|
Details
|
|
|
09-18-2014
|
1.50
|
Right wing tip wrap and leading gdge wrap prep[
|
Details
|
|
|
09-18-2014
|
2.50
|
Finish wing assembly
|
Details
|
|
|
09-17-2014
|
2.00
|
Clean leading edge wrap
|
Details
|
|
|
09-16-2014
|
1.50
|
Attach leading edge skin
|
Details
|
|
|
09-15-2014
|
2.00
|
Work on right fuel tank
|
Details
|
|
|
09-14-2014
|
4.00
|
Work on left wing skin and fuel tank
|
Details
|
|
|
09-13-2014
|
5.00
|
Work on right wing tank area
|
Details
|
|
|
09-12-2014
|
3.00
|
Work on fuel tank left wing
|
Details
|
|
|
09-11-2014
|
3.00
|
Work on left fuel tank
|
Details
|
|
|
09-10-2014
|
2.00
|
Work on root skin
|
Details
|
|
|
09-09-2014
|
2.00
|
Work on wing root skins
|
Details
|
|
|
09-08-2014
|
6.00
|
Work on wing root skins
|
Details
|
|
|
09-07-2014
|
3.50
|
Double check both wing assemblies
|
Details
|
|
|
09-06-2014
|
2.50
|
Position and cleco right wing ribs
|
Details
|
|
|
09-05-2014
|
1.50
|
Rivet left wing ribs
|
Details
|
|
|
09-04-2014
|
4.00
|
Modify ribs, cleco ribs in place
|
Details
|
|
|
09-03-2014
|
3.00
|
Modify ribs
|
Details
|
|
|
09-02-2014
|
3.00
|
Work on ribs
|
Details
|
|
|
08-31-2014
|
1.50
|
Assemble second aileron bellcrank and install both
|
Details
|
|
|
08-30-2014
|
6.00
|
Install compression tubes both wings
|
Details
|
|
|
08-29-2014
|
3.00
|
install compression struts
|
Details
|
|
|
08-28-2014
|
3.00
|
Spar fittings installation
|
Details
|
|
|
08-27-2014
|
3.00
|
work on wing spars
|
Details
|
|
|
08-26-2014
|
4.50
|
inventory parts, layout wing spars
|
Details
|
|