Powered By Kitlog Pro v2.0
STUART'S WEB SITE
RV-7
All
Work Logs Found:
40
Category Work Time:
394 Hours
Date
Hours
Work Log Summary
Details
11-28-2015
25.00
Console Tailwheel and Wing Fitting
Details
01-23-2015
25.00
Alignment of H/Stab & V/Stab Final Drilling & Bolt
Details
12-13-2014
15.00
Roll Servo Finalized V/Stab & H/Stab Fit Up
Details
07-05-2014
15.00
Landing Lights
Details
06-18-2014
13.00
RH Side Ail Bellcrank And Ail Fitted
Details
04-27-2014
20.00
Fitted Wing Tips
Details
04-06-2014
25.00
Horizontal Stab Spar Modification
Details
03-28-2014
5.00
Stall Warner
Details
03-18-2014
8.00
Attach Flap Brace and Aileron Fairing
Details
03-15-2014
5.00
TC Visit
Details
03-11-2014
16.00
Left side Aileronn Hinges Fitted
Details
01-01-2014
6.00
Prepared and assembled left aileron bellcrank
Details
12-30-2013
11.00
aileron hinge brackets and flap brace assembly
Details
12-29-2013
4.00
Pushrods aileron
Details
12-27-2013
6.00
Fitted Rod Ends And Riveted
Details
12-27-2013
15.00
Cut and assembled aileron pushrods
Details
12-26-2013
8.00
Prepared Aileron Pushrods
Details
12-05-2013
2.00
Elevators Fitted
Details
11-29-2013
20.00
Left Elevator With Tab Fitted
Details
11-21-2013
10.00
RH Elevator Under Structure Work
Details
10-21-2013
6.00
Counter Weight RH Elevator
Details
10-20-2013
4.00
RH Elevator Leading Edge Rolled
Details
09-14-2013
7.00
Stifners And Trailing Edge RH Elevator
Details
09-08-2013
8.00
Right Elevator Skin
Details
09-08-2013
4.00
Right Elevator Priming
Details
09-07-2013
8.00
Right & Left Elevator Stiffners.
Details
09-03-2013
6.00
Assembled Vertical Stab
Details
09-01-2013
1.00
Rudder Counterbalance Weight Fitted
Details
08-31-2013
5.00
Riveting the under frame rudder.
Details
08-03-2013
5.00
Primed and ready the rudder is close to assembly
Details
07-14-2013
6.00
Primmed Rudder Components.
Details
07-07-2013
1.50
Rudder Horn Brace.
Details
07-06-2013
7.00
Trim Tab Primed
Details
04-07-2013
12.00
Vertical Stabiliser Dimpled Match Drilled
Details
04-06-2013
8.00
Rudder Cleaned Up For Priming
Details
03-23-2013
7.00
Final assembly of horizontal stab
Details
12-24-2012
6.00
Match Drilled & Dimpled H/S
Details
09-02-2012
6.00
Preparing inboard ribs on horiz stab
Details
07-02-2012
20.00
Horizontal Stab Forward Spar Assy
Details
06-16-2012
12.00
Horizontal Stab Rear Spar Assy
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
40
393
Empennage
24
196
Fuselage
2
40
Miscellaneous
1
5
None
1
25
Wings
12
127
Copyright © 2001-2024 Matronics. All Rights Reserved.