RANDY'S WEB SITE
RV-12
All
Work Logs Found:
172
Category Work Time:
949 Hours
Date
Hours
Work Log Summary
Details
07-01-2017
8.00
Garmin G3X dual screen MFD added
Details
12-03-2016
2.00
Final DAR inspection and airworthiness certificati
Details
11-23-2016
4.00
Placed seals on wings and re-attached
Details
11-19-2016
12.00
Painting and final identification
Details
10-08-2016
2.00
Added required labels.
Details
10-02-2016
2.00
Calibrated Magnetometer
Details
10-01-2016
3.00
Set Idle speed and balance carbs
Details
09-25-2016
4.00
Vernier Rotax Throttle and Choke cables
Details
09-24-2016
1.00
Connected Shroud Hose
Details
09-17-2016
8.00
Fitted and installed Cowl Cooling Duct
Details
09-10-2016
3.00
Installed the Oil Cooler Box assembly
Details
09-03-2016
2.00
Installed Cabin Heat Cable
Details
08-27-2016
4.00
Oil Tank Assembly and Coolant Overflow Bottle
Details
08-20-2016
8.00
Cooler Box assembly and Radiator
Details
08-14-2016
2.00
installed Oil Door in top Cowling
Details
08-13-2016
8.00
Trimmed and Fitted Cowling
Details
08-07-2016
3.00
Replaced magnetic spar pin switches
Details
08-06-2016
2.00
Installed EGT probes
Details
07-30-2016
4.00
Installed Exhaust Pipes and Muffler
Details
07-24-2016
6.00
Fitted and attached Spinner
Details
07-23-2016
4.00
Mounted and adjusted prop
Details
07-16-2016
4.00
Installed Pitot Tube
Details
07-09-2016
2.00
Installed Rectifier Regulator
Details
06-25-2016
4.00
Installed Igniion harness and oil pressure wires
Details
06-18-2016
2.00
Installed Fuel pump and Fuel Return Hoses
Details
06-11-2016
4.00
Mounted Rotax Engine
Details
06-04-2016
8.00
Fitted and installed the FF-1207 Cooling Shroud
Details
05-28-2016
4.00
Battery, Master Relay and Manifold Pressure Sensor
Details
05-21-2016
4.00
Garmin G3X ADS-B out 2020 compliant GPS
Details
05-14-2016
8.00
Attached canopy to airframe and added seals
Details
05-08-2016
0.00
Flight instruction
Details
05-07-2016
24.00
Completed Fiberglass bracket for canopy
Details
03-19-2016
4.00
Preparing for canopy fiberglass work
Details
03-12-2016
4.00
Installed seats, side panels and carpet
Details
03-05-2016
3.00
Installed GDU 460 EFIS
Details
02-27-2016
2.00
Installed GTX 23 ES transponder
Details
02-20-2016
3.00
Backup Battery and engine monitor
Details
02-13-2016
3.00
Ignition & Start Module and Garmin ADS-B
Details
02-12-2016
2.00
Installed Map Box and Right Panel
Details
02-09-2016
4.00
Center Panel installation
Details
02-06-2016
3.00
Control module and spare fuse installation
Details
02-05-2016
0.00
Pictures
Details
02-02-2016
4.00
Installed Baggage Bulkhead and Gas Tank
Details
01-31-2016
4.00
Installed Autopilot Roll Servo
Details
01-30-2016
4.00
installed Autopilot Pitch Servo
Details
01-24-2016
2.00
Installed ADS-B Antenna
Details
01-23-2016
3.00
Installed ADAHRS unit
Details
01-17-2016
4.00
Installed Magnetometer
Details
01-16-2016
3.00
Installed Com and Transponder Antennas
Details
01-09-2016
4.00
Installed ELT
Details
12-18-2015
20.00
Wheel Pants
Details
09-26-2015
12.00
Installed Gas Tank
Details
09-19-2015
16.00
Added Canopy
Details
09-05-2015
6.00
Attached Canopy Frame
Details
07-11-2015
6.00
Fabricated and installed Tail Cone
Details
06-30-2015
6.00
Attached Stabilator Cables
Details
06-29-2015
5.00
Attached Rudder Cables
Details
06-27-2015
8.00
Installed Flaperon
Details
06-26-2015
4.00
Tail attachment
Details
06-25-2015
4.00
Wing attachment
Details
06-24-2015
6.00
Moving into hanger
Details
06-09-2015
3.00
Installed Cockpit light and Canopy Latch wire
Details
06-06-2015
8.00
Completed wire installation
Details
05-30-2015
8.00
Connecting the Options Harness
Details
05-23-2015
5.00
Installed Pilot/Co-Pilot Headset jacks
Details
05-19-2015
2.00
Aux Music Jack and 12v Power Outlet
Details
05-16-2015
6.00
Ran Options Wiring Harness
Details
05-09-2015
6.00
Installed Control Sticks
Details
05-02-2015
6.00
Installed Spar Pin Switches
Details
04-25-2015
4.00
Installed Wing Connectors and OAT
Details
04-21-2015
2.00
Installed Pitch Trim Servo
Details
04-18-2015
16.00
Ran main Fuselage Wire Harness and Antenna cables
Details
04-12-2015
4.00
12 Wing Doubler and Rudder Trim Tab Kits
Details
04-11-2015
4.00
Brake Lines installed to brakes
Details
04-10-2015
2.00
Set on it's feet
Details
04-09-2015
6.00
Brakes and Wheels
Details
04-04-2015
6.00
Landing Gear Legs
Details
03-30-2015
2.00
Assembled the Wing Attach Pins
Details
03-29-2015
3.00
Installed Wing Electronic Connectors
Details
03-28-2015
2.00
Installed Flaperons to wings
Details
03-26-2015
6.00
Installed the Plexigass Rear Window
Details
03-24-2015
3.00
Added Firewall sealant
Details
03-19-2015
4.00
Upper Forward Fuselage Skin
Details
03-17-2015
3.00
Added Oil Tank Brace and Battery Mount
Details
03-13-2015
4.00
installed Panel Base and Canopy Ribs
Details
03-12-2015
4.00
Installed Fwd Firewall Stiffner Kit
Details
03-10-2015
4.00
Installed Forward Upper Fuselage
Details
03-07-2015
4.00
Installed Gas return lines
Details
02-18-2015
3.00
Gas floscan and Gascolator
Details
02-17-2015
4.00
Gas pump, shutoff valve and lines
Details
02-08-2015
4.00
Upper Forward Firewall
Details
02-07-2015
2.00
Fuel valve install
Details
02-06-2015
1.00
Seats, carpet and side panels arrived today
Details
02-04-2015
6.00
Ran brake lines
Details
01-31-2015
6.00
Assembled Rudder and Brake Pedals
Details
01-13-2015
8.00
Seat Back fabrication and attach
Details
01-09-2015
8.00
Side Panels riveted
Details
12-20-2014
2.00
Hanger Purchase
Details
12-18-2014
3.00
Finish Kit shipment inventory
Details
12-14-2014
8.00
Empennage Attach
Details
12-05-2014
3.00
Fuselage Back Panels and Roll Bar Bracket
Details
12-04-2014
9.00
Roll Bar
Details
11-23-2014
3.00
Added side vents
Details
11-22-2014
8.00
Riveted Fuselage Side Skins
Details
11-13-2014
3.00
Fuselage Side Skins
Details
11-11-2014
3.00
Arm Rests
Details
11-10-2014
3.00
Roll Bar attach plates and Mid-Fuse Brace
Details
11-09-2014
4.00
Fabricated longerons
Details
10-30-2014
3.00
Attached Lower fwd fuselage
Details
10-29-2014
3.00
F-1201L gascolator bracket and fuel flow meter mou
Details
10-28-2014
3.00
firewall shelf and rudder pedal support channels
Details
10-27-2014
2.00
Firewall Spacers and Cowl Attach Plates
Details
10-26-2014
4.00
Began work on fwd lower fuselage
Details
10-25-2014
2.00
Installed the six systems block studs
Details
10-24-2014
2.00
Attached Steps
Details
10-23-2014
3.00
Baggage Bulkhead, Auto-pilot & Facet Pump brack
Details
10-21-2014
3.00
Step Floors
Details
10-20-2014
3.00
Step Attachments
Details
10-19-2014
4.00
Riveted Bottom Skin
Details
10-15-2014
4.00
Clecoed Fuselage Bottom Skin
Details
10-13-2014
2.00
Corner Skins completed
Details
10-12-2014
5.00
Step Ribs and Corner Skins
Details
10-09-2014
2.00
Installed Control Column
Details
10-08-2014
4.00
F-1203A Bulkhead
Details
10-03-2014
3.00
Bulkhead Side Assemblies
Details
10-02-2014
3.00
Attached Seat Ribs and Floor
Details
09-25-2014
2.00
Added Seat Back Henges
Details
09-20-2014
8.00
Flaperon Mixer Arm & Seat Ribs
Details
09-19-2014
16.00
Start of mid-fuselage
Details
09-08-2014
2.00
Attached Anti-Servo Tabs to Stabilator
Details
09-07-2014
2.00
Added tip fairings onto tail
Details
09-04-2014
1.00
Added Rod and Bearings to Flaperons
Details
09-03-2014
3.00
Left Flaperon completed
Details
09-02-2014
3.00
Right Flaperon complete
Details
09-01-2014
3.00
Flaperon Rib Skins
Details
08-31-2014
5.00
Flaperon structure
Details
08-10-2014
4.00
Fabricated pivot brackets
Details
08-07-2014
2.00
Fabricated Actuation Brackets
Details
07-24-2014
3.00
Landing light plexiglass re-installation
Details
07-22-2014
4.00
Mounted Navigation lights on wings
Details
07-17-2014
4.00
Installed landing light plexiglass
Details
07-12-2014
6.00
Navigation light work
Details
07-11-2014
8.00
Completed end section of right wing
Details
07-10-2014
8.00
Tool shopping and deburring
Details
07-09-2014
8.00
Riveting the right wing top skin
Details
07-08-2014
8.00
Clecoed skin of right wing and worked on navigatio
Details
07-07-2014
6.00
Landing light installation
Details
07-06-2014
4.00
Helping hand from dad
Details
06-22-2014
20.00
Training at RV-12 Expo
Details
05-24-2014
8.00
Moving the RV-12 Kit to Randy's house
Details
03-09-2012
0.75
Rework center section rivets
Details
02-05-2012
1.25
Right Wing Skinning
Details
01-03-2012
1.00
Right wing bottom sheeting
Details
06-24-2010
24.00
Left Wing Completed
Details
03-28-2010
60.00
Left Wing Construction
Details
02-28-2010
8.00
Rear Spar and Stub Spar Prep
Details
02-21-2010
5.00
Wing Spar Prep
Details
02-19-2010
4.00
Wing Kit Arrival
Details
10-13-2009
20.00
Tail Cone Skins & Pitch Servo
Details
10-04-2009
6.00
Tail cone bottom skins
Details
10-01-2009
7.50
Rear Bulkhead Assembly
Details
09-27-2009
25.00
Horizontal Stabilator
Details
09-16-2009
20.00
Horizontal Stabilator
Details
09-11-2009
5.50
Horizontal Stabilator
Details
09-10-2009
6.50
Anti-Servo Tabs
Details
09-09-2009
6.00
Rudder
Details
09-08-2009
5.00
Rudder
Details
09-07-2009
4.50
Vertical Stabilizer
Details
09-06-2009
9.00
Vertical Stabilizer
Details
09-04-2009
10.00
Vertical Stabilizer
Details
09-03-2009
4.00
Unpacked and inventoried Empennage Kit
Details
08-03-2009
0.00
Ordered RV-12 Empennage Kit
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
172
949
Avionics
16
56
Empennage
18
143
Engine
17
67
Finish Kit
28
201
Fuselage
52
220
Miscellaneous
11
59
Prop
2
10
Wings
28
193