Powered By Kitlog Pro v2.0
My earth journey takes flight
Zodiac CH601 XLB-TD
All
Work Logs Found:
264
Category Work Time:
1832 Hours
Date
Hours
Work Log Summary
Details
02-14-2018
100.00
First 100 Hours Flying
Details
08-05-2017
1.00
First Flight Video
Details
07-15-2017
10.00
TC Inspection
Details
07-14-2017
12.00
Prep for TC Inspetion
Details
07-06-2017
10.00
Control Cable Lockwire
Details
07-05-2017
12.00
Lock Wire the Flight COntrols
Details
07-04-2017
12.00
Wieghing
Details
07-03-2017
4.00
Preparation for Wieghing
Details
06-29-2017
0.00
Flying in a 601
Details
06-25-2017
10.00
Final Assembly and Checks
Details
06-24-2017
12.00
Final Assembly and Checks
06-18-2017
12.00
Final Assemble and Checks
Details
06-17-2017
12.00
Taxi Test
Details
06-04-2017
12.00
Assembly and Preparation
Details
06-03-2017
12.00
Repair and Assemble
Details
05-20-2017
10.00
Assemble
Details
05-16-2017
10.00
Transport to Airport
Details
05-15-2017
8.00
Modify the Trailer for Transport
Details
05-13-2017
9.00
Cockpit Finishing Touches
Details
05-06-2017
10.00
Rudder Cables
Details
05-05-2017
9.00
Re-assembled the wheels
Details
05-02-2017
8.00
Cables
Details
04-27-2017
11.00
Flight Control Cables
Details
04-24-2017
10.00
Finished off Fuselage bits
04-23-2017
10.00
Check Engine and Service
Details
04-22-2017
9.00
Wheel Bearing
Details
04-21-2017
10.00
Wiring
04-17-2017
10.00
Decals
04-01-2017
10.00
Apolstery
Details
03-19-2017
10.00
Head Rests
Details
03-17-2017
10.00
Paint Undercarriage
Details
03-15-2017
10.00
Paint Canopy
03-14-2017
10.00
Paint Fuselage
03-13-2017
10.00
Painting Fuselage
Details
03-06-2017
6.00
Making Stobe Light Fitting for Fuselage
Details
03-05-2017
8.00
Rigging the Tail wheel steering
Details
03-04-2017
10.00
Paint Fuselage
Details
02-21-2017
10.00
Wiring
Details
02-18-2017
10.00
Dashboard Cowling
Details
02-11-2017
8.00
Tail Wheel Mount
Details
02-10-2017
8.00
Tailwheel Mounting
Details
01-31-2017
8.00
Painting Cowlings
Details
01-30-2017
8.00
Painting Cowlings
Details
01-28-2017
8.00
Painting Cowlings
Details
01-27-2017
10.00
Painting Wings
Details
01-25-2017
10.00
Painting Wings
01-23-2017
10.00
Painting Wings
01-17-2017
10.00
Painting Wings
Details
01-14-2017
10.00
Painting Wings
Details
01-08-2017
10.00
Painting Wings
01-07-2017
10.00
Aileron Counter Weight Doublers and fitting
Details
01-04-2017
8.00
Painting Wings
Details
01-02-2017
9.00
Painting Wings
Details
12-29-2016
10.00
Painting the Wings
Details
12-23-2016
10.00
Flaps and Aelirons
Details
12-12-2016
10.00
Painting Elevator
Details
12-11-2016
10.00
Painting Elevator
Details
12-10-2016
6.00
Painting Rudder
Details
11-07-2016
8.00
Wired up control switches
Details
11-04-2016
8.00
Control Grip Installation
Details
10-31-2016
8.00
Throttle handle
Details
10-31-2016
8.00
Engine Run
Details
10-28-2016
8.00
Install ed Data Collector
Details
10-24-2016
8.00
Sorting little jobs around the cowling
Details
10-17-2016
4.00
Seat Cushions
Details
10-13-2016
8.00
Installed Radio Antenna
10-12-2016
8.00
Installed and Wirded Radio
Details
10-04-2016
8.00
Cockpit Controls
10-03-2016
8.00
Install Engine Data Collector
Details
09-30-2016
8.00
Re-Wire Instrument Panel
09-29-2016
8.00
Cover Instrument Panel
Details
09-28-2016
8.00
Rewire the Instrument Panel
09-27-2016
8.00
Rewire Engine Bay
Details
09-26-2016
8.00
Rewire Engine Bay
Details
07-02-2016
10.00
Continued wiring instrument panel
06-13-2016
4.00
Engine diagnostic run
Details
05-22-2016
6.00
Engine Diagnostic and Running
Details
05-15-2016
6.00
Engine Diagnostic and Running
Details
04-30-2016
4.00
Adjusting the Rotec TBI Primer
Details
04-03-2016
1.00
Inspection following Engine Run
Details
04-03-2016
1.00
Engine Inspection (more pics)
Details
03-28-2016
8.00
Second Engine Run
Details
03-08-2016
4.00
Completed Control Cable install and then dissassmb
Details
03-07-2016
8.00
Aileron and Elevator Control Cables
Details
03-05-2016
8.00
Aileron Control Cables
Details
03-04-2016
8.00
Instaling Wing Flaps
Details
02-29-2016
8.00
Rear Spar Bolt Drilled
Details
02-28-2016
10.00
Wing Installation
02-27-2016
10.00
Left Wing skin riveting
Details
02-26-2016
4.00
LeftSkin
Details
02-25-2016
6.00
Right Wing Final Skin Riveting
02-25-2016
6.00
Canopy Final Installation
Details
02-22-2016
8.00
Seat Belt Shoulder Attachment and Canopy Latch
Details
02-15-2016
8.00
Finished making and installing CHT sensors
Details
02-14-2016
4.00
Right Wing Tank
02-13-2016
4.00
Right Wing Tank
02-08-2016
8.00
Fuel Tank Sender Reinstallation
Details
02-07-2016
2.00
Started Installing Right Fuel tank
Details
02-07-2016
2.00
SAAA Builder Visit
Details
02-06-2016
6.00
Changed the cross shaft on the throttle
Details
02-03-2016
8.00
Cool Air Cabin vent Doors and Control
Details
02-01-2016
2.00
Upgraded Odyssey to Gen 2
01-31-2016
10.00
Constucting Secondary Latch/Rollbar
Details
01-26-2016
5.00
Finial Assemble of the Canopy
01-25-2016
6.00
Finished of lower cylinder baffles
01-24-2016
0.00
Mal Bennet Visit
Details
01-24-2016
8.00
Build Engine Accessory Cooling Baffles
Details
01-23-2016
8.00
Fuse and Ground bus installation
01-22-2016
8.00
Lower cyinder Baffles
01-12-2016
8.00
Finalising Enigne Start Components
01-10-2016
6.00
Refining Cowling and inlet mounting
01-09-2016
4.00
Refining Cowling
Details
01-06-2016
4.00
First Engine Start
01-04-2016
12.00
Finalising Enigne Start Components
Details
01-03-2016
8.00
Finalising Enigne Start Components
12-02-2015
10.00
Engine Accessories
11-19-2015
10.00
Engine Accessories
11-12-2015
9.00
Cowl Cleanup and Throttle
11-10-2015
9.00
Cowl Cleanup and Finishing
Details
11-05-2015
9.00
Throttle Cable Assemble
Details
10-26-2015
9.00
Engine Exhaust Pipe
Details
10-25-2015
9.00
Cowling - Oil Cooler/Engine Inlet Duct
Details
10-24-2015
9.00
Cowling - Oil Cooler/Engine Inlet Duct
Details
10-23-2015
9.00
Cowling - Engine Inlet Manifold
Details
10-22-2015
9.00
Cowl - Oil Cooler Inlet Duct
Details
10-15-2015
9.00
Cowling - Cooling Inlet Construction
Details
10-13-2015
2.00
Cowling - Cooling Inlet Construction
Details
10-12-2015
9.00
Cowling - Cooling Inlet Construction
Details
10-10-2015
9.00
Cowling - Cooling Inlet Construction
Details
10-09-2015
9.00
Cowl Inlet Duct
Details
10-06-2015
9.00
Cowl Inlet Duct
10-05-2015
9.00
Cowl Inlet
09-22-2015
9.00
Cowl Inlet Duct
Details
09-18-2015
9.00
Cowl Inlet Duct
Details
09-17-2015
9.00
Augmentor Outlet
Details
09-14-2015
9.00
Plenum and Cowl
Details
09-02-2015
9.00
Plenum and Cowl
Details
08-28-2015
9.00
Plenum and Cowl
08-21-2015
2.00
Plenum and Cowl
08-20-2015
8.00
Cowl
08-19-2015
8.00
Plenum
08-16-2015
10.00
Upper Cowl and Plenum
Details
08-13-2015
12.00
Engine Baffles, Plenum and cowl
Details
07-09-2015
8.00
Instrument Panel - iPad mount
Details
07-02-2015
8.00
Seat Foam Assemble
Details
06-28-2015
12.00
Dual Throttles
Details
06-24-2015
2.00
Throttle Body Injector
Details
06-21-2015
8.00
Lower cowling and Exhaust Augmentor
Details
06-13-2015
10.00
Exhaust System and lower cowling
Details
06-06-2015
6.00
Cowling
Details
05-31-2015
10.00
Install engine back on the Fuselage
Details
05-30-2015
10.00
Installed Engine Accessories
Details
05-24-2015
6.00
Installing heads
Details
05-23-2015
10.00
Engine Assembly
Details
05-18-2015
1.00
Test install centre console
Details
05-17-2015
8.00
Cockpit Centre Console
Details
05-16-2015
6.00
Completed fitting values and rockers and CHT mod
Details
05-12-2015
3.00
Started fitting vales and rockers to heads
Details
05-03-2015
6.00
Fitting EFIS to Instrument Panel
Details
05-02-2015
5.00
Second Hand MGL Odyssey EFIS
Details
04-26-2015
4.00
Removed the Instrument Panel and wiring
Details
04-26-2015
2.00
Re-Installed Filight Control Tube
Details
04-26-2015
4.00
Designing and Sourcing Fuel Plumbing
Details
03-30-2015
8.00
Finished riveting fuselage back together
Details
03-23-2015
8.00
Began riveted Centre Fuselage back together with B
Details
03-21-2015
8.00
Fuselage B Mod Parts Fitting and Priming
Details
03-18-2015
2.00
Canopy - Parts Clean up
Details
03-17-2015
2.00
Fuselage - B Mod Parts Cleaning
Details
03-16-2015
2.00
Right Wing - Wing tip install and parts clean up
Details
03-10-2015
4.00
Right Wing - Tip
Details
03-10-2015
6.00
Rear Cockpit Tube Adjustment
Details
03-02-2015
10.00
Fuselage B-Mod Cockpit Installation
Details
02-23-2015
1.00
Centre Spar - Installation of B-Mod
Details
02-23-2015
9.00
Canopy Assemble
Details
02-22-2015
3.00
Engine Assemble Crankcase and Pistons
Details
02-16-2015
6.00
Centre Spar and Fuselage Modification
Details
02-16-2015
6.00
Canopy - Drilled Perspex to Frame
Details
02-15-2015
6.00
Canopy Assemble
Details
02-09-2015
2.00
Centre Spar - Reaming Wing Fitting Bolts
Details
02-09-2015
8.00
Canopy - Fitting Canopy and Side Rails
Details
02-08-2015
4.00
Canopy Side Rails
Details
02-03-2015
8.00
Cockpit Modification Upgrade - Dissassembly
Details
02-02-2015
8.00
Centre Spar Modifcation - Assembly
Details
02-01-2015
4.00
Centre Spar Upgrade - Assemble
Details
01-31-2015
8.00
Centre Spar Upgrade
Details
01-28-2015
1.00
Removed the instrument that I do not need
Details
01-13-2015
6.00
Installing B Mod into Center Spar
Details
01-12-2015
4.00
Installing B Mod to Center Spar
Details
01-10-2015
3.00
Disassemble wing centre spar
Details
01-07-2015
4.00
Engine Assemble
Details
01-06-2015
4.00
Begin engine assembly
Details
01-03-2015
3.00
Finish wing locker doors
Details
12-30-2014
4.00
Left Wing - Rivet Bottom Rear and nose skin
Details
12-29-2014
4.00
Left Wing - Prim inside
Details
12-28-2014
6.00
Left Wing - Debur
Details
12-27-2014
4.00
Left Wing - Break Down for deburring
Details
12-22-2014
2.00
Left Wing - Baggage Locker
Details
12-18-2014
3.00
Left Flap - Fitting
Details
12-16-2014
4.00
Torque Wrench Calibration
Details
12-16-2014
4.00
Left Wing - Fuel tank inspection cover.
Details
12-09-2014
4.00
Left Wing - L Angles and Tip Access
Details
12-09-2014
4.00
Checking Engine Parts for Installation
Details
12-01-2014
4.00
Preparation for re-building the engine
Details
11-25-2014
7.00
Left Wing - L Angles and Locker divider
Details
11-15-2014
8.00
Left Wing - Wing Tip
Details
11-13-2014
3.00
Installed Left Wing Locker
Details
11-11-2014
7.00
Installation of Wing lockers
Details
11-09-2014
6.00
SAAA Maintenance Procedures Course (Day 2)
Details
11-08-2014
6.00
SAAA - Maintenance Procedure Course (day 1)
Details
10-28-2014
1.00
Packed and Shipped Crankcase to CAMIT
Details
10-25-2014
1.00
Left Wing Fuel Cap
Details
10-24-2014
4.00
Left wing - Fitted top of leading edge skin
Details
10-24-2014
3.00
Corked and fitted left fuel tank
Details
10-21-2014
8.00
Left Wing - Bend and fit l leading edge skin
Details
10-17-2014
4.00
Left Wing - Aileron Fitting
Details
10-16-2014
1.00
Left Wing Leading edge rib preparation
10-15-2014
1.00
Left Leading Edge Rib Preparation
10-14-2014
6.00
Left Aileron Assembly
Details
10-12-2014
2.00
Preparations for Leading edge Skin and Alieron Tri
Details
10-12-2014
2.00
Left Alieron trim Tab
Details
10-11-2014
4.00
Left Wing Fitting (Tie Down, Bell Crank Access, Pi
Details
10-10-2014
8.00
Left Wing - Putting the Frame together
Details
10-08-2014
8.00
Left Wing - Clean, PRime and prep all parts
Details
10-06-2014
4.00
Remove studs and pack crank case
Details
10-05-2014
6.00
Clean up engine store parts
Details
10-04-2014
8.00
Pulled Jabiru 3300A Engine down
Details
10-03-2014
10.00
Right Wing Deburring and Leftwing Spar
Details
10-02-2014
6.00
Right Wing - Drilled out bottom skin to full size
Details
10-01-2014
6.00
Right Wing - Wrapped Leading Edge
Details
09-30-2014
4.00
Top leading edge skin
Details
09-29-2014
4.00
Vacuum forming the leading edge skin
Details
09-29-2014
4.00
Fitting the leading edge skin
Details
09-28-2014
6.00
Assembles all the Modification parts into wing.
Details
09-27-2014
8.00
Deburr and Primed upgrade and leading edge parts
Details
09-26-2014
6.00
Fitting leadng edge ribs
Details
09-23-2014
1.00
Pilot drilled right wing bottom skin L angles
Details
09-17-2014
2.00
Right Wing - Spar Extension & Cap Edge Distance
Details
09-16-2014
4.00
Alierion Bell Crank and Skin L angle Modifications
Details
09-12-2014
3.00
Right Wing Rear Spar Modification
Details
09-10-2014
1.00
De-riveting the top right wing skin rear spar line
Details
09-09-2014
4.00
Rear Spar modification
Details
09-09-2014
4.00
Fitting the Right Spar back to the wing
Details
09-07-2014
5.00
Riveting Right wing spar
09-06-2014
5.00
Riveting the right spar
Details
09-05-2014
6.00
Finished of preparing both spars for re riveting
Details
08-17-2014
5.00
Preparing update spare cap and wing root doubler
Details
08-15-2014
8.00
Remove rivets from main spare cap
Details
08-13-2014
4.00
Removed the engine from the fuselage
Details
08-09-2014
1.50
Survey of Rudder Construction
Details
08-09-2014
3.00
Riveted Right Ailerons
Details
08-09-2014
2.00
Elevator Survey
Details
08-08-2014
12.00
Aileron Assembly
Details
08-03-2014
3.00
Setting up for Ailerons
Details
08-01-2014
4.50
Rivet flaps
Details
08-01-2014
2.50
Firsts - Rib, Rivet, Lockwire
Details
07-30-2014
2.50
Drilled out and deburred flaps
Details
07-28-2014
4.00
Drilling left flap
Details
07-27-2014
7.00
Assemble Flaps
Details
07-26-2014
3.00
Primed rudder
Details
07-25-2014
1.00
Removed right wing spare
Details
07-25-2014
3.00
Re finish Rudder Surface
Details
07-20-2014
0.00
SAAA Chapter workshop meeting
Details
01-11-2014
0.00
Bring it home
Details
01-10-2014
0.00
Picking up the kit
Details
SITE NAVIGATION
Contact Builder
Zodiac CH601 XLB-TD Home
Category
# Logs
# Hours
All
264
1832
Aircraft
10
108
Avionics
10
62
Canopy
10
65
Cockpit
18
152
Engine
72
515
Flight Controls
5
51
Flying :)
2
101
Fuel System
4
10
Fuselage
26
161
Inspections
5
16
Landing Gear
2
18
Miscellaneous
5
18
Surface Finishing
22
205
Tail
6
26
Tools
1
4
Training
2
12
Wing
56
270
Wing - Flap & Ailero
8
38
Copyright © 2001-2024 Matronics. All Rights Reserved.