KitLog pro

Powered By Kitlog Pro v2.0

My earth journey takes flight
Work Logs Found: 264
Category Work Time: 1832 Hours
 Date
Hours
Work Log Summary

Details

 02-14-2018
100.00
First 100 Hours Flying
Details
       

 08-05-2017
1.00
First Flight Video
Details
     

 07-15-2017
10.00
TC Inspection
Details
     

 07-14-2017
12.00
Prep for TC Inspetion
Details
       

 07-06-2017
10.00
Control Cable Lockwire
Details
     

 07-05-2017
12.00
Lock Wire the Flight COntrols
Details
       

 07-04-2017
12.00
Wieghing
Details
       

 07-03-2017
4.00
Preparation for Wieghing
Details
     

 06-29-2017
0.00
Flying in a 601
Details
       

 06-25-2017
10.00
Final Assembly and Checks
Details
       

 06-24-2017
12.00
Final Assembly and Checks

 06-18-2017
12.00
Final Assemble and Checks
Details
       

 06-17-2017
12.00
Taxi Test
Details
       

 06-04-2017
12.00
Assembly and Preparation
Details
       

 06-03-2017
12.00
Repair and Assemble
Details
       

 05-20-2017
10.00
Assemble
Details
       

 05-16-2017
10.00
Transport to Airport
Details
       

 05-15-2017
8.00
Modify the Trailer for Transport
Details
       

 05-13-2017
9.00
Cockpit Finishing Touches
Details
       

 05-06-2017
10.00
Rudder Cables
Details
       

 05-05-2017
9.00
Re-assembled the wheels
Details
       

 05-02-2017
8.00
Cables
Details
     

 04-27-2017
11.00
Flight Control Cables
Details
       

 04-24-2017
10.00
Finished off Fuselage bits
     

 04-23-2017
10.00
Check Engine and Service
Details
       

 04-22-2017
9.00
Wheel Bearing
Details
       

 04-21-2017
10.00
Wiring
     

 04-17-2017
10.00
Decals
       

 04-01-2017
10.00
Apolstery
Details
     

 03-19-2017
10.00
Head Rests
Details
       

 03-17-2017
10.00
Paint Undercarriage
Details
       

 03-15-2017
10.00
Paint Canopy

 03-14-2017
10.00
Paint Fuselage

 03-13-2017
10.00
Painting Fuselage
Details
       

 03-06-2017
6.00
Making Stobe Light Fitting for Fuselage
Details
     

 03-05-2017
8.00
Rigging the Tail wheel steering
Details
       

 03-04-2017
10.00
Paint Fuselage
Details
       

 02-21-2017
10.00
Wiring
Details
       

 02-18-2017
10.00
Dashboard Cowling
Details
       

 02-11-2017
8.00
Tail Wheel Mount
Details
       

 02-10-2017
8.00
Tailwheel Mounting
Details
       

 01-31-2017
8.00
Painting Cowlings
Details
       

 01-30-2017
8.00
Painting Cowlings
Details
       

 01-28-2017
8.00
Painting Cowlings
Details
       

 01-27-2017
10.00
Painting Wings
Details
       

 01-25-2017
10.00
Painting Wings

 01-23-2017
10.00
Painting Wings
       

 01-17-2017
10.00
Painting Wings
Details
       

 01-14-2017
10.00
Painting Wings
Details
     

 01-08-2017
10.00
Painting Wings
     

 01-07-2017
10.00
Aileron Counter Weight Doublers and fitting
Details
       

 01-04-2017
8.00
Painting Wings
Details
       

 01-02-2017
9.00
Painting Wings
Details
     

 12-29-2016
10.00
Painting the Wings
Details
     

 12-23-2016
10.00
Flaps and Aelirons
Details
       

 12-12-2016
10.00
Painting Elevator
Details
       

 12-11-2016
10.00
Painting Elevator
Details
       

 12-10-2016
6.00
Painting Rudder
Details
       

 11-07-2016
8.00
Wired up control switches
Details

 11-04-2016
8.00
Control Grip Installation
Details

 10-31-2016
8.00
Throttle handle
Details

 10-31-2016
8.00
Engine Run
Details
       

 10-28-2016
8.00
Install ed Data Collector
Details
       

 10-24-2016
8.00
Sorting little jobs around the cowling
Details
       

 10-17-2016
4.00
Seat Cushions
Details

 10-13-2016
8.00
Installed Radio Antenna

 10-12-2016
8.00
Installed and Wirded Radio
Details

 10-04-2016
8.00
Cockpit Controls

 10-03-2016
8.00
Install Engine Data Collector
Details
     

 09-30-2016
8.00
Re-Wire Instrument Panel

 09-29-2016
8.00
Cover Instrument Panel
Details
     

 09-28-2016
8.00
Rewire the Instrument Panel

 09-27-2016
8.00
Rewire Engine Bay
Details
       

 09-26-2016
8.00
Rewire Engine Bay
Details

 07-02-2016
10.00
Continued wiring instrument panel

 06-13-2016
4.00
Engine diagnostic run
Details
       

 05-22-2016
6.00
Engine Diagnostic and Running
Details
       

 05-15-2016
6.00
Engine Diagnostic and Running
Details
       

 04-30-2016
4.00
Adjusting the Rotec TBI Primer
Details
       

 04-03-2016
1.00
Inspection following Engine Run
Details
       

 04-03-2016
1.00
Engine Inspection (more pics)
Details
       

 03-28-2016
8.00
Second Engine Run
Details
       

 03-08-2016
4.00
Completed Control Cable install and then dissassmb
Details
       

 03-07-2016
8.00
Aileron and Elevator Control Cables
Details
       

 03-05-2016
8.00
Aileron Control Cables
Details
       

 03-04-2016
8.00
Instaling Wing Flaps
Details
       

 02-29-2016
8.00
Rear Spar Bolt Drilled
Details
       

 02-28-2016
10.00
Wing Installation

 02-27-2016
10.00
Left Wing skin riveting
Details
       

 02-26-2016
4.00
LeftSkin
Details
       

 02-25-2016
6.00
Right Wing Final Skin Riveting
       

 02-25-2016
6.00
Canopy Final Installation
Details
     

 02-22-2016
8.00
Seat Belt Shoulder Attachment and Canopy Latch
Details
       

 02-15-2016
8.00
Finished making and installing CHT sensors
Details
       

 02-14-2016
4.00
Right Wing Tank

 02-13-2016
4.00
Right Wing Tank

 02-08-2016
8.00
Fuel Tank Sender Reinstallation
Details
     

 02-07-2016
2.00
Started Installing Right Fuel tank
Details
     

 02-07-2016
2.00
SAAA Builder Visit
Details
       

 02-06-2016
6.00
Changed the cross shaft on the throttle
Details

 02-03-2016
8.00
Cool Air Cabin vent Doors and Control
Details
       

 02-01-2016
2.00
Upgraded Odyssey to Gen 2
       

 01-31-2016
10.00
Constucting Secondary Latch/Rollbar
Details
       

 01-26-2016
5.00
Finial Assemble of the Canopy
       

 01-25-2016
6.00
Finished of lower cylinder baffles
       

 01-24-2016
0.00
Mal Bennet Visit
Details

 01-24-2016
8.00
Build Engine Accessory Cooling Baffles
Details
       

 01-23-2016
8.00
Fuse and Ground bus installation

 01-22-2016
8.00
Lower cyinder Baffles

 01-12-2016
8.00
Finalising Enigne Start Components

 01-10-2016
6.00
Refining Cowling and inlet mounting

 01-09-2016
4.00
Refining Cowling
Details

 01-06-2016
4.00
First Engine Start

 01-04-2016
12.00
Finalising Enigne Start Components
Details

 01-03-2016
8.00
Finalising Enigne Start Components

 12-02-2015
10.00
Engine Accessories

 11-19-2015
10.00
Engine Accessories

 11-12-2015
9.00
Cowl Cleanup and Throttle

 11-10-2015
9.00
Cowl Cleanup and Finishing
Details
     

 11-05-2015
9.00
Throttle Cable Assemble
Details
     

 10-26-2015
9.00
Engine Exhaust Pipe
Details
       

 10-25-2015
9.00
Cowling - Oil Cooler/Engine Inlet Duct
Details
       

 10-24-2015
9.00
Cowling - Oil Cooler/Engine Inlet Duct
Details
       

 10-23-2015
9.00
Cowling - Engine Inlet Manifold
Details
       

 10-22-2015
9.00
Cowl - Oil Cooler Inlet Duct
Details
       

 10-15-2015
9.00
Cowling - Cooling Inlet Construction
Details
       

 10-13-2015
2.00
Cowling - Cooling Inlet Construction
Details
       

 10-12-2015
9.00
Cowling - Cooling Inlet Construction
Details
     

 10-10-2015
9.00
Cowling - Cooling Inlet Construction
Details
       

 10-09-2015
9.00
Cowl Inlet Duct
Details

 10-06-2015
9.00
Cowl Inlet Duct
       

 10-05-2015
9.00
Cowl Inlet

 09-22-2015
9.00
Cowl Inlet Duct
Details
       

 09-18-2015
9.00
Cowl Inlet Duct
Details
       

 09-17-2015
9.00
Augmentor Outlet
Details
       

 09-14-2015
9.00
Plenum and Cowl
Details
       

 09-02-2015
9.00
Plenum and Cowl
Details
     

 08-28-2015
9.00
Plenum and Cowl

 08-21-2015
2.00
Plenum and Cowl

 08-20-2015
8.00
Cowl

 08-19-2015
8.00
Plenum

 08-16-2015
10.00
Upper Cowl and Plenum
Details
       

 08-13-2015
12.00
Engine Baffles, Plenum and cowl
Details
       

 07-09-2015
8.00
Instrument Panel - iPad mount
Details
       

 07-02-2015
8.00
Seat Foam Assemble
Details
       

 06-28-2015
12.00
Dual Throttles
Details
       

 06-24-2015
2.00
Throttle Body Injector
Details
       

 06-21-2015
8.00
Lower cowling and Exhaust Augmentor
Details
       

 06-13-2015
10.00
Exhaust System and lower cowling
Details
       

 06-06-2015
6.00
Cowling
Details
       

 05-31-2015
10.00
Install engine back on the Fuselage
Details
       

 05-30-2015
10.00
Installed Engine Accessories
Details
       

 05-24-2015
6.00
Installing heads
Details
       

 05-23-2015
10.00
Engine Assembly
Details
       

 05-18-2015
1.00
Test install centre console
Details
       

 05-17-2015
8.00
Cockpit Centre Console
Details
       

 05-16-2015
6.00
Completed fitting values and rockers and CHT mod
Details
       

 05-12-2015
3.00
Started fitting vales and rockers to heads
Details
       

 05-03-2015
6.00
Fitting EFIS to Instrument Panel
Details
       

 05-02-2015
5.00
Second Hand MGL Odyssey EFIS
Details
       

 04-26-2015
4.00
Removed the Instrument Panel and wiring
Details

 04-26-2015
2.00
Re-Installed Filight Control Tube
Details

 04-26-2015
4.00
Designing and Sourcing Fuel Plumbing
Details

 03-30-2015
8.00
Finished riveting fuselage back together
Details
       

 03-23-2015
8.00
Began riveted Centre Fuselage back together with B
Details
       

 03-21-2015
8.00
Fuselage B Mod Parts Fitting and Priming
Details
       

 03-18-2015
2.00
Canopy - Parts Clean up
Details
     

 03-17-2015
2.00
Fuselage - B Mod Parts Cleaning
Details
     

 03-16-2015
2.00
Right Wing - Wing tip install and parts clean up
Details
     

 03-10-2015
4.00
Right Wing - Tip
Details

 03-10-2015
6.00
Rear Cockpit Tube Adjustment
Details
       

 03-02-2015
10.00
Fuselage B-Mod Cockpit Installation
Details
       

 02-23-2015
1.00
Centre Spar - Installation of B-Mod
Details

 02-23-2015
9.00
Canopy Assemble
Details
     

 02-22-2015
3.00
Engine Assemble Crankcase and Pistons
Details
       

 02-16-2015
6.00
Centre Spar and Fuselage Modification
Details
       

 02-16-2015
6.00
Canopy - Drilled Perspex to Frame
Details
       

 02-15-2015
6.00
Canopy Assemble
Details

 02-09-2015
2.00
Centre Spar - Reaming Wing Fitting Bolts
Details
       

 02-09-2015
8.00
Canopy - Fitting Canopy and Side Rails
Details
       

 02-08-2015
4.00
Canopy Side Rails
Details

 02-03-2015
8.00
Cockpit Modification Upgrade - Dissassembly
Details
       

 02-02-2015
8.00
Centre Spar Modifcation - Assembly
Details
       

 02-01-2015
4.00
Centre Spar Upgrade - Assemble
Details
       

 01-31-2015
8.00
Centre Spar Upgrade
Details
       

 01-28-2015
1.00
Removed the instrument that I do not need
Details
       

 01-13-2015
6.00
Installing B Mod into Center Spar
Details

 01-12-2015
4.00
Installing B Mod to Center Spar
Details

 01-10-2015
3.00
Disassemble wing centre spar
Details

 01-07-2015
4.00
Engine Assemble
Details
       

 01-06-2015
4.00
Begin engine assembly
Details
       

 01-03-2015
3.00
Finish wing locker doors
Details

 12-30-2014
4.00
Left Wing - Rivet Bottom Rear and nose skin
Details
       

 12-29-2014
4.00
Left Wing - Prim inside
Details
     

 12-28-2014
6.00
Left Wing - Debur
Details
       

 12-27-2014
4.00
Left Wing - Break Down for deburring
Details
       

 12-22-2014
2.00
Left Wing - Baggage Locker
Details
       

 12-18-2014
3.00
Left Flap - Fitting
Details

 12-16-2014
4.00
Torque Wrench Calibration
Details
       

 12-16-2014
4.00
Left Wing - Fuel tank inspection cover.
Details
     

 12-09-2014
4.00
Left Wing - L Angles and Tip Access
Details
       

 12-09-2014
4.00
Checking Engine Parts for Installation
Details
       

 12-01-2014
4.00
Preparation for re-building the engine
Details
       

 11-25-2014
7.00
Left Wing - L Angles and Locker divider
Details
       

 11-15-2014
8.00
Left Wing - Wing Tip
Details
       

 11-13-2014
3.00
Installed Left Wing Locker
Details

 11-11-2014
7.00
Installation of Wing lockers
Details
       

 11-09-2014
6.00
SAAA Maintenance Procedures Course (Day 2)
Details

 11-08-2014
6.00
SAAA - Maintenance Procedure Course (day 1)
Details

 10-28-2014
1.00
Packed and Shipped Crankcase to CAMIT
Details

 10-25-2014
1.00
Left Wing Fuel Cap
Details

 10-24-2014
4.00
Left wing - Fitted top of leading edge skin
Details

 10-24-2014
3.00
Corked and fitted left fuel tank
Details

 10-21-2014
8.00
Left Wing - Bend and fit l leading edge skin
Details

 10-17-2014
4.00
Left Wing - Aileron Fitting
Details

 10-16-2014
1.00
Left Wing Leading edge rib preparation

 10-15-2014
1.00
Left Leading Edge Rib Preparation

 10-14-2014
6.00
Left Aileron Assembly
Details
       

 10-12-2014
2.00
Preparations for Leading edge Skin and Alieron Tri
Details
     

 10-12-2014
2.00
Left Alieron trim Tab
Details

 10-11-2014
4.00
Left Wing Fitting (Tie Down, Bell Crank Access, Pi
Details
       

 10-10-2014
8.00
Left Wing - Putting the Frame together
Details
       

 10-08-2014
8.00
Left Wing - Clean, PRime and prep all parts
Details
     

 10-06-2014
4.00
Remove studs and pack crank case
Details
     

 10-05-2014
6.00
Clean up engine store parts
Details
     

 10-04-2014
8.00
Pulled Jabiru 3300A Engine down
Details
       

 10-03-2014
10.00
Right Wing Deburring and Leftwing Spar
Details
     

 10-02-2014
6.00
Right Wing - Drilled out bottom skin to full size
Details
       

 10-01-2014
6.00
Right Wing - Wrapped Leading Edge
Details
       

 09-30-2014
4.00
Top leading edge skin
Details
       

 09-29-2014
4.00
Vacuum forming the leading edge skin
Details
       

 09-29-2014
4.00
Fitting the leading edge skin
Details
       

 09-28-2014
6.00
Assembles all the Modification parts into wing.
Details
     

 09-27-2014
8.00
Deburr and Primed upgrade and leading edge parts
Details

 09-26-2014
6.00
Fitting leadng edge ribs
Details
       

 09-23-2014
1.00
Pilot drilled right wing bottom skin L angles
Details
     

 09-17-2014
2.00
Right Wing - Spar Extension & Cap Edge Distance
Details
       

 09-16-2014
4.00
Alierion Bell Crank and Skin L angle Modifications
Details
       

 09-12-2014
3.00
Right Wing Rear Spar Modification
Details
       

 09-10-2014
1.00
De-riveting the top right wing skin rear spar line
Details
       

 09-09-2014
4.00
Rear Spar modification
Details
       

 09-09-2014
4.00
Fitting the Right Spar back to the wing
Details
       

 09-07-2014
5.00
Riveting Right wing spar
       

 09-06-2014
5.00
Riveting the right spar
Details

 09-05-2014
6.00
Finished of preparing both spars for re riveting
Details

 08-17-2014
5.00
Preparing update spare cap and wing root doubler
Details
       

 08-15-2014
8.00
Remove rivets from main spare cap
Details
       

 08-13-2014
4.00
Removed the engine from the fuselage
Details
       

 08-09-2014
1.50
Survey of Rudder Construction
Details
       

 08-09-2014
3.00
Riveted Right Ailerons
Details
       

 08-09-2014
2.00
Elevator Survey
Details
       

 08-08-2014
12.00
Aileron Assembly
Details
       

 08-03-2014
3.00
Setting up for Ailerons
Details

 08-01-2014
4.50
Rivet flaps
Details
       

 08-01-2014
2.50
Firsts - Rib, Rivet, Lockwire
Details
       

 07-30-2014
2.50
Drilled out and deburred flaps
Details
     

 07-28-2014
4.00
Drilling left flap
Details
     

 07-27-2014
7.00
Assemble Flaps
Details
       

 07-26-2014
3.00
Primed rudder
Details
     

 07-25-2014
1.00
Removed right wing spare
Details
       

 07-25-2014
3.00
Re finish Rudder Surface
Details
       

 07-20-2014
0.00
SAAA Chapter workshop meeting
Details

 01-11-2014
0.00
Bring it home
Details
       

 01-10-2014
0.00
Picking up the kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.