KitLog pro

Powered By Kitlog Pro v2.0

Jasons Thatcher buildlog
Work Logs Found: 107
Category Work Time: 475 Hours
 Date
Hours
Work Log Summary

Details

 02-28-2016
4.00
Horizontal stab spar
Details
       

 02-27-2016
0.10
Block to space the stab spar caps
Details
     

 01-05-2016
2.00
More Welding
Details

 11-22-2015
2.00
Welding engine mount
Details
     

 11-21-2015
3.00
Notching tube for engine mount
Details
       

 10-20-2015
3.00
engine mount jig
Details
     

 10-04-2015
6.00
Panel mounting
Details
       

 10-03-2015
3.00
New panel cut
Details

 09-26-2015
7.00
Panel
Details

 09-05-2015
3.00
Panel layout
Details

 08-02-2015
3.00
Riveting the turtledeck
Details
       

 08-01-2015
8.00
Baggage turtledeck
Details
       

 07-29-2015
3.00
Baggage area floor
Details
     

 07-28-2015
4.00
Lower skin riveting
Details

 07-26-2015
6.00
Top skin
Details
       

 07-15-2015
14.00
Tail assembly
Details
       

 07-14-2015
5.00
Set in jig and start assembling
Details
       

 06-13-2015
6.00
New parts and more fitting
Details
     

 06-12-2015
5.00
More bulkhead fitting
Details
     

 06-07-2015
5.00
New forms and fuselage layout
Details
       

 04-26-2015
4.00
Fuel valve housing
Details

 04-03-2015
5.00
Seat pan and controls
Details
       

 04-02-2015
3.00
Seat pan and fuel lines
Details
       

 03-29-2015
2.00
Front seat pan
Details
     

 03-28-2015
7.00
More roll cage
Details
       

 03-27-2015
2.00
Roll cage
Details
       

 03-21-2015
8.00
Nose gear
Details
       

 03-15-2015
4.00
Powdercoat and rollbar
Details
       

 03-14-2015
3.50
Cut Speedbrake and change tube
Details
     

 03-08-2015
7.00
Rear spar wrap and nose gear fork
Details
       

 03-07-2015
7.00
Rear seat
Details
     

 03-06-2015
6.00
Rudder pedals
Details
       

 03-03-2015
10.00
Landing gear and rudder pedals
Details
       

 03-02-2015
2.00
Drill landing gear
Details
       

 02-28-2015
6.00
Finished the pedals
Details
     

 02-27-2015
6.00
installed the speed brake motor
Details
     

 02-22-2015
7.00
Welded the rudder pedals
Details
     

 02-08-2015
9.00
Landing gear fitting
Details
     

 02-01-2015
8.00
Welding the speed brake tube
Details
     

 01-27-2015
7.00
Wing root skins
Details
       

 01-19-2015
6.00
Center section right nose skin
Details
       

 01-18-2015
2.00
Cutting 040 nose ribs
Details

 01-17-2015
5.00
Wing root nose ribs
Details
       

 01-16-2015
4.00
left skin
Details
       

 01-14-2015
5.00
Skin right lower fuselage
Details
       

 01-10-2015
10.00
Bellcrank and control rod
Details
       

 01-09-2015
6.00
Control linkage refine and bellcrank
Details
       

 01-03-2015
7.00
control rods
Details

 01-02-2015
6.00
Welding controls
Details

 12-31-2014
0.50
Controls (cont.)
Details
     

 12-31-2014
5.00
Control horns
Details
       

 12-29-2014
7.00
Bottom skin rear cockpit
Details
       

 12-28-2014
6.00
Control sticks
Details
       

 12-27-2014
7.00
Rear spar and seat ribs
Details
       

 12-26-2014
6.00
Longeron reinforcement and bottom skin
Details

 12-20-2014
8.00
Skin riveting and leg rests
Details
       

 12-19-2014
10.00
Firewall and bottom skin
Details
       

 12-18-2014
5.00
Rear cockpit frameing
Details
     

 12-14-2014
3.00
Rivets and rework firewall
Details

 12-13-2014
5.00
Seat belt mounts and bottom skin
Details
       

 12-12-2014
0.50
seat cont.
       

 12-12-2014
8.00
Front seat framework
Details
       

 12-09-2014
4.00
Mistake found plus a1, a2 bulkheads
Details
       

 12-07-2014
7.00
Spar to fuselage join
Details
       

 12-06-2014
7.00
Right fuselage side and spar attach
Details
       

 12-05-2014
5.00
Fuselage side
Details
       

 12-05-2014
1.00
Flanging pliers
Details

 12-01-2014
4.00
Fuselage sides construction
Details
       

 11-23-2014
7.00
Water jet and bulkheads
Details
       

 11-22-2014
4.00
Sheet metal cutting
Details

 11-21-2014
3.00
Firewall machining and rivet
Details
     

 11-17-2014
3.50
Firewall construction
Details
     

 11-09-2014
1.00
Bending longeron
Details

 11-07-2014
7.00
CAD work
Details

 11-06-2014
5.00
Longeron cutting
Details
       

 10-11-2014
2.00
Spar drilling
Details
       

 10-11-2014
0.50
Complete spar
Details
       

 10-10-2014
1.50
Dihedral jig
Details

 10-05-2014
3.00
Wing attach fittings
Details
       

 09-28-2014
2.00
Wingtip splice braces
Details

 09-24-2014
4.00
Spar riveting
Details

 09-20-2014
3.00
Spar riveting
Details

 09-07-2014
6.00
Drill left spar
Details
       

 08-27-2014
3.00
Tip spar riveting
Details

 08-23-2014
3.00
Tip rib brackets
Details
       

 08-22-2014
4.00
More powder coat and drilling
Details
       

 08-20-2014
3.00
Finish spar riveting and rib brackets
Details
       

 08-19-2014
3.00
Right spar rib brackets
Details
       

 08-17-2014
1.50
Left tip spar
Details

 08-16-2014
6.50
Powder coat and spar tip
Details
       

 08-15-2014
3.50
Spar riveting
Details

 08-09-2014
5.00
Rivet hole drilling
Details
       

 08-07-2014
1.50
Right spar components
Details
       

 08-06-2014
1.50
Spar cap tapers
Details
       

 07-26-2014
2.00
Taper jig
Details
       

 07-20-2014
2.00
Spar cap taper
Details

 07-10-2014
1.00
Center spar finished
Details
       

 07-07-2014
2.00
Drill out bad rivets
Details

 07-06-2014
5.50
Clean, primer and rivet center spar
Details

 07-05-2014
2.00
Match drill fittings to center spar
Details
       

 07-02-2014
3.00
Wing attach fittings
Details
     

 07-01-2014
2.00
Fabricate center spar stiffner angles
Details
       

 06-30-2014
4.00
Fabricate and drill center spar
Details
       

 06-26-2014
2.00
Waterjet wing attach fittings
Details
     

 06-25-2014
3.00
Waterjet spar web
Details

 06-25-2014
1.00
Cut rear seat ribs
Details

 04-30-2014
2.00
Cut wood rib forms
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.