KitLog pro

Powered By Kitlog Pro v2.0

JOHN's Web Site
Work Logs Found: 715
Category Work Time: 1917 Hours
 Date
Hours
Work Log Summary

Details

 09-11-2014
0.00
First Flight
Details
     

 09-04-2014
0.00
Transition training
Details
       

 08-10-2014
0.00
N919JR issued an Airworthiness Certificate.
Details
       

 07-24-2014
0.10
Service Bulletin No. 366B. Carb body inspection.
Details

 07-24-2014
0.50
Safety wired the canopy release handle.
Details
       

 07-09-2014
2.25
New Brake Lines
Details
       

 07-07-2014
1.25
Magneto Timing
Details
       

 07-07-2014
2.25
Changing brakes lines
Details

 06-24-2014
0.20
Conditioning the Brakes
Details

 06-23-2014
0.50
Throttle, Mixture, and Prop Decals
Details
     

 06-19-2014
0.20
Checked Prop Tracking
Details
     

 06-13-2014
1.50
Spinner touch up
Details
     

 06-10-2014
3.50
Repack main gear wheel bearings.
Details
       

 06-10-2014
1.25
Clean the gascolator and replaced screen.
Details
       

 05-30-2014
1.25
Labeling
Details
       

 05-22-2014
0.75
Compression check
Details
     

 05-15-2014
0.00
Altimeter, static system, and transponder check.
Details
       

 05-10-2014
1.00
Some more labels
Details
       

 05-05-2014
0.10
Test run engine and tested the brakes
Details

 04-29-2014
2.50
Heat sheild and flap rod.
Details
       

 04-26-2014
0.50
2nd Engine Start
Details

 04-22-2014
1.50
Change gaskets on fuel tanks.
Details
     

 04-19-2014
0.50
1st Engine Start
Details

 04-17-2014
3.00
Pre-oiling for first engine start.
Details

 04-17-2014
0.50
Installed new Odyssey PC-680 Battery
Details

 04-12-2014
0.50
Drain oil
Details
     

 04-12-2014
1.00
Attached Data Plate
Details
       

 03-22-2014
2.00
Checking the boost pump.
Details
       

 03-07-2014
1.50
Verified the data for weight and balance.
Details
       

 03-06-2014
2.00
Weighed the plane today.
Details
       

 02-26-2014
1.00
Prepping the plane for weighing.
Details
       

 02-26-2014
0.50
Installed batteries to the ELT.
Details
     

 02-20-2014
0.50
Lower cowling slot
Details
       

 02-13-2014
2.50
Plate for additional cowl slot length.
Details
       

 02-06-2014
1.00
Repaired some small dents
Details
       

 02-06-2014
2.00
Made bushings for seat belts and harnesses.
Details
       

 02-01-2014
1.00
Repaired a dent on wing and on fuselage.
Details
       

 01-25-2014
0.50
Installed oil filler
Details
       

 01-25-2014
0.50
Applied high temp RTV to the engine baffles.
Details
       

 01-16-2014
2.75
Installed seats, stick boots, and carpet
Details
       

 01-11-2014
1.75
Installing wing root fairings
Details
       

 01-11-2014
1.00
Installing forward cover assembly
Details
       

 01-11-2014
0.50
Installed new fuel line
Details
     

 01-06-2014
3.00
Floor cover and bulkhead screw installation
Details
       

 12-10-2013
0.25
Secured D-sub stick wiring
Details
     

 12-10-2013
1.25
Calibrated left fuel tank
Details
       

 12-10-2013
0.25
Added bolts where the factory left out rivets
Details
       

 11-23-2013
2.50
Gas in tanks for the first time
Details
       

 11-23-2013
0.00
Gas continued
Details
       

 11-23-2013
1.00
Finished bleeding the brakes and repair a leak.
Details

 11-16-2013
0.50
Trimmed and attached the vent tubing.
Details
       

 11-16-2013
2.50
Bleeding the brakes
Details
       

 11-13-2013
0.25
Installed brass screws for remote ELT control.
Details
     

 11-13-2013
0.50
Air Vents
Details
     

 11-06-2013
1.00
Attaching scat tubing to carb air muff
Details
     

 11-02-2013
0.50
Secured and fitted the fuel vents.
Details
       

 10-30-2013
0.50
Installed the Canopy seal.
Details
       

 10-30-2013
1.00
Installed Canopy Release Spring and Secured
Details
       

 10-30-2013
0.25
Drilled drain hole in lower rudder fairing
Details
     

 10-30-2013
0.50
Attached spark plug wires with adel clamp
Details
     

 10-21-2013
2.75
Tail fairing. Drilled out rivet and tap hole for s
Details
       

 10-21-2013
1.25
Reattached seals
Details
     

 10-09-2013
0.75
Installed the fuel vents to bottom of fuselage.
Details
       

 10-09-2013
1.00
Flap switch and labels
Details
       

 09-30-2013
0.75
Safety wired the flaps
Details
       

 09-18-2013
4.75
Secured wires from control stick and wingtips.
Details
       

 09-02-2013
2.25
Lower Cowl Hinge Pins
Details
       

 08-10-2013
2.25
Fitting canopy after riveting the F-771
Details
       

 07-28-2013
3.25
Corrugated tubing added for wire protection.
Details
       

 07-28-2013
1.00
Center Floor Cover
Details
       

 07-08-2013
3.50
Reinstalled the canopy release mechanism
Details
       

 07-05-2013
4.25
Riveted the hinge to the firewall
Details
       

 07-05-2013
0.50
Modified the cowling hinge pins.
Details
       

 06-23-2013
4.25
Riveted top skin
Details
       

 06-18-2013
3.50
Riveted the F-704K upright cap strips
Details
       

 06-13-2013
0.75
Shortened the existing F-6119 links
Details
     

 06-13-2013
0.00
Sent picture to Van's for approval
Details
     

 06-02-2013
4.00
Riveting the F-771 forward top skin
Details
       

 05-30-2013
1.00
Drilled adjustment holes for the compass
Details
       

 05-30-2013
2.50
Added Stifferner plate to oil door
Details
       

 05-24-2013
1.50
Primed and burred the F-771 Top Skin
Details
       

 05-24-2013
0.50
Pimed the F-6119 rudder cable links
Details
     

 05-16-2013
2.50
New Dimmer
Details
       

 05-16-2013
0.50
Decals added to plane
Details
       

 05-09-2013
2.50
Tail fairing work
Details
       

 04-28-2013
1.00
N-Number
Details
       

 04-28-2013
2.00
More tail fairing work
Details
       

 04-28-2013
1.50
Dimmer troubles
Details
       

 04-26-2013
2.00
Empennage fairing work
Details
       

 04-16-2013
2.25
Trimming the wing root fairing and installing seal
Details
       

 04-16-2013
1.50
Transponder Antenna installation
Details
       

 04-16-2013
0.25
Cabin heat and Carb heat decal installings
Details
       

 04-04-2013
2.00
Installing alternate carb air cable.
Details
       

 03-16-2013
2.50
Setting Nosewheel Breakout Force.
Details
       

 03-16-2013
2.25
Installing alternate emergency carb air cable
Details
       

 03-10-2013
6.00
Cowling Work
Details
       

 03-03-2013
2.25
Cowling Work
Details
       

 02-15-2013
4.00
Primed and filled pinholes
Details
       

 02-12-2013
3.25
Primed canopy frame
Details
       

 02-03-2013
2.50
Priming cowling and canopy frame.
Details
       

 01-17-2013
2.00
Primed upper cowl and oil door.
Details
       

 01-09-2013
2.00
Prepping the engine cowling for paint.
Details
       

 12-30-2012
3.50
Oil door rework.
Details
       

 12-16-2012
0.00
Oil door rework
Details
 

 10-30-2012
1.50
Primed the wingtips
Details
       

 10-28-2012
0.00

       

 10-16-2012
2.50
Tail and wingtips primed
Details
       

 09-28-2012
4.50
Primed the tail and installed tinnerman washers.
Details
       

 05-08-2012
1.25
Primed the empennage tips
Details
       

 02-11-2012
0.00
Adjusting the flap pushrods.
Details
       

 01-28-2012
1.75
Adjusting the flap and fuselage gap
Details
       

 06-11-2011
2.50
Closing the fiberglass tips on the tail
Details
       

 05-30-2011
2.75
Riveted wingtip rib & safety wired the
Details
       

 05-23-2011
2.25
Installed W-412 wingtip rib.
Details
       

 05-02-2011
2.75
Prop bolts torque and safety wired.
Details
       

 05-02-2011
0.00
Prop
       

 05-02-2011
2.75
Added wing tip ribs.
Details
     

 03-28-2011
2.25
Baffle seal to air box
Details
       

 03-21-2011
3.50
Installing the wings for the last time.
Details
     

 03-07-2011
2.50
Wired the landing light and secured wiring.
Details
       

 02-07-2011
2.25
Closing the fiberglass tips on the tail.
Details
       

 01-31-2011
1.50
Connecting the pitot tubing to the airspeed.
Details
       

 12-29-2010
5.50
Installing wing root nut plates.
Details
       

 12-13-2010
4.00
Canopy fairing.
Details
       

 12-06-2010
3.25
Canopy Fairing.
Details
       

 12-03-2010
1.75
Canopy Fairing.
Details
       

 11-15-2010
1.25
Canopy Fairing.
Details
       

 11-05-2010
1.50
Canopy Fairing.
Details
       

 10-25-2010
1.50
Canopy fairing.
Details
       

 10-18-2010
2.00
Canopy fairing
Details
       

 10-17-2010
1.50
Canopy fairing.
Details
       

 10-10-2010
3.50
Canopy Fairing.
Details
       

 09-16-2010
1.50
Canopy fairing.
Details
       

 09-16-2010
0.00
Canopy Fairing
       

 09-06-2010
4.25
Carb heat on airbox
Details
       

 08-22-2010
2.50
Lower cowling seal
Details
       

 07-29-2010
3.00
Canopy latch mechinism
Details
       

 07-23-2010
0.00
Lower Cowling Attach Bracket
     

 07-23-2010
1.50
Cowling attach brackets
Details
       

 07-12-2010
3.50
Cowling exit attach brackets
Details
       

 07-08-2010
1.00
Rear window
Details
 

 07-01-2010
1.25
Installing rear window.
Details
       

 06-30-2010
1.25
Rear Window Installation
Details
       

 06-30-2010
1.25
Inspection plates
Details
       

 06-20-2010
3.50
Inpection plates for the F-771 skin.
Details
       

 06-15-2010
3.50
Cutting inspection plates for the F-771
Details
       

 06-10-2010
2.50
Cutting inspection plates for the F-771
Details
       

 06-09-2010
3.50
Cutting inspection plates for the F-771
Details
       

 05-10-2010
6.00
Riveting the F-774 aft top skin.
Details
       

 05-03-2010
1.50
Headphone hangers
Details
       

 04-27-2010
3.50
Spinner Installation
Details
       

 04-25-2010
3.50
Spinner installation
Details
       

 04-19-2010
2.25
Spinner Installation
Details
       

 04-12-2010
1.50
Spinner Installation
Details
       

 03-22-2010
2.25
Pilot step installation
Details
       

 03-21-2010
0.00
Priming the Step
     

 03-21-2010
3.25
Pilot step installation
Details
       

 03-15-2010
4.25
Pilot step installation
Details
       

 03-01-2010
0.50
Lower cowl air intake.
Details
       

 02-22-2010
2.75
Canopy skin painted flat black.
Details
       

 01-18-2010
2.00
Lower cowl air intake
Details
       

 01-11-2010
2.50
Lower cowling air intake
Details
       

 12-31-2009
4.50
Ball stud mounts
Details
       

 12-27-2009
4.25
Ball stud mounts aft and forward
Details
       

 12-19-2009
5.50
Canopy, riveting, C-725, C-603, Canopy handle inst
Details
       

 11-30-2009
3.50
Installing the reinforcement kit
Details
       

 11-16-2009
2.25
Canopy Reinforcement kit installation
Details
       

 11-09-2009
1.00
Deburred and primed side rails.
Details
     

 11-09-2009
3.25
Canopy reinforcement kit
Details
       

 11-02-2009
3.45
Canopy wedges and spacers for C-603
Details
       

 10-26-2009
4.50
Remake right C-603 side skin
Details
       

 10-26-2009
1.00
Fiberglass the inlets to cowl.
Details
       

 10-05-2009
3.25
Enlarging the slot on F-705
Details
       

 10-05-2009
4.25
C-603 side skins and F-705G angle.
Details
       

 09-28-2009
3.50
Fitting the WD-622 to the F-631 Channels
Details
       

 08-10-2009
4.00
Drilling the F-631 to the WD-725 side rails
Details
     

 08-03-2009
2.00
Rivet the C-613 to the WD-725 side rails
Details
       

 07-27-2009
7.50
Rebuilding the canopy frame.
Details
       

 07-25-2009
3.50
Canopy Reinforcement Kit
Details
       

 07-20-2009
3.50
Re-building the canopy frame
Details
       

 07-20-2009
2.50
Nose Gear Modification
Details
       

 07-03-2009
3.50
Removing the nose gear for modification.
Details
       

 07-03-2009
3.25
Fitting the wing tips to the ailerons.
Details
       

 06-29-2009
2.20
Wingtip trimming
Details
     

 06-29-2009
1.50
Finishing the oil door.
Details
       

 06-22-2009
1.50
Vent lines
Details
       

 06-22-2009
1.00
Added Superfil to the cowling.
Details
       

 05-25-2009
4.75
Oil door on cowling hinge pin attach point.
Details
       

 05-09-2009
4.25
Installation of the wing flap pushrods
Details
       

 04-26-2009
5.50
Installation of landing lights
Details
       

 04-12-2009
4.00
Fitting the wingtp lens
Details
     

 04-09-2009
2.25
Light installation continued
Details
       

 04-06-2009
4.00
Installing wingtip lights.
Details
       

 03-30-2009
4.00
Right wingtip installation
Details
       

 03-23-2009
4.50
Wing tip reinforcement strips
Details
       

 03-09-2009
3.50
Saftey wire the fuel tank pick ups.
Details
       

 03-09-2009
1.50
Installed fuel floats sensors.
Details
     

 03-02-2009
4.00
Right wing outboard lower skin
Details
     

 02-23-2009
0.00
Wing skin
     

 02-23-2009
0.00
Wing Skin
     

 02-23-2009
4.50
Lower right outboard wing skin
Details
       

 02-02-2009
1.00
Verified torque on Z-bracket tank bolts.
Details
       

 02-02-2009
4.00
Rivet lower outboard wing skin.
Details
     

 01-26-2009
1.00
VS-411PP installation.
Details
     

 01-26-2009
4.00
Primed wing skins and installed fuel sender.
Details
       

 01-19-2009
0.00
Installing Nut Plates
     

 01-19-2009
6.00
Dimpled wing skins, installed wing tips and nutpla
Details
       

 01-04-2009
3.00
Debured and dimpled the wing skin
Details
       

 01-03-2009
7.00
Wing tip installation
Details
       

 12-08-2008
0.00
Moving plane to hangar.
Details
       

 12-01-2008
0.00
Prepping the plane for the big move.
Details
       

 11-28-2008
0.00
Moving items to the Chino hangar.
Details
       

 11-22-2008
0.00
Moving the wings to the Chino hangar
Details
       

 10-13-2008
2.50
P-lead connection to right mag
Details
       

 10-13-2008
1.50
Attached the prop controller cable
Details
     

 09-29-2008
2.25
P-lead installation
Details
       

 09-22-2008
3.50
Starter cable installation
Details
       

 09-21-2008
2.75
Alternator Power Lead
Details
       

 09-14-2008
1.00
Fusible links from the ammeter shunt.
Details
       

 09-13-2008
0.75
Engine grounding strap
Details
       

 09-08-2008
2.50
Installed the ammeter shunt
Details
       

 08-31-2008
3.50
Parking brake finsihed
Details
       

 08-31-2008
0.00
Parking brake finish Cont'd
Details
       

 08-31-2008
1.00
Finished routing the alternator field wire
Details

 08-24-2008
0.50
Alternator field wire fabrication
Details
       

 08-22-2008
0.00
Parking brake installation-02
Details
       

 08-22-2008
2.00
Parking brake installation-01
Details
       

 08-20-2008
4.25
Oil pressure switch and warning light install.
Details
       

 08-19-2008
2.50
Install Digital Clock/Timer/G-meter
Details
       

 08-18-2008
1.50
GT-50 installation.
Details
     

 08-16-2008
3.25
Prop governer bracket modification
Details
     

 08-14-2008
1.50
Tachometer sender.
Details
     

 08-13-2008
2.50
Fuel and oil pressure senders.
Details
       

 08-03-2008
2.50
JPI EDM-700.
Details
       

 07-04-2008
3.50
Installing JPI EDM-700
Details
       

 06-28-2008
1.50
Installing JPI EDM-700
Details
       

 05-26-2008
6.50
Installed breather and cooling tubes.
Details
       

 05-18-2008
6.25
Oil filer and heater scat tubing.
Details
       

 05-04-2008
3.00
Engine baffle seals
Details
       

 05-03-2008
3.00
Installing air seals on the engine baffles
Details
       

 04-26-2008
3.00
Cabin heat air muff
Details
       

 04-20-2008
3.50
Lower cowl air box connection
Details
       

 03-30-2008
2.75
Carb heat cable and fuel hose.
Details
       

 03-21-2008
4.00
Air box work
Details
       

 03-09-2008
8.00
Filtered air box
Details
       

 01-26-2008
2.00
Baffel connecting rods.
Details
       

 01-20-2008
1.50
Carb air box
Details
       

 01-13-2008
3.50
Carb air box
Details
       

 01-04-2008
7.50
Engine baffles.
Details
       

 01-02-2008
6.00
Engine baffles.
Details
       

 12-29-2007
2.50
Engine baffling
Details
       

 12-28-2007
4.00
Engine baffling
Details
       

 12-02-2007
2.25
Inlet ducts
Details
     

 11-28-2007
1.75
Engine Baffling.
Details
     

 11-25-2007
0.00
Engine Baffling.
Details
       

 11-24-2007
7.00
Engine Baffling.
Details
       

 11-18-2007
10.50
Engine Baffling.
Details
       

 11-17-2007
2.00
Engine Baffling.
Details
       

 11-01-2007
2.00
Engine Baffling.
Details
       

 10-31-2007
2.50
Engine Baffling.
Details
       

 10-30-2007
4.50
Engine Baffling.
Details
       

 10-28-2007
7.25
Engine baffling.
Details
       

 10-20-2007
2.75
Nutplate installation on cowling.
Details
       

 10-13-2007
2.00
Cowling hinge riveting
Details
       

 10-07-2007
6.50
Rivet the hinges to the cowl
Details
       

 10-06-2007
10.50
Installing engine cowling.
Details
       

 09-23-2007
3.50
Installing hinges to top cowl
Details
       

 08-19-2007
5.50
Cowling side hinges.
Details
       

 08-18-2007
4.50
Making shims for upper cowling hinge.
Details
     

 08-12-2007
2.25
Fitting lower cowl.
Details
       

 08-11-2007
3.00
Fitting lower cowl.
Details
       

 08-06-2007
4.50
Fitting top cowl.
Details
       

 08-04-2007
2.00
Fitting top cowl hinge.
Details
       

 08-02-2007
2.00
Fitting top cowl hinge.
Details
       

 07-29-2007
6.50
Prop installation
Details
       

 07-28-2007
5.00
Prop installation.
Details
       

 07-24-2007
2.75
Prop installation
Details
       

 07-23-2007
1.50
Carb spacer.
Details
       

 07-22-2007
2.00
Carb air box
Details
       

 07-19-2007
2.00
Installing the exhaust.
Details
       

 07-14-2007
3.75
Prop governer and exhust.
Details
       

 07-07-2007
3.00
Carb. control cables and toque bolts.
Details
       

 07-05-2007
2.00
Alternator installation.
Details
       

 07-04-2007
3.50
Installing engine systems.
Details
       

 06-30-2007
4.25
Trouble shoot Garmin radio.
Details
       

 06-29-2007
0.00
Installing carb.
Details
       

 06-29-2007
3.50
Installed control cables
Details
       

 06-27-2007
0.00
Connecting engine systems and devices
Details
       

 06-27-2007
0.00
Connecting engine systems and devices
Details
       

 06-26-2007
6.50
Connecting engine systems and devices
Details
       

 06-23-2007
7.50
Reinstalled panel
Details
       

 06-22-2007
0.00
Reply from Vans on the side skin fitting problem.
Details
     

 06-21-2007
7.25
Riveted side skins to canopy frame.
Details
       

 06-20-2007
2.00
Side skins and C-702 prime and painted.
Details
       

 06-19-2007
3.50
Canopy Side skin work.
Details
       

 06-16-2007
4.50
Installing canopy side skins.
Details
       

 06-12-2007
1.25
Installed cotter pins to engine mounts.
Details
       

 06-11-2007
4.50
Hanging the engine
Details
       

 06-11-2007
0.00
Engine Hanging
       

 06-09-2007
1.50
Unpacking the engine.
Details
       

 06-05-2007
0.25
Getting ready to hang the engine.
Details
       

 06-02-2007
3.25
Rewired back of panel
Details
     

 05-28-2007
2.25
Parking brake and switches.
Details
     

 05-15-2007
1.50
Fabricated jumper wires for instruments.
Details
     

 05-13-2007
2.75
Installed manifold pressure sender.
Details
       

 05-12-2007
3.50
Riveted recess and installed battery box.
Details
       

 05-10-2007
2.00
Installed recess plate.
Details
       

 05-09-2007
1.00
Installed sender mount to firewall.
Details
       

 05-07-2007
2.25
Firewall forward prep.
Details
       

 05-07-2007
0.00
Firewall Drilling
     

 05-05-2007
6.50
Install low voltage light
Details
       

 04-22-2007
4.25
Installed cabin heat cable and more.
Details
       

 04-22-2007
1.25
Clearance slots for the ELT and GPS connectors.
Details
     

 04-15-2007
2.50
Installed heat shuttle to firewall.
Details
       

 04-11-2007
2.00
Riveted lower rudder fairing.
Details
       

 10-29-2006
4.50
Antenna installation.
Details
       

 09-15-2006
2.75
Installed new panel in plane and tested.
Details
     

 09-02-2006
2.50
Laying out panel switches.
Details
     

 08-07-2006
5.00
Panel painting.
Details

 08-06-2006
3.00
Panel painting.
Details

 08-04-2006
5.50
Fabricating new panel.
Details
     

 08-03-2006
11.00
New panel work.
Details
       

 07-31-2006
9.50
Trimming canopy.
Details
       

 06-04-2006
3.50
Wiring the headphone jacks.
Details
       

 05-28-2006
8.25
Intercom installation.
Details
       

 05-13-2006
0.00
Panel picture
Details
     

 04-17-2006
0.00
Panel pictures.
Details
       

 04-15-2006
3.75
Installed brake lines.
Details
       

 04-08-2006
3.50
Wired the fuel pump.
Details

 04-02-2006
4.50
Strobe wiring
Details

 03-26-2006
14.20
Empennage Fairing and more
Details
       

 03-11-2006
4.15
Drilling for nutplates for the empennage fairing.
Details
     

 03-05-2006
4.25
Painted insturment bracket and fuel selector.
Details

 03-04-2006
3.00
Empennage Fairings.
Details

 02-26-2006
3.50
Empennage Fairing and Eyeball Vents.
Details
       

 02-22-2006
1.25
Altitude Encoder
Details
       

 02-16-2006
2.00
Eyeball Vent Installation.
Details
       

 02-12-2006
4.75
Plexiglas canopy drilling and countersinking.
Details

 02-11-2006
8.00
Empennage Fairing
Details
       

 02-11-2006
0.00
Empennage Fairing
     

 02-06-2006
2.25
Installing the empennage fairing.
Details
       

 01-21-2006
0.25
Ball stud bolt installed into mounts.
Details
     

 01-16-2006
2.25
Drilling skin to canopy frame.
Details
     

 01-15-2006
5.25
Ball mount brackets.
Details
       

 01-08-2006
4.50
Tip up canopy ball stud mounts.
Details
       

 01-07-2006
1.50
Electric Aileron Trim
Details
     

 12-30-2005
4.25
Trim wiring
Details
       

 12-29-2005
3.00
Trim servo wiring
Details
       

 12-28-2005
4.00
Elevator trim work.
Details

 12-27-2005
4.50
D-sub stick wiring and center tunnel wiring.
Details
       

 11-13-2005
4.25
ELT
Details
       

 10-26-2005
3.50
Van's Tip-Up Modification
Details
       

 10-23-2005
1.50
ELT installation
Details

 10-16-2005
2.50
Drilling Z-brackets for ELT
Details
     

 10-09-2005
6.50
Static line, installed strobe power supply
Details
       

 10-09-2005
0.00
Static Air
     

 10-01-2005
5.50
Static line routing
Details
       

 09-28-2005
3.50
Rudder cables and links
Details
       

 09-24-2005
1.25
Gascolator fuel line
Details
       

 09-23-2005
1.50
Gascolator
Details

 09-21-2005
6.50
Aileron trim installation
Details
       

 09-09-2005
2.00
Battery cable
Details

 09-05-2005
8.00
Wiring the trim servo
Details

 08-08-2005
29.00
Tail work
Details
       

 07-01-2005
2.00
Rudder fairings
Details
       

 06-26-2005
5.50
Rudder stops
Details
     

 06-17-2005
6.50
Remake rudder stops and rudder strips
Details

 06-12-2005
4.50
Installing rudder
Details

 06-07-2005
3.00
Remaking the rudder
Details
       

 06-07-2005
3.00
Gascolator
Details
       

 06-04-2005
1.75
Remaking the rudder
Details
       

 06-01-2005
2.00
Remaking the rudder
Details

 05-31-2005
2.50
Remaking the rudder
Details
       

 05-30-2005
5.00
Remaking the rudder
Details

 05-16-2005
3.00
Remaking rudder
Details
     

 05-14-2005
4.00
Remaking the rudder
Details
     

 05-10-2005
1.25
Prep stiffeners and rudder skin.
Details

 05-10-2005
1.75
Headphone jacks.
Details
       

 05-06-2005
2.25
Remaking the rudder
Details
     

 05-05-2005
2.00
Remaking the rudder
Details

 05-02-2005
2.00
Remaking the rudder
Details
     

 04-26-2005
1.50
Remaking the rudder
Details
     

 04-19-2005
4.00
Elevator trim wiring
Details
       

 04-18-2005
2.50
Attaching tail
Details

 04-17-2005
1.50
Torque the bolts
Details
       

 04-15-2005
6.00
Gear leg weldments
Details

 04-14-2005
1.50
Installing Tail
Details

 04-13-2005
0.00
Landing gear
     

 04-13-2005
4.25
Install the landing gear on aircraft
Details
       

 04-05-2005
2.00
Landing gear work
Details
     

 04-02-2005
1.00
Torque and cotter pin the engine mount.
Details

 04-02-2005
2.25
Axil nut work.
Details
     

 04-01-2005
2.00
Axle nut modification
Details
       

 03-31-2005
1.00
Axle nut modification
Details

 03-26-2005
4.25
Installed main wheels.
Details
       

 03-25-2005
2.50
Nose Wheel.
Details
       

 03-23-2005
3.50
Installing ELT
Details
       

 03-12-2005
2.50
Wiring Strobe
Details
       

 03-05-2005
1.50
Trimming Control Sticks
Details
       

 03-01-2005
1.50
Turn coordinator
Details
       

 02-26-2005
6.00
Eyeball lights and saftey wired the flap actuator.
Details
       

 02-15-2005
4.00
Eyeball lights and wiring
Details
     

 02-12-2005
7.00
Flap actuator wiring
Details
       

 02-05-2005
5.00
Dimmer, voltage reg., and wiring
Details
       

 01-23-2005
4.00
Wigwag flasher and switches
Details
       

 01-16-2005
6.00
Instrument wiring
Details
     

 01-09-2005
4.50
Installed voltage regulator.
Details
       

 01-01-2005
4.00
Installed instruments and continued wiring.
Details
       

 12-31-2004
0.00
Dimmer contol is in panel
Details
     

 12-30-2004
0.50
Dimmer Control
Details
     

 12-29-2004
6.00
Wiring the panel.
Details
       

 12-27-2004
5.00
Intercom installation.
Details
       

 12-26-2004
3.00
Wiring the Ray Allen control stick grip.
Details
       

 11-28-2004
3.00
Wiring the wings and fuselage
Details
       

 11-21-2004
2.00
Wing wiring and compass hole in the panel.
Details
       

 11-01-2004
2.00
Enlarge exisiting wire run holes
Details
       

 10-31-2004
2.00
Pitot tube and strobe wire.
Details
       

 10-17-2004
6.00
Dimmer, flap switch, and hobbs installation.
Details
       

 10-09-2004
1.00
Engine Mount Spacers
Details
     

 10-03-2004
7.00
Labeling machine, Engine mount spacers.
Details
       

 09-25-2004
1.50
Installing switches
Details
       

 09-22-2004
2.00
Diode installation on master and starter relays.
Details
     

 09-20-2004
2.00
Battery cable, battery bus.
Details
       

 09-18-2004
1.50
Current limiter
Details
       

 09-17-2004
3.00
Current limiter
Details
       

 09-16-2004
1.00
Installed instrument panel
Details
     

 09-12-2004
1.00
Connecting the main and E-bus
Details
       

 09-10-2004
1.00
Grounding Block
Details
       

 09-09-2004
1.50
Heavy gauge electrical cables.
Details
       

 09-06-2004
6.00
Engine mount and rudder cable fairings.
Details
       

 08-31-2004
2.00
Fuse block and bridge-diode installation.
Details
       

 08-24-2004
4.00
Map Box Installation.
Details
       

 08-22-2004
5.50
Map Box Installation
Details
       

 08-19-2004
5.00
Map Box Installation.
Details
     

 08-17-2004
1.75
Map Box Installation.
Details
       

 08-11-2004
4.00
Firewall hole locations.
Details
       

 08-06-2004
4.00
Tip up frame and installed seats
Details
     

 08-05-2004
3.50
Painting
Details

 08-04-2004
4.25
Forward fuselage
Details

 08-03-2004
5.50
Forward fuselage, Rudder cable clamp holes.
Details

 08-02-2004
9.00
Fuel line, Air vents, rudder cable fairings, and s
Details
       

 07-22-2004
3.50
Battery box and relays
Details
       

 07-21-2004
3.00
Battery Box-03
Details
       

 07-21-2004
3.00
Battery box
Details
       

 07-20-2004
0.00
Battery Box-02
Details
       

 07-20-2004
3.25
Battery Box
Details
       

 07-11-2004
0.00
Air Vents.
Details
       

 07-11-2004
3.50
Air Vents
Details
       

 07-07-2004
2.50
Installed flap actuation latch weldments. EXP deca
Details
     

 07-06-2004
1.00
Items reinstalled after painting.
Details
       

 07-05-2004
4.00
Painted the cockpit
Details
       

 07-04-2004
4.50
Cockpit prep for paint
Details
       

 07-02-2004
3.50
Spraying Urethane
Details
     

 06-30-2004
3.00
More priming of parts
Details

 06-26-2004
5.00
Priming the seat backs
Details

 06-16-2004
1.00
Primed tip up canopy frame
Details
     

 06-14-2004
3.00
Deburring and prepping the canopy frame.
Details

 06-12-2004
6.00
Painting prep work
Details
       

 05-12-2004
3.00
Drill roll bar and side rails
Details
       

 05-07-2004
2.00
Sanding the plexiglas
Details
     

 05-06-2004
6.00
Rear Window drilling
Details
       

 05-05-2004
0.00
Drilling the Plexiglas canopy
Details
       

 05-05-2004
7.00
Drilling the canopy
Details
       

 05-04-2004
0.00
Cutting the Plexiglas Canopy
Details
       

 05-04-2004
0.00
Cutting the Plexiglas
Details
       

 05-04-2004
8.00
Cutting the canopy Plexiglas
Details
       

 05-04-2004
0.00
Cutting the Canopy
     

 05-03-2004
3.50
Trimming the canopy.
Details
       

 05-03-2004
0.00
Trimming the canopy
Details
       

 05-03-2004
0.00
Trimming the canopy
Details
       

 05-03-2004
0.00
Canopy cutting
       

 04-09-2004
0.00
Riveted C-613 splice plate
Details
       

 04-09-2004
0.00
Drilling the C-613 splice plates.
Details
       

 04-09-2004
7.00
Canopy Frame
Details
       

 04-03-2004
0.00
Fitting the canopy frame.
Details
       

 04-03-2004
0.00
Fitting the canopy frame.
Details
       

 04-02-2004
0.00
Fitting the canopy frame.
Details
       

 03-27-2004
5.50
Fitting the F-631A
Details
       

 03-17-2004
6.00
Drilling the hinge brackets
Details
     

 03-13-2004
10.00
Canopy Frame
Details

 03-04-2004
1.00
Canopy Jettison Handle
Details
       

 03-03-2004
4.00
Canopy Frame
Details
       

 03-02-2004
6.00
C-710 pushrod and starting canopy
Details
       

 03-01-2004
7.00
Canopy side handle
Details
       

 03-01-2004
0.00
Canopy release
Details
       

 02-29-2004
0.00
Canopy release mechanism-03
Details
       

 02-29-2004
0.00
Canopy release mechanism-02
Details
       

 02-29-2004
1.50
Canopy Release Mechanism
Details
       

 02-28-2004
6.00
Canopy release mechanism-01
Details
       

 02-21-2004
6.00
Canopy release system
Details
       

 02-12-2004
1.50
Attaching the cabin frame.
Details
       

 02-11-2004
0.50
Cabin frame installation
Details
     

 02-08-2004
4.00
Cabin Frame
Details
       

 02-07-2004
0.50
Cabin Frame
Details
       

 02-06-2004
1.75
Drilling the F-774 skin to the F-631 assembly.
Details
       

 02-05-2004
10.00
Remade the cabin frame.
Details
       

 01-25-2004
7.00
F-771 Top skin.
Details
       

 01-24-2004
5.25
Sub panel work
Details
       

 01-24-2004
3.25
Forward Fuselage
Details
       

 01-23-2004
2.50
Forward fuselage
Details
       

 01-22-2004
1.50
Sub Panel
Details
       

 01-21-2004
3.50
Control Panel
Details
       

 01-19-2004
2.50
F-703B drilled to panel.
Details
       

 01-17-2004
4.00
Upper forward fuselage
Details
       

 01-11-2004
3.50
Forward Deck
Details
       

 01-10-2004
0.00
Drilling the F-631 brackets
Details
       

 01-09-2004
2.50
Cabin Frame
Details
       

 01-08-2004
2.00
Cabin Frame
Details
     

 01-07-2004
0.00
Cabin Frame
Details
       

 01-05-2004
3.00
Cabin Frame
Details
       

 01-04-2004
0.00
Cabin Frame
Details
       

 01-03-2004
6.00
Cabin Frame
Details
       

 01-02-2004
2.50
Cabin Frame
Details
       

 12-31-2003
0.00
Cabin Frame
Details
       

 12-30-2003
5.00
Cabin Frame
Details
       

 12-29-2003
3.50
F-712E Tie down bar.
Details
       

 12-24-2003
4.00
Enlarge tunnel pass through for push rod and and t
Details
       

 12-24-2003
0.00
Attaching the verticle stabilizer.
Details
       

 12-23-2003
7.00
Vertical stabilizer installation
Details
       

 12-23-2003
0.00
Fitting the empennage
Details
       

 12-23-2003
0.00
Attaching verticle stabilizer.
Details
       

 12-22-2003
7.00
Mating the horizontal stabilizer.
Details
       

 12-07-2003
5.00
Elevator control rods.
Details
       

 12-07-2003
2.25
Cabin Frame
Details
       

 12-05-2003
2.00
Aft bulkhead.
Details
     

 12-03-2003
0.75
Rivet the rudder stops.
Details
       

 12-02-2003
0.50
Primming the rudder stops.
Details
     

 12-01-2003
4.00
Riveted aft bulkhead.
Details
       

 11-30-2003
8.00
Elevator horns and tail section.
Details
       

 11-30-2003
0.00
Drilling aft bulkhead and rudder stops.
Details
       

 11-22-2003
0.00
Brake lines and hoses-03
Details
       

 11-22-2003
0.00
Brake lines and hoses-02
Details
       

 11-22-2003
6.00
Brake line and hoses-01
Details
       

 11-18-2003
4.00
Vent lines
Details
       

 11-14-2003
1.00
Rudder pedal brace.
Details
       

 11-14-2003
0.00
Fuel selector valve installed.
Details
     

 11-13-2003
5.00
Fuel valve covers, F-6122-1, and rudder pedal brac
Details
       

 11-08-2003
4.00
Fuel vent lines.
Details
       

 11-06-2003
2.25
Installing the nuts and bolts to the landing gear.
Details
       

 11-05-2003
2.25
Fuel line installtion.
Details
     

 11-04-2003
3.00
Fuel line installtion.
Details
       

 11-02-2003
6.00
Wing root nut plates and F-796B support brackets.
Details
       

 10-28-2003
0.00
Landing Lights.
Details
       

 10-28-2003
0.00
Landing light installation.
Details
     

 10-27-2003
0.00
Landing lights.
Details
       

 10-27-2003
0.00
Landing lights
Details
       

 10-27-2003
7.00
Landing light installation.
Details
       

 10-26-2003
1.50
Wing Root Fairing Installation.
Details
     

 10-26-2003
6.50
Landing lights.
Details
       

 10-25-2003
0.75
Fuel tank attach brackets.
Details
       

 10-25-2003
2.00
Drilling the rear spar
Details
       

 10-25-2003
0.00
Drilling rear wing spar
     

 10-24-2003
1.50
Setting the angle of incidence.
Details
       

 10-23-2003
4.00
Wing mating
Details
       

 10-23-2003
0.50
Securing the pushrods and ailerons.
Details
       

 10-21-2003
0.75
Preparing the rear spar-02
Details
       

 10-21-2003
2.50
Preparing the rear spar-01
Details
       

 10-15-2003
1.25
Flap rods attached and rear spar prepped.
Details
       

 10-13-2003
1.50
Prepping the brakes pedals for anodize.
Details
     

 10-06-2003
1.00
Wing mating drift pins
Details
     

 10-04-2003
0.75
Wing/Fuselage Assembly.
Details
       

 10-03-2003
1.00
Flap Push Rods
Details
       

 10-02-2003
0.50
Flap push rods
Details
     

 09-30-2003
0.00
Installed control stick system and fuel line hole-
Details
       

 09-29-2003
2.25
Installed control stick system and fuel line hole-
Details
       

 09-29-2003
1.25
Fuel tank attach bracket assembly.
Details
       

 09-27-2003
2.25
Vent line bulkheads and fuel selector valve.
Details
       

 09-27-2003
0.50
Priming tank attach bracket components.
Details
       

 09-27-2003
1.50
Fuel tank attach brackets.
Details
       

 09-27-2003
1.25
Fuel selector valve.
Details
       

 09-25-2003
1.25
Pitot tube hole and attachment.
Details
       

 09-25-2003
1.50
Fuel vent installation & fuselage side hole.
Details
       

 09-23-2003
1.00
Pitot tube hole.
Details
       

 09-22-2003
0.00
Boot rings continued
Details
       

 09-21-2003
3.75
Stick boot rings.
Details
       

 09-14-2003
3.50
Installing the landing gear mounts.
Details
       

 09-10-2003
1.25
Installing the landing gear mounts.
Details
       

 09-10-2003
1.50
Installing the landing gear mounts.
Details
       

 09-09-2003
2.50
Installing the landing gear mounts.
Details
       

 09-09-2003
2.25
Installing the landing gear mounts.
Details
       

 09-08-2003
1.25
Installing the landing gear mounts.
Details
       

 09-04-2003
2.00
Electric Flap Actuation System
Details
       

 09-02-2003
2.25
Electric Flap Actuation System
Details
       

 09-01-2003
3.50
Electric Flap Actuation System
Details
       

 08-31-2003
1.00
Electric Flap Actuation System
Details
       

 08-30-2003
3.75
Electric Flap Actuation System
Details
       

 08-28-2003
6.00
Forward covers.
Details
       

 08-27-2003
0.00
Seat fabrication-04
Details
       

 08-27-2003
0.00
Seat fabrication-03
Details
       

 08-27-2003
0.00
Seat fabrication-02
Details
       

 08-27-2003
2.00
F-741 Tunnel Cover
Details
       

 08-27-2003
4.00
F-741 Tunnel Cover
Details
       

 08-26-2003
12.00
Seat fabrication-01
Details
       

 08-21-2003
2.75
F-757
Details
       

 08-20-2003
6.00
F-741A L-R
Details
       

 08-19-2003
3.00
Aft seat floors.
Details
       

 08-18-2003
2.50
Aft seat floors.
Details
       

 08-17-2003
4.25
Baggage floor.
Details
       

 08-13-2003
3.00
Step Installation.
Details
       

 08-11-2003
2.25
Step Installation.
Details
       

 08-11-2003
3.50
Step installation
Details
       

 08-09-2003
1.50
Step Installation.
Details
       

 08-04-2003
3.00
F-750 baggage side covers.
Details
       

 08-03-2003
3.00
Drilled top aft skin to stiffeners and bulkhead.
Details
       

 08-02-2003
1.75
F-688 Gusset.
Details

 08-01-2003
0.75
Bellcrank Assembly
Details
       

 07-31-2003
1.00
Bellcrank Assembly
Details
       

 07-30-2003
1.50
Bellcrank assembly
Details
       

 07-28-2003
2.25
Drilling the F6118 Brace.
Details
       

 07-22-2003
3.50
Brakes and rudder pedals in fuselage.
Details
       

 07-21-2003
0.50
Assembling the rudder and brake pedals.
Details
     

 07-20-2003
1.75
Rudder and brake pedals.
Details
       

 07-18-2003
1.25
Drilling the F-6116 side rudder pedal brg. blocks.
Details
     

 07-17-2003
2.25
Brake and rudder assembly
Details
       

 07-16-2003
4.00
Brake and rudder pedal assembly.
Details
       

 07-15-2003
2.25
Brake and rudder pedal assembly.
Details
       

 07-14-2003
4.50
F-705G Angle installation.
Details
       

 07-12-2003
4.00
F-796C and D spacers
Details
       

 07-09-2003
3.50
F-705G angles and flap actuator bearing blocks.
Details
     

 07-08-2003
0.00
Fuselage work. F-601, F-6122-1, and F601Z
Details
       

 07-07-2003
0.00
Fuselage work. F-601, F-6122-1, and F601Z
Details
       

 07-06-2003
4.50
Fuselage work. F-601E, F-6122-1, and F601Z
Details
       

 07-04-2003
0.00
Outboard skin cleo'd and ready for drilling.
Details
       

 07-03-2003
12.00
Countersinking flap hinges and drilled holes in ai
Details
       

 06-25-2003
7.00
Drilling the flap hinges
Details
       

 06-23-2003
0.00
Aileron installation
Details
       

 06-22-2003
0.00
Aileron installation
Details
       

 06-21-2003
4.00
Aileron installation
Details
       

 06-20-2003
7.00
Gap fairing, flap brace, and W-716 contol tube.
Details
       

 06-14-2003
3.00
Aileron control rods
Details
       

 06-09-2003
3.00
Aileron attach brackets.
Details
       

 06-08-2003
4.00
Attach brackets, gap fairings, and braces.
Details
       

 06-07-2003
2.00
Drilling the flap braces and aileron gap fairings.
Details
       

 06-07-2003
0.00
Aileron Brackets-02
Details
       

 06-06-2003
2.50
Aileron Brackets-01
Details
       

 06-03-2003
2.75
Large Aileron Pushrods.
Details
     

 06-01-2003
1.75
Aileron control tubes
Details
       

 05-31-2003
2.00
Install bell cranks
Details
       

 05-29-2003
2.00
Bell crank work
Details
       

 05-28-2003
0.00
EZ lube, torque seal, tube bender, etc.
Details
     

 05-26-2003
0.00
Inventory the kit
Details
     

 05-19-2003
0.00
Quickbuild kit arrives
Details
       

 05-19-2003
0.00
Lots of parts
Details
       

 04-27-2003
2.00
Wing cradle work
Details
       

 04-18-2003
6.00
Started building the wing cradle.
Details
       

 03-29-2003
2.00
More fiberglass tip work.
Details

 03-15-2003
2.50
Attaching fiberglass tips. Van's reply.
Details

 03-11-2003
1.00
Elevator slightly bowed.
Details
       

 03-01-2003
4.25
Installing the fiberglass tips
Details
       

 02-17-2003
1.00
Final riveting of trim tab to elevator.
Details
       

 02-16-2003
1.75
Attaching trim tab to left elevator.
Details
       

 02-15-2003
6.50
Riveting left Elevator.
Details
       

 02-15-2003
2.50
Priming elevator components.
Details
       

 02-09-2003
0.00
Trim Tab
     

 02-09-2003
0.00
Trim Tab
     

 02-09-2003
0.00
Riveting the trim tab.
Details
       

 02-09-2003
0.00
Finished trim tab assembly.
Details
       

 02-08-2003
4.25
Riveting the trim tab.
Details
       

 02-02-2003
2.00
Deburred and primed trim trim tab components.
Details
       

 02-01-2003
0.50
Trimming the trim tab hinge.
Details
       

 01-31-2003
4.25
Trim Tab
Details
       

 01-26-2003
3.75
Right elevator attached to horizontal stab.
Details
       

 11-02-2002
6.00
Drilling the left elevator.
Details

 10-30-2002
0.00
Right Elevator - Part 03
Details
       

 10-30-2002
0.00
Right Elevator - Part 02
Details
       

 10-30-2002
8.00
Right Elevator - Part 01
Details
       

 10-26-2002
4.00
Riveting the right elevator.
Details
       

 10-23-2002
2.75
Final elevator work.
Details

 10-22-2002
4.50
Drilling elevator spares and ribs.
Details
       

 10-20-2002
4.00
Back riveted the stiffeners to the elevators.
Details
       

 10-19-2002
5.00
Primed the elevator components.
Details
       

 10-16-2002
2.50
Drilling, deburring, and dimpling the stiffeners.
Details
     

 10-15-2002
2.00
More stiffener debacles.
Details

 10-06-2002
0.50
Checking fit of stiffeners.
Details
     

 10-03-2002
2.00
Elevator skin deburring and dimpling.
Details
       

 09-30-2002
1.50
Mistake on the elevator siffeners.
Details

 09-29-2002
3.00
Fabricated the elevator stiffeners.
Details

 08-04-2002
4.00
Mistake on rudder.
Details

 08-03-2002
6.00
Finished the rudder stiffeners.
Details
     

 08-01-2002
3.00
Started Rudder
Details

 07-28-2002
5.00
Finished vertical stabilizer
Details
       

 07-25-2002
3.00
Riveting the Vertical Stabilizer.
Details
       

 07-23-2002
2.50
Riveting rear spar of vertical stabilizer.
Details
       

 07-11-2002
5.00
Deburring and priming of the vertical stabilizer.
Details

 07-07-2002
5.00
Drilled and dimpled the vertical stabilizer.
Details
     

 07-05-2002
1.00
Starting vertical stabilizer.
Details

 07-02-2002
3.00
Finished the horizontal stabilizer.
Details
       

 07-01-2002
3.00
Rivet the periphery of stabilizer using hand squee
Details

 06-30-2002
4.00
More riveting on the stabilizer
Details
       

 06-29-2002
5.00
Started riveting the horizontal stabilizer.
Details
       

 06-29-2002
0.00
Riveting horizontal stabilizer cont'd.
Details
       

 06-22-2002
0.00
Inspecting rivets on the rear spar
     

 06-22-2002
0.00
Checking rivets
     

 06-21-2002
2.00
Riveted front spar to HS-710 and HS-714
Details
       

 06-20-2002
3.00
Riveting the rear spar of the horizontal stab.
Details
       

 06-19-2002
1.00
More priming of the stabilizer
Details

 06-17-2002
4.00
Priming the stabilizer
Details
       

 06-15-2002
4.00
Stabilizer work
Details
     

 06-08-2002
4.00
Drilling right side of horizontal stabilizer
Details
       

 06-08-2002
4.00
Deburr and dimple stabilizer
Details
       

 06-02-2002
7.00
Drilled left stabilizer skeletal structure.
Details
       

 05-29-2002
1.50
Left Horizontal stab skeleton.
Details
       

 05-25-2002
3.00
HS-404, 405,and HS-710 drilling.
Details

 05-23-2002
2.50
Front spar of horizontal stabilizer
Details
       

 05-22-2002
2.00
Front spar of horizontal stabilizer
Details
       

 05-20-2002
0.00
Drilling the rear spar of horizontal stabilizer
     

 05-20-2002
1.50
Drilling the rear spar
Details
       

 05-19-2002
1.50
Drilling rear spar of horizontal stabilizer.
Details
       

 05-19-2002
0.00
Drilling Rear Spar
     

 05-18-2002
0.00
Avery Tools Arrive
Details
       

 05-14-2002
0.00
Tools have shipped from Avery.
Details

 05-11-2002
0.00
Tools on order
Details

 05-03-2002
0.00
Tail kit arrives
Details
       

 04-27-2002
0.00
Sent check for tail kit
Details
       

 04-27-2002
0.00
Sending check for tail kit.
     










Copyright © 2001-2024 Matronics. All Rights Reserved.