Date
|
Hours
|
Work Log Summary

|
Details

|
07-28-2018
|
1.00
|
High Speed Taxi Testing and Compass Calibration (D
|
Details
|
  |
|
07-27-2018
|
1.00
|
Taxi Test. Idle and Idle Mixture final adjustment
|
Details
|
  |
|
07-26-2018
|
1.00
|
Extended Range Tanks - Fuel flow test
|
Details
|
  |
|
07-25-2018
|
1.00
|
First taxi test. Idle/Idle Mixture Adjustment and
|
Details
|
 |
|
07-22-2018
|
3.00
|
First Engine Start!!!
|
Details
|
|
|
07-20-2018
|
2.00
|
Trimmed inboard flaps and re-checked rig.
|
Details
|
|
|
07-19-2018
|
2.00
|
Dynon Fuel Calibration Completed.
|
Details
|
|
|
07-17-2018
|
2.00
|
Weight and Balance
|
Details
|
 |
|
07-17-2018
|
0.00
|
Weight & Balance weight pics
|
Details
|
|
|
07-16-2018
|
2.00
|
Fuel Flow and Unusable Fuel Testing
|
Details
|
 |
|
07-03-2018
|
3.00
|
Interior Installed to prep for W&B
|
Details
|
  |
|
07-01-2018
|
2.00
|
Finished cleaning up wing gap fairings and install
|
Details
|
|
|
07-01-2018
|
2.00
|
ELT GPS Testing/Ops Testing and AP Servo config an
|
Details
|
|
|
07-01-2018
|
0.00
|
Airframe completed - pics
|
Details
|
|
|
06-30-2018
|
6.00
|
All fabrication is finished now - the aircraft is
|
Details
|
|
|
06-30-2018
|
0.00
|
Additional pics for today.
|
Details
|
|
|
06-30-2018
|
0.00
|
Additional pics for today.
|
Details
|
|
|
06-30-2018
|
0.00
|
Additional pics for today.
|
Details
|
|
|
06-30-2018
|
0.00
|
Additional pics for today.
|
Details
|
|
|
06-30-2018
|
0.00
|
Additional pics for today.
|
Details
|
|
|
06-30-2018
|
0.00
|
Additional pics for today.
|
Details
|
|
|
06-30-2018
|
0.00
|
Additional pics for today.
|
Details
|
|
|
06-30-2018
|
0.00
|
Additional pics for today.
|
Details
|
|
|
06-29-2018
|
6.00
|
Final flap rigging & install. ADSB472 new box ins
|
Details
|
|
|
06-29-2018
|
0.00
|
Additional pics for today.
|
Details
|
|
|
06-29-2018
|
0.00
|
Additional pics for today.
|
Details
|
|
|
06-25-2018
|
4.00
|
Final install of ailerons, torqued all nuts, initi
|
Details
|
|
|
06-20-2018
|
3.00
|
Tank brackets bolted/torqued & safety wire. Rigge
|
Details
|
  |
|
06-19-2018
|
2.00
|
Installed pitot tube and heat connections. AP ser
|
Details
|
|
|
06-18-2018
|
3.00
|
Wing wiring connections finished on both wings. RT
|
Details
|
|
|
06-17-2018
|
4.00
|
Wing bolts installed (close tolerance) and torqued
|
Details
|
|
|
06-16-2018
|
8.00
|
Wing - aft spar drilling and gap fairing nutplate
|
Details
|
|
|
06-14-2018
|
1.00
|
Made 3" incidence spacer for Smart Level for wing
|
Details
|
  |
|
06-12-2018
|
2.50
|
Tailwheel - Tail Lynx installed
|
Details
|
|
|
06-08-2018
|
2.00
|
Marked spar stubs and made templates. Removed int
|
Details
|
|
|
06-07-2018
|
0.50
|
Wing walk tape installed
|
Details
|
  |
|
06-05-2018
|
3.00
|
Wing root fairing nutplates installed - all except
|
Details
|
 |
|
06-03-2018
|
8.00
|
Lots of odd tasks done today....
|
Details
|
|
|
06-02-2018
|
3.00
|
Installed elevators and torqued. Rudder in place,
|
Details
|
|
|
05-31-2018
|
3.00
|
Installed cowliing, adjusted skybolts and installe
|
Details
|
|
|
05-29-2018
|
1.00
|
Move completed
|
Details
|
|
|
05-28-2018
|
6.00
|
Moving Day
|
Details
|
|
|
05-23-2018
|
0.50
|
Installed baffle strips and cleaned up anti-chafe
|
Details
|
  |
|
05-22-2018
|
3.50
|
Adjust heat muff, installed spark plugs, wet sande
|
Details
|
|
|
05-21-2018
|
1.00
|
Installed canopy seals and Koger sunshade.
|
Details
|
 |
|
05-20-2018
|
6.00
|
Coat of K38 primer to cowling, spinner installed,
|
Details
|
|
|
05-19-2018
|
5.50
|
Installed interior
|
Details
|
|
|
05-17-2018
|
0.50
|
Added additional adel clamp on heater SCEET and di
|
Details
|
  |
|
05-16-2018
|
1.00
|
More cowling wet sanding
|
Details
|
  |
|
05-15-2018
|
3.00
|
Skybolt cowl fasteners drilled and riveted to FW p
|
Details
|
|
|
05-12-2018
|
7.00
|
Nutplates installed on cowling, primed cowl, spinn
|
Details
|
  |
|
05-03-2018
|
0.50
|
Dynon file update and back up battery charged.
|
Details
|
  |
|
05-02-2018
|
0.50
|
Installed GPS antenna and forward access covers.
|
Details
|
|
|
05-01-2018
|
2.00
|
Firewall barrier and proseal canopy seal area
|
Details
|
  |
|
04-30-2018
|
3.00
|
Seat back hinges drilled and riveted. Lightening
|
Details
|
|
|
04-28-2018
|
6.00
|
Cowl inlet baffle seals fabricated, clips fabricat
|
Details
|
|
|
04-27-2018
|
2.50
|
Engine is done! CHT/EGT lines for all cyls. SCEE
|
Details
|
|
|
04-26-2018
|
5.00
|
Baffling and engine install almost complete.
|
Details
|
|
|
04-24-2018
|
2.00
|
Primed/painted and riveted 4130 doublers to cyl ba
|
Details
|
 |
|
04-23-2018
|
1.50
|
Fabricated and drilled 4130 reinforcements for low
|
Details
|
  |
|
04-22-2018
|
8.00
|
Baffle seals fabricated and installed
|
Details
|
|
|
04-21-2018
|
3.00
|
FAB wet sanded, primed and painted. Alernate air
|
Details
|
  |
|
04-20-2018
|
4.00
|
Drill and rivet heat and alternator ducts. Rivete
|
Details
|
  |
|
04-18-2018
|
1.00
|
More forward cowl trim and FAB micro sanding
|
Details
|
  |
|
04-18-2018
|
1.00
|
|
Details
|
  |
|
04-17-2018
|
3.00
|
Oil cooler duct riveted, heat duct cut, alternator
|
Details
|
|
|
04-16-2018
|
2.50
|
Glassed alternate air hole and micro on FAB, cut o
|
|
|
|
04-15-2018
|
2.00
|
Snorkel test fit, alternate air hole cut. Cowl in
|
Details
|
 |
|
04-14-2018
|
6.00
|
FAB, finished all brackets. Nutplates to hold dow
|
Details
|
  |
|
04-13-2018
|
0.50
|
New interior arrived, checked out seats
|
Details
|
|
|
04-12-2018
|
3.00
|
FAB work continues
|
Details
|
  |
|
04-11-2018
|
7.00
|
FAB work continues - made VA 132 brackets and baff
|
Details
|
|
|
04-10-2018
|
4.00
|
Snorkel fitting to left inlet, drilled holes, cut
|
Details
|
|
|
04-09-2018
|
1.00
|
More baffle riveting, clearanced forward cowling p
|
Details
|
  |
|
04-07-2018
|
5.00
|
Finished top baffle trim
|
Details
|
  |
|
04-06-2018
|
2.00
|
Baffle marking and initial top trim
|
Details
|
|
|
04-05-2018
|
3.00
|
Baffling fitting and trimming, fabricated front cl
|
Details
|
|
|
04-04-2018
|
4.00
|
Baffling fitting and trimming
|
Details
|
  |
|
04-02-2018
|
2.00
|
Baffling fitting and trimming
|
Details
|
  |
|
04-01-2018
|
4.00
|
Baffling fabrication, deburr and riveting
|
Details
|
  |
|
04-01-2018
|
1.50
|
Baffling fabrication and riveting
|
Details
|
|
|
03-31-2018
|
3.00
|
Baffling fabrication and deburring
|
Details
|
  |
|
03-29-2018
|
0.50
|
Started baffles
|
Details
|
  |
|
03-28-2018
|
2.00
|
Cowling oil door sanding, cowl sanding
|
Details
|
  |
|
03-27-2018
|
2.00
|
Oil Door Fabrication finished. Hinges drilled. G
|
Details
|
|
|
03-25-2018
|
3.00
|
Oil Cooler Lines - Firesleeve, oil door fabricatio
|
Details
|
|
|
03-24-2018
|
5.00
|
Installed oil cooler mount, cooler, plenum and cab
|
Details
|
|
|
03-23-2018
|
2.00
|
Painted oil cooler plenum white. RTV plenum mount
|
Details
|
 |
|
03-22-2018
|
2.00
|
Sanded upper intersection fairing.
|
Details
|
  |
|
03-21-2018
|
1.00
|
Glassed upper intersection fairing
|
Details
|
  |
|
03-18-2018
|
3.00
|
Cowling - removed cover plates an drilled nutplate
|
Details
|
|
|
03-17-2018
|
3.00
|
Sanded forward cowl and glassed hinge pin cover pl
|
Details
|
|
|
03-16-2018
|
3.00
|
Front cowling micro sanding, OC plenum sanding
|
|
|
|
03-15-2018
|
3.00
|
Oil Cooler plenum sanding and micro. Cowling fron
|
Details
|
  |
|
03-14-2018
|
3.50
|
Oil Cooler Plenum layup and cowl edge sanding
|
Details
|
|
|
03-13-2018
|
2.00
|
Riveted horizontal side hinges.
|
Details
|
|
|
03-12-2018
|
2.50
|
Cowling horizontal hinge prep
|
Details
|
  |
|
03-11-2018
|
3.50
|
Drilled, shaped upper intersection fairings and op
|
Details
|
|
|
03-09-2018
|
2.00
|
Oil Cooler gap seals fabricated and riveted
|
|
|
|
03-08-2018
|
3.50
|
Cowl side hinges, upper and lower drilled
|
Details
|
|
|
03-07-2018
|
4.00
|
Cowl edge gap sanding, oil cooler plate fabricated
|
Details
|
 |
|
03-06-2018
|
2.00
|
Trimmed and sanded left lower cowling edge
|
Details
|
  |
|
03-04-2018
|
3.00
|
Lower Cowl right edge glassing and oil cooler fitm
|
Details
|
|
|
03-03-2018
|
4.00
|
Lower Cowl fitted, trimmed and drilled to firewall
|
Details
|
|
|
03-02-2018
|
2.00
|
Lower Cowling - Trimmed gear area and aft bottom c
|
|
 |
|
03-01-2018
|
3.00
|
Top Cowl - final forward trim, trimmed aft edge an
|
Details
|
|
|
02-28-2018
|
3.00
|
Cowling - leveled fuselage, marked spinner hole.
|
Details
|
|
|
02-27-2018
|
1.50
|
Cowling - measured perimeter, forward cowl/spinner
|
Details
|
  |
|
02-26-2018
|
2.50
|
Prop all done. Spinner primed. Prop safetied. A
|
Details
|
|
|
02-26-2018
|
0.50
|
Changed sender manifold fitting for fuel pressure.
|
Details
|
 |
|
02-25-2018
|
0.50
|
Propeller track and spinner wobble check.
|
Details
|
|
|
02-25-2018
|
2.50
|
Prop installed!
|
Details
|
|
|
02-24-2018
|
3.00
|
Finished spinner gaps and riveted all nutplates.
|
Details
|
|
|
02-23-2018
|
3.00
|
Spinner gaps fabricated and drilled
|
Details
|
 |
|
02-22-2018
|
3.50
|
Spinner dome cut. Drilled all mounting holes to #
|
Details
|
|
|
02-20-2018
|
4.00
|
Forward top skin riveted!
|
Details
|
|
|
02-20-2018
|
3.50
|
|
Details
|
  |
|
02-19-2018
|
2.50
|
Continued spinner aft bulkhead - removed center ma
|
Details
|
|
|
02-18-2018
|
1.00
|
Drilled spinner backplate
|
Details
|
  |
|
02-17-2018
|
2.50
|
P-leads installed. Servo to pump line final instal
|
Details
|
|
|
02-17-2018
|
1.00
|
Forward Central Tunnel Covers
|
Details
|
|
|
02-16-2018
|
3.50
|
P-leads installed. Sniffle valve and fuel pump dr
|
Details
|
|
|
02-15-2018
|
2.50
|
Engine breather fabricated and installed. Ignitio
|
Details
|
|
|
02-14-2018
|
2.50
|
Engine Ground Strap fabricated. Field wire at reg
|
Details
|
 |
|
02-13-2018
|
4.00
|
Starter/Alternator/Red Cube wire routing planning
|
Details
|
  |
|
02-12-2018
|
2.00
|
Starter cable end crimped, Alternator B-lead end c
|
Details
|
 |
|
02-11-2018
|
2.50
|
Sender manifold lines fabricated and installed.
|
Details
|
|
|
02-10-2018
|
3.00
|
Main fuel lines to pump and servo fabricated. Exh
|
Details
|
|
|
02-09-2018
|
2.00
|
Heat Muff installed. Sender manifold - redid all
|
Details
|
  |
|
02-08-2018
|
8.00
|
Torqued Exhaust. Removed preservative oil/added o
|
Details
|
|
|
02-07-2018
|
3.00
|
MAP restrictor fitting installed, throttle linkage
|
Details
|
|
|
02-05-2018
|
1.50
|
Exhaust mocked up and EGTs drilled. Throttle brac
|
Details
|
|
|
02-04-2018
|
7.00
|
Torqued engine mounts and cotters. Servo installe
|
Details
|
|
|
02-03-2018
|
4.00
|
Engine Install and test fitting components
|
Details
|
 |
|
02-02-2018
|
1.00
|
Ready for engine installation
|
Details
|
|
|
02-01-2018
|
1.00
|
Installed OT Sender, FP fittings (all, including F
|
Details
|
|
|
02-01-2018
|
0.50
|
Installed N-numbers on tailcone
|
Details
|
|
|
01-31-2018
|
1.50
|
Added final placards - panel now done!
|
Details
|
|
|
01-29-2018
|
1.00
|
Avionics Access Hatch - FIPS seals completed.
|
Details
|
|
|
01-28-2018
|
1.00
|
Shimmed ADAHRS to center slip/skid ball w/ .025" s
|
Details
|
  |
|
01-27-2018
|
2.50
|
Crankshaft plug removed. Oil pressure restrictor
|
Details
|
|
|
01-26-2018
|
3.00
|
Prop governor clocked and cable end checked. Inst
|
Details
|
|
|
01-25-2018
|
1.00
|
Prop governor installed and oil pressure restricto
|
Details
|
|
|
01-24-2018
|
0.00
|
More final wiring shots.
|
Details
|
|
|
01-24-2018
|
0.00
|
More final wiring shots.
|
Details
|
|
|
01-24-2018
|
0.00
|
More final wiring shots.
|
Details
|
|
|
01-24-2018
|
0.00
|
More final wiring shots
|
Details
|
|
|
01-24-2018
|
3.00
|
Finished Tie Wraps for all forward wiring, Install
|
Details
|
|
|
01-23-2018
|
0.50
|
Vent tubing insstalled for NACA fresh air ducts
|
Details
|
  |
|
01-22-2018
|
4.00
|
Dynon Skyview Configuration - finished & Batt Test
|
Details
|
|
|
01-21-2018
|
3.00
|
Dynon Skyview Configuration
|
Details
|
  |
|
01-20-2018
|
1.00
|
New panel screws installed, thicker mic/phone isol
|
Details
|
  |
|
01-19-2018
|
2.50
|
Panel Done!
|
Details
|
|
|
01-18-2018
|
3.00
|
Wired stack and installed main main panel
|
Details
|
|
|
01-17-2018
|
1.00
|
Installed intercom, comms 1&2, AP Panel and Switch
|
Details
|
 |
|
01-16-2018
|
2.00
|
Drilled music input (alternate) hole and TX 1&2 lo
|
Details
|
 |
|
01-15-2018
|
4.00
|
Seat Heat Finally Finished
|
Details
|
  |
|
01-14-2018
|
4.00
|
Seat Heat Cont'd
|
Details
|
 |
|
01-13-2018
|
3.00
|
Seat Heat Cont'd
|
Details
|
|
|
01-12-2018
|
3.50
|
Seat Heat Harness fabrication started
|
Details
|
 |
|
01-11-2018
|
3.00
|
Designed switch labels and placards/overlays
|
Details
|
 |
|
01-10-2018
|
1.50
|
Wiring Diagrams continued
|
Details
|
  |
|
01-09-2018
|
1.00
|
Wiring Diagrams continued
|
Details
|
  |
|
01-08-2018
|
2.00
|
Fuse blocks relabeled, seat heat doc redo, wiring
|
Details
|
|
|
01-07-2018
|
2.50
|
Installed RAMI AV-17 antennas, comm 1&2, ELT test
|
Details
|
 |
|
01-06-2018
|
0.00
|
PTT Notes - Pilot PTT ground COMMON with trim on s
|
Details
|
  |
|
01-06-2018
|
2.00
|
Avionics stack (2 SV Comms and SV Intcom) planning
|
Details
|
  |
|
01-05-2018
|
2.00
|
Tested Trim System, ELT Batteries installed. Prep
|
Details
|
  |
|
01-04-2018
|
7.00
|
Aileron trim spring Install, Safeair FW pass throu
|
Details
|
|
|
01-03-2018
|
3.00
|
Fuel Capacitance Senders wired to EMS.
|
Details
|
 |
|
01-02-2018
|
3.50
|
EMS D-37 All Sensors Terminated. EMS D-25 wires r
|
Details
|
 |
|
01-01-2018
|
5.50
|
EMS Wiring - hook ups to sensors
|
Details
|
  |
|
12-30-2017
|
7.00
|
Auto Pilot/Auto Trim Wiring / EMS 220 Wiring
|
Details
|
|
|
12-29-2017
|
4.00
|
Dynon Skyview HDX is live!
|
Details
|
|
|
12-28-2017
|
2.00
|
SV D-37 EFIS D-subs completed (Serial/GPS/Audio)
|
Details
|
  |
|
12-27-2017
|
2.00
|
Airframe Wiring Testing and SV D-37 Audio Splices
|
Details
|
  |
|
12-16-2017
|
9.00
|
Dynon dual D-37 Serial Wires spliced, GPS bundle s
|
Details
|
|
|
12-12-2017
|
2.00
|
Avionics wiring - ADAHRS and roll/pitch servos
|
Details
|
 |
|
12-11-2017
|
3.00
|
Avionics Wiring - power and grounds
|
Details
|
|
|
12-10-2017
|
5.00
|
Panel - airframe wiring terminated
|
Details
|
  |
|
12-09-2017
|
4.00
|
Panel - airframe wiring terminated
|
Details
|
  |
|
12-08-2017
|
3.00
|
Annunciator Lights - wired
|
Details
|
 |
|
12-07-2017
|
4.00
|
Alternator/Regulator Finished, Flap wiring routed
|
Details
|
|
|
12-06-2017
|
2.00
|
ACS Switch
|
|
|
|
12-05-2017
|
3.00
|
Alternator/Reg wiring, warn light, flap switch wir
|
Details
|
  |
|
12-04-2017
|
3.00
|
Bus power to panel switches
|
Details
|
|
|
12-03-2017
|
2.00
|
Bus wiring completed
|
|
  |
|
12-01-2017
|
1.00
|
Engine Arrived and uncrated - new Lycoming YIO-360
|
Details
|
|
|
11-29-2017
|
2.00
|
Primary/Secondary/Tertiary Bus Diagrams completed
|
Details
|
  |
|
11-28-2017
|
2.00
|
Wiring Diagram - Primary Wiring Diagram Completed
|
Details
|
  |
|
11-25-2017
|
4.00
|
Wire Diagramming/Planning with Tiny Cad
|
Details
|
  |
|
11-19-2017
|
1.00
|
Glareshield padding and LED light strip installed.
|
Details
|
 |
|
11-18-2017
|
1.00
|
Panel installed and mocked up with all EFISs & avi
|
Details
|
|
|
11-17-2017
|
0.00
|
Canpopy Seal Pics
|
Details
|
|
|
11-16-2017
|
4.00
|
Drilled and installed avionics stack nutplates. F
|
Details
|
|
|
11-15-2017
|
3.00
|
Installed GPS antenna to mount. Fabricated circui
|
Details
|
|
|
11-14-2017
|
2.50
|
Drilled TX 1 & 2 switch. GPS mount fabricated
|
Details
|
  |
|
11-13-2017
|
2.50
|
Finished avionics stack holes
|
Details
|
|
|
11-12-2017
|
7.00
|
Cut EFIS 1, Drilled EFS 1 & EFIS 2 to panel.
|
Details
|
|
|
11-11-2017
|
3.00
|
Cut holes for EFIS2, ELT and USBs
|
Details
|
  |
|
11-10-2017
|
3.00
|
Installed instrument panel and cabin heat cable
|
Details
|
 |
|
11-08-2017
|
2.50
|
Panel - lower mount finished, sanded and clearcoat
|
Details
|
|
|
11-07-2017
|
2.00
|
Panel hole cutting and lower panel mounting
|
Details
|
|
|
11-06-2017
|
2.00
|
Panel layout and hole cutting
|
Details
|
 |
|
11-05-2017
|
2.00
|
Panel - More layout and spot micro w/black dye
|
Details
|
  |
|
11-04-2017
|
3.00
|
Panel Layout and spot micro w/black dye
|
Details
|
  |
|
11-02-2017
|
1.00
|
Wheelpants/GLF DONE - final spot fill and sealer p
|
Details
|
|
|
11-01-2017
|
1.00
|
Gear Leg Fairings - more sanding, added brake line
|
Details
|
  |
|
10-31-2017
|
1.00
|
Wheelpants amd GLF - more sanding and filling
|
Details
|
|
|
10-30-2017
|
2.50
|
Wheelpants sanding/filling and painted sub panel
|
Details
|
|
|
10-29-2017
|
6.00
|
Wheelpants
|
Details
|
  |
|
10-28-2017
|
6.00
|
Wheelpants - NPs on int fairings, initial primer/f
|
Details
|
|
|
10-27-2017
|
5.00
|
Wheelpants
|
Details
|
|
|
10-23-2017
|
3.00
|
Wheelpant mount bolt/washers and aft fuse stiffene
|
Details
|
|
|
10-22-2017
|
2.00
|
Wheelpants - sanding and more micro
|
Details
|
  |
|
10-21-2017
|
2.00
|
Wheelpants - sanded lower intersection fairings an
|
Details
|
|
|
10-20-2017
|
2.00
|
Wheelpants - glassed aft pieces of lower intersect
|
Details
|
  |
|
10-19-2017
|
15.00
|
Wheelpants - cut intersection fairings in half and
|
Details
|
  |
|
10-18-2017
|
3.00
|
Wheelpants - sanded seams, drilled lower intersect
|
Details
|
|
|
10-17-2017
|
2.00
|
Wheelpants - drilled mounts to final size and nutp
|
Details
|
|
|
10-16-2017
|
1.50
|
Wheelpants, csk fwd halves and flox mounting point
|
Details
|
  |
|
10-15-2017
|
1.00
|
Wheelpants - installed nutplates on pants
|
Details
|
|
|
10-14-2017
|
1.50
|
Gear Leg Fairing - aligned and installed
|
Details
|
|
|
10-13-2017
|
1.00
|
Gear Leg Fairing - dampeners wrapped with glass cl
|
Details
|
 |
|
10-12-2017
|
2.50
|
Gear Leg Fairing dampeners installed
|
Details
|
|
|
10-11-2017
|
3.00
|
Wheelpants - final trimming of openings
|
Details
|
  |
|
10-10-2017
|
3.00
|
Wheelpants drilled to U808 and U810
|
Details
|
|
|
10-09-2017
|
2.00
|
Landing gear fairing and wheelpant trimming - more
|
Details
|
  |
|
10-08-2017
|
3.00
|
Landing gear fairing and wheelpant trimming. Dampe
|
Details
|
  |
|
10-06-2017
|
0.50
|
Prop Arrived!
|
Details
|
|
|
10-05-2017
|
3.00
|
Wheelpants - cutouts for wheels and sanded halves
|
Details
|
|
|
10-04-2017
|
0.50
|
Wheelpants - centerline marked
|
Details
|
  |
|
10-03-2017
|
2.50
|
Gear Leg Fairing
|
Details
|
|
|
10-02-2017
|
2.00
|
Gear Leg Fairing
|
Details
|
  |
|
10-01-2017
|
1.50
|
Cut Hobbs and 12V charger holes, panel dimmer
|
Details
|
|
|
09-30-2017
|
1.00
|
Installed sender manifold
|
Details
|
|
|
09-29-2017
|
0.50
|
Sender manifold spacer fabrication
|
Details
|
  |
|
09-27-2017
|
1.00
|
Installed ELT horn and more panel layout
|
Details
|
  |
|
09-26-2017
|
3.00
|
Panel design and layout
|
|
 |
|
09-25-2017
|
0.50
|
Installed MP Sender
|
Details
|
  |
|
09-24-2017
|
2.00
|
Installed Dynon Batt, Radio, EMS, BNC regulator
|
Details
|
|
|
09-18-2017
|
2.00
|
Empennage fairing nutplates installed on fuselage
|
Details
|
  |
|
09-17-2017
|
1.00
|
Empennage fairing nutplates installed on VS/HS.
|
Details
|
  |
|
09-16-2017
|
1.00
|
Empennage removed, new lower emp fairings.
|
Details
|
  |
|
09-13-2017
|
1.50
|
Empennage fairing final filling and primer.
|
Details
|
|
|
09-12-2017
|
2.00
|
Empennage Fairing sanding/glassing and initial pri
|
Details
|
  |
|
09-10-2017
|
2.00
|
Empennage Fairing sanding/glassing.
|
Details
|
  |
|
09-09-2017
|
2.00
|
Empennage Fairing sanding/glassing.
|
Details
|
  |
|
09-08-2017
|
2.00
|
Empennage Fairing sanding/glassing.
|
Details
|
  |
|
09-07-2017
|
2.00
|
Empennage Fairing sanding/glassing.
|
Details
|
  |
|
09-06-2017
|
3.00
|
Forward access panels done.
|
Details
|
|
|
09-05-2017
|
0.50
|
Added layer of glass to forward access panels
|
Details
|
  |
|
09-04-2017
|
1.50
|
Installed rudder linkages to pedals. More forward
|
Details
|
 |
|
09-03-2017
|
3.00
|
Fabricated rudder linkages and access panel sandin
|
Details
|
 |
|
09-02-2017
|
1.00
|
Installed rudder and fabricated templates for link
|
Details
|
  |
|
09-01-2017
|
2.00
|
Forward access doublers completed and riveted.
|
Details
|
|
|
08-31-2017
|
2.00
|
More forward access doubler/shim fabrication.
|
Details
|
  |
|
08-30-2017
|
0.50
|
Ordered engine and prop.Van's Lycoming IO-360-M1B
|
Details
|
  |
|
08-30-2017
|
2.00
|
Forward access doubler/shim fabrication.
|
Details
|
  |
|
08-29-2017
|
1.00
|
Finished forward skin cuts and rough sanded emp fa
|
Details
|
 |
|
08-22-2017
|
1.00
|
More glass on empennage fairing, cut holes for for
|
Details
|
 |
|
08-21-2017
|
1.50
|
Floxed and glassed empennage fairing.
|
Details
|
 |
|
08-20-2017
|
1.00
|
Trimmed empennage fairing and drilled to fuselage.
|
Details
|
 |
|
08-18-2017
|
1.50
|
Canopy is done! Installed HS/VS.
|
Details
|
  |
|
08-17-2017
|
1.50
|
|
Details
|
|
|
08-16-2017
|
1.00
|
More canopy fiberglass sanding, initial filler pri
|
Details
|
 |
|
08-15-2017
|
1.50
|
More glassing of canopy, trimmed empennage fairing
|
Details
|
 |
|
08-14-2017
|
1.00
|
Remasked and added micro/drilled aft HS lower fair
|
Details
|
  |
|
08-13-2017
|
0.50
|
Added glass to left side and sanded.
|
Details
|
  |
|
08-12-2017
|
2.00
|
More canopy fairing sanding/ removed canopy
|
Details
|
  |
|
08-11-2017
|
2.00
|
More canopy fairing sanding
|
Details
|
  |
|
08-10-2017
|
0.50
|
Removed peel ply and added fiberglass to low spot
|
Details
|
|
|
08-09-2017
|
2.50
|
Sanded flox and added fiberglass layers to windscr
|
Details
|
|
|
08-08-2017
|
1.00
|
More flox on forward windscreen area
|
Details
|
  |
|
08-07-2017
|
1.50
|
Final adjustment of aft latch. Initial flox of FW
|
|
 |
|
08-06-2017
|
2.00
|
Installed all screws on canopy and adjusted aft la
|
Details
|
 |
|
08-05-2017
|
3.00
|
Installed canopy latch lugs and upper safety latch
|
|
|
|
08-04-2017
|
4.00
|
Painted inside of canopy frame (gray) and canopy s
|
Details
|
  |
|
08-03-2017
|
4.00
|
Primed and painted glareshield flat black. Rivete
|
Details
|
 |
|
08-02-2017
|
3.00
|
Primed canopy frame/side skirts. Drilled roll bar
|
Details
|
  |
|
08-01-2017
|
1.00
|
Dimpled canopy side skirts and aft top skins for p
|
|
  |
|
07-31-2017
|
3.00
|
Canopy stops installed.
|
Details
|
|
|
07-29-2017
|
3.00
|
Mounted Busses 1 & 2 and Dynon Hubs 1 & 2. Began
|
Details
|
|
|
07-28-2017
|
3.00
|
Canopy Guides installed. Carbon wrap on F-721A/B
|
Details
|
 |
|
07-27-2017
|
2.00
|
Aft canopy finishing, drilled all canopy holes to
|
Details
|
  |
|
07-26-2017
|
2.00
|
Fabricated FWD canopy clips and aft top skin shims
|
Details
|
  |
|
07-24-2017
|
2.50
|
Drilled side skirts to canopy frame. FWD canopy a
|
Details
|
|
|
07-21-2017
|
8.00
|
Final trim and drill of AFT canopy
|
Details
|
|
|
07-20-2017
|
9.00
|
Aft canopy latch lugs. Final FWD canopy trim. In
|
Details
|
  |
|
07-13-2017
|
0.50
|
Final FWD canopy trim areas marked.
|
Details
|
  |
|
07-12-2017
|
1.50
|
Drilled FWD canopy plexi to frame and deburred.
|
Details
|
 |
|
07-06-2017
|
3.00
|
Canopy frame riveting continued.
|
Details
|
  |
|
07-05-2017
|
3.00
|
Canopy frame riveting
|
Details
|
|
|
07-03-2017
|
6.00
|
Deburr, dimple/csk canopy skin and frame.
|
Details
|
|
|
07-02-2017
|
2.00
|
Made strut mount (aft) nutplate plate for ease of
|
Details
|
 |
|
07-01-2017
|
8.00
|
Deburred primed and riveted aft bow F631 splice pl
|
Details
|
|
|
06-30-2017
|
2.00
|
Final drilled F631s to WD725s and drilled splice p
|
Details
|
 |
|
06-27-2017
|
2.00
|
Final trimming of canopy at the ears area. Final
|
Details
|
 |
|
06-26-2017
|
3.00
|
Trimmed front 3x, sides of canopy.
|
Details
|
 |
|
06-23-2017
|
2.00
|
The big cut. Done.
|
Details
|
|
|
06-22-2017
|
1.50
|
More forward canopy edge trimming and deburring.
|
Details
|
  |
|
06-21-2017
|
3.00
|
Trimmed aft and both sides of canopy. Additional
|
Details
|
|
|
06-20-2017
|
1.50
|
Trimming of lower forward flange. Marked F631A's
|
|
  |
|
06-19-2017
|
1.00
|
Positioning of canopy on frame. Taped off canopy
|
Details
|
  |
|
06-17-2017
|
4.50
|
Drilled Reinf Pieces C7128 A/Bs Fabricated F7128C
|
|
|
|
06-16-2017
|
7.50
|
Finished wedges, drilled and riveted. Reinforceme
|
Details
|
|
|
06-15-2017
|
9.00
|
Drilled splice plates for WD-725s and WD716s, star
|
Details
|
  |
|
06-14-2017
|
3.50
|
WD-725 and F-631 interface work.
|
Details
|
  |
|
06-13-2017
|
1.50
|
F631 splice plate template
|
Details
|
  |
|
06-11-2017
|
1.00
|
F631 A Flanges to 92.5 degrees.
|
Details
|
  |
|
06-10-2017
|
1.00
|
Canopy skin "ears" and side skirts
|
Details
|
  |
|
06-09-2017
|
5.00
|
Drilled hinge arms, installed bushing.
|
Details
|
|
|
06-08-2017
|
3.50
|
Deburred, primed and riveted WD-716 hinge arms and
|
Details
|
|
|
06-07-2017
|
3.50
|
Drilled hinge arms to weldment
|
Details
|
 |
|
06-07-2017
|
2.50
|
Canopy work continues / battery cables
|
Details
|
|
|
06-05-2017
|
2.00
|
Deburrring canopy frame
|
Details
|
  |
|
06-04-2017
|
1.50
|
Drilled C-614 Splice Plate & Deburrring WD-716
|
Details
|
 |
|
06-03-2017
|
1.00
|
WD-716 (forward canopy frame) and C-702 skin
|
Details
|
 |
|
06-02-2017
|
2.00
|
Bled Brakes
|
Details
|
|
|
06-01-2017
|
2.00
|
Installed copper buss type bars for master/starter
|
Details
|
  |
|
05-31-2017
|
2.00
|
Parking brake install completed. Brake lines on e
|
Details
|
|
|
05-30-2017
|
2.00
|
Worked on aft canopy latch - completed
|
Details
|
|
|
05-29-2017
|
2.50
|
Worked on aft canopy latch
|
Details
|
  |
|
05-26-2017
|
3.00
|
Repacked wheel bearings, finished axle nut mod. I
|
Details
|
  |
|
05-24-2017
|
4.00
|
Landing gear installed and on! Landing gear insta
|
Details
|
|
|
05-23-2017
|
2.00
|
Cut axle nut for Avery jack tool. Reamed gear leg
|
Details
|
|
|
05-22-2017
|
2.00
|
Deburred wheel paint fairling, removed deburred en
|
Details
|
 |
|
05-21-2017
|
8.00
|
Riveted Skybolt Cowl Strips - Sides/Bottom and FW
|
Details
|
|
|
05-20-2017
|
4.00
|
Engine Mount Drilled to FW
|
Details
|
  |
|
05-19-2017
|
1.00
|
Ammeter Shunt and ANL-60 FW mounts riveted, gear l
|
Details
|
  |
|
05-18-2017
|
2.00
|
Ammeter Shunt and ANL-60 FW mounts fabricated/dril
|
Details
|
  |
|
05-17-2017
|
2.00
|
Finish Kit received and inventoried
|
Details
|
 |
|
05-16-2017
|
2.00
|
Sticks insalled and harnesses ran fwd. AFP Fuel P
|
Details
|
|
|
05-15-2017
|
4.00
|
Stick harnesses fabricated
|
Details
|
  |
|
05-14-2017
|
1.00
|
Clecoed FWD bulkhead/panel to measure stick length
|
Details
|
|
|
05-13-2017
|
4.00
|
Wing Wiring to Fuselage (Cont'd)
|
Details
|
|
|
05-11-2017
|
2.00
|
Wing Wiring to Fuselage (Cont'd)
|
Details
|
 |
|
05-10-2017
|
2.00
|
Wing Wiring to Fuselage
|
Details
|
  |
|
05-09-2017
|
1.50
|
Installed brake lines, new fuel pump line
|
Details
|
  |
|
05-08-2017
|
1.00
|
Riveted F-723 Cabin Frame Channel Ass'y
|
Details
|
  |
|
05-05-2017
|
2.00
|
Ran all existing wiring forward, installed forest
|
Details
|
 |
|
05-04-2017
|
1.00
|
Canopy latch installed, flap motor installed, FWD
|
Details
|
  |
|
05-03-2017
|
2.00
|
Final installed rudder pedals, parking brake/lines
|
Details
|
|
|
05-02-2017
|
2.00
|
Installed interior items (Cabin Frame, Spar/Gear r
|
Details
|
|
|
04-30-2017
|
2.00
|
Finished painting - touch up and removed masking
|
|
|
|
04-29-2017
|
10.00
|
Painted Fuselage interior JetFlex WR Basic Gray.
|
Details
|
|
|
04-27-2017
|
3.00
|
Cut flap rod holes. Central tunnel and FW adels.
|
Details
|
|
|
04-26-2017
|
1.00
|
Removed all cabin items, getting ready for paint.
|
|
 |
|
04-25-2017
|
2.00
|
Drilled AMM Shunt, fabricated FP and Flap harnesse
|
Details
|
  |
|
04-23-2017
|
2.50
|
Prosealed NACA vents, main fuel line from pump to
|
Details
|
|
|
04-22-2017
|
8.00
|
Fuel Line Fabrication
|
Details
|
 |
|
04-21-2017
|
1.00
|
Fuel Line Fabrication started
|
Details
|
|
|
04-19-2017
|
1.00
|
Drilled and riveted rudder cable fairing
|
Details
|
 |
|
04-16-2017
|
6.00
|
-4 (3003) vent and brake lines fabricated.
|
Details
|
|
|
04-12-2017
|
3.00
|
Throttle/Prop/Mixt cable pass thrus drilled.
|
Details
|
|
|
04-11-2017
|
1.00
|
F-774 aft top skin riveting complete
|
Details
|
|
|
04-10-2017
|
0.50
|
Brake Cable Mount Fabricated
|
Details
|
  |
|
04-09-2017
|
5.00
|
F774 Top Skin Riveted
|
Details
|
 |
|
04-07-2017
|
1.00
|
ELT GPS 4 conductor wire soldered.
|
|
  |
|
04-06-2017
|
3.50
|
Wiring in aft fuselage
|
Details
|
|
|
04-03-2017
|
1.00
|
Transponder, ADSB and Pitch Servo wire harnesses r
|
Details
|
  |
|
04-02-2017
|
6.00
|
Finished ADAHARS Mount.
|
Details
|
|
|
04-01-2017
|
9.00
|
Finished Riveting aft fuselage - all and ADAHRS mo
|
Details
|
|
|
03-31-2017
|
2.00
|
Riveting on F775 Rear Top Skin
|
|
  |
|
03-30-2017
|
1.00
|
Installed Transponder rack, installed ADSB-IN moun
|
Details
|
  |
|
03-29-2017
|
1.00
|
Ran OAT lines and heat shrunk them. Removed top s
|
Details
|
  |
|
03-27-2017
|
1.50
|
VS 411PP drukked abd riveted to F705 for canopy la
|
Details
|
  |
|
03-25-2017
|
3.00
|
Canopy Latch - final install
|
Details
|
|
|
03-24-2017
|
2.50
|
Canopy Latch - primed angles, layed out and drille
|
Details
|
 |
|
03-23-2017
|
1.50
|
Canopy Latch - Drilled attachment holes to canopy
|
Details
|
  |
|
03-20-2017
|
1.00
|
Deburring Canopy Latch and cut angles
|
Details
|
  |
|
03-19-2017
|
1.00
|
Rudder pedals, helper springs added, AN fittings i
|
Details
|
 |
|
03-17-2017
|
0.50
|
Rudder Pedals - sprayed additional coat of white
|
Details
|
  |
|
03-17-2017
|
0.50
|
Cabin Frame - drilled pilot holes on frame and aft
|
Details
|
 |
|
03-15-2017
|
3.00
|
Cabin Frame Support - drilled small brackets/brace
|
Details
|
|
|
03-15-2017
|
3.00
|
Cabin Frame - Drilled frame to main brackets, CSK
|
Details
|
|
|
03-14-2017
|
2.50
|
Cabin Frame - Drilled brackets to fuse and deburre
|
Details
|
|
|
03-10-2017
|
2.00
|
Cabin Frame - completed primary structure
|
Details
|
|
|
03-09-2017
|
2.50
|
Cabin Frame - deburred holes and riveted joint pla
|
Details
|
|
|
03-08-2017
|
3.50
|
Cabin Frame - redid edges on all flanges. Made 7/
|
Details
|
  |
|
03-07-2017
|
2.00
|
Cabin Frame - drilled strips & splice plate to AFT
|
Details
|
|
|
03-06-2017
|
2.50
|
Cabin Frame - drilled Access holes and deburred al
|
Details
|
  |
|
03-05-2017
|
1.00
|
Cabin Frame filing for alignment. Fabricated jig.
|
Details
|
 |
|
03-04-2017
|
1.00
|
Removed extra tabs from weldment and filed.
|
Details
|
  |
|
03-03-2017
|
2.00
|
Rudder Pedals - riveted and brake arms drilled
|
Details
|
|
|
03-02-2017
|
2.50
|
Rudder Pedals - drilling, deburr and prime.
|
Details
|
  |
|
03-01-2017
|
2.00
|
Rudder Pedals - deburring and cabin frame angle de
|
Details
|
  |
|
02-28-2017
|
1.50
|
Cabin Frame mounts cut and sanded. Rudder pedal d
|
Details
|
 |
|
02-27-2017
|
3.00
|
Finished deburring of flanges
|
Details
|
|
|
02-26-2017
|
1.50
|
Deburring of flanges
|
Details
|
  |
|
02-25-2017
|
2.00
|
Cut lightening areas in FWD flanges.
|
Details
|
|
|
02-24-2017
|
4.00
|
Drilled all remaining holes for lightening, measur
|
Details
|
 |
|
02-22-2017
|
3.00
|
Made small side pieces and drilled mounting holes
|
Details
|
  |
|
02-21-2017
|
1.00
|
fabricated .020 spacers and drilled
|
Details
|
  |
|
02-16-2017
|
1.00
|
Mounted seats and FWD Bulkhead, started cowl mount
|
Details
|
 |
|
02-15-2017
|
4.50
|
Drilled all seatback holes, deburred, primed & riv
|
Details
|
|
|
02-14-2017
|
3.00
|
Cut 2.5" holes in support. Cut/Deburred tall angl
|
Details
|
  |
|
02-13-2017
|
1.50
|
Filed and Deburred seatback angles.
|
Details
|
  |
|
02-12-2017
|
4.00
|
Riveted F-768-A/L and F-643 to F768-A. Made canop
|
Details
|
|
|
02-10-2017
|
4.00
|
Assembled Panel and FWD Deck. Riveted F-745 angle
|
Details
|
  |
|
02-09-2017
|
3.00
|
New F-745-R fabricated, panel nutplates installed.
|
Details
|
  |
|
02-08-2017
|
2.00
|
Finished deburring panel and riveted angles/nutpla
|
Details
|
  |
|
02-07-2017
|
2.00
|
CSK panel reinf and deburred flanges. Pilot holes
|
Details
|
 |
|
02-06-2017
|
3.00
|
Fabricated /Drilled Canopy hinge blocks
|
Details
|
  |
|
02-05-2017
|
5.00
|
Completed deburring of FWD bulkhead parts.
|
Details
|
  |
|
01-31-2017
|
2.50
|
Deburring of FWD bulkhead parts.
|
|
  |
|
01-30-2017
|
1.50
|
Drilled T/U seals, drilled NP holes for F745 panel
|
Details
|
 |
|
01-29-2017
|
1.00
|
Removed FWD Bulkhead Assembly. Measured C-617/C-1
|
Details
|
  |
|
01-28-2017
|
4.00
|
Deburred T/U seal & Panel Reinf. Drilled Panel fla
|
Details
|
  |
|
01-27-2017
|
2.50
|
F-697 Hat Section Cut/Drilled & F643 center rib an
|
Details
|
 |
|
01-26-2017
|
2.00
|
Drilled & Cut Angles for T/U seal and panel reinf
|
Details
|
  |
|
01-25-2017
|
4.50
|
Fab'd seatback angles, tip up seal, panel refinf a
|
Details
|
  |
|
01-24-2017
|
1.50
|
Riveted vent bracket and F-721B FWD canopy decks
|
Details
|
|
|
01-23-2017
|
1.00
|
Final fit of vent bracket, nutplate holes drilled
|
Details
|
|
|
01-22-2017
|
1.50
|
Fabricated/Drilled air vent supports to side skins
|
Details
|
 |
|
01-21-2017
|
1.50
|
jigged and drilled new F745 ribs/brackets to F786
|
Details
|
|
|
01-19-2017
|
1.00
|
2 deg bend in F768 subpanel. Fabricated angle bra
|
Details
|
 |
|
01-18-2017
|
1.50
|
Trimmed F-745-L/R ribs and measured/drilled new lo
|
Details
|
  |
|
01-13-2017
|
1.50
|
Carbon Panel Trimming and Initial Fit/Install
|
Details
|
|
|
01-12-2017
|
1.00
|
Carbon Panel Subframe - inserts drilled
|
Details
|
  |
|
12-14-2016
|
1.00
|
Riveted F-721C/D angles to F-721A fwd canopy decks
|
Details
|
|
|
12-13-2016
|
1.00
|
Fabricated F-703C and F-721C/D angles
|
Details
|
  |
|
12-12-2016
|
1.00
|
Rivated F-704K cap strips
|
Details
|
|
|
12-11-2016
|
5.00
|
Canopy Decks and F757s riveted. Tail removed.
|
Details
|
|
|
12-08-2016
|
8.00
|
Control System Installed
|
Details
|
|
|
12-01-2016
|
1.50
|
Fabricated bushings for elev. bellcrank, large pus
|
Details
|
|
|
11-30-2016
|
1.00
|
Deburred, primed and riveted small elevator pushro
|
Details
|
  |
|
11-29-2016
|
1.50
|
Drilled Tailwheel Assembly to Rod, installed bolts
|
Details
|
|
|
11-28-2016
|
0.50
|
Final wire to rudder nav/strobe and elevator pushr
|
Details
|
  |
|
11-26-2016
|
3.00
|
Reamed new tailwheel assembly on lathe
|
Details
|
 |
|
11-20-2016
|
0.50
|
Reinstalled empennage
|
Details
|
|
|
11-19-2016
|
3.00
|
Installed FWD seat floors and flap assembly, bagga
|
Details
|
|
|
11-18-2016
|
4.00
|
Wiring runs continued: ELT antenna, pitot/static/
|
Details
|
|
|
11-17-2016
|
3.00
|
Wiring Runs: Pitch Trim, Nav/Strobe/ADSB Ant
|
Details
|
|
|
11-16-2016
|
4.00
|
Riveted all cabin small parts, riveted seat hinges
|
Details
|
|
|
11-15-2016
|
3.00
|
Primed all forward/top parts, initial riveting and
|
Details
|
|
|
11-14-2016
|
1.00
|
Installed forward lower conduit
|
Details
|
 |
|
11-13-2016
|
3.00
|
Aft conduit mounts fabricated and drilled
|
Details
|
 |
|
11-12-2016
|
1.00
|
Deburring forward cabin components - finished!
|
Details
|
  |
|
11-11-2016
|
3.00
|
Deburring forward cabin components - cont'd
|
Details
|
  |
|
11-10-2016
|
1.00
|
Deburring forward cabin components - cont'd
|
Details
|
  |
|
11-09-2016
|
5.50
|
Deburring forward cabin components - cont'd
|
Details
|
  |
|
11-08-2016
|
1.00
|
Deburring forward cabin components
|
Details
|
  |
|
11-06-2016
|
2.00
|
Shoulder harness - F-706/F-751/F-652 UHMW pass thr
|
Details
|
  |
|
11-05-2016
|
2.00
|
Top skin edge deburring - both skins
|
Details
|
  |
|
11-03-2016
|
1.00
|
Forward cabin - underseat/baggage conduit drilled
|
Details
|
  |
|
11-01-2016
|
2.00
|
Floor - seatback hinge fabrication.
|
Details
|
  |
|
10-29-2016
|
2.00
|
Forward tunnel cover fabrication, drilling and csk
|
Details
|
 |
|
10-28-2016
|
2.00
|
Andair Fuel Valve work.
|
Details
|
|
|
10-27-2016
|
2.00
|
Drilled new baggage floors. Drilled center flap b
|
Details
|
|
|
10-24-2016
|
3.00
|
Flap housing drilled, WD-613 flap weldment holes r
|
Details
|
  |
|
10-23-2016
|
1.00
|
Drilled tailcone inspection panels and installed n
|
Details
|
  |
|
10-22-2016
|
6.00
|
ELT bracket drilled to mount/fuselage, F-706 nutpl
|
Details
|
 |
|
10-21-2016
|
1.00
|
ELT bracket drilled to mount/fuselage
|
Details
|
|
|
10-18-2016
|
1.00
|
Drilled fuel pump/center covers - final fit
|
Details
|
 |
|
10-17-2016
|
1.50
|
Drilled fuel pump covers
|
Details
|
  |
|
10-16-2016
|
2.00
|
Baggage Bulkhead Covers Drilled and Trimmed
|
Details
|
 |
|
10-15-2016
|
1.50
|
Rudder Stops adjusted and riveted.
|
|
|
|
10-14-2016
|
2.00
|
Drilled 2 aft skins, drilled FWD top skin, F-707B
|
Details
|
|
|
10-11-2016
|
1.50
|
Drilled aft top stringers F-786L/R. Drilled and r
|
Details
|
  |
|
10-10-2016
|
2.00
|
Riveted F-781 VS attach plate and filed elevator s
|
Details
|
|
|
10-09-2016
|
3.00
|
Finished VS Mounting
|
Details
|
|
|
10-08-2016
|
2.00
|
VS initial alignment and drilling aft spar to F-71
|
Details
|
  |
|
10-07-2016
|
3.00
|
Drilled HS to fuselage - fore and aft spars.
|
Details
|
|
|
10-05-2016
|
1.00
|
FWD upper fuselage structure drilled
|
Details
|
|
|
10-04-2016
|
0.50
|
Drilled upper fwd fuselage. Riveted F-902s to long
|
Details
|
  |
|
10-01-2016
|
2.00
|
Riveted F-695 gussets. Drilled 2 aft F-695s to bu
|
Details
|
|
|
09-30-2016
|
2.50
|
Drilled F-695 gussets to longerons and FW
|
Details
|
 |
|
09-29-2016
|
0.50
|
Finished riveting aft deck and deburred F-757 hole
|
Details
|
  |
|
09-26-2016
|
2.00
|
F-757s drilled, aft deck deburred and riveted
|
Details
|
|
|
09-25-2016
|
3.00
|
Fabricated and drilled new F-712 aft elev stop and
|
Details
|
|
|
09-24-2016
|
1.50
|
Drilled FWD95 elevator stop and deburred F-695s
|
Details
|
  |
|
09-23-2016
|
3.00
|
Finished Fuselage Riveting and Flipped the Canoe!
|
Details
|
|
|
09-22-2016
|
3.00
|
Riveted FWD fuselage remaining and center section
|
Details
|
 |
|
09-20-2016
|
4.00
|
Fuselage Stand - built
|
Details
|
|
|
09-18-2016
|
0.50
|
Finished riveting two outboard floor stiffeners wi
|
Details
|
 |
|
09-17-2016
|
1.50
|
Firewall prep and forward section riveting.
|
Details
|
  |
|
09-16-2016
|
3.00
|
Forward side skins riveted to angles and F-772 flo
|
Details
|
|
|
09-15-2016
|
2.00
|
More Forward Section riveting.
|
Details
|
|
|
09-14-2016
|
2.50
|
Riveting forward fuselage
|
Details
|
  |
|
09-13-2016
|
3.00
|
F-704 riveted - #30 and #40 entire length. F706 t
|
Details
|
  |
|
09-12-2016
|
2.00
|
Initial forward section riveting
|
Details
|
|
|
09-11-2016
|
6.00
|
Moved fuselage components to garage and re-assembl
|
Details
|
|
|
09-10-2016
|
5.00
|
Primed all remaining forward fuselage parts and mo
|
Details
|
|
|
09-09-2016
|
4.00
|
Deburred and dimpled F-770 side skins, and upper f
|
Details
|
|
|
09-08-2016
|
2.50
|
F-772 forward skin deburred, rolled edges on F-772
|
Details
|
  |
|
09-07-2016
|
3.50
|
Countersunk both F-718 longerons
|
Details
|
|
|
09-06-2016
|
1.00
|
Riveted F-902 to F-7101 and F-684 gussets
|
Details
|
|
|
09-05-2016
|
6.00
|
Deburring, Dimpling and Final Fabrication of Aft D
|
Details
|
|
|
09-05-2016
|
3.00
|
Built EAA Workbench
|
Details
|
 |
|
09-04-2016
|
2.00
|
Deburring, Dimpling and Fabrication of Aft Deck it
|
Details
|
  |
|
09-03-2016
|
8.00
|
Deburring/Dimpling/CSK and priming
|
Details
|
|
|
09-02-2016
|
3.50
|
Deburring/Dimpling
|
Details
|
 |
|
09-01-2016
|
3.00
|
Disassembly and Deburring Begins
|
Details
|
 |
|
08-26-2016
|
2.00
|
Drilled Skybolt FW fastener mounting strips. Dril
|
Details
|
|
|
08-22-2016
|
1.00
|
Began FW strips for Skybolt fasteners
|
Details
|
  |
|
08-21-2016
|
2.00
|
Baggage area bulkhead - fab of lower flanges and a
|
Details
|
|
|
08-19-2016
|
2.00
|
Redo of F-710-B angle
|
Details
|
|
|
08-18-2016
|
3.50
|
Fabricated/Installed F-782D angles to forward cove
|
Details
|
|
|
08-17-2016
|
1.00
|
Drilled F-6115 center rudder bearing block to rudd
|
Details
|
|
|
08-16-2016
|
2.00
|
Rudder Blocks Drilled
|
Details
|
|
|
08-14-2016
|
3.00
|
Forward stiffeners, and CSK #12 hole for tank brac
|
Details
|
|
|
08-13-2016
|
2.00
|
Tank Bracket Installed
|
Details
|
|
|
08-12-2016
|
2.00
|
Fabricated F-796C/D brackets
|
Details
|
  |
|
08-11-2016
|
4.00
|
Final fabrication and drilling of F-684 gussets an
|
Details
|
|
|
08-10-2016
|
2.50
|
F902's installed, lower longerons/gear webs drille
|
Details
|
|
|
08-08-2016
|
1.00
|
Fabricated F-684 gussets
|
Details
|
 |
|
08-08-2016
|
1.00
|
Drilled F717 lower longeron to WD-603 weldment to
|
Details
|
|
|
08-07-2016
|
1.50
|
Initial Drilling of lower longeron to wedment.
|
Details
|
  |
|
08-06-2016
|
2.00
|
Drilled fuel vents, fuel line holes, radiused bott
|
Details
|
  |
|
08-05-2016
|
2.00
|
Twisted lower longerons and marked, gear webs dril
|
Details
|
|
|
08-03-2016
|
3.00
|
F719 stiffeners completed, gear web started, lower
|
Details
|
|
|
08-02-2016
|
2.00
|
New F719s drilled and clips started for fore/aft
|
Details
|
  |
|
08-01-2016
|
2.00
|
F-719 stiffener work
|
Details
|
  |
|
07-31-2016
|
10.00
|
Firewall drilled to skins, longerons to weldments
|
Details
|
|
|
07-30-2016
|
1.50
|
Longeron twist tweaking and mounted firewall
|
Details
|
|
|
07-29-2016
|
2.50
|
Trimmed longeron ends; installed F904L attach stri
|
Details
|
|
|
07-28-2016
|
1.50
|
Longeron drilling complete to firewall.
|
Details
|
|
|
07-27-2016
|
3.00
|
Drilled Longerons F-704 and aft
|
Details
|
|
|
07-07-2016
|
2.00
|
Match drilled all holes aft of and including F-704
|
Details
|
 |
|
07-06-2016
|
2.50
|
Tweaked fwd longeron bends and F770 conical bends
|
Details
|
  |
|
07-05-2016
|
2.50
|
Conical Bends at Aft/Center fuselage interface, ad
|
Details
|
|
|
07-03-2016
|
2.00
|
Clecoed F770 side skins to fuselage, clamped longe
|
Details
|
  |
|
06-30-2016
|
2.00
|
Aileron Trim Kit assembled/test mounted
|
Details
|
|
|
06-29-2016
|
2.00
|
Riveted F715 end seat ribs and tested longeron
|
Details
|
|
|
06-28-2016
|
2.50
|
Deburred/dimpled F715 seat ribs and F776 skin, sea
|
Details
|
  |
|
06-27-2016
|
0.50
|
Reorganized shop and reconfigured sawhorses
|
Details
|
|
|
06-27-2016
|
2.00
|
Drilled F715 ribs to F776/F704/H, drilled floor sk
|
Details
|
|
|
06-26-2016
|
4.50
|
Riveted F776 skin to center section structure
|
Details
|
|
|
06-23-2016
|
2.00
|
AN3/AN4 bolts torqued to F704 assembly, clecoed F7
|
Details
|
|
|
06-22-2016
|
4.00
|
Riveted center section structure.
|
Details
|
|
|
06-21-2016
|
1.50
|
Riveted all NPs on F716s and forward cover support
|
Details
|
  |
|
06-20-2016
|
3.50
|
Prepped and primed all center section parts
|
Details
|
|
|
06-19-2016
|
2.00
|
VHF comm mounts fabricated. F776 debur & dimple
|
Details
|
 |
|
06-18-2016
|
0.50
|
Deburred F776 edges
|
Details
|
  |
|
06-17-2016
|
2.00
|
Misc center section tasks
|
Details
|
  |
|
06-16-2016
|
3.00
|
Drilled Crotch Strap Brackets
|
Details
|
|
|
06-15-2016
|
1.00
|
Fabricated and drilled F623A AFT straps.
|
Details
|
|
|
06-14-2016
|
1.50
|
Drilled, Cut, Deburred F-623 holes and ends.
|
Details
|
  |
|
06-13-2016
|
4.00
|
Drilled F704H to F704 assembly. F623s started
|
Details
|
|
|
06-12-2016
|
5.50
|
Deburred all baggage ribs, flanged and fluted all
|
Details
|
 |
|
06-11-2016
|
1.50
|
Deburred 4 F716 ribs, drilled holes for forward co
|
Details
|
|
|
06-10-2016
|
5.00
|
Control Mount lightening areas, 6 F715/F716 ribs d
|
Details
|
  |
|
06-09-2016
|
1.00
|
F704 Work - drilled control mounts and cover suppo
|
Details
|
 |
|
06-05-2016
|
1.50
|
Drilled control column mounts - initial hole, acce
|
Details
|
 |
|
06-04-2016
|
0.75
|
Cut 1.5" holes in the 4 center F-716 ribs and cut
|
Details
|
  |
|
06-02-2016
|
3.00
|
Aft Fuselage riveting completed
|
Details
|
|
|
06-01-2016
|
3.50
|
Aft Fuselage riveting with Ralph - lower areas
|
Details
|
  |
|
05-27-2016
|
1.00
|
More adjustment to F712/711 - reclecoed
|
Details
|
|
|
05-26-2016
|
3.00
|
Riveted F779, F711, F712 and bolted WD-409
|
Details
|
|
|
05-25-2016
|
2.00
|
Primed aft skins and misc parts
|
Details
|
  |
|
05-23-2016
|
4.00
|
F773 R and L tailcone sideskins deburred and dimpl
|
Details
|
  |
|
05-22-2016
|
0.50
|
Rudder Cable Fairings cut, shaped and deburred
|
Details
|
  |
|
05-19-2016
|
2.00
|
Aft bottom skin deburred edges, drilled transponde
|
|
|
|
05-18-2016
|
2.00
|
Deburred and dimpled all Jstringers, F779 skin
|
Details
|
  |
|
05-17-2016
|
2.00
|
Deburred and dimpled all bulkhead holes
|
Details
|
  |
|
05-15-2016
|
2.50
|
Drilled Static Ports and Disassembled entire aft f
|
Details
|
  |
|
05-14-2016
|
1.50
|
J-stringers drilled
|
Details
|
|
|
05-13-2016
|
1.00
|
AN174-14A Close Tolerance Bolt for WD-409
|
Details
|
  |
|
05-12-2016
|
1.00
|
F712 - clearanced aft tabs and more adjusting. F6
|
Details
|
  |
|
05-11-2016
|
2.00
|
F711 and F712 flanging
|
Details
|
  |
|
05-10-2016
|
2.00
|
Drilled lower J-stringers in aft most tail
|
Details
|
  |
|
05-09-2016
|
4.00
|
WD-409 and tailspring drilled to final size
|
Details
|
 |
|
05-08-2016
|
2.00
|
Clecoed entire aft fuselage
|
|
|
|
05-07-2016
|
2.00
|
WD-409 and F711/712/779 measurement/fitting
|
Details
|
|
|
05-06-2016
|
3.00
|
Finished riveting F705, flap bushings drilled, F70
|
Details
|
|
|
05-04-2016
|
2.00
|
Riveted all AFT bulkheads
|
Details
|
 |
|
05-03-2016
|
3.00
|
Primed alll bulkheads
|
Details
|
|
|
05-02-2016
|
8.00
|
F705 Final prep
|
Details
|
|
|
05-01-2016
|
4.00
|
F705 continued - finished F634s, and deburred all
|
Details
|
  |
|
04-30-2016
|
2.00
|
Drilled F634 lap belt anchors
|
Details
|
|
|
04-29-2016
|
2.00
|
F705H spacer drilled
|
Details
|
  |
|
04-28-2016
|
1.50
|
F705 C/B Drilled
|
Details
|
  |
|
04-26-2016
|
1.00
|
Began F-705 and cut F705-B/K
|
Details
|
|
|
04-25-2016
|
3.00
|
Finished and debured/fluted F-706
|
Details
|
  |
|
04-24-2016
|
2.00
|
F706 and autopilot bracket started
|
Details
|
|
|
04-22-2016
|
1.00
|
F729-A/B/C and F-728-A/B fab
|
Details
|
 |
|
04-21-2016
|
1.00
|
Finished F707 and F708 including deburr and flutin
|
Details
|
 |
|
04-20-2016
|
2.00
|
Drilled F707 and F708 including rudder bushing hol
|
Details
|
  |
|
04-19-2016
|
3.00
|
Drilled F711-A/B/C/D, deburred/finished
|
Details
|
|
|
04-18-2016
|
5.00
|
Aft fuselage bulkheads - prep
|
Details
|
 |
|
04-14-2016
|
2.50
|
Deburred and Finished all J-channels
|
Details
|
 |
|
04-13-2016
|
1.00
|
Cut J-stringers
|
Details
|
 |
|
04-12-2016
|
1.50
|
Riveted new F601Js. Firewall done!
|
Details
|
|
|
04-05-2016
|
3.00
|
FW riveting - all except F-601J
|
Details
|
|
|
04-04-2016
|
2.00
|
Primed and top coat of FW angle and doublers
|
|
  |
|
04-03-2016
|
7.00
|
Deburred/Dimpled SS FW, made another F601J-L
|
Details
|
  |
|
04-02-2016
|
7.50
|
Deburred and prepped, countersunk all angles/doubl
|
Details
|
  |
|
03-28-2016
|
1.50
|
Disassembled FW, csk SS nutplate holes, fabricated
|
Details
|
  |
|
03-20-2016
|
3.50
|
Firewall - final item prep
|
Details
|
|
|
03-18-2016
|
5.00
|
Firewall Misc: Heater Valve, Transducer Manifold,
|
Details
|
|
|
03-17-2016
|
1.00
|
Parking Brake Mount Fabrication - completed
|
Details
|
 |
|
03-15-2016
|
2.00
|
Parking Brake Mount Fabrication
|
Details
|
 |
|
03-14-2016
|
2.50
|
FW - completed match drilling including F-601J ang
|
Details
|
|
|
03-11-2016
|
2.50
|
Match drilled FW and F601J fabrication
|
Details
|
|
|
03-08-2016
|
3.00
|
Completed inventory and organization
|
Details
|
  |
|
03-07-2016
|
5.00
|
Fuselage Arrived and Inventory
|
Details
|
|
|
02-20-2016
|
1.50
|
Pre-prepped Parts for Firewall
|
Details
|
 |
|
02-19-2016
|
2.00
|
Deburring F721-B Aft Canopy Decks and F714 Aft Dec
|
Details
|
|
|
02-18-2016
|
5.00
|
New RIGHT Longeron Completed
|
Details
|
|
|
02-14-2016
|
1.50
|
Downward Bend LEFT Longeron
|
Details
|
  |
|
02-09-2016
|
4.00
|
Final finishing of R & L shallow bends and drilled
|
Details
|
|
|
02-08-2016
|
5.00
|
Finished most of LEFT bend and started RIGHT bend,
|
Details
|
|
|
02-07-2016
|
3.00
|
Shallow Bend in LEFT Longeron
|
Details
|
 |
|
02-01-2016
|
3.00
|
F704 Final Finishing
|
Details
|
|
|
01-28-2016
|
0.50
|
F-704 Nutplates riveted to center section x 18
|
Details
|
  |
|
01-27-2016
|
2.00
|
F704 Center Section Riveting
|
Details
|
|
|
01-27-2016
|
3.00
|
Aft deck relief notches in longerons & F704M reinf
|
Details
|
|
|
01-26-2016
|
2.00
|
F704M -R/L stiffeners fabricated, drilled, deburre
|
Details
|
  |
|
01-25-2016
|
4.00
|
F704 Center Section - Initial Drilling
|
Details
|
|
|
01-24-2016
|
3.50
|
Battery Box
|
Details
|
|
|
01-23-2016
|
1.00
|
More aft longeron filing/dressing
|
Details
|
  |
|
01-18-2016
|
2.00
|
Cut aft longeron areas - bulkhead interface
|
Details
|
|
|
01-16-2016
|
2.00
|
Longerons
|
Details
|
  |
|
01-09-2016
|
9.00
|
Rudder Bottom Fairing Done!
|
Details
|
|
|
01-08-2016
|
3.00
|
Rudder Bottom Fairing - Riveted on
|
Details
|
|
|
01-08-2016
|
1.00
|
Ordered Fuselage!
|
Details
|
  |
|
01-07-2016
|
2.00
|
Test Fit of Whelen Nav/Strobe
|
Details
|
|
|
01-06-2016
|
3.00
|
Rudder Bottom Fairing Work
|
Details
|
  |
|
01-04-2016
|
1.00
|
More Trim of Rudder Bottom Fairing
|
|
  |
|
01-03-2016
|
1.00
|
Rough Trim of Rudder Bottom Fairing
|
|
  |
|
12-20-2015
|
4.00
|
Wings Done!
|
Details
|
|
|
12-19-2015
|
1.00
|
More wingtip sanding and fiberglass clean up.
|
Details
|
  |
|
12-13-2015
|
4.00
|
ER Tank Fuel Cap Access Door and Wingtip
|
Details
|
|
|
12-11-2015
|
1.00
|
ER Tank Fuel Cap Access Door Work
|
Details
|
 |
|
12-10-2015
|
6.00
|
ER Tank Fuel Cap Access Door work
|
Details
|
|
|
12-09-2015
|
3.00
|
Fiberglass work on wingtips
|
Details
|
  |
|
12-08-2015
|
1.00
|
Fiberglass work on wingtips - micro
|
|
|
|
12-07-2015
|
4.00
|
ER Tank Finish Work
|
Details
|
|
|
12-05-2015
|
9.00
|
More ER Tank Work
|
Details
|
|
|
12-04-2015
|
6.00
|
ER Tank Misc.
|
Details
|
|
|
12-02-2015
|
2.00
|
ER Tank Inboard Mount Doublers/Nutplates Fabricate
|
|
  |
|
11-30-2015
|
7.00
|
ER Tank - inboard mounting area
|
Details
|
  |
|
11-29-2015
|
1.00
|
Trimmed ER Tank Access doublers
|
|
  |
|
11-28-2015
|
3.00
|
Removed Main Tanks, Cut ER Access doublers and pan
|
|
  |
|
11-22-2015
|
3.00
|
Additional flox inside of trailng edges of tips.
|
Details
|
  |
|
11-21-2015
|
3.00
|
Wing Tip - Trailing Edge Fiberglass Work
|
Details
|
|
|
11-20-2015
|
4.00
|
Wing Finishing Tasks
|
Details
|
  |
|
11-19-2015
|
2.00
|
Re-do of short aileron pushrods
|
Details
|
|
|
11-18-2015
|
4.00
|
Finished Tip Hinge Install
|
Details
|
 |
|
11-17-2015
|
3.00
|
Wingtip hinge prep
|
Details
|
  |
|
11-16-2015
|
4.00
|
Drilled tip hinges x 4.
|
Details
|
  |
|
11-15-2015
|
1.00
|
Drilled Wingtips
|
Details
|
 |
|
11-14-2015
|
0.50
|
Fabricated 1/2" nylon aileron stops
|
|
  |
|
11-13-2015
|
1.50
|
Began fitting wingtips
|
|
  |
|
11-12-2015
|
4.00
|
Final flap hinge install
|
Details
|
|
|
11-10-2015
|
3.00
|
Drilled R Flap hinge. Painted Aileron pushrods (l
|
|
|
|
11-09-2015
|
3.00
|
Fabricated and finished long aileron pushrods
|
Details
|
|
|
11-08-2015
|
2.00
|
Fabricated short aileron pushrods
|
Details
|
  |
|
11-07-2015
|
6.00
|
Riveted Ailerons R & L
|
Details
|
|
|
11-06-2015
|
6.00
|
Final prep and priming
|
Details
|
|
|
11-04-2015
|
2.15
|
Deburred and dimpled FWD skins and spars.
|
|
  |
|
11-03-2015
|
3.00
|
Forward aileron work
|
Details
|
  |
|
11-02-2015
|
2.50
|
Drilled aileron spars, ribs, counterbalance pipes
|
|
|
|
10-30-2015
|
4.00
|
Finished aileron stiffeners, riveted. Trailing ed
|
Details
|
  |
|
10-29-2015
|
5.00
|
Cut all 32 aileron stiffeners, deburred aft skins
|
Details
|
|
|
10-26-2015
|
10.50
|
Riveted R & L Flaps
|
Details
|
|
|
10-25-2015
|
3.00
|
Primed Flap parts and skins
|
|
|
|
10-25-2015
|
2.00
|
Made Flap Jig
|
|
 |
|
10-23-2015
|
11.00
|
Prep of Flap Parts
|
Details
|
  |
|
10-22-2015
|
4.00
|
Fabricated Flap Hinges, drilled nutplates
|
|
|
|
10-21-2015
|
5.00
|
Drilled Flap Skins/Ribs
|
Details
|
|
|
10-19-2015
|
4.00
|
Riveted RIGHT Outboard Bottom Skin
|
Details
|
|
|
10-16-2015
|
5.50
|
Riveted LEFT Outboard Bottom Skin
|
Details
|
|
|
10-12-2015
|
2.00
|
Rescured wiring and pitot/AOA lines near bellcrank
|
|
  |
|
10-10-2015
|
10.00
|
Riveted R & L Inboard Bottom Skins
|
Details
|
|
|
04-23-2015
|
2.00
|
Riveted Flap Braces, Clecoed INBD skins
|
|
|
|
04-20-2015
|
3.00
|
Riveted Aileron Brackets and Aileron Gap Seals
|
|
|
|
04-18-2015
|
3.00
|
Painted all bottom wing skins, flap braces/aileron
|
Details
|
|
|
04-17-2015
|
3.00
|
Dimpled alll 4 bottom wing skins
|
|
|
|
04-16-2015
|
2.00
|
Deburred all 4 bottom wing skin holes
|
Details
|
  |
|
04-14-2015
|
4.00
|
Deburred all 4 bottom skin edges.
|
|
  |
|
04-12-2015
|
2.00
|
Built wing cart
|
|
|
|
04-11-2015
|
3.50
|
Deburred flap braces and aileron gap seal edges.
|
Details
|
  |
|
04-05-2015
|
1.50
|
Prepped aileron gap seals and flap braces
|
Details
|
  |
|
04-01-2015
|
1.50
|
Drilled aileron gap seals and flap braces - both w
|
|
|
|
03-31-2015
|
1.50
|
Drilled aileron brackets to rear spars
|
|
  |
|
03-27-2015
|
2.00
|
Fiberglassed in Marker Beacon antenna
|
|
 |
|
03-23-2015
|
2.00
|
Marker Beacon Antenna Install - R wing
|
Details
|
 |
|
03-15-2015
|
3.00
|
Fabricated Pitch Trim Harness and D-sub
|
|
  |
|
03-10-2015
|
3.00
|
Finished wing wiring
|
Details
|
|
|
03-09-2015
|
4.00
|
Roll Servo Install, L/R aileron bellcranks install
|
Details
|
|
|
03-07-2015
|
5.00
|
Autopilot Roll/Pitch Servo Harnesses Fabricated
|
Details
|
  |
|
03-04-2015
|
3.00
|
Terminated Land/Taxi, Nav/Stobes/VOR wiring ends
|
|
  |
|
03-03-2015
|
3.00
|
Landing/Taxi Wiring, Nav/Strobe, VOR runs
|
|
  |
|
03-01-2015
|
8.00
|
Installed Pitot Mast, AOA & Pitot Tubing Wiring
|
|
|
|
02-28-2015
|
7.00
|
Riveted RIGHT Top Wing Skins
|
Details
|
 |
|
02-24-2015
|
2.00
|
Deburred and riveted Landing and Taxi Lights
|
|
  |
|
02-20-2015
|
1.00
|
Installed Conduit in L Wing
|
Details
|
|
|
02-15-2015
|
7.00
|
Riveted LEFT Top Wing Skins
|
Details
|
|
|
02-14-2015
|
1.50
|
Primed and Riveted Aileron Brackets
|
|
 |
|
02-10-2015
|
2.00
|
Prepped Aileron Brackets and drilled all holes and
|
|
  |
|
02-06-2015
|
3.00
|
Removed and Reinstalled Tanks - Edge Forming
|
Details
|
  |
|
02-01-2015
|
1.50
|
Installed both tanks
|
Details
|
|
|
01-31-2015
|
3.00
|
Leak Tested both tanks
|
Details
|
|
|
01-30-2015
|
1.50
|
Installed Inboard Coverplates/fuel pick ups and di
|
|
|
|
01-29-2015
|
3.50
|
Encapsulated all shop heads on rear baffles
|
Details
|
 |
|
01-28-2015
|
5.00
|
RightTank Baffle and Z Brackets Installed
|
|
|
|
01-27-2015
|
0.50
|
Left Tank Interior Photos
|
|
|
|
01-27-2015
|
6.00
|
Left Tank Baffle and Z Brackets Installed
|
|
|
|
01-25-2015
|
2.50
|
Fuel Pick ups/anti-rotation brackets and IB Cap se
|
Details
|
|
|
01-23-2015
|
4.00
|
Outboard ribs riveted.
|
Details
|
|
|
01-22-2015
|
4.00
|
Inboard Ribs and T-405/T-410's installed.
|
Details
|
|
|
01-21-2015
|
3.50
|
Fabricated Fuel Vent Lines. Outboard cap senders.
|
Details
|
  |
|
01-20-2015
|
3.50
|
Encapsulated all inboard rivet heads in sealant.
|
|
  |
|
01-17-2015
|
9.00
|
Riveted all L and R inboard ribs.
|
|
|
|
01-15-2015
|
2.00
|
BNC, vent bulkhead fitting install. OB cap sender
|
Details
|
  |
|
01-14-2015
|
4.00
|
Cleaned all inboard rib holes, removed excess seal
|
|
  |
|
01-13-2015
|
0.50
|
Pushed in all clecoes and pushed excess sealant t
|
|
  |
|
01-12-2015
|
5.00
|
Fay sealed all Left and Right internal ribs.
|
Details
|
|
|
01-09-2015
|
3.50
|
Riveted Fuel Caps and Clips
|
Details
|
|
|
01-07-2015
|
4.00
|
Riveted left tank stiffeners
|
Details
|
|
|
01-06-2015
|
4.00
|
Right tank stiffeners
|
Details
|
|
|
01-04-2015
|
2.00
|
Dimpled tank skins
|
|
  |
|
01-02-2015
|
3.00
|
Deburred all tank skin and baffle holes and scotc
|
|
 |
|
12-20-2014
|
3.00
|
Dimpled stiffeners, new T-410s drilled, skins edge
|
|
  |
|
12-19-2014
|
2.00
|
Prepped ribs, clearanced T-405s. Riveted Tank Acc
|
|
 |
|
12-15-2014
|
2.00
|
Deburred all rib holes. Dimpled all ribs with str
|
|
  |
|
12-13-2014
|
9.00
|
Drilled all Stiffeners, Cap Sender NP's, Vent Line
|
Details
|
|
|
12-12-2014
|
3.00
|
Drilled T-405 / T-410 attach/reinforcements and Ca
|
Details
|
|
|
12-10-2014
|
4.00
|
ER Tank attach holes, tank drains, flycut access c
|
Details
|
|
|
12-09-2014
|
7.00
|
Deburred holes, BNC/vent/ER tank holes, fuel caps
|
Details
|
|
|
12-08-2014
|
1.50
|
Countersunk tank skins for rear baffles
|
|
 |
|
12-07-2014
|
2.00
|
Fabricated Tank Attach brackets
|
|
 |
|
12-03-2014
|
2.00
|
Match drilled both L/R tank skins to ribs
|
|
 |
|
12-02-2014
|
2.00
|
Cut stiffeners, drilled cover plates for fuel pick
|
|
  |
|
11-23-2014
|
1.00
|
Installed Tank Joint Plate and ER Tank Access nutp
|
|
|
|
11-22-2014
|
5.00
|
Riveted both leading edges to spars, clecoed top s
|
Details
|
|
|
11-20-2014
|
4.50
|
Riveted both leading edge skins to ribs and primed
|
|
|
|
11-19-2014
|
2.00
|
Countersunk R wingspars top/bottom and L wing bott
|
|
  |
|
11-18-2014
|
4.50
|
Dimpled Wing Ribs and Coutersinking of L top spar
|
Details
|
  |
|
11-17-2014
|
2.00
|
Deburred wing skeletons (spars/ribs) for both wing
|
|
  |
|
11-16-2014
|
4.00
|
Primed top skins and LE parts
|
Details
|
|
|
11-15-2014
|
5.00
|
Deburred Top Skin Holes, Dimpled and Cleaned
|
|
  |
|
11-14-2014
|
3.50
|
Deburred all top skin edges and wing walks.
|
|
  |
|
11-12-2014
|
1.00
|
Devinyled all top skins.
|
Details
|
  |
|
11-08-2014
|
3.00
|
LE Deburring and Dimpling
|
Details
|
  |
|
11-06-2014
|
2.00
|
Deburred LE skins
|
Details
|
  |
|
11-02-2014
|
4.00
|
LE Deburring, skins and holes
|
Details
|
  |
|
11-01-2014
|
8.00
|
Pitot Tube Mount, Landing Lights, new L LE rib
|
Details
|
 |
|
10-27-2014
|
4.00
|
Match drilled bottom skins and fab'ed pitot bracke
|
Details
|
|
|
10-26-2014
|
4.00
|
Match Drilled Top Skins and LE's
|
Details
|
|
|
10-24-2014
|
2.00
|
Landing Light holes cut
|
Details
|
|
|
10-21-2014
|
1.00
|
Landing Light marking
|
|
  |
|
10-20-2014
|
3.00
|
Drilled outboard Z brackets and R leading edge ins
|
Details
|
|
|
10-19-2014
|
8.50
|
Z bracket to baffle drilling - tank clecoed
|
Details
|
|
|
10-18-2014
|
1.00
|
Prepped new 408-1L inboard LE rib and W-423 joint
|
Details
|
 |
|
10-17-2014
|
1.00
|
Deburred Z brackets
|
|
  |
|
10-16-2014
|
1.50
|
Drilled Z brackets for nutplates
|
|
 |
|
10-15-2014
|
0.50
|
Riveted Inboard Z-bracket nutplates to spars
|
|
  |
|
10-14-2014
|
2.00
|
Drilled Z brackets to spars
|
|
|
|
10-13-2014
|
2.00
|
Drilled Z bracket center holes
|
|
  |
|
10-12-2014
|
1.00
|
Drilled Tie Down Ring holes
|
|
|
|
10-10-2014
|
2.00
|
Drilled 408-1L/R LE ribs and W-423 joint plates to
|
|
  |
|
10-09-2014
|
2.00
|
Drilled wing walks, clecoed L/R top skins, clecoed
|
|
|
|
10-08-2014
|
3.00
|
Fabricated rear spar brackets to wing stands, re-l
|
|
  |
|
10-07-2014
|
1.00
|
Fabricated wing jacks; checked spars with fishing
|
|
|
|
10-06-2014
|
7.00
|
Wing Stand Set Up
|
Details
|
|
|
10-05-2014
|
2.00
|
Riveted R main ribs to and rear spar and clecoed L
|
Details
|
|
|
10-04-2014
|
7.00
|
Main Ribs riveted to spars
|
Details
|
|
|
10-03-2014
|
4.00
|
Match drilled and deburred all main ribs to spar
|
|
|
|
10-02-2014
|
4.00
|
Primed all main and LE ribs
|
|
|
|
10-01-2014
|
1.00
|
Cleaned all ribs with mineral spirits, fluted both
|
|
  |
|
09-28-2014
|
1.00
|
Final rib scotch-brite
|
|
  |
|
09-27-2014
|
1.00
|
Drilled rear spar to main rib lower (small) flange
|
|
  |
|
09-26-2014
|
1.00
|
Flanged and Fluted All Tank Ribs
|
|
|
|
09-26-2014
|
0.50
|
All Ribs Completed
|
Details
|
|
|
09-25-2014
|
3.00
|
Deburred 10 Remaining Tank Ribs
|
|
  |
|
09-24-2014
|
1.50
|
Deburred 4 Tank Ribs
|
|
  |
|
09-23-2014
|
3.00
|
Deburred 5 Wing Nose Ribs, Flanged and Fluted
|
|
  |
|
09-22-2014
|
2.50
|
Deburred 7 Wing Nose Ribs
|
|
  |
|
09-17-2014
|
1.50
|
Drilled Main Wing Ribs for Conduit/Wiring
|
|
  |
|
09-16-2014
|
1.00
|
Painted Wing Stands
|
|
|
|
09-16-2014
|
2.50
|
Completed Main Wing Ribs
|
Details
|
  |
|
09-15-2014
|
2.00
|
Fabricated Aluminum Spar Attach Brackets for Stand
|
|
  |
|
09-12-2014
|
1.50
|
Welded Floor Brackets to Uprights
|
Details
|
|
|
09-10-2014
|
1.50
|
Welded Floor Brackets to Uprights
|
|
  |
|
09-08-2014
|
2.00
|
Fabricated Steel Wing Stand Parts
|
|
  |
|
08-30-2014
|
4.00
|
Deburred 10 Main Wing Ribs
|
|
  |
|
08-27-2014
|
2.00
|
Deburred 4 Main Wing Ribs
|
|
  |
|
08-24-2014
|
1.00
|
Completed Flanging Tool
|
|
|
|
08-23-2014
|
1.00
|
Deburred 2 Ribs
|
|
  |
|
08-23-2014
|
1.50
|
Built Flanging Tool
|
|
  |
|
08-22-2014
|
1.00
|
Inventoried and Relabeled Wing Ribs
|
|
 |
|
07-25-2014
|
0.50
|
Spars Completed
|
|
|
|
07-24-2014
|
1.50
|
Rear Spars - Riveted
|
|
|
|
07-22-2014
|
1.50
|
Rear Spars - Primed
|
|
|
|
07-20-2014
|
1.50
|
Rear Spars - Deburring Completed
|
|
 |
|
07-18-2014
|
2.50
|
Rear Spars - Deburring
|
|
|
|
07-13-2014
|
2.50
|
Rear Spars - Match Drilled and Aileron Pushrod Hol
|
|
|
|
07-12-2014
|
3.00
|
Main Spar - Tank NP Countersinking Cont'd
|
Details
|
 |
|
07-11-2014
|
1.00
|
Main Spar - Tank NP Countersinking
|
Details
|
|
|
07-10-2014
|
2.00
|
Rear Spars - Attach Area Trimmed and Match Drille
|
Details
|
 |
|
07-09-2014
|
2.00
|
Main Spar - Installed Tie Downs and Aileron Bellcr
|
Details
|
  |
|
07-08-2014
|
1.00
|
Main Spar - Tie Downs Completed
|
Details
|
 |
|
07-07-2014
|
2.00
|
Main Spars - Drilled Tie Downs
|
|
  |
|
07-05-2014
|
3.50
|
Main Spars - Tie Downs
|
Details
|
|
|
07-04-2014
|
3.00
|
Main Spars - Riveted Fuel Tank and Inspection Pane
|
|
  |
|
07-03-2014
|
2.00
|
Main Spar - Primed CSKs and tested NP countersinks
|
Details
|
  |
|
07-02-2014
|
3.00
|
Main Spar Nutplates - #40 CSK
|
Details
|
|
|
06-13-2014
|
2.00
|
Wing Kit Inventory
|
Details
|
|
|
06-08-2014
|
3.00
|
Drilled Elevator horns
|
Details
|
 |
|
06-07-2014
|
4.00
|
Empennage Tips - Finished
|
|
|
|
06-01-2014
|
1.00
|
Empennage Tips - Sanded, Glassed and Filled
|
|
  |
|
05-23-2014
|
2.00
|
Empennage Tips - Sanded, Glassed and Filled
|
|
  |
|
05-20-2014
|
2.00
|
Empennage Tips - Sanded, Glassed and Filled
|
|
  |
|
05-17-2014
|
6.00
|
Empennage Tips - Sanded, Glassed and Filled
|
|
  |
|
05-11-2014
|
3.00
|
Empennage Tips - added basswood stiffeners
|
|
 |
|
05-10-2014
|
4.00
|
Empennage Tips - Riveted
|
Details
|
  |
|
05-07-2014
|
4.00
|
Trim Tab - #2
|
Details
|
|
|
05-04-2014
|
4.00
|
Elevator - Rolled leading edges
|
Details
|
|
|
05-03-2014
|
5.00
|
Trim Tab and Left Elevator Riblet
|
Details
|
 |
|
05-02-2014
|
12.00
|
Elevator Riveting
|
Details
|
|
|
05-01-2014
|
3.00
|
Elevators - Deburr, Dimple, Prime
|
|
  |
|
04-30-2014
|
3.00
|
Elevator - Deburr and Dimple
|
|
  |
|
04-21-2014
|
2.00
|
Elevator Skins Drilled
|
Details
|
 |
|
04-19-2014
|
2.00
|
Elevator Stiffeners Riveted
|
Details
|
|
|
04-18-2014
|
2.00
|
Elevator Stiffeners - primed
|
Details
|
  |
|
04-17-2014
|
5.00
|
Elevator Stiffeners - deburred
|
Details
|
  |
|
04-11-2014
|
2.00
|
Elevator Stiffeners Drilled to Skins
|
Details
|
  |
|
04-10-2014
|
3.00
|
Elevator Stiffeners
|
Details
|
  |
|
04-06-2014
|
3.00
|
Elevator Counterweights shaped and drilled
|
Details
|
  |
|
04-05-2014
|
3.00
|
Elevator Stiffeners fabricated
|
Details
|
 |
|
04-03-2014
|
4.00
|
Rudder Leading Edge rolled and riveted
|
Details
|
  |
|
04-03-2014
|
4.00
|
Elevator Spars, ribs and counterweight assemblies
|
Details
|
 |
|
04-02-2014
|
2.00
|
Rudder Trailing Edge - riveted
|
Details
|
|
|
03-28-2014
|
8.00
|
Riveted Rudder, clecoed trailing edge
|
Details
|
|
|
03-27-2014
|
3.00
|
Deburring of Rudder Skeleton, priming and painting
|
|
  |
|
03-25-2014
|
2.00
|
Rudder Skeleton match drilled
|
Details
|
 |
|
03-24-2014
|
1.00
|
Rudder skins and stiffeners riveted
|
Details
|
 |
|
03-23-2014
|
5.00
|
Rudder Skins and Stiffeners
|
Details
|
 |
|
03-20-2014
|
2.50
|
Rudder Stiffeners Match Drilled
|
Details
|
 |
|
03-16-2014
|
2.00
|
Rudder Stiffeners - cut to size
|
Details
|
  |
|
03-13-2014
|
5.00
|
HS Skins Riveted
|
Details
|
|
|
03-10-2014
|
4.00
|
HS Skeleton riveting
|
Details
|
|
|
03-09-2014
|
11.00
|
HS Deburring/Painting
|
Details
|
|
|
03-06-2014
|
4.00
|
HS Forward Spar - replaced reinforcement bar
|
Details
|
  |
|
02-20-2014
|
4.00
|
Deburred HS Spars
|
Details
|
  |
|
02-18-2014
|
4.00
|
HS Spars
|
Details
|
|
|
02-18-2014
|
6.00
|
HS Spar - match drilled HS Spars and added SB kit
|
Details
|
  |
|
11-18-2013
|
3.00
|
Vertical Stabilizer - riveted
|
Details
|
|
|
11-16-2013
|
5.00
|
Vertical Stabilizer - Deburring of parts - CSK, di
|
Details
|
  |
|
11-13-2013
|
3.00
|
Vertical Stabilizer - Deburring of parts - spars,
|
Details
|
 |
|
11-12-2013
|
2.00
|
Vertical Stabilizer - Match drilled skins, ribs an
|
Details
|
  |