Work Logs Found: 701
Category Work Time: 1292 Hours
 Date
Hours
Work Log Summary

Details

 05-13-2020
1.50
Rebuild throttle linkage - again

 05-12-2020
2.00
Adjest wing washout. Correct tailwheel chain.

 05-10-2020
2.50
Adjust right wing dihedral

 05-05-2020
2.50
Test fit throttle.Still needs adjustment. Adjust l

 05-03-2020
0.75
Test fit Throttle. Need spacers. Make spacers

 04-29-2020
1.50
Modift Throttle linkage - again

 04-28-2020
0.25
Test fit Throttle. No good :(

 04-27-2020
1.00
Modify Throttle linkage

 04-21-2020
0.50
Trial fit modified pedals. Interferrence with thro

 04-14-2020
2.00
Extend pedals 2". Make angle bracket for throttle

 04-08-2020
2.00
Remove pedals and throttle. Torque and safety all

 04-05-2020
2.00
Misc. Taxi test raised tailwheel. riding brakes:(

 04-03-2020
3.00
Reinstall aileron pivot and adjust ailerons. Taxi

 03-29-2020
2.00
Misc. Taxi test

 03-25-2020
1.25
Bleed brakes. Misc

 03-22-2020
0.50
Reinstall brake lines to pedals

 03-16-2020
3.00
Reassemble elevator and rudder. Adjust rudder peda

 03-14-2020
1.00
Misc

 03-13-2020
2.50
Reinstall pedals. Shorten Rudder cables. Remove el

 03-11-2020
2.50
Work on pedals and misc.

 03-09-2020
1.50
Misc

 03-01-2020
1.00
Test fit pedal extensions

 02-25-2020
0.50
Build spring extension for repositioned pedals

 01-26-2020
1.00
Trial fit pedals. Fit strut stiffener. Install win

 01-26-2020
2.00
Sync tach to Tiny tach

 01-21-2020
0.50
Paint rudder pedals

 01-19-2020
0.50
Trial fit pedals

 01-14-2020
1.00
Complete welding right side pedals

 01-12-2020
1.00
Complete welding left side pedals

 01-08-2020
1.50
Begin widening pedal assembly

 01-07-2020
1.50
Trial fit pedals

 01-02-2020
1.00
REpair and modify rudder pedals

 01-01-2020
2.50
Taxi test. Check mags, probem with one. Broke Rudd

 12-30-2019
1.00
Build windshield standoffs. Build strut stiffeners

 12-29-2019
2.00
Re pitch prop. Run up to full static RPM

 12-22-2019
3.50
Complete left door. Fit Tiny Tach. Fit new fuel pu

 12-16-2019
1.00
Reassemble left door

 12-14-2019
2.50
Run engine. Work on tach

 12-13-2019
3.00
Taxi tests

 12-09-2019
0.50
Reassemble door

 12-08-2019
2.00
Install Data plate. General assembly

 12-04-2019
1.50
Mount camera. Taxi tests

 12-02-2019
0.75
Build Camera mount

 12-01-2019
2.00
Complete windshield install. Program engine monito

 11-25-2019
0.00
Taxied.
       

 11-24-2019
4.50
Hanger - install kick panels. Install windscreen
       

 11-17-2019
5.00
Hanger - Fix fuel drain. Attch kick panels

 11-11-2019
4.50
Hanger - complete electrical. Zip tie, Installcomp
     

 11-08-2019
1.50
Hanger - general assembly

 11-07-2019
1.00
Prepare parts

 11-06-2019
1.00
Hanger - General assembly

 11-04-2019
1.00
Prepare parts

 11-03-2019
3.50
Hanger - general assembly

 10-29-2019
2.50
Hanger - Install seat adjusters
     

 10-27-2019
2.00
Hanger - test seats. Misc

 10-24-2019
0.50
Work on seat adjusters

 10-23-2019
2.50
Hanger - Work on seats. Misc

 10-21-2019
1.00
Build seat adjusters

 10-20-2019
4.00
Hanger - Fix fuel leak, start engine, taxi, wash a

 10-17-2019
2.50
Hanger - Wire fuel pump. Mount pilot seat. Misc
     

 10-16-2019
3.00
Hanger - Complete bleeding brakes, Install electri
       

 10-13-2019
1.00
Prep parts

 10-10-2019
3.00
Hanger - general assembly

 10-09-2019
0.50
Prep parts

 10-08-2019
2.50
Hanger - general assembly

 10-07-2019
0.50
Prep parts

 10-06-2019
4.00
Hanger - General assembly

 10-03-2019
2.50
Hanger - General assembly

 10-02-2019
1.00
Prep parts - Make rudder to tail wheel bracket
     

 10-01-2019
2.50
Hanger - Connect and adjust aileron push rods. Mou
       

 09-30-2019
1.00
Prep parts

 09-29-2019
3.50
Hanger - general assembly

 09-26-2019
2.00
Hanger - General assembly

 09-24-2019
0.50
Prepare new elevator pivot
     

 09-22-2019
4.00
Rebuils carbs (w Paul Hockin). General assembly

 09-16-2019
1.50
Hanger - Remove carbs. General assembly
     

 09-14-2019
1.50
Hanger - First engine start

 09-13-2019
3.50
Hanger - general assembly

 09-12-2019
0.50
Prep parts

 09-11-2019
2.50
Hanger - Attach and adjust propeller
       

 09-10-2019
0.50
Prep parts

 09-09-2019
3.00
Hanger - Install oiling system, add fuel, general
     

 09-08-2019
4.00
Hanger - Prep engine for starup. General assembly
       

 09-04-2019
0.50
Prep parts

 09-03-2019
2.50
Hanger - general assembly

 09-02-2019
1.00
Prep parts

 08-29-2019
2.00
Hanger - general assembly

 08-28-2019
1.00
Prep parts for installation. Finish painting wing

 08-27-2019
3.50
Hanger - general assembly

 08-26-2019
2.00
Prep parts for installation. Build new elevator fr

 08-25-2019
3.50
Hanger - general assembly

 08-24-2019
4.00
Hanger - General Assembly

 08-15-2019
2.50
Hanger - Install Rudder and elevator stops. Fit ai

 08-14-2019
1.50
Paint Jury struts. Buils aileron push rods. Prime

 08-13-2019
1.50
Work on aileron pivot mounts. Paint Jury strust. G

 08-12-2019
1.50
Hanger - Continue assembly

 08-10-2019
2.50
Hanger - Continue assembly

 08-08-2019
2.50
Hanger - Continue assembly

 08-07-2019
1.50
Prepare Jury struts

 08-06-2019
3.00
Hanger - Continue assembly

 08-04-2019
2.00
General prep

 08-02-2019
3.00
Hanger - Continue assembly

 08-01-2019
3.00
Hanger - Continue assebmly of tail feathers

 07-31-2019
0.50
Misc. Prep parts

 07-30-2019
3.00
Hanger - Assemble Tail feathers

 07-28-2019
5.00
Hanger - General assembly

 07-25-2019
2.50
Hanger - Mount engine. Misc

 07-24-2019
2.00
Adjust strut lengths. Prime wing and tail struts

 07-23-2019
2.00
Hanger - Wiring and misc.

 07-22-2019
2.00
Misc.

 07-21-2019
3.00
Hanger - Reinstall wings

 07-17-2019
2.00
Hanger - Reinstall landing gear

 07-15-2019
1.00
Work on engine

 07-12-2019
0.00
Move fuselage to hanger

 07-11-2019
1.50
Prepare fuselage for move to hanger

 07-07-2019
2.00
Work on exhaust. Misc

 07-02-2019
1.50
Mount radiator and map out hose layout. Mount exha

 07-01-2019
1.50
Paint misc metal fittings. Repair and paint exhaus

 06-30-2019
5.00
Install landing gear. Rub brake lines and install

 06-27-2019
1.50
Final paint on landing gear. Work on left side doo

 06-25-2019
1.50
Claen up and prime landing gear. Prepare wheels fo

 06-24-2019
1.50
Complete welding on new landing gear

 06-20-2019
1.00
Misc

 06-19-2019
2.00
Continue work on landing gear

 06-16-2019
4.00
Build new longer landing gear

 06-14-2019
2.00
Build new longer landing gea

 06-12-2019
2.00
Begin building new longer landing gear

 06-10-2019
1.00
Repair door damaged in transit

 06-07-2019
2.00
Misc.

 06-06-2019
1.00
Make temporary stands. Lift nose to new required h

 06-04-2019
1.50
Final assembly of console and switch panel

 06-03-2019
0.50
General tidy up.

 06-01-2019
2.00
General tidy up

 05-31-2019
3.00
Tidy up wiring. Work on fuel line. Mount fire exti

 05-30-2019
1.00
Clean up and paint radiator air intake

 05-28-2019
4.00
Mount battery box. Run battery cables

 05-27-2019
4.00
Attach Right side landing gear. Clean upo and pain

 05-26-2019
4.00
Final paint on center section. Mount Comms antenna

 05-23-2019
0.50
Complete prime center section

 05-22-2019
1.00
Prime center section. Work on main ground and feed

 05-21-2019
1.00
Shrink anf tape center section

 05-20-2019
1.50
Cover center section

 05-19-2019
4.00
Work on exhaust mount. Work on antenna ground plan

 05-17-2019
3.00
Work on wiring

 05-16-2019
1.00
Work on throttle. Work on exhaust. Mount gascolato

 05-15-2019
1.00
Work on radiator air intake

 05-14-2019
1.00
Work on radiator air intake

 05-13-2019
1.50
Work on radiator air intake

 05-12-2019
3.00
Work on throttle. Build radiator intake mount

 05-09-2019
2.00
Complete engine mount 2

 05-08-2019
2.00
Work on engine mount 2

 05-06-2019
2.00
Rework engine mount

 05-05-2019
2.00
Rework engine mount :(

 05-04-2019
3.00
Work on engine mount. Work on Radiator shroud

 05-04-2019
3.00
Work on engine mount

 05-03-2019
3.00
Work on engine mount

 05-02-2019
2.50
Work on engine mount

 05-01-2019
1.00
Dismantle cabin area for work on engine mount. Pos

 04-30-2019
0.00
Bring fuselage back from hanger

 04-29-2019
0.00
Tidy up workshop for fuselage. Assemble engine hoi

 04-28-2019
5.00
Hanger - Dismantle plane for move to hiuse. Work o

 04-21-2019
5.00
Hanger - Move plane to level surface. Measure all

 04-16-2019
2.00
Hanger - Fit prop. Fit gap seals. Fit tail feather

 04-14-2019
2.00
Work on firewall corners. Build heater box

 04-10-2019
0.50
Work on firewall corners

 04-08-2019
1.50
Cut out wing gap seals to fit around cabin. Build

 04-07-2019
3.00
Temporarily mount engine. Adjust ailerons

 04-04-2019
1.50
Build wing gap seals

 04-03-2019
2.00
At hanger. Fit temp engine mount. work on aileron

 04-01-2019
1.00
Prepare temp. firewall

 03-31-2019
1.00
Work on engine mount
Details
     

 03-28-2019
0.50
Finish painting aileron pivots

 03-27-2019
1.00
Wire wing end plate. Clean up anf paint aileron pi

 03-26-2019
2.00
Attach wing to fuselage. Measure for aileron pivot

 03-24-2019
0.00
Move Wing to hanger

 03-21-2019
1.00
Touch up paint. Wire nav. light

 03-20-2019
1.00
Mask and painr red stripe. unmask

 03-19-2019
1.50
Mask and paint blue

 03-18-2019
1.00
Paint grey on lower side

 03-17-2019
1.00
Paint red strip on upper surface

 03-14-2019
1.00
Spray final coat of blue on top side of wing

 03-12-2019
1.50
Mask top side. 1st blue coat

 03-11-2019
0.50
Fit aileron

 03-10-2019
1.00
Spray grey on top side

 03-09-2019
0.50
1st grey coat on top side

 03-08-2019
1.00
Final primer coat

 03-07-2019
0.50
Spray primer on top side

 03-06-2019
1.00
2nd primer coat on top side of wing

 03-03-2019
1.00
Prepare and brush primer coat on wing top surface

 03-01-2019
15.00
1st color coat on underside of wing

 02-28-2019
0.50
Last primer coat on underside

 02-27-2019
1.00
Spray 2nd and 3rd cross coats

 02-26-2019
0.50
Spray 1st cross coat on underside of wing

 02-25-2019
1.00
Prime underside of wing

 02-24-2019
4.00
Complete all taping. Shrink and tape aileron. Prep

 02-21-2019
2.00
Complete rib stitching. Tape lower surfaces
     

 02-20-2019
1.50
Rin stitch lower surface

 02-19-2019
1.50
Prepare lower surface for rib stitching. Begin cov

 02-18-2019
4.00
Rib stitch upper surface. Install empennage struts

 02-07-2019
0.50
Complete top surface gluing. Prepare aileron

 02-06-2019
1.50
Attach fabric to upper wing surface

 02-05-2019
1.00
Complete shrink on lower wing surface. Prepare top
       

 01-17-2019
0.50
Complete attaching lower surface wing fabric

 01-16-2019
1.50
Attach lower surface wing fabric

 01-15-2019
1.50
Prepare wing for covering. Anto chafe tape

 01-14-2019
1.50
Prepare wing for covering

 01-13-2019
2.00
Misc.

 01-09-2019
1.50
Wing wiring. Prep for covering
       

 01-08-2019
1.50
Mount OAT probe. Cover Right wing end surfaces

 01-03-2019
1.00
Tidy up wiring

 01-01-2019
4.00
Attach left wing to fuselage. Work on elevator tri

 12-30-2018
1.00
Work on elevator trim

 12-27-2018
1.00
Paint touch up

 12-26-2018
1.00
Paint touch up

 12-25-2018
1.00
Paint touch up

 12-20-2018
1.00
Work on Horizontal stablizer. Setup arduino test b

 12-18-2018
0.00
Move left wing to hanger

 12-17-2018
1.00
Mount aileron

 12-16-2018
0.50
Paint aileron

 12-13-2018
0.50
Paint aileron

 12-12-2018
1.00
Paint aileron

 12-11-2018
1.00
Work on mounting wing end plate.Paint aileron

 12-10-2018
1.00
Clean up wing end plates. First color coat on aile

 12-09-2018
1.00
Paint touch up

 12-08-2018
0.50
Route wing endplate

 12-05-2018
0.50
Work on Aileron. Cut out inspection holes

 12-04-2018
0.50
Touch up blue on under side

 12-03-2018
1.50
Touch up grey on underside. Prep end plate

 12-02-2018
1.00
Apply red stripe to top side
       

 11-29-2018
0.50
Touch up blue on top side

 11-28-2018
1.50
Paint blue on top side

 11-26-2018
1.00
Prepare wing end plate template

 11-25-2018
2.00
Paint grey and blue on under side

 11-24-2018
1.50
Paint grey on top side

 11-23-2018
1.00
Prime underside

 11-20-2018
0.50
Spray final primer on top surface

 11-19-2018
1.00
Spray 3rd coat primer on top surface

 11-18-2018
2.00
Spray 1st two coats of primer

 11-15-2018
0.50
Add tape to top surface along rear spar

 11-13-2018
0.50
Sand top wing surface

 11-12-2018
0.50
2nd coat primer on top surface

 11-08-2018
2.00
Iron down tapes. 1st primer coat on topside

 11-07-2018
1.00
Install leading edge tape

 11-05-2018
1.00
2nd primer coat

 11-04-2018
3.00
Rib stitching. Taping. 1st primer coat.

 11-03-2018
3.00
Rib stitching. Taping

 11-01-2018
1.50
Continue rib stitching. Prepare tapes to cover rib

 10-31-2018
1.50
Rib stitching. Shrink fabric on aileron

 10-30-2018
2.00
Rib stitching
     

 10-29-2018
1.50
Rib stitching. Continue covering aileron

 10-28-2018
2.50
Rib stitching. Begin covering aileron

 10-21-2018
2.50
Shrink to skin
     

 10-18-2018
1.50
Install fabric on top wing surface
       

 10-17-2018
1.50
Continue to prep top side of wing

 10-16-2018
1.50
Prep top side of wing for fabric

 10-15-2018
1.50
Shrink fabric on bottob of left wing

 10-14-2018
3.00
Cover bottom of left wing

 10-11-2018
1.00
Cover end ribs
     

 10-10-2018
1.00
Clean up wing. Prepare for covering.

 10-09-2018
1.00
Prepare pitot tube mount. Clean up wing

 10-08-2018
1.00
Touch up paint

 10-04-2018
1.00
Touch up paint. repair tire

 10-03-2018
1.00
Touchup paint

 10-02-2018
1.00
Begin wiring and plumbing left wing

 10-01-2018
1.50
Clean up wing. Paint misc. parts. Repaint rudder b

 09-30-2018
2.00
Attach doors. Take fuselage to hanger. Bring left

 09-27-2018
1.00
Paint misc. small parts

 09-26-2018
1.00
Build bracket for tailwheel spring

 09-25-2018
1.50
Assembly

 09-24-2018
1.50
Assembly

 09-23-2018
4.00
Assembly

 09-20-2018
1.50
Complete painting interior parts. Prepare fittings

 09-19-2018
1.50
repaint interior parts. Connect brake lines to ped

 09-18-2018
1.50
Install beacon. Reinstall floor, reinstall pedals.

 09-17-2018
1.00
Make and install bracket for beacon

 09-16-2018
2.00
Paint interior parts

 09-13-2018
1.00
Replace control hardware with castlenuts

 09-12-2018
1.00
Misc

 09-11-2018
1.00
Attach windscreen to fuselage

 09-07-2018
1.50
Trim windscreen to fit doors. Replace suspension h
     

 09-06-2018
1.50
Mount ELT antenna. Work on brakes.

 09-05-2018
1.00
Paint antenna mount. Work on brake lines. Work on

 09-04-2018
1.00
Begin running brake lines. work on right side air

 09-03-2018
4.00
Complete dash. Cutout windscreen. Install left sid
     

 08-30-2018
1.00
Prep and prime dash

 08-28-2018
1.50
Work on dash

 08-26-2018
1.00
Misc.

 08-24-2018
2.00
Fit and bolt center section

 08-23-2018
1.00
Torque bolts

 08-22-2018
1.50
Work on tidying up wiring. Cabin vent

 08-21-2018
1.00
Run pneumatic tubing

 08-20-2018
1.00
Wiring

 08-19-2018
4.00
Wiring anf misc panels

 08-09-2018
1.50
Prime empennage. Wiring

 08-08-2018
1.00
Wiring

 08-06-2018
1.50
Prime empennage. Wiring

 08-05-2018
4.00
Continue work on replacement empennage struts. Pri

 08-02-2018
1.00
Work on replacement empennage struts.

 08-01-2018
1.50
Wiring

 07-31-2018
1.50
Continue covering verticals. Wiring

 07-30-2018
0.50
Wiring

 07-29-2018
4.00
Continue covering verticals. Wiring

 07-27-2018
2.00
Wiring

 07-25-2018
1.50
continue covering verticals.

 07-24-2018
4.00
Wiring. Cover vertical stab. and rudder

 07-23-2018
1.00
Tail light housing

 07-22-2018
5.00
Wiring. Prep tail light housing

 07-19-2018
1.50
Paint. work on empennage struts

 07-18-2018
0.50
Paint touch up

 07-17-2018
0.50
Paint touch up

 07-14-2018
2.00
Install and setup elevator controls and stops. Mea

 07-13-2018
2.00
Continue color coats on hor. stab. and elevators.

 07-12-2018
1.50
Mask and apply 2nd base color to topp of hor. stab

 07-11-2018
1.00
Paint horizontal stablizer
       

 07-10-2018
1.00
Paint horizontal stablizer

 07-09-2018
1.00
Cover center section leading edge. Paint base colo

 07-08-2018
2.00
General assembly
       

 07-05-2018
1.00
Install fuel tank. Continue priming elevators

 07-03-2018
6.00
Prime horizontal stablizer. Fuel tank vent assembl

 06-30-2018
3.00
Prime horizontal stablizer. Fit elevator trim tab

 06-29-2018
2.00
Prime horizontal stablizer

 06-28-2018
1.00
Paint touchup

 06-27-2018
1.00
Paint red stripe on fuselage

 06-26-2018
2.00
Paint 2nd base coat (Blue) on upper fuselage

 06-25-2018
1.50
Mask for 2nd base coat. Shrink fabric on elevators

 06-24-2018
3.00
Prep and paint gray base on fuselage

 06-21-2018
1.50
Cover 2nd side of elevators. Add tapes to horizont

 06-20-2018
0.50
Shrink 2nd side of horizontal stablizer and 1st si

 06-19-2018
1.50
Cover 2nd side of horizontal stablizer. Begin cove

 06-18-2018
1.00
last primer coat on fuselage.shrink 1st side of ho

 06-17-2018
3.00
2nd primer coat. Begin covering horizontal stabliz

 06-15-2018
2.00
Finish tapes on upper side of fuselage. 1st primer

 06-14-2018
2.00
Fit rudder cable fairings. Complete tapes

 06-12-2018
0.50
Final primer coat on underside of fuselage

 06-11-2018
1.00
Sand and second cross coat of primer

 06-10-2018
0.50
Prime bottom of fuselage

 06-07-2018
1.00
Covering - Add tapes

 06-06-2018
1.50
Covering - Add tapes

 06-05-2018
1.50
Covering - Add tapes

 06-05-2018
1.50
Covering - add tapes

 06-03-2018
0.50
Covering - tighten upper part of cabin and below d

 06-01-2018
1.00
Covering - Upper part of cabin and below door

 05-31-2018
0.50
Covering - Tighten center part of cabin. install d

 05-30-2018
3.00
Covering - Tighten lower part of cabin. Cover uppe

 05-29-2018
3.00
Covering - tighten rear of fueslage. Cover lower p

 05-28-2018
5.00
Covering

 05-27-2018
2.00
Covering - underside

 05-23-2018
0.50
Prepare underside of fuselage for covering

 05-22-2018
0.50
cover section above left door

 05-21-2018
0.50
Cover section above right door

 05-18-2018
4.00
Final paint fuselage and interior parts

 05-16-2018
1.00
Misc

 05-15-2018
0.50
Clean up center section

 05-14-2018
0.50
Work on center section

 05-13-2018
3.00
Paint other parts

 05-12-2018
4.00
Final paint fuselage (ran out of paint)

 05-06-2018
1.00
Misc

 05-04-2018
2.50
Final prime fuselage

 05-03-2018
1.00
Misc

 05-02-2018
2.50
Final welding on fuselage and controls

 04-30-2018
5.00
Final weld both wing extensions. Work on center se

 04-29-2018
2.00
Misc

 04-26-2018
1.00
Work on right wing mount extension

 04-25-2018
1.00
Work on center section

 04-24-2018
1.50
Work on Fuel system

 04-23-2018
1.00
Work on center section

 04-22-2018
3.00
Fuselage back from Pisgah. Work on inner torque tu

 04-19-2018
1.50
Door assembly

 04-18-2018
1.50
Door assembly

 04-13-2018
2.00
Finalize measure for wing adjustment

 04-12-2018
1.50
Begin assembly of doors. Build jury strut lower mo

 04-11-2018
1.00
Top coat aluminium parts

 04-10-2018
1.50
Top coat Aluminium parts

 04-09-2018
1.00
Prime misc parts
       

 04-07-2018
2.00
Prime Aluminium parts

 04-06-2018
2.00
Aileron Alignment

 04-05-2018
1.00
Stuff

 04-03-2018
1.00
Prime Aluminium parts

 04-01-2018
3.50
Work on Ailerons and front center section. Alodine

 03-28-2018
1.00
Prepare Aluminium panels

 03-25-2018
2.00
Work on wing alignment. Ailerons

 03-20-2018
0.00
Build tail stand
     

 03-19-2018
1.00
Work on Aileron push rods and pivot

 03-14-2018
2.00
Mockup modified torque tube pivot. Measure for squ

 03-12-2018
1.00
Build extended Aileron Torque tube pivot

 03-10-2018
4.00
Attach wings. Mock up Ailerons. Measure for bolts
       

 03-01-2018
1.50
Work on struts
     

 02-28-2018
1.00
Weld rear center section support tabs

 02-27-2018
1.50
Weld rear center section support

 02-22-2018
0.50
Discover out of square condition on rear of cabin

 02-21-2018
1.00
Work on center section leading edge

 02-20-2018
1.00
Weld on tabs for ELT

 02-19-2018
2.00
Work on fuselage

 02-15-2018
1.50
Work on center section. Prepare paint booth

 01-25-2018
1.00
Work on center section leading edge

 01-24-2018
1.50
Work on windscreen template and center section

 01-23-2018
1.00
Work on windscreen template

 01-22-2018
1.50
Work on Ground plane

 01-21-2018
2.00
Work on center section and glpvebox

 01-15-2018
4.00
Attach wings
Details

 01-11-2018
0.50
work on center section

 01-10-2018
1.00
Work on center section and dash

 01-09-2018
1.50
Prime last welded sections. Work on center section

 01-08-2018
1.50
Cleanup Panel. Work on center section

 01-06-2018
1.00
Cutout panel for instruments

 01-01-2018
1.00
Panel layout

 12-29-2017
1.50
Build dash panel

 12-28-2017
1.50
Mock up rear wing mounts.
Details

 12-26-2017
4.00
Final welding front wing mounts

 12-25-2017
3.00
Building dash

 12-21-2017
1.00
Begin building dash

 12-20-2017
2.00
Align both wing mounts
     

 12-19-2017
2.00
Build right wing mount

 12-18-2017
2.00
Build left kick panel
Details
     

 12-17-2017
4.00
Bring fuselage back from Hanger.
Details
       

 12-15-2017
2.00
Right side kick panel
       

 12-03-2017
2.00
Prime aluminium pieces

 12-02-2017
0.00
Move fuselage to harrell field

 11-14-2017
0.00
Rent hanger at Harrell field

 11-01-2017
1.00
Alumiprep and Alodine aluminium parts

 10-31-2017
1.00
Prepare aluminium parts

 10-30-2017
1.00
Prepare aluminium parts

 10-08-2017
2.00
Final welding on fuselage

 10-02-2017
0.50
Work on center section

 10-01-2017
1.00
Work on center section

 09-24-2017
4.00
Final welding on top and front of fuselage

 09-23-2017
6.00
Mount wings
Details

 09-20-2017
1.50
Weld tabs. Build Engine mount spools

 09-19-2017
1.50
Build and weld tabs.Finish weld engine mount plate

 09-18-2017
1.00
Build tabs for kick panel Aluminium. Work on Alumi

 09-13-2017
1.00
Work on Aluminium covering dash

 08-30-2017
1.50
Wiring

 08-28-2017
1.50
Work on center consol

 08-27-2017
1.00
Wiring

 08-23-2017
0.50
Work on latch for left door

 08-21-2017
1.50
Wiring and work on latch for left door

 08-20-2017
4.00
Work on center section leading edge

 08-06-2017
2.50
Door holds. Wiring.
     

 08-03-2017
1.50
Wiring.
     

 08-01-2017
1.00
Continue rigging elevators.

 07-30-2017
5.00
Rigging rudder cables and elevator controls. Start

 07-26-2017
1.00
Work on rudder cables.

 07-24-2017
1.00
Continue work on doors. Build 2nd strut attach.

 07-23-2017
1.50
Continue work on doors. Build 2nd strut attach.

 07-17-2017
1.00
Work on doors.
     

 07-16-2017
3.00
Work on doors.
     

 07-06-2017
1.00
Attach floor boards.

 06-29-2017
1.50
Prepare switch panel

 06-28-2017
1.00
Mockup fuel line

 06-27-2017
3.00
Complete prep and priming of tail feathers and str

 06-23-2017
1.00
Bend up SS Firewall.

 06-22-2017
1.00
Final welding on firewall. Bend SS for firewall.

 06-21-2017
1.00
Continue work on left door. Research fuel line.
     

 06-20-2017
1.00
Work on throttle linkage

 06-18-2017
4.00
Work on left door.
     

 06-14-2017
1.00
Misc

 06-13-2017
1.00
Paint rudder pedals and control column

 06-12-2017
1.00
Work on left door hinge.

 06-11-2017
5.00
Prepare and Prime tail feathers

 06-08-2017
1.50
Build door handle (right)
       

 06-06-2017
1.00
Mockup electrical panel. Work on right door.
     

 06-04-2017
3.00
Prepare tail feather struts

 06-02-2017
2.00
Work on right door
     

 05-31-2017
1.50
Work on right door hinges.
     

 05-30-2017
1.50
Work on right door frame

 05-29-2017
5.00
Install rear fuel tank mount and front support bar

 05-25-2017
3.00
Mockup right wing. Build strut fittings. Measure f
       

 05-24-2017
1.50
Final welding of tail feathers

 05-22-2017
3.00
Final welding horizontal stabliser and rudder. Cut
     

 05-21-2017
3.00
Complete pedals and install brake master cylinder.
     

 05-17-2017
1.00
Weld in tubing for Panel and components

 05-14-2017
2.00
Final paint (red) for control rods and Landing gea

 05-09-2017
1.50
Aluminium floor panels
       

 05-07-2017
3.00
Prepare and Prime Control rods and Langing gear

 05-05-2017
3.00
Final welding on horizontal stabliser
     

 05-03-2017
1.00
Work on trim tab servo install

 05-02-2017
1.00
Final weld on Elevator

 05-01-2017
0.50
Work on trim tab

 04-27-2017
1.50
Work on elevator trim tab

 04-26-2017
1.00
Work on tail feathers

 04-24-2017
1.00
Weld Control tube ends

 04-23-2017
4.00
Work on Tail feather ribs

 04-19-2017
1.00
Work on Left wheel/brake

 04-18-2017
1.00
Assembly of Left Front Landing gear

 04-17-2017
0.50
Work on Right step

 04-16-2017
0.50
Work on Right wheel/brake

 04-13-2017
1.00
Assembly of Right Front Landing gear
     

 04-12-2017
0.00
Work on engine test stand

 04-11-2017
1.00
Final Welding on Landing gear

 04-06-2017
0.00
Pick up Engine
Details

 04-05-2017
1.00
Final Welding on Landing gear

 04-04-2017
1.00
Final Welding on Landing gear

 04-02-2017
2.00
Color coat on Fuselage (Blue)
     

 03-30-2017
1.00
Inject Tubeseal in painted areas and rivet closed
     

 03-29-2017
2.00
2nd coat of primer on fuselage

 03-26-2017
7.00
Sand and Clean fuselage rear of panel. Prime

 03-24-2017
1.00
Work on Firewall engine mount fittings

 03-24-2017
2.50
Weld windsheild tabs, Tab floor tabs

 03-23-2017
1.00
Make tabs for windshield

 03-22-2017
1.00
Final welding, Light grinding

 03-21-2017
1.00
Final welding - Tabs, Brackets, Door mods.
     

 03-14-2017
1.00
Tubeseal
     

 03-12-2017
5.00
Final welding - Tabs, Brackets, Battery door, Door
     

 03-08-2017
1.50
Final welding - Tabs, Brackets, Door mods.

 03-06-2017
1.00
Final welding - Tabs, Brackets, Door mods.

 03-05-2017
3.00
Final welding - Tabs, Brackets,Door mods

 02-28-2017
1.00
more Tabs and Brackets

 02-27-2017
1.00
Modifications to passenger side door frame
       

 02-26-2017
6.00
Tabs and Brackets
       

 01-19-2017
1.00
Work on Rudder cable routing and rudder pedals

 01-18-2017
1.00
Work on Rudder cable routing and rudder pedals

 01-17-2017
1.50
Work on Rudder cable routing

 01-16-2017
4.00
Rebuild pedal assembly. Work on Horizontal stablis

 01-12-2017
1.00
Work on Elevator controls

 01-09-2017
0.50
Work on Elevator controls

 01-06-2017
1.00
Work on Elevator Torque tube

 01-05-2017
1.00
Work on Elevator torque tube
     

 01-04-2017
0.50
Add structure to support Elevator control tube
     

 01-02-2017
3.00
Work on Rudder Pedals. Modicications to floor

 01-01-2017
3.00
Work on Rudder Pedals
       

 12-30-2016
2.00
Rudder Stops and controls

 12-29-2016
1.00
Work on Elevator controls

 12-28-2016
1.50
Work on Elevator controls

 12-27-2016
0.50
Work on Elevator

 12-20-2016
1.00
Work on elevator

 12-19-2016
1.00
Work on controls
       

 12-18-2016
2.00
Complete 2nd seat. Work on controls
       

 12-14-2016
1.00
Prepare 2nd seat
       

 12-11-2016
1.00
Work on Elevator control torque tube and pivots

 12-08-2016
0.50
Weld up Aileron control tube

 12-07-2016
0.50
Cut out materials for 2nd seat

 12-06-2016
1.00
Continue work on controls

 12-05-2016
1.00
Continue work on controls

 12-04-2016
3.00
Build elevator horn. Start layout of controls and
     

 12-02-2016
2.00
Build and tack together Elevators

 12-01-2016
1.00
Continue work on horizontal stabliser

 11-30-2016
1.00
Tack together horizontal stabliser
       

 11-29-2016
1.00
Bend tubes for horizontal stabliser leading edge.

 11-28-2016
1.00
Weld up last Elevator Hinge section

 11-24-2016
1.00
Mock up right wing to Fueslage
Details
       

 11-17-2016
1.00
Work on Rudder

 11-16-2016
0.50
Mock up rudder hinges

 11-15-2016
1.00
Build Elevator hinges

 11-11-2016
2.50
Add diagonals to cabin top. Add seat support, Weld
     

 11-07-2016
1.00
Work on Fin
     

 11-06-2016
1.00
Build hinges for Rudder. Work on fuel tank, Layout
     

 11-05-2016
1.00
Work on Fin
     

 11-03-2016
0.50
Mock up Fin
     

 11-02-2016
1.00
Landing Gear installed

 11-01-2016
1.00
Fitting Landing gear

 10-31-2016
1.00
Final welding around station 1

 10-30-2016
1.50
Add additional bracing beneath seat and floor
     

 10-25-2016
1.00
Final weld landing gear fittings

 10-24-2016
1.00
Final weld tail wheel support

 10-23-2016
1.00
Work on fuel tank, Prepare tabs

 10-20-2016
0.50
Work on fuel tank

 10-19-2016
0.50
Cur out tabs

 10-18-2016
0.50
Cut out tabs

 10-17-2016
0.50
Work on Fuel tank

 10-16-2016
0.50
Work on fuel tank

 10-14-2016
1.00
Work on Landing gear
       

 10-06-2016
1.00
Finish and install 1st seat
     

 10-04-2016
1.50
Continue 1st seat and build seat hardware
       

 10-03-2016
1.50
Seats

 10-02-2016
1.00
Cut out strips for seats
     

 09-29-2016
0.50
Work on Landing Gear
       

 09-28-2016
0.50
Work on Landing Gear

 09-26-2016
0.50
Work on Landing Gear

 09-24-2016
3.00
Work on Landing Gear
     

 09-23-2016
2.00
Work on Landing Gear
       

 09-21-2016
1.50
Complete installation of left side Landing Gear fi
       

 09-20-2016
1.00
Complete installation of right side landing gear f
       

 09-19-2016
0.50
Work onLanding gear fittings

 09-12-2016
1.00
Work on Landing Gear fittings

 09-06-2016
1.50
Continue fully welding fuselage

 09-05-2016
2.00
Continue fully welding fuselage
       

 09-04-2016
3.00
Begin fully welding fuselage
       

 08-31-2016
0.50
Drill holes for tubeseal

 08-30-2016
0.50
Continue work on fuel tank

 08-29-2016
1.00
Work on fuel tank, prep for final welding

 08-25-2016
1.00
Work on frame to support fuselage for final weldin

 08-24-2016
1.50
Work on seat adjusters

 08-23-2016
0.75
Add last diagonals from station 2 to station 1

 08-22-2016
0.50
Work on fuel tank and leading edge center section

 08-11-2016
0.75
Begin work on seat adjusters
     

 08-10-2016
0.75
Cut out tabs

 08-09-2016
1.00
Add cabin top diagonal. Work on tabs. Work on cent

 08-08-2016
1.50
Add 2nd diagonal from Cabin top to station 1, add

 08-05-2016
1.00
Add tubes from cabin top to station 1 plus 1 diago

 08-03-2016
1.50
Continue work on landing gear to fuselage fittings

 08-01-2016
0.75
Continue work on landing gear to fuselage fittings

 07-31-2016
1.00
Cleaned up 1st four landing gear fuselage fittings

 07-31-2016
1.00
Begin assembling fuel tank. Ran into issues with f

 07-28-2016
1.50
Bend and tack lower longerons to station 1. work o

 07-27-2016
1.50
Add diagonals from upper to lower longerons for st
     

 07-26-2016
0.50
Begin cutting out landing gear fuselage fittings
     

 07-26-2016
1.50
Add diagonals from upper to lower longerons for st
     

 07-25-2016
0.50
Markup ply for fuel tank and center section leadin

 07-20-2016
1.00
Add diagonals from upper to lower longerons for st
     

 07-20-2016
1.50
Add cross braces to station 1. Add diagonals from
     

 07-19-2016
1.00
Build station 1 on bench and fully weld
       

 07-18-2016
1.50
complete diagonals between bottom longerons
     

 07-16-2016
1.00
Add diagonals from upper to lower longerons for st
     

 07-11-2016
1.00
Add diagonals from upper to longer longerons for s
     

 07-10-2016
1.50
Complete diagonals between bottom longerons

 07-09-2016
1.50
Cut all remaining diagonals for tail section

 07-04-2016
2.50
Add diagonals fron station 3 to station 4
       

 07-03-2016
1.50
Tack in station 4
     

 07-02-2016
1.00
Install upper Longerons
     

 07-01-2016
1.00
Bend Longerons and tack in tail post
     

 06-30-2016
1.50
Add door diagonals and corner bracing
     

 06-25-2016
1.00
Install spreaders for seat back and panel
     

 06-24-2016
1.50
Build cabin top (with wing mounts)
       

 06-23-2016
1.50
Add cabin uprights - Stations 2 and 3
       

 06-21-2016
1.50
Tack cabin floor spreaders and diagonal
       

 06-19-2016
1.50
Layout fuselage on bench
       

 06-18-2016
0.25
Put wings in storage and prepare bench for fuselag

 06-14-2016
1.00
Varnish right wing

 06-13-2016
1.00
Varnish Right wing

 06-12-2016
1.00
Varnish Right Wing

 06-11-2016
1.00
Varnish right wing

 06-10-2016
1.00
Varnish right wing

 06-05-2016
1.00
Varnish left wing

 06-04-2016
1.00
Varnish left wing

 06-03-2016
1.00
Varnish left wing

 06-02-2016
1.00
Varnish left wing

 06-01-2016
1.00
Varnish left wing

 05-26-2016
14.50
Work on left wing

 04-12-2016
4.00
Work on left wing aileron

 04-11-2016
0.00
Left wing back in storage
Details

 03-31-2016
2.00
Generally cleaned up and sanded the left wing

 03-25-2016
2.50
Filling the rear of the aileron pocket with flox.
Details
       

 03-24-2016
1.00
Strengthened aileron with flox
Details
     

 03-24-2016
1.50
Building the aileron pocket (left wing)
Details

 03-23-2016
3.00
Building the aileron pocket (left wing)
Details
       

 03-16-2016
1.00
Installing the aileron leading edge ply (left wing

 03-15-2016
1.50
Preparing the aileronleading edge ply (left wing)

 03-14-2016
2.50
Installing Aileron leading edge ribs left wing)
Details
       

 03-13-2016
1.00
Cutting loose the left wing Aileron
Details
       

 03-12-2016
2.00
Installing Aileron bracing (left wing)
Details
       

 03-11-2016
2.00
Aileron spar (left wing)
Details
       

 03-10-2016
2.00
Aileron Hinge block (left wing)
Details
     

 03-08-2016
1.50
Working on Aileron (left wing)
Details
       

 03-07-2016
1.50
Working on Aileron (left wing)
Details
     

 03-06-2016
1.50
Working on Right wing aileron
Details
     

 02-28-2016
24.00
Detail all stuff done to complete 2nd wing

 01-27-2016
3.50
Installing leading edge ply (left)
Details
       

 12-01-2015
0.00
Left wing out of storage

 11-30-2015
0.00
Right wing placed in storage
Details

 11-25-2015
8.00
Complete all bracing and reinforcing of the wing (

 11-17-2015
3.50
Installing leading edge ply
Details
       

 11-05-2015
1.50
Preparing leading edge ply
       

 10-25-2015
6.00
Wing to fuselage and spar fittings (right wing)
Details
       

 10-22-2015
1.50
Prepare leading edge D section
Details
       

 10-07-2015
4.00
Installing the Wing leading edge ribs
Details
       

 09-05-2015
6.00
Build the wing leading edge ribs
Details
       

 08-31-2015
0.00
Right wing out of storage and back on bench

 08-30-2015
0.00
Wing out of storage and back on the bench
Details
       

 08-30-2015
4.00
Complete the wing to fuselage and wing to spar fit

 08-29-2015
4.00
Built the metal wing fittings
Details
     

 08-22-2015
0.00
Re setup in new location
Details
     

 07-31-2015
0.00
Setup in Jackson
Details

 04-01-2015
0.00
Move to MS
Details

 03-01-2015
0.00
Move to MS
Details

 03-01-2015
24.00
Complete the left wing to the same state as the ri

 02-01-2015
0.00
Move to MS
Details

 12-31-2014
0.00
Move to MS
Details

 12-24-2014
0.00
Move to MS
Details

 12-22-2014
9.00
Complete assembly of right wing
Details

 12-14-2014
2.00
Rough cut leading edge ribs

 12-04-2014
1.50
Complete strut and diagonal bracing, complete trai

 12-03-2014
1.50
Complete strut and diagonal bracing, attach traili

 12-02-2014
2.00
Glue in compression struts and diagonals, prepare

 11-26-2014
2.00
Prepare compression and diagonals.
Details

 11-24-2014
2.00
Glue in rear spar, add 1/8 pl;y spacer for fitting

 11-24-2014
5.00
Atach all ribs, continue work on metal fittings

 11-23-2014
6.00
Prepare right wing spars
Details

 11-23-2014
3.00
Build wing stand and store left wing
Details

 11-22-2014
2.00
Complete Strut and diagonal bracing, add gussets t

 11-21-2014
1.50
Continue Strut and Diagonal bracing, attach traili

 11-20-2014
6.00
Rough cut the wing to fuselage and wing to strut f

 11-19-2014
1.50
Glue in compression struts and diagonals, prepare

 11-18-2014
1.50
Glue in compression struts and diagonals (left win

 11-17-2014
1.50
Glue in compression struts (left wing)

 11-08-2014
2.00
Wing mockup with spars and ribs (left wing)
     

 11-08-2014
3.50
Spars drilled for steel fittings
Details

 11-05-2014
6.00
Build Bench for wing assembly

 10-27-2014
25.00
Spars finished
Details
       

 09-17-2014
7.00
Spars continued
Details
     

 09-03-2014
2.00
1st Spar initial layout
     

 09-02-2014
1.00
Ribs are completed
Details
       

 08-06-2014
5.57
19 ribs so far
Details

 07-22-2014
5.06
The Pile of Ribs grows
Details
     

 07-10-2014
5.06
6 Ribs built so far

 06-24-2014
6.50
Finally completed making all the rib gussets

 06-15-2014
2.00
Making rib gussets

 06-14-2014
4.00
Cut all remaining wing rib capstrips
Details

 06-01-2014
1.50
First Rib Layout
Details
     

 05-17-2014
0.50
Building Rib Jig
Details
     

 05-02-2014
0.00
Note
Details

 05-01-2014
0.25
Purchased plans