Date
|
Hours
|
Work Log Summary
|
Details
|
10-29-2016
|
3.50
|
Condition Inspection and Data Plate
|
Details
|
|
|
10-24-2016
|
1.50
|
First Engine Run
|
Details
|
|
|
10-22-2016
|
2.50
|
Removed Items for Inspection
|
Details
|
|
|
10-17-2016
|
1.50
|
Weight and Balance
|
Details
|
|
|
10-16-2016
|
3.00
|
Seat Belts, Carpet
|
Details
|
|
|
10-15-2016
|
3.00
|
Interior Install
|
Details
|
|
|
10-14-2016
|
1.50
|
Elevator Trim, AP Servo Calibration
|
Details
|
|
|
10-13-2016
|
1.00
|
Install Headliners
|
Details
|
|
|
10-09-2016
|
6.00
|
Interior Install, Drain Oil
|
Details
|
|
|
10-01-2016
|
3.00
|
Vinyl Letter Install, Finish Front Interior Panels
|
Details
|
|
|
09-28-2016
|
2.00
|
Covered Headliners
|
Details
|
|
|
09-26-2016
|
3.00
|
Rivet Baggage Panel, Front NACA Vents, Stick Grips
|
Details
|
|
|
09-25-2016
|
2.50
|
Fuel Selector, Seat Supports, OH Console
|
Details
|
|
|
09-24-2016
|
2.00
|
Rigging Check
|
Details
|
|
|
09-19-2016
|
1.00
|
Pro-Seal Foward Vents and Static Ports
|
Details
|
|
|
09-18-2016
|
4.00
|
Wing Attached Pushrods, Pitot Mast, Wiring
|
Details
|
|
|
09-11-2016
|
2.00
|
Install Tail Items, GPS Antenna
|
Details
|
|
|
09-10-2016
|
3.00
|
Rivet Upper Foward Tail Skin
|
Details
|
|
|
09-03-2016
|
1.50
|
Aileron Rigging
|
Details
|
|
|
09-02-2016
|
2.00
|
EAA Tech Visit
|
Details
|
|
|
08-27-2016
|
2.00
|
Aileron Trim, Torque and Tie Prop
|
Details
|
|
|
08-22-2016
|
2.00
|
Wing Attach Bolts, Install Prop and Spinner
|
Details
|
|
|
08-21-2016
|
4.00
|
Wing Attach, Spinner
|
Details
|
|
|
08-20-2016
|
1.50
|
Flap Sensor and Adjustment
|
Details
|
|
|
08-19-2016
|
1.00
|
Tail Adjustments
|
Details
|
|
|
08-14-2016
|
3.00
|
Tail Wiring
|
Details
|
|
|
08-12-2016
|
2.00
|
Tail Rigging
|
Details
|
|
|
08-09-2016
|
2.50
|
Wing Tip Wiring
|
Details
|
|
|
08-08-2016
|
2.00
|
Wing Subpanel Wiring
|
Details
|
|
|
08-07-2016
|
2.00
|
Wing Wiring, Air Line Routing
|
Details
|
|
|
08-06-2016
|
4.00
|
Final Wing Attach
|
Details
|
|
|
07-31-2016
|
4.00
|
Initial Wing Fit
|
Details
|
|
|
07-23-2016
|
3.00
|
Wing Attach Preparation, HS Install
|
Details
|
|
|
07-18-2016
|
2.00
|
Move to Airport
|
Details
|
|
|
07-17-2016
|
2.00
|
Prepared Plane for Airport Move
|
Details
|
|
|
07-08-2016
|
1.50
|
Windscreen Fairing
|
Details
|
|
|
07-04-2016
|
2.00
|
Windscreen Fairing
|
Details
|
|
|
07-03-2016
|
2.00
|
Windscreen Fairing
|
Details
|
|
|
07-03-2016
|
1.50
|
EAA Tech Visit
|
Details
|
|
|
07-02-2016
|
1.00
|
Windscreen Adhesive
|
Details
|
|
|
06-28-2016
|
2.50
|
Epoxy Door Gaps
|
Details
|
|
|
06-27-2016
|
2.00
|
Cut and Fit Headliner Panels
|
Details
|
|
|
06-26-2016
|
2.00
|
Left Windows Adhesive
|
Details
|
|
|
06-25-2016
|
1.50
|
Right Window Adhesive
|
Details
|
|
|
06-24-2016
|
2.00
|
Install Vertical Stabilizer and Tail Wiring
|
Details
|
|
|
06-19-2016
|
2.00
|
Bleed Brakes, Window Preparation
|
Details
|
|
|
06-12-2016
|
1.50
|
Fit Front Interior Panel
|
Details
|
|
|
06-06-2016
|
2.00
|
Gap Fairing, Seats, Stick Grips
|
Details
|
|
|
06-05-2016
|
4.00
|
Wing Attach
|
Details
|
|
|
06-01-2016
|
2.00
|
Baffles, Tunnel SCAT, FAB
|
Details
|
|
|
05-22-2016
|
2.50
|
Various Tasks
|
Details
|
|
|
05-19-2016
|
2.50
|
Various Tasks
|
Details
|
|
|
05-18-2016
|
1.00
|
Sand and Prime Doors
|
Details
|
|
|
05-17-2016
|
2.50
|
Various Tasks
|
Details
|
|
|
05-16-2016
|
6.00
|
Smooth Prime Doors, Cowl Work
|
Details
|
|
|
05-15-2016
|
8.00
|
Empennage Fairings and Wing Tips
|
Details
|
|
|
05-14-2016
|
4.00
|
Rivet Upper Fuse and Emp Attach
|
Details
|
|
|
05-12-2016
|
1.00
|
Door Wiring
|
Details
|
|
|
05-11-2016
|
1.00
|
Foward Fuse Riveting
|
Details
|
|
|
05-10-2016
|
1.50
|
Panel Brackets
|
Details
|
|
|
05-09-2016
|
2.00
|
Empennage Fairings
|
Details
|
|
|
05-02-2016
|
3.00
|
Panel Debugging
|
Details
|
|
|
05-01-2016
|
3.00
|
Panel Install
|
Details
|
|
|
04-30-2016
|
2.00
|
Battery Install
|
Details
|
|
|
04-25-2016
|
2.00
|
Wiring
|
Details
|
|
|
04-24-2016
|
6.00
|
EMS Wiring
|
Details
|
|
|
04-23-2016
|
3.00
|
Rivet Upper Foward Fuse and Pull Wires
|
Details
|
|
|
04-22-2016
|
1.00
|
Overhead Panel Wiring
|
Details
|
|
|
04-20-2016
|
1.50
|
Elevator Servo Wiring
|
Details
|
|
|
04-18-2016
|
3.00
|
Control Sticks
|
Details
|
|
|
04-17-2016
|
1.50
|
Cut Front Overhead Panel
|
Details
|
|
|
04-16-2016
|
2.50
|
Control Stick Wiring
|
Details
|
|
|
04-12-2016
|
1.50
|
Wiring
|
Details
|
|
|
04-11-2016
|
4.00
|
ACM Connectioms
|
Details
|
|
|
04-10-2016
|
5.00
|
Varous Wiring Tasks
|
Details
|
|
|
04-09-2016
|
2.50
|
EMS Install
|
Details
|
|
|
04-04-2016
|
3.25
|
Wiring Tasks, Wing Move
|
Details
|
|
|
04-03-2016
|
4.00
|
Various Wiring Tasks
|
Details
|
|
|
04-02-2016
|
2.00
|
Mount Subpanel Componets
|
Details
|
|
|
04-01-2016
|
0.50
|
Solder ELT Connector
|
Details
|
|
|
03-30-2016
|
0.50
|
Rivet Subpanel, SV-NET Wire
|
Details
|
|
|
03-28-2016
|
3.00
|
FWF Electrical
|
Details
|
|
|
03-27-2016
|
4.00
|
FWF Electrical
|
Details
|
|
|
03-26-2016
|
6.00
|
Wiring and Subpanel Cut
|
Details
|
|
|
03-23-2016
|
1.00
|
Ran Altenator and Flow Wires
|
Details
|
|
|
03-22-2016
|
1.00
|
Air Line Planning
|
Details
|
|
|
03-21-2016
|
3.00
|
Front Baffles, Rudder Fairing, Engine Sensors
|
Details
|
|
|
03-20-2016
|
3.00
|
Engine Probes, AP Mount, Door Gap
|
Details
|
|
|
03-19-2016
|
4.00
|
Landing Lights
|
Details
|
|
|
03-16-2016
|
1.50
|
Wing Tip Ribs
|
Details
|
|
|
03-14-2016
|
3.00
|
Left Wing Tip
|
Details
|
|
|
03-13-2016
|
3.00
|
Right Wing Tip
|
Details
|
|
|
03-12-2016
|
8.00
|
Rivet Bottom Wing Skins
|
Details
|
|
|
03-11-2016
|
0.75
|
Removed Bottom Skin Vinyl
|
Details
|
|
|
03-07-2016
|
3.00
|
Wing Wiring
|
Details
|
|
|
03-06-2016
|
4.00
|
Various Tasks
|
Details
|
|
|
03-05-2016
|
4.00
|
Pitot Control Box and Wiring.
|
Details
|
|
|
03-04-2016
|
2.00
|
Roll Servo
|
Details
|
|
|
03-03-2016
|
1.50
|
Pitot Plumbing
|
Details
|
|
|
03-02-2016
|
2.00
|
Pitot Mast and Dimple Left Wing
|
Details
|
|
|
03-01-2016
|
1.50
|
Fabricated ADAHRS Tray
|
Details
|
|
|
02-29-2016
|
1.50
|
Magneto Harness and Wire
|
Details
|
|
|
02-22-2016
|
2.00
|
Alternator Install
|
Details
|
|
|
02-21-2016
|
3.00
|
Sanded and Filled Epoxy and Wiring
|
Details
|
|
|
02-20-2016
|
3.00
|
Epoxy Cabin Cover
|
Details
|
|
|
02-18-2016
|
1.00
|
Sanded Cowling
|
Details
|
|
|
02-17-2016
|
1.00
|
Added Micro to Cowling
|
Details
|
|
|
02-14-2016
|
3.00
|
Install Cabin Cover
|
Details
|
|
|
02-10-2016
|
2.00
|
Engine Mount Covers
|
Details
|
|
|
02-09-2016
|
1.00
|
Install Over Head NACA Controller
|
Details
|
|
|
02-08-2016
|
2.00
|
Cut and Drill Air Seal Fabric
|
Details
|
|
|
02-07-2016
|
1.50
|
Sanded and Added to Door Hinge Covers
|
Details
|
|
|
02-06-2016
|
2.00
|
Fiberglass Hinges
|
Details
|
|
|
02-05-2016
|
1.50
|
Wing Conduit
|
Details
|
|
|
01-25-2016
|
2.00
|
Oil System
|
Details
|
|
|
01-24-2016
|
3.00
|
Fuel Lines, Enhaust
|
Details
|
|
|
01-23-2016
|
1.50
|
Baffle Seal Patterns
|
Details
|
|
|
01-18-2016
|
3.00
|
Baffling Clips and Tension Rods
|
Details
|
|
|
01-17-2016
|
2.00
|
Painted Cowling
|
Details
|
|
|
01-09-2016
|
3.00
|
Cowl - Baffling Gap
|
Details
|
|
|
12-28-2015
|
4.00
|
Trimming Baffling
|
Details
|
|
|
12-27-2015
|
4.00
|
Baffling Air Ramps
|
Details
|
|
|
12-07-2015
|
2.00
|
Epoxy Air Ramps and Starter Solenoid Wire
|
Details
|
|
|
11-28-2015
|
3.00
|
FAB Alternate Air and Air Seal
|
Details
|
|
|
11-27-2015
|
1.50
|
FAB Transition Lay-Up
|
Details
|
|
|
11-24-2015
|
0.50
|
Oil Door Lay-Up
|
Details
|
|
|
11-23-2015
|
4.00
|
Filtered Air Box
|
Details
|
|
|
11-22-2015
|
2.00
|
Oil Door
|
Details
|
|
|
11-17-2015
|
3.50
|
Baffling
|
Details
|
|
|
11-16-2015
|
2.00
|
Baffling
|
Details
|
|
|
11-15-2015
|
1.50
|
Baffling
|
Details
|
|
|
11-14-2015
|
3.00
|
Bottom of Lower Cowl
|
Details
|
|
|
11-08-2015
|
3.00
|
Side Hinges
|
Details
|
|
|
11-02-2015
|
2.00
|
Cowling
|
Details
|
|
|
10-31-2015
|
5.00
|
Fit Bottom Cowl and Cowl Split Line
|
Details
|
|
|
10-26-2015
|
3.00
|
Bottom Cowl Slot, Inlet Ramps
|
Details
|
|
|
10-25-2015
|
3.00
|
Mount Propeller, Tope Cowling
|
Details
|
|
|
10-24-2015
|
2.00
|
Cowling Halves
|
Details
|
|
|
10-22-2015
|
2.00
|
Match Drill Spinner
|
Details
|
|
|
10-20-2015
|
2.00
|
Mount Engine
|
Details
|
|
|
10-19-2015
|
1.50
|
Engine Arrival
|
Details
|
|
|
10-18-2015
|
2.00
|
Firewall Bulkhead Components
|
Details
|
|
|
10-17-2015
|
2.00
|
Rear NACA Vents
|
Details
|
|
|
10-12-2015
|
1.50
|
Finish Nose Gear Fairing
|
Details
|
|
|
10-11-2015
|
3.00
|
Re-Do Nose Faring
|
Details
|
|
|
10-10-2015
|
1.50
|
Cut Spinner
|
Details
|
|
|
10-07-2015
|
1.00
|
Riveted Spinner Backplate
|
Details
|
|
|
10-05-2015
|
2.00
|
Spinner Backplate
|
Details
|
|
|
10-04-2015
|
1.00
|
Riveted Nose Gear Nutplates
|
Details
|
|
|
10-03-2015
|
3.00
|
Nose Gear Leg Fairing
|
Details
|
|
|
10-03-2015
|
1.50
|
Fit Spinner
|
Details
|
|
|
10-02-2015
|
1.00
|
Final Coat Cabin Top
|
Details
|
|
|
09-30-2015
|
1.00
|
Painted Cabin Top
|
Details
|
|
|
09-28-2015
|
3.00
|
Fit Nose Gear Fairing
|
Details
|
|
|
09-27-2015
|
3.00
|
Lower Intersection Fairings
|
Details
|
|
|
09-26-2015
|
3.50
|
Gear Fairings
|
Details
|
|
|
09-25-2015
|
3.00
|
Epoxy Pads Right Faring, Fit Nose Fairing
|
Details
|
|
|
09-22-2015
|
3.00
|
Fit Right Main Gear Fairing
|
Details
|
|
|
09-21-2015
|
3.00
|
Fit and Adjust Left Main Gear Fairing
|
Details
|
|
|
09-20-2015
|
3.00
|
Main Fairings
|
Details
|
|
|
09-14-2015
|
1.00
|
Sand and Fill Cabin Top
|
Details
|
|
|
09-13-2015
|
1.00
|
Sand and Fill Cabin Top Again
|
Details
|
|
|
09-06-2015
|
1.50
|
Install Brakes
|
Details
|
|
|
09-05-2015
|
3.00
|
Install Nose Gear
|
Details
|
|
|
09-03-2015
|
2.00
|
Mount Main Gear
|
Details
|
|
|
09-02-2015
|
1.50
|
Assemble Main Wheels and Tires
|
Details
|
|
|
08-31-2015
|
3.50
|
Prime Cabin Top and Rear Vent Adapters
|
Details
|
|
|
08-30-2015
|
4.00
|
Overhead Console Install, Rivet Oil Cooler
|
Details
|
|
|
08-29-2015
|
4.00
|
Mount Gear Legs
|
Details
|
|
|
08-26-2015
|
1.00
|
Install Fuel Filter, Pump, and Transducer
|
Details
|
|
|
08-23-2015
|
1.50
|
Sanded Micro and Paint Hinges
|
Details
|
|
|
08-22-2015
|
1.75
|
Sand and Filler on Doors
|
Details
|
|
|
08-18-2015
|
1.00
|
Sand Filler and Add Filler to Right Cabin Top
|
Details
|
|
|
08-17-2015
|
1.00
|
FIller to Left Cabin Top
|
Details
|
|
|
08-15-2015
|
1.00
|
Reflective Heat Shield
|
Details
|
|
|
08-14-2015
|
2.50
|
Rivet Cowl Hinges. Match Drill Engine Mount
|
Details
|
|
|
08-09-2015
|
2.00
|
Oil Cooler Mount, Heater Boxes
|
Details
|
|
|
08-08-2015
|
3.00
|
Cowl Attatch Hinges
|
Details
|
|
|
08-05-2015
|
2.00
|
Overhead Console Access Panels
|
Details
|
|
|
08-04-2015
|
1.50
|
Fit Overhead Console
|
Details
|
|
|
08-03-2015
|
1.00
|
Build Door Seal Edges
|
Details
|
|
|
08-02-2015
|
2.50
|
Door Windows and Door Gap Fill
|
Details
|
|
|
08-01-2015
|
6.00
|
Left Door Latch Assembly, Fit, and Strut
|
Details
|
|
|
07-29-2015
|
1.00
|
Right Gas Strut Doubler
|
Details
|
|
|
07-28-2015
|
2.00
|
Cabin Pins Block
|
Details
|
|
|
07-27-2015
|
4.00
|
Righr Door Latch Assembly
|
Details
|
|
|
07-26-2015
|
3.00
|
Door Latch
|
Details
|
|
|
07-25-2015
|
2.00
|
Right Door Seal Gap
|
Details
|
|
|
07-25-2015
|
1.00
|
Added to Top of Left Door
|
Details
|
|
|
07-24-2015
|
0.75
|
Nosewheel Assembly
|
Details
|
|
|
07-23-2015
|
2.00
|
Left Door Seal
|
Details
|
|
|
07-22-2015
|
1.00
|
Drilled Left Door Hinge
|
Details
|
|
|
07-21-2015
|
1.00
|
Pilot Door Re-Do
|
Details
|
|
|
07-20-2015
|
6.00
|
Trim Doors and Door Hinges
|
Details
|
|
|
07-19-2015
|
6.00
|
Inital Trim of Doors
|
Details
|
|
|
07-18-2015
|
2.50
|
Glue Door Halves
|
Details
|
|
|
07-12-2015
|
2.50
|
Drill Door Shell and Gas Strut Doubler
|
Details
|
|
|
07-11-2015
|
2.50
|
Prepare Door Shells
|
Details
|
|
|
07-06-2015
|
2.00
|
Finishing Kit Arrival and Inventory
|
Details
|
|
|
06-28-2015
|
2.00
|
Fuel Lines
|
Details
|
|
|
06-27-2015
|
3.00
|
Alieron Trim Install
|
Details
|
|
|
06-20-2015
|
2.00
|
Cabin Top Filler
|
Details
|
|
|
06-15-2015
|
3.00
|
Cabin Top
|
Details
|
|
|
06-14-2015
|
3.50
|
Windscreen and Rear Windows
|
Details
|
|
|
06-13-2015
|
4.00
|
Drilling Cabin Cover
|
Details
|
|
|
06-07-2015
|
1.50
|
Fit Cabin Cover and Tail Skin
|
Details
|
|
|
06-06-2015
|
1.50
|
Striker Plate and Rudder Cable Guides
|
Details
|
|
|
06-05-2015
|
2.00
|
Re-fit Cabin Top
|
Details
|
|
|
06-04-2015
|
2.00
|
Add Glass to Cabin Top
|
Details
|
|
|
05-19-2015
|
2.00
|
Elevator Control Rods
|
Details
|
|
|
05-18-2015
|
2.50
|
Rudder Cables
|
Details
|
|
|
05-17-2015
|
3.00
|
Cabin Cover Fit and Fail
|
Details
|
|
|
05-16-2015
|
1.50
|
Rudder Pedal Install
|
Details
|
|
|
05-12-2015
|
1.00
|
Brake Reservoir and Rudder Cables
|
Details
|
|
|
05-11-2015
|
1.00
|
Small Fuselage Tasks
|
Details
|
|
|
05-10-2015
|
2.00
|
Continue Fitting Cabin Cover
|
Details
|
|
|
05-09-2015
|
2.00
|
Sanding and Cutting Cabin Cover
|
Details
|
|
|
05-02-2015
|
3.00
|
Intial Cabin Cover Fit
|
Details
|
|
|
04-25-2015
|
2.50
|
Baggage Door Install
|
Details
|
|
|
04-19-2015
|
3.00
|
Rivet Baggage Door
|
Details
|
|
|
04-18-2015
|
2.50
|
Install Control Sticks/Base
|
Details
|
|
|
04-13-2015
|
2.00
|
Control Sticks and Bases
|
Details
|
|
|
04-12-2015
|
1.50
|
Elevator Idler Arm
|
Details
|
|
|
04-11-2015
|
4.00
|
Rear Seat Backs
|
Details
|
|
|
04-06-2015
|
1.50
|
Cut and Match Drill Rudder Bearing Blocks
|
Details
|
|
|
04-05-2015
|
2.00
|
Flap System Install
|
Details
|
|
|
04-05-2015
|
2.50
|
Flap System
|
Details
|
|
|
04-04-2015
|
3.00
|
Brake Pedals and Brake Cylinder
|
Details
|
|
|
03-30-2015
|
2.00
|
Fuel Valve Install
|
Details
|
|
|
03-29-2015
|
1.00
|
Final Drill and Paint Access Covers
|
Details
|
|
|
03-28-2015
|
3.00
|
Control Rod Fabrication
|
Details
|
|
|
03-25-2015
|
1.00
|
Interior Paint
|
Details
|
|
|
03-22-2015
|
4.50
|
Brake Lines
|
Details
|
|
|
03-21-2015
|
1.50
|
Parking Brake
|
Details
|
|
|
03-18-2015
|
1.50
|
Tunnel Covers
|
Details
|
|
|
03-14-2015
|
2.50
|
Baggage Door
|
Details
|
|
|
03-13-2015
|
2.00
|
Shoulder Harness Wear Blocks
|
Details
|
|
|
03-08-2015
|
2.50
|
Baggage Cover and Corrugations
|
Details
|
|
|
03-07-2015
|
4.00
|
Rivet Baggage Floors
|
Details
|
|
|
03-06-2015
|
1.50
|
Rivet Fowards Cabin Floors
|
Details
|
|
|
03-04-2015
|
2.00
|
Rivets Floor Plans
|
Details
|
|
|
03-01-2015
|
2.00
|
Conduit in Baggage Area
|
Details
|
|
|
02-28-2015
|
4.00
|
Baggage Floor and Antenna Access Panels
|
Details
|
|
|
02-22-2015
|
2.50
|
Comm Antenna Doublers
|
Details
|
|
|
02-21-2015
|
2.50
|
Baggage Door Channel Seals and Panel
|
Details
|
|
|
02-20-2015
|
2.00
|
Baggage Area
|
Details
|
|
|
02-15-2015
|
3.00
|
Rivet Tailcone to Fuselage
|
Details
|
|
|
02-14-2015
|
1.50
|
Rivet Tailcone Attach
|
Details
|
|
|
02-08-2015
|
3.00
|
Cleco, Match Drill, CS, and Debur and Dimple Tailc
|
Details
|
|
|
02-07-2015
|
1.00
|
Drill and Dimple F-1006 Bulkhead
|
Details
|
|
|
02-06-2015
|
1.00
|
Install Steps
|
Details
|
|
|
02-02-2015
|
4.00
|
Torque Tube, Bellcrank Pushrod, Aileron Install
|
Details
|
|
|
02-01-2015
|
2.00
|
Trim Mount
|
Details
|
|
|
01-31-2015
|
2.00
|
Trim Cable and Trim Bellcrank Brackets
|
Details
|
|
|
01-30-2015
|
1.50
|
Elevator Pushrod
|
Details
|
|
|
01-24-2015
|
3.00
|
Aileron Torque Tube Fabrication
|
Details
|
|
|
01-19-2015
|
1.50
|
Aileron Acutation - Bellcrank Install
|
Details
|
|
|
01-18-2015
|
2.50
|
Aileron Acutation - Aileron Pushrods
|
Details
|
|
|
01-17-2015
|
2.00
|
Aileron Acutation - Bellcrank Pushrods
|
Details
|
|
|
01-11-2015
|
4.50
|
Bottom Wing Skins - Right
|
Details
|
|
|
01-10-2015
|
3.50
|
Bottom Wing Skins - Left
|
Details
|
|
|
01-03-2015
|
2.00
|
Mount Fuel Tanks, Repair Tank Leak
|
Details
|
|
|
12-27-2014
|
1.00
|
Stall Warning Wires
|
Details
|
|
|
12-26-2014
|
1.50
|
Test Fuel Tanks
|
Details
|
|
|
12-21-2014
|
4.00
|
Removing QB Panels
|
Details
|
|
|
12-20-2014
|
4.00
|
Rivet Rudder TE, Roll Leading Edge, CB Weight
|
Details
|
|
|
12-14-2014
|
3.00
|
Tank Sealant on Trailing Edge
|
Details
|
|
|
12-13-2014
|
1.00
|
Stall Warning System
|
Details
|
|
|
12-07-2014
|
3.00
|
Stall Warning System
|
Details
|
|
|
12-06-2014
|
4.00
|
Rivet Vertical Stabilizer
|
Details
|
|
|
11-30-2014
|
4.00
|
Rivet Gap Fairings, Top Skin Inboard Nutplates
|
Details
|
|
|
11-29-2014
|
3.00
|
Gap Fairing
|
Details
|
|
|
11-28-2014
|
2.00
|
Rivet Rudder Assembly
|
Details
|
|
|
11-27-2014
|
1.00
|
Prime Rudder Parts
|
Details
|
|
|
11-26-2014
|
2.00
|
Dimple and Countersink Rudder Parts
|
Details
|
|
|
11-25-2014
|
2.00
|
Debur Parts
|
Details
|
|
|
11-23-2014
|
4.00
|
Rudder Assembly
|
Details
|
|
|
11-21-2014
|
2.00
|
Prime VS Parts
|
Details
|
|
|
11-20-2014
|
3.00
|
Debur, Dimple and Countersink
|
Details
|
|
|
11-17-2014
|
4.00
|
Vertical Stabilizer
|
Details
|
|
|
11-16-2014
|
2.00
|
Fuel Senders
|
Details
|
|
|
11-14-2014
|
2.00
|
QB Wing and Fuselage Inventory
|
Details
|
|
|
11-12-2014
|
2.00
|
Quick Build Kit Arrival
|
Details
|
|
|
11-09-2014
|
3.00
|
Fabrication of Wing and Fuselage Carts
|
Details
|
|
|
11-01-2014
|
1.50
|
EAA Tech Visit
|
Details
|
|
|
10-19-2014
|
2.50
|
Rivet Top Skin & Attatch Bellcrank Mount
|
Details
|
|
|
10-18-2014
|
2.00
|
Rivet and Install Harware on Aft Deck
|
Details
|
|
|
10-15-2014
|
2.00
|
Rivet Side and Bottom Skins
|
Details
|
|
|
10-12-2014
|
3.00
|
Rivet Side and Bottom Skins
|
Details
|
|
|
10-11-2014
|
3.00
|
Rivet Bellcrank and Bulkheads
|
Details
|
|
|
10-10-2014
|
1.50
|
Prime Tailcone Parts
|
Details
|
|
|
10-06-2014
|
1.50
|
Bellcrank Assembly
|
Details
|
|
|
10-05-2014
|
3.00
|
Dimpling and Countersinking Tailcone Parts
|
Details
|
|
|
10-04-2014
|
4.00
|
Debur Tailcone Parts
|
Details
|
|
|
10-01-2014
|
2.00
|
Shoulder Harness, Cover Plates, Disassemble
|
Details
|
|
|
09-29-2014
|
2.00
|
Fabricate F-1011D, F-1012D, and Drill Aft Deck
|
Details
|
|
|
09-28-2014
|
4.00
|
Match Drill Assemble Skin and Top Skins
|
Details
|
|
|
09-27-2014
|
3.00
|
Aft Deck
|
Details
|
|
|
09-26-2014
|
1.50
|
Bellcrank Rib Angles
|
Details
|
|
|
09-25-2014
|
1.00
|
Match Drill Longerons and Bulkhead Channel
|
Details
|
|
|
09-22-2014
|
2.00
|
Rudder Stiffners and Rudder Stop Brace
|
Details
|
|
|
09-21-2014
|
2.00
|
Assemble and Match Drill Left and Aft Bottom Skin
|
Details
|
|
|
09-20-2014
|
4.00
|
Assemble and Match Drill Bottom and Right Skin
|
Details
|
|
|
09-18-2014
|
1.50
|
Fabricate F-1032 Longerons
|
Details
|
|
|
09-15-2014
|
2.00
|
Cut and Mark Fuselage Stiffners
|
Details
|
|
|
09-14-2014
|
2.00
|
Assemble and Match Drill F-1008, F-1007, F-1006
|
Details
|
|
|
09-13-2014
|
2.00
|
Fabricate and Assemble F-1010 Bulkhead
|
Details
|
|
|
09-08-2014
|
2.00
|
Assemble and Match Drill F-1011 Bulkhead
|
Details
|
|
|
09-07-2014
|
3.50
|
Fabricate Tie Down, Rudder Cable Anchor and Stiffn
|
Details
|
|
|
09-06-2014
|
4.00
|
Attach Trim Tab to Elevator with Hinge
|
Details
|
|
|
09-01-2014
|
2.00
|
Trim and Attach Counter Weights
|
Details
|
|
|
08-31-2014
|
2.50
|
Roll Leading Edge
|
Details
|
|
|
08-30-2014
|
2.00
|
Rivet Trailing Edge
|
Details
|
|
|
08-25-2014
|
2.00
|
Tank Sealant on TE and Trim Tabs
|
Details
|
|
|
08-24-2014
|
2.50
|
Debur, Dimple, and Rivets Trim Tabs to Bottom Flan
|
Details
|
|
|
08-23-2014
|
3.00
|
Trim Tab Assembly
|
Details
|
|
|
08-22-2014
|
1.50
|
Cut Out TE and Trim Tab Foam Ribs
|
Details
|
|
|
08-18-2014
|
2.00
|
Rivets Skins to Root Rib and Rib Tips
|
Details
|
|
|
08-17-2014
|
1.50
|
Rivet Skins to Front Spars, Rivet Trim Bracket
|
Details
|
|
|
08-16-2014
|
2.50
|
Rivets Skins to Rear Spars and Ribs Halves
|
Details
|
|
|
08-11-2014
|
2.00
|
Back Rivet Rib Halves to Skins
|
Details
|
|
|
08-10-2014
|
1.00
|
Rivet Nutplates to Reinforcemnt Plates
|
Details
|
|
|
08-09-2014
|
2.00
|
Rivet Rib Tips, RP/NP to Spar, Root Ribs and Horns
|
Details
|
|
|
08-03-2014
|
1.50
|
Prime Elevator Parts
|
Details
|
|
|
08-02-2014
|
5.00
|
Debur, Dimple, and Countersink Parts
|
Details
|
|
|
07-28-2014
|
2.00
|
Match Drill Close-Out Tabs, Elevators Horns, Trim
|
Details
|
|
|
07-27-2014
|
3.00
|
Trim Access Plates, Gussets, Rip Tip, and Trailing
|
Details
|
|
|
07-26-2014
|
2.00
|
Cleco and Match Drill Elevators
|
Details
|
|
|
07-20-2014
|
2.00
|
Rib Tip Assembly, Shear Clips, Bend Close-Out Tabs
|
Details
|
|
|
07-19-2014
|
2.00
|
Separate, Debur, Cleco, and Match Drill Ribs
|
Details
|
|
|
07-12-2014
|
4.00
|
Rivets Skins to Ribs, Spars, and Stringers
|
Details
|
|
|
07-07-2014
|
1.00
|
Rivet Nose Ribs
|
Details
|
|
|
07-06-2014
|
1.00
|
Rivet Inspar Ribs
|
Details
|
|
|
07-05-2014
|
1.00
|
Rivets Stringers and Stringer Web
|
Details
|
|
|
06-29-2014
|
2.00
|
Prime HS Parts
|
Details
|
|
|
06-28-2014
|
2.00
|
Debur, Dimple, and Countersink HS Parts
|
Details
|
|
|
06-22-2014
|
3.00
|
Cleco and Drill Stingers, Web, Skin and Rear Spar
|
Details
|
|
|
06-21-2014
|
3.00
|
Cleco and Drill Nose and Inspar Ribs to Front Spar
|
Details
|
|
|
06-15-2014
|
1.00
|
Fabricate HS Cradles
|
Details
|
|
|
06-14-2014
|
2.00
|
Trim, Debur, and Bend Inspar and Nose Ribs
|
|
|
|
06-07-2014
|
5.00
|
Front Spar Assembly
|
Details
|
|
|
06-01-2014
|
1.50
|
Cut and Debur Spar Caps and Stringers
|
Details
|
|
|
05-31-2014
|
1.50
|
Fabricate Front Spar Attachment Brackets
|
Details
|
|
|
05-26-2014
|
1.00
|
Hinge Bracket Assembly
|
Details
|
|
|
05-25-2014
|
4.00
|
Rear Spar Assembly
|
Details
|
|
|
05-22-2014
|
1.00
|
EAA Technical Visit
|
Details
|
|
|
05-19-2014
|
2.00
|
CB Weight and Final Skin Rviets
|
Details
|
|
|
05-18-2014
|
1.50
|
Roll Leading Edge
|
Details
|
|
|
05-17-2014
|
1.50
|
Rivet Trailing Edge
|
Details
|
|
|
05-16-2014
|
2.00
|
Rivet Main Spar, Top Rib, and CB Rib
|
Details
|
|
|
05-12-2014
|
1.50
|
Sealant and Cleco TE, Rivets Stiffners and Ribs
|
Details
|
|
|
05-11-2014
|
2.00
|
Rivet Top & Bottom Halves and Shear Clips
|
Details
|
|
|
05-10-2014
|
2.00
|
Back Rivet Stiffners to Skins
|
Details
|
|
|
05-09-2014
|
1.50
|
Rivet Rudder Horn, Bottom Rib, NP to Spar
|
Details
|
|
|
05-05-2014
|
3.50
|
Deburr/Dimple Flanges, Dimple Skins, CS TE, Prime
|
Details
|
|
|
05-04-2014
|
1.00
|
Remove Skins, Deburr and Bend TE
|
Details
|
|
|
05-03-2014
|
2.00
|
Cleco and Final Drill Rudder Skins and TE
|
Details
|
|
|
05-02-2014
|
1.00
|
Cleco and Drill Top Rib and CB Rib
|
Details
|
|
|
05-01-2014
|
2.00
|
Assemble Rudder Spar and Skeleton
|
Details
|
|
|
04-30-2014
|
1.50
|
CS Rudder Horn and Attach to Bottom Rib and Spar
|
Details
|
|
|
04-29-2014
|
0.50
|
Cleco and Drill Bottom Rib Halves
|
Details
|
|
|
04-28-2014
|
2.00
|
Cut and Deburr R1003, R1004, R1010, R1015
|
Details
|
|
|
04-27-2014
|
3.50
|
Rivet VS Skin
|
Details
|
|
|
04-26-2014
|
2.00
|
Rivet Rudder Stops, Rear Spar, and VS Skeleton
|
Details
|
|
|
04-25-2014
|
1.00
|
Prime VS Parts
|
Details
|
|
|
04-24-2014
|
1.00
|
Front Spar Doubler and Rubber Stops
|
Details
|
|
|
04-23-2014
|
2.00
|
Deburr and Dimple Ribs Flanges
|
Details
|
|
|
04-22-2014
|
2.50
|
Final Drill, Deburr, and Dimple Skin
|
Details
|
|
|
04-21-2014
|
1.00
|
Cleco VS Skin
|
Details
|
|
|
04-20-2014
|
1.00
|
Assemble VS Skeleton and Final Drill
|
Details
|
|
|
04-19-2014
|
2.50
|
Cut, Assemble, Cleco, and Drill Rear Spar Assembly
|
Details
|
|