Date
|
Hours
|
Work Log Summary
|
Details
|
07-25-2018
|
3.50
|
Mount the crank in the casing
|
|
|
|
07-18-2018
|
3.50
|
assemble the crank
|
|
|
|
07-11-2018
|
3.00
|
Prepare for Canapy install
|
|
|
|
07-04-2018
|
0.00
|
No work night - Independence Day
|
|
|
|
06-27-2018
|
3.00
|
Prep for cockpit canopy
|
|
|
|
06-20-2018
|
3.50
|
Installed radio button on sticks, trim tab hinge,
|
|
|
|
06-13-2018
|
3.00
|
Prep for adding a trim tab & began reviewing work.
|
|
|
|
06-06-2018
|
3.00
|
Wrapping up the rudder
|
|
|
|
05-30-2018
|
1.00
|
Discuss status and hangar flying.
|
|
|
|
05-23-2018
|
3.00
|
Working on wrapping up rudder
|
|
|
|
05-16-2018
|
3.00
|
Engine analysis of parts
|
|
|
|
05-09-2018
|
3.00
|
Engine teardown continues
|
|
|
|
05-02-2018
|
3.00
|
Continued on rudder, and a reinforcement piece for
|
|
|
|
04-25-2018
|
3.00
|
Still working on the rudder
|
|
|
|
04-18-2018
|
3.00
|
Woked on rudder, and trottle/trim mounting.
|
|
|
|
04-11-2018
|
3.00
|
Rudder control work.
|
|
|
|
04-04-2018
|
4.00
|
Cockpit controls and tailwheel
|
|
|
|
03-28-2018
|
3.00
|
Fuel filter and piping
|
|
|
|
03-14-2018
|
3.00
|
Inventory of parts for motor
|
|
|
|
02-21-2018
|
4.00
|
fitted the tail section and worked on fuel system
|
|
|
|
02-14-2018
|
4.00
|
Working to fit the stabilizers to the fuselage.
|
|
|
|
02-07-2018
|
3.50
|
Added the stabilizer tips
|
|
|
|
01-31-2018
|
3.50
|
Continued cleaning and teardown of engine.
|
|
|
|
01-24-2018
|
3.00
|
Fuel tank was removed, and fuel filter and battery
|
|
|
|
01-10-2018
|
3.00
|
Removed the fuel tank and finished up odd jobs.
|
|
|
|
01-03-2018
|
3.00
|
Disassemble the motor
|
|
|
|
12-20-2017
|
3.00
|
Dual control stick fitting and firewall top.
|
|
|
|
12-13-2017
|
3.00
|
Seatbelts and securing the fuel tank
|
|
|
|
12-06-2017
|
3.00
|
Seat belt anchors, and started to fit the fuel tan
|
|
|
|
11-29-2017
|
4.00
|
Holes drilled and work on wing box
|
|
|
|
11-15-2017
|
3.00
|
Drilled the holes for wing attachment. Phew!
|
|
|
|
11-08-2017
|
3.00
|
Continued messing with levels and lasers.
|
|
|
|
11-01-2017
|
3.00
|
More analyzing the placement of the wings
|
|
|
|
10-25-2017
|
3.00
|
Just studying how we position the wings before dri
|
|
|
|
10-18-2017
|
3.50
|
assembling the wings to the fuselage
|
|
|
|
10-11-2017
|
3.00
|
wing work and clearing the space for assembly
|
|
|
|
10-04-2017
|
3.00
|
Work on wing
|
|
|
|
09-27-2017
|
3.50
|
Continued to finish the wing.
|
|
|
|
09-20-2017
|
3.00
|
No power! Going over control connections
|
|
|
|
09-13-2017
|
3.00
|
work continues
|
|
|
|
09-06-2017
|
3.50
|
Building wing stand & wing tip work
|
|
|
|
08-30-2017
|
3.00
|
Continued riveting and pitot tube fitting
|
|
|
|
08-23-2017
|
4.00
|
debur
|
|
|
|
08-16-2017
|
3.00
|
Counter sunk rivets
|
|
|
|
08-09-2017
|
4.00
|
Getting ready to rivet the skin on right wing
|
|
|
|
08-02-2017
|
3.00
|
start to fit the skin on right wing
|
|
|
|
07-26-2017
|
4.00
|
continued work on right wing
|
|
|
|
07-19-2017
|
3.00
|
addling a landing light to right wing
|
|
|
|
07-12-2017
|
3.00
|
prepping the skin for right wing
|
|
|
|
07-05-2017
|
3.00
|
|
|
|
|
06-28-2017
|
3.00
|
right wing
|
|
|
|
06-21-2017
|
3.00
|
right wing work
|
|
|
|
06-14-2017
|
3.00
|
right wing and control surfaces
|
|
|
|
06-07-2017
|
3.00
|
right wing work continues
|
|
|
|
05-31-2017
|
3.00
|
continue to work on right wing
|
|
|
|
05-24-2017
|
3.00
|
Started skin on right wing, continued on flap and
|
|
|
|
05-17-2017
|
3.00
|
Aileron and flap work - righ wing
|
|
|
|
05-10-2017
|
3.00
|
Right wing
|
|
|
|
05-03-2017
|
3.00
|
Right wing - flap worlk
|
|
|
|
04-26-2017
|
3.00
|
Continued on right wing landing light
|
|
|
|
04-19-2017
|
3.00
|
Continued on right wing
|
|
|
|
04-12-2017
|
3.00
|
Worked on the right wing
|
|
|
|
04-05-2017
|
3.00
|
Left wing complete - at ceiling
|
|
|
|
03-29-2017
|
3.00
|
Continued to work on the right aileron
|
|
|
|
03-22-2017
|
3.00
|
moved left wing to ceiling and began on right one.
|
|
|
|
03-15-2017
|
3.00
|
ready left wing for storage
|
|
|
|
03-08-2017
|
4.00
|
finished riveting left wing skin
|
|
|
|
03-01-2017
|
3.50
|
finish landing light wiring and mount
|
|
|
|
02-22-2017
|
3.00
|
left wing
|
|
|
|
02-15-2017
|
3.00
|
Left wing
|
|
|
|
02-08-2017
|
3.00
|
Continued on left wing
|
|
|
|
02-01-2017
|
3.00
|
Continue to rivet the left wing, and landing light
|
|
|
|
01-25-2017
|
3.50
|
Build the mount for the landing light, and some ai
|
|
|
|
01-18-2017
|
3.00
|
Started to rivet the skin on left wing.
|
|
|
|
01-11-2017
|
3.00
|
Fitting a landing light and continue on aileron
|
|
|
|
01-04-2017
|
4.00
|
Attached wing tip and prepared for rivets.
|
|
|
|
12-28-2016
|
1.00
|
Mostly clean up
|
|
|
|
12-21-2016
|
3.50
|
Worked on fitting end and connecting spars
|
|
|
|
12-14-2016
|
4.00
|
Work on final fitting of skins on left wing
|
|
|
|
12-07-2016
|
4.00
|
Continued work on assembly and deburring the wing
|
|
|
|
11-30-2016
|
3.50
|
Continued to work on left wing
|
|
|
|
11-23-2016
|
4.00
|
Began deburring the left wing skin
|
|
|
|
11-16-2016
|
4.00
|
Continued to skin the left wing
|
|
|
|
11-09-2016
|
4.00
|
Continued fitting the left wing skin
|
|
|
|
11-02-2016
|
4.00
|
Continued to cleco the left wing skin
|
|
|
|
10-26-2016
|
4.00
|
Continued fitting the left wing skin
|
|
|
|
10-19-2016
|
4.00
|
Continued to fit the skin on left wing
|
|
|
|
10-12-2016
|
4.50
|
Started to cleco the skin on the left wing
|
|
|
|
10-05-2016
|
4.00
|
Attaching the ribs to the left spar
|
|
|
|
09-28-2016
|
4.00
|
Fitting the ribs to the left spar.
|
|
|
|
09-21-2016
|
4.50
|
Started the left wing assembly!
|
|
|
|
09-14-2016
|
4.00
|
|
|
|
|
09-07-2016
|
4.00
|
Getting ribs ready.
|
|
|
|
08-31-2016
|
3.00
|
More wing spar spacers, etc.
|
|
|
|
08-24-2016
|
3.00
|
Working on the wing spars.
|
|
|
|
08-17-2016
|
3.00
|
Wing spar work; and spacers. And dreaming.
|
|
|
|
08-10-2016
|
3.50
|
Continued assembly of the spars, and bucking rivet
|
|
|
|
08-03-2016
|
4.00
|
Assembly of the spars continues. Solid rivets!
|
|
|
|
07-27-2016
|
3.00
|
|
|
|
|
07-20-2016
|
3.00
|
Applying solid rivets to a spar.
|
|
|
|
07-13-2016
|
3.00
|
|
|
|
|
07-06-2016
|
3.00
|
|
|
|
|
06-29-2016
|
3.00
|
|
|
|
|
06-22-2016
|
3.00
|
|
|
|
|
06-15-2016
|
3.00
|
|
|
|
|
06-08-2016
|
3.00
|
|
|
|
|
06-01-2016
|
3.00
|
|
|
|
|
05-25-2016
|
3.00
|
|
|
|
|
05-18-2016
|
3.50
|
Began to assemble the spar
|
|
|
|
05-11-2016
|
3.00
|
Completed some of the other spar pieces
|
|
|
|
05-04-2016
|
3.00
|
Starting to layout and drill the spar
|
|
|
|
04-27-2016
|
1.00
|
Layed out details for drilling the newly made part
|
Details
|
|
|
04-20-2016
|
4.50
|
Making the wing parts not in the kit.
|
|
|
|
04-13-2016
|
3.00
|
Looked for wing parts and began making others.
|
|
|
|
04-06-2016
|
2.50
|
Mounted the trim and fuel mixture control
|
|
|
|
03-30-2016
|
3.00
|
test fitted the fuel mixture control and trim
|
|
|
|
03-23-2016
|
4.00
|
Began assembly of wing spars
|
|
|
|
03-16-2016
|
3.00
|
Located wing parts and layout, drain oil from moto
|
|
|
|
03-09-2016
|
3.00
|
Brakes and tailwheel
|
Details
|
|
|
03-02-2016
|
4.50
|
Worked at fitting the tail wheel and fuel tank.
|
|
|
|
02-28-2016
|
2.00
|
The engine has arrived! And prop.
|
|
|
|
02-24-2016
|
3.00
|
Brake cable router
|
Details
|
|
|
02-17-2016
|
2.50
|
Installed landing gear, and brakes
|
Details
|
|
|
02-10-2016
|
4.00
|
Attached upper firewall, and work on landing gear
|
Details
|
|
|
02-03-2016
|
3.00
|
Setup pedals and continued on gear
|
|
|
|
01-27-2016
|
3.50
|
Flap control and coffee.
|
|
|
|
01-20-2016
|
2.50
|
continued on mount and start on landing gear
|
|
|
|
01-13-2016
|
3.00
|
Cockpit controls and engine mount
|
|
|
|
01-06-2016
|
3.50
|
Cockpit controls and engine mount
|
|
|
|
12-16-2015
|
3.00
|
Continued on cockpit and firewall forward
|
|
|
|
12-09-2015
|
3.00
|
Started on firewall forward
|
|
|
|
12-02-2015
|
3.00
|
continued on cockpit controls
|
|
|
|
11-18-2015
|
4.50
|
Cockpit seats and antiglare shield work
|
|
|
|
11-11-2015
|
4.00
|
Worked on firewall details
|
|
|
|
11-04-2015
|
4.00
|
Continued work on the cockpit
|
|
|
|
10-28-2015
|
1.00
|
Mostly studied plans.
|
|
|
|
10-21-2015
|
3.50
|
Cockpit dasboard and antiglare shield
|
|
|
|
10-14-2015
|
4.50
|
Cockpit windshield anti-glare cover
|
|
|
|
10-07-2015
|
4.50
|
Started on cockpit controls and dash
|
|
|
|
09-30-2015
|
3.50
|
Continued small assemblies in cockpit
|
|
|
|
09-23-2015
|
4.50
|
Cockpit floor assemblies
|
Details
|
|
|
09-16-2015
|
3.00
|
Continued cockpit assembly.
|
|
|
|
09-09-2015
|
3.00
|
Began resassembly of cockpit
|
|
|
|
09-02-2015
|
4.50
|
Continued deburring the cockpit parts
|
|
|
|
08-26-2015
|
3.00
|
Disassembled the cockpit and deburred
|
|
|
|
08-19-2015
|
4.00
|
Cockpit shell assembly with clecos.
|
|
|
|
08-12-2015
|
4.00
|
Cockpit disassembly and deburr.
|
|
|
|
08-05-2015
|
3.50
|
Renewed checking of all cockpit shell components
|
|
|
|
07-29-2015
|
4.00
|
Completed cleco of cockpit.
|
Details
|
|
|
07-22-2015
|
3.00
|
Continued on the cockpit structure.
|
|
|
|
07-15-2015
|
4.00
|
Attached cockpit to fuselage.
|
|
|
|
07-08-2015
|
3.50
|
Cockpit assembly
|
|
|
|
07-01-2015
|
3.50
|
Continued assembling the cockpit
|
|
|
|
06-24-2015
|
4.50
|
Completed riveting the left cockpit side
|
Details
|
|
|
06-17-2015
|
4.00
|
completed cockpit left side
|
|
|
|
06-10-2015
|
3.50
|
deburring and cleco'ing right cockpit
|
|
|
|
05-27-2015
|
3.50
|
cockpit subassemblies and right side
|
|
|
|
05-20-2015
|
4.00
|
Start to assemble the cockpit right side
|
Details
|
|
|
05-13-2015
|
3.00
|
making cockpit pieces
|
|
|
|
05-06-2015
|
3.00
|
cockpit pieces
|
|
|
|
04-29-2015
|
4.50
|
Cockpit parts and trial assembly
|
Details
|
|
|
04-22-2015
|
4.00
|
Parts continue to be created.
|
|
|
|
04-15-2015
|
4.00
|
Continued to make parts for the cockpit
|
|
|
|
04-08-2015
|
4.00
|
Continued making cockpit parts.
|
|
|
|
04-01-2015
|
4.50
|
building cockpit parts
|
Details
|
|
|
03-25-2015
|
3.00
|
Continue to make cockpit parts
|
|
|
|
03-18-2015
|
3.00
|
Making parts for the cockpit
|
|
|
|
03-11-2015
|
3.50
|
Completed the turtledeck assembly
|
Details
|
|
|
03-04-2015
|
3.00
|
Deburred turtle deck and reassembled
|
Details
|
|
|
01-21-2015
|
1.00
|
completed inspection covers
|
Details
|
|
|
01-21-2015
|
4.00
|
Began turtledeck assembly
|
Details
|
|
|
01-14-2015
|
4.00
|
Reassembled and began riveting the fusalage.
|
Details
|
|
|
01-07-2015
|
4.00
|
disassembled and started to debur fuselage
|
|
|
|
12-17-2014
|
3.50
|
Finished drilling the fuselage.
|
Details
|
|
|
12-10-2014
|
4.00
|
Fitted tail wheel and underside of fuselage.
|
Details
|
|
|
12-03-2014
|
3.00
|
Completed drilling and tailwheel
|
Details
|
|
|
11-19-2014
|
3.50
|
Fuselage work contines
|
Details
|
|
|
11-12-2014
|
3.50
|
Continue fabricating small parts
|
Details
|
|
|
11-05-2014
|
5.00
|
Moved pallet and continued on fuselage.
|
Details
|
|
|
10-29-2014
|
3.00
|
Continued on second panel.
|
Details
|
|
|
10-22-2014
|
2.50
|
Continued on second side panel.
|
Details
|
|
|
10-15-2014
|
3.50
|
Began on second fuselage panel.
|
|
|
|
10-08-2014
|
3.50
|
Completed the deburring and prep.
|
|
|
|
10-01-2014
|
3.00
|
Deburring one of the fuselage panels
|
Details
|
|
|
09-24-2014
|
3.50
|
One side of fuselage ready to deburr.
|
|
|
|
09-17-2014
|
3.50
|
Started to assemble fuselage, and made more parts.
|
Details
|
|
|
09-03-2014
|
3.00
|
Cutting holes and bending fuselage pieces.
|
Details
|
|
|
08-27-2014
|
3.50
|
Began preparing the fuselage pieces.
|
|
|
|
08-20-2014
|
3.50
|
Started on the fuselage
|
|
|
|
08-13-2014
|
3.00
|
fitted vertical stabilizer tip
|
Details
|
|
|
08-06-2014
|
3.00
|
Riveted the rudder
|
|
|
|
07-30-2014
|
3.50
|
fitted and drilled rudder
|
|
|
|
07-30-2014
|
3.00
|
drilled and fitted rudder
|
|
|
|
07-23-2014
|
3.50
|
Completed vertical stabilizer
|
Details
|
|
|
07-16-2014
|
3.00
|
Fit skin on vertical stabilizer and cleanup
|
Details
|
|
|
07-09-2014
|
3.50
|
Continued working on vertical stabilizer
|
|
|
|
06-25-2014
|
4.00
|
assembled vertical stabilizer
|
Details
|
|
|
06-18-2014
|
3.50
|
vertical stabilizer
|
Details
|
|
|
06-11-2014
|
3.50
|
Sub-assembly SNX -T02 completed
|
Details
|
|
|
06-04-2014
|
2.50
|
Stabilizer wing tips fitted
|
Details
|
|
|
05-28-2014
|
3.00
|
Worked on elevators
|
Details
|
|
|
05-21-2014
|
3.50
|
hinge alignment
|
Details
|
|
|
05-14-2014
|
3.00
|
Continued work on elevator hinges.
|
|
|
|
05-07-2014
|
3.00
|
Worked on making a part.
|
|
|
|
04-30-2014
|
3.50
|
Riveted elevator ribs.
|
Details
|
|
|
04-23-2014
|
3.00
|
Elevator ribs work.
|
Details
|
|
|
04-16-2014
|
3.50
|
Fly-in cleanup
|
Details
|
|
|
04-09-2014
|
3.50
|
Drilled right hinge and cut elevators.
|
Details
|
|
|
04-02-2014
|
3.00
|
Marked elevators and drilled left hinge.
|
|
|
|
03-26-2014
|
3.00
|
rivetting complered
|
|
|
|
03-19-2014
|
3.00
|
Right stabilizer spars / channel rivetted.
|
|
|
|
03-12-2014
|
3.00
|
"great progress on horizontal stabilizer"
|
|
|
|
03-05-2014
|
3.00
|
Rivetted half of horizontal stabilizer.
|
|
|
|
02-26-2014
|
3.00
|
"just progress"
|
|
|
|
02-19-2014
|
3.00
|
"good progress"
|
|
|
|
02-12-2014
|
3.00
|
Fitted both skins on horizontal stabilizer.
|
|
|
|
01-29-2014
|
3.00
|
"Progress!"
|
|
|
|
01-25-2014
|
4.00
|
Upgrade band saw and repair other tools.
|
|
|
|
01-15-2014
|
3.00
|
Checking the fit on the horizontal stabilizer.
|
|
|
|
01-08-2014
|
3.00
|
finding the pieces and trying to assemble
|
|
|
|
12-21-2013
|
4.00
|
Inventory all parts from Sonex shipment
|
|
|
|
12-11-2013
|
3.00
|
Table completion and begin leveling.
|
|
|
|
12-04-2013
|
3.00
|
Builder's table construction begins.
|
|
|
|
12-03-2013
|
3.00
|
Sonex delivery unloading and storage
|
|
|
|
11-20-2013
|
3.00
|
Prep for the Sonex delivery
|
|
|
|
11-13-2013
|
3.00
|
Continued cleanup and attention to gathering tools
|
|
|
|
11-06-2013
|
3.00
|
Remove Nieuport project parts and clean.
|
Details
|
|
|
10-16-2013
|
3.00
|
Discussion about our building process (days, hours
|
|
|