Date
|
Hours
|
Work Log Summary
|
Details
|
09-11-2017
|
2.00
|
propeller checking
|
Details
|
|
|
08-04-2017
|
6.00
|
annual inspection
|
Details
|
|
|
07-08-2017
|
2.00
|
end pipes
|
Details
|
|
|
06-28-2017
|
2.00
|
pressure regulator
|
Details
|
|
|
06-06-2017
|
2.00
|
oilcooler
|
Details
|
|
|
06-02-2017
|
2.00
|
Test flights
|
Details
|
|
|
05-22-2017
|
5.00
|
Reinstall engine
|
Details
|
|
|
04-28-2017
|
5.00
|
Remove engine
|
Details
|
|
|
04-06-2017
|
2.00
|
exchange MAP sensor
|
Details
|
|
|
03-15-2017
|
2.00
|
exchange angle-sensor
|
Details
|
|
|
03-11-2017
|
2.00
|
New brakes
|
Details
|
|
|
02-24-2017
|
2.00
|
Lambda
|
Details
|
|
|
02-22-2017
|
2.00
|
Brake failure
|
Details
|
|
|
01-06-2017
|
2.00
|
moving thermostate
|
Details
|
|
|
12-27-2016
|
0.00
|
fit ECU
|
Details
|
|
|
12-19-2016
|
0.00
|
remove ECU
|
Details
|
|
|
10-12-2016
|
2.00
|
first take off
|
Details
|
|
|
09-26-2016
|
2.00
|
Final inspection
|
Details
|
|
|
09-20-2016
|
2.00
|
compass swing
|
Details
|
|
|
09-18-2016
|
2.00
|
markings under wing
|
Details
|
|
|
09-13-2016
|
2.00
|
rudder deflection
|
Details
|
|
|
09-11-2016
|
2.00
|
Inspection
|
Details
|
|
|
09-07-2016
|
2.00
|
cylinder pressure test
|
Details
|
|
|
09-05-2016
|
2.00
|
markings
|
Details
|
|
|
09-01-2016
|
4.00
|
new airfilter and cooling performance
|
Details
|
|
|
08-23-2016
|
3.00
|
improve cooling
|
Details
|
|
|
08-22-2016
|
2.00
|
brakes
|
Details
|
|
|
08-19-2016
|
3.00
|
wing sealing
|
Details
|
|
|
08-17-2016
|
2.00
|
low speed test ESGO
|
Details
|
|
|
08-12-2016
|
3.00
|
flap actuator
|
Details
|
|
|
08-05-2016
|
5.00
|
weight and ballance
|
Details
|
|
|
08-01-2016
|
2.00
|
wing walk
|
Details
|
|
|
07-19-2016
|
2.00
|
elevator trim
|
Details
|
|
|
07-17-2016
|
3.00
|
registration
|
Details
|
|
|
07-14-2016
|
2.00
|
cable tension
|
Details
|
|
|
07-12-2016
|
3.00
|
fuel syst left
|
Details
|
|
|
07-10-2016
|
2.00
|
seat belt and placards
|
Details
|
|
|
07-08-2016
|
5.00
|
egine run and inspection
|
Details
|
|
|
07-05-2016
|
2.00
|
seats & belts
|
Details
|
|
|
07-03-2016
|
3.00
|
engine start
|
Details
|
|
|
07-02-2016
|
6.00
|
fuelsystem right side
|
Details
|
|
|
06-29-2016
|
1.00
|
bleeding brake syst
|
Details
|
|
|
06-28-2016
|
2.00
|
Calibration speed and alt
|
Details
|
|
|
06-23-2016
|
2.00
|
Transponder
|
Details
|
|
|
06-22-2016
|
2.00
|
Connect strobe-nav and landlight
|
Details
|
|
|
06-21-2016
|
2.00
|
return line wingtanks
|
Details
|
|
|
06-17-2016
|
3.00
|
aileron left side
|
Details
|
|
|
06-16-2016
|
6.00
|
left wing installation
|
Details
|
|
|
06-13-2016
|
5.00
|
polish
|
Details
|
|
|
06-08-2016
|
1.00
|
strobe/nav light
|
Details
|
|
|
06-06-2016
|
5.00
|
left wing, prepare and paint
|
Details
|
|
|
06-01-2016
|
4.00
|
aileron
|
Details
|
|
|
05-30-2016
|
6.00
|
right wing install
|
Details
|
|
|
05-20-2016
|
5.00
|
polish
|
Details
|
|
|
05-19-2016
|
1.00
|
strobe
|
Details
|
|
|
05-18-2016
|
5.00
|
right wing prep and paint
|
Details
|
|
|
05-10-2016
|
1.00
|
gas spring
|
Details
|
|
|
05-09-2016
|
6.00
|
transport to ESGO
|
Details
|
|
|
05-06-2016
|
2.00
|
Steering rod boot
|
Details
|
|
|
04-28-2016
|
1.00
|
silicon tape
|
Details
|
|
|
04-27-2016
|
3.00
|
Control stick boot
|
Details
|
|
|
04-23-2016
|
2.00
|
reinstall propeller
|
Details
|
|
|
04-21-2016
|
3.00
|
canopy
|
Details
|
|
|
04-20-2016
|
1.00
|
static port
|
Details
|
|
|
04-18-2016
|
1.00
|
heater
|
Details
|
|
|
04-17-2016
|
1.00
|
sealing firewall
|
Details
|
|
|
04-16-2016
|
2.00
|
paint
|
Details
|
|
|
04-13-2016
|
2.00
|
main gear fairing
|
Details
|
|
|
04-12-2016
|
1.00
|
prepare for paint
|
Details
|
|
|
04-11-2016
|
6.00
|
cowling, filler
|
Details
|
|
|
03-28-2016
|
8.00
|
cowling
|
Details
|
|
|
03-17-2016
|
2.00
|
side panels
|
Details
|
|
|
03-15-2016
|
2.00
|
fuselage skins
|
Details
|
|
|
03-12-2016
|
2.00
|
cooling modif
|
Details
|
|
|
03-11-2016
|
3.00
|
Heater 4
|
Details
|
|
|
03-07-2016
|
2.00
|
filler
|
Details
|
|
|
03-05-2016
|
2.00
|
modif upper cowling
|
Details
|
|
|
03-02-2016
|
1.00
|
avionic switch
|
Details
|
|
|
02-29-2016
|
2.00
|
Steering rods
|
Details
|
|
|
02-19-2016
|
3.00
|
antenna
|
Details
|
|
|
02-16-2016
|
2.00
|
D-sub for radio and transponder
|
Details
|
|
|
02-15-2016
|
2.00
|
heater 3
|
Details
|
|
|
02-08-2016
|
2.00
|
Brake tubing
|
Details
|
|
|
02-06-2016
|
2.00
|
heater 2
|
Details
|
|
|
02-05-2016
|
2.00
|
canopy handle
|
Details
|
|
|
02-03-2016
|
1.00
|
Heater
|
Details
|
|
|
01-26-2016
|
1.00
|
modif lower cowling
|
Details
|
|
|
01-25-2016
|
5.00
|
modif fuselage skins
|
Details
|
|
|
01-23-2016
|
2.00
|
wires for radio
|
Details
|
|
|
01-22-2016
|
4.00
|
panel mod
|
Details
|
|
|
01-16-2016
|
3.00
|
return line
|
Details
|
|
|
01-15-2016
|
1.00
|
oilleak
|
Details
|
|
|
01-14-2016
|
3.00
|
oil leak test
|
Details
|
|
|
01-12-2016
|
3.00
|
replacing propeller hub
|
Details
|
|
|
01-08-2016
|
2.00
|
center consol
|
Details
|
|
|
01-06-2016
|
1.00
|
armrest cover
|
Details
|
|
|
12-22-2015
|
5.00
|
first fire-up
|
Details
|
|
|
12-17-2015
|
2.00
|
inspection
|
Details
|
|
|
12-15-2015
|
2.00
|
radiator bracket
|
Details
|
|
|
12-14-2015
|
2.00
|
radiator bracket
|
Details
|
|
|
12-12-2015
|
3.00
|
throttle quadrant
|
Details
|
|
|
12-10-2015
|
1.00
|
alternator fuse
|
Details
|
|
|
12-09-2015
|
2.00
|
regulator and current transducter
|
Details
|
|
|
12-09-2015
|
2.00
|
Propeller
|
Details
|
|
|
12-08-2015
|
2.00
|
Coolant filled
|
Details
|
|
|
12-07-2015
|
4.00
|
final installation oilcooler
|
Details
|
|
|
12-02-2015
|
2.00
|
Inlet air temp
|
Details
|
|
|
12-01-2015
|
1.00
|
CHT probe
|
Details
|
|
|
11-25-2015
|
3.00
|
Airfilter & MAP connection
|
Details
|
|
|
11-23-2015
|
2.00
|
expansion tank
|
Details
|
|
|
11-19-2015
|
3.00
|
heat exchanger & thermostat
|
Details
|
|
|
11-11-2015
|
2.00
|
cooling system
|
Details
|
|
|
11-10-2015
|
2.00
|
Radiator tubing
|
Details
|
|
|
11-06-2015
|
4.00
|
modif cowling
|
Details
|
|
|
10-30-2015
|
2.00
|
modif cowling
|
Details
|
|
|
10-21-2015
|
2.00
|
test mount cowling and radiator
|
Details
|
|
|
10-19-2015
|
3.00
|
one way valves
|
Details
|
|
|
10-17-2015
|
3.00
|
fiberglass work
|
Details
|
|
|
10-15-2015
|
6.00
|
fiberglass work
|
Details
|
|
|
10-13-2015
|
5.00
|
modification of cowling
|
Details
|
|
|
10-06-2015
|
3.00
|
fuel lines and fire sleeve
|
Details
|
|
|
10-03-2015
|
2.00
|
antispin
|
Details
|
|
|
09-29-2015
|
2.00
|
update of waterpump-alternator
|
Details
|
|
|
09-26-2015
|
2.00
|
stick grip
|
Details
|
|
|
09-18-2015
|
4.00
|
cowling and radiator
|
Details
|
|
|
09-15-2015
|
3.00
|
Exhaust
|
Details
|
|
|
09-13-2015
|
2.00
|
Sparkplug and wires
|
Details
|
|
|
09-03-2015
|
3.00
|
oilcontainer
|
Details
|
|
|
09-02-2015
|
3.00
|
install ECU
|
Details
|
|
|
09-01-2015
|
1.00
|
engine bolts
|
Details
|
|
|
08-27-2015
|
3.00
|
Installing fuelpumps
|
Details
|
|
|
08-17-2015
|
1.00
|
Replace eng bolts
|
Details
|
|
|
08-15-2015
|
2.00
|
engine mounting
|
Details
|
|
|
08-14-2015
|
1.00
|
painting
|
Details
|
|
|
08-13-2015
|
3.00
|
test mounting
|
Details
|
|
|
08-12-2015
|
4.00
|
welding
|
Details
|
|
|
07-31-2015
|
8.00
|
cutting tubes
|
Details
|
|
|
07-24-2015
|
5.00
|
construction engine mount
|
Details
|
|
|
07-17-2015
|
5.00
|
engine mount jig
|
Details
|
|
|
07-15-2015
|
2.00
|
Master relay
|
Details
|
|
|
07-14-2015
|
4.00
|
Flap and trim sensor
|
Details
|
|
|
07-13-2015
|
3.00
|
mounting Daqu
|
Details
|
|
|
07-10-2015
|
5.00
|
instrument panel
|
Details
|
|
|
07-03-2015
|
4.00
|
center consol
|
Details
|
|
|
07-01-2015
|
1.00
|
propeller arrived
|
Details
|
|
|
06-29-2015
|
6.00
|
paint instrument panel
|
Details
|
|
|
06-26-2015
|
1.00
|
design report
|
Details
|
|
|
06-23-2015
|
3.00
|
battery
|
Details
|
|
|
06-22-2015
|
2.00
|
gascolator
|
Details
|
|
|
06-20-2015
|
2.00
|
Installation radio and switches
|
Details
|
|
|
06-16-2015
|
4.00
|
connecting fuel valve
|
Details
|
|
|
06-15-2015
|
2.00
|
Installation of compass and backup alt/speed
|
Details
|
|
|
06-14-2015
|
2.00
|
installation circuit breaker
|
Details
|
|
|
06-09-2015
|
3.00
|
install Kanardia
|
Details
|
|
|
06-08-2015
|
2.00
|
covers
|
Details
|
|
|
06-07-2015
|
3.00
|
Installing rudder
|
Details
|
|
|
06-05-2015
|
2.00
|
installation stabilizer
|
Details
|
|
|
06-04-2015
|
6.00
|
polish & paint fuselage
|
Details
|
|
|
05-30-2015
|
8.00
|
finish stabilizer
|
Details
|
|
|
05-27-2015
|
10.00
|
rudder finish
|
Details
|
|
|
05-13-2015
|
3.00
|
fuel valve
|
Details
|
|
|
05-09-2015
|
4.00
|
engine installation
|
Details
|
|
|
05-07-2015
|
1.00
|
Belgium trip
|
Details
|
|
|
04-19-2015
|
4.00
|
Polish stabilzer
|
Details
|
|
|
04-17-2015
|
3.00
|
stabilizer finish
|
Details
|
|
|
04-10-2015
|
4.00
|
Instrument panel
|
Details
|
|
|
03-27-2015
|
1.00
|
motor mount
|
Details
|
|
|
03-18-2015
|
2.00
|
brake line
|
Details
|
|
|
03-13-2015
|
1.00
|
Approval engine position
|
Details
|
|
|
03-05-2015
|
2.00
|
canopy lock
|
Details
|
|
|
03-04-2015
|
1.00
|
sound barrier
|
Details
|
|
|
03-03-2015
|
2.00
|
replacing bolts
|
Details
|
|
|
03-02-2015
|
4.00
|
baggage carpet, and safety belts
|
Details
|
|
|
02-25-2015
|
4.00
|
Rear canopy
|
Details
|
|
|
02-23-2015
|
2.00
|
Rear canopy
|
Details
|
|
|
02-20-2015
|
3.00
|
Rear canopy cont.
|
Details
|
|
|
02-19-2015
|
2.00
|
Rear canopy
|
Details
|
|
|
02-18-2015
|
2.00
|
installation of canopy
|
Details
|
|
|
02-17-2015
|
4.00
|
rivet canopy
|
Details
|
|
|
02-15-2015
|
2.00
|
primer
|
Details
|
|
|
02-12-2015
|
2.00
|
remove canopy and trim
|
Details
|
|
|
02-09-2015
|
3.00
|
final cut
|
Details
|
|
|
02-06-2015
|
2.00
|
canopy
|
Details
|
|
|
02-04-2015
|
5.00
|
cutting canopy
|
Details
|
|
|
02-01-2015
|
2.00
|
canopy
|
Details
|
|
|
01-29-2015
|
2.00
|
canopy, rear frame
|
Details
|
|
|
01-28-2015
|
2.00
|
canopy frame
|
Details
|
|
|
01-14-2015
|
8.00
|
trial fitting left wing
|
Details
|
|
|
01-13-2015
|
3.00
|
prepare for mounting wing
|
Details
|
|
|
01-11-2015
|
1.00
|
baggage locker
|
Details
|
|
|
01-10-2015
|
4.00
|
wing tip
|
Details
|
|
|
01-07-2015
|
3.00
|
landing light
|
Details
|
|
|
01-06-2015
|
1.00
|
fuel fill door
|
Details
|
|
|
01-05-2015
|
1.00
|
prepare wingtip
|
Details
|
|
|
01-03-2015
|
4.00
|
nose skin
|
Details
|
|
|
12-31-2014
|
2.00
|
nose skin
|
Details
|
|
|
12-30-2014
|
2.00
|
nose skin
|
Details
|
|
|
12-18-2014
|
2.00
|
pitot-tube and nose skin
|
Details
|
|
|
12-16-2014
|
5.00
|
top skin
|
Details
|
|
|
12-13-2014
|
1.00
|
inspection left wing
|
Details
|
|
|
12-11-2014
|
2.00
|
prepare for inspection
|
Details
|
|
|
12-10-2014
|
3.00
|
front canopy frame
|
Details
|
|
|
12-08-2014
|
2.00
|
canopy frame
|
Details
|
|
|
12-05-2014
|
2.00
|
upper skin
|
Details
|
|
|
12-04-2014
|
2.00
|
fuel line
|
Details
|
|
|
12-03-2014
|
1.00
|
rollcage delivered
|
Details
|
|
|
12-01-2014
|
3.00
|
lower skin
|
Details
|
|
|
11-29-2014
|
4.00
|
riveting lower skin
|
Details
|
|
|
11-27-2014
|
2.00
|
lower skin
|
Details
|
|
|
11-26-2014
|
2.00
|
alieron cables
|
Details
|
|
|
11-24-2014
|
2.00
|
electrical wiring
|
Details
|
|
|
11-21-2014
|
2.00
|
fueltank
|
Details
|
|
|
11-20-2014
|
1.00
|
bellcrank angles
|
Details
|
|
|
11-19-2014
|
2.00
|
Wing assembly
|
Details
|
|
|
11-18-2014
|
8.00
|
install wing into fuselage
|
Details
|
|
|
11-15-2014
|
5.00
|
Wing tip
|
Details
|
|
|
11-12-2014
|
2.00
|
tip nose skin
|
Details
|
|
|
11-11-2014
|
3.00
|
rivet leading edge
|
Details
|
|
|
11-10-2014
|
3.00
|
leading edge
|
Details
|
|
|
11-09-2014
|
2.00
|
leading edge
|
Details
|
|
|
11-08-2014
|
3.00
|
install top skin
|
Details
|
|
|
11-07-2014
|
1.00
|
Inspection
|
Details
|
|
|
11-04-2014
|
2.00
|
wire and tubing
|
Details
|
|
|
11-03-2014
|
2.00
|
right wing cont.
|
Details
|
|
|
11-01-2014
|
3.00
|
main-gear left wheel
|
Details
|
|
|
10-31-2014
|
3.00
|
maingear, right wheel
|
Details
|
|
|
10-30-2014
|
1.00
|
mounting of fwd wheel
|
Details
|
|
|
10-29-2014
|
2.00
|
nose gear leg
|
Details
|
|
|
10-28-2014
|
2.00
|
nose wheel bearings
|
Details
|
|
|
10-27-2014
|
2.00
|
cabin acess step
|
Details
|
|
|
10-25-2014
|
2.00
|
cleaning up
|
Details
|
|
|
10-23-2014
|
3.00
|
baggage floor
|
Details
|
|
|
10-22-2014
|
3.00
|
fuel lines
|
Details
|
|
|
10-21-2014
|
3.00
|
electrical wie
|
Details
|
|
|
10-17-2014
|
3.00
|
main gear spring
|
Details
|
|
|
10-13-2014
|
6.00
|
polishing fuselage
|
Details
|
|
|
10-11-2014
|
2.00
|
turtle deck
|
Details
|
|
|
10-10-2014
|
2.00
|
turtle deck
|
Details
|
|
|
10-09-2014
|
1.00
|
turtle deck
|
Details
|
|
|
10-08-2014
|
1.00
|
nose gear
|
Details
|
|
|
10-07-2014
|
2.00
|
trim electrical connections
|
Details
|
|
|
10-03-2014
|
5.00
|
main gear spring
|
Details
|
|
|
09-25-2014
|
5.00
|
rudder pedals
|
Details
|
|
|
09-21-2014
|
2.00
|
installation of rudder
|
Details
|
|
|
09-20-2014
|
2.00
|
connect stabilizer
|
Details
|
|
|
09-18-2014
|
3.00
|
flap control and firewall
|
Details
|
|
|
09-15-2014
|
2.00
|
inspection
|
Details
|
|
|
09-12-2014
|
1.00
|
potentiometer support
|
Details
|
|
|
09-10-2014
|
4.00
|
flap control
|
Details
|
|
|
09-08-2014
|
1.00
|
centre consol
|
Details
|
|
|
09-05-2014
|
1.00
|
Seat panel
|
Details
|
|
|
09-01-2014
|
1.00
|
trapdoor
|
Details
|
|
|
08-31-2014
|
2.00
|
pedal reinforcements
|
Details
|
|
|
08-28-2014
|
2.00
|
Air intake doors
|
Details
|
|
|
08-27-2014
|
2.00
|
Elevator cable support
|
Details
|
|
|
08-25-2014
|
2.00
|
control panel
|
Details
|
|
|
08-24-2014
|
2.00
|
control panel frames
|
Details
|
|
|
08-23-2014
|
2.00
|
control stick
|
Details
|
|
|
08-22-2014
|
2.00
|
torque tube
|
Details
|
|
|
08-21-2014
|
2.00
|
rudder cables
|
Details
|
|
|
08-14-2014
|
1.00
|
bulkhead
|
Details
|
|
|
08-13-2014
|
2.00
|
bulkhead
|
Details
|
|
|
08-12-2014
|
2.00
|
canopy lock
|
Details
|
|
|
08-11-2014
|
2.00
|
arm rest
|
Details
|
|
|
08-07-2014
|
2.00
|
arm rest
|
Details
|
|
|
08-06-2014
|
2.00
|
canopy lock
|
Details
|
|
|
08-05-2014
|
2.00
|
flap torq tube
|
Details
|
|
|
08-04-2014
|
2.00
|
safety belt attachments
|
Details
|
|
|
08-03-2014
|
5.00
|
riveting
|
Details
|
|
|
07-31-2014
|
2.00
|
back rest
|
Details
|
|
|
07-30-2014
|
2.00
|
seat back
|
Details
|
|
|
07-29-2014
|
2.00
|
canopy lock lever
|
Details
|
|
|
07-28-2014
|
2.00
|
baggage floor brackets
|
Details
|
|
|
07-27-2014
|
3.00
|
lower eng mont and maingear support
|
Details
|
|
|
07-26-2014
|
2.00
|
angle doublers
|
Details
|
|
|
07-24-2014
|
2.00
|
upper engine mount
|
Details
|
|
|
07-21-2014
|
3.00
|
brackets in tail section
|
Details
|
|
|
07-19-2014
|
2.00
|
tail skid & front wheel support
|
Details
|
|
|
07-18-2014
|
6.00
|
bottom skin
|
Details
|
|
|
07-15-2014
|
3.00
|
front skins
|
Details
|
|
|
07-14-2014
|
2.00
|
front skins
|
Details
|
|
|
07-13-2014
|
2.00
|
riveting
|
Details
|
|
|
07-10-2014
|
2.00
|
front end fuselage
|
Details
|
|
|
07-09-2014
|
2.00
|
front end fuselage
|
Details
|
|
|
07-08-2014
|
2.00
|
firewall installation
|
Details
|
|
|
07-07-2014
|
4.00
|
prepare reinforcements
|
Details
|
|
|
07-05-2014
|
2.00
|
mounting front left skin
|
Details
|
|
|
07-04-2014
|
2.00
|
left front skin
|
Details
|
|
|
07-03-2014
|
2.00
|
mounting right front skin
|
Details
|
|
|
07-02-2014
|
1.00
|
right front skin
|
Details
|
|
|
07-01-2014
|
2.00
|
upper longerons-central spar
|
Details
|
|
|
06-30-2014
|
3.00
|
cont right rear skin
|
Details
|
|
|
06-29-2014
|
2.00
|
continue right rear skin
|
Details
|
|
|
06-28-2014
|
3.00
|
Right rear side skin
|
Details
|
|
|
06-27-2014
|
2.00
|
left rear skin cont.
|
Details
|
|
|
06-26-2014
|
3.00
|
rear left side skin
|
Details
|
|
|
06-25-2014
|
8.00
|
lower skin and ribs
|
Details
|
|
|
06-20-2014
|
2.00
|
fuselage start
|
Details
|
|
|
06-14-2014
|
1.00
|
panels
|
Details
|
|
|
06-13-2014
|
2.00
|
inspection panels
|
Details
|
|
|
06-06-2014
|
2.00
|
flap-hingle
|
Details
|
|
|
06-02-2014
|
1.00
|
leak testing
|
Details
|
|
|
05-30-2014
|
3.00
|
wire and hose for fuel-indicator and strobe
|
Details
|
|
|
05-29-2014
|
2.00
|
fuel return line
|
Details
|
|
|
05-19-2014
|
4.00
|
firewall finished
|
Details
|
|
|
05-15-2014
|
1.00
|
firewall
|
Details
|
|
|
05-14-2014
|
2.00
|
firewall
|
Details
|
|
|
05-13-2014
|
1.00
|
firewall
|
Details
|
|
|
05-11-2014
|
2.00
|
Install fuel lever indicator
|
Details
|
|
|
05-10-2014
|
2.00
|
wing tank connections
|
Details
|
|
|
05-09-2014
|
1.00
|
left wing, fuel line holes
|
Details
|
|
|
05-08-2014
|
2.00
|
Left wing, center spar
|
Details
|
|
|
05-07-2014
|
2.00
|
Left wing, centerspars
|
Details
|
|
|
05-06-2014
|
2.00
|
left wing, center spars
|
Details
|
|
|
05-05-2014
|
2.00
|
Left wing, nose ribs
|
Details
|
|
|
05-03-2014
|
2.00
|
Left wing, rear spar
|
Details
|
|
|
05-02-2014
|
2.00
|
Left wing, rear spar
|
Details
|
|
|
04-29-2014
|
1.00
|
upper skin
|
Details
|
|
|
04-24-2014
|
0.00
|
missing parts
|
Details
|
|
|
04-22-2014
|
1.00
|
order parts
|
Details
|
|
|
04-19-2014
|
2.00
|
aileron cables
|
Details
|
|
|
04-18-2014
|
1.00
|
turn around wing
|
Details
|
|
|
04-16-2014
|
5.00
|
install lower skin
|
Details
|
|
|
04-14-2014
|
2.00
|
lower skin
|
Details
|
|
|
04-13-2014
|
2.00
|
prepare skin
|
Details
|
|
|
04-12-2014
|
2.00
|
fuel-tank and -line
|
Details
|
|
|
04-11-2014
|
2.00
|
rear spar
|
Details
|
|
|
04-09-2014
|
2.00
|
wing
|
Details
|
|
|
04-08-2014
|
2.00
|
fitting front and center ribs
|
Details
|
|
|
04-07-2014
|
3.00
|
assemble center-ribs
|
Details
|
|
|
04-06-2014
|
1.00
|
prepare right wing
|
Details
|
|
|
04-05-2014
|
2.00
|
moving workbench
|
Details
|
|
|
04-01-2014
|
2.00
|
riveting rudder skin
|
Details
|
|
|
03-31-2014
|
2.00
|
riveting flaps
|
Details
|
|
|
03-29-2014
|
2.00
|
reveting aileron
|
Details
|
|
|
03-28-2014
|
1.00
|
Inspection
|
Details
|
|
|
03-19-2014
|
2.00
|
left flap
|
Details
|
|
|
03-18-2014
|
2.00
|
Riveting of flap
|
Details
|
|
|
03-17-2014
|
1.00
|
Right aileron riveted
|
Details
|
|
|
03-17-2014
|
1.00
|
prepare flaps
|
Details
|
|
|
03-16-2014
|
2.00
|
Riveting of aileron skin
|
Details
|
|
|
03-15-2014
|
2.00
|
deburr and primer aileron
|
Details
|
|
|
03-14-2014
|
0.00
|
picked up aileron
|
Details
|
|
|
03-14-2014
|
1.00
|
mounted skin
|
Details
|
|
|
03-13-2014
|
2.00
|
riveted together rudder frame
|
Details
|
|
|
03-12-2014
|
2.00
|
modify ribs
|
Details
|
|
|
03-11-2014
|
1.00
|
Sort up rudder parts
|
Details
|
|
|
03-10-2014
|
2.00
|
stabilizer done
|
Details
|
|
|
03-09-2014
|
2.00
|
final assembly
|
Details
|
|
|
03-08-2014
|
2.00
|
rivet upper elevator skin
|
Details
|
|
|
03-07-2014
|
1.00
|
Inspection
|
Details
|
|
|
03-06-2014
|
2.00
|
fiberglass ends
|
Details
|
|
|
03-05-2014
|
3.00
|
Close lower skin on stabilizer
|
Details
|
|
|
03-02-2014
|
2.00
|
assemble trim skin
|
Details
|
|
|
03-01-2014
|
3.00
|
elevator, install ribs in skin
|
Details
|
|
|
02-28-2014
|
2.00
|
deburr and primer elevator
|
Details
|
|
|
02-27-2014
|
2.00
|
Start with elevator
|
Details
|
|
|
02-26-2014
|
4.00
|
Rivet skin & inspection
|
Details
|
|
|
02-24-2014
|
9.00
|
assemble stabilizer
|
Details
|
|
|
02-20-2014
|
2.00
|
Stabilizer
|
Details
|
|
|
02-19-2014
|
2.00
|
Continue with stabilizer
|
Details
|
|
|
02-18-2014
|
3.00
|
Start with stabilizer
|
Details
|
|
|
02-16-2014
|
30.00
|
Unpack and store all parts
|
Details
|
|
|
01-30-2014
|
2.00
|
Kit arrives
|
Details
|
|
|
01-17-2014
|
3.00
|
Bench no 2
|
Details
|
|
|
01-16-2014
|
2.00
|
Work bench
|
Details
|
|
|
01-14-2014
|
1.00
|
Order my kit
|
Details
|
|
|
12-20-2013
|
1.00
|
Approval from EAA
|
Details
|
|