Powered By Kitlog Pro v2.0
Frank's Panther Cave
Panther LSA
All
Work Logs Found:
123
Category Work Time:
493 Hours
Date
Hours
Work Log Summary
Details
06-14-2021
20.00
Continuation with right wing
Details
05-17-2021
5.00
Setup for right wing
Details
04-03-2021
3.00
Drill and rivet support angles to ribs
Details
02-19-2021
15.00
Rivet right spar
Details
02-15-2021
3.00
Install steel bushings into right spar
Details
02-02-2021
8.00
Deburr spar caps and plates
08-22-2020
15.00
Continuation of left wing
Details
08-08-2020
20.00
Left wing construction
Details
07-25-2020
3.00
Fill and sand on tailplane fairing
07-11-2020
4.00
Some bad rivets to drill out and reset
Details
05-23-2020
4.00
Trial fit for rudder cables and brake cylinders
Details
05-09-2020
4.00
Installed instruments into panel
04-27-2020
5.00
Drilling rear spar and wing access cover
Details
04-21-2020
10.00
Continued riveting and installing hardware
Details
04-02-2020
10.00
Rivet Squeezer
Details
03-10-2020
6.00
Deburr holes in left spar
Details
01-23-2018
10.00
Airleon Construction
Details
01-08-2018
10.00
Flap Construction
Details
11-27-2017
4.00
Seal back flange
Details
07-25-2017
3.00
Paint Instrument panel
Details
07-24-2017
2.00
Instrument Panel
Details
07-12-2017
3.00
Proseal Right Tank
Details
07-09-2017
3.00
Rudder cables
Details
07-09-2017
3.00
Rudder cables
Details
07-08-2017
8.00
Instrument Panel
Details
06-14-2017
2.00
Rudder pivot blocks
Details
06-11-2017
2.00
Elevator inspection plates
Details
06-10-2017
3.00
Map pockets
Details
05-16-2017
4.00
Instrument panel design
Details
04-09-2017
3.00
Trim and throttle controls
Details
04-08-2017
3.00
Boot cowl
Details
03-19-2017
3.00
Elevator travel adjustment
Details
03-18-2017
4.00
Trim Lever
Details
03-15-2017
1.50
Right Tank
Details
03-09-2017
1.50
Right Fuel Tank
Details
03-07-2017
1.50
Right Fuel Tank
Details
03-05-2017
6.00
Various work on fuselage
Details
03-04-2017
6.00
Re-join fuselage
Details
03-04-2017
4.00
Open up Fuselage bottom holes
Details
02-18-2017
4.00
Seperate fuselage
Details
02-05-2017
3.00
Cleko canopy to skirt
Details
02-04-2017
3.00
Instrument panel
Details
01-19-2017
6.00
Fitting canopy to frame
Details
01-18-2017
4.00
Bubble to canopy inital fit
Details
01-17-2017
4.00
Canopy frame
Details
01-16-2017
4.00
Canopy frane
Details
01-14-2017
2.00
More Sealant
Details
01-13-2017
6.00
Seal Left tank
Details
01-10-2017
6.00
Prepare left tank
Details
01-09-2017
4.00
Rib 1
Details
01-05-2017
8.00
Spar Drilling & Tailwheel rod
Details
01-04-2017
8.00
Spar Drilling
Details
01-02-2017
8.00
Rib 4 , Rib 7 and Rib 9 Modification
Details
01-02-2017
4.00
Rib 1 modification
Details
01-01-2017
4.00
Elevator and Flaps
Details
12-31-2016
6.00
Elevator pushrod
Details
12-30-2016
6.00
Rudder and brake pedal
Details
12-29-2016
2.00
Control stick mixer
Details
12-11-2016
0.00
Photo shoot
Details
12-10-2016
4.00
Stabiliser Connection
Details
11-18-2016
0.00
Second Jabiru Engined Panther Flies
Details
11-13-2016
4.00
Vertical fin connection
Details
11-12-2016
2.00
Flap handle
Details
11-08-2016
2.00
Undercarriage legs
Details
10-30-2016
2.00
Spar guides
Details
10-29-2016
2.00
Fuselage
Details
10-18-2016
2.00
Mount rear horizontal stabiliser angles
Details
10-17-2016
4.00
horizontal stabiliser modification
Details
09-11-2016
1.00
Control stick bearings
Details
09-10-2016
2.00
Seat
Details
09-10-2016
1.50
Elevator Pivot Arm
Details
08-06-2016
2.00
Firewall Tunnel
Details
08-01-2016
1.50
Instument cowl strips
Details
07-24-2016
3.00
Fit undercarriage
Details
07-23-2016
6.00
Tail Cone Connection
Details
06-24-2016
4.00
Wheels and tailcone alignment
Details
06-20-2016
4.00
Assemble tailcone and rivet
Details
06-12-2016
6.00
Dimple/Countersink
Details
06-05-2016
1.00
Machined axel fabrication
Details
06-05-2016
0.00
Imperial Step Drill
Details
06-05-2016
2.00
Fuel Pickups
Details
06-04-2016
3.00
Match drill Right fuel tank
Details
06-02-2016
1.50
Jig and trial fit
Details
06-01-2016
4.00
Side Frames
Details
05-22-2016
3.00
Match drill bottom
Details
05-22-2016
3.00
Deburr and rivet assembly
Details
05-21-2016
4.00
Angle supports/ deburr
Details
05-09-2016
0.50
Root Ribs
Details
05-09-2016
1.50
Caps and drains
Details
05-07-2016
0.00
Drill bits and cutters
Details
04-27-2016
1.00
Tailwheel
Details
04-27-2016
6.00
Tailcone assembly
Details
04-26-2016
7.00
Tailcone assembly
Details
04-01-2016
8.00
Complete Kit Arrives
Details
07-06-2014
2.00
Finish riveting skins
Details
07-03-2014
4.00
Rivet Stabiliser
Details
05-06-2014
2.00
Deburr and dimple skins
Details
04-06-2014
2.00
Deburr and dimple spars
Details
04-05-2014
4.00
Horizontal Stabiliser
Details
04-04-2014
2.00
Horizontal Stabiliser
Details
03-27-2014
2.00
Horizontal Tailplane - support jig
Details
02-18-2014
2.00
Supafill tip and rivet second spar stiffener
Details
02-12-2014
2.00
Rudder hinge correction and tip riveting
Details
02-04-2014
2.00
Vertical stabiliser tip
Details
02-03-2014
1.00
Vertical Stabiliser
Details
02-02-2014
3.00
Vertical stabiliser and Spar stiffener
Details
02-01-2014
4.00
Vertical Stabiliser
Details
01-30-2014
3.00
Vertical stabiliser
Details
01-29-2014
3.50
Vertical stabiliser
Details
12-28-2013
3.00
Rudder
Details
12-27-2013
5.00
Rudder
Details
12-27-2013
5.00
Elevator
Details
12-26-2013
3.00
Elevator
Details
12-25-2013
2.00
Elevator drilling
Details
12-24-2013
2.00
Elevator
Details
12-21-2013
1.50
Elevator
Details
12-18-2013
1.50
Elevator dimple
Details
12-17-2013
1.50
Continued with elevator
Details
12-16-2013
2.00
Elevator
Details
12-14-2013
4.00
Horizontal spars
Details
12-09-2013
4.00
Vertical stabiliser Spars
Details
12-07-2013
2.00
Deburr and hinge gauge
Details
11-30-2013
2.00
Delivery Of Tail Kit
Details
SITE NAVIGATION
Contact Builder
Corby Starlet Home
Panther LSA Home
Category
# Logs
# Hours
All
123
1991
Avionics
3
38
Canopy
5
21
Controls
5
16
Empennage
31
329
Fuel Tanks
14
38
Fuselage
34
1158
Miscellaneous
3
38
Spar
10
77
Tailcone
7
31
Tools
2
Wings
9
245
Copyright © 2001-2025 Matronics. All Rights Reserved.