KitLog pro

Powered By Kitlog Pro v2.0

GLENN'S WEB SITE
Work Logs Found: 284
Category Work Time: 546 Hours
 Date
Hours
Work Log Summary

Details

 08-18-2015
3.00
Riveted Wing skins
Details

 08-13-2015
0.50
Installed fueler neck doublers
Details
     

 08-07-2015
3.00
Re-installed the wing skins.
Details
       

 08-06-2015
2.00
Installed the ELT
Details
       

 08-06-2015
5.00
Install fuel tanks in center wing
Details
       

 08-06-2015
1.50
Fuel tank vent tubes
Details
       

 08-05-2015
2.00
Installed Poly Carbonite in cargo area
Details
       

 08-05-2015
2.00
Install aileron cable pullys
Details
       

 08-05-2015
1.00
Aileron push tubes
Details
       

 08-05-2015
2.00
Aileron bell crank
Details
       

 07-14-2015
0.50
Cargo are floor tray
Details
     

 07-10-2015
6.00
Primed parts
Details
       

 07-09-2015
8.00
Prepped and primed the front upper skins
Details
       

 07-09-2015
0.50
Drilled Polycarbonate
Details
     

 07-08-2015
8.00
Prep and prime upper aft skins
Details
       

 07-08-2015
1.00
Painted storage area.
Details
       

 07-07-2015
1.50
Riveted cargo holes and inspection hole
Details
       

 07-07-2015
7.00
Primed lower center skins
       

 07-07-2015
0.50
Install Flap motor
Details
       

 07-06-2015
1.80
Upper wing stiffener
Details
       

 07-06-2015
2.50
Lower center cargo door
Details
       

 07-06-2015
2.50
Center wing lower skin
Details
     

 07-06-2015
2.30
Cargo bay floor tray
Details
       

 07-05-2015
1.80
reinstalled parts for lower right
Details
       

 07-05-2015
8.00
Lower right center wing
Details
       

 07-04-2015
1.00
Reinstalled left nose rib and stiffener
Details
       

 07-04-2015
7.50
Prep and prime
Details
       

 07-03-2015
4.00
Drilled bttom of center wing
Details
       

 07-03-2015
5.00
Drill top of center wing
Details
       

 07-02-2015
4.00
Drilled skin to rear spar
Details
       

 05-30-2015
1.50
CT-095 installation
Details
       

 05-07-2015
2.50
Right top skin to new nose rib
Details
       

 05-07-2015
2.00
made doublers for new nose ribs
Details
     

 05-06-2015
5.00
Reinstalled New nose ribs
Details
       

 05-06-2015
0.50
New AC-CT-052
Details
       

 05-06-2015
1.00
ELT antenna bracket
Details
     

 05-05-2015
4.00
Recieved Center wing back
Details
       

 04-01-2015
3.00
shipop center wing to Lockwood
Details
     

 03-08-2015
2.00
Repair tensioning rib
Details
     

 03-07-2015
0.60
Wing tip bow gussets
Details
       

 03-07-2015
0.50
Trailing edge cuff and tip bow compression tube
Details
       

 03-07-2015
0.00
More pictures
Details
       

 03-07-2015
0.40
Leading edge cuff
Details
       

 03-07-2015
0.40
installed aileron bell crack to compression tube
Details
       

 03-07-2015
5.00
install tensioning rib butress
Details
       

 03-07-2015
2.50
Install tensioning harware
Details
       

 03-07-2015
1.50
Assembled rear tip comp. tube and spar extension
Details
       

 03-07-2015
1.00
Assemble Jury compression tube WI-004 rear spar
Details
     

 03-07-2015
2.00
Assemble compression tube WI-005 with Wires
Details
       

 03-07-2015
0.40
Aileron tube attached to bell crank
Details
       

 03-07-2015
0.50
Aileron push tubes
Details
       

 03-07-2015
0.50
Aileron flap hinge bolts
Details
       

 03-07-2015
0.80
Aileron bearings to bell cranks
Details
       

 03-06-2015
1.50
WI-005 Compression tube assembly
Details
       

 03-06-2015
1.00
Root compression tube to rear spar
Details
       

 03-06-2015
0.90
Compression tube to tip bow front spar
Details
       

 03-05-2015
1.00
Root compression tube to front spar right wing
Details
       

 03-05-2015
1.00
Assemble Jury Compression tube
Details
       

 03-04-2015
16.00
Skin install
Details
       

 03-04-2015
2.00
Center wing
Details
       

 03-01-2015
6.50
Fiber glass to ribs
Details
       

 02-28-2015
2.50
Fiber glass tensioning ribs
Details
       

 02-19-2015
6.00
Finished the access hole in lower center wing
Details
       

 02-10-2015
1.00
Stiffeners
Details
       

 02-08-2015
1.50
Stiffeners
Details
       

 02-08-2015
1.20
Lower skins attached
Details
       

 02-08-2015
2.50
Inspection hole doublers
Details
       

 02-08-2015
0.40
Filler neck seals
Details
     

 02-08-2015
5.00
Center wing access panel doubler
Details
     

 02-07-2015
2.00
Lower center skins
Details
       

 02-07-2015
0.50
install front down tubes
Details
       

 02-07-2015
1.00
Compression tubes
Details
       

 02-03-2015
2.00
Tailwheel
Details
     

 02-03-2015
1.00
Mount center wing
Details
       

 02-03-2015
1.20
Install langer gear legs
Details
       

 02-02-2015
0.30
Strut attach points
Details
       

 02-02-2015
1.20
Down tube ends
Details
       

 02-02-2015
3.00
Cut skin for accesss panel
Details
       

 02-01-2015
1.20
Attach struts
Details
       

 01-27-2015
8.00
Added nose ribs in front of fuel tanks
Details
       

 01-17-2015
1.50
Rear spar brackets
Details
       

 01-16-2015
0.70
Stiffener panels
Details
       

 01-16-2015
0.60
Sdded rear ribs halves
Details
       

 01-16-2015
1.00
Riveted Panel to CT-055
Details
       

 01-16-2015
1.00
Flap motor channel
Details
       

 01-16-2015
2.50
Added my own stiffener
Details
       

 01-15-2015
3.50
Parts CT-060, 059 and 056
Details
       

 01-15-2015
1.00
Doublers to ribs
Details
       

 01-07-2015
1.00
Rivet rib to front spar
Details
       

 01-07-2015
2.00
Ribs riveted to front spar
Details
       

 01-07-2015
0.30
Part CT-052 installed
Details
     

 01-07-2015
0.30
Install CT-053,074
Details
     

 01-07-2015
0.20
ELT bracket
Details
     

 01-07-2015
0.70
Attach rib to front spar
Details
       

 01-07-2015
0.40
Assembled Aileron pully brackets
Details
       

 01-07-2015
0.40
Angle to outer ribs
Details
       

 01-07-2015
0.70
Angle brackets to ribs
Details
       

 01-06-2015
0.60
Added Ct-002 brackets to front spars
Details
       

 01-05-2015
1.00
Spar cary through
Details
       

 01-05-2015
4.00
Prime parts
Details
     

 01-01-2015
7.50
Scuff alclad on parts
Details
     

 12-24-2014
3.00
Scuff alcad on parts
Details
     

 12-11-2014
1.00
Stiffeners
Details
       

 12-11-2014
1.50
rear ribs
Details
       

 12-11-2014
2.00
More brackets
Details
       

 12-11-2014
0.80
Install stiffeners
Details
       

 12-11-2014
0.40
ELT bracket
Details
     

 12-11-2014
2.00
Driiled out brackets
Details
       

 12-11-2014
0.40
Attach Airleron bellcrank
Details
       

 12-10-2014
1.00
Riveted the root and tip spar
Details
       

 12-10-2014
1.00
riveted the root and tip ribs
Details
       

 12-10-2014
1.50
Rivet Spar Carry through
Details
       

 12-10-2014
2.00
attached angles to ribs
Details
       

 12-10-2014
1.00
Assemble root rib and gussets
Details
       

 12-10-2014
0.80
Aileron pully brackets
Details
       

 12-06-2014
2.00
Prepped, prime parts
Details
     

 12-06-2014
2.00
prep, and primer
Details
     

 12-06-2014
2.00
prep and prime parts
Details
     

 12-06-2014
5.50
acid was and primer
Details
       

 12-02-2014
4.00
sand and acid wash parts
Details
     

 12-01-2014
2.80
Took apart deburred carry through spar
Details
       

 08-19-2014
2.50
Added gusset for strength
Details
       

 08-18-2014
1.00
Service bulletin
Details
       

 08-18-2014
2.50
Added gussets to flaps
Details
       

 08-13-2014
2.50
Root ribs to spar
Details
       

 08-13-2014
1.50
Added outer gussets.
Details
       

 08-12-2014
1.50
Rear spar tip to front spar
Details
       

 08-11-2014
1.20
Spar extention to Spar
Details
       

 08-11-2014
0.50
install ribs
Details
     

 08-11-2014
1.20
Compression ribs
Details
       

 08-11-2014
1.00
Attach trailing edge rib anchors
Details
       

 08-09-2014
2.50
Hinge plates and nut plates installed
Details
       

 07-03-2014
0.60
Rib Anchors
Details
     

 07-03-2014
1.50
Install ribs into front spar
Details
       

 07-02-2014
4.00
Nut plates and reinforce plates
Details
       

 06-12-2014
7.00
Put HS back together
Details
       

 06-12-2014
0.20
More photos
Details
       

 06-12-2014
0.20
More Photos
Details
       

 06-12-2014
0.20
More Photos
Details
       

 06-12-2014
0.20
More photos
Details
       

 06-12-2014
1.00
Cleco and drill trailing edge skin.
Details
       

 06-12-2014
1.50
Anti twist plates
Details
       

 06-12-2014
1.00
Added the 4th and 5th ribs
Details
       

 06-08-2014
0.10
More photos
Details
       

 06-08-2014
1.30
Install HS-012 R/L
Details
       

 06-08-2014
0.20
HS pics
Details
       

 06-08-2014
0.80
Assemble trim push rods
Details
       

 06-08-2014
1.00
Added 2nd , 3rd, 6th and 8th ribs
Details
       

 06-07-2014
1.00
Cut elevator motor plate to fit.
Details
       

 06-07-2014
6.50
acid washed parts
Details
       

 06-06-2014
8.50
Debuured and scuffed up parts
Details
       

 06-06-2014
6.00
2 part epoxy primed parts.
Details
       

 06-02-2014
2.50
Step drilled left leading edge skin
Details
       

 06-02-2014
4.00
Disassemble left Horizontal stab
Details

 06-02-2014
0.60
Bent tab in leading edge skins
Details
       

 06-02-2014
0.40
AN43FB-14A in doublers
Details
     

 06-01-2014
1.70
Rib flanges
Details
       

 06-01-2014
0.40
Mark center line of nose ribs
Details
     

 06-01-2014
0.80
Leading edge skin right
Details
       

 06-01-2014
2.00
intall 4th rib and componets
Details
       

 06-01-2014
1.00
Installed anti drag wires
Details
       

 06-01-2014
2.50
Drilled leading edge skin to #29 right
Details
       

 06-01-2014
0.50
Angle brace to ribs
Details
       

 06-01-2014
1.00
4th rib
Details
       

 05-29-2014
1.50
Nose ribs
Details
       

 05-29-2014
2.50
Assemble front spar
Details
       

 05-28-2014
2.50
Installed ribs except 4th rib
Details
       

 05-28-2014
0.80
Diagonal brace
Details
       

 05-28-2014
1.50
Anti drag wire braket
Details
       

 05-27-2014
0.20
Step drill actuator arm
Details
     

 05-27-2014
0.40
Riveted hinges
Details
       

 05-27-2014
1.00
Rivet elevator trim tab
Details
       

 05-27-2014
2.00
Right Elevator
Details
       

 05-27-2014
3.50
Primed elevator parts
Details
       

 05-27-2014
2.50
Left elevator
Details
       

 05-26-2014
2.50
Prep for primer
Details
       

 05-22-2014
3.00
Sanded and 3M Scotch Brite
Details

 05-22-2014
3.00
Drilled out holes in spar carry through
Details
       

 05-15-2014
4.50
PRC lids to tanks
Details
       

 05-01-2014
0.80
spar flanges
Details
       

 04-28-2014
0.50
EL-007
Details
       

 04-28-2014
3.00
Debur and ready for primer
Details

 04-28-2014
0.40
Curtis drain valve
Details
       

 04-28-2014
0.30
curtis drain valve
Details
       

 04-18-2014
0.60
Elevator hinges
Details
       

 04-17-2014
2.00
Spar root doublers
Details
       

 04-17-2014
0.50
Set EL-105 tab horn.
Details
     

 04-17-2014
0.40
Drilled Trim tab ends to #29
Details
       

 04-16-2014
1.00
Still rib to spar work
Details
       

 04-16-2014
1.50
Hinge bolt plates
Details
       

 04-15-2014
1.00
Drilled rear spar to ribs to spars at 19
Details
     

 04-15-2014
1.50
Attached ribs to front spar
Details
       

 04-14-2014
1.00
Ribs to spar
Details
       

 04-09-2014
0.50
Spar doublers
Details
     

 04-09-2014
3.00
Rivet nose skin to rudder
       

 04-09-2014
0.80
Put front and aft front rear spar
Details
       

 04-09-2014
0.30
Outboard end spar doubler
Details
       

 04-09-2014
0.70
Nut plates fitted and drilled
Details

 04-09-2014
0.80
Mid spar doublers
Details
       

 04-09-2014
0.30
HS-004 step drilled to #19
Details
       

 04-09-2014
0.40
HS-003 Spar doubler
Details
       

 04-08-2014
0.30
Rudder top bearing plate
Details
       

 04-08-2014
0.40
Rudder horn to lower rib.
Details
       

 04-08-2014
1.20
Rivet ribs to sapr
       

 04-08-2014
1.00
Reassemble ribs to sapr and rivet
Details
     

 04-08-2014
2.00
Clecoed rudder nose skin
Details
     

 04-08-2014
0.50
Bell crank bearing
Details
       

 04-08-2014
0.30
Bearing plate to mid rudder bearing nose rib
Details
       

 04-07-2014
0.70
Spar root brackets
Details
       

 04-03-2014
3.00
Primed back side of rudder parts
Details
     

 04-02-2014
2.00
Metal prep
Details
     

 03-25-2014
5.50
Disassemble, Deburr, Metal prep
Details
       

 03-24-2014
4.00
Lower D skin
Details
       

 03-24-2014
0.80
Diagonal Rib and rear spar
Details
     

 03-24-2014
0.80
Assemble Gussets RU-003 to front spar
Details
       

 03-24-2014
2.50
Assemble D cell Skins to rudder Spar
Details
       

 03-23-2014
0.40
Rudder horn to bottom rib
Details
       

 03-23-2014
0.40
Rudder bearings
Details
       

 03-23-2014
0.50
Rudder Bearing plates
Details
       

 03-23-2014
1.00
Cleco and step drill ribs
Details
       

 03-18-2014
1.50
Sealed interior seams and tube
Details
       

 03-18-2014
0.00
More pictures
Details
       

 02-13-2014
3.00
Fuel pick up lines and vents
Details
       

 02-04-2014
7.00
PRC
Details
       

 01-26-2014
5.00
Started PRC of fuel tanks
Details
       

 01-26-2014
1.00
PRC clean up.
Details
     

 01-25-2014
6.30
Prep parts for prc
Details
       

 01-19-2014
0.50
Fuel pick up lines
Details
     

 01-13-2014
0.50
Drilled out AC-CT-028 attachment Brackets
Details
     

 01-13-2014
4.00
Drilled all holes out with #30
Details

 01-13-2014
1.00
counter sunk all the attachment brackets with 100c
Details

 01-12-2014
2.50
Internal tank stiffeners and ribs
Details
       

 01-12-2014
1.00
Cleco both tanks together
Details
       

 01-05-2014
2.00
Fule tank ring doublers
Details
       

 01-04-2014
0.50
lower tank drain valve assemblies

 01-04-2014
0.70
Fuel caps
Details
     

 12-27-2013
0.70
Fin cap rib
Details
       

 12-22-2013
2.00
Fin cap
Details
       

 12-18-2013
1.90
Finished riveting right side skins
Details
       

 12-17-2013
0.30
Top Rudder Hinge
Details
       

 12-17-2013
1.00
Push rod lugs
Details
       

 12-17-2013
0.10
Front spar attachement hardware.
     

 12-17-2013
1.00
Clecoed skins to right side
Details
       

 12-12-2013
0.10
counter weight
Details
     

 12-11-2013
1.70
elevator push rod
Details
       

 12-11-2013
1.50
elevator horn
Details
       

 12-07-2013
1.10
left side skins and spar doublers
Details
       

 12-06-2013
1.50
Leading edge skin
Details
       

 12-06-2013
0.60
Attached stringers to skins
Details
       

 12-05-2013
0.40
VS-010 and VS-013
Details
       

 12-05-2013
0.40
Top rudder hinge braket VS-012
Details
       

 12-05-2013
0.40
spar cable attachment braket
Details
       

 12-05-2013
0.20
Shear plate VS-023
Details
       

 12-05-2013
1.50
Ribs to spars
Details
       

 12-05-2013
0.70
left and right elevator hinge brakets to spar
Details
       

 12-05-2013
1.20
Inspection covers redone
Details
       

 12-05-2013
1.80
inspection cover doublers and covers
Details
       

 12-05-2013
0.40
Compression bracket
Details
       

 12-05-2013
0.20
Attached VS-019 rudder hinge assembly
Details
     

 12-04-2013
3.00
Sprayed epoxy primer EC117
Details
       

 12-03-2013
3.40
treated parts with Aluma-Dyne E2310
Details
       

 12-02-2013
8.00
built paint booth
Details
       

 11-26-2013
3.50
pre sand parts for corrosion protection
Details
       

 11-15-2013
2.00
prep fpr corrosion protection
Details

 11-14-2013
3.00
corrosuon protection prep
Details

 11-10-2013
4.00
polishing of spar doublers
Details
       

 11-09-2013
2.00
Step drilling VS-010, and 013
Details
       

 11-09-2013
1.00
step drill part #VS-015 to top inspar
       

 11-09-2013
2.00
inspection covers and doublers
Details
       

 11-08-2013
0.40
VS-023
Details
       

 11-07-2013
1.50
Step drilled vs-014 and VS-010
       

 11-07-2013
1.50

Details
     

 11-07-2013
1.80

Details
       

 11-04-2013
1.50
Step drilled VS-017 and VS-016
Details
     

 11-01-2013
1.00
Nose spars and in spars
Details
       

 10-30-2013
1.50
De burred skins and doublers
Details
     

 10-29-2013
1.50
take apart skins
Details
       

 10-27-2013
2.50
drilled al to #29, then over spars to #19
       

 10-26-2013
1.50
Drilled to #29
Details
     

 10-24-2013
2.50
drilled out to #40
Details
       

 10-24-2013
4.50
drilled from #40 to #29 then #19 over spars
Details
       

 10-22-2013
3.00
Drilled all hole to #40
Details
     

 10-21-2013
1.50
Parts inventory
Details
       

 10-21-2013
0.10
First hole drilled and Clecoed
       










Copyright © 2001-2024 Matronics. All Rights Reserved.