Powered By Kitlog Pro v2.0
Pietenpol Air Camper
Pietenpol Air Camper
All
Work Logs Found:
461
Category Work Time:
1041 Hours
Date
Hours
Work Log Summary
Details
11-14-2021
3.00
Aileron Controls
Details
10-31-2021
2.00
Aileron Controls
Details
09-14-2021
2.50
Instruments Fitted
Details
09-09-2021
1.50
Instrument Panel
Details
08-30-2021
2.00
Instrument panel
Details
08-28-2021
1.00
Instrument panel
Details
08-06-2021
12.00
Moving the workshop
Details
09-06-2020
1.50
Cylinder Nuts
Details
09-04-2020
1.00
Valve covers
Details
09-02-2020
1.00
Cleaning
Details
08-23-2020
3.00
Mounting the cylinders
Details
08-23-2020
1.00
Mounting the cylinders
Details
08-11-2020
1.50
Pistons
Details
07-28-2020
1.00
#2 cylinder
Details
07-26-2020
1.50
Painting the cylinders
Details
07-24-2020
3.00
Cylinders sandblasted
Details
07-18-2020
1.50
Oil sump
Details
07-06-2020
2.00
Cylinder cleaning
Details
07-05-2020
2.00
Cleaning
Details
07-04-2020
1.50
Engine Assembly
Details
04-04-2020
2.00
Instrument panel
Details
02-16-2020
2.00
Connecting rods
Details
01-11-2020
0.50
Compass
Details
08-11-2019
1.00
Shoulder belts
08-10-2019
1.00
Shoulder belts
06-02-2019
0.80
Blade #2 Front
Details
06-01-2019
1.00
1200 grid sanding
Details
05-30-2019
0.50
Temperature and pressure gauges
Details
05-30-2019
0.70
Scotch brite
Details
05-27-2019
1.00
McCauley prop cleaning
05-26-2019
1.50
McCauley prop cleaning
05-22-2019
1.50
McCauley prop cleaning
05-21-2019
1.50
McCauley prop cleaning
Details
05-19-2019
1.00
McCauley prop received
Details
04-19-2019
1.00
Safety Belts
03-16-2019
2.00
Fuel Tank Test
03-15-2019
2.00
Fuel Tank
03-13-2019
2.00
Fuel Tank
03-11-2019
2.00
Fuel Tank
02-16-2019
3.00
Fuel Tank
12-14-2018
1.00
Fuel Tank
12-11-2018
1.00
Fuel Tank
12-07-2018
1.00
Fuel Tank
12-04-2018
2.50
Fuel Tank
11-22-2018
2.00
Fuel Tank
11-20-2018
1.50
Fuel Tank
11-18-2018
3.00
Tank Plug
11-17-2018
1.00
Windshield
Details
11-10-2018
1.00
Center Wing
Details
11-02-2018
1.00
10-14-2018
1.50
Wing center
10-06-2018
1.50
Center wing
Details
09-01-2018
2.00
Small stuff on wings
Details
08-22-2018
1.50
T-nuts epoxy
Details
08-21-2018
2.00
Le sheeting
Details
08-16-2018
4.00
Root cf reinforcements
Details
08-15-2018
4.00
Finishing touches
08-15-2018
3.00
Aileron
Details
08-13-2018
2.00
Right wing aileron
Details
07-22-2018
2.00
Left wing
Details
07-13-2018
2.00
Left wing tip sheeting
Details
07-06-2018
1.50
Tip sheeting
Details
06-16-2018
2.00
Compression struts
Details
06-15-2018
2.00
Left wing tip sheeting
Details
06-08-2018
4.00
Le sheeting
Details
06-03-2018
2.00
Left wing le sheeting
Details
06-02-2018
3.50
Leading edge sheeting
05-27-2018
3.00
Drag antidrag wires
05-25-2018
2.50
Drag-antidrag wires
Details
05-19-2018
1.00
Youth day
Details
05-13-2018
2.00
Left wingtip
Details
04-20-2018
2.00
Left wingtip preparation
Details
04-15-2018
3.00
Ailkeron spars
Details
04-14-2018
3.50
Trailing edge guessets, right wing.
Details
04-13-2018
1.00
Left wing false spar
Details
04-07-2018
4.00
03-31-2018
5.00
03-30-2018
3.00
03-17-2018
2.00
03-16-2018
3.00
03-11-2018
5.00
Details
03-10-2018
4.00
03-09-2018
4.50
Left wing, starting assembly.
Details
03-08-2018
1.00
Details
03-06-2018
2.00
Wing tip sheeting, right wing.
Details
03-04-2018
3.50
Diagonal braces, right wing.
Details
03-03-2018
2.50
Tip sheeting.
Details
03-02-2018
2.00
Right wing le sheeting again.
03-02-2018
3.00
Right wing
Details
02-26-2018
2.00
Right wing le sheeting
02-17-2018
2.00
Left wing trial fit
Details
01-12-2018
2.50
Filler battens
Details
01-07-2018
3.00
Cutting right aileron out
Details
01-06-2018
3.00
Glueing wood in place
Details
01-05-2018
1.00
Throttle arm
Details
01-02-2018
1.00
Left wingtip
01-01-2018
3.00
Right wingtip bow
Details
12-31-2017
3.00
Right wing aileron
Details
12-30-2017
3.00
Ailerons
Details
12-29-2017
2.50
Preparing wood
Details
12-26-2017
1.50
Throttle lever
Details
12-24-2017
3.00
Elevator control cables
Details
12-20-2017
2.00
Throttle lever
Details
12-17-2017
2.00
Tail brace wires
Details
12-16-2017
4.00
Tail brace wires
Details
12-09-2017
4.00
Measuring for struts
Details
12-09-2017
1.00
Measuring for struts
11-24-2017
1.50
Tailwheel
Details
11-19-2017
2.00
Checking
Details
11-17-2017
2.00
Rear deck
Details
11-16-2017
3.00
Covering rear deck
Details
11-11-2017
2.00
Deck
Details
11-05-2017
1.00
Door finished
Details
11-04-2017
4.00
Door and brakes
Details
11-03-2017
4.00
Door
Details
10-28-2017
3.00
Trial fitting cabane struts etc.
Details
10-15-2017
1.00
Door hinges
Details
10-10-2017
2.00
Aileron yoke
Details
09-29-2017
3.00
Diagonal cabane struts
Details
09-13-2017
1.00
Airspeed
Details
08-27-2017
3.50
Wing center
Details
08-19-2017
1.00
Cessna panel
Details
08-12-2017
2.00
Door opening
Details
08-01-2017
2.50
Bad vertical speed
Details
07-30-2017
3.00
Door opening
Details
07-30-2017
3.00
Center wing
Details
06-27-2017
2.50
Cabane struts
Details
06-25-2017
2.00
Deck
Details
06-18-2017
4.00
Door opening
Details
06-17-2017
2.00
Venturi
Details
06-04-2017
3.50
Door opening
Details
05-31-2017
2.00
Checking things
Details
05-28-2017
4.00
Metals
Details
05-27-2017
3.00
Metal fittings
Details
05-21-2017
2.00
Preparation for battens
Details
05-20-2017
3.00
Holes for metal fittings
Details
05-19-2017
3.00
Strip reinforcements
Details
05-15-2017
3.00
Bottom strips
Details
05-13-2017
2.00
Edge preparation
Details
05-12-2017
0.50
Throttle cable
Details
05-07-2017
4.00
Side ply again
Details
05-06-2017
5.00
Left side ply
Details
05-01-2017
5.00
Side plys
Details
04-30-2017
4.00
Starboard plywood
Details
04-29-2017
4.00
Varnishing fuselage
Details
04-23-2017
3.00
Varnish
Details
04-23-2017
2.00
Fabric adhesive and Acrylic water based paint test
Details
04-22-2017
3.00
Varnish
Details
04-01-2017
2.00
Varnishing
Details
03-19-2017
3.00
Landing Gear Angles
Details
03-11-2017
2.00
Trailing edge reinforcements
Details
02-26-2017
3.00
Aileron spar shaping
Details
02-26-2017
4.00
Aileron pulleys
Details
02-05-2017
5.00
Wing center
02-04-2017
3.00
Wing center
02-03-2017
2.00
Center wing fittings
Details
01-29-2017
2.00
Wing center
01-28-2017
2.00
Wing center
01-23-2017
1.00
Wing center
01-22-2017
2.00
Wing center
12-18-2016
3.00
Wing center
11-20-2016
3.00
Aileron false spar
11-19-2016
4.00
Trailing and leading edges pf right wing
Details
11-13-2016
4.00
Right wing work
11-06-2016
3.00
Work on parts of right wing
Details
11-05-2016
2.00
Leading and trailing edges
Details
10-02-2016
2.00
Intake manifold
Details
10-02-2016
3.00
Cabane strut lamination
Details
10-01-2016
3.00
Drag wires
Details
09-25-2016
3.00
Drag - antidrag wires
Details
09-18-2016
3.00
Right wing
Details
09-17-2016
2.00
09-16-2016
2.00
Drg - anti drag wires
09-14-2016
2.00
Right wing butt rib
Details
09-13-2016
2.50
Weights
Details
09-11-2016
2.00
Right wing
Details
09-04-2016
2.00
Rework
Details
09-03-2016
4.00
Rework
Details
08-28-2016
3.00
Right wing
08-21-2016
3.50
Right wing
08-20-2016
3.00
Clean up
Details
08-18-2016
3.00
Ply braces
Details
08-17-2016
3.00
Ply lamination
Details
08-16-2016
2.00
Root fittings
08-08-2016
2.00
Right wing panel
Details
07-24-2016
2.00
Struts
Details
07-23-2016
4.00
Struts
Details
07-19-2016
3.00
Cabane struts
Details
07-10-2016
2.00
Lift struts
Details
07-09-2016
4.00
Strut fittings
Details
07-09-2016
3.00
Cabane struts
Details
07-07-2016
2.00
Strut fittings
Details
07-06-2016
1.00
Cabane struts
Details
07-05-2016
2.00
Cabane struts
Details
06-26-2016
4.00
Struts
Details
06-25-2016
2.00
Spar tips
Details
06-19-2016
1.50
Dry fitting blocks
Details
06-16-2016
3.00
Router again
Details
06-12-2016
2.00
Last spar
Details
06-11-2016
2.00
Center section spars
Details
06-10-2016
4.00
Engine mount
Details
06-04-2016
2.00
Spar caps cont'd.
Details
05-28-2016
2.00
Spar caps
Details
05-26-2016
2.50
Intake pipes
Details
05-21-2016
2.00
More spar caps
Details
05-21-2016
1.50
Glueing the spar caps
Details
05-19-2016
2.50
Spar caps
Details
05-15-2016
2.00
Glueing spar caps
Details
05-14-2016
2.00
First spar caps
Details
05-11-2016
1.00
Piston cleaning
Details
05-10-2016
2.00
Still splicing
Details
05-10-2016
1.50
#4 piston
Details
05-08-2016
1.50
Epoxying splices
Details
05-07-2016
4.00
Plywood for spars
Details
04-18-2016
4.00
Crankcase as is.
04-15-2016
3.00
End of disassembly
04-15-2016
3.00
End of disassembly
04-14-2016
3.00
Splitting the case
Details
04-12-2016
3.00
Crankcase
Details
04-11-2016
2.00
Engine disassembly
Details
04-08-2016
3.00
Landing gear
Details
04-07-2016
4.00
Landing gear
Details
04-05-2016
3.00
Diassembly
Details
04-04-2016
2.00
Disassembly cont'd
Details
03-31-2016
2.00
Engine on table
Details
03-30-2016
1.00
Disassembly cont'd
Details
03-29-2016
1.00
Disassembly
Details
03-26-2016
1.00
Turtledeck
Details
03-25-2016
1.00
C90-8F
Details
03-20-2016
2.00
Turtledeck
Details
03-20-2016
1.00
Turtledeck
Details
03-18-2016
1.00
Wheels
Details
03-17-2016
2.00
Wheels
Details
03-17-2016
3.00
Shocks
Details
03-02-2016
2.00
Shocks
Details
03-01-2016
2.00
Axle
Details
02-28-2016
1.00
Wheel trial
Details
02-27-2016
1.00
Idler arm
Details
02-25-2016
1.50
Shock absorber
Details
02-20-2016
3.00
Checking the correctness
Details
02-18-2016
7.00
Lower reinforcements
Details
02-17-2016
1.00
Wheels
Details
02-12-2016
1.00
Engine mount fittings
Details
02-12-2016
3.00
Control wires
Details
02-07-2016
1.50
Clean up
Details
02-06-2016
1.00
Looking at the engine
Details
01-30-2016
3.00
Front seat back
Details
01-25-2016
1.50
Fornt seatback reinforcements
Details
01-23-2016
2.00
Work on fuselage
Details
01-22-2016
2.00
Welding
Details
01-20-2016
2.00
Reinforcements
Details
01-17-2016
1.00
Discussion
Details
01-12-2016
2.00
Ribs
Details
01-10-2016
2.00
Rudder pedals
Details
01-08-2016
1.00
Rudder pedals
Details
01-05-2016
1.00
Selim's son
Details
12-26-2015
2.00
Front seat
Details
12-20-2015
2.00
Rear seat "sittable".
Details
12-19-2015
1.50
Rear seat
Details
12-08-2015
2.00
Machining
Details
12-07-2015
1.00
Shock struts
Details
12-06-2015
3.00
Seats
Details
12-05-2015
1.00
Shock struts
Details
12-05-2015
2.50
Rear seat
Details
11-30-2015
2.00
Landing gear
Details
11-29-2015
3.50
Fuselage
Details
11-28-2015
1.00
Fuselage formers
Details
11-28-2015
2.00
Elavator bellcrank again
Details
11-27-2015
1.00
Landing gear vees
Details
11-22-2015
2.00
Bellcrank mounts
Details
11-14-2015
3.50
Seats
Details
11-11-2015
2.50
Door reinforcement
Details
11-10-2015
4.00
Fuselage bearings
Details
11-08-2015
4.00
Rear seat
Details
11-07-2015
1.00
Turnbuckles
Details
11-07-2015
1.00
Rudder pedals
Details
11-07-2015
4.00
Rear seat back
Details
11-02-2015
1.50
Finger straps
Details
11-01-2015
5.00
Bottom plywood
Details
10-31-2015
5.00
Firewall
Details
10-29-2015
4.00
Fuselage guessets
Details
10-25-2015
3.00
Fuselage work
Details
10-24-2015
3.00
Firewall
Details
10-23-2015
1.00
Landing gear jig
Details
10-18-2015
5.00
Fuselage bottom ply
Details
10-17-2015
4.00
Cleaning
Details
10-16-2015
2.00
Elevator bellcrank and lower tail brace wire joint
Details
10-11-2015
2.00
Landing gear cross braces
Details
10-10-2015
3.00
Landing gear cross brace
Details
10-09-2015
4.00
Rudder pedals
Details
10-06-2015
2.00
Landing gear cross braces
Details
10-04-2015
5.00
More fuselage work
Details
10-03-2015
4.00
Work on fuselage
Details
09-28-2015
2.00
Rudder pedals tubing
Details
09-27-2015
2.00
Correction
Details
09-26-2015
4.00
Cleaning
Details
09-25-2015
3.00
Fuselage work
Details
09-24-2015
4.00
Fuselage work
Details
09-20-2015
3.50
Fuselage work
Details
09-19-2015
4.00
Fuselage construction
Details
09-13-2015
3.50
More ply cutting
Details
09-12-2015
7.00
Cutting fuselage ply
Details
09-08-2015
0.50
Sanding
Details
09-06-2015
4.00
Cleaning
Details
09-05-2015
4.00
Fuselage on its own
Details
08-30-2015
3.50
Cross members
Details
08-29-2015
3.50
Tail post
Details
08-22-2015
5.00
Fuselage work
Details
08-21-2015
5.00
Fuselage construction
Details
08-20-2015
5.50
Sides coming together
Details
08-19-2015
5.50
Leftt side epoxied
Details
08-18-2015
5.00
Fuse left side preparation
Details
08-17-2015
6.50
Fuselage work going on
Details
08-16-2015
5.00
Fuselage right side again
Details
08-15-2015
6.00
Right side finished
Details
08-14-2015
4.00
Cutting wood
Details
08-13-2015
3.00
Fuselage construction start
Details
08-10-2015
5.00
Setting up the workshop
Details
07-27-2015
1.00
Rudder
Details
07-26-2015
1.50
Fin finished
Details
07-18-2015
2.50
Sanding empennage components
Details
07-12-2015
1.00
Glue for covering
Details
07-07-2015
1.00
Sanding
Details
07-05-2015
1.00
Thicness differences
Details
07-02-2015
1.00
Elevator T-nuts
Details
07-01-2015
0.50
Fin T-nuts
Details
06-30-2015
0.50
Rudder T-nuts
Details
06-29-2015
0.50
Epoxying T-nuts
Details
06-28-2015
1.50
T-nuts again
Details
06-23-2015
1.00
More T-nuts
Details
06-22-2015
1.00
Nicopress
Details
06-19-2015
1.00
M5 T-nuts
Details
06-14-2015
2.00
Ribs finished
Details
05-31-2015
1.00
Guesset defects
Details
05-30-2015
1.50
Trailing edge sizing
Details
05-29-2015
1.00
Trailing edge
Details
05-28-2015
2.00
Outline sanding
Details
05-23-2015
1.00
Rib outline sanding
Details
05-19-2015
2.00
Rib outline sanding
Details
05-11-2015
1.00
Rib outlines
Details
05-07-2015
10.00
Hinges
Details
05-06-2015
0.50
Ditto
Details
05-03-2015
1.00
Rib outlines
Details
05-02-2015
1.50
Sanding the rib outlines
Details
05-01-2015
1.50
Leading edges
Details
04-30-2015
1.00
Hardener
Details
04-26-2015
1.00
Last rib
Details
04-23-2015
1.00
Still more ribs
Details
04-19-2015
1.00
More ribs
Details
04-17-2015
1.00
Butt rib
Details
04-16-2015
0.50
Landing Gear Springs
Details
04-13-2015
1.00
Another facing
Details
04-11-2015
1.00
Ply facing
Details
04-06-2015
0.50
Another facing
Details
04-05-2015
0.50
Facing for butt rib
Details
04-04-2015
0.50
Ply facing
Details
04-04-2015
1.00
Finishing #30
Details
04-04-2015
0.50
Epoxy mixer
Details
04-02-2015
0.50
Rib #30
Details
04-01-2015
0.50
Rib #30
Details
03-29-2015
0.50
Started rib #30
Details
03-28-2015
0.80
Rib #29
Details
03-24-2015
0.60
Rib #29
Details
03-21-2015
0.50
Finishing the ribs
Details
03-18-2015
0.40
Left aileron bay rib
Details
03-17-2015
0.60
The other side
Details
03-16-2015
0.30
Capstrips
Details
03-15-2015
0.50
Left side guessets
Details
03-14-2015
1.00
#28 rib
Details
03-10-2015
1.00
#28 rib
Details
03-08-2015
0.50
#28 rib
Details
03-07-2015
0.10
Rib #27
Details
03-07-2015
0.70
More ribs
Details
03-07-2015
1.00
Even more ribs
Details
03-06-2015
0.50
Remaining guessets
Details
03-03-2015
2.40
Ply guessets
Details
02-28-2015
0.80
Leading edge
Details
02-27-2015
1.00
Leading edge
Details
02-24-2015
1.00
Stab leading edge rounded
Details
02-23-2015
0.10
Rib
Details
02-23-2015
2.50
Cleaning the ribs
Details
02-22-2015
1.20
Wing ribs again
Details
02-17-2015
0.20
Stab weight
Details
02-15-2015
1.00
Glued corner braces of stab
Details
02-10-2015
1.00
Cutting plywood again
Details
02-03-2015
0.10
Seat belts
Details
01-24-2015
1.50
Tail brackets
Details
01-15-2015
1.50
Stab bracing
Details
01-14-2015
0.50
Fin bracing
Details
01-10-2015
0.50
Weights
Details
01-09-2015
1.30
Metal Parts
Details
01-09-2015
0.50
Making ply
Details
01-09-2015
1.00
Aileron yoke and elevator bellcrank
Details
12-31-2014
1.10
Ply blocks
Details
12-30-2014
0.60
Bace wire attachmants
Details
12-28-2014
0.60
Stab LE corners
Details
12-19-2014
1.00
Stab
Details
12-16-2014
0.80
Stab reinforcements cont'd
Details
12-15-2014
0.80
Stab reinforcements cont'd
Details
06-14-2014
1.00
Stabr reinforcements
Details
03-26-2014
1.20
More bearings
Details
03-23-2014
1.00
Torque rod bearings
Details
03-23-2014
1.00
Elevator outer battens
Details
03-22-2014
0.20
Rudder weight
Details
03-21-2014
0.50
Trimming rudder
Details
03-21-2014
1.50
Torque tube bearings
Details
03-20-2014
1.00
Reinforcements glued.
Details
03-19-2014
0.80
Reinforcements
Details
03-08-2014
8.00
Still rudder
Details
03-01-2014
1.00
Rudder Braces
Details
02-25-2014
0.80
Rudder
Details
02-21-2014
0.60
More Stick
Details
02-20-2014
1.00
Rudder again
Details
02-20-2014
0.10
How I work
Details
02-19-2014
1.00
Stick
Details
02-18-2014
0.50
Primer
Details
02-17-2014
1.00
Rudder
Details
02-14-2014
0.80
Stick bottom
Details
02-13-2014
1.50
Stick bottom
Details
02-13-2014
0.50
Fin
Details
02-12-2014
1.00
Fin
Details
02-09-2014
0.80
Stab
Details
02-09-2014
1.00
Fin
Details
02-08-2014
1.00
Fin
Details
02-07-2014
0.60
Brace glued.
Details
02-06-2014
0.70
Joysticks
Details
02-05-2014
1.00
Fin top ply
Details
02-03-2014
1.00
Magneto
Details
02-01-2014
2.50
More plywood
Details
01-29-2014
1.00
Fin ribs
Details
01-26-2014
0.80
Fin spar
Details
01-20-2014
0.50
Fin frame
01-19-2014
1.00
Fin
Details
01-18-2014
1.00
Glueing tip
01-17-2014
1.00
Preparation
01-16-2014
1.00
Planing the laminate
01-15-2014
1.00
Fin top piece lamination
01-14-2014
1.00
Braces
Details
01-13-2014
0.80
Reinforcements glued
Details
01-12-2014
1.00
Reinforcements
Details
01-09-2014
1.00
Stab
Details
01-01-2014
0.00
Project background
Details
01-01-2014
0.50
More work on empennage
Details
01-01-2014
1.00
Fin top piece
Details
12-30-2013
0.50
New horns
Details
12-21-2013
2.00
Stab cont'd
Details
12-18-2013
4.00
Stab cont'd
Details
12-16-2013
2.00
Started stab
Details
12-08-2013
2.00
Ribs
Details
10-07-2013
2.00
Engine
Details
07-01-2013
0.80
Some horns
Details
06-29-2013
1.00
Empennage hinges
Details
06-28-2013
2.00
Hinge reinforcements
Details
05-26-2013
64.00
More ribs
Details
03-05-2011
4.00
Ribs
Details
06-27-2010
1.00
Starting ribs
Details
05-19-2009
4.00
Right side (with door)
Details
04-25-2009
1.50
Preparing for box spars
Details
04-04-2009
5.00
Starting fuselage
Details
03-28-2009
4.00
Cutting wood
Details
03-28-2009
4.00
Buying wood
Details
SITE NAVIGATION
Contact Builder
Gyrocopter Home
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
461
1041
Controls
32
60
Covering
1
2
Empennage
67
78
Engine
36
68
Fittings
1
1
Fuselage
98
310
Instruments
9
14
Intro
1
Landing Gear
21
38
Miscellaneous
5
18
Plumbing
12
23
Prop
8
9
Shop Supplies
3
9
Wings
167
411
Copyright © 2001-2025 Matronics. All Rights Reserved.