KitLog pro

Powered By Kitlog Pro v2.0

GEORGE'S WEB SITE
Work Logs Found: 75
Category Work Time: 215 Hours
 Date
Hours
Work Log Summary

Details

 08-29-2016
8.00
Conditioned and riveted bottom skin on wings
Details

 07-07-2016
1.00
Expanded drilling pilot holes on O/B Bottom Skin.
Details

 07-04-2016
4.00
Set up level surface for frame, Attached O/B bott
Details

 07-02-2016
4.00
Completed Riveting Frame
Details

 04-24-2016
4.00
Assembled Wing 1
Details

 04-23-2016
1.00
Rear Channel
Details

 09-06-2015
4.00
Preassemble Wing Sheleton
Details
       

 08-30-2015
6.00
Fabricated Nose Ribs for wings
Details
       

 08-30-2015
3.00
Completed Wing Nose Ribs
Details
     

 08-16-2015
24.00
Completed Flaps and Slats
Details

 08-06-2014
6.00
Fabricated internal structures of STOL Slats
Details

 07-07-2014
2.00
riveted all flaperons
Details

 07-07-2014
2.00
packed assembled flaperons
Details

 07-06-2014
2.00
prepped right o/b Flaperon
Details

 07-05-2014
2.00
prepped left o/b Flaperon
Details

 07-04-2014
2.00
Prepped right i/b flaperon
Details

 07-03-2014
2.00
Prepped the left i/b flaperon
Details

 07-02-2014
2.00
Drilled and fabricated the right outboard flaperon

 07-01-2014
2.00
fabricated and drilled left outboard flap
Details

 06-29-2014
4.00
Fabricated and drilled right I/B Flaperon
Details

 06-28-2014
8.00
Assembled ribs Left I/B Flaperon
Details

 06-20-2014
1.00
Unpack Skin, Prepare 75A2-3
Details

 06-15-2014
4.00
Fabricate and Rivet 75A2-1
Details

 06-08-2014
3.00
Riveted Flaperon Spars
     

 06-01-2014
3.00
Completed drilling, deburring of spar
Details
     

 05-18-2014
2.00
Deburred, Drilling
Details
       

 05-10-2014
2.00
Flaperon frame assembly
       

 03-15-2014
2.00
Inventoried Kit
Details
     

 01-19-2014
1.00
Work Table work
Details
       

 01-12-2014
3.00
Opened and inspected Flap and Slat Kit
Details
     

 12-08-2013
4.00
Mated horrizontal stabilizer with elevator
Details
       

 12-02-2013
2.00
Mated horizontal stabilizer with Elevator
Details
     

 11-30-2013
1.00
Piveted elevator
Details

 11-29-2013
1.00
Riveting elevator
Details

 11-27-2013
1.00
Riveting of Elevator
Details

 11-25-2013
1.00
Final riveting
Details

 11-24-2013
2.00
Finished drilling on Elevator
Details

 11-23-2013
2.00
More Drilling on the Elevator, Part 2
Details

 11-22-2013
2.00
Drilled pilot holes on Elevator Part 1
Details

 11-21-2013
2.00
Level table for drilling
Details

 11-18-2013
2.00
Remounted a front elevator skin and front skin spa
Details

 11-17-2013
2.00
Mounted Trim Tab Servo Part 2
Details

 11-15-2013
2.00
Linkage for Trim Tab Server Part 1
Details

 11-10-2013
2.00
Initially drilled holes for Trim Tab Servo
Details

 11-09-2013
2.00
Mounted Trim tab on Horizontal stabilizer
Details

 11-08-2013
2.00
Initial drilling of Trim hinge
Details

 11-06-2013
2.00
Fabrication of Elevator horn
Details
     

 11-03-2013
2.00
Final riveting Horizontal Stabilizer
Details

 10-28-2013
2.00
Drilled Mounting bracket horizontal stabilizer
Details

 10-23-2013
2.00
Mounted elevator horn
Details

 10-20-2013
2.00
Trim tab mounting on elevator
Details

 10-18-2013
2.00
Drilled skin on elevator
Details

 10-17-2013
2.00
Mount skin on Elevator
Details

 10-15-2013
2.00
Assemble Elevator
Details

 10-14-2013
2.00
Deburr and rivet
Details
     

 10-13-2013
3.00
Debur and Cortec Horizonal Stabilizer
Details
       

 10-11-2013
1.00
Debur Horizontal Stabilizer
Details

 10-10-2013
1.00
Deburring Horizontal Stabilizer
Details

 10-08-2013
1.00
Deburring
Details

 10-03-2013
2.00
Deburring
Details

 10-02-2013
2.00
Redrill Non-compliant Holes
Details

 10-01-2013
2.00
Redrilling Horizontal Stabilizer
Details

 09-30-2013
2.00
Drilling Inspection
Details

 09-29-2013
2.00
Completed Drilling
Details

 09-28-2013
6.00
De-assembled Tail Kit Shipping Crate
Details

 09-24-2013
1.00
Drilling
Details

 09-22-2013
6.00
Horizontal Stabilizer Skin
Details
       

 09-21-2013
6.50
Rear Mounting Bracket and tools
Details
     

 09-19-2013
2.00
Cut rear mounting bracket
Details

 09-17-2013
1.00
Drilled front spar
Details

 09-16-2013
2.00
Tools testing and adjustment
Details

 09-15-2013
2.50
Started Construction
Details

 09-08-2013
4.00
Set out parts and tools for Tail Kit
Details

 09-07-2013
4.00
Inventory Tail Kit
Details

 08-30-2013
2.00
Rear Mounting Bracket Redrill.
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.