Powered By Kitlog Pro v2.0
PAUL'S WEB SITE
GP-4
All
Work Logs Found:
39
Category Work Time:
168 Hours
Date
Hours
Work Log Summary
Details
08-03-2013
6.00
Sta 0
Details
08-02-2013
3.00
Sta 0
Details
08-01-2013
4.00
Sta 0
Details
07-30-2013
4.00
Sta 0 members
07-29-2013
2.00
Sta 0
Details
07-28-2013
2.50
Cut and glue diagonals, STA 168 3/4
Details
07-27-2013
0.50
Glued in Station 141 1/4 diagonals
07-26-2013
3.50
Gluing stations 97,114, 137 1/4, 178 and diagonals
07-22-2013
1.00
measure and cut cross members
Details
07-14-2013
6.00
More Frames
Details
07-12-2013
6.00
Additional Frames
Details
07-07-2013
4.00
begin building construction jig frames
Details
07-06-2013
0.50
pre-curve the fuselage sides
Details
07-06-2013
1.50
Glue 3/32 ply to inside face of fuselage sides
07-04-2013
2.50
Cutting and fitting 3/32 Ply from Station 0 to 78
Details
07-03-2013
4.00
Sand off excess glue and fill with t-88 a couple o
07-02-2013
2.50
Glue Fuselage Side # 2
07-01-2013
1.00
cleaning off excess glue from fuselage side #1
Details
06-29-2013
3.00
Glue up of Fuselage side #1
Details
03-20-2013
48.00
Cutting fitting uprights / supports / corner bloc
Details
03-19-2013
3.00
cutting longerons scarf sections and gluing
03-17-2013
2.00
Rip, and taper longerons from 3"x3/4" spruce to 1
03-16-2013
2.00
Rip, and taper longerons from 3"x3/4" spruce to 1
Details
03-15-2013
2.00
cut and apply gussets for front of spar assembly
03-10-2013
1.00
trim excess ply on horizontal stab spar with route
03-09-2013
2.00
glue and clamp ply to stabilizer
03-08-2013
1.50
Rip 3/32 inch mahogany 90 dergee plywood for horiz
03-03-2013
1.50
clean up and sand excess epoxy from spar assembly
02-16-2013
7.00
Glue up of the horizontal stab spar
02-15-2013
2.00
Jig up and fit the individual pieces of the horizo
02-13-2013
1.00
Cutting more pieces for horizontal stab spar - 2 i
02-12-2013
1.00
rip 7/8 inch piece, make more mistakes, and waste
02-11-2013
2.00
Cutting Hinge blocks for Horizontal Stab
02-10-2013
2.00
cut horizontal stab spar web
02-09-2013
1.00
Rip 3/8 inch spar caps for Stap
02-09-2013
3.00
Lofting the horizontal stabilizer
Details
02-05-2013
2.00
Loft Fuselage sides to table
01-01-2013
16.00
Aquired project and materials
Details
10-10-2012
10.00
build table
Details
SITE NAVIGATION
Contact Builder
GP-4 Home
Category
# Logs
# Hours
All
39
167
Empennage
13
27
Fuselage
24
114
Miscellaneous
1
16
Shop Supplies
1
10
Copyright © 2001-2024 Matronics. All Rights Reserved.