KitLog pro

Powered By Kitlog Pro v2.0

PIERRE'S WEB SITE
Work Logs Found: 112
Category Work Time: 463 Hours
 Date
Hours
Work Log Summary

Details

 07-29-2015
4.00
At the Airport
Details
       

 07-23-2015
2.00
leaving house for the airport
       

 07-14-2015
4.00
hang test
Details
       

 07-06-2015
5.00
instrument panel
Details
       

 06-05-2015
2.00
fuel leak test
Details
       

 06-04-2015
4.00
fuel cap installation
Details
       

 06-04-2015
2.00
fuel cap in place
       

 06-01-2015
8.00
wiring
       

 06-01-2015
8.00
wiring
       

 05-29-2015
4.00
Key West regulator
       

 05-29-2015
1.00
first solo flight R22
Details
       

 05-28-2015
1.00
oil lines details pictures
       

 05-28-2015
4.00
governor in place
       

 05-27-2015
4.00
wiring governor
       

 05-26-2015
2.00
adjusting battery box
       

 05-25-2015
4.00
dual sensor preparation
       

 05-25-2015
2.00
dual sensor in place
       

 05-23-2015
2.00
clutch and start swithch installation
       

 05-21-2015
2.00
exhaust in place
       

 05-20-2015
2.00
engine exhaust
Details
       

 05-20-2015
2.00
Chrome exhaust cutting
Details
       

 05-15-2015
2.00
exiter installation
       

 05-13-2015
2.00
clutch microswitch brackets
       

 05-12-2015
4.00
clutch microswitch
       

 05-10-2015
2.00
governor installation
       

 05-07-2015
4.00
Governor box
Details
       

 05-04-2015
4.00
engine installation
Details
       

 04-28-2015
2.00
Evershield on engine oil line
       

 04-26-2015
4.00
oil lines engine
Details
       

 04-20-2015
4.00
Engine Oil tank
Details
       

 04-15-2015
4.00
preparing clutch parts
Details
       

 08-18-2014
2.00
Instrument panel
Details
       

 02-18-2014
2.00
paint cabin
Details
       

 02-04-2014
6.00
starting to populate instruments panels
       

 02-01-2014
2.00
Tail rotor painted
     

 01-30-2014
8.00
cabin and fins painted
Details
       

 01-20-2014
2.00
inst panel complete
       

 01-19-2014
4.00
Lower panel cut out
Details
       

 01-06-2014
4.00
belly visit door
Details
     

 09-10-2013
1.00
battery box installation
       

 09-06-2013
2.00
mounting the cabin
Details
       

 09-04-2013
1.00
recheck this oil fitting inside the pulley....
Details
     

 09-03-2013
4.00
Main battery
Details
     

 09-01-2013
4.00
painting cabin interior
Details
       

 08-28-2013
4.00
seat pan and instrument pod installation
Details
       

 08-28-2013
2.00
instrument pannel cut out
Details
       

 08-22-2013
4.00
Aux battery
Details
       

 08-20-2013
1.00
Aux tank fuel leak test
Details
       

 07-19-2013
2.00
Putting windows on
Details
       

 07-17-2013
6.00
Adjusting seat pan pedals and inst pod
Details
       

 07-15-2013
6.00
Painting windshield and chin window
Details
       

 07-07-2013
6.00
completing static balancing
Details
     

 07-06-2013
8.00
Static balancing
Details
       

 07-05-2013
4.00
Blades on
Details
       

 06-30-2013
4.00
Reinforced Aux Fuel Tank support
Details
       

 06-28-2013
4.00
frabricating blades support
Details
       

 05-19-2013
2.00
Oil Test Main Trans
Details
       

 05-13-2013
4.00
Evershield
Details
       

 05-09-2013
8.00
Polishing rotor blades
Details
       

 05-06-2013
2.00
Putting the ship outside
Details
       

 03-18-2013
4.00
Fuel pump + Gascolator
Details
     

 03-17-2013
2.00
Torqued controls
Details
     

 03-13-2013
6.00
Drag links preparation
Details
       

 02-19-2013
4.00
Hub in place
Details
       

 02-17-2013
4.00
sanding
Details
       

 02-14-2013
4.00
Swash plate and hood bearing
Details
     

 02-12-2013
6.00
finihing upper and lower panels
       

 02-11-2013
4.00
trim fins work
Details
       

 02-08-2013
6.00
Instrument panel
Details
       

 02-07-2013
4.00
Oil line and fuel lines
Details
       

 02-01-2013
4.00
Oil Cooler
Details
       

 02-01-2013
4.00
Aux Fuel Tank preparation
Details
       

 01-28-2013
4.00
Fuel tank leak test
Details
       

 01-27-2013
4.00
Working tank access fittings
Details
       

 01-26-2013
4.00
Oil cooler Main trans
Details
     

 01-25-2013
6.00
Hub preparation
Details
       

 01-21-2013
4.00
Swasplate adjustement
Details
       

 01-20-2013
4.00
Swasplate install
Details
       

 01-19-2013
4.00
Swasplate
Details
       

 01-19-2013
4.00
Final installing directional controls/new Mixer
Details
       

 01-13-2013
2.00
Rotor blades crates is damaged !!!!!
Details
       

 12-14-2012
2.00
Windows
Details
       

 12-13-2012
2.00
3rd Shipment
Details
       

 10-28-2012
4.00
windows painting
Details
       

 08-05-2012
8.00
windows latches
Details
       

 07-29-2012
4.00
Windows latches
Details
       

 07-29-2012
4.00
Windows
Details
       

 07-26-2012
8.00
windows
Details
       

 06-10-2012
4.00
tail rotor work
Details
       

 06-10-2012
4.00
fuel tanks install
Details
       

 06-10-2012
2.00
Fitting Instrument Pod
Details
       

 06-07-2012
6.00
tail rotor mounting
Details
       

 06-07-2012
6.00
tail rotor blades and shaft
Details
       

 06-05-2012
4.00
tail direction scissors
Details
       

 05-30-2012
4.00
Shiming the tail rotor gear box
Details
       

 05-27-2012
4.00
Hood bearing
Details
       

 03-21-2012
7.00
Preparing upper fuel tank
Details
       

 03-17-2012
2.00
Powder coating
Details
       

 03-11-2012
8.00
Tail rotor drive shaft
Details
       

 03-11-2012
2.00
Checking drive shaft alignement
Details
       

 03-08-2012
8.00
Tail fin braces
Details
       

 02-23-2012
8.00
installing control rods
Details
       

 02-12-2012
8.00
Controls Rods and wlking beams
Details
       

 01-23-2012
6.00
collective and cyclic
Details
       

 01-23-2012
6.00
Anti Torque pedals
Details
       

 01-22-2012
6.00
Main Transmission Alignement
Details
       

 01-13-2012
4.00
vertical fin alignement
Details
       

 01-13-2012
6.00
horizontal fin
Details
       

 12-20-2011
8.00
trim fin construction
Details
       

 08-15-2011
8.00

Details
       

 08-07-2011
10.00
frame assembly
Details
       

 06-22-2011
2.00
first shipment
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.