Date
|
Hours
|
Work Log Summary
|
Details
|
06-09-2015
|
0.70
|
Smoothing rough cuts 601C
|
Details
|
|
|
05-19-2015
|
1.00
|
Fabricating F-601J
|
Details
|
|
|
05-18-2015
|
1.50
|
Firewall layout and parts finding
|
Details
|
|
|
05-04-2015
|
1.00
|
Work area setup
|
Details
|
|
|
05-03-2015
|
3.00
|
Air compressor connected to plumbing
|
Details
|
|
|
03-20-2015
|
2.00
|
Unpacking and inventory
|
Details
|
|
|
03-20-2015
|
1.50
|
More unpacking and organizing
|
Details
|
|
|
03-18-2015
|
0.70
|
Fusleage kit arrival
|
Details
|
|
|
02-18-2015
|
4.00
|
Work bench construction
|
Details
|
|
|
02-27-2014
|
0.00
|
Crest (S36) House and Hangar
|
Details
|
|
|
11-26-2013
|
0.50
|
Mounting the hinge bearings for the rudder.
|
Details
|
|
|
11-26-2013
|
1.50
|
Connecting the trim tab servo/push-rod.
|
Details
|
|
|
11-15-2013
|
0.50
|
Drilling the pivot point in the elvator horns
|
Details
|
|
|
11-13-2013
|
1.30
|
trimming H. stab trim to fit elevator counterweigh
|
Details
|
|
|
11-13-2013
|
0.70
|
Fitting elevator hinges.
|
Details
|
|
|
11-12-2013
|
0.70
|
Screwing in the hinge bearing bolts to the elevato
|
Details
|
|
|
11-11-2013
|
0.50
|
PVC hinge beariing screwing-in tool.
|
Details
|
|
|
11-11-2013
|
1.50
|
Final leading edge rolling of left elevator
|
Details
|
|
|
11-08-2013
|
0.70
|
Riveting trim tab spar and trim horn
|
Details
|
|
|
11-08-2013
|
1.00
|
Left elevator leading edge rolling.
|
Details
|
|
|
11-08-2013
|
0.30
|
Closing the trim/elvator tabs with blind rivets.
|
Details
|
|
|
11-08-2013
|
0.70
|
Attaching the trim tab hinge to elevator.
|
Details
|
|
|
11-07-2013
|
1.70
|
Rolling the right elevator leading edge.
|
Details
|
|
|
11-07-2013
|
0.50
|
Riveting the trim tab spar to the elevator.
|
Details
|
|
|
11-07-2013
|
1.50
|
Riveting the right elevator leading edges.
|
Details
|
|
|
11-06-2013
|
1.00
|
Fitting, drilling, and trimming the trim tab horn.
|
Details
|
|
|
11-06-2013
|
1.50
|
Countersink, dimpling, and primer prep
|
Details
|
|
|
11-05-2013
|
0.50
|
Starting assembly on the trim tab.
|
Details
|
|
|
11-05-2013
|
0.50
|
Some fine tuning the elevator tab bends.
|
Details
|
|
|
11-04-2013
|
0.70
|
Riveting left elevator skeleton.
|
Details
|
|
|
11-04-2013
|
1.00
|
Bending tab for trim tab on left elevator skin.
|
Details
|
|
|
11-01-2013
|
0.70
|
Setting up for elevator/trim tab flange bending.
|
Details
|
|
|
11-01-2013
|
1.00
|
Bending the flange on the trim tab.
|
Details
|
|
|
10-30-2013
|
1.50
|
Rudder leading edge rolling.
|
Details
|
|
|
10-30-2013
|
1.00
|
Rolling and finally riveting the rudder leading ed
|
Details
|
|
|
10-29-2013
|
1.00
|
Riveting the rudder trailing egde.
|
Details
|
|
|
10-22-2013
|
1.50
|
Riveting the skin on the left skeleton.
|
Details
|
|
|
10-22-2013
|
1.00
|
Riveting the right elevator skeleton.
|
Details
|
|
|
10-21-2013
|
1.00
|
Trimming the right side elevator counterweight.
|
Details
|
|
|
10-21-2013
|
2.50
|
Preparing the right elevator spar and rib - again.
|
Details
|
|
|
10-17-2013
|
1.00
|
RTV on the trailing edge and counterweight marking
|
Details
|
|
|
10-16-2013
|
1.50
|
Gluing the rudder trailing edge with the ProSeal.
|
Details
|
|
|
10-15-2013
|
0.70
|
Completing right elevator skeleton assembly.
|
Details
|
|
|
10-14-2013
|
1.00
|
Riveting the right elevator skeleton.
|
Details
|
|
|
10-14-2013
|
0.50
|
Riveting and completeing the trim tab server mount
|
Details
|
|
|
10-11-2013
|
1.50
|
Preparing the trim tab servo mounting.
|
Details
|
|
|
10-11-2013
|
2.50
|
Left spar rebuild/reprime
|
Details
|
|
|
10-10-2013
|
0.70
|
Left elevator rib/spar mistake
|
Details
|
|
|
10-09-2013
|
0.70
|
Trim tab plate - nut plate riveting.
|
Details
|
|
|
10-09-2013
|
0.50
|
Machine countersinking the trim tab hinge spar.
|
Details
|
|
|
10-09-2013
|
0.70
|
Left counterweight skin dimpling.
|
Details
|
|
|
10-09-2013
|
0.50
|
Dimpling the bottom of the trim tab hinge spar.
|
Details
|
|
|
10-08-2013
|
0.70
|
Trim nutplate rivet countersinking.
|
Details
|
|
|
10-07-2013
|
0.70
|
Left horn, skeleton, and trim spar fitting.
|
Details
|
|
|
10-07-2013
|
1.25
|
Left elevator counterweight rib fitting.
|
Details
|
|
|
10-04-2013
|
0.00
|
Just me. :-)
|
|
|
|
10-04-2013
|
1.50
|
Final dimpling and skeleton prep for right elevato
|
Details
|
|
|
10-03-2013
|
0.50
|
Left elevator rib dimpling. E-705 error.
|
Details
|
|
|
10-03-2013
|
1.00
|
Dimpling elevator counterweight skin for mounting
|
Details
|
|
|
10-03-2013
|
0.70
|
Dimple flattening, and counterweight drillling.
|
Details
|
|
|
10-02-2013
|
0.70
|
Checking the radius of the elevator bend.
|
Details
|
|
|
10-02-2013
|
0.50
|
Bending left elevator trailing edge.
|
Details
|
|
|
10-02-2013
|
0.70
|
Assembling and match drilling left elevator skin a
|
Details
|
|
|
10-01-2013
|
0.70
|
Counterweight drilling (right elevator)
|
Details
|
|
|
09-30-2013
|
1.50
|
Riveting lessons and successful stiffener riveting
|
Details
|
|
|
09-26-2013
|
1.50
|
Dimpling elevator skins and ready for primer prep.
|
Details
|
|
|
09-25-2013
|
3.00
|
Match drilling stiffeners and skin holes.
|
Details
|
|
|
09-24-2013
|
1.00
|
Cutting and fittig the stiffeners.
|
Details
|
|
|
09-19-2013
|
1.70
|
New elevators arrive - and cutting stiffeners
|
Details
|
|
|
09-17-2013
|
1.00
|
Rivet removal practice from elevators.
|
Details
|
|
|
09-13-2013
|
1.00
|
Staring at rivets....put in order with Van's
|
Details
|
|
|
09-11-2013
|
1.00
|
Elevator trailing edge bending brake.
|
Details
|
|
|
09-10-2013
|
0.70
|
Instaling the trim backing plate.
|
Details
|
|
|
09-09-2013
|
2.00
|
Right elevator back riveting.
|
Details
|
|
|
09-05-2013
|
1.50
|
Back riveting elevator skin - problems.
|
Details
|
|
|
09-04-2013
|
0.50
|
Backriveting problems with the elevator stiffeners
|
Details
|
|
|
09-03-2013
|
0.70
|
Rudder trailing edge clekoing.
|
Details
|
|
|
09-03-2013
|
1.00
|
Fixing my R-918 error.
|
Details
|
|
|
08-30-2013
|
0.70
|
Prepping the elevator skins for priming
|
Details
|
|
|
08-29-2013
|
0.50
|
The forgotten R-918 pieces
|
Details
|
|
|
08-28-2013
|
1.50
|
Rudder top and bottom rib riveting.
|
Details
|
|
|
08-28-2013
|
0.50
|
Completed rudder skin...or was it?!
|
Details
|
|
|
08-26-2013
|
0.70
|
Riveting the main and counterweight skin.
|
Details
|
|
|
08-26-2013
|
0.70
|
Counterweight skin riveting and beveling.
|
Details
|
|
|
08-24-2013
|
1.50
|
Rudder wedge riveting.
|
Details
|
|
|
08-24-2013
|
1.00
|
Counterweight rib assembly arnd riveting
|
Details
|
|
|
08-22-2013
|
1.00
|
Trailing edge countersink part II
|
Details
|
|
|
08-22-2013
|
1.50
|
Riveting backing plates and nut-plates to rudder s
|
Details
|
|
|
08-21-2013
|
0.70
|
Countersink rudder trailing edge wedge.
|
Details
|
|
|
08-19-2013
|
0.70
|
Shaping/installing the lead counterweight.
|
Details
|
|
|
08-19-2013
|
0.50
|
Dimpling the tight trailing edge of the rib.
|
Details
|
|
|
08-19-2013
|
0.70
|
Dimpling the rudder spar
|
Details
|
|
|
08-19-2013
|
1.00
|
Dimpling the rudder counterweight rib.
|
Details
|
|
|
08-19-2013
|
0.50
|
Countersink the rudder counterweight.
|
Details
|
|
|
08-16-2013
|
0.70
|
Dimpling the edges of the rudder skin.
|
Details
|
|
|
08-15-2013
|
0.50
|
Trimming the R-710 to fit.
|
Details
|
|
|
08-15-2013
|
0.70
|
Fabricating the R-918 fairing flanges.
|
Details
|
|
|
08-14-2013
|
1.50
|
Stiffeners on the other skin are riveted in place.
|
Details
|
|
|
08-13-2013
|
1.50
|
Fitting the countersink rib and starting the stiff
|
Details
|
|
|
08-13-2013
|
0.70
|
Attaching skin to rudder to fit and drill.
|
Details
|
|
|
08-12-2013
|
0.50
|
Priming the skin.
|
Details
|
|
|
08-12-2013
|
0.70
|
Prepping the rudder skin for priming.
|
Details
|
|
|
08-12-2013
|
0.70
|
First assembly of the rudder skelelton for fitting
|
Details
|
|
|
08-12-2013
|
0.50
|
Fabricating the R-917 shim
|
Details
|
|
|
08-12-2013
|
0.70
|
Completion of the vertical stabilizer.
|
Details
|
|
|
08-07-2013
|
2.50
|
Riveting the skin to the vertical stabilizer skele
|
Details
|
|
|
08-06-2013
|
1.50
|
Lower rudder hinge rivets to the main vetical spar
|
Details
|
|
|
08-06-2013
|
1.00
|
Assembling the skeleton and skin of the vertical s
|
Details
|
|
|
08-05-2013
|
0.70
|
Riveting the vertical stabilizer rear spar hinges.
|
Details
|
|
|
08-05-2013
|
1.00
|
Prep and priming the vertical stablizer skin.
|
Details
|
|
|
08-05-2013
|
0.50
|
Horizontal stablizer completed!
|
Details
|
|
|
08-02-2013
|
0.50
|
Final horizontal stablizer rivets.
|
Details
|
|
|
08-01-2013
|
3.00
|
Skin HS601PP riveted to HS708 and rear spar.
|
Details
|
|
|
07-31-2013
|
1.50
|
Riveting the HS707 rib and a rivet fix.
|
Details
|
|
|
07-31-2013
|
2.00
|
Another challenge - fix for the mis-dimpled hole.
|
Details
|
|
|
07-30-2013
|
1.50
|
Just another priming day.
|
Details
|
|
|
07-29-2013
|
3.00
|
Finally riveting the HS-601PP skin to spar.
|
Details
|
|
|
07-25-2013
|
2.00
|
Riveting the ribs to the foreward spar.
|
Details
|
|
|
07-24-2013
|
2.00
|
Spar riveting - and more learning.
|
Details
|
|
|
07-23-2013
|
1.50
|
Rivet removal Horizontal Spar - Part II (Success!)
|
Details
|
|
|
07-23-2013
|
1.00
|
Priming the left horizontal skin - HS-601PP
|
Details
|
|
|
07-22-2013
|
1.00
|
Elevator hinges riveted to spar.
|
Details
|
|
|
07-22-2013
|
1.00
|
Education in Rivet removal.
|
Details
|
|
|
07-18-2013
|
0.70
|
Replaced the E-720 L stiffener
|
Details
|
|
|
07-18-2013
|
1.50
|
Horizontal rear spar riveting.
|
Details
|
|
|
07-17-2013
|
0.70
|
Trim tab plate
|
Details
|
|
|
07-17-2013
|
1.00
|
The first rivets - horizontal stabilizer spar.
|
Details
|
|
|
07-17-2013
|
2.50
|
Elevator Stiffeners
|
Details
|
|
|
07-15-2013
|
3.00
|
Right elevator drill, cut, deburr, grind and match
|
Details
|
|
|
07-15-2013
|
1.00
|
A mistake - cut one of the E720 stiffeners wrong.
|
Details
|
|
|
07-11-2013
|
2.00
|
Priming...and starting the rudder.
|
Details
|
|
|
07-10-2013
|
1.00
|
Just a lot more priming...
|
Details
|
|
|
07-09-2013
|
1.00
|
Completed rudder skin and stiffener dimpling.
|
Details
|
|
|
07-08-2013
|
0.70
|
More priming the vertical stablizer.
|
Details
|
|
|
07-07-2013
|
2.00
|
Paint booth setup for priming parts.
|
Details
|
|
|
07-05-2013
|
2.00
|
Trimming the R-915 stiffeners / re-drilling holes.
|
Details
|
|
|
07-03-2013
|
2.00
|
Trimming the R-915 stiffeners.
|
Details
|
|
|
07-02-2013
|
0.70
|
Cutting the R-915 stiffeners
|
Details
|
|
|
07-02-2013
|
1.50
|
Countersink and dimpling the VS-808PP
|
Details
|
|
|
06-27-2013
|
0.70
|
Vertical stabilzer VS-808PP prep
|
Details
|
|
|
06-27-2013
|
1.50
|
Rib and skin prep.
|
Details
|
|
|
06-26-2013
|
1.50
|
Vertical stabilizer rear spar dimpling.
|
Details
|
|
|
06-25-2013
|
1.50
|
Vertical stablizer, spar, fluting and assembly
|
Details
|
|
|
06-25-2013
|
0.70
|
Cutting the rear spare notch.
|
Details
|
|
|
06-25-2013
|
1.50
|
Cleko and drill the holes in the skin.
|
Details
|
|
|
06-24-2013
|
2.00
|
Deburring, dimpling...oops.
|
Details
|
|
|
06-21-2013
|
2.00
|
Just another day of deburring - right H. sablizer
|
Details
|
|
|
06-20-2013
|
1.50
|
Same as before, but right side - 404/405 drilling
|
Details
|
|
|
06-19-2013
|
1.00
|
Dimpling - part 2
|
Details
|
|
|
06-18-2013
|
2.00
|
Deburr, drilling and dimples - part 1
|
Details
|
|
|
06-17-2013
|
0.70
|
Deburring holes and - oops.
|
Details
|
|
|
06-12-2013
|
1.00
|
Starting the right horizontal stabilizer.
|
Details
|
|
|
06-12-2013
|
1.50
|
Final HS-601PP to ribs holes.
|
Details
|
|
|
06-11-2013
|
0.50
|
Enlarging the HS405/404 and spar holes.
|
Details
|
|
|
06-11-2013
|
1.00
|
Drilling the HS405/404 to the spar
|
Details
|
|
|
06-07-2013
|
0.50
|
HR-405 drilling mistake? Time to ask!
|
Details
|
|
|
06-07-2013
|
0.50
|
Fluting and marking the HR-405 and HR-404
|
Details
|
|
|
06-07-2013
|
1.50
|
Fitting the HR-405 and 404 ribs and drilliing hole
|
Details
|
|
|
06-03-2013
|
1.50
|
Drilling ribs and putting skin on.
|
Details
|
|
|
05-29-2013
|
0.50
|
Fluting the horizontal stabilizer ribs.
|
Details
|
|
|
05-28-2013
|
1.00
|
Trim flanges of HS-405 ribs for spar fit.
|
Details
|
|
|
05-28-2013
|
0.20
|
Damage or just cosmetic?? (HS-405)
|
Details
|
|
|
05-28-2013
|
0.70
|
Countersink the HS-710 and HS-714 holes.
|
Details
|
|
|
05-23-2013
|
1.00
|
Six degrees of separation - bending spars
|
Details
|
|
|
05-23-2013
|
0.50
|
HS-702 bends - another 6 degree angle.
|
Details
|
|
|
05-23-2013
|
0.50
|
First dimple and set up countersink in HS-710 and
|
Details
|
|
|
05-23-2013
|
0.75
|
Cutting the bend strain relief in HS-702 spars.
|
Details
|
|
|
05-22-2013
|
2.00
|
Tapering the ends of the HS-710 and HS-714 spars.
|
Details
|
|
|
05-22-2013
|
1.00
|
Starting the forward spar
|
Details
|
|
|
05-22-2013
|
0.50
|
Marking the ends to round.
|
Details
|
|
|
05-22-2013
|
0.75
|
Center bearing assembly.
|
Details
|
|
|
05-21-2013
|
1.50
|
Rounding and smoothing.
|
Details
|
|
|
05-21-2013
|
1.50
|
Fitting spars and enlarging holes.
|
Details
|
|
|
05-20-2013
|
1.50
|
Counting the parts.
|
Details
|
|
|
05-20-2013
|
1.50
|
"Breaking" edges
|
Details
|
|
|
01-18-2013
|
0.50
|
Kit arrives!
|
Details
|
|