KitLog pro

Powered By Kitlog Pro v2.0

Traci and Tom's RV-7A
Work Logs Found: 176
Category Work Time: 198 Hours
 Date
Hours
Work Log Summary

Details

 06-09-2015
0.70
Smoothing rough cuts 601C
Details
     

 05-19-2015
1.00
Fabricating F-601J
Details
     

 05-18-2015
1.50
Firewall layout and parts finding
Details
       

 05-04-2015
1.00
Work area setup
Details
       

 05-03-2015
3.00
Air compressor connected to plumbing
Details
       

 03-20-2015
2.00
Unpacking and inventory
Details
       

 03-20-2015
1.50
More unpacking and organizing
Details
       

 03-18-2015
0.70
Fusleage kit arrival
Details
       

 02-18-2015
4.00
Work bench construction
Details
     

 02-27-2014
0.00
Crest (S36) House and Hangar
Details
       

 11-26-2013
0.50
Mounting the hinge bearings for the rudder.
Details
       

 11-26-2013
1.50
Connecting the trim tab servo/push-rod.
Details
       

 11-15-2013
0.50
Drilling the pivot point in the elvator horns
Details
       

 11-13-2013
1.30
trimming H. stab trim to fit elevator counterweigh
Details
       

 11-13-2013
0.70
Fitting elevator hinges.
Details
       

 11-12-2013
0.70
Screwing in the hinge bearing bolts to the elevato
Details
       

 11-11-2013
0.50
PVC hinge beariing screwing-in tool.
Details
     

 11-11-2013
1.50
Final leading edge rolling of left elevator
Details
       

 11-08-2013
0.70
Riveting trim tab spar and trim horn
Details
       

 11-08-2013
1.00
Left elevator leading edge rolling.
Details
       

 11-08-2013
0.30
Closing the trim/elvator tabs with blind rivets.
Details
     

 11-08-2013
0.70
Attaching the trim tab hinge to elevator.
Details
       

 11-07-2013
1.70
Rolling the right elevator leading edge.
Details
       

 11-07-2013
0.50
Riveting the trim tab spar to the elevator.
Details
     

 11-07-2013
1.50
Riveting the right elevator leading edges.
Details
       

 11-06-2013
1.00
Fitting, drilling, and trimming the trim tab horn.
Details
       

 11-06-2013
1.50
Countersink, dimpling, and primer prep
Details
       

 11-05-2013
0.50
Starting assembly on the trim tab.
Details
       

 11-05-2013
0.50
Some fine tuning the elevator tab bends.
Details
       

 11-04-2013
0.70
Riveting left elevator skeleton.
Details
     

 11-04-2013
1.00
Bending tab for trim tab on left elevator skin.
Details
       

 11-01-2013
0.70
Setting up for elevator/trim tab flange bending.
Details
       

 11-01-2013
1.00
Bending the flange on the trim tab.
Details
       

 10-30-2013
1.50
Rudder leading edge rolling.
Details
       

 10-30-2013
1.00
Rolling and finally riveting the rudder leading ed
Details
       

 10-29-2013
1.00
Riveting the rudder trailing egde.
Details
       

 10-22-2013
1.50
Riveting the skin on the left skeleton.
Details
       

 10-22-2013
1.00
Riveting the right elevator skeleton.
Details
       

 10-21-2013
1.00
Trimming the right side elevator counterweight.
Details
       

 10-21-2013
2.50
Preparing the right elevator spar and rib - again.
Details
       

 10-17-2013
1.00
RTV on the trailing edge and counterweight marking
Details
       

 10-16-2013
1.50
Gluing the rudder trailing edge with the ProSeal.
Details
       

 10-15-2013
0.70
Completing right elevator skeleton assembly.
Details
       

 10-14-2013
1.00
Riveting the right elevator skeleton.
Details
       

 10-14-2013
0.50
Riveting and completeing the trim tab server mount
Details
       

 10-11-2013
1.50
Preparing the trim tab servo mounting.
Details
       

 10-11-2013
2.50
Left spar rebuild/reprime
Details
       

 10-10-2013
0.70
Left elevator rib/spar mistake
Details
     

 10-09-2013
0.70
Trim tab plate - nut plate riveting.
Details
       

 10-09-2013
0.50
Machine countersinking the trim tab hinge spar.
Details
       

 10-09-2013
0.70
Left counterweight skin dimpling.
Details
       

 10-09-2013
0.50
Dimpling the bottom of the trim tab hinge spar.
Details
       

 10-08-2013
0.70
Trim nutplate rivet countersinking.
Details
     

 10-07-2013
0.70
Left horn, skeleton, and trim spar fitting.
Details
       

 10-07-2013
1.25
Left elevator counterweight rib fitting.
Details
       

 10-04-2013
0.00
Just me. :-)
     

 10-04-2013
1.50
Final dimpling and skeleton prep for right elevato
Details
       

 10-03-2013
0.50
Left elevator rib dimpling. E-705 error.
Details
       

 10-03-2013
1.00
Dimpling elevator counterweight skin for mounting
Details
       

 10-03-2013
0.70
Dimple flattening, and counterweight drillling.
Details
       

 10-02-2013
0.70
Checking the radius of the elevator bend.
Details
       

 10-02-2013
0.50
Bending left elevator trailing edge.
Details
       

 10-02-2013
0.70
Assembling and match drilling left elevator skin a
Details
       

 10-01-2013
0.70
Counterweight drilling (right elevator)
Details
       

 09-30-2013
1.50
Riveting lessons and successful stiffener riveting
Details
       

 09-26-2013
1.50
Dimpling elevator skins and ready for primer prep.
Details
     

 09-25-2013
3.00
Match drilling stiffeners and skin holes.
Details
     

 09-24-2013
1.00
Cutting and fittig the stiffeners.
Details
       

 09-19-2013
1.70
New elevators arrive - and cutting stiffeners
Details
       

 09-17-2013
1.00
Rivet removal practice from elevators.
Details
     

 09-13-2013
1.00
Staring at rivets....put in order with Van's
Details
       

 09-11-2013
1.00
Elevator trailing edge bending brake.
Details
       

 09-10-2013
0.70
Instaling the trim backing plate.
Details
       

 09-09-2013
2.00
Right elevator back riveting.
Details
       

 09-05-2013
1.50
Back riveting elevator skin - problems.
Details
       

 09-04-2013
0.50
Backriveting problems with the elevator stiffeners
Details
     

 09-03-2013
0.70
Rudder trailing edge clekoing.
Details
       

 09-03-2013
1.00
Fixing my R-918 error.
Details
       

 08-30-2013
0.70
Prepping the elevator skins for priming
Details
       

 08-29-2013
0.50
The forgotten R-918 pieces
Details
       

 08-28-2013
1.50
Rudder top and bottom rib riveting.
Details
       

 08-28-2013
0.50
Completed rudder skin...or was it?!
Details
     

 08-26-2013
0.70
Riveting the main and counterweight skin.
Details
       

 08-26-2013
0.70
Counterweight skin riveting and beveling.
Details
       

 08-24-2013
1.50
Rudder wedge riveting.
Details
       

 08-24-2013
1.00
Counterweight rib assembly arnd riveting
Details
       

 08-22-2013
1.00
Trailing edge countersink part II
Details
       

 08-22-2013
1.50
Riveting backing plates and nut-plates to rudder s
Details
       

 08-21-2013
0.70
Countersink rudder trailing edge wedge.
Details
       

 08-19-2013
0.70
Shaping/installing the lead counterweight.
Details
       

 08-19-2013
0.50
Dimpling the tight trailing edge of the rib.
Details
       

 08-19-2013
0.70
Dimpling the rudder spar
Details
       

 08-19-2013
1.00
Dimpling the rudder counterweight rib.
Details
       

 08-19-2013
0.50
Countersink the rudder counterweight.
Details
     

 08-16-2013
0.70
Dimpling the edges of the rudder skin.
Details
       

 08-15-2013
0.50
Trimming the R-710 to fit.
Details
       

 08-15-2013
0.70
Fabricating the R-918 fairing flanges.
Details
       

 08-14-2013
1.50
Stiffeners on the other skin are riveted in place.
Details
       

 08-13-2013
1.50
Fitting the countersink rib and starting the stiff
Details
       

 08-13-2013
0.70
Attaching skin to rudder to fit and drill.
Details
       

 08-12-2013
0.50
Priming the skin.
Details
     

 08-12-2013
0.70
Prepping the rudder skin for priming.
Details
     

 08-12-2013
0.70
First assembly of the rudder skelelton for fitting
Details
       

 08-12-2013
0.50
Fabricating the R-917 shim
Details
       

 08-12-2013
0.70
Completion of the vertical stabilizer.
Details
       

 08-07-2013
2.50
Riveting the skin to the vertical stabilizer skele
Details
       

 08-06-2013
1.50
Lower rudder hinge rivets to the main vetical spar
Details
       

 08-06-2013
1.00
Assembling the skeleton and skin of the vertical s
Details
       

 08-05-2013
0.70
Riveting the vertical stabilizer rear spar hinges.
Details
       

 08-05-2013
1.00
Prep and priming the vertical stablizer skin.
Details
       

 08-05-2013
0.50
Horizontal stablizer completed!
Details
       

 08-02-2013
0.50
Final horizontal stablizer rivets.
Details
       

 08-01-2013
3.00
Skin HS601PP riveted to HS708 and rear spar.
Details
       

 07-31-2013
1.50
Riveting the HS707 rib and a rivet fix.
Details
       

 07-31-2013
2.00
Another challenge - fix for the mis-dimpled hole.
Details
       

 07-30-2013
1.50
Just another priming day.
Details
     

 07-29-2013
3.00
Finally riveting the HS-601PP skin to spar.
Details
       

 07-25-2013
2.00
Riveting the ribs to the foreward spar.
Details
       

 07-24-2013
2.00
Spar riveting - and more learning.
Details
       

 07-23-2013
1.50
Rivet removal Horizontal Spar - Part II (Success!)
Details
       

 07-23-2013
1.00
Priming the left horizontal skin - HS-601PP
Details
       

 07-22-2013
1.00
Elevator hinges riveted to spar.
Details
       

 07-22-2013
1.00
Education in Rivet removal.
Details
       

 07-18-2013
0.70
Replaced the E-720 L stiffener
Details
       

 07-18-2013
1.50
Horizontal rear spar riveting.
Details
       

 07-17-2013
0.70
Trim tab plate
Details
       

 07-17-2013
1.00
The first rivets - horizontal stabilizer spar.
Details
       

 07-17-2013
2.50
Elevator Stiffeners
Details
       

 07-15-2013
3.00
Right elevator drill, cut, deburr, grind and match
Details
       

 07-15-2013
1.00
A mistake - cut one of the E720 stiffeners wrong.
Details
     

 07-11-2013
2.00
Priming...and starting the rudder.
Details
       

 07-10-2013
1.00
Just a lot more priming...
Details
       

 07-09-2013
1.00
Completed rudder skin and stiffener dimpling.
Details
       

 07-08-2013
0.70
More priming the vertical stablizer.
Details
     

 07-07-2013
2.00
Paint booth setup for priming parts.
Details
       

 07-05-2013
2.00
Trimming the R-915 stiffeners / re-drilling holes.
Details
       

 07-03-2013
2.00
Trimming the R-915 stiffeners.
Details
       

 07-02-2013
0.70
Cutting the R-915 stiffeners
Details
       

 07-02-2013
1.50
Countersink and dimpling the VS-808PP
Details
     

 06-27-2013
0.70
Vertical stabilzer VS-808PP prep
Details
       

 06-27-2013
1.50
Rib and skin prep.
Details
       

 06-26-2013
1.50
Vertical stabilizer rear spar dimpling.
Details
       

 06-25-2013
1.50
Vertical stablizer, spar, fluting and assembly
Details
       

 06-25-2013
0.70
Cutting the rear spare notch.
Details
     

 06-25-2013
1.50
Cleko and drill the holes in the skin.
Details
       

 06-24-2013
2.00
Deburring, dimpling...oops.
Details
       

 06-21-2013
2.00
Just another day of deburring - right H. sablizer
Details

 06-20-2013
1.50
Same as before, but right side - 404/405 drilling
Details
       

 06-19-2013
1.00
Dimpling - part 2
Details
       

 06-18-2013
2.00
Deburr, drilling and dimples - part 1
Details
       

 06-17-2013
0.70
Deburring holes and - oops.
Details
       

 06-12-2013
1.00
Starting the right horizontal stabilizer.
Details
       

 06-12-2013
1.50
Final HS-601PP to ribs holes.
Details
       

 06-11-2013
0.50
Enlarging the HS405/404 and spar holes.
Details
       

 06-11-2013
1.00
Drilling the HS405/404 to the spar
Details
       

 06-07-2013
0.50
HR-405 drilling mistake? Time to ask!
Details
       

 06-07-2013
0.50
Fluting and marking the HR-405 and HR-404
Details
       

 06-07-2013
1.50
Fitting the HR-405 and 404 ribs and drilliing hole
Details
       

 06-03-2013
1.50
Drilling ribs and putting skin on.
Details
       

 05-29-2013
0.50
Fluting the horizontal stabilizer ribs.
Details
       

 05-28-2013
1.00
Trim flanges of HS-405 ribs for spar fit.
Details
       

 05-28-2013
0.20
Damage or just cosmetic?? (HS-405)
Details
       

 05-28-2013
0.70
Countersink the HS-710 and HS-714 holes.
Details
       

 05-23-2013
1.00
Six degrees of separation - bending spars
Details
       

 05-23-2013
0.50
HS-702 bends - another 6 degree angle.
Details
     

 05-23-2013
0.50
First dimple and set up countersink in HS-710 and
Details
       

 05-23-2013
0.75
Cutting the bend strain relief in HS-702 spars.
Details
       

 05-22-2013
2.00
Tapering the ends of the HS-710 and HS-714 spars.
Details
       

 05-22-2013
1.00
Starting the forward spar
Details
       

 05-22-2013
0.50
Marking the ends to round.
Details
     

 05-22-2013
0.75
Center bearing assembly.
Details
       

 05-21-2013
1.50
Rounding and smoothing.
Details
       

 05-21-2013
1.50
Fitting spars and enlarging holes.
Details
       

 05-20-2013
1.50
Counting the parts.
Details
       

 05-20-2013
1.50
"Breaking" edges
Details
       

 01-18-2013
0.50
Kit arrives!
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.