KitLog pro

Powered By Kitlog Pro v2.0

Bayou Bert's RV9A Web Site
Work Logs Found: 47
Category Work Time: 868 Hours
 Date
Hours
Work Log Summary

Details

 11-19-2015
0.50
First Flight
Details
       

 07-29-2015
12.50
Airworthiness Certificate
Details
       

 07-06-2015
10.00
Engine Run In
Details
     

 07-03-2015
10.00
First Engine Run
Details

 07-01-2015
8.00
FAA Paperwork
Details

 06-22-2015
25.00
Full Inspection
Details

 06-15-2015
20.00
Interior Install
Details
       

 06-08-2015
45.00
Fuel Flow Test
Details
       

 05-25-2015
8.00
Panel Checkout
Details
     

 05-14-2015
10.00
Installed Flaps
Details
     

 05-06-2015
9.00
Weight and Balance
Details
       

 04-24-2015
23.00
Sticks Cut and Grips Wired
Details
     

 04-21-2015
26.00
Aileron Alignment
Details
       

 04-14-2015
16.00
Wing Spars Final Bolt Install
Details
     

 04-10-2015
25.00
Wing Root Work
Details
     

 04-06-2015
5.00
Electrial Checkouts
Details
     

 03-28-2015
8.00
Wing Day
Details
       

 03-18-2015
38.00
Install of the HS and VS
Details
     

 03-15-2015
4.00
Move to Airport
Details
       

 03-10-2015
8.50
Removing Damaged Area of Vertical Stablizer
Details
       

 11-04-2014
85.00
Fairing on Windscreen
Details
       

 10-13-2014
40.00
Windscreen and Fairing
Details
       

 09-02-2014
65.00
Panel Complete
Details
       

 08-22-2014
145.00
Much Wiring Work
Details
       

 07-23-2014
15.00
Seat Heaters
Details
       

 07-17-2014
20.00
Strobe Wires
Details
       

 07-07-2014
10.00
APRS
Details
     

 07-03-2014
12.50
APRS Install and Damage
Details
       

 06-27-2014
3.00
Landing Light Upgrade
Details
       

 06-25-2014
18.50
VOR/ILS Antenna In Wing Tip
Details
       

 06-23-2014
7.50
Headset Phone Jacks
Details
       

 06-19-2014
7.50
Flap Position Sensor
Details
     

 06-11-2014
9.50
AOA Micro Switch
Details
       

 06-07-2014
8.00
It's the Little Things
Details
       

 05-27-2014
10.00
Test Fit Interior & FAB Bracket
Details
       

 05-21-2014
8.50
Misc Jobs
Details
       

 05-10-2014
12.50
FAB
Details
       

 05-06-2014
8.00
Filtered Air Box or FAB
Details
       

 05-02-2014
10.50
More Panel Prep
Details
       

 04-30-2014
4.50
Firewall Electrical Pass Through
Details
       

 04-25-2014
4.50
MAP Sensors
Details
       

 04-15-2014
2.00
Control Spacing
Details
       

 04-07-2014
6.50
Power Supply Lug
Details
       

 03-20-2014
5.00
Panel Organization
Details
       

 03-15-2014
4.00
Finished Access Doors
Details
     

 03-12-2014
24.00
Access Doors for Front Skin
Details
       

 03-06-2014
10.50
5th Point Install
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.