Date
|
Hours
|
Work Log Summary
|
Details
|
10-21-2015
|
1.00
|
Seat Mod - Nutserts in T-handle
|
Details
|
|
|
09-01-2015
|
0.00
|
Finished console with iPad mount
|
Details
|
|
|
12-10-2014
|
0.00
|
Control Lock using Bogi Bar Tow Bar
|
Details
|
|
|
10-17-2014
|
10.00
|
Beefing Up Tow Bar Attach Points on Nose Gear
|
Details
|
|
|
10-13-2014
|
24.00
|
SB-14-08-29 - Nose Wheel Elastomer Installation
|
Details
|
|
|
10-12-2014
|
24.00
|
SB-14-08-29 - engine removal & re-installation
|
Details
|
|
|
09-18-2014
|
24.00
|
SB-14-08-29 - engine removal & re-installation
|
Details
|
|
|
09-12-2014
|
3.00
|
Cracks in Nosewheel Elastomer Plate on Engine Moun
|
Details
|
|
|
09-10-2013
|
0.00
|
Engine Control Chafing - Replacement Cables
|
Details
|
|
|
09-09-2013
|
0.00
|
Engine Control Cable Chafing
|
Details
|
|
|
08-30-2013
|
0.00
|
Cracked Nose Wheel at 333 hours
|
Details
|
|
|
08-28-2013
|
0.00
|
Discovered fatigued alternator lead and replaced
|
Details
|
|
|
05-15-2013
|
0.00
|
Finished panel pictures
|
|
|
|
01-18-2013
|
0.00
|
Sealing up the Oil Door
|
Details
|
|
|
01-18-2013
|
0.00
|
Sealing Oil Door
|
Details
|
|
|
01-18-2013
|
0.00
|
Mounting Details
|
Details
|
|
|
01-17-2013
|
0.00
|
O2 Console - painted and in the '10
|
Details
|
|
|
01-17-2013
|
0.00
|
Finished Console - removing O2 tank
|
Details
|
|
|
01-16-2013
|
0.00
|
Center Console for O2 - 1st plug and mold
|
Details
|
|
|
01-16-2013
|
0.00
|
blank
|
|
|
|
12-23-2012
|
0.00
|
O2 Console - Finishing up
|
Details
|
|
|
09-30-2012
|
0.00
|
O2 Console - 2nd attempt using 2 part mold
|
Details
|
|
|
09-07-2012
|
0.00
|
O2 Console - 2nd mold - 2 part this time
|
Details
|
|
|
08-01-2012
|
3.00
|
Nose wheel jacking solution
|
Details
|
|
|
08-01-2012
|
3.00
|
Jackstand for wheel work - low cost and no welding
|
Details
|
|
|
07-31-2012
|
0.00
|
O2 Center Console - 1st mold design unsatisfactory
|
Details
|
|
|
05-26-2012
|
0.00
|
O2 Console - finished mold
|
Details
|
|
|
05-03-2012
|
0.00
|
O2 Console - Turning the plug into a mold
|
Details
|
|
|
04-19-2012
|
0.00
|
O2 Console - Foam plug finishing
|
Details
|
|
|
04-10-2012
|
0.00
|
O2 Console - Design and Foam Plug Making
|
Details
|
|
|
03-20-2012
|
3.00
|
Seat Belt Hangers
|
Details
|
|
|
03-17-2012
|
5.00
|
Installation of NavWorx box and antenna
|
Details
|
|
|
03-09-2012
|
5.00
|
Adding NavWorx ADS-B unit
|
Details
|
|
|
08-26-2011
|
24.00
|
It Flies!! It Flies!! It Flew
|
Details
|
|
|
08-25-2011
|
0.70
|
https://www.youtube.com/watch?v=_Ah7zOnt0-s
|
Details
|
|
|
06-25-2011
|
24.00
|
Putting the wings on
|
Details
|
|
|
06-18-2011
|
4.00
|
Moved fuselage to Oxford-Henderson airport for fin
|
|
|
|
02-28-2011
|
8.00
|
Removing paint from fin for repainting
|
Details
|
|
|
02-12-2011
|
1.00
|
Honeywell Rocker Switch wiring
|
Details
|
|
|
01-27-2011
|
12.00
|
Painting starts again
|
Details
|
|
|
11-28-2010
|
2.00
|
Cowl paint results
|
Details
|
|
|
11-26-2010
|
24.00
|
Some notes on atomization, heat, dust, and paint f
|
Details
|
|
|
11-25-2010
|
24.00
|
Cowling & Rudder
|
Details
|
|
|
11-11-2010
|
0.10
|
Getting all the pieces for painting
|
Details
|
|
|
11-11-2010
|
24.00
|
Autumn Sunburst effect on remaining tail parts
|
Details
|
|
|
11-10-2010
|
24.00
|
Priming tail pieces continued
|
Details
|
|
|
10-27-2010
|
24.00
|
Painting the tail red - Imron Autumn Sunburst Sing
|
Details
|
|
|
10-21-2010
|
8.00
|
Paint Scheme - update
|
Details
|
|
|
10-19-2010
|
12.00
|
Testing metal flake/pearlesences Autumn Sunburst
|
Details
|
|
|
10-15-2010
|
4.00
|
Painting a wing - redux (cont)
|
Details
|
|
|
10-14-2010
|
6.00
|
Painting a wing - redux
|
Details
|
|
|
10-13-2010
|
10.00
|
Painting a wing
|
Details
|
|
|
10-10-2010
|
8.00
|
Fabricated wing jig
|
Details
|
|
|
10-09-2010
|
12.00
|
Prepping wings
|
Details
|
|
|
10-08-2010
|
8.00
|
Final paint color selection - changed
|
Details
|
|
|
10-04-2010
|
5.00
|
Prepping 2nd flap and aileron - visit to paint sho
|
Details
|
|
|
10-02-2010
|
12.00
|
Priming & painting aileron and flap
|
Details
|
|
|
10-01-2010
|
12.00
|
Painting an aileron and a flap - first final paint
|
Details
|
|
|
09-23-2010
|
8.00
|
Final Paint Selection Made
|
Details
|
|
|
08-22-2010
|
8.00
|
Interior paint - other stuff
|
Details
|
|
|
08-22-2010
|
8.00
|
Interior paint materials and results
|
Details
|
|
|
08-20-2010
|
8.00
|
Masking interior for paint per Flightline Interior
|
Details
|
|
|
08-19-2010
|
8.00
|
Finishing door sills
|
Details
|
|
|
08-07-2010
|
8.00
|
Shoulder belt studs in cabin top
|
Details
|
|
|
07-29-2010
|
8.00
|
Paint schemes and paint selection
|
Details
|
|
|
07-25-2010
|
8.00
|
Problems sanding next coat of filler
|
Details
|
|
|
07-24-2010
|
8.00
|
More Sanding the engine cowling
|
Details
|
|
|
07-21-2010
|
4.00
|
Sanding the engine cowling filler/primer
|
Details
|
|
|
07-18-2010
|
8.00
|
Painting outside of cowling with filler/primer
|
Details
|
|
|
07-16-2010
|
8.00
|
painting inside of cowl, test WonderFil & spray gu
|
Details
|
|
|
07-11-2010
|
15.00
|
Painting the instrument panel
|
Details
|
|
|
06-16-2010
|
20.00
|
Setting up paint booth - chopping up the shop
|
Details
|
|
|
06-05-2010
|
20.00
|
Exhaust fan setup for paint booth
|
Details
|
|
|
05-15-2010
|
0.00
|
Paint product selection
|
Details
|
|
|
05-01-2010
|
0.00
|
Painting strategy - paint and paint supplier selec
|
Details
|
|
|
04-21-2010
|
20.00
|
Wheel pants - completed
|
Details
|
|
|
04-01-2010
|
0.00
|
Choosing spray paint equipment
|
Details
|
|
|
03-18-2010
|
5.00
|
Interior arrives from Flightline - fuse panel
|
Details
|
|
|
03-18-2010
|
6.00
|
Crimper - problem crimping D-sub pins
|
Details
|
|
|
03-18-2010
|
1.00
|
Crimper - D-sub problems (cont)
|
Details
|
|
|
03-16-2010
|
4.00
|
The interior arrives from Flightline - seats
|
Details
|
|
|
03-12-2010
|
8.00
|
Putting on the pants - strut fairing
|
Details
|
|
|
03-07-2010
|
20.00
|
Installing wheel pants - right hand pant
|
Details
|
|
|
03-05-2010
|
20.00
|
Left hand pant - just pics
|
|
|
|
03-01-2010
|
0.00
|
Painting Strategy - the decision to paint it mysel
|
Details
|
|
|
02-28-2010
|
24.00
|
Wheel Pants
|
Details
|
|
|
02-21-2010
|
24.00
|
Windsheild
|
Details
|
|
|
01-25-2010
|
0.00
|
A visit to Jonathan & Vicky's at the Duchy
|
Details
|
|
|
01-23-2010
|
2.00
|
Weather antenna mount & other GPS Antenna
|
|
|
|
01-23-2010
|
6.00
|
Fabricated brackets for headphone jacks
|
Details
|
|
|
01-22-2010
|
24.00
|
Garmin 430W & other GPS antenna mounting
|
Details
|
|
|
01-22-2010
|
8.00
|
Brackets for Bose headset jacks
|
Details
|
|
|
01-19-2010
|
8.00
|
Mini-overhead console & GPS Antenna
|
Details
|
|
|
12-09-2009
|
10.00
|
Rear Windows
|
Details
|
|
|
11-05-2009
|
4.00
|
Added 2 hardpoints for rear seat belt harness
|
Details
|
|
|
10-26-2009
|
12.00
|
Lit Panel
|
|
|
|
10-05-2009
|
3.00
|
Added covers for engine mount bolts
|
Details
|
|
|
02-15-2009
|
8.00
|
Hung Engine!
|
Details
|
|
|
02-12-2009
|
4.00
|
Nose wheel and Elastomers
|
Details
|
|
|
02-10-2009
|
6.00
|
Mounted main wheels and nose strut
|
Details
|
|
|
02-07-2009
|
12.00
|
It has wheels!
|
Details
|
|
|
02-01-2009
|
3.00
|
Assembled wheels
|
Details
|
|
|
11-16-2008
|
24.00
|
Panel Work - continued
|
Details
|
|
|
11-13-2008
|
6.00
|
switch holes
|
Details
|
|
|
11-08-2008
|
12.00
|
Panel cutouts - continued
|
Details
|
|
|
11-01-2008
|
6.00
|
LH Panel fabrication continued
|
Details
|
|
|
10-31-2008
|
6.00
|
Mounted Fuse Blocks
|
Details
|
|
|
10-30-2008
|
6.00
|
Mounting GRT Magnetometer
|
Details
|
|
|
10-27-2008
|
6.00
|
Building left hand panel
|
Details
|
|
|
10-26-2008
|
1.00
|
Visitors
|
Details
|
|
|
10-23-2008
|
24.00
|
Center stack cutouts & mounting
|
Details
|
|
|
10-15-2008
|
24.00
|
Panel Blank and Throttle Quadrant
|
|
|
|
10-09-2008
|
4.00
|
Installed Vans AHRS Bracket
|
Details
|
|
|
10-06-2008
|
4.00
|
Attached Engine Mount
|
Details
|
|
|
09-28-2008
|
4.00
|
Mounted Alternator regulators and firewall ground
|
Details
|
|
|
09-26-2008
|
6.00
|
Installed heat controls
|
Details
|
|
|
09-25-2008
|
4.00
|
Installed Engine Mount
|
Details
|
|
|
09-24-2008
|
3.00
|
Installed B&C SD-20 Alternator
|
Details
|
|
|
09-22-2008
|
4.00
|
Installed various components on engine
|
Details
|
|
|
09-19-2008
|
4.00
|
Installed various firewall components
|
Details
|
|
|
09-13-2008
|
3.00
|
Unpacked YIO-540
|
Details
|
|
|
09-06-2008
|
8.00
|
Starting radio stack
|
Details
|
|
|
07-24-2008
|
6.00
|
Installed oil coller box assembly
|
|
|
|
06-02-2008
|
15.00
|
Installed door pins and blocks and lock assembly
|
Details
|
|
|
05-30-2008
|
15.00
|
Assembled and installed door handles
|
|
|
|
05-11-2008
|
15.00
|
Doors - Continued
|
|
|
|
05-07-2008
|
15.00
|
Doors - continued
|
Details
|
|
|
05-05-2008
|
3.00
|
Started Doors
|
Details
|
|
|
05-03-2008
|
10.00
|
Rear Seat Backs
|
Details
|
|
|
04-01-2008
|
8.00
|
Fitting the Top - More Tools
|
Details
|
|
|
03-27-2008
|
40.00
|
Riveting Bottom wing skins
|
|
|
|
02-09-2008
|
50.00
|
Basic fitting of top to fuselage - tools
|
Details
|
|
|
01-08-2008
|
2.00
|
Taking a look at the Big Pieces in Jan 08
|
Details
|
|
|
12-22-2007
|
2.00
|
Fitting baggage corrugation
|
Details
|
|
|
12-22-2007
|
4.00
|
Baggage Door
|
|
|
|
12-21-2007
|
8.00
|
Prepping RH baggage cover & riveting bulkhead flan
|
Details
|
|
|
12-15-2007
|
4.00
|
Riveting Baggage area
|
Details
|
|
|
12-09-2007
|
20.00
|
Flap Control System
|
Details
|
|
|
12-01-2007
|
15.00
|
Installed Control Systems
|
Details
|
|
|
11-03-2007
|
6.00
|
Installed brake lines and master cylinder
|
Details
|
|
|
11-01-2007
|
6.00
|
Installed fuel filter, boost pump, and flo scan
|
Details
|
|
|
10-29-2007
|
8.00
|
Installed Matco Parking Brake
|
Details
|
|
|
10-26-2007
|
8.00
|
Assembled Rudder pedals
|
Details
|
|
|
10-13-2007
|
5.00
|
Finished Blind rivets front and rear floors
|
Details
|
|
|
10-11-2007
|
2.00
|
Riveted LH front seat floor
|
|
|
|
10-10-2007
|
6.00
|
Completed wiring of Strobe power supply
|
Details
|
|
|
09-29-2007
|
8.00
|
Heater Valve mounting on tunnel
|
Details
|
|
|
09-15-2007
|
40.00
|
Battery Tray and Main Power Wiring
|
Details
|
|
|
08-15-2007
|
40.00
|
Electrical System Design
|
Details
|
|
|
08-02-2007
|
1.00
|
Baggage Area - door seals
|
Details
|
|
|
08-01-2007
|
3.00
|
Baggage area
|
Details
|
|
|
07-31-2007
|
6.00
|
Riveting tailcone to fuselage
|
Details
|
|
|
07-28-2007
|
6.00
|
Riveting Tailcone to Fuse
|
Details
|
|
|
07-27-2007
|
10.00
|
Riveting tailcone to Fuselage
|
Details
|
|
|
07-26-2007
|
4.00
|
Began riveting tailcone to fuselage
|
Details
|
|
|
07-18-2007
|
3.50
|
Tailcone attach
|
Details
|
|
|
07-16-2007
|
3.00
|
Match drilling and CSKing tailcone attach
|
Details
|
|
|
07-15-2007
|
9.00
|
Tailcone attach
|
Details
|
|
|
07-14-2007
|
2.50
|
Rivet misc nutplates, bagg door cutout,
|
|
|
|
07-14-2007
|
1.00
|
Fuselage Step installation
|
Details
|
|
|
07-12-2007
|
4.00
|
Inpected QB Fuse side skins and adjusted baggage d
|
Details
|
|
|
07-11-2007
|
2.50
|
QB Inspection Fwd Fuse ribs, Blkhds, and Bottom Sk
|
Details
|
|
|
07-10-2007
|
3.00
|
QB Fuselage Firewall work
|
Details
|
|
|
07-10-2007
|
1.00
|
Finished installation of autopilot roll servo in w
|
Details
|
|
|
07-08-2007
|
1.50
|
QB inspection Mid Fuselage and bottom skins
|
Details
|
|
|
07-04-2007
|
7.00
|
Deconstructed QB Fuse and inspected work
|
Details
|
|
|
07-01-2007
|
2.50
|
Wing wiring
|
Details
|
|
|
06-30-2007
|
8.00
|
Wing wiring
|
Details
|
|
|
06-29-2007
|
8.00
|
Wing Wiring
|
Details
|
|
|
06-18-2007
|
2.00
|
Began installation of autopilot roll servo
|
Details
|
|
|
06-16-2007
|
2.00
|
Fitted Right Aileron pushrod, bellcrank, torque tu
|
Details
|
|
|
06-16-2007
|
4.50
|
Fitted left Aileron pushrod, bellcrank, torque tub
|
Details
|
|
|
06-15-2007
|
1.50
|
soldered plugs on aileron trim servo and cable
|
Details
|
|
|
05-13-2007
|
4.50
|
Primed skins and various wing parts - rivet pushro
|
Details
|
|
|
05-12-2007
|
2.50
|
Prime prep & fuel tank leak tests
|
Details
|
|
|
05-11-2007
|
1.00
|
Misc dimpling, skin dressing, etc
|
Details
|
|
|
05-10-2007
|
1.50
|
Misc dimpling, skin dressing, etc
|
Details
|
|
|
05-09-2007
|
1.50
|
Completed platenuts on wing root
|
Details
|
|
|
05-08-2007
|
4.60
|
Match drill, deburr & dimple skins, & scarf
|
Details
|
|
|
05-07-2007
|
3.50
|
Match drill, deburr & dimple skins, countersink
|
Details
|
|
|
05-06-2007
|
5.00
|
Match drill, deburr & dimple skins
|
Details
|
|
|
05-05-2007
|
6.00
|
Match drill, deburr & dimple skins
|
Details
|
|
|
05-04-2007
|
2.50
|
Match drill bottom skin on LH QB wing
|
|
|
|
05-03-2007
|
1.50
|
Deburr Aileron Trim parts
|
|
|
|
05-02-2007
|
4.00
|
Fabricate aileron control system parts
|
Details
|
|
|
04-30-2007
|
2.50
|
Platenuts on root edge wing skins
|
Details
|
|
|
04-29-2007
|
2.50
|
Fitted flap and aileron gap fairing on L Wing
|
|
|
|
04-28-2007
|
5.00
|
Installed Gretz heated pitot
|
Details
|
|
|
04-22-2007
|
6.00
|
Installed Duckworks HID light in Left Wing
|
Details
|
|
|
04-21-2007
|
5.00
|
Installed Stall warning system
|
Details
|
|
|
04-14-2007
|
2.00
|
Installed Right Wing Fuel Sender
|
Details
|
|
|
04-13-2007
|
2.00
|
Installed Left Wing Fuel Sender
|
Details
|
|
|
04-12-2007
|
2.50
|
Assembled Stall Warning microswitch and bracket
|
|
|
|
04-11-2007
|
3.00
|
Fabricated access hatch for stall warning device
|
Details
|
|
|
04-09-2007
|
2.00
|
Removed Right Fuel Tank & Inspected QB work
|
Details
|
|
|
04-09-2007
|
1.00
|
Attach VA146 Bearings
|
Details
|
|
|
04-08-2007
|
3.00
|
Removed Left Tank & Inspected QB work
|
|
|
|
04-07-2007
|
3.00
|
Completed inspection of QB wings
|
|
|
|
03-31-2007
|
10.00
|
Empennage Attach
|
Details
|
|
|
03-15-2007
|
2.00
|
Inspected QB Wings
|
Details
|
|
|
03-13-2007
|
3.00
|
Inspected QB Wings
|
Details
|
|
|
03-07-2007
|
2.50
|
|
Details
|
|
|
03-06-2007
|
3.00
|
Attached elevators and started pushrod assembly
|
Details
|
|
|
02-21-2007
|
2.50
|
Resolved issue with stab horn drilling
|
Details
|
|
|
02-20-2007
|
1.50
|
Attached Fin to tailcone
|
Details
|
|
|
02-18-2007
|
5.30
|
RH elevator attach and control horn drill
|
Details
|
|
|
02-18-2007
|
2.50
|
Attach Stab to Tailcone
|
|
|
|
02-17-2007
|
1.50
|
RH Elevator attach
|
Details
|
|
|
02-15-2007
|
2.70
|
LH Elevator attach
|
Details
|
|
|
02-13-2007
|
1.50
|
Began elevator to stab attach
|
Details
|
|
|
02-11-2007
|
4.00
|
Rivet aft top skin
|
Details
|
|
|
02-03-2007
|
7.50
|
Rivet stab deck and cleco aft top skin
|
Details
|
|
|
02-03-2007
|
0.00
|
Installed static port from Rivethead
|
Details
|
|
|
02-01-2007
|
0.40
|
Rivet F1011 to aft deck
|
Details
|
|
|
02-01-2007
|
0.50
|
Rivet F-1055 Rudder Stop
|
Details
|
|
|
02-01-2007
|
3.00
|
Rivet aft deck
|
Details
|
|
|
01-31-2007
|
3.20
|
Completed elevators and trim tabs
|
Details
|
|
|
01-30-2007
|
3.50
|
Riveting elevator & trim tab hinge - 1 complete
|
Details
|
|
|
01-27-2007
|
2.00
|
Proseal and rivet elevators
|
Details
|
|
|
01-26-2007
|
2.25
|
Riveting aft bottom skin to bulkheads
|
Details
|
|
|
01-25-2007
|
1.00
|
Blind riveted F1011E nutplates
|
Details
|
|
|
01-14-2007
|
1.50
|
Riveting trim tab
|
|
|
|
01-13-2007
|
4.00
|
Finishing elevator riveting
|
|
|
|
01-11-2007
|
2.50
|
Rivet skin to bulkheads
|
|
|
|
01-10-2007
|
1.00
|
Riveted bulkheads to skin
|
|
|
|
01-10-2007
|
1.00
|
Prosealed elevator trailing edges
|
|
|
|
01-09-2007
|
0.50
|
Riveting bulkheads
|
|
|
|
01-07-2007
|
2.20
|
Completed riveting 1047 J stiffeners
|
Details
|
|
|
01-06-2007
|
8.00
|
Riveting elevator
|
|
|
|
01-05-2007
|
5.50
|
Riveting Elevator skins, spars, tip
|
Details
|
|
|
01-04-2007
|
2.50
|
Rivet J stiffeners
|
Details
|
|
|
01-03-2007
|
1.50
|
Riveting J stiffeners
|
Details
|
|
|
01-03-2007
|
1.00
|
Rivet elevator skins
|
Details
|
|
|
12-29-2006
|
3.50
|
Riveting J-channels to tailcone skins
|
Details
|
|
|
12-28-2006
|
3.00
|
Assembly and Started riveting skins
|
Details
|
|
|
12-27-2006
|
3.00
|
Elevator riveting and assembly
|
|
|
|
12-26-2006
|
3.00
|
Assembly, prep, misc
|
|
|
|
12-25-2006
|
1.50
|
Rivet tailcone bulkheads
|
Details
|
|
|
12-25-2006
|
1.70
|
Rivet RH elevator rear spar
|
Details
|
|
|
12-24-2006
|
3.50
|
Riveted battery tray, bulkheads
|
Details
|
|
|
12-24-2006
|
2.50
|
priming tailcone parts
|
Details
|
|
|
12-23-2006
|
1.50
|
Replace RH rear elevator spar and half rib
|
Details
|
|
|
12-23-2006
|
2.00
|
Prep for Priming
|
Details
|
|
|
12-23-2006
|
0.20
|
build & deburr elevator bellcrank
|
Details
|
|
|
12-22-2006
|
7.50
|
Dimple and deburr tailcone skins
|
Details
|
|
|
12-22-2006
|
0.50
|
deburr battery tray
|
Details
|
|
|
12-22-2006
|
3.20
|
deburr & dimple tailcone (cont)
|
Details
|
|
|
12-21-2006
|
4.50
|
Dimple deburr, dimple deburr & countersink
|
Details
|
|
|
12-21-2006
|
1.00
|
deburr skins, mark holes
|
Details
|
|
|
12-20-2006
|
3.60
|
deburr and dimple tailcone parts
|
Details
|
|
|
12-19-2006
|
3.50
|
Disassembly and deburr of tailcone
|
Details
|
|
|
12-18-2006
|
2.00
|
Shoulder harness and tailcone dissassembly
|
Details
|
|
|
12-18-2006
|
2.00
|
Inventory Fuse and Wing QB
|
Details
|
|
|
12-16-2006
|
2.00
|
Riveted spars to ribs and skins
|
Details
|
|
|
12-16-2006
|
3.00
|
Inventoried QB Fuse and Wing - small box
|
Details
|
|
|
12-14-2006
|
1.50
|
Elevator riveting - skins to ribs
|
Details
|
|
|
12-13-2006
|
0.75
|
Prepped Backrivet plate
|
Details
|
|
|
12-13-2006
|
3.00
|
Elevator riveting
|
|
|
|
12-12-2006
|
1.00
|
Riveted Elevator Horns
|
Details
|
|
|
12-12-2006
|
3.75
|
Rivet Tip ribs, spar plates and root ribs
|
|
|
|
12-12-2006
|
1.00
|
Primed Elevator and trim tab skins
|
Details
|
|
|
12-11-2006
|
2.00
|
Rivet tip ribs
|
|
|
|
12-11-2006
|
4.50
|
Prep and Prime elevator and trim tab
|
|
|
|
12-10-2006
|
0.30
|
slight bend in trailing edge of elevator skins
|
Details
|
|
|
12-10-2006
|
0.50
|
Match drilled WD-415 replacement part from Rivethe
|
Details
|
|
|
12-10-2006
|
2.00
|
Cleaned Elevator & Trim tab parts for priming
|
Details
|
|
|
12-10-2006
|
0.00
|
ALSF-2 in stained glass by Bucking Buddy #1
|
Details
|
|
|
12-10-2006
|
0.75
|
Adjusted angle on elevator flanges with hand seame
|
Details
|
|
|
12-09-2006
|
2.50
|
Built spray table for priming
|
Details
|
|
|
12-02-2006
|
0.40
|
Completed top skin match drilling
|
Details
|
|
|
12-02-2006
|
1.25
|
Aft Deck Assembly
|
Details
|
|
|
12-01-2006
|
4.00
|
Match drilling turtledeck stiffners
|
Details
|
|
|
12-01-2006
|
1.75
|
Initial assembly top skins
|
Details
|
|
|
11-30-2006
|
0.50
|
Prepped top skins and Stab deck
|
Details
|
|
|
11-29-2006
|
4.00
|
Match Drilling tailcone
|
Details
|
|
|
11-28-2006
|
1.00
|
Reinforced bench, mounted vice, added aluminum jaw
|
Details
|
|
|
11-28-2006
|
0.50
|
Fitted and refitted RH Longeron - unsuccessfully
|
|
|
|
11-27-2006
|
0.60
|
Drill bellcrank supports
|
|
|
|
11-27-2006
|
1.40
|
Assemble bellcrank support, longerons, rear stab
|
Details
|
|
|
11-26-2006
|
1.50
|
Assemble bulkhead and baggage support
|
|
|
|
11-24-2006
|
2.00
|
Initial tailcone Assembly
|
Details
|
|
|
11-23-2006
|
3.00
|
Assembly of rear tailcone skins and bulkheads
|
Details
|
|
|
11-22-2006
|
8.00
|
Stiffener and Longeron Fab - initial Tailcone asse
|
Details
|
|
|
11-21-2006
|
0.00
|
Small tear in bulkhead
|
Details
|
|
|
11-21-2006
|
2.00
|
Bulkhead assmbly - Stiffener fabrication
|
Details
|
|
|
11-20-2006
|
0.00
|
Rec'd quick build wings and built wing stands
|
Details
|
|
|
11-20-2006
|
0.00
|
QB Fuselage
|
Details
|
|
|
11-20-2006
|
1.00
|
deburr & deburr bulkheads
|
|
|
|
11-20-2006
|
1.50
|
Assmble and match drill bulkheads
|
Details
|
|
|
11-19-2006
|
3.00
|
Wing stand, paint booth, shop maintenance
|
|
|
|
11-16-2006
|
0.50
|
Assemble bulkhead
|
|
|
|
11-16-2006
|
0.50
|
Assemble bulkhead
|
|
|
|
11-15-2006
|
1.00
|
Fabricate Ruddel Cable angle and stiffner
|
|
|
|
11-15-2006
|
1.00
|
Deburr and dimple elevator trim plates
|
|
|
|
11-15-2006
|
1.50
|
Assemble F-1011 bulkhead
|
|
|
|
11-14-2006
|
3.00
|
Mounted Rudder counterweight
|
Details
|
|
|
11-11-2006
|
3.00
|
Trim Tab
|
Details
|
|
|
11-11-2006
|
3.00
|
Assembled rear fuse bulkhead
|
Details
|
|
|
11-10-2006
|
2.00
|
dimpled remaining elevator parts - tough ones
|
|
|
|
11-10-2006
|
1.00
|
Cut clamping blocks for trim tab
|
|
|
|
11-08-2006
|
0.50
|
Foam rib cutting and sanding
|
|
|
|
11-08-2006
|
0.50
|
foam rib cutout & sanding
|
|
|
|
11-08-2006
|
1.00
|
Cutting out 6 trim tab jigs
|
Details
|
|
|
11-06-2006
|
4.00
|
elevator - misc dimple and CS
|
Details
|
|
|
11-05-2006
|
2.50
|
Elevator spars - CS and dimple
|
|
|
|
11-01-2006
|
0.00
|
Pictures of Maule and Workshop
|
Details
|
|
|
10-31-2006
|
1.50
|
Disassemble LH elevator, deburr, dimple
|
|
|
|
10-31-2006
|
1.50
|
dimpled RH elevator skins
|
|
|
|
10-30-2006
|
2.00
|
Elevator disassembly, deburring, dimple
|
|
|
|
10-30-2006
|
10.00
|
AHRS tray
|
Details
|
|
|
10-23-2006
|
1.50
|
Riveted HS attach brackets - out of sequence
|
Details
|
|
|
10-22-2006
|
1.50
|
Completed skin riveting
|
Details
|
|
|
10-09-2006
|
1.00
|
Final drilling Elevator
|
|
|
|
10-07-2006
|
1.50
|
Initial assembly of elevators - clecoing cont
|
|
|
|
10-06-2006
|
2.00
|
Riveting HS - cont
|
|
|
|
10-06-2006
|
1.00
|
Initial Assembly of Elevators - cont
|
|
|
|
10-05-2006
|
3.00
|
Riveting skins on HS - continued
|
|
|
|
10-05-2006
|
0.00
|
Mounted Cantenna for Internet access
|
Details
|
|
|
10-04-2006
|
1.00
|
Built Cantenna to enable Web access from Hangar
|
|
|
|
10-03-2006
|
4.00
|
Riveting HS skins
|
|
|
|
10-02-2006
|
5.00
|
Riveting HS skins
|
|
|
|
10-01-2006
|
4.50
|
HS riveting & Elevator assembly
|
Details
|
|
|
10-01-2006
|
0.00
|
Air Compresser and manifold
|
Details
|
|
|
09-30-2006
|
1.00
|
Riveting front spar of HS (cont)
|
|
|
|
09-30-2006
|
2.50
|
Cleco'd Elevator
|
Details
|
|
|
09-28-2006
|
2.50
|
Riveted HS Spar - Cleco'd elevator
|
|
|
|
09-26-2006
|
1.00
|
Cleco Elevator ribs and spars
|
|
|
|
09-24-2006
|
0.00
|
Workshop layout
|
|
|
|
09-24-2006
|
6.00
|
Riveted HS nose ribs and LH Bottom spar to skin
|
Details
|
|
|
09-23-2006
|
3.50
|
Assembled and matchdrilled elevator tip ribs
|
Details
|
|
|
09-13-2006
|
2.00
|
cleco'd stab skins & Cut 3 wing cradles
|
Details
|
|
|
08-26-2006
|
0.00
|
Picture of Jacob - master instructor
|
Details
|
|
|
08-25-2006
|
16.00
|
Horizontal Stab, Rudder
|
Details
|
|
|
08-24-2006
|
14.00
|
Vertical Fin & Rudder & Horizontal Stab
|
Details
|
|
|
08-23-2006
|
14.00
|
Vertical Fin and Rudder
|
Details
|
|
|
08-22-2006
|
12.00
|
Vertical Fin
|
Details
|
|
|
08-21-2006
|
9.00
|
Vertical Fin
|
Details
|
|
|
08-21-2006
|
3.00
|
Kit Inventory
|
Details
|
|