KitLog pro

Powered By Kitlog Pro v2.0

MIKE'S WEB SITE
Work Logs Found: 406
Category Work Time: 1559 Hours
 Date
Hours
Work Log Summary

Details

 09-17-2016
16.00
Finished aileron hinge
Details

 09-08-2016
1.00
Aileron hinge
Details

 08-26-2016
1.00
Engine run and taxi
Details

 08-21-2016
1.00
WOT test
Details

 08-17-2016
1.00
First Taxi
Details

 08-17-2016
3.00
Airworthy
Details

 08-16-2016
2.00
Fuel Calibration
Details

 08-14-2016
3.00
Engine Start
Details

 08-13-2016
10.00
Final assembly
Details

 08-12-2016
8.00
F‌inal Assembly
Details

 08-12-2016
1.00
ELT
Details

 08-11-2016
1.00
Cabin inspection my Matt
Details

 08-08-2016
2.00
Wing wiring to fuse
Details

 08-06-2016
5.00
Wing prep for mounting
Details
     

 08-06-2016
2.00
Mounted wings
Details

 08-04-2016
8.00
Wingtips
Details
       

 08-02-2016
2.00
Wingtip lighting
Details
     

 07-23-2016
2.00
Wingtip landing lights
Details
     

 07-22-2016
5.00
Wingtip lighting
Details
     

 07-20-2016
8.00
Wingtips
Details
     

 07-08-2016
1.00
Wingtip
Details
     

 07-06-2016
6.00
Wingtip
Details
     

 07-05-2016
8.00
Final wing skins
Details
     

 07-03-2016
5.00
Wing prep
Details
     

 06-30-2016
6.00
Wing wiring and pitot setup
     

 06-28-2016
6.00
Wing skin prep

 06-25-2016
3.00
Trailered fuse to hangar
     

 06-23-2016
6.00
Prop
Details

 06-21-2016
8.00
Spinner
Details
       

 06-20-2016
10.00
Mounted prop. Fit cowl
Details
       

 06-15-2016
8.00
FWF cleanup and prop prep
Details

 06-14-2016
5.00
Fiberglass work
Details
     

 06-14-2016
5.00
Bracket for fuel cube and fuel lines
Details
     

 06-09-2016
8.00
More fiberglass work
Details
     

 06-05-2016
4.00
Fairings
Details

 05-22-2016
6.00
Fairings
Details
       

 05-19-2016
3.00
Fairings
Details

 05-17-2016
4.00
Fairings
Details

 05-12-2016
7.00
Fairings
Details
     

 05-06-2016
5.00
Fairings
       

 05-05-2016
9.00
Fairings
Details
       

 05-04-2016
8.00
Intersection fairings
Details
       

 04-27-2016
10.00
Wheel pants and gear leg fairings.
Details
       

 04-26-2016
5.00
Gear leg fairings
Details
       

 02-26-2016
5.00
Cowl
Details
       

 02-25-2016
4.00
Filled engine/ baffle leaks
Details
       

 02-23-2016
6.00
More engine wiring.
Details
       

 02-18-2016
8.00
Engine wiring
Details
     

 02-17-2016
8.00
Red cube mouting locations.
Details
       

 02-16-2016
8.00
Assembled baffles to engine
       

 02-13-2016
2.00
Glue and rivet the fabric seal
       

 02-12-2016
8.00
Baffles
Details
       

 02-11-2016
8.00
Sanding snorkel, ramps. Baffles
Details

 02-10-2016
5.00
Baffle fabric seal cutting
       

 02-05-2016
6.00
Cowl inlets and fabric seal
Details

 02-03-2016
8.00
Baffling
Details
       

 01-31-2016
5.00
Cowl inlets
Details
       

 01-29-2016
3.00
Cowl inlets
Details
     

 01-28-2016
6.00
Oil cooler
Details
     

 01-27-2016
5.00
Oil cooler
Details
     

 01-26-2016
8.00
Baffle trim
Details
     

 01-25-2016
8.00
Fiinished right front baffle.
Details
     

 01-22-2016
6.00
Baffle
Details
       

 01-21-2016
4.00
Baffle and Snorkel

 01-19-2016
5.50
Snorkel
Details
       

 01-16-2016
6.00
Snorkel
Details

 01-13-2016
3.00
Baffle
Details
       

 01-10-2016
3.00
Baffle
Details

 01-05-2016
2.00
Oil door. Baffle.
Details

 01-04-2016
3.00
Windscreen Fairing
Details
     

 01-03-2016
3.00
Reinforced oil door. Windscreen work.
     

 12-30-2015
8.00
Windscreen
Details

 12-28-2015
8.00
Windscreen fairings.
Details
       

 12-26-2015
11.00
Windscreen
Details
       

 12-22-2015
5.00
Oil door cleanup
Details
       

 12-21-2015
7.00
Cowl
Details
       

 12-08-2015
11.00
Cowl
Details
       

 12-05-2015
11.00
Cowl
Details
       

 11-19-2015
6.00
Skybolt
Details
       

 11-07-2015
6.00
Cowl
Details
       

 11-06-2015
7.00
Skybolt flanges
Details
     

 11-05-2015
6.00
Glare shield and windscreen.
Details
       

 11-01-2015
2.00
Installed rudder and trim
Details
       

 10-31-2015
6.00
Baggage area aft
Details
     

 10-29-2015
6.00
Top Skin
Details
     

 10-28-2015
6.00
Top skin install.
Details
       

 10-27-2015
6.00
Bleed brakes with garden sprayer
Details
       

 10-24-2015
3.00
Pushrod. Fuel sender wiring. New zip ties.
Details
     

 10-23-2015
2.00
Prepped for tech counsler visit.
Details

 10-19-2015
10.00
Cowling prep.
Details
       

 10-15-2015
0.50
Behind Panel Pictures
       

 10-14-2015
8.00
Mounted switches etc.
Details
       

 09-24-2015
6.00
Panel
Details
       

 09-23-2015
4.00
Oil and fuel pressure sensor. Mounted calipers on
Details
       

 09-22-2015
3.00
RPM
Details
     

 09-16-2015
6.00
Mix and throttle
Details
       

 09-15-2015
4.00
Wiried map sensor.
Details
       

 09-15-2015
2.00

Details
       

 09-03-2015
3.00
Heat muff
Details
       

 08-29-2015
8.00
Worked on decals for panel
Details
       

 08-02-2015
1.00
Mounted smoke injector on #1

 08-01-2015
6.00
Installed exahust
Details
       

 07-29-2015
0.50
Bolted exahust
     

 06-07-2015
0.80
Gear and brakes
Details
       

 05-31-2015
1.00
Comms still getting static. Setup for gear leg ins
     

 05-30-2015
4.00
Tested comms again. Installed flap motor

 05-22-2015
2.00
More wiring cleanup behind the panel
     

 05-21-2015
3.00
Cleaned up some wiring with zip ties.

 05-17-2015
2.00
Moved oil sender to correct spot
Details
       

 05-15-2015
5.00
Finished prop gov
Details
       

 05-14-2015
0.50
Installed ELT battery
Details
     

 05-13-2015
7.00
Tried coms outside and more wiring
Details
       

 05-09-2015
10.00
Redo of intercom harness
Details
       

 05-09-2015
5.00
Prepped for other holes in panel
Details
       

 05-05-2015
2.00
Cut holes in carbon from backer
Details
     

 05-04-2015
3.00
Prepped panel for glue
Details
     

 04-29-2015
3.00
Lighting
Details
       

 04-27-2015
8.00
Wiring
Details
     

 04-24-2015
4.00
Wiring
Details
       

 04-20-2015
3.00
Research for com/intercom
Details
       

 04-19-2015
4.00
Wiring
Details
       

 04-16-2015
6.00
More cutting of panel
Details
       

 04-15-2015
5.00
Avionics and wiring
Details
       

 04-14-2015
5.00
Wired Landing Lights
Details
       

 04-13-2015
2.50
Avionics
Details
       

 04-12-2015
6.00
Layout and Grips
Details
       

 04-01-2015
7.00
Pilot and copilot stick grip wiring.
Details
       

 03-31-2015
1.00
Wiring
Details

 03-31-2015
3.00
Installed roll trim servo. Root connections.
Details
       

 03-29-2015
4.50
Molex connectors. More wiring.
Details
       

 03-28-2015
2.00
Finished batter mount and worked on stick grip set
Details
       

 03-26-2015
6.00
Recieved dynon order and stick grips.
Details
       

 03-05-2015
7.00
Electrical work aft of baggage
Details
       

 03-04-2015
1.00
Wiring for adsb and transponder
       

 03-03-2015
2.00
Pulled some more wires through the center tunnel

 03-03-2015
2.00
Finished smoke system.
       

 03-03-2015
4.00
Electrical work mainly aft of baggage
Details
       

 03-02-2015
4.00
Smoke system
Details
       

 03-01-2015
3.00
Worked on vent brackets.
Details

 03-01-2015
2.00
Drilled hole in spar web
Details

 02-28-2015
9.00
Control bracket. Panel. Vent brackets.
Details
       

 02-27-2015
4.00
Avionics planning
Details
       

 02-22-2015
5.00
Cleaned garage. Mounted tail.
Details

 02-15-2015
2.00
Another round of micro and sanding

 02-10-2015
2.00
Fiberglass tips
Details
       

 02-09-2015
2.00
Fiberglass tips and mounted adahrs
Details
       

 02-08-2015
3.00
Intersection fairing
Details
       

 02-06-2015
6.00
Fiberglass tips
Details

 02-04-2015
4.00
More fiberglass work
Details
     

 02-02-2015
3.00
Fiberglass tips
Details
     

 01-31-2015
3.00
Fiberglass tips
Details
       

 01-29-2015
3.00
Fiberglass tips
Details
       

 01-27-2015
3.00
More work on fiberglass tips
       

 01-25-2015
2.00
Setup tips for a round of micoballons
       

 01-25-2015
6.00
Glassed in vertical tip with rib
Details
       

 01-23-2015
2.00
Left horizontal tip
Details
       

 01-22-2015
6.00
Elevator and horizontal tips
Details
       

 01-21-2015
3.00
Electric runs to tail. Mounted empannage.
Details
       

 01-16-2015
1.00
Finished rivets near the tail area
     

 01-14-2015
1.00
Finished nutplates for fairings

 01-11-2015
4.00
More fairing work
Details
       

 01-04-2015
2.50
More empannage fairing work
Details
     

 01-04-2015
4.00
Empannage fairing
       

 01-03-2015
4.50
Tail electric runs and empannage gap cover.
Details
       

 01-02-2015
1.00
New connector for elevator trim servo
Details

 12-31-2014
1.00
Replaced hinge pin on trim tab with SS
Details
       

 12-28-2014
4.00
Engine work. A couple steps back.
Details
       

 12-27-2014
6.00
Engine prep work
Details
       

 12-21-2014
4.00
Crimped BNC connectors on ELT antenna
Details
       

 12-20-2014
8.00
Misc. electrical tasks
Details
       

 12-19-2014
1.00
Finally unwrapped the engine
       

 12-19-2014
4.00
Canopy is done.
Details
       

 12-19-2014
4.00
Canopy
Details
       

 12-17-2014
8.00
Canopy
Details
       

 12-16-2014
6.00
Canopy
Details
       

 12-15-2014
13.00
Canopy wrapping up
Details
       

 12-14-2014
2.00
Canopy
Details
     

 12-02-2014
1.00
Canopy
Details
     

 12-01-2014
2.00
Canopy
Details
     

 11-30-2014
6.00
Canopy
Details
       

 11-29-2014
5.00
Canopy
Details
       

 11-19-2014
8.00
Canopy
Details
       

 11-18-2014
4.00
Canopy
Details
       

 11-18-2014
1.00
Canopy
Details

 11-14-2014
2.00
Canopy
Details

 09-22-2014
4.00
Canopy work
Details
       

 09-22-2014
2.00
Canopy work
Details

 09-18-2014
6.00
Canopy work
Details
       

 09-16-2014
2.00
Windscreen
Details
       

 09-06-2014
6.00
Finished right side of windscreen
Details
       

 09-05-2014
2.00
Trimmed windscreen
Details

 09-04-2014
4.50
Trimmed and polished canopy edges
Details
       

 09-02-2014
4.00
Drilled bubble to frame
Details
       

 09-01-2014
3.00
More frame bending.
Details

 08-31-2014
2.50
Canopy problems solved
Details
       

 08-30-2014
6.00
More carving on canopy bubble
Details
       

 08-24-2014
5.00
Made the big cut
Details
       

 08-20-2014
6.00
More canopy frame bending

 08-19-2014
8.00
The canopy really begins
Details
       

 08-12-2014
3.00
Riveted aft skin

 08-07-2014
2.00
Mounted tail
Details
       

 08-07-2014
7.00
Electrical prep and brake lines
Details
       

 08-06-2014
3.00

Details
       

 08-05-2014
0.75
Solder ELT Din connector
Details
     

 07-25-2014
1.00
Canopy
Details
     

 07-24-2014
4.50
Mounted adahrs started canopy
Details
       

 07-24-2014
2.00
Canopy
Details
     

 07-23-2014
2.00
Made new pitot line supports
Details
     

 07-23-2014
1.50
Electrical Prep
Details
     

 07-21-2014
2.50
Roll bar
Details
       

 07-20-2014
3.00
Roll bar mount
Details
     

 07-17-2014
2.50
Riveted antenna doublers and pitch servo mount.
Details
     

 07-17-2014
3.00
Motor mount
Details
     

 07-16-2014
8.00
More Firewall work. Motor mount holes drilled
Details
       

 07-16-2014
1.00
Made spacers for motor mount center holes

 07-15-2014
6.50
Antenna Doublers. Firewall recess
Details
       

 07-12-2014
1.00
Temp. mounted pitch servo
     

 07-12-2014
2.50
Installed rudder cable fairings.
Details
       

 07-11-2014
3.50
ELT wire run. Fixed ELT mount. Started building ad
Details
       

 07-11-2014
1.50
Cleaned up fuse. Drilled, prepped and primed pitch
     

 07-10-2014
1.00
Firewall misc.
Details
     

 07-10-2014
5.00
AOA and pitot run. Mounted OAT. Firewall misc.
Details
       

 07-09-2014
5.00
AOA and pitot routed to back. Tanks to wings.
Details
     

 07-08-2014
7.00
Finished boost pump fuel runs
Details
       

 07-07-2014
2.00
Boost pump
Details
     

 07-06-2014
5.00
Fixed contactor mounts. Finished cabin covers.
Details
       

 04-20-2014
1.50
Removed interior. Prepped cabin covers.

 04-12-2014
4.00
Battery Box complete.
Details
     

 04-10-2014
7.00
Firewall work
Details
       

 04-09-2014
8.00
Firewall work
Details
       

 04-08-2014
7.50
Cabin covers and fuel pump
Details
       

 04-04-2014
4.00
Horizontal SB continued
Details
       

 04-04-2014
3.00
Horizontal SB 1-31-14 is complete
Details
     

 04-03-2014
6.00
Horizontal Service Bulletin
Details
       

 03-21-2014
2.00
Mount ELT
Details
     

 03-19-2014
1.50
Inventory
Details
     

 03-11-2014
4.00
Fabricated ADAHRS Bracket
Details
       

 03-07-2014
5.00
Front Deck
Details
       

 03-06-2014
4.50
Front Deck
Details
     

 03-05-2014
8.00
Front Deck
Details
       

 03-03-2014
6.50
Front deck
Details
       

 01-31-2014
3.00
Front Deck
Details
       

 01-27-2014
2.00
Small parts for Front Deck
Details
     

 01-26-2014
5.00
Prepping interior parts for paint
Details

 01-18-2014
1.00
Wings are at the airport. Tanks are fueled
Details
     

 01-16-2014
3.00
Access hole for stall horn warning kit. Removed ot
Details
       

 01-14-2014
5.50
Finished nutplates for wing root fairings.
Details
       

 01-11-2014
5.00
Misc. wing tasks after removal
Details
     

 12-31-2013
1.50
Removed wings.
Details
     

 12-30-2013
10.00
Fixed aileron pushrods and re-rigged. Installed ai
Details
       

 12-28-2013
3.00
Fuel line for left tank to selector valve
Details
     

 12-20-2013
0.50
Finished right fuel tank line
Details
       

 12-20-2013
6.00
Finished left wing root fairing. Made right fuel v
Details
       

 12-19-2013
3.00
Right wing root fairing installed
       

 12-17-2013
0.75
Started on aileron stop
Details
       

 12-17-2013
3.00
Ailreron stops
Details
       

 12-16-2013
4.00
Rigged ailerons and started on flaps
Details
       

 12-16-2013
2.00
Finished flap pushrod holes and rigged up test swi
Details
       

 12-15-2013
2.00
More wing fit
Details
       

 12-14-2013
2.00
Misc. wing fitament
Details
     

 12-14-2013
6.50
Installed wings with Pete and Mark
Details
       

 12-11-2013
3.00
Fuel vent line for left side
Details
     

 12-10-2013
0.75
Installed flap assemebly
Details
       

 12-09-2013
3.00
Painted some misc. interior parts
Details
     

 12-08-2013
5.00
Painted interior
Details
       

 11-29-2013
3.00
Cleaned holes on main spars
Details
       

 11-24-2013
3.00
Inventory
Details
       

 11-16-2013
4.50
More tail
Details
       

 11-15-2013
1.50
Finished static port tubing.
Details
       

 11-09-2013
3.00
Disassembled tail. Primed tail parts. Started Stat
Details
       

 11-08-2013
7.00
Mount Vertical stab.
Details
       

 11-08-2013
1.00
Fixed down elevator stops
Details
       

 10-04-2013
2.00
Set elevator down stops
Details
     

 10-03-2013
4.50
Mounted horizontal
Details
       

 10-03-2013
2.00
Mounted elevators to horizontal and drilled horns
Details
       

 09-30-2013
2.50
Static port install
Details
       

 09-30-2013
1.00
Started fabricating parts necessarry for tail inst
Details

 09-27-2013
2.00
Started static
Details
       

 09-24-2013
3.00
Mounting flaps
Details
       

 09-24-2013
6.00
Disassembled flaps and ailerons. Fuel pickup setup
Details
       

 09-23-2013
6.50
Mounting flaps to wings
Details
       

 09-21-2013
3.50
Elevator pushrods
Details
       

 09-19-2013
4.00
Finished missing single lug nut plates. F-7114 gus
Details

 09-12-2013
2.00
Seatbelt wear blocks
Details
       

 09-11-2013
1.00
Flaps entry continued for more pics
       

 09-11-2013
6.00
Flaps
Details
       

 09-10-2013
2.50
Started Flaps
Details
       

 09-07-2013
1.00
Finished center and cabin cover
Details
       

 09-06-2013
4.00
Finished center tunnel cover. Heat baffle and fowa
Details
       

 09-05-2013
1.00
Started working on center tunnel cover

 09-02-2013
7.00
Baggage compartment floor install. Prep aft floor.
Details
       

 09-02-2013
0.10
Alex has been waiting to get back in.
       

 08-30-2013
1.00
Prepping baggage compartment floor area
Details
     

 08-28-2013
5.00
Crotch strap brackets
Details
       

 08-27-2013
0.75
Setback hing pins
Details
       

 08-27-2013
6.00
Finished seat backs.
Details
       

 08-26-2013
4.00
Seat backs
Details
       

 08-26-2013
1.00
Built right seat back

 08-25-2013
0.75
Started seat backs.
Details
       

 08-25-2013
2.00
Center brace for rudder pedal assembly
Details
     

 08-24-2013
4.00
Rudder pedal assembly
Details
       

 08-23-2013
3.00
Rudder pedal assembly
Details
       

 08-21-2013
3.00
F-7112
Details
     

 08-20-2013
1.00
trimmed f-7112 rib stiffeners
Details
       

 08-20-2013
1.00
Match drilled f-7112
Details

 08-20-2013
1.50
F-7112 skin
Details
       

 08-19-2013
5.00
Misc. wiring, static holes. Elevator bellcrank. Fi
Details
       

 08-18-2013
1.50
Fuel tank attach bracket
Details
       

 08-17-2013
1.00
Rudder pedals
Details
     

 08-16-2013
1.00
Interior choices and tail number
Details
       

 08-13-2013
6.00
Fuel tank attach bracket. Started on rudder pedals
Details
       

 08-12-2013
2.50
Removed floors. Started on Fuel tank attach bracke
Details
       

 08-12-2013
2.00
Fuel tank attach bracket
Details
     

 08-11-2013
2.50
Wd-409 mounted to f-712
Details
       

 08-11-2013
1.00
Riveted F-711 and keeper rivets to WD-409
Details
     

 08-09-2013
7.00
WD-409 and misc. fuse work
Details
       

 08-07-2013
0.50
Finished F-705 rivets
Details
     

 08-07-2013
1.25
F-757 gusset plates
Details
     

 07-29-2013
2.50
F-705 Bulkhead work
Details
       

 07-25-2013
0.50
Tail spring mount
Details
     

 07-24-2013
5.00
Riveted seat adjustment assembly and started
Details
       

 07-23-2013
2.75
Seat adjustment supports
Details
       

 07-17-2013
2.00
Prep for control mounting
Details
     

 07-16-2013
1.50
Right Aileron
Details
     

 07-16-2013
5.50
Fuse begins
Details
     

 07-14-2013
3.50
Ailerons
Details
       

 07-13-2013
1.00
Prepped aileron bell cranks.
Details
       

 07-12-2013
5.00
Finished Aileron gap. Started pushrods
Details
       

 07-11-2013
5.00
Finished aileron brackets
Details
       

 07-08-2013
1.25
Aileron bracket
Details
       

 07-03-2013
5.00
Going through directions for Wings
Details
       

 06-29-2013
7.00
Finished elevators
Details
       

 06-27-2013
1.00
Finished inventory

 06-26-2013
0.50
More fuse inventory

 06-23-2013
1.50
Inventory
     

 06-18-2013
8.00
Trim Tab
Details
       

 06-18-2013
1.00
QB Wings and Fuse arrive!
     

 06-18-2013
1.00
QB Wings and Fuse arrive
     

 06-15-2013
3.00
Trim Tab
Details

 06-14-2013
2.00
Bent trim tab
Details
       

 06-13-2013
2.00
Trim tab
Details
       

 06-10-2013
4.00
Built wing and fuse stands
       

 06-06-2013
5.00
Rivet Elevators
Details
       

 06-04-2013
2.00
Finally riveting Elevator
Details
       

 06-02-2013
1.50
Elevator
Details

 05-29-2013
1.00
Elevator parts prime
Details

 05-24-2013
1.00
Elevator
Details

 05-19-2013
2.00
Elevators
Details

 05-17-2013
2.00
Elevator continues
Details
       

 05-16-2013
3.50
Elevator skin to skeleton
Details
       

 05-07-2013
2.50
Elevators
Details
       

 05-05-2013
3.50
Elevators
Details
       

 05-02-2013
4.00
Elevators
Details
       

 04-29-2013
2.00
Elevator skin work
Details

 04-21-2013
1.00
Primed elevator parts
Details

 04-21-2013
2.50
More elevator work
Details
     

 04-20-2013
1.50
Elevator continues
Details

 04-20-2013
3.00
Elevator begins
Details
       

 04-13-2013
2.25
Rudder tasks
Details

 04-13-2013
3.50
Finished rudder
Details
       

 04-11-2013
2.50
Rudder stiffeners prep
Details

 04-11-2013
1.50
Riveted trailing edge of rudder
Details
       

 04-09-2013
1.00
Stiffeners for elevators
Details
     

 04-08-2013
0.75
Started Elevators
Details

 04-07-2013
3.00
More rudder riveting and prosealed trailing edge
Details
     

 04-06-2013
3.00
More rudder work
Details
       

 04-04-2013
3.00
Rivited the rudder skeleton
Details
       

 04-04-2013
1.00
Riveted rudder skeleton part 2
Details
       

 04-03-2013
0.75
Wash and primed more rudder parts
Details

 04-02-2013
2.00
Counterbalance for rudder
Details
       

 04-01-2013
4.00
Rudder edge finishing and dimpling.
Details
       

 03-28-2013
2.00
Finished everything on HS and started back on rudd
Details
     

 03-26-2013
4.00
Riveting HS
Details
       

 03-24-2013
8.00
A little rudder work then back to the HS with Kenn
Details
       

 03-23-2013
0.75
Started backriveting rudder skin
Details
     

 03-20-2013
1.00
Primed rudder parts
Details
       

 03-19-2013
3.00
Rudder Stiffeners
Details
       

 03-19-2013
3.00
More drilling and skin prep
Details
     

 03-18-2013
2.00
Rudder stiffeners
Details
     

 03-17-2013
6.00
VS skeleton riveting
Details
       

 03-17-2013
1.00
Finished riveting VS edges
Details
       

 03-15-2013
2.00
VS prime
Details

 03-14-2013
2.50
Dimpled VS and started countersinking the doubler
Details

 03-13-2013
1.50
More VS prep
Details

 03-12-2013
1.50
VS prep
Details

 03-11-2013
2.50
VS prep
Details
       

 03-10-2013
2.00
VS drilling
Details
     

 03-09-2013
7.00
Riveting skin to left side of HS and started VS
Details
       

 03-09-2013
2.00
Riveting HS front spar
Details
       

 03-07-2013
3.00
Finished riveting HS rear spar
Details
       

 03-06-2013
2.00
Riveting HS rear spar
Details
     

 03-05-2013
5.00
Dimpling, wash, prime
Details
       

 03-03-2013
4.00
Final edge finishing and devinyl skins
Details

 03-02-2013
12.00
More HS skeleton work
Details
     

 02-28-2013
3.00
Horizontal substructure
Details
       

 02-27-2013
2.50
Rib prep
Details
       

 02-26-2013
3.00
Deburring, sanding, scuffing the ribs.
Details
       

 02-25-2013
2.50
Countersinking the front spar doublers
Details
       

 02-24-2013
2.50
Relief notches in two front spars
Details
       

 02-23-2013
2.00
Built DRDT-2 table and more practice rivets
Details
       

 02-21-2013
4.00
First real day in the shop
Details
       

 02-21-2013
0.00
Downdraft box
Details
     

 02-20-2013
0.00
Matt Tromfichuck and Mark Kenney came over
Details

 02-19-2013
0.00
Tools Arrived
Details

 02-12-2013
2.50
Prepping rear spar doublers and inventoried 2nd bo
Details

 02-11-2013
1.00
First box arrives
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.