Marks Web Site
Work Logs Found: 403
Category Work Time: 1236 Hours
 Date
Hours
Work Log Summary

Details

 06-06-2005
4.00
Put Elevator on Plane - 88R

 06-05-2005
2.50
Move plane to Spicewood Airport

 06-05-2005
2.50
Clean up few details. cowling, dr pulls,

 06-02-2005
2.50
Final Inspection w/Dick Dumler

 06-01-2005
6.50
Elev wgts, change oil, drs on,

 05-31-2005
6.50
Seats in, Rear Bulkhead attached, winds

 05-30-2005
4.50
Seat Rails and Seat Belts Installed

 05-29-2005
5.50
Final Wire check / fittings / Windshield

 05-28-2005
3.50
Install Windshield Final

 05-26-2005
5.00
Instercom / Radio work switches

 05-25-2005
5.50
Flow Master fix - windshield final fit

 05-24-2005
4.50
Intercom Sqwaks fixed new Mag sensors

 05-23-2005
5.50
Glare shield. mag sensors dimmer

 05-22-2005
3.50
Fitting of front Window / Spinner work

 05-21-2005
3.50
Weight and Balance

 05-17-2005
3.50
Scale pickup - door latches, gelcoat

 05-14-2005
4.00
flap seals

 05-13-2005
3.50
Cable connections

 05-12-2005
3.50
Static lines installed- Flap handel redo

 05-11-2005
3.00
Rudder and flap seals

 05-10-2005
3.50
Adjust Flaps and Prop pitch

 05-09-2005
4.50
Letters on Plane - Rudder attached Final

 05-09-2005
1.00
Dick Dumler - Pre-inspection #3

 05-08-2005
3.50
Door windows installed

 05-07-2005
5.00
Place Flaps ailerons back on Plane

 05-04-2005
8.50
Solution to DEC A- Bad crank sensor fnd

 05-03-2005
6.50
Cowling picked up, mount prop test

 05-02-2005
6.50
Trouble shoot - egt, diodes on Panel #2

 05-01-2005
4.50
Trouble shoot Panel #2

 04-26-2005
2.50
Side windows install

 04-25-2005
5.50
Trouble shoot engine - Top windows

 04-25-2005
2.50
Prep of side windows / Sulpruf Sides

 04-24-2005
2.50
Re-wire engine tach clock/Windows top

 04-23-2005
5.50
STARTED ENGINE TODAY

 04-22-2005
4.00
Re-Wire QD fittings engine side

 04-21-2005
6.50
Install 8awg wires into CTS main

 04-20-2005
5.50
CAP ECU Pre Mounting/DFU Power

 04-19-2005
6.50
Mount COMPUTERS and QD Firewall

 04-18-2005
8.00
Wire QD-1 and others, Static work/ GPS

 04-17-2005
5.00
Wire CTS #1 & #2

 04-16-2005
5.50
Wire CTS #4 and #3

 04-15-2005
6.50
Wire CTS #5

 04-14-2005
3.30
Hard mount panel to frame, rout wires

 04-13-2005
4.00
Install Panel Relay tray

 04-12-2005
2.00
Install Panel in plane

 04-11-2005
2.00
Picked UP Plane todau

 04-08-2005
2.00
Gel-coat work in Rus shop

 04-07-2005
1.00
Strobe lights assy on wintips

 03-25-2005
5.00
Etch left wing totally - Taped off ready

 03-24-2005
2.50
Strobe lights attached to Wing Tips

 03-23-2005
1.00
Paint Right wing at Rus's shop

 03-21-2005
3.00
Chemical ech right wing at Shop

 03-19-2005
1.00
re-wire panel #2 SW-3

 03-15-2005
2.00
Amp-Seal Connectors

 03-13-2005
2.50
Wire AMP-SEAL Connectors

 03-06-2005
5.00
rework NSI Panel #6 and check relays

 03-05-2005
5.50
Re-wire Panel #2 with updates

 02-09-2005
1.50
Prep Screws for paint

 02-08-2005
1.00
Plane at Paint Shop

 02-08-2005
3.00
Get Plane to RUS for paint/Gelcoat work

 02-08-2005
1.10
Get Plane to Paint Shop

 02-08-2005
0.50
Flaps to Paint Shop

 02-07-2005
2.50
Prep work for PAINT- WINGS

 02-06-2005
3.50
Build Ramps for trailer

 02-03-2005
1.00
Left leg fairing completed

 02-02-2005
4.50
Left gear leg Fairings

 02-01-2005
2.50
Work on lower leg fairings

 01-31-2005
2.50
Work on lower leg fairngs

 01-30-2005
2.50
Front Leg Fairing work support

 01-29-2005
2.50
Lower cowling work

 01-28-2005
2.00
Worked on Lower Cowl support

 01-26-2005
1.50
Prime Co-Pilot inside door

 01-16-2005
3.50
Completed Tunnel wires / Control wires

 01-15-2005
2.50
Strobe Power wires

 01-13-2005
2.50
Install Battery Rack

 01-11-2005
3.50
Battery Area install

 01-10-2005
3.50
Battery Tray

 01-08-2005
2.50
Work on Battery Tray

 01-05-2005
1.50
Floor Board Adjustments

 01-04-2005
2.50
Panel # 3 Wiring

 01-03-2005
5.50
Re-wire

 12-19-2004
2.00
Rewire per new Drwg's

 12-15-2004
1.50
Review drawings

 12-13-2004
4.50
Working on New Drwg's CB panel

 12-12-2004
2.00
Re-Wired to new drwgs 11/21/04 set

 12-09-2004
2.00
Reviewed NEW NSI DRAWINGS Nov21

 12-08-2004
2.50
Wiring #6

 12-07-2004
1.50
Wire Panel #6

 12-04-2004
2.50
Wired the rest of the relay's

 11-17-2004
1.50
Mount GPS Antenna

 11-15-2004
1.00
Panel #6 wiring

 11-12-2004
3.50
Radio rack assy / Fitting

 11-11-2004
1.50
Tested GTX327 and GNC300XL on/off

 11-08-2004
2.20
Fitting of OIL ACCESS Door

 11-06-2004
3.20
Wiring Relay's

 11-04-2004
2.00
Wire Relays

 11-04-2004
1.50
Wire Relays

 11-02-2004
2.20
Wire Relays

 11-01-2004
2.00
Outside Vortex's and wire to fuel sensor

 10-31-2004
3.00
CTS #7 and co-pilot handle

 10-30-2004
1.00
Completed Right CTS box

 10-28-2004
3.50
Complete Left CTS, Cut Right CTS Box

 10-27-2004
2.20
Install tray #2 - Top left CTS #2 Fit

 10-24-2004
3.50
Panel #1 finished wiring

 10-23-2004
1.50
Glass in Ext mag Compass wires

 10-22-2004
3.50
Dynon Temp and Ext mag install

 10-20-2004
3.00
Wiring of Panel #5 and #1

 10-19-2004
2.50
Panel Wiring Insert #5

 10-18-2004
2.50
Panel Wiring

 10-17-2004
4.00
Finished Panel #2 Wiring

 10-15-2004
3.00
Wire Panel #2

 10-13-2004
2.50
Panel #2 wiring

 10-09-2004
2.50
Glass work inside intakes

 10-07-2004
0.20
Glass Work

 10-06-2004
2.00
Glass Cowling work

 10-05-2004
3.20
Glass cowling work

 10-04-2004
4.50
Glass the intakes on top- intake work

 10-03-2004
2.50
Gelcoat intakes and Strobe wiring

 10-02-2004
1.00
Glass work on cowling intakes

 10-01-2004
2.00
Right wing wires routing/tunnel

 09-28-2004
2.00
Route Com cable and Trim in tunnel

 09-27-2004
2.00
Final fitting of air channels L & R

 09-26-2004
5.50
Top and bottom fitting

 09-25-2004
2.00
Fitting of cowling

 09-24-2004
1.50
Pickup cowling

 09-21-2004
1.50
Rout Cables in Tunnel tie-wrap

 09-20-2004
1.00
Hand Sand gel-coat on strake

 09-19-2004
2.00
EAA Tech Advisor - Jim Newman report

 09-18-2004
2.50
Spray White Gel-coat on Tail

 09-17-2004
2.50
Spray Gelcoat on Air-Vents and others

 09-16-2004
2.00
Side air-vents Bondo/Sand

 09-15-2004
1.50
Handle holes w/Bondo fill/sand

 09-14-2004
3.50
Rear cockpit safety panels

 09-13-2004
2.50
Placement of 2Awg battery cables

 09-12-2004
3.50
Install Nutplates on cable cover - REAR

 09-09-2004
1.50
Pickup tail feathers from Rus Dewart

 09-08-2004
2.50
2nd Inspection W/Dick

 09-07-2004
1.50
Battery Tray Assy

 08-26-2004
2.00
Inserts #2,4,5

 08-25-2004
2.00
Install Nutplates on Dash

 08-24-2004
2.50
Prime and Paint Panel

 08-22-2004
2.50
Door Springs and final latch fittings

 08-07-2004
3.50
Door tabs install'd

 08-06-2004
1.50
Take parts to Rus for paint

 08-06-2004
1.50
Pull plastic off rudder/hStab, elevator

 08-04-2004
1.00
Certificate of Aircraft Registration

 08-02-2004
2.60
Q-cell door hinges in place

 08-01-2004
3.50
Dill out door hinges/placement

 07-31-2004
2.90
Fitting of front leg faring

 07-28-2004
1.50
Hookup water lines on Motor

 07-26-2004
1.50
Picked up motor

 07-26-2004
1.90
Mount motor on Plane

 07-26-2004
2.30
Finish Motor Mounting

 07-25-2004
4.00
Finish Firewall install

 07-24-2004
4.00
Install Sound Proffing to Firewall/Wheel

 07-19-2004
1.50
Stick control handle assy

 07-18-2004
2.00
Fit baggage door locks

 07-17-2004
2.50
Fitting of doors / hinges

 07-16-2004
3.00
Door toggle pieces mgf'd

 07-15-2004
4.00
Fab all door latch pieces / prime

 06-16-2004
2.50
Wing-tip glassed together

 06-05-2004
3.00
Aft Fuselage supports glassed in

 06-04-2004
1.50
Wing fuselage cloase-out - Fitting/Glass

 06-03-2004
2.00
Wing fuselage close-out glass work

 06-02-2004
0.50
Rear tie-down support glass work

 05-31-2004
1.00
Flex Gas hose connections to tanks

 05-30-2004
2.50
Gas Tank Fittings cut-outs on Fuse

 05-16-2004
2.50
Install Aileron counter wgts on wings

 05-15-2004
3.50
Install Flaps on Wings - Final

 05-15-2004
1.20
Install Cove inspection plates on Wings

 05-14-2004
1.00
Cove skin inspection plates

 05-10-2004
2.00
Rivet right wing cove skins

 05-09-2004
2.25
Prime amnd Rivet Left wing cove skings

 05-08-2004
1.50
Install Pitot and Vent line in Left wing

 05-05-2004
1.00
Expanded wings in Hanger

 04-25-2004
1.50
Rudder attach pts for wing brace

 04-22-2004
1.50
ELT antenna mounting

 04-08-2004
1.50
New Kitlog Pro Loaded with 1.73 Update

 03-28-2004
1.00
Put wings on

 03-22-2004
2.50
Wing cove skins drilling

 03-21-2004
2.50
Wing cove skins drilling

 02-28-2004
2.50
Top skin left wing- outbd ruvet

 02-25-2004
4.50
Left wing prep- hat sections

 02-24-2004
5.50
Prep Left Wing- route air vent/cables

 02-23-2004
4.50
Cut rgt vent/glass wire wing

 02-22-2004
1.50
Cut-out left air vent

 02-21-2004
2.90
Finished Rgt Top skins/tank

 02-20-2004
4.00
Work on top skins riveting

 02-12-2004
5.50
Rivet Top skins

 02-11-2004
4.50
Rivet Wing top skins supports

 02-10-2004
4.00
Work on Left wing

 02-09-2004
4.00
Rgt Wing Vent routing

 02-08-2004
2.00
Close in Strakes on Leading edge

 02-07-2004
6.80
Hortz Stab Completed, firewall, rudder

 02-06-2004
5.50
Horztl stab rivets - hinge pins

 01-26-2004
2.00
Right Strake resin'd to plane

 01-25-2004
3.50
Strake Assy onto Fuselage

 01-25-2004
1.00
Glue on Strake Left side

 01-24-2004
2.50
Wingtip Elevator Nutplates

 01-22-2004
3.50
Elevator Wing tips / Carbon Fiber

 01-21-2004
2.50
Srake Position assy

 01-18-2004
0.70
Install'd Brake Reservor to firewall

 01-16-2004
1.50
Cockpit heater install

 01-15-2004
1.40
installed engine control - throttle

 01-13-2004
2.00
Header Tanks installed

 01-11-2004
5.00
Painted Floorboards, Transpdr antenna-

 01-10-2004
2.50
Front cable cover - left and right

 01-09-2004
3.50
Brake Line install'd -Dash Bd Prep

 01-08-2004
5.50
Rivet Firewall assy together

 01-07-2004
3.50
Work on Firewall Assy - Fitting

 01-04-2004
1.50
Cut out firewall from templete

 12-07-2003
5.50
Fitting Gas Tanks Right wing - Hat sec's

 11-30-2003
1.80
Rear luggage Door assy

 11-19-2003
1.50
Install front wheel pant

 11-18-2003
0.50
Font wheel pant glass work

 11-13-2003
4.00
Install Wheel pants- Fitting and assy

 11-12-2003
2.00
Gear wheel pants - bulkheads and support

 11-11-2003
1.50
Glass wheel pant skins together

 11-08-2003
4.00
Pitot Tube Bracket Assy

 11-08-2003
1.20
Elevator Stop Installed

 11-06-2003
5.00
Drill Main gears

 11-05-2003
6.00
Fit and Position Main Landing Gear

 11-04-2003
5.50
Pulled Wings Off. Ailerons and Flaps

 11-04-2003
3.00
Disk Bumler Intial Inspection- Wings

 11-03-2003
6.50
NicoPress Left Aileron/pitot

 11-02-2003
1.20
Jim Neman - EAA Technical Advisor Visit

 11-02-2003
6.00
FLAP ADJUST Aileron NicoPress

 10-28-2003
1.00
Cable Covers

 10-27-2003
0.30
Check Backlog- Installation Kit - Pulled

 10-26-2003
1.50
Adjust Aileron cables

 10-20-2003
2.50
Install seat pans - Fitting

 10-18-2003
1.00
Fit Aileron aft cables

 10-18-2003
1.00
Cutout Bulkhead A Cover

 10-16-2003
3.50
Install Flap cables

 10-15-2003
1.00
NicoPress empanage cables - all 4

 10-14-2003
2.00
Install Ailerons and connecting rods

 10-13-2003
0.70
Install Flap conecting rods

 10-12-2003
3.00
Install both FLAPS - Left Aileron

 10-11-2003
1.50
Set wing angle of incidence

 10-11-2003
4.50
Drill upper wing strut holes

 10-10-2003
2.00
Wing Strut location - Drill lowers

 10-09-2003
1.50
Clean Hanger and relocate wing suppots

 10-08-2003
2.00
Mount wings to Fuselage

 10-08-2003
3.50
Fitted fonrt landing gear to frame

 10-07-2003
1.50
Drilled out front Landing gear- @ Don's

 10-05-2003
2.00
Position and Drill lower shell angles

 10-04-2003
3.50
Fuselage side supports installed

 09-28-2003
5.00
Assemble Rudder pedals

 09-26-2003
1.60
Install Elevator Pushrod to Elev.

 09-26-2003
4.60
Install Cables rudder and Elev

 09-26-2003
2.30
Fab Elevator Pushrod

 09-25-2003
3.50
Placement of 4 empanage cables routed

 09-24-2003
3.00
Install Rudder actuator left and right -

 09-23-2003
1.50
install fuselage struts

 09-23-2003
2.50
Fabricate rudder pedal brackets steel

 09-23-2003
3.50
Fab and Install Bulk A pulleys

 09-22-2003
3.50
install Forward pulleys

 09-21-2003
2.50
Install lower / Aft pulleys

 09-21-2003
2.00
Fabricate Rudder pedals

 09-21-2003
1.50
Assemble elev/aileron controls

 09-20-2003
1.00
install lower forward pulleys

 09-20-2003
1.50
Install Flap handle

 09-18-2003
2.50
Fabricate rudder control supports

 09-17-2003
1.90
Cut-out aft inter-bulkhd shearweb

 09-16-2003
2.60
Install HStab to attach brckt

 09-16-2003
3.50
Aft inter buckhead drilled and fitted

 09-15-2003
4.50
Work on Bulkhead E fitting

 09-15-2003
1.50
Install forwd sherweb attach angles

 09-14-2003
3.60
Laminate aft flange for inter-bulkhd

 09-14-2003
2.50
Drill inspection hole in Lower Aft

 09-13-2003
7.50
Right wing smal rivets- hat sections

 09-13-2003
2.50
Position & Drill HStab bracket

 09-13-2003
1.25
Cut-out fuselage for Hstab fit

 09-12-2003
1.00
Rivet Rudder stop to Yoke

 09-11-2003
1.50
Ordered Engine (Talked to Lance and Jim

 09-11-2003
0.50
Install elevator bellcrank to bracket

 09-10-2003
1.75
Prep Elevator Bellcrank

 09-09-2003
2.20
Rudder control stop plate fitted

 09-09-2003
2.00
Rivet Right wing - Rib and hard spors

 09-09-2003
1.60
Install Stop plate to yoke

 09-08-2003
3.00
Rivet .125" on Lower spar

 09-08-2003
5.00
Hang Rudder, sand to fit, sand to fit

 09-06-2003
2.00
Rivet Vertical Spar

 09-05-2003
2.00
Install Vertical Spar Resin Bed

 09-05-2003
1.50
Attach Door handle angles with bushings

 09-04-2003
5.50
Work on Rudder Vertical Spar fittings

 09-04-2003
1.50
Mark the Fuslage water LINE

 09-04-2003
3.50
Install forward shell attach fittings

 09-03-2003
1.60
Position and drill aft shell fittings

 09-01-2003
2.50
Fitting Fabrication- Shell angles

 08-19-2003
6.50
Prep Hat sections & rivet Main Spar lowr

 08-18-2003
6.50
Rivet Nose Rib Assy to Front Spar

 08-16-2003
1.50
DeBur and Prime Skins

 08-13-2003
2.00
Rivet Aft spar componets

 08-12-2003
2.50
Dimple, Prime, Prep

 08-11-2003
2.00
Dimple, Prime Nose Ribs

 08-10-2003
1.50
Dimple

 08-09-2003
6.00
Countersink front main rib, Rib 1 work

 07-28-2003
3.50
Drill all brackets locations on Aft

 07-27-2003
4.50
Drill all #30's on skins both sides

 07-26-2003
6.00
Position and Drill HAT sections / Prep

 07-25-2003
2.25
Drill Lower CAP section and prep Hat's

 07-21-2003
3.50
Drill Bottom Skins all three

 07-20-2003
3.00
Work on Main Rib 1, Strut beam Drill

 07-18-2003
1.50
Drilled out rest of L.E. and Nose ribs

 07-17-2003
3.00
Drill Right L/E and nose ribs

 07-16-2003
1.50
Place top leading edges w/pilot holes

 07-14-2003
3.00
Place in jig and attach ribs/drill out30

 07-13-2003
0.50
Placement of Left wing over Garage Door

 07-13-2003
1.50
Dimple top skins and fit on Left wing

 07-12-2003
2.50
Rivet hat sections on bottom left wing

 07-08-2003
2.50
Rivet bottom Skins to Wing

 07-07-2003
3.00
Prime hat sections, Rivet lower doubler

 07-06-2003
2.50
Rivet LE and inboard skins

 07-06-2003
3.50
Prime wing skins lowers, hats

 07-05-2003
5.50
Rivet Leading Edge and nose ribs

 07-04-2003
6.50
Rivet Ribs and Leading Edge to wing

 07-03-2003
2.50
Prime Leading edges, dimple

 07-02-2003
3.00
Rivet Aft spar Coves / brackets

 07-01-2003
4.50
Drill front spar countersinks / deburr

 06-29-2003
4.00
De-Burr parts

 06-28-2003
5.50
Aileron Pully, Brckets, prime. Prep wing

 06-27-2003
2.00
Drill Cap stiffeners left wing

 06-26-2003
0.50
More Parts from Glasair

 06-26-2003
3.50
Drilled Hat section lower left- doubler

 06-25-2003
3.00
Install'd and drill hat sections top

 06-25-2003
1.00
Drill out Left wing doubler

 06-24-2003
7.00
Drilled out all skins on Left,top/bottom

 06-23-2003
1.20
Placement on Upper skins left wing

 06-23-2003
1.00
Drilled out main spar on leading Edge

 06-22-2003
3.00
Placement of leading Edge 3-pcs

 06-21-2003
4.50
Support jigs for Wing - Drill Ribs out

 06-19-2003
7.00
Place wing in Wing Jig

 06-18-2003
3.00
Main Rib #3 shortened both L & R

 06-17-2003
4.50
Main Wing rib l & R

 06-16-2003
2.00
Sub - Assy Work - Bellcrank L & R

 06-15-2003
7.50
Prime Rivet left and right Wing subs

 06-14-2003
5.50
Drill out Flaps rails, Bellcrank assy /P

 06-13-2003
2.00
Drill out Aileron brackets

 06-12-2003
2.50
Work on Sub - Assy for both wings

 06-09-2003
1.50
Layout Wing Spars and Ribs - Left

 06-08-2003
5.50
Rivet top skin to right flap

 06-07-2003
7.00
Rivet bottom Skin to Right Flap- Prime

 06-06-2003
3.50
Rivet ribs to Spar Right Flap

 06-05-2003
2.50
Prime parts & DeBurr

 06-03-2003
1.50
Curve Doublers and take apart

 06-02-2003
4.50
Drill Right Flap skin top and bottom

 06-01-2003
3.50
Rivet Left Top Skin in place

 05-31-2003
1.20
DeBur Left Skin and Prime

 05-30-2003
2.00
Rivet Left Ribs to Spar

 05-30-2003
2.50
De-Bur and Etch and Prime Ribs

 05-29-2003
1.00
Bend Flap Doublers on 3" pipe

 05-26-2003
1.50
Right Flap support brkts riveted

 05-25-2003
3.50
Drill top Flap skin (left)

 05-24-2003
4.00
Drill Ribs and bottom Skin

 05-21-2003
3.00
Prime Flap hardware and Rivet a,b,c

 05-20-2003
3.50
Prep flap supporting hardware qty 12

 05-17-2003
0.50
Layout all the parts

 05-17-2003
6.50
Attached right skin - both sides

 05-13-2003
3.00
Rivet Bottom side of Skin left aileron

 05-11-2003
6.50
Rivet Left Aileron ribs and skins

 05-10-2003
4.50
De-burr and etch and prime Left Aileron

 05-08-2003
4.50
Drilled out Right Aileron and take apart

 05-07-2003
1.20
Placement of Inspection plates

 05-06-2003
2.50
Drilled bottom skin on Left

 05-05-2003
1.50
Started on Arilerons placed ribs / nose

 05-03-2003
2.00
Inventory Plane Kit

 04-30-2003
2.00
Unpack Large Crate

 04-30-2003
2.50
Pickup Wings and Fuselage

 04-30-2003
2.00
Deliver to Hanger

 03-28-2003
2.50
Install Electric Trim Servo - holes

 03-25-2003
2.50
Trim Tab Hinge Assy / Rivet

 03-25-2003
7.50
Elevator hinge Assy

 03-24-2003
7.00
Top skins / ribs riveted

 03-24-2003
3.00
Drill, Fab, form , rivet assy together

 03-23-2003
4.00
Rivet lower skins / horn sub-assy

 03-22-2003
7.00
DeBurr and Prime Elev / rivet spar

 03-21-2003
5.00
Upper Skins and Trim Motor cutout

 03-20-2003
5.50
Elevator Ribs/Spar- lower skins

 03-17-2003
5.50
Rivet Left Skin and Aft Spar

 03-16-2003
4.50
Right Skin Rivet in place

 03-16-2003
1.50
Bracket Attach pts trimmed

 03-15-2003
4.00
Rivet Ribs to SPAR, Prep skins

 03-14-2003
2.00
Rivet Trailing edge and Mnl Trim

 03-14-2003
1.50
Prime Ribs and re-assemble frame

 03-13-2003
2.00
Rudder Top Rib and 2nd Skins

 03-12-2003
5.00
Rivet Rudder Skin 1 and brkts

 03-11-2003
5.00
Rivet Rudder Spars

 03-10-2003
1.00
Rivet Spar doublers on main spars

 03-10-2003
4.00
Corrosion Proof Rudder and Horiz. parts

 03-08-2003
5.00
Install Aft spar and all skins

 03-07-2003
3.50
Assy of front spar and root rib.

 03-06-2003
2.50
De-Burr Parts

 03-05-2003
6.50
Placement of left skin

 03-04-2003
6.50
Place Ribs on Main Spars and Right skin

 02-24-2003
1.00
Horz. parts arranged

 02-23-2003
5.50
Wing Jig Table

 02-21-2003
8.00
Hanger Shelves + Trim

 02-20-2003
8.00
Hanger Shelves

 02-19-2003
6.50
Hanger Prep - Shelves

 02-18-2003
8.00
Install Cabinets & Bench

 02-14-2003
8.00
Sheetrock Hanger Prep

 02-10-2003
1.00
Picked up Tail Kit from Pilot Air Frgt