Date
|
Hours
|
Work Log Summary

|
Details

|
08-11-2013
|
1.50
|
Test Fit Emp
|
Details
|
|
|
08-08-2013
|
4.00
|
Final rivet tailcone
|
Details
|
|
|
08-07-2013
|
2.50
|
Reassemble Tailcone
|
Details
|
|
|
07-15-2013
|
2.00
|
Tail Cone Dimpling
|
Details
|
  |
|
06-29-2013
|
2.30
|
Tail Cone Match Drill
|
Details
|
|
|
06-27-2013
|
4.50
|
Tail Cone Construction
|
Details
|
|
|
06-23-2013
|
1.30
|
FInishing The Trim Tab Attach To Elevators
|
Details
|
|
|
06-19-2013
|
1.00
|
Finishing up trib tabs
|
Details
|
|
|
06-17-2013
|
1.00
|
Workong On Trim Tabs
|
Details
|
|
|
06-13-2013
|
3.50
|
CLosing out the elevators
|
Details
|
|
|
06-10-2013
|
2.00
|
Started the left elevator
|
Details
|
|
|
06-10-2013
|
1.30
|
Attaching Trim Tab To Elevator
|
Details
|
|
|
06-09-2013
|
2.50
|
Final riveted the right elevator
|
Details
|
|
|
06-08-2013
|
1.50
|
Dimpling Nutplates Elevator
|
Details
|
|
|
06-04-2013
|
2.00
|
Elevators
|
Details
|
  |
|
06-01-2013
|
2.50
|
Finished Horizontal Stabilizer
|
Details
|
|
|
05-30-2013
|
3.30
|
Riveting The Horizontal Stabilizer
|
Details
|
|
|
05-30-2013
|
2.00
|
Machine Countersink HS Spar
|
Details
|
|
|
05-17-2013
|
2.20
|
Final Drilled HS and Started Dimpling
|
Details
|
|
|
05-16-2013
|
2.10
|
Match Drilling Horizontal Stabilizer
|
Details
|
 |
|
05-12-2013
|
2.00
|
|
Details
|
|
|
05-11-2013
|
4.50
|
Primed & Riveted Horizontal Stabilizer Spars
|
Details
|
|
|
05-10-2013
|
2.10
|
Preparing Horizontal Stabilizer
|
Details
|
|
|
05-08-2013
|
3.20
|
Finsihed Rudder
|
Details
|
|
|
05-07-2013
|
1.10
|
Final Rivet Rudder Spar
|
Details
|
|
|
05-06-2013
|
2.30
|
FInal Riveted Rudder / Leading Edge
|
Details
|
|
|
05-05-2013
|
3.00
|
Back Riveted The Stiffeners To Skins
|
Details
|
|
|
05-04-2013
|
1.50
|
Preparing For Priming Rudder
|
Details
|
|
|
05-03-2013
|
3.00
|
Match Drill & Dimple
|
Details
|
|
|
05-01-2013
|
2.20
|
Began Rudder Build
|
Details
|
|
|
04-28-2013
|
3.20
|
Finished Vertical Stabilizer Riveting
|
Details
|
|
|
04-28-2013
|
2.00
|
FInished Vertical Stabilizer
|
Details
|
|
|
04-27-2013
|
2.00
|
Match Drilled, Deburred & Dimpled VS
|
Details
|
|
|
04-26-2013
|
3.00
|
Vertical Stabilizer Started
|
Details
|
|
|
04-26-2013
|
2.00
|
Inventoried Emp Kit
|
Details
|
  |
|
04-20-2013
|
6.00
|
Ordered Empennage
|
Details
|
  |
|
02-23-2013
|
2.00
|
Put together the drill press bandsaw and installed
|
Details
|
|
|
02-17-2013
|
4.00
|
Finished workshop
|
Details
|
|
|
02-16-2013
|
2.50
|
Built work bench
|
Details
|
|
|
02-15-2013
|
6.00
|
Prepared Workshop Floor
|
Details
|
|