Date
|
Hours
|
Work Log Summary
|
Details
|
08-27-2023
|
2.00
|
Riveting l/h
|
Details
|
|
|
08-27-2023
|
4.50
|
l/h wing L.E & top skin
|
Details
|
|
|
08-26-2023
|
1.50
|
re-installing fuel tank in LH wing
|
Details
|
|
|
08-26-2023
|
2.50
|
Preparing to rivet LH top skin & L.E.
|
Details
|
|
|
08-26-2023
|
3.00
|
install fuel tank & pull down L.E. skin
|
Details
|
|
|
08-26-2023
|
1.50
|
fuel sender access opening
|
Details
|
|
|
11-05-2021
|
1.50
|
fitting bottom skin on L wing
|
Details
|
|
|
11-05-2021
|
2.50
|
Begin re-assembly of L wing spars
|
Details
|
|
|
11-04-2021
|
3.00
|
Left wing spars and rib fitting
|
Details
|
|
|
11-04-2021
|
3.00
|
Left Wing details corrosion protection
|
Details
|
|
|
11-04-2021
|
2.00
|
corrosion protect L wing details
|
Details
|
|
|
09-26-2021
|
1.00
|
L/H wing Rin stiffeners
|
Details
|
|
|
09-26-2021
|
1.00
|
L/H Wing rib stiffeners
|
Details
|
|
|
09-26-2021
|
0.50
|
L/H wing aileron bell crank support
|
Details
|
|
|
09-26-2021
|
1.00
|
L/H aileron Bell crank pivot brackets
|
Details
|
|
|
09-25-2021
|
2.50
|
Starting L/H wing
|
Details
|
|
|
09-25-2021
|
2.00
|
L/H wing aft Spar drilling
|
Details
|
|
|
09-25-2021
|
1.00
|
finish drilling aft spar
|
Details
|
|
|
09-15-2021
|
1.00
|
5th bearing oil line
|
Details
|
|
|
09-15-2021
|
1.00
|
5th bearing AN oil fitting
|
Details
|
|
|
05-22-2021
|
4.50
|
Prep Engine for prime and paint
|
Details
|
|
|
05-21-2021
|
1.50
|
Prep to install the oil pump housing
|
Details
|
|
|
05-21-2021
|
0.50
|
Final Torque of oil pump cover
|
Details
|
|
|
05-21-2021
|
1.00
|
5th Bearing oil seal install
|
Details
|
|
|
05-13-2021
|
1.50
|
Prep for 5th bearing install
|
Details
|
|
|
05-13-2021
|
1.00
|
Finished 5th bearing install
|
Details
|
|
|
05-13-2021
|
2.00
|
Drilling new pin holes thru 5th bearing
|
Details
|
|
|
05-13-2021
|
1.00
|
Checking 5th bearing runout.
|
Details
|
|
|
05-07-2021
|
1.00
|
Torqing the case bolts
|
Details
|
|
|
05-07-2021
|
1.50
|
putting cam in case half
|
Details
|
|
|
05-07-2021
|
0.50
|
Fitting crank and cam into case half
|
Details
|
|
|
05-07-2021
|
1.50
|
closing case halves
|
Details
|
|
|
05-07-2021
|
0.50
|
Case halves bolted and torqued.
|
Details
|
|
|
05-07-2021
|
0.50
|
Cam & crank alignment
|
Details
|
|
|
05-05-2021
|
2.00
|
Fuel level sender cover, body filler
|
Details
|
|
|
05-04-2021
|
2.50
|
Fuel sender cover, 2nd layer of glass
|
Details
|
|
|
05-02-2021
|
0.75
|
Plastigage test prep.
|
Details
|
|
|
05-02-2021
|
1.00
|
Plastigage test and case storage.
|
Details
|
|
|
05-02-2021
|
0.50
|
Plastigage check
|
Details
|
|
|
05-02-2021
|
0.50
|
Main Bearings verification
|
Details
|
|
|
05-02-2021
|
0.50
|
Installing oil galley plugs
|
Details
|
|
|
05-02-2021
|
1.00
|
Installing bushing plugs for 5th bearing
|
Details
|
|
|
05-02-2021
|
0.25
|
Documenting Main bearing numbers
|
Details
|
|
|
05-02-2021
|
0.25
|
Bagging The engine for short storage
|
Details
|
|
|
02-07-2021
|
2.50
|
RH wing top skin
|
Details
|
|
|
02-07-2021
|
2.00
|
re-checking level before final riveting
|
Details
|
|
|
02-07-2021
|
1.50
|
final riveting of RH top wing skin
|
Details
|
|
|
02-06-2021
|
2.50
|
RH wing top skin placement
|
Details
|
|
|
02-06-2021
|
2.00
|
landing light & fuel tank
|
Details
|
|
|
02-06-2021
|
2.50
|
Aileron Control rod
|
Details
|
|
|
02-02-2021
|
2.00
|
RH Aileron control and balance cables
|
Details
|
|
|
02-02-2021
|
0.50
|
Cables installed, torq.d and cotter pin'd
|
Details
|
|
|
01-30-2021
|
3.00
|
Wing details alodine and prep top skin
|
Details
|
|
|
01-30-2021
|
1.00
|
Landing light lens support brackets
|
Details
|
|
|
01-30-2021
|
1.00
|
aileron bell crank pivot bolt
|
Details
|
|
|
01-28-2021
|
1.50
|
Wing tip access cover panel
|
Details
|
|
|
01-27-2021
|
1.00
|
RH Wing tip access cutout
|
Details
|
|
|
01-27-2021
|
2.50
|
Landing light mount and access covers
|
Details
|
|
|
01-24-2021
|
2.75
|
power up wing lights
|
Details
|
|
|
01-23-2021
|
2.50
|
Right wing lights
|
Details
|
|
|
01-23-2021
|
2.50
|
RH Leading edge and rib grommets
|
Details
|
|
|
01-16-2021
|
2.50
|
Landing light
|
Details
|
|
|
01-09-2021
|
2.50
|
right wing leading edge prep
|
Details
|
|
|
01-09-2021
|
1.50
|
RH Leading edge prep
|
Details
|
|
|
12-28-2020
|
1.50
|
Pre install flex fuel line
|
Details
|
|
|
12-28-2020
|
0.50
|
flex fuel line in right wing
|
Details
|
|
|
12-27-2020
|
2.00
|
top mount fuel sender prep for installation
|
Details
|
|
|
12-27-2020
|
3.00
|
fuel tank ground / sender wires
|
Details
|
|
|
12-26-2020
|
3.50
|
wire harness in RH wing
|
Details
|
|
|
12-23-2020
|
1.00
|
clean up and prep for wire run
|
Details
|
|
|
11-18-2020
|
1.50
|
riveting R wing internal items
|
Details
|
|
|
11-17-2020
|
1.50
|
Turning Right wing over to work inside
|
Details
|
|
|
11-17-2020
|
1.50
|
riveting lower wing skin stiffeners
|
Details
|
|
|
11-15-2020
|
1.50
|
strip R wing, primer prep
|
Details
|
|
|
11-15-2020
|
1.50
|
riveting R wing bottom skin
|
Details
|
|
|
11-15-2020
|
2.50
|
primer prep on bottom right skin
|
Details
|
|
|
11-15-2020
|
1.00
|
preparing to rivet R wing lower skin
|
Details
|
|
|
11-14-2020
|
1.50
|
dis-assemble wing to deburr
|
Details
|
|
|
11-07-2020
|
2.00
|
fitting tank and making templates for LE skin
|
Details
|
|
|
11-07-2020
|
1.50
|
fitting right tank into LE bay area
|
Details
|
|
|
11-07-2020
|
1.50
|
fitting cork on right wing tank
|
Details
|
|
|
11-07-2020
|
1.50
|
cutting LE skin openings for fuel tank
|
Details
|
|
|
11-06-2020
|
1.00
|
wing tip, nav light support bracket
|
Details
|
|
|
11-06-2020
|
1.00
|
wing locker hatch fitting
|
Details
|
|
|
11-06-2020
|
1.50
|
starting right wing fuel tank
|
Details
|
|
|
11-06-2020
|
1.50
|
setting float for SW fuel sender
|
Details
|
|
|
11-06-2020
|
1.00
|
fitting the locker hatch
|
Details
|
|
|
11-06-2020
|
2.00
|
fitting SW fuel sender in right tank
|
Details
|
|
|
11-05-2020
|
1.50
|
wing locker hatch cover
|
Details
|
|
|
11-04-2020
|
2.50
|
Right wing tip glass repair
|
Details
|
|
|
11-04-2020
|
2.00
|
Langing light option
|
Details
|
|
|
11-04-2020
|
2.50
|
landing light support structure
|
Details
|
|
|
11-04-2020
|
2.50
|
landing light support
|
Details
|
|
|
11-04-2020
|
1.50
|
Landing light lens
|
Details
|
|
|
11-04-2020
|
0.50
|
cutting opening for wing locker
|
Details
|
|
|
11-03-2020
|
1.50
|
wing drilling & tip cap prep
|
Details
|
|
|
11-03-2020
|
2.00
|
right wing tip
|
Details
|
|
|
11-03-2020
|
4.50
|
fitting rignt wing tip cap
|
Details
|
|
|
11-03-2020
|
4.00
|
bell crank supports
|
Details
|
|
|
11-02-2020
|
2.00
|
drilling lower skin stiffeners between ribs
|
Details
|
|
|
10-08-2020
|
1.50
|
Top wing skin stiffeners between ribs
|
Details
|
|
|
10-07-2020
|
1.50
|
Top Wing skin stiffeners between ribs
|
Details
|
|
|
10-06-2020
|
1.00
|
Final drill of top wing skin and ribs
|
Details
|
|
|
10-05-2020
|
1.00
|
Drilling LE skins
|
Details
|
|
|
09-30-2020
|
2.50
|
Dip stick tube clamp
|
Details
|
|
|
09-28-2020
|
1.50
|
OIl pump primer tool
|
Details
|
|
|
09-23-2020
|
2.50
|
Modifying Valve covers for Corvair
|
Details
|
|
|
09-22-2020
|
1.50
|
drilling LE wing skins
|
Details
|
|
|
09-15-2020
|
1.50
|
Torq testing head studs
|
Details
|
|
|
09-14-2020
|
3.50
|
Building Wing holding Stand
|
Details
|
|
|
09-13-2020
|
2.50
|
Engine Stand & torq tester
|
Details
|
|
|
09-07-2020
|
0.50
|
Prop flange engin stand complete
|
Details
|
|
|
09-02-2020
|
3.50
|
Engine prop flange stand
|
Details
|
|
|
08-31-2020
|
2.00
|
Engine Prop flange stand
|
Details
|
|
|
08-29-2020
|
1.50
|
Installing replacement head studs
|
Details
|
|
|
08-25-2020
|
1.50
|
Strapping down leading edge
|
Details
|
|
|
08-24-2020
|
1.00
|
Torq test tool for head studs
|
Details
|
|
|
08-23-2020
|
1.50
|
Pulling leading edge skin closed
|
Details
|
|
|
08-16-2020
|
3.50
|
Fitting the oil filler neck to Valve cover
|
Details
|
|
|
08-16-2020
|
0.50
|
Cutting Filler neck
|
Details
|
|
|
08-15-2020
|
2.50
|
Tapping hole for Keen sert
|
Details
|
|
|
08-15-2020
|
2.00
|
Keen-sert hole prep
|
Details
|
|
|
08-15-2020
|
3.00
|
Hole prep for Keen-sert
|
Details
|
|
|
08-08-2020
|
3.50
|
Stuck Head Stud
|
Details
|
|
|
08-02-2020
|
4.00
|
Cleaning threads & install head studs
|
Details
|
|
|
07-11-2020
|
3.00
|
Chasing holes and pulling studs
|
Details
|
|
|
07-11-2020
|
3.00
|
Chasing all the threads in the engine case
|
Details
|
|
|
07-04-2020
|
14.00
|
engine inspection
|
Details
|
|
|
07-03-2020
|
5.00
|
cleaning engin oil passages
|
Details
|
|
|
06-27-2020
|
0.50
|
Harmonic balancer puller
|
Details
|
|
|
06-27-2020
|
2.00
|
engine teardown, pull harmonic balancer
|
Details
|
|
|
06-27-2020
|
1.50
|
Engine Teardown / remove cylinders
|
Details
|
|
|
06-27-2020
|
1.00
|
CYLINDER HOLDING JIGS
|
Details
|
|
|
06-27-2020
|
1.50
|
Corvair cylinder assembly clamps
|
Details
|
|
|
06-27-2020
|
1.50
|
Clean crank and split case
|
Details
|
|
|
05-27-2020
|
1.00
|
drilling bottom holes in right wing nose skin
|
Details
|
|
|
05-26-2020
|
2.00
|
tie down support and access panel
|
Details
|
|
|
05-26-2020
|
2.00
|
Cleco nose ribs and align bottom LE skin
|
Details
|
|
|
04-27-2020
|
1.00
|
Set up for bottom right wing skin
|
Details
|
|
|
04-27-2020
|
0.50
|
R wing top skin drilling set up
|
Details
|
|
|
04-27-2020
|
1.50
|
drilling top right wing skin
|
Details
|
|
|
04-27-2020
|
1.50
|
drilling r wing top skin to #4
|
Details
|
|
|
04-27-2020
|
4.50
|
drilling R wing bottom skin
|
Details
|
|
|
04-26-2020
|
0.50
|
top skin right wing fit
|
Details
|
|
|
04-26-2020
|
0.50
|
top skin clampup / fit
|
Details
|
|
|
04-26-2020
|
0.50
|
recheck wing for level
|
Details
|
|
|
04-20-2020
|
0.50
|
Taking top skin out of crate.
|
Details
|
|
|
04-19-2020
|
0.50
|
Wing structure riveting
|
Details
|
|
|
04-19-2020
|
3.00
|
riveting rib stiffeners to RR1-RR4
|
Details
|
|
|
04-19-2020
|
1.50
|
Riveting Rear ribs 1 & 4
|
Details
|
|
|
04-19-2020
|
1.00
|
Rear spar re-assembly
|
Details
|
|
|
04-19-2020
|
1.00
|
Rear spar re-assembly
|
Details
|
|
|
04-19-2020
|
1.50
|
Rear Spar Assembly
|
Details
|
|
|
04-19-2020
|
2.00
|
Completing Right wing rear ribs
|
Details
|
|
|
04-17-2020
|
1.50
|
beburr spars and prep for assembly
|
Details
|
|
|
04-11-2020
|
1.50
|
Ribs and spars fitted together
|
Details
|
|
|
04-04-2020
|
1.50
|
Wing ribs
|
Details
|
|
|
04-04-2020
|
1.00
|
Wing Rib lay out on spar
|
Details
|
|
|
04-04-2020
|
1.50
|
Rear wibs, right wing
|
Details
|
|
|
04-04-2020
|
2.00
|
Fitting all the nose ribs
|
Details
|
|
|
04-04-2020
|
1.00
|
Fiting Nose Ribs
|
Details
|
|
|
04-04-2020
|
1.00
|
drilling RR 1#4
|
Details
|
|
|
04-04-2020
|
1.00
|
Drilling Rear Ribs to spar
|
Details
|
|
|
04-04-2020
|
2.00
|
All Ribs located
|
Details
|
|
|
03-28-2020
|
0.50
|
Rear Spar drilling
|
Details
|
|
|
03-28-2020
|
1.00
|
Finish Drill Rib L's and start Rear Spar
|
Details
|
|
|
03-28-2020
|
1.00
|
Drilling all doublers to rear spar
|
Details
|
|
|
03-23-2020
|
1.50
|
Starting wings, Aileron Belcrank Support
|
Details
|
|
|
03-23-2020
|
1.00
|
Aileron Bellcrank Support Channel / rib support L'
|
Details
|
|
|
03-23-2020
|
1.00
|
Aileron bell crank support
|
Details
|
|
|
03-16-2020
|
1.00
|
finishing R Aileron
|
Details
|
|
|
03-16-2020
|
1.00
|
Finish L Aileron, Start riveting R aileron
|
Details
|
|
|
03-15-2020
|
1.50
|
Riveting Left Aileron
|
Details
|
|
|
03-15-2020
|
1.00
|
Re-Assemble left Aileron
|
Details
|
|
|
03-15-2020
|
1.00
|
Finish riveting L aileron
|
Details
|
|
|
03-14-2020
|
1.50
|
Dis-assembly and Deburr
|
Details
|
|
|
02-23-2020
|
1.50
|
Trim tab fitting
|
Details
|
|
|
02-23-2020
|
1.00
|
Aileron trim tab servo access opening
|
Details
|
|
|
02-23-2020
|
1.50
|
Aileron Trim tab Servo
|
Details
|
|
|
02-22-2020
|
2.00
|
Left Aileron Trim tab
|
Details
|
|
|
02-22-2020
|
1.00
|
Left Aileron
|
Details
|
|
|
02-22-2020
|
1.50
|
Left Aileron
|
Details
|
|
|
02-21-2020
|
1.00
|
Right Aileron
|
Details
|
|
|
02-21-2020
|
1.00
|
Aileron balance arm cutout
|
Details
|
|
|
02-17-2020
|
0.50
|
Right Aileron
|
Details
|
|
|
02-17-2020
|
1.00
|
Aileron
|
Details
|
|
|
02-09-2020
|
3.00
|
Starting Wings
|
Details
|
|
|
02-09-2020
|
1.00
|
Attatching spar tip
|
Details
|
|
|
02-08-2020
|
4.50
|
Aileron Detail prep
|
Details
|
|
|
02-02-2020
|
2.00
|
Left Flap assembly
|
Details
|
|
|
02-02-2020
|
1.00
|
Finishing L/H flap
|
Details
|
|
|
02-01-2020
|
1.00
|
Finish riveting Right Flap
|
Details
|
|
|
02-01-2020
|
2.00
|
Corrosion Protect Right Flap
|
Details
|
|
|
01-26-2020
|
4.00
|
Finish L/H flap drilling
|
Details
|
|
|
01-25-2020
|
5.00
|
Starting L/H flap
|
Details
|
|
|
01-20-2020
|
1.00
|
DRILL FLAP HINGE TO FLAP
|
Details
|
|
|
01-19-2020
|
1.00
|
layout rivet pitch and drill flap hinge
|
Details
|
|
|
01-19-2020
|
3.00
|
Flap Control plate
|
Details
|
|
|
01-18-2020
|
3.50
|
STARTING ON RIGHT FLAP
|
Details
|
|
|
12-07-2019
|
8.00
|
Inventory
|
Details
|
|
|
11-16-2019
|
8.00
|
opening crate / inventory
|
Details
|
|
|
11-15-2019
|
1.00
|
Picking up Complete kit
|
Details
|
|
|
02-01-2015
|
0.50
|
Complete Elevator / stab / rudder
|
Details
|
|
|
01-27-2015
|
1.00
|
Elevator horn
|
Details
|
|
|
01-24-2015
|
0.25
|
Deburring Trim tab
|
Details
|
|
|
12-30-2014
|
0.50
|
Riveting Elevator Top Skin
|
Details
|
|
|
12-30-2014
|
0.50
|
Prep Elevator for Final Assembly
|
Details
|
|
|
12-30-2014
|
0.25
|
Elevator trim tab, Final assembly
|
Details
|
|
|
12-30-2014
|
0.50
|
Elevator Top Skin
|
Details
|
|
|
12-30-2014
|
0.50
|
Alodine Elevator Details
|
Details
|
|
|
12-13-2014
|
1.00
|
Verify assembly of horizontal stab
|
Details
|
|
|
12-13-2014
|
1.50
|
H Stab drill & rivet top skin
|
Details
|
|
|
12-12-2014
|
2.50
|
Top Skin on Horizontal Stabilizer
|
|
|
|
12-12-2014
|
2.50
|
Horiz. Stab Bottom Skin install
|
Details
|
|
|
12-12-2014
|
1.50
|
finish riveting HS bottom skin
|
Details
|
|
|
12-06-2014
|
2.50
|
H Stab Drill and skin fit
|
Details
|
|
|
11-22-2014
|
0.10
|
Tools purchased
|
Details
|
|
|
11-22-2014
|
1.50
|
stabalizer spar sub assemblies
|
Details
|
|
|
11-22-2014
|
3.20
|
Assemble H Stab spars and ribs
|
Details
|
|
|
11-08-2014
|
0.01
|
tools from The Yard Store
|
Details
|
|
|
11-08-2014
|
0.01
|
Rivet tools from Zenith
|
Details
|
|
|
11-08-2014
|
1.00
|
Receiving Tail kit
|
Details
|
|
|
11-08-2014
|
2.00
|
Horizontal Stab Spars
|
Details
|
|
|
09-26-2014
|
2.00
|
work bench adjustable feet
|
Details
|
|
|
09-26-2014
|
6.00
|
building work benches
|
Details
|
|
|
09-18-2011
|
1.00
|
Rudder workshop / Open hanger day
|
Details
|
|
|
09-17-2011
|
2.00
|
OPEN HANGER DAY 2011
|
Details
|
|
|
09-17-2011
|
6.00
|
Final riveting of the Rudder at Workshop
|
Details
|
|
|
09-16-2011
|
4.00
|
Rudder Workshop
|
Details
|
|
|
09-16-2011
|
6.00
|
Getting Started
|
Details
|
|