Powered By Kitlog Pro v2.0
Dave Yost RV-4
RV-4
All
Work Logs Found:
26
Category Work Time:
106 Hours
Date
Hours
Work Log Summary
Details
06-18-2019
1.00
Details
11-03-2013
15.00
Rudder Structure
02-03-2013
1.00
Bio: Dave Yost
Details
02-02-2013
1.00
Prepairing the elevator bearing bracket
Details
01-30-2013
2.00
Horizontal Stab Begins!
Details
08-29-2012
6.00
Final finish on the fiberglass tip. Vertical stab
Details
08-29-2012
3.00
Fiberglass tip final install
Details
08-25-2012
8.00
VS Stab fiberglass tip.
Details
08-21-2012
8.00
Final Assembly of the Vertical Stab!
Details
08-20-2012
4.00
Riveting begins!
Details
08-15-2012
7.00
Priming
Details
08-12-2012
0.50
Handy Tips
Details
08-07-2012
4.00
Deburring and Dimpling
Details
08-05-2012
4.00
Match Drilling Complete!
Details
08-02-2012
12.00
Match Drilling the Vertical Stab Skin
Details
08-01-2012
7.00
Vertical Stab Fixture
Details
07-29-2012
5.00
Building the structure
Details
07-28-2012
2.00
Triming the bottom of the Vertical Stab T.E. spar
07-10-2012
3.00
Fixing the Hinge Brackets
Details
07-05-2012
6.00
Hinge layout on Vertical Stab T.E. Spar
Details
07-05-2012
0.30
Cutting the "V" in VS408
Details
07-03-2012
1.00
Rudder and Stab T.E. Spar Hinge Line
Details
07-03-2012
0.50
Locating Center Line of VS408
Details
07-03-2012
0.50
Drilling 1/2" hole on center line of "V" cut out.
07-03-2012
3.00
Blue Sharpie and a Mic.
Details
07-03-2003
1.00
VS408 Layout
Details
SITE NAVIGATION
Contact Builder
RV-4 Home
Category
# Logs
# Hours
All
26
106
About the builder
1
1
Empennage
23
89
Horizontal Stab
1
1
Rudder
1
15
Copyright © 2001-2024 Matronics. All Rights Reserved.