Date
|
Hours
|
Work Log Summary

|
Details

|
02-26-2019
|
0.00
|
JDair Latch Modification
|
|
 |
|
05-16-2018
|
0.00
|
Test posting
|
|
 |
|
01-31-2015
|
0.00
|
RV Finish Painting Pictures
|
Details
|
|
|
01-30-2015
|
0.00
|
RV Painting Prep #3
|
|
|
|
01-30-2015
|
0.00
|
RV Painting Prep #2
|
Details
|
|
|
01-30-2015
|
0.00
|
RV Painting Prep #1
|
Details
|
|
|
06-08-2014
|
2.00
|
Doylestown To Ocean City Trip
|
Details
|
 |
|
03-09-2014
|
2.10
|
X-Country and Pattern work weekend Hobbs 14.1
|
Details
|
|
|
02-08-2014
|
0.00
|
RV in the Snow
|
Details
|
|
|
02-01-2014
|
1.70
|
First Cross Country
|
Details
|
 |
|
01-19-2014
|
0.00
|
First Solo and Other Phase 1 Activities
|
Details
|
  |
|
01-13-2014
|
4.50
|
Fuel Tank Calibration & Flaps config
|
Details
|
  |
|
01-09-2014
|
1.00
|
Minor Airplane Upgrades
|
Details
|
 |
|
01-09-2014
|
1.50
|
Fixing Phase I Squawks
|
Details
|
|
|
01-05-2014
|
2.50
|
Reinforced nosewheel fairing tow bar
|
Details
|
|
|
01-04-2014
|
1.00
|
Finalized and laminated checklists
|
Details
|
  |
|
01-03-2014
|
0.00
|
Phase I testing - Planned Activities
|
Details
|
  |
|
01-01-2014
|
2.00
|
First Test Flight
|
Details
|
|
|
12-28-2013
|
0.00
|
New Canopy Cover
|
Details
|
|
|
12-28-2013
|
1.00
|
Minor Avionics Adjustments
|
Details
|
  |
|
12-26-2013
|
2.00
|
Reinstalled Wheel Pants and Fairings
|
Details
|
  |
|
12-21-2013
|
2.00
|
Resolved Bad Cylinder #2 Spark Plug
|
Details
|
|
|
12-14-2013
|
1.00
|
Tinnerman washers for Empennage Fairing
|
Details
|
 |
|
12-14-2013
|
3.00
|
Adjusted Exhaust pipes for cowling clearance
|
Details
|
|
|
12-07-2013
|
1.50
|
Skyview EMS Settings amd Compass
|
Details
|
  |
|
11-30-2013
|
5.00
|
DAR Inspection
|
Details
|
 |
|
11-29-2013
|
0.00
|
Remaining Punch list items
|
Details
|
  |
|
11-28-2013
|
0.00
|
Completed Weight and Balance - addl pics
|
|
|
|
11-28-2013
|
4.00
|
Completed Weight and Balance
|
Details
|
|
|
11-27-2013
|
4.00
|
Punch list items completed
|
Details
|
  |
|
11-27-2013
|
2.50
|
Fuel Flow Testing - Straight and Level
|
Details
|
|
|
11-27-2013
|
0.50
|
Fuel Flow Testing - Climb configuration
|
Details
|
|
|
11-26-2013
|
2.00
|
Picked up Racing Scales at Sky Manor
|
|
  |
|
11-25-2013
|
3.50
|
Wing Root Fairing Installation
|
Details
|
|
|
11-25-2013
|
0.50
|
Secured Tail Strobe wiring bundle
|
Details
|
 |
|
11-25-2013
|
0.50
|
Secured Right Side EGT CHT Wiring
|
Details
|
 |
|
11-25-2013
|
0.00
|
Remaining Punch List
|
Details
|
  |
|
11-25-2013
|
0.25
|
Prop Tracking
|
Details
|
 |
|
11-25-2013
|
1.00
|
Installed Strobe wiring pass through
|
Details
|
|
|
11-25-2013
|
1.00
|
Filled with 7 Quarts of Mineral Oil
|
Details
|
  |
|
11-24-2013
|
15.00
|
Installed Spark Plugs, Drained preservative oil
|
Details
|
  |
|
11-23-2013
|
6.00
|
Rigging Ailerons, Elevator and Flaps
|
Details
|
  |
|
11-09-2013
|
0.00
|
Remaining Punch List
|
Details
|
  |
|
11-08-2013
|
1.00
|
Installed Prop
|
Details
|
|
|
11-03-2013
|
1.50
|
Installed rear wing support bolts
|
Details
|
 |
|
11-03-2013
|
2.00
|
Installed Elevator tips
|
Details
|
|
|
11-03-2013
|
8.00
|
Finished Installing Wing Bolts
|
Details
|
|
|
11-02-2013
|
0.50
|
Sftety tied gascolator
|
Details
|
 |
|
11-02-2013
|
2.50
|
Reinstalled EMS Skyview module and tested
|
Details
|
  |
|
11-02-2013
|
3.50
|
Installed Pitot Heat and tubing
|
Details
|
  |
|
11-01-2013
|
5.00
|
Installed tank attach brackets
|
Details
|
 |
|
11-01-2013
|
2.00
|
Drilled heat shield bolt through firewall
|
Details
|
  |
|
10-27-2013
|
6.00
|
Wing and Pitot Wiring
|
Details
|
  |
|
10-27-2013
|
0.00
|
95% done - final punch list before DAR Inspection
|
Details
|
  |
|
10-26-2013
|
4.00
|
Mounted Ailerons and Flaps and wing wiring
|
Details
|
|
|
10-25-2013
|
2.50
|
Installed Wing Bolts
|
Details
|
 |
|
10-20-2013
|
3.00
|
Installed Elevator and Rudder
|
Details
|
 |
|
10-20-2013
|
3.50
|
Final Empennage Assembly
|
Details
|
|
|
10-19-2013
|
4.00
|
Moving remaining hangar items
|
Details
|
|
|
10-18-2013
|
0.00
|
Fuselage move to Airport - 3
|
|
|
|
10-18-2013
|
0.00
|
Fuselage move to Airport - 2
|
|
|
|
10-18-2013
|
1.50
|
Fuselage move to Airport - 1
|
Details
|
|
|
10-13-2013
|
4.00
|
Installed Canopy Handle, Targa Strip finishing
|
Details
|
|
|
10-12-2013
|
3.50
|
Started Targa Strip
|
Details
|
|
|
10-12-2013
|
2.50
|
Sanding Windscreen
|
Details
|
|
|
10-08-2013
|
1.50
|
Six layers of Fiberglass and peel ply
|
Details
|
|
|
10-07-2013
|
2.00
|
Prep for Canopy Fiberglass layups
|
Details
|
|
|
10-06-2013
|
2.00
|
Gluing Glareshield Vinyl
|
Details
|
 |
|
10-06-2013
|
1.00
|
Final Install Rear Plexiglass
|
Details
|
|
|
10-06-2013
|
2.50
|
Epoxied Front Windscreen
|
Details
|
|
|
10-05-2013
|
1.00
|
Touch up Canopy Frame
|
Details
|
|
|
10-05-2013
|
2.50
|
Canopy Frame top coat painting
|
Details
|
|
|
09-29-2013
|
2.00
|
Riveted Canopy Side Skirts
|
Details
|
|
|
09-29-2013
|
1.50
|
Reinstalled Canopy and check clearance.
|
Details
|
|
|
09-29-2013
|
3.00
|
Final Cut for Canopy
|
Details
|
|
|
09-29-2013
|
2.00
|
Drilled and countersunk holes for the Canopy
|
Details
|
|
|
09-23-2013
|
0.50
|
Installed Aileron Boot Flange
|
Details
|
|
|
09-23-2013
|
1.50
|
Drilled Right Gear Leg Cotter Pin
|
Details
|
|
|
09-22-2013
|
1.50
|
Pop-Riveted bottom cover plate
|
Details
|
 |
|
09-22-2013
|
1.50
|
Drilled Left Gear Leg Cotter Pin
|
Details
|
 |
|
09-20-2013
|
5.50
|
RV Transition Training Complete
|
Details
|
  |
|
09-16-2013
|
0.75
|
Front Skin 45% complete
|
Details
|
 |
|
09-15-2013
|
1.00
|
Started riveting front skin
|
Details
|
  |
|
09-15-2013
|
2.00
|
Moved items to the Airport
|
Details
|
  |
|
09-14-2013
|
1.50
|
Canopy Rough Cut and fit
|
Details
|
|
|
09-08-2013
|
3.00
|
Move to Doylestown Airport
|
Details
|
  |
|
09-07-2013
|
1.50
|
resealed tank access plates
|
Details
|
|
|
09-07-2013
|
2.00
|
Remoded old proseal from tank access plates
|
Details
|
|
|
09-02-2013
|
0.50
|
Installed Engine Oil filler neck
|
Details
|
|
|
09-02-2013
|
1.00
|
First Draft of POH
|
Details
|
 |
|
09-01-2013
|
0.50
|
Unpacked replacement canopy
|
Details
|
|
|
09-01-2013
|
3.50
|
Installed cap strips
|
Details
|
|
|
09-01-2013
|
2.00
|
Dimpled, marked and installed Top forward skin
|
Details
|
 |
|
08-31-2013
|
1.00
|
Tested Landing Lights and Fuel Sender wiring
|
Details
|
  |
|
08-31-2013
|
1.50
|
Added missing rivets to F-757-T
|
Details
|
|
|
08-30-2013
|
1.50
|
Fuel Tank Sender Wiring
|
Details
|
 |
|
08-30-2013
|
5.00
|
Finished routing & bundling wiring
|
Details
|
|
|
08-29-2013
|
3.50
|
Re-installed Avionics panels and riveted data plat
|
Details
|
|
|
08-29-2013
|
3.00
|
Minor Setback Tank cover plates reversed
|
Details
|
  |
|
08-28-2013
|
3.50
|
Primed and Top Coated Avionics panels
|
Details
|
|
|
08-28-2013
|
1.00
|
Fuel Pump Overflow Tubing
|
Details
|
|
|
08-27-2013
|
3.00
|
Wingtip Reinforcement Angles
|
Details
|
|
|
08-27-2013
|
0.50
|
Sealing Firewall Pass through
|
Details
|
|
|
08-27-2013
|
0.50
|
Riveted Rudder Stops
|
Details
|
|
|
08-27-2013
|
1.50
|
Installed Springs for Electric Aileron Trim
|
Details
|
|
|
08-27-2013
|
0.50
|
Drilled and Tapped Co-Pilot set screw
|
Details
|
|
|
08-26-2013
|
0.00
|
Future Home for N913WG at KDYL
|
Details
|
|
|
08-26-2013
|
3.00
|
Finished Wingtip Lenses
|
Details
|
|
|
08-25-2013
|
0.00
|
Remaining Punch list before moving to KDYL
|
Details
|
  |
|
08-25-2013
|
4.00
|
Fuselage final routing and bundling.
|
Details
|
  |
|
08-25-2013
|
0.50
|
Added Fast-on connectors for NAV lights
|
Details
|
 |
|
08-24-2013
|
3.00
|
Nav Strobe Wing wiring and termination
|
Details
|
|
|
08-24-2013
|
1.00
|
Added VOR Pigtail Coax connector
|
Details
|
 |
|
08-24-2013
|
3.00
|
Added additional center section hole for wiring
|
Details
|
 |
|
08-18-2013
|
1.00
|
Wing spot priming completed
|
Details
|
|
|
08-18-2013
|
2.00
|
Wing corrosion fix
|
Details
|
|
|
08-18-2013
|
1.50
|
Installed Nav/Strobe in wingtips
|
Details
|
|
|
08-18-2013
|
1.50
|
Drilled holes for Skyview OAT Probes
|
Details
|
|
|
08-18-2013
|
1.00
|
Added Dual USB Charger Port
|
Details
|
 |
|
08-18-2013
|
1.00
|
"N" Number decal installation
|
Details
|
|
|
08-17-2013
|
6.00
|
Wing Root Wiring
|
Details
|
|
|
08-13-2013
|
0.00
|
RV Transition Training Scheduled
|
Details
|
  |
|
08-11-2013
|
3.00
|
Stick Grip Final Wiring
|
Details
|
|
|
08-11-2013
|
1.00
|
Skyview Backup Battery Test
|
Details
|
|
|
08-11-2013
|
0.50
|
Registered ELT at NOAA / SARSAT
|
Details
|
  |
|
08-10-2013
|
3.50
|
OAT Sensor Wiring
|
Details
|
|
|
08-05-2013
|
3.00
|
Minor Setback with Fuel Tank cover plates
|
Details
|
  |
|
08-04-2013
|
0.50
|
Drilled holes for Nose Weel fairing tow bar
|
Details
|
|
|
08-04-2013
|
1.50
|
Annunciator Warning Light
|
Details
|
 |
|
08-03-2013
|
2.00
|
Nose Wheel bearing bushings and final installation
|
Details
|
|
|
07-25-2013
|
2.00
|
Reiff Oil sump heater installation
|
Details
|
|
|
07-13-2013
|
0.00
|
Phase 1 Flight Area requested
|
Details
|
 |
|
07-07-2013
|
4.50
|
Cut and Installed Control Sticks
|
Details
|
|
|
07-06-2013
|
2.00
|
Added Brake Fluid
|
Details
|
|
|
07-05-2013
|
1.50
|
Secured aft baggage avionics wiring
|
Details
|
  |
|
07-04-2013
|
3.00
|
Engine cable support and cover plates
|
Details
|
|
|
06-30-2013
|
0.00
|
Ordered Multiple-Point Temp labels
|
Details
|
 |
|
06-30-2013
|
3.50
|
Control Cable Installation
|
Details
|
|
|
06-29-2013
|
2.50
|
Top Coated Avionics Panel Inserts
|
Details
|
 |
|
06-29-2013
|
1.50
|
NACA Vent and Screen Installation
|
Details
|
|
|
06-24-2013
|
1.50
|
Primer Line Installation
|
Details
|
|
|
06-23-2013
|
3.50
|
Oil Cooler Shutter Cable Installation
|
Details
|
|
|
06-23-2013
|
0.00
|
Additinal Picture Oil Cooler Shutter Installation
|
Details
|
 |
|
06-22-2013
|
1.00
|
Safety Tie Carb and Alternator
|
Details
|
|
|
06-22-2013
|
0.50
|
Blast Tubes for P-Mags
|
Details
|
|
|
06-22-2013
|
0.50
|
Alternate Static Installation
|
Details
|
|
|
06-22-2013
|
1.00
|
Alternate Air Push Pull Install
|
Details
|
|
|
06-16-2013
|
3.50
|
Throttle Mixture and Carb Heat Controls
|
Details
|
|
|
06-16-2013
|
2.50
|
Alternate Air Push-Pull Control
|
Details
|
|
|
06-15-2013
|
2.00
|
Primer lines FWF
|
Details
|
 |
|
06-14-2013
|
0.00
|
Data Plate Engraving
|
Details
|
 |
|
06-14-2013
|
0.00
|
Custom Wheel Chocks
|
Details
|
 |
|
06-10-2013
|
0.00
|
Draft punch list for completion
|
Details
|
  |
|
06-09-2013
|
1.00
|
Wired Precision GPS input for Transponder 2020 man
|
Details
|
|
|
06-09-2013
|
1.00
|
Tested Garmin GPS and Transponder
|
Details
|
|
|
06-09-2013
|
0.00
|
RV outside shots for GPS testing
|
Details
|
|
|
06-09-2013
|
1.00
|
Reconfigured VP-X Software
|
Details
|
  |
|
06-08-2013
|
0.50
|
Ordered Mineral Oil and Brake Fluid
|
Details
|
  |
|
06-08-2013
|
0.50
|
Drilled holes for Coax ELT Pass through
|
Details
|
|
|
06-06-2013
|
0.50
|
Got Quote from Falcon Insurance
|
Details
|
  |
|
06-05-2013
|
0.50
|
FAA Registration & Data Plate engraving
|
Details
|
  |
|
06-02-2013
|
1.00
|
Fixed Com2 Tx issue
|
Details
|
  |
|
05-24-2013
|
1.00
|
Started Aircraft Registration process
|
Details
|
  |
|
05-19-2013
|
4.00
|
Completed Flap Switch and wiring harness
|
Details
|
|
|
05-18-2013
|
1.00
|
Headset Testing
|
Details
|
|
|
05-18-2013
|
4.00
|
Flaps & Position Sensor Installation
|
Details
|
|
|
05-17-2013
|
1.00
|
Started Aircraft Registration process
|
Details
|
  |
|
05-17-2013
|
2.00
|
Headset Mounting & Wiring
|
Details
|
|
|
05-12-2013
|
1.00
|
Tied in Serial 1 Transponder to both displays
|
Details
|
  |
|
05-12-2013
|
0.00
|
Headphone Jack Placement pictures
|
Details
|
|
|
05-12-2013
|
3.00
|
Fabricated Headpone Jacks
|
Details
|
|
|
05-05-2013
|
4.50
|
Transponder, ELT & Pitch Servo Wiring
|
Details
|
|
|
04-28-2013
|
3.00
|
ADSB Wiring and Other minor items
|
Details
|
  |
|
04-21-2013
|
3.50
|
Avionics and trim wiring
|
Details
|
  |
|
04-14-2013
|
3.00
|
Ran wiring for Pitch trim servo and tail strobe
|
Details
|
|
|
04-14-2013
|
3.00
|
Installed Electric Roll Trim Servo
|
Details
|
|
|
04-11-2013
|
0.00
|
Replacement Canopy Arrives
|
Details
|
 |
|
04-07-2013
|
1.50
|
P-Mag Manifold pressure tubing
|
Details
|
 |
|
04-07-2013
|
2.50
|
Antenna Coax Runs
|
Details
|
|
|
03-31-2013
|
4.00
|
Ran Pmag Wiring
|
Details
|
|
|
03-30-2013
|
3.50
|
VPX Wiring 4
|
Details
|
|
|
03-24-2013
|
4.50
|
VPX Wiring Part 3
|
Details
|
|
|
03-24-2013
|
1.00
|
Mounting SkyView Net Hub
|
Details
|
|
|
03-24-2013
|
2.00
|
Completed EGT - CHT Wiring
|
Details
|
|
|
03-23-2013
|
2.00
|
Planning Coax runs and wiring details
|
Details
|
  |
|
03-17-2013
|
1.50
|
VPX Wiring Continued Part 2
|
Details
|
 |
|
03-15-2013
|
3.50
|
VP-X Wiring Continued
|
Details
|
 |
|
03-14-2013
|
2.50
|
Wiring harness for VPX Switches
|
Details
|
 |
|
03-13-2013
|
1.50
|
VP-X and Skyview Wiring
|
Details
|
|
|
03-12-2013
|
1.50
|
Mounted Rear Avionics Harness and tested
|
Details
|
|
|
03-11-2013
|
1.00
|
Ran main power cable to VP-X
|
Details
|
|
|
03-10-2013
|
2.00
|
Started Wiring Engine Monitor
|
Details
|
|
|
03-10-2013
|
1.50
|
Skyview ARINC Mounting
|
Details
|
 |
|
03-10-2013
|
1.50
|
Mounted Backup Alternator Volt Regulator
|
Details
|
|
|
03-09-2013
|
1.50
|
Ran wiring and string through conduit
|
Details
|
|
|
03-09-2013
|
2.00
|
Mounted Skyview Engine Monitor Module
|
Details
|
|
|
03-09-2013
|
3.00
|
Installed VP-X Module
|
Details
|
|
|
03-09-2013
|
2.00
|
Installed Skyview ADSB Unit
|
Details
|
 |
|
03-03-2013
|
3.50
|
Installed Garmin Skyview and Backup Batteries
|
Details
|
|
|
03-02-2013
|
2.50
|
Installed center stack avionics
|
Details
|
|
|
03-02-2013
|
4.00
|
Avionics Rail Mounts
|
Details
|
|
|
02-24-2013
|
2.00
|
Drilled Canopy Latches
|
Details
|
|
|
02-23-2013
|
3.00
|
Finishing Canopy Skirts and Cracked Canopy
|
Details
|
|
|
02-21-2013
|
0.00
|
Right Side Canopy rail alignmentt (addl picures)
|
Details
|
|
|
02-18-2013
|
0.00
|
Right Side Canopy Rail alignment gap
|
Details
|
|
|
02-17-2013
|
1.50
|
Fixing the Canopy flat spot
|
Details
|
|
|
02-17-2013
|
3.50
|
Drilled Left Side Canopy Skirt
|
Details
|
|
|
02-16-2013
|
2.00
|
Part 2 - Installed Canopy Screws and Nuts and back
|
Details
|
|
|
02-16-2013
|
3.00
|
Part 1 - Rear Canopy Countersink and Tap
|
Details
|
|
|
02-10-2013
|
0.00
|
Part 4- Canopy Struts Opened and Closed
|
Details
|
|
|
02-10-2013
|
3.50
|
Part 3 - Installing the Struts on the Canopy
|
Details
|
|
|
02-10-2013
|
3.00
|
Part 2 - Tapping Canopy blocks and fabricating nut
|
Details
|
|
|
02-10-2013
|
3.50
|
Part 1 - Fabricating Canopy Strut Mounts
|
Details
|
|
|
02-05-2013
|
3.00
|
Installed top cowling pins and Nosewheel fairing
|
Details
|
|
|
02-05-2013
|
3.50
|
Bottom Cowling Support and hinge pins
|
Details
|
|
|
02-02-2013
|
3.00
|
VP-X Bench Test Configuraiton upload
|
Details
|
 |
|
01-26-2013
|
3.50
|
Installed left cowling pin and cowl epoxy
|
Details
|
|
|
01-21-2013
|
8.00
|
Front Baffle Seal, Platenuts and RTV
|
Details
|
|
|
01-13-2013
|
4.00
|
Fitting Top Cowling and Baffle
|
Details
|
|
|
01-12-2013
|
3.50
|
Right Side baffle final riveting
|
Details
|
|
|
01-04-2013
|
1.50
|
Front spinner nutplate installed and test fit
|
Details
|
|
|
01-04-2013
|
3.50
|
Fabricating the Prop Filler Plates
|
Details
|
|
|
01-03-2013
|
1.50
|
Installed Baffle Seal on bottom cowl inlet
|
Details
|
|
|
01-03-2013
|
2.50
|
Fabricated Prop Spinner gap seal plates
|
Details
|
|
|
01-01-2013
|
2.50
|
Threaded rod baffle keeper installation
|
Details
|
|
|
01-01-2013
|
3.50
|
Left side baffle final riveting and top cowl clear
|
Details
|
|
|
01-01-2013
|
1.00
|
Center baffle rough sizing
|
Details
|
 |
|
12-31-2012
|
3.50
|
Left Side Baffle progress
|
Details
|
|
|
12-30-2012
|
3.50
|
Front Baffles started
|
Details
|
|
|
11-25-2012
|
2.50
|
FAB Part 7 - Alternate Air Installation
|
Details
|
 |
|
11-25-2012
|
1.50
|
FAB Part 6 - Rubber Air Seal Installation
|
Details
|
|
|
11-22-2012
|
1.50
|
FAB Part 5 - Reinforced Fiberglass FAB air inlet
|
Details
|
 |
|
11-21-2012
|
2.50
|
FAB Part 4 - Epoxied FAB air inlet
|
Details
|
|
|
11-21-2012
|
3.50
|
FAB Part 2 - Fabricating the FAB
|
Details
|
|
|
11-20-2012
|
3.50
|
FAB Part 3 - Carb heat door and alternate air
|
Details
|
|
|
11-20-2012
|
2.00
|
FAB Part 1 - Lining up horizontal
|
Details
|
|
|
11-12-2012
|
0.50
|
Top Cowling retainer pin bracket
|
Details
|
 |
|
11-11-2012
|
2.00
|
Riveted pin clips
|
Details
|
|
|
11-09-2012
|
1.50
|
Nose Wheel Platenuts
|
Details
|
|
|
11-08-2012
|
5.50
|
Nosewheel Fairings
|
Details
|
|
|
11-05-2012
|
2.00
|
Nose Wheel wheel pants
|
Details
|
|
|
11-05-2012
|
3.50
|
Nose Wheel Fairing
|
Details
|
|
|
10-29-2012
|
0.00
|
Hurricane Sandy Damage Part 4
|
|
|
|
10-29-2012
|
0.00
|
Hurricane Sandy Damage Part 3
|
|
|
|
10-29-2012
|
0.00
|
Hurricane Sandy Damage Part 2
|
|
|
|
10-29-2012
|
0.00
|
Hurricane Sandy Damage Part 1
|
Details
|
|
|
10-27-2012
|
2.50
|
Second coat epoxy and final hinge riveting
|
Details
|
|
|
10-26-2012
|
2.50
|
First coat epoxy acetone for lower cowling
|
Details
|
|
|
10-26-2012
|
1.00
|
Cowling inlet finish epoxy coat
|
Details
|
 |
|
10-21-2012
|
0.50
|
Riveted Oil Access door
|
Details
|
|
|
10-21-2012
|
1.50
|
Install Cowling Inlet Ducts
|
Details
|
 |
|
10-20-2012
|
2.50
|
Oil Door problem resolved
|
Details
|
|
|
10-15-2012
|
0.00
|
Part 2 - Oil Door flush latch problem
|
Details
|
|
|
10-15-2012
|
0.00
|
Part 1 - Oil Door flush latch problem
|
Details
|
|
|
10-14-2012
|
1.50
|
Top Cowl sanding and second epoxy coat
|
Details
|
|
|
10-14-2012
|
2.50
|
Riveted lower cowling top hinge
|
Details
|
|
|
10-14-2012
|
3.50
|
Epoxy skim coat top cowling inside and out
|
Details
|
|
|
10-13-2012
|
1.50
|
Riveted side and bottom fuselage hinge
|
Details
|
|
|
10-07-2012
|
5.00
|
Drilled top and bottom cowling piano hinge
|
Details
|
|
|
10-06-2012
|
2.00
|
Installed side cowling piano hinge
|
Details
|
|
|
10-06-2012
|
1.00
|
Installed Eyeball fresh air vents
|
Details
|
|
|
09-30-2012
|
0.00
|
Part 2 - Trial fit of lower cowling (Add'l picture
|
Details
|
|
|
09-30-2012
|
1.50
|
Part 1 - Trial fit of lower cowling
|
Details
|
|
|
09-23-2012
|
2.00
|
Part 4 - Set clearance for top Cowling
|
Details
|
|
|
09-23-2012
|
0.50
|
Part 3 - Sanded and match drilled front cowling
|
Details
|
 |
|
09-23-2012
|
2.50
|
Part 2 - Installed Oil Door
|
Details
|
|
|
09-23-2012
|
1.00
|
Marked avionics cut for intermediate bulkhead
|
Details
|
  |
|
09-21-2012
|
2.00
|
Sanded Front cowling for fit
|
Details
|
 |
|
09-21-2012
|
2.00
|
Part 1 - Test Fit canopy and made wood plate for s
|
Details
|
|
|
09-16-2012
|
3.50
|
PArt 3 - Drilling Platenuts and mounting avionics
|
Details
|
|
|
09-16-2012
|
3.50
|
Part 2 - Drilling and Riveting the back panel
|
Details
|
|
|
09-16-2012
|
4.00
|
Part 1 - Fitting the carbon fiber panel
|
Details
|
|
|
09-10-2012
|
1.00
|
Avionics Arrive
|
Details
|
|
|
09-03-2012
|
4.50
|
Cut and drilled Rear Canopy
|
Details
|
|
|
08-30-2012
|
0.00
|
Things to complete before moving to DYL
|
Details
|
  |
|
08-29-2012
|
2.00
|
Mounted Transponder and UAT blade antennas
|
Details
|
|
|
08-28-2012
|
3.00
|
3 - Drilled Canopy Plexiglass to the Frame
|
Details
|
|
|
08-28-2012
|
4.50
|
2 - Final Canopy cutting and clamp down
|
Details
|
|
|
08-28-2012
|
0.50
|
1 - Moved ELT Antenna Mount and tapped screws
|
Details
|
|
|
08-26-2012
|
0.00
|
Canopy Plexiglass final cut additional pictures
|
|
|
|
08-26-2012
|
3.50
|
Cabin Plexiglass final cuts
|
Details
|
|
|
08-25-2012
|
3.50
|
Canopy Brace and finish painting
|
Details
|
|
|
08-22-2012
|
2.50
|
Drilled the canopy frame support brackets
|
Details
|
 |
|
08-21-2012
|
2.00
|
Splitting the Canopy plexiglass
|
Details
|
|
|
08-19-2012
|
1.50
|
2 - Canopy Plexiglass Placement
|
Details
|
|
|
08-19-2012
|
2.00
|
1 - First cut Canopy Plexiglass
|
Details
|
|
|
08-18-2012
|
5.00
|
Riveted Canopy Frame
|
Details
|
|
|
08-17-2012
|
0.00
|
Fuel Caps Engraved
|
Details
|
 |
|
08-16-2012
|
1.00
|
Canopy Frame Stiffener - Flanged lightening holes
|
Details
|
|
|
08-15-2012
|
3.50
|
Canopy frame Primed and Riveted
|
Details
|
|
|
08-12-2012
|
8.00
|
Drilling and Clecoing the Canopy fRame
|
Details
|
|
|
08-11-2012
|
1.00
|
Picture of Canopy hinge gap (finally acceptable)
|
Details
|
 |
|
08-10-2012
|
1.50
|
Bastard canopy hinge pins take two
|
Details
|
|
|
08-08-2012
|
1.50
|
Drilling Canopy Hinge Bolts
|
Details
|
|
|
08-07-2012
|
0.00
|
Canopy splice plate additional pictures
|
Details
|
|
|
08-07-2012
|
1.00
|
4 - Riveting canopy splice plate and hinge bracket
|
Details
|
|
|
08-07-2012
|
3.50
|
3 - Drilling canopy splice block
|
Details
|
|
|
08-07-2012
|
0.00
|
2 - Canopy ready for hinge drilling
|
Details
|
 |
|
08-07-2012
|
0.50
|
1 - Reinstalled canopy side handle parts
|
Details
|
|
|
08-05-2012
|
1.00
|
Painted canopy latch side handle parts
|
Details
|
 |
|
08-05-2012
|
1.50
|
Mounted ELT Antenna
|
Details
|
|
|
08-04-2012
|
2.50
|
Drilling Canopy Frame skins
|
Details
|
|
|
08-02-2012
|
2.50
|
Canopy Latch Side Handle Install
|
Details
|
|
|
07-28-2012
|
5.00
|
Drilled Canopy Hinge Blocks
|
Details
|
|
|
07-26-2012
|
1.00
|
Painted Forward Upper Fuselage parts
|
Details
|
|
|
07-25-2012
|
1.50
|
Upward Forward Fuselage deburring
|
Details
|
 |
|
07-23-2012
|
4.00
|
Cleocoed the Upper Forward Fuselage
|
Details
|
|
|
07-22-2012
|
0.00
|
Installing the Canopy Release
|
Details
|
  |
|
07-22-2012
|
3.00
|
Final Install Canopy Deck
|
Details
|
|
|
07-21-2012
|
1.50
|
Prepped Cockpit for Painting
|
Details
|
|
|
07-21-2012
|
0.00
|
Drilling the Canopy Hinge Blocks to the Ribs
|
Details
|
  |
|
07-21-2012
|
2.00
|
Cockpit Painting Completed
|
Details
|
|
|
07-20-2012
|
0.00
|
Installing the Front Deck (Tip-Up)
|
Details
|
  |
|
07-17-2012
|
1.50
|
Rear Baggage side panels and Canopy installation
|
Details
|
|
|
07-15-2012
|
3.00
|
Riveted upper cabin fuselage skin
|
Details
|
 |
|
07-14-2012
|
8.00
|
Riveted canopy frame rear skin
|
Details
|
|
|
07-14-2012
|
3.00
|
Riveted Canopy Frame
|
Details
|
|
|
07-13-2012
|
1.50
|
Safety tied elevator servo
|
Details
|
 |
|
07-12-2012
|
2.50
|
Painting Canopy Frame parts
|
Details
|
|
|
07-08-2012
|
3.50
|
Drilled Canopy Brace Bolts
|
Details
|
|
|
07-04-2012
|
2.00
|
Oil cooler shutter final installation
|
Details
|
|
|
07-03-2012
|
0.00
|
Finalized Paint Scheme Series #1
|
Details
|
|
|
07-03-2012
|
0.00
|
Finalized Paint Scheme #2
|
|
|
|
07-02-2012
|
2.00
|
Fabricated Oil Cooler shutter FW pass thru
|
Details
|
|
|
07-01-2012
|
4.50
|
Riveted Baggage Floor Pans
|
Details
|
 |
|
06-30-2012
|
2.50
|
Installed Shoulder Harness Wear Blocks
|
Details
|
|
|
06-28-2012
|
2.00
|
Installed upper gearleg intersection fairings
|
Details
|
|
|
06-23-2012
|
4.00
|
Right Wheel Pants completed
|
Details
|
|
|
06-23-2012
|
3.00
|
Left Wheelpant completed
|
Details
|
|
|
06-03-2012
|
0.50
|
Switched out Adel G7 for G6 clamps for hoses
|
Details
|
 |
|
06-03-2012
|
4.00
|
Finished Left Wheel Pant
|
Details
|
|
|
05-20-2012
|
2.00
|
Reworked Fuel Line
|
Details
|
  |
|
05-05-2012
|
3.50
|
Final Riveting Transponder and ELT mounts
|
Details
|
|
|
04-22-2012
|
3.50
|
Transponder Mounting
|
Details
|
|
|
04-21-2012
|
3.50
|
Glassing Right Wheel Pants
|
Details
|
 |
|
04-15-2012
|
4.50
|
Glassing Left Main Intersection Fairing
|
Details
|
|
|
04-08-2012
|
2.50
|
Intersection Fairing - Left Wheel
|
Details
|
|
|
04-01-2012
|
3.00
|
Gear Fairings alignment - Left Wheel
|
Details
|
|
|
03-31-2012
|
3.00
|
Gear Fairings Install #1
|
Details
|
|
|
03-24-2012
|
0.00
|
Wheel Pants Install Part #3
|
Details
|
|
|
03-24-2012
|
4.00
|
Wheel Pants Install Part #2
|
Details
|
|
|
03-11-2012
|
2.00
|
Wheel Pants Install part #1
|
Details
|
 |
|
03-11-2012
|
1.00
|
Bonaco Brake Line replacements
|
Details
|
|
|
03-10-2012
|
1.50
|
Remade Fuel & Brake Line center Console spacers
|
Details
|
 |
|
03-10-2012
|
2.50
|
Install main gear leg brake lines
|
Details
|
|
|
03-04-2012
|
3.50
|
Brake Line Installation
|
Details
|
|
|
03-03-2012
|
1.50
|
Run Fuel Line right
|
Details
|
|
|
03-03-2012
|
1.50
|
Fuel Line Left
|
Details
|
|
|
02-26-2012
|
2.00
|
Pitot and AOS cockpit install
|
Details
|
|
|
02-25-2012
|
3.00
|
Install Fuel Lines
|
Details
|
|
|
02-19-2012
|
1.50
|
Secured Static line at rear bulkhead
|
Details
|
|
|
02-19-2012
|
1.00
|
High Level Avionics Wire planning
|
Details
|
|
|
02-18-2012
|
3.00
|
AOA, Pitot and Static lines , cabin painting
|
Details
|
|
|
02-12-2012
|
1.50
|
Static Line routing
|
Details
|
|
|
02-12-2012
|
1.50
|
RAMI Dual Com Antenna Installation
|
Details
|
|
|
02-04-2012
|
1.00
|
Test Mounted ELT Bracket
|
Details
|
|
|
02-04-2012
|
2.00
|
Rived Dynon ADHARS Bracket to Fuselage
|
Details
|
|
|
02-04-2012
|
1.00
|
Install DB9 connector to Pitch Servo
|
Details
|
|
|
01-29-2012
|
1.00
|
Finished Riveting Pitch Servo Bracket
|
Details
|
|
|
01-29-2012
|
2.50
|
Fabricated ADHARS mount
|
Details
|
|
|
01-28-2012
|
1.00
|
Prop Extension and spinner trial fit
|
Details
|
|
|
01-28-2012
|
1.50
|
Pitch Servo Rough-in and review
|
Details
|
|
|
01-28-2012
|
0.50
|
Game Plan for next few months
|
Details
|
  |
|
01-16-2012
|
4.50
|
Front Baffle Installation
|
Details
|
|
|
01-15-2012
|
4.50
|
Passenger Side Baffle Installation
|
Details
|
|
|
01-08-2012
|
3.50
|
Passenger Side Baffle prep
|
Details
|
 |
|
01-07-2012
|
0.50
|
Mainfold pressure tubing
|
Details
|
|
|
01-07-2012
|
3.50
|
Baffle and Oil Filter Mounting
|
Details
|
|
|
01-01-2012
|
1.50
|
Review and Analysis for MAP Sensor tubing
|
Details
|
  |
|
12-31-2011
|
0.00
|
Summary Build Accomplishments - 2011
|
Details
|
  |
|
12-31-2011
|
1.00
|
Finished Engine Breather
|
Details
|
|
|
12-31-2011
|
3.50
|
Dynon MAP Sensor mounting and Alodyne Baffles
|
Details
|
|
|
12-30-2011
|
1.00
|
Starter Cable Fabrication and Installation
|
Details
|
|
|
12-29-2011
|
3.00
|
Oil Pressure line support and engine electric
|
Details
|
|
|
12-27-2011
|
2.00
|
EGT Probe and Engine Baffle Install
|
Details
|
|
|
12-22-2011
|
2.00
|
CHT Probe install, fuel and breather line support
|
Details
|
|
|
12-18-2011
|
4.50
|
Red Cube and ATC Fuseholders install
|
Details
|
|
|
11-12-2011
|
2.00
|
Forward Fuselage and Cockpit finish painting
|
Details
|
 |
|
11-05-2011
|
2.00
|
Finish Exhaust hangars & Torque carb bolts
|
Details
|
|
|
10-29-2011
|
2.50
|
Vetterman Enhaust & Heat Muff installtion
|
Details
|
|
|
10-29-2011
|
0.50
|
Gascolator Installation
|
Details
|
 |
|
10-23-2011
|
2.50
|
Reworked Engine attachment and installed cotter pi
|
Details
|
  |
|
10-06-2011
|
3.50
|
Mounting the Engine to the Fuselage
|
Details
|
|
|
10-05-2011
|
2.00
|
Mounted Main gear
|
Details
|
|
|
10-05-2011
|
0.00
|
Electric Primer mounting configuration
|
Details
|
 |
|
10-02-2011
|
2.00
|
Riveted Gascolater Stiffener
|
Details
|
|
|
10-02-2011
|
1.00
|
Marked and Drilled FW Cable Penetrations
|
Details
|
 |
|
09-25-2011
|
5.00
|
Battery Contactor & Starter Relay FWF Install
|
Details
|
|
|
09-24-2011
|
2.00
|
Installed Andair gascolator and stiffener
|
Details
|
|
|
09-24-2011
|
2.00
|
Heat box install and FW recess sealing
|
Details
|
|
|
09-18-2011
|
4.00
|
Install battery box and firewall recess
|
Details
|
|
|
09-12-2011
|
2.00
|
Bolted landing gear weldments to fuselage
|
Details
|
  |
|
09-10-2011
|
2.00
|
Packing Main Wheel Bearings
|
Details
|
|
|
09-10-2011
|
1.50
|
Packing Front Wheel Bearings
|
Details
|
|
|
09-10-2011
|
3.00
|
Mounted Main Wheels
|
Details
|
|
|
09-02-2011
|
3.50
|
Drilled engine to fuselage bolt holes
|
Details
|
|
|
09-01-2011
|
0.00
|
Lycoming O320 Arrives
|
Details
|
|
|
08-20-2011
|
1.50
|
Wings Completed !
|
Details
|
  |
|
08-17-2011
|
1.50
|
Right Wing root fairing nutplates
|
Details
|
|
|
08-16-2011
|
2.00
|
Right Wing Flap pushrod clearance hole
|
Details
|
|
|
08-13-2011
|
2.00
|
Flaprod Clearance Hole & rear spar bolt clearance
|
Details
|
|
|
08-13-2011
|
4.00
|
Finished left Wing root fairing Nutplates
|
Details
|
|
|
08-08-2011
|
1.50
|
Drill Left Wing Root Fairing Continued
|
Details
|
|
|
08-04-2011
|
1.50
|
Drilled Left Wing root fairing
|
Details
|
|
|
08-03-2011
|
2.50
|
Drilling Wing Spar bolts
|
Details
|
|
|
07-24-2011
|
2.00
|
Setting Wing Incidence, Part 1
|
Details
|
|
|
07-23-2011
|
3.50
|
Rework Right WingTip nutplates
|
Details
|
  |
|
07-09-2011
|
3.00
|
Right Access platenuts and wing fairing
|
Details
|
|
|
07-05-2011
|
5.00
|
Riveted right wing bottom skin
|
Details
|
 |
|
07-04-2011
|
1.50
|
Misc Right Wing items
|
Details
|
 |
|
06-17-2011
|
3.00
|
Right bottom wing skin prep
|
Details
|
|
|
06-14-2011
|
1.50
|
Right Wing Aileron pushrod clearance
|
Details
|
|
|
06-13-2011
|
0.00
|
Ordered Lycoming O320-D2A from AeroSport Power
|
Details
|
  |
|
06-12-2011
|
1.00
|
Prime wing access plates
|
Details
|
 |
|
06-11-2011
|
0.00
|
Wingtip final assembly add'l pictures
|
Details
|
|
|
06-11-2011
|
5.00
|
Left Wingtip platenut and final assembly
|
Details
|
|
|
06-05-2011
|
3.00
|
Left Wingtip initial installation
|
Details
|
|
|
05-30-2011
|
2.00
|
Panel Planning V 2.0
|
Details
|
 |
|
05-30-2011
|
3.00
|
Left bottom Wing skin 70% done
|
Details
|
|
|
05-29-2011
|
2.50
|
Left Wing bottom skin prep
|
Details
|
|
|
05-22-2011
|
1.50
|
Left Wing Skin Prep
|
Details
|
 |
|
05-22-2011
|
1.50
|
Left Wing Pitot fitings install
|
Details
|
|
|
05-22-2011
|
1.50
|
First Cut Panel Layout
|
Details
|
|
|
05-17-2011
|
1.00
|
Left Wing Pitot Heat Wiring
|
Details
|
|
|
05-16-2011
|
2.50
|
Left Wingtip Lens install
|
Details
|
|
|
05-11-2011
|
1.00
|
Dynon Roll Servo install Right Wing
|
Details
|
|
|
05-09-2011
|
1.00
|
Pitot mount to mast
|
Details
|
|
|
05-07-2011
|
1.50
|
VOR Coax runs for Right Wing
|
Details
|
|
|
05-07-2011
|
2.50
|
Pitot mounting
|
Details
|
|
|
05-07-2011
|
1.00
|
Installed left wing access plate nutplates
|
Details
|
|
|
05-01-2011
|
4.50
|
Right Wing Aileron and Flap Alignment
|
Details
|
|
|
04-12-2011
|
2.00
|
Pitot Location Decision and IFR provisions
|
Details
|
 |
|
04-10-2011
|
3.00
|
Left Wing Aleron Attachment
|
Details
|
|
|
04-10-2011
|
2.00
|
Aileron stop install and pushrod clearance (Left)
|
Details
|
|
|
04-05-2011
|
1.00
|
Fuel tank leak check
|
Details
|
  |
|
04-03-2011
|
1.50
|
Leak test right fuel tank
|
Details
|
|
|
04-03-2011
|
1.00
|
Finished Prosealing vent screens, sealed left tank
|
Details
|
 |
|
04-02-2011
|
1.50
|
Prosealed vent screen and right tank
|
Details
|
|
|
04-02-2011
|
1.50
|
Finish Duckworks lighting
|
Details
|
|
|
03-27-2011
|
2.00
|
Finished plexiglass cover
|
Details
|
|
|
03-27-2011
|
3.50
|
Assembled landing light bracket and outlined cover
|
Details
|
|
|
03-26-2011
|
3.50
|
Duckworks Landing Light Cutout
|
Details
|
|
|
03-20-2011
|
4.50
|
Installed Aileron gap seal left wing
|
Details
|
|
|
03-19-2011
|
3.50
|
Aileron Bracket Installation
|
Details
|
|
|
03-19-2011
|
0.00
|
Additional pictures wing aileron brackets
|
Details
|
|
|
03-13-2011
|
2.50
|
Primed Aileron and Flap Gap Seals
|
Details
|
  |
|
03-06-2011
|
2.00
|
Proseal Tank Access plate hardware
|
Details
|
|
|
02-27-2011
|
2.50
|
Builder Mod Cabin frame support cover
|
Details
|
|
|
02-20-2011
|
3.50
|
Right Bellcrank and Fuel Pickup and sender assy
|
Details
|
|
|
02-20-2011
|
1.00
|
QB Wing assembly planning
|
Details
|
  |
|
02-20-2011
|
0.00
|
Fuel Access plate CAD pictures
|
Details
|
|
|
02-20-2011
|
0.00
|
Construction log analysis, more worktime needed
|
Details
|
 |
|
02-19-2011
|
4.50
|
Left Wing Conduit and Bellcrank Install
|
Details
|
|
|
02-13-2011
|
3.00
|
Right Wing Conduit Run
|
Details
|
|
|
01-30-2011
|
0.00
|
Drilling the Canopy Bolts (Right Side)
|
Details
|
|
|
01-30-2011
|
2.00
|
Drilling Canopy Attach Bolts (Left side)
|
Details
|
|
|
01-29-2011
|
5.00
|
Trimming and priming for Canopy Attach bolt
|
Details
|
|
|
01-17-2011
|
2.00
|
Completed riveting cabin frame
|
Details
|
|
|
01-08-2011
|
3.50
|
Riveted Forward Section of the Cabin Frame
|
Details
|
|
|
01-03-2011
|
1.00
|
Canopy Frame priming
|
Details
|
|
|
01-03-2011
|
3.00
|
Canopy Frame countersinking
|
Details
|
|
|
12-31-2010
|
0.00
|
Summary Build Accomplishments - 2010
|
Details
|
  |
|
12-30-2010
|
1.50
|
Installed fuel vent line passenger side
|
Details
|
|
|
12-30-2010
|
1.00
|
Drilled out broken tap on longeron
|
Details
|
|
|
12-29-2010
|
4.00
|
Installed Fuel vent tubing pilot side
|
Details
|
|
|
12-29-2010
|
0.00
|
Add'l pictures Fuel vent tubing
|
Details
|
|
|
12-26-2010
|
2.00
|
Canopy Frame mechanical countersinking - Day 3
|
Details
|
|
|
12-22-2010
|
3.50
|
Drilling Canopy Frame forward holes
|
Details
|
  |
|
12-19-2010
|
3.50
|
Cabin Frame Assembly Day 2
|
Details
|
|
|
12-18-2010
|
3.50
|
Cabin Frame Assembly Day 1
|
Details
|
|
|
12-17-2010
|
0.00
|
Catto Prop Arrives !
|
|
|
|
12-17-2010
|
0.00
|
Catto Prop Arrives !
|
Details
|
|
|
12-12-2010
|
1.00
|
Riveting Rudder cable exit fairings
|
Details
|
|
|
12-12-2010
|
1.50
|
Priming Parts
|
Details
|
|
|
12-05-2010
|
4.00
|
Rivet Rear Fuselage skins
|
Details
|
|
|
11-28-2010
|
3.50
|
Pop Rivet vertical and horizontal stabilizer fairi
|
Details
|
|
|
11-28-2010
|
0.00
|
Additional pictures
|
Details
|
|
|
11-27-2010
|
3.50
|
Elevator Balancing and wing part prep
|
Details
|
|
|
11-23-2010
|
1.50
|
ProSeal NACA Fresh air ducts
|
Details
|
|
|
11-23-2010
|
1.50
|
Final Epoxy Coat for Empennage Fairing
|
Details
|
|
|
11-23-2010
|
0.00
|
Expoxied Faring add'l pictures
|
Details
|
|
|
11-23-2010
|
1.00
|
Epoxied Fairing
|
Details
|
|
|
11-22-2010
|
1.50
|
Lower Empennage fairing holes fore and aft
|
Details
|
|
|
11-22-2010
|
2.00
|
Install forward empennage fairing plate nuts
|
Details
|
|
|
11-21-2010
|
3.50
|
Finish cutting Fuselage Fairing
|
Details
|
|
|
11-20-2010
|
3.50
|
Install Nut Plates for Empennage Fairing
|
Details
|
|
|
11-16-2010
|
0.00
|
Cockpit parts painted #2
|
|
|
|
11-16-2010
|
0.00
|
Cockpit parts painted #1
|
Details
|
|
|
11-14-2010
|
2.00
|
Empennage Fairing trial fit
|
Details
|
|
|
11-13-2010
|
2.00
|
Platenut install for Rudder Fairing
|
Details
|
|
|
11-08-2010
|
1.50
|
FInish sanding and drilling bottom rudder fairing
|
Details
|
|
|
11-07-2010
|
2.00
|
Primed parts and Finished Aileron Pushrod
|
Details
|
|
|
11-07-2010
|
2.50
|
Fabricated and Installed Rudder Stops
|
Details
|
|
|
10-31-2010
|
3.00
|
Rudder Cable Exit Fairings
|
Details
|
|
|
10-31-2010
|
3.50
|
Electric Elevator Trim
|
Details
|
|
|
10-31-2010
|
1.50
|
Bottom Rudder Fairing test fit
|
Details
|
 |
|
10-30-2010
|
3.50
|
Rudder Cables
|
Details
|
|
|
10-24-2010
|
1.00
|
Reamed Gear Leg holes
|
Details
|
 |
|
10-23-2010
|
1.00
|
Lower elevator horn hole (continued)
|
Details
|
|
|
10-23-2010
|
2.50
|
Lower elevator horn hole
|
Details
|
|
|
10-23-2010
|
0.50
|
Elevator push pull tube allignment
|
Details
|
|
|
10-23-2010
|
1.50
|
Adjusted Elevator up / down stops
|
Details
|
|
|
10-10-2010
|
2.00
|
Passenger side Crotch Strap assembly
|
Details
|
|
|
10-10-2010
|
1.00
|
Elevator Push Pull tube blind rivets
|
Details
|
|
|
10-03-2010
|
0.50
|
Crotch strap with seats installed
|
Details
|
|
|
10-02-2010
|
2.00
|
Finish Crotch strap assembly (pilot side)
|
Details
|
|
|
09-26-2010
|
2.00
|
Primed Push Pull Tubes
|
Details
|
|
|
09-19-2010
|
3.00
|
Crotch Strap assembly
|
Details
|
|
|
09-18-2010
|
1.50
|
Moved Rudder pedal assembly aft
|
Details
|
 |
|
09-18-2010
|
1.00
|
Adjusted control stick clearance
|
Details
|
|
|
09-10-2010
|
0.50
|
Test Fit Interior seating
|
Details
|
|
|
09-10-2010
|
0.00
|
Leather fitting
|
|
|
|
08-01-2010
|
2.50
|
Epoxy finishing empennage tips
|
Details
|
|
|
07-27-2010
|
2.00
|
Vertical Stabilizer Fiberglass tips
|
Details
|
|
|
07-26-2010
|
2.00
|
Horizontal Stabilizer Fiberglass tip (right)
|
Details
|
|
|
07-25-2010
|
2.50
|
Horizontal Stabilizer Fiberglass tips (left)
|
Details
|
|
|
07-21-2010
|
1.50
|
Empennage Tips
|
Details
|
|
|
07-20-2010
|
2.00
|
Tail Tie down bar and Rudder attach
|
Details
|
|
|
07-18-2010
|
2.00
|
Horitontal Stabilizer front spar attach
|
Details
|
|
|
07-17-2010
|
2.50
|
Elevator Horn Bolts
|
Details
|
|
|
07-12-2010
|
0.00
|
Horizontal attach bolts underside edge clearance
|
Details
|
|
|
07-11-2010
|
0.50
|
Horizontal Stabilizer Empennage Attach #1
|
Details
|
|
|
07-11-2010
|
5.50
|
Horizontal Stabilizer Attach #2
|
Details
|
|
|
07-10-2010
|
0.50
|
Install Elevator counterweights
|
Details
|
|
|
07-10-2010
|
2.50
|
Horizontal Stabilizer fairing
|
Details
|
|
|
07-09-2010
|
2.00
|
Elevator rod end bearings install
|
Details
|
|
|
07-05-2010
|
1.50
|
SafeAir Pitot Static fuselage install
|
Details
|
|
|
07-05-2010
|
1.00
|
Horizontal Stabilizer trial fit
|
Details
|
|
|
06-13-2010
|
2.50
|
Electric Flap Assembly - 2
|
Details
|
|
|
06-06-2010
|
3.00
|
Electric Flap assembly -1
|
Details
|
|
|
06-05-2010
|
0.50
|
Testing cover plates with screws
|
Details
|
|
|
06-05-2010
|
1.00
|
Riveted Heat baffle
|
Details
|
|
|
06-05-2010
|
1.50
|
Mounting the Andiar Fuel Valve & Priming parts
|
Details
|
|
|
06-05-2010
|
2.00
|
Finishing the Forward Fuselage Cover
|
Details
|
|
|
06-05-2010
|
0.50
|
Drilled nutplates on firewall recesss
|
Details
|
|
|
05-31-2010
|
3.00
|
Fitting the Forward Top Skins
|
Details
|
|
|
05-31-2010
|
2.00
|
Fitting the Forward Top Skin - Continued
|
Details
|
|
|
05-30-2010
|
1.00
|
Priming parts
|
Details
|
 |
|
05-30-2010
|
2.50
|
Elevator Bellcrank Assembly
|
Details
|
|
|
05-29-2010
|
1.50
|
Ordered Oregon Aero Seats package
|
Details
|
  |
|
05-22-2010
|
2.50
|
Received Finishing Kit, Inventoried parts
|
Details
|
  |
|
05-16-2010
|
1.00
|
Rudder Pedals Finish Painting
|
Details
|
|
|
05-15-2010
|
2.00
|
Drilling Landing Gear (Con't)
|
Details
|
|
|
05-15-2010
|
4.00
|
Drilling Landing Gear
|
Details
|
|
|
05-08-2010
|
1.00
|
Mounted Brake fluid resorvior
|
Details
|
|
|
05-08-2010
|
2.50
|
Made spray bench and primed parts
|
Details
|
|
|
05-08-2010
|
4.00
|
Drilled Brake Pedal piston holes & final assembly
|
Details
|
|
|
05-02-2010
|
1.50
|
Cleaned & Primed Rudder Pedals
|
Details
|
 |
|
05-01-2010
|
4.00
|
Fabricated Rudder Pedals
|
Details
|
|
|
04-25-2010
|
3.00
|
Rudder Pedals bearing assembly
|
Details
|
|
|
04-24-2010
|
3.00
|
Test Fit rudder pedal assembly and deburred parts
|
Details
|
|
|
04-24-2010
|
2.50
|
Fuselage forward test fitting
|
Details
|
|
|
04-23-2010
|
1.00
|
Right side seat riveted
|
Details
|
|
|
04-18-2010
|
2.00
|
Riveted Left Seat
|
Details
|
|
|
04-18-2010
|
3.00
|
Drilled Steat backs
|
Details
|
|
|
04-17-2010
|
2.00
|
Final Assembly Right Side Step
|
Details
|
|
|
04-10-2010
|
2.50
|
Finish installing left side step
|
Details
|
|
|
04-01-2010
|
2.00
|
Final fitting left side fuselage step
|
Details
|
|
|
03-28-2010
|
1.50
|
Rough cut install of Fuselage Steps
|
Details
|
|
|
03-28-2010
|
2.50
|
Removed Baggage floor and side skins
|
Details
|
|
|
03-24-2010
|
1.50
|
Tunnel Cover & Flap Bracket
|
Details
|
|
|
03-21-2010
|
4.50
|
Seat Adjustment Supports
|
Details
|
|
|
03-21-2010
|
1.50
|
Enlarging Ribs for Control Stick Fitting
|
Details
|
|
|
03-21-2010
|
1.00
|
Completed Control stick installation
|
Details
|
|
|
03-21-2010
|
1.00
|
Added spacing washers to Control stick assmb
|
Details
|
|
|
03-20-2010
|
1.50
|
Fuel Pump Doubler Prime and Rivet
|
Details
|
|
|
03-20-2010
|
2.50
|
Fuel Pump Doubler Fabrication
|
Details
|
|
|
03-14-2010
|
2.00
|
Tunnel Cover (F-741B)
|
Details
|
|
|
03-14-2010
|
2.00
|
Drilling lightening holes for seatback support
|
Details
|
|
|
03-13-2010
|
3.00
|
Control Stick Assembly
|
Details
|
|
|
03-12-2010
|
1.50
|
Firewall Recess Drill & Dimple
|
Details
|
 |
|
03-08-2010
|
0.00
|
Potential Paint Schemes Page 2
|
Details
|
|
|
03-08-2010
|
0.00
|
Poitential Paint Schemes Page 1
|
Details
|
|
|
03-08-2010
|
0.00
|
Interior Seat Layout pictures
|
Details
|
|
|
03-06-2010
|
0.50
|
Tap Tie-Down Bar (W-933)
|
Details
|
|
|
03-06-2010
|
4.50
|
Parts Inventory and Storage
|
Details
|
 |
|
03-06-2010
|
2.00
|
Drill, Prime and Rivet brake line bracket (F-6122)
|
Details
|
|
|
02-28-2010
|
0.00
|
QB Fuselage Quality Pictures #2
|
|
|
|
02-28-2010
|
0.00
|
QB Fuselage Quality Pictures #1
|
|
|
|
02-27-2010
|
4.00
|
Fabricate Seat Back Assembly & Tie down bar
|
Details
|
|
|
02-20-2010
|
2.00
|
QB Fuselage and Wing Inventory
|
Details
|
  |
|
02-20-2010
|
2.00
|
Inventoried Parts Fabrication
|
Details
|
  |
|
02-17-2010
|
1.00
|
QB Fuselage & Wings Delivery
|
Details
|
|
|
01-24-2010
|
5.00
|
EAA Modified Workbench
|
Details
|
|
|
12-31-2009
|
0.00
|
Summary Build Accomplishments - 2009
|
Details
|
  |
|
11-17-2009
|
1.50
|
Wing Cradle
|
Details
|
|
|
10-31-2009
|
6.00
|
Garage heater Gas line install
|
Details
|
|
|
10-31-2009
|
0.00
|
Fellow Builder RV-9 At KDYL - Firewall Forward
|
Details
|
|
|
10-31-2009
|
0.00
|
Fellow Builder RV-9 At KDYL - Avionics
|
Details
|
|
|
10-18-2009
|
4.00
|
Garage Heater vent install
|
Details
|
|
|
10-17-2009
|
4.00
|
Garage Heater unit ceiling installation
|
Details
|
|
|
09-05-2009
|
0.00
|
Shop Tools
|
Details
|
|
|
09-05-2009
|
0.00
|
Shop Tools
|
Details
|
|
|
09-05-2009
|
0.00
|
Shop Tools
|
Details
|
|
|
08-28-2009
|
0.10
|
Photo or Wally and Phil from Synergy Air
|
Details
|
 |
|
08-27-2009
|
1.00
|
rveting horizontal stabilizer spar
|
Details
|
 |
|
08-27-2009
|
2.00
|
riveting horizontal stabilizer skins
|
Details
|
|
|
08-27-2009
|
1.00
|
riveting horizontal stabilizer frame ribs and spar
|
Details
|
 |
|
08-27-2009
|
1.00
|
pop riveting rudder leading edge
|
Details
|
 |
|
08-27-2009
|
2.00
|
flush riveting horizontal stabilizer leading edge
|
Details
|
|
|
08-27-2009
|
2.00
|
cleaning up trailing edges before riveting
|
Details
|
 |
|
08-26-2009
|
2.00
|
riveting vertical stabilzer skin to frame
|
|
|
|
08-26-2009
|
2.00
|
Glue elevator trailing edges
|
Details
|
|
|
08-26-2009
|
1.00
|
fabricate horizontal stabilizer attach points
|
Details
|
 |
|
08-26-2009
|
1.00
|
countersinking rudder trailing edge
|
Details
|
 |
|
08-26-2009
|
1.00
|
assembling vertical stabilizer frame
|
Details
|
 |
|
08-25-2009
|
3.00
|
riveting skins to left elevator
|
Details
|
|
|
08-25-2009
|
4.00
|
fitting skins to right elevator
|
Details
|
|
|
08-25-2009
|
1.00
|
assemble left elevator frame
|
Details
|
|
|
08-24-2009
|
2.00
|
Rivet Horizontal Stabilizer frame
|
Details
|
|
|
08-24-2009
|
4.00
|
flush rivet horizontal stabilizer skins
|
Details
|
|
|
08-24-2009
|
2.00
|
Building the Horizontal Stabilizer Frame
|
Details
|
|
|
08-22-2009
|
8.00
|
Rudder Skeleton
|
Details
|
|
|
08-02-2009
|
0.00
|
Aircraft Selection
|
Details
|
|
|
08-01-2009
|
0.00
|
Getting into Aviation
|
Details
|
|