09-20-2022
|
6.50
|
DAR inspection!!
|
Details
|
|
|
09-19-2022
|
5.00
|
recal W&B, calibrate fuel tank sensor
|
Details
|
|
|
09-18-2022
|
6.50
|
perform weight and balance
|
Details
|
|
|
09-17-2022
|
7.00
|
prep for weight and balance weighing
|
Details
|
|
|
09-16-2022
|
5.00
|
cleanup wiring in instrument bay
|
Details
|
|
|
09-15-2022
|
6.00
|
Tested pitot/static ports, reduce idle
|
Details
|
|
|
09-14-2022
|
1.45
|
check static ports and pitot
|
Details
|
|
|
09-13-2022
|
4.50
|
Installed nameplate and ELT
|
Details
|
|
|
09-12-2022
|
4.00
|
Tightened canopy screws, ELT label
|
Details
|
|
|
09-07-2022
|
2.50
|
Applied more placard items.
|
Details
|
|
|
09-06-2022
|
1.50
|
Placard applying, taxiing, radio
|
Details
|
|
|
09-05-2022
|
0.75
|
Fabricate flaperon skin adjust tool
|
Details
|
|
|
08-24-2022
|
5.25
|
finished install of rear window
|
Details
|
|
|
08-23-2022
|
2.50
|
ELT testing
|
Details
|
|
|
08-17-2022
|
1.50
|
fixed ELT, installed some placards
|
Details
|
|
|
08-16-2022
|
4.00
|
taxi, ELT work and rear window prep
|
Details
|
|
|
08-15-2022
|
4.00
|
fairings, rear window work
|
Details
|
|
|
08-14-2022
|
2.00
|
fairings sanding and finish priming
|
Details
|
|
|
08-09-2022
|
2.30
|
Transition Training in RV-12
|
Details
|
|
|
08-04-2022
|
8.00
|
taxi test, re-bleed right brake
|
Details
|
|
|
08-03-2022
|
3.00
|
fit seat backs and bottoms
|
Details
|
|
|
08-02-2022
|
2.00
|
install shoulder harnesses, other
|
Details
|
|
|
08-01-2022
|
3.75
|
Install some seatbelts
|
Details
|
|
|
07-31-2022
|
2.00
|
zeroed the ADAHRS
|
Details
|
|
|
07-20-2022
|
2.00
|
put on cowls, show the plane
|
Details
|
|
|
07-19-2022
|
2.25
|
wire-ties and RTV on the engine
|
Details
|
|
|
07-18-2022
|
1.25
|
wire-tie and one RTV on the engine
|
Details
|
|
|
07-17-2022
|
2.90
|
More taxi testing
|
Details
|
|
|
07-16-2022
|
1.25
|
First time taxi testing
|
Details
|
|
|
06-26-2022
|
1.75
|
torque the engine throttle cable clamps
|
Details
|
|
|
06-25-2022
|
4.50
|
syncronized the engine carbs
|
Details
|
|
|
06-23-2022
|
4.00
|
sand fit canopy, cotterpins on mains
|
Details
|
|
|
06-22-2022
|
3.00
|
prime the enpennage fairings
|
Details
|
|
|
06-21-2022
|
1.00
|
prep empenage fairings for prime
|
Details
|
|
|
06-17-2022
|
1.75
|
blue wrap on crossover bar
|
Details
|
|
|
06-16-2022
|
2.00
|
replaced valve cover bolt
|
Details
|
|
|
06-13-2022
|
2.25
|
check engine lifters
|
Details
|
|
|
06-04-2022
|
1.50
|
major engine run, very successful
|
Details
|
|
|
06-02-2022
|
2.00
|
remove seat ramp, misc
|
Details
|
|
|
05-31-2022
|
3.25
|
adjusted thottle cables, misc
|
Details
|
|
|
05-29-2022
|
2.25
|
fixed EGT wiring, and misc
|
Details
|
|
|
05-28-2022
|
2.00
|
first engine start!!
|
Details
|
|
|
05-27-2022
|
2.00
|
tested fuel flow per PAP
|
Details
|
|
|
05-25-2022
|
1.75
|
partial install of rear window
|
Details
|
|
|
05-21-2022
|
2.50
|
added fuel for the first time
|
Details
|
|
|
05-19-2022
|
1.50
|
get engine ready to run
|
Details
|
|
|
05-18-2022
|
6.00
|
completed blue wrap on the rollbar
|
Details
|
|
|
05-17-2022
|
2.00
|
apply more blue wrap
|
Details
|
|
|
05-13-2022
|
2.00
|
torque seal and apply blue wrap
|
Details
|
|
|
05-11-2022
|
2.75
|
screwed rear bulkhead plate, misc
|
Details
|
|
|
05-10-2022
|
3.00
|
final tension of stab cables,misc.
|
Details
|
|
|
05-09-2022
|
3.60
|
adjust horz. stab cables
|
Details
|
|
|
05-06-2022
|
2.00
|
added more oil, install seat ramp
|
Details
|
|
|
05-05-2022
|
1.25
|
added engine antifreeze
|
Details
|
|
|
05-04-2022
|
3.00
|
reinstall fuel tank, filler tube
|
Details
|
|
|
04-29-2022
|
1.25
|
finish clips on the last rib
|
Details
|
|
|
04-28-2022
|
4.00
|
fabricate floor pads, drill rivets
|
Details
|
|
|
04-27-2022
|
2.00
|
start on service bulletin
|
Details
|
|
|
04-26-2022
|
2.40
|
perform SB 10-3-17 radiator clearance
|
Details
|
|
|
04-24-2022
|
2.00
|
Engine oil purge
|
Details
|
|
|
04-22-2022
|
1.50
|
safety wire oil tank drain, oil purge
|
Details
|
|
|
04-21-2022
|
2.50
|
put wrap on center support of roll bar
|
Details
|
|
|
04-20-2022
|
0.75
|
check 50/50 water vinegar, fire ext.
|
Details
|
|
|
04-18-2022
|
1.00
|
Tested oil purge and vinegar cleaning
|
Details
|
|
|
04-12-2022
|
6.50
|
bleed the brake lines
|
Details
|
|
|
04-10-2022
|
3.25
|
attached the rudder cable links, stab cables
|
Details
|
|
|
04-09-2022
|
2.50
|
fabricate rudder cable links
|
Details
|
|
|
04-07-2022
|
1.50
|
work on rudder cable links
|
Details
|
|
|
04-05-2022
|
1.25
|
trim the left flaperon
|
Details
|
|
|
04-04-2022
|
1.60
|
remove plastic film, file left flaperon
|
Details
|
|
|
04-03-2022
|
1.50
|
remove almost all remaining protective plastic
|
Details
|
|
|
04-02-2022
|
1.50
|
open talcone fairing hole
|
Details
|
|
|
03-29-2022
|
2.50
|
check horiz stab servo trim tab clearance
|
Details
|
|
|
03-28-2022
|
1.25
|
torque stabilator bolts,
|
Details
|
|
|
03-25-2022
|
3.00
|
stabilator install.
|
Details
|
|
|
03-23-2022
|
1.00
|
Prep part for SB-00053
|
Details
|
|
|
03-20-2022
|
1.75
|
Remove stabilator and reglue washers
|
Details
|
|
|
03-02-2022
|
4.00
|
install wings, test lights, etc. check CO monitor
|
Details
|
|
|
03-01-2022
|
2.50
|
prepare wings for install, CO monitor setup
|
Details
|
|
|
02-15-2022
|
1.00
|
corrected trim servo wiring
|
Details
|
|
|
02-12-2022
|
0.50
|
enlarge bottom tailcone fairing hole an slot
|
Details
|
|
|
02-10-2022
|
2.50
|
install tailcone fairings, check clearance
|
Details
|
|
|
02-08-2022
|
2.25
|
step drill 3/4" hole in bottom tailcone fairing
|
Details
|
|
|
01-29-2022
|
1.50
|
Temporary install of horz stab
|
Details
|
|
|
01-27-2022
|
1.00
|
Update Syview, install horiz stab counter weight
|
Details
|
|
|
01-13-2022
|
0.50
|
Installed the vertical stabilizer leading edge pie
|
Details
|
|
|
01-08-2022
|
1.00
|
installed rudder top bolt, torqued vert. stab bolt
|
Details
|
|
|
01-06-2022
|
1.00
|
made bolt holding tool
|
Details
|
|
|
01-04-2022
|
2.00
|
moved H. Stab to hangar, mounted V. Stab
|
Details
|
|
|
01-01-2022
|
1.50
|
Happy New Year, glued washers to H. stab.
|
Details
|
|
|
12-20-2021
|
2.00
|
move fuselage to the hangar
|
Details
|
|
|
12-18-2021
|
1.50
|
Replace the instrument bay cover, test fans
|
Details
|
|
|
12-16-2021
|
0.75
|
re-install top cowling, install screws in spinner
|
Details
|
|
|
12-15-2021
|
2.00
|
verified wire tie, replace wing roller bushings
|
Details
|
|
|
12-14-2021
|
1.50
|
|
Details
|
|
|
12-09-2021
|
4.50
|
move the wings to the hangar
|
Details
|
|
|
12-03-2021
|
1.00
|
install both cowlings
|
Details
|
|
|
11-29-2021
|
1.50
|
calibrate AP servos
|
Details
|
|
|
11-28-2021
|
2.00
|
connect battery and power-up avionics
|
Details
|
|
|
11-27-2021
|
3.25
|
install comm radio antenna
|
Details
|
|
|
11-14-2021
|
2.25
|
finalize aft window fit, safety wire air cleaners
|
Details
|
|
|
11-10-2021
|
0.75
|
drill #27 rear edge of aft window
|
Details
|
|
|
11-09-2021
|
3.50
|
drill and tap #36 holes, sanded window for gap fit
|
Details
|
|
|
11-08-2021
|
3.25
|
finished drilling #30 and #40 holes in aft window
|
Details
|
|
|
11-07-2021
|
5.25
|
fit and clamp aft window
|
Details
|
|
|
11-06-2021
|
1.50
|
finish rivet turtle deck skins
|
Details
|
|
|
11-05-2021
|
1.50
|
rivet turtle deck skins
|
Details
|
|
|
11-04-2021
|
2.75
|
Install fuel tank, fuel lines, fuel sender wire
|
Details
|
|
|
11-03-2021
|
2.35
|
install shoulder harness cables cleco left turtle
|
Details
|
|
|
10-05-2021
|
1.50
|
Prepare for next steps, place fuel tank
|
Details
|
|
|
10-02-2021
|
3.00
|
mount prop blades and adjust pitch
|
Details
|
|
|
10-01-2021
|
1.00
|
mount propeller aft mount hub
|
Details
|
|
|
09-30-2021
|
2.50
|
more spinner work plus rivetting
|
Details
|
|
|
09-29-2021
|
2.75
|
more spinner work
|
Details
|
|
|
09-27-2021
|
2.00
|
work on the spinner
|
Details
|
|
|
09-26-2021
|
3.25
|
work on spinner gap spacers
|
Details
|
|
|
09-25-2021
|
1.25
|
more spinner work
|
Details
|
|
|
09-24-2021
|
3.75
|
finish spinner while mounted
|
Details
|
|
|
09-23-2021
|
2.75
|
work on the spinner, mount prop blades
|
Details
|
|
|
09-22-2021
|
4.00
|
pitot yube and spinner work
|
Details
|
|
|
09-21-2021
|
2.50
|
work on pitot tube
|
Details
|
|
|
09-19-2021
|
1.50
|
attached throttle cables
|
Details
|
|
|
09-17-2021
|
0.03
|
attach choke cables to carb
|
Details
|
|
|
09-16-2021
|
1.00
|
finished cable spacer, installed cushioned clamp
|
Details
|
|
|
09-14-2021
|
5.50
|
work on engine throttle controls
|
Details
|
|
|
09-13-2021
|
0.50
|
Look at engine controls details
|
Details
|
|
|
09-11-2021
|
3.50
|
install choke in instrument panel
|
Details
|
|
|
09-10-2021
|
1.50
|
install throttle cable in instrument panel
|
Details
|
|
|
09-08-2021
|
2.25
|
finish oil hoses, start install of throttle
|
Details
|
|
|
09-07-2021
|
2.75
|
talked to Vans on the oil hoses
|
Details
|
|
|
09-03-2021
|
1.25
|
worked on fit of oil cooler and hose plaecment
|
Details
|
|
|
09-02-2021
|
2.75
|
finish cowl heat shield foil, install oil hose
|
Details
|
|
|
09-01-2021
|
1.50
|
attach two oil hoses finger tight
|
Details
|
|
|
08-31-2021
|
1.50
|
|
Details
|
|
|
08-30-2021
|
3.00
|
cut paper templates for foil cowl heat shield
|
Details
|
|
|
08-29-2021
|
2.00
|
install EGT sensors
|
Details
|
|
|
08-27-2021
|
2.75
|
torque exhaust tubes, RTV on retention springs
|
Details
|
|
|
08-26-2021
|
2.25
|
partial install of muffler
|
Details
|
|
|
08-25-2021
|
1.60
|
applied duct seals, install exhaust pipes
|
Details
|
|
|
08-24-2021
|
1.50
|
cut cooling air duct seals
|
Details
|
|
|
08-23-2021
|
1.00
|
sand repair some items on cowls
|
Details
|
|
|
08-20-2021
|
2.25
|
fill gaps in cowl air duct, affix label on duct
|
Details
|
|
|
08-19-2021
|
3.00
|
epoxy the colling duct and interface
|
Details
|
|
|
08-18-2021
|
2.00
|
more sanding and fitting duct
|
Details
|
|
|
08-16-2021
|
3.00
|
sand and fit the cooling duct for radiator clearan
|
Details
|
|
|
08-15-2021
|
1.00
|
trim aft edge of cooling duct
|
Details
|
|
|
08-14-2021
|
4.50
|
trim cooling for fit, test cleco, ready to trim
|
Details
|
|
|
08-12-2021
|
1.50
|
drill oil cooler assy. mount holes in duct, rivet
|
Details
|
|
|
08-11-2021
|
3.00
|
finish fabficating oil cooling box with radiator
|
Details
|
|
|
08-10-2021
|
1.50
|
prepare and rivet top plate on cooling box
|
Details
|
|
|
08-08-2021
|
1.25
|
fab wood plates, deburr cooling box parts
|
Details
|
|
|
08-07-2021
|
1.00
|
mark scribe lines on cooling duct
|
Details
|
|
|
08-06-2021
|
4.25
|
install heater cable onto heater door
|
Details
|
|
|
08-05-2021
|
7.00
|
debur friction comb, apply wrap to instrument pane
|
Details
|
|
|
08-04-2021
|
3.00
|
secure coolant hose to front gear leg
|
Details
|
|
|
08-03-2021
|
5.25
|
sand cowling, install radiator and hoses
|
Details
|
|
|
08-02-2021
|
3.80
|
epoxy scoop onto cowl, RTV cooling door
|
Details
|
|
|
07-28-2021
|
2.65
|
work on top cowl scoop
|
Details
|
|
|
07-27-2021
|
1.25
|
work on NACA template
|
Details
|
|
|
07-26-2021
|
3.00
|
finish up bottom cowl close out and cut holes
|
Details
|
|
|
07-22-2021
|
1.50
|
work on bottom cowl close out
|
Details
|
|
|
07-21-2021
|
1.60
|
more work on oil door
|
Details
|
|
|
07-20-2021
|
3.50
|
top cowling oil door work
|
Details
|
|
|
07-09-2021
|
3.25
|
rivet front cowl rivuts, assemble oil door
|
Details
|
|
|
07-08-2021
|
1.75
|
drill forward colwing holes to #19, rivet 2 knuckl
|
Details
|
|
|
07-07-2021
|
3.00
|
finish riveting cowls
|
Details
|
|
|
07-05-2021
|
2.25
|
more riveting
|
Details
|
|
|
07-02-2021
|
4.00
|
rivet hinges onto the cowlings
|
Details
|
|
|
07-01-2021
|
1.50
|
fabricate oil door and hinge pieces
|
Details
|
|
|
06-27-2021
|
2.80
|
drill remaining cowling hinge holes
|
Details
|
|
|
06-24-2021
|
3.50
|
sanded top and bottom cowls for better fit, drille
|
Details
|
|
|
06-23-2021
|
7.50
|
attach mid cowl hinges, trim pins, sand to fit
|
Details
|
|
|
06-22-2021
|
2.50
|
flute cowling hinges to match curves
|
Details
|
|
|
06-19-2021
|
2.00
|
remarked hinges and reinstalled on fuselage
|
Details
|
|
|
06-18-2021
|
4.25
|
fabricate and mark other cowling hinges
|
Details
|
|
|
06-17-2021
|
1.25
|
layout holes on hinge pieces
|
Details
|
|
|
06-16-2021
|
2.00
|
cut bend and grind hinge pins, re-install panel
|
Details
|
|
|
06-15-2021
|
1.50
|
cut cowling hinges
|
Details
|
|
|
06-11-2021
|
4.85
|
finish sanding bottom cowling, cut slot
|
Details
|
|
|
06-10-2021
|
1.25
|
finish sanding top cowling
|
Details
|
|
|
06-09-2021
|
4.00
|
work on cowling
|
Details
|
|
|
06-08-2021
|
1.50
|
worked on getting ready for cowling work
|
Details
|
|
|
06-07-2021
|
1.25
|
connect wires to voltage reg., order 3M Wrap
|
Details
|
|
|
06-04-2021
|
1.50
|
reroute WH-P156 & WH-P761, safety wire plugs
|
Details
|
|
|
06-02-2021
|
2.50
|
fabricate and install fuel drain hose and tube
|
Details
|
|
|
06-01-2021
|
1.50
|
connect starter wires, connect man. press. hose
|
Details
|
|
|
05-29-2021
|
5.25
|
connect sensors to the engine
|
Details
|
|
|
05-27-2021
|
2.50
|
torqued engine bracket bolts,
|
Details
|
|
|
05-25-2021
|
2.50
|
replace engine mount bracket per SB00023
|
Details
|
|
|
04-29-2021
|
4.00
|
torqued engine bolts, fuel line install, ignition
|
Details
|
|
|
04-27-2021
|
2.00
|
deburr holes, mount the engine
|
Details
|
|
|
04-22-2021
|
0.75
|
made an extended tool for the deburr bit
|
Details
|
|
|
04-21-2021
|
0.10
|
vans correspondence
|
Details
|
|
|
04-06-2021
|
1.25
|
shorten the avionics dimmer pot shaft
|
Details
|
|
|
03-29-2021
|
1.75
|
connect oil tank vent, cooling overflow bottle
|
Details
|
|
|
03-25-2021
|
0.75
|
install oil tank assembly
|
Details
|
|
|
03-24-2021
|
1.00
|
cut hoses for oil tank vent and coolant overflow
|
Details
|
|
|
03-09-2021
|
2.75
|
drilled larger two engine mount holes
|
Details
|
|
|
03-08-2021
|
1.50
|
redo placement of fuel line banjo bolts
|
Details
|
|
|
03-07-2021
|
1.00
|
cut and mount carb drip tray dampeners
|
Details
|
|
|
03-06-2021
|
1.00
|
final torqued the upper left engine mount
|
Details
|
|
|
02-27-2021
|
0.50
|
finish riveting the cooling box
|
Details
|
|
|
02-26-2021
|
1.50
|
Make new cooling box hinge, match drill, rivet
|
Details
|
|
|
02-22-2021
|
0.75
|
drill #30 holes in cooling box hinge
|
Details
|
|
|
02-18-2021
|
1.50
|
rivet colling box hinge and bracket to door
|
Details
|
|
|
02-15-2021
|
1.00
|
countersink the hinge holes
|
Details
|
|
|
02-11-2021
|
1.50
|
colling box parts
|
Details
|
|
|
02-10-2021
|
1.25
|
Cooling hoses
|
Details
|
|
|
01-29-2021
|
1.00
|
install ignition screw, modify 8mm hex wrench
|
Details
|
|
|
01-20-2021
|
0.75
|
packed exhaust pieces to send to Vans
|
Details
|
|
|
01-13-2021
|
2.25
|
install carb drip trays
|
Details
|
|
|
12-29-2020
|
0.75
|
install regulator monitor wire
|
Details
|
|
|
12-20-2020
|
1.00
|
work on voltage regulator mounting
|
Details
|
|
|
12-15-2020
|
1.25
|
seal corners of carb drip trays
|
Details
|
|
|
12-12-2020
|
1.50
|
work on voltage regulator mounting
|
Details
|
|
|
12-11-2020
|
1.75
|
complete drip trays riveting, glue/clamp doubler
|
Details
|
|
|
12-10-2020
|
1.75
|
partial assembly of carburetor drip trays
|
Details
|
|
|
12-09-2020
|
1.00
|
paint tie-down rings, prime rivnuts
|
Details
|
|
|
12-05-2020
|
1.00
|
cut and deburr carburetor drip pan pieces
|
Details
|
|
|
12-02-2020
|
0.75
|
start prep of carb drip pan pieces
|
Details
|
|
|
11-22-2020
|
1.75
|
wire some power wires
|
Details
|
|
|
11-20-2020
|
1.25
|
replace connectors on EGT sensors, prime parts
|
Details
|
|
|
11-18-2020
|
2.25
|
Install firewall forward wiring
|
Details
|
|
|
11-14-2020
|
2.00
|
torque engine mount, install master relay, wiring
|
Details
|
|
|
11-11-2020
|
4.50
|
INstall engine mount on the engine
|
Details
|
|
|
11-09-2020
|
1.75
|
remove both carbs, cut lug on starter
|
Details
|
|
|
11-08-2020
|
2.00
|
verify ignition coil spacing, start other engine m
|
Details
|
|
|
11-04-2020
|
1.50
|
disconnect the Rotax ignition connectors, etc.
|
Details
|
|
|
11-03-2020
|
2.00
|
redo safety wire on gascolator,install pitot exten
|
Details
|
|
|
10-31-2020
|
3.25
|
firewall forward wiring
|
Details
|
|
|
10-27-2020
|
2.80
|
Start install of engine wiring
|
Details
|
|
|
10-24-2020
|
1.50
|
Got new prints, gathered engine parts
|
Details
|
|
|
10-23-2020
|
3.00
|
Review engine drawings, order DynaVibe
|
Details
|
|
|
10-22-2020
|
1.50
|
Review SD-00001 and engine drawings
|
Details
|
|
|
10-16-2020
|
3.00
|
Received 912ULS powerplant kit
|
Details
|
|
|
10-09-2020
|
1.25
|
work on redo of gascolator safety wiring
|
Details
|
|
|
10-07-2020
|
1.00
|
painted both turtle deck skins
|
Details
|
|
|
10-06-2020
|
1.00
|
Prepped right turtle deck skin and primed both
|
Details
|
|
|
10-05-2020
|
0.50
|
prep turtle deck skins for painting
|
Details
|
|
|
09-30-2020
|
0.50
|
paint fuel filler neck
|
Details
|
|
|
09-29-2020
|
0.75
|
prime fule tank filler neck
|
Details
|
|
|
09-13-2020
|
2.00
|
build the ELT GPS received test tool
|
Details
|
|
|
09-11-2020
|
2.50
|
Install ELT remote nameplate, wire connector
|
Details
|
|
|
09-10-2020
|
1.00
|
Investigate the ELT wiring
|
Details
|
|
|
09-05-2020
|
2.00
|
Finish AP cutoff wiring, connect trim tab wiring
|
Details
|
|
|
09-01-2020
|
1.50
|
install remote ELT
|
Details
|
|
|
08-31-2020
|
2.50
|
clean-up the wiring behind the instrument panel
|
Details
|
|
|
08-30-2020
|
4.50
|
misc avionics wiring and install
|
Details
|
|
|
08-29-2020
|
3.75
|
Many items related to the avionics installation
|
Details
|
|
|
08-28-2020
|
3.00
|
wire up the CO monitor wires to EMS connector
|
Details
|
|
|
08-27-2020
|
1.00
|
mount the CO monitor module
|
Details
|
|
|
08-26-2020
|
4.00
|
wire up GPS, install connector on CO monitor
|
Details
|
|
|
08-25-2020
|
3.00
|
review CO monitor installation
|
Details
|
|
|
08-24-2020
|
1.00
|
Review elec. schematics and connector changes
|
Details
|
|
|
08-23-2020
|
0.25
|
tighten transponder antenna & connect cable
|
Details
|
|
|
08-22-2020
|
2.75
|
finish countersink holes in instr. panels, rivnuts
|
Details
|
|
|
08-19-2020
|
2.25
|
file and fit cutouts for AP Knob Panels
|
Details
|
|
|
08-18-2020
|
2.75
|
cutout the holes for AP Knob Panles
|
Details
|
|
|
08-17-2020
|
2.50
|
prep comm brackets and ADS-b brackets
|
Details
|
|
|
08-15-2020
|
2.40
|
mount ELT antenna bracket, install stack angles
|
Details
|
|
|
08-13-2020
|
3.00
|
|
Details
|
|
|
08-12-2020
|
1.50
|
install xponder mount and xponder, connect ant.
|
Details
|
|
|
08-11-2020
|
1.00
|
rivet rivnuts for starter module, prep xponder mou
|
Details
|
|
|
08-10-2020
|
1.75
|
countersink Skyview panel and rivet doubler
|
Details
|
|
|
08-08-2020
|
1.00
|
install EMS and Battery modules
|
Details
|
|
|
08-07-2020
|
1.50
|
install ransponder antenna, ELT parts
|
Details
|
|
|
08-06-2020
|
4.50
|
protect ADS-B antenna, deburr parts
|
Details
|
|
|
08-05-2020
|
1.75
|
install ADS-B antenna
|
Details
|
|
|
08-04-2020
|
3.50
|
prime rivnuts, install d-sub ADAHRS, install ADAHR
|
Details
|
|
|
07-29-2020
|
1.75
|
fixed 2 cotter pins, misc. install 2 rear baggage
|
Details
|
|
|
07-28-2020
|
1.50
|
received and inventoried Dynon Avionics
|
Details
|
|
|
07-25-2020
|
1.50
|
finish installing rivnuts on tailcone for fairing
|
Details
|
|
|
07-19-2020
|
7.25
|
remove stabilator, start installing rivnuts for fa
|
Details
|
|
|
07-18-2020
|
5.50
|
file and sand stab. and fairing, final drill fairi
|
Details
|
|
|
07-17-2020
|
2.50
|
install stabilator, drill remaining fairing holes
|
Details
|
|
|
07-16-2020
|
2.75
|
clamp tailcone fairing, drill inboard holes in tai
|
Details
|
|
|
07-15-2020
|
2.30
|
move stab. to side wall, install vertical stab. to
|
Details
|
|
|
07-12-2020
|
1.00
|
move wings to basement, stabilator to garage
|
Details
|
|
|
07-11-2020
|
1.00
|
move fuselage in the garage
|
Details
|
|
|
07-08-2020
|
4.00
|
Rivet rivnuts to nose wheel fairing brkt, install
|
Details
|
|
|
07-07-2020
|
2.50
|
Attach fairing brackets on nose fork
|
Details
|
|
|
07-01-2020
|
1.75
|
installed wire connectors, ran control cables
|
Details
|
|
|
06-30-2020
|
2.50
|
clean wiring, routed wiring in tailcone
|
Details
|
|
|
06-29-2020
|
1.00
|
clean-up wire/tube bundles under 7 thru panel base
|
Details
|
|
|
06-28-2020
|
1.00
|
finish routing the pitch trim/pitot tube thru pane
|
Details
|
|
|
06-27-2020
|
3.00
|
Clean-up & run wiring and tube
|
Details
|
|
|
06-26-2020
|
4.50
|
wiretie and RTV filter near fuel pump
|
Details
|
|
|
06-23-2020
|
0.50
|
|
Details
|
|
|
06-22-2020
|
4.00
|
run pitch trim cable & aft pitot tube further
|
Details
|
|
|
06-21-2020
|
2.30
|
Run pitch trim cable & pitot tube through fuselage
|
Details
|
|
|
06-20-2020
|
1.50
|
remove blue plastic from inside of turtle deck pie
|
Details
|
|
|
06-19-2020
|
4.00
|
rivet the tailcone onto the fuselage
|
Details
|
|
|
06-18-2020
|
3.00
|
wire tie fuel air vent, rivet shoulder harness lug
|
Details
|
|
|
06-17-2020
|
3.00
|
drill and attach fuel line vent tubes
|
Details
|
|
|
06-16-2020
|
2.75
|
bend tailcone tabs, cleco tailcone bottom
|
Details
|
|
|
06-15-2020
|
2.50
|
install pitch servo, drill hole for AP stop switch
|
Details
|
|
|
06-14-2020
|
0.30
|
attach pitch pushrod to servo
|
Details
|
|
|
06-13-2020
|
3.25
|
Install roll servo
|
Details
|
|
|
06-11-2020
|
2.00
|
make autopilot servo push rods
|
Details
|
|
|
06-10-2020
|
2.50
|
countersink bottom fairing, rivet clamps
|
Details
|
|
|
06-09-2020
|
0.75
|
sand empanage fairings to final fit
|
Details
|
|
|
06-08-2020
|
2.00
|
countersink bottom fairing and rivet nut plates
|
Details
|
|
|
06-07-2020
|
2.75
|
tempoary attachment and drill for fairing clamps
|
Details
|
|
|
06-06-2020
|
3.00
|
finish sanding fairings, apply masking tape templa
|
Details
|
|
|
06-05-2020
|
2.75
|
trim bottom and top tailcone fairings
|
Details
|
|
|
06-04-2020
|
2.50
|
marked 3/4" masking tape for tailcone, fairings
|
Details
|
|
|
06-03-2020
|
1.50
|
connect aft stabilator control cables
|
Details
|
|
|
06-02-2020
|
3.00
|
deburr parts, review KAI
|
Details
|
|
|
06-01-2020
|
1.50
|
remove fuel tank, review manual prints
|
Details
|
|
|
05-31-2020
|
0.50
|
ordered Dynon Autopilot servos
|
Details
|
|
|
05-29-2020
|
1.00
|
finish fuel vent line from tank
|
Details
|
|
|
05-28-2020
|
3.25
|
rivet nut plates, check tank for leaks and sensor
|
Details
|
|
|
05-27-2020
|
2.75
|
bend the fuel filler flange and drill for mounting
|
Details
|
|
|
05-26-2020
|
2.50
|
review items, mount fuel tank - connect filler nec
|
Details
|
|
|
05-25-2020
|
2.00
|
assemble the torque tubes
|
Details
|
|
|
05-22-2020
|
2.50
|
drilled the remaining holes in the torque tubes
|
Details
|
|
|
05-21-2020
|
2.00
|
mounted the wings, drilled the torque tubes
|
Details
|
|
|
05-19-2020
|
2.00
|
file left wing bottom skin, fix wing fuselage roll
|
Details
|
|
|
05-18-2020
|
1.50
|
filed bottom skin of right wing
|
Details
|
|
|
05-16-2020
|
1.25
|
Reviewed Service Bull & Dir. marked file line rt w
|
Details
|
|
|
05-15-2020
|
2.00
|
first wing test mount
|
Details
|
|
|
05-14-2020
|
1.00
|
Review manual pages, attach 0.125 spacers
|
Details
|
|
|
05-13-2020
|
1.50
|
canopy latch handle rotation tightening
|
Details
|
|
|
05-09-2020
|
1.00
|
investigate cable attach process for rudder & stab
|
Details
|
|
|
05-08-2020
|
1.75
|
filed parts for better wing fit, reverse connector
|
Details
|
|
|
05-07-2020
|
1.75
|
figured out problem with wing connector
|
Details
|
|
|
04-30-2020
|
2.00
|
test mount left wing onto fuselage
|
Details
|
|
|
04-29-2020
|
1.50
|
re-hang stab. in basement, get ready for wing mtg.
|
Details
|
|
|
04-26-2020
|
1.00
|
move wings from basement to garage
|
Details
|
|
|
04-25-2020
|
1.40
|
attach stabilator trims
|
Details
|
|
|
04-24-2020
|
1.00
|
make stabilator hinge wires
|
Details
|
|
|
04-22-2020
|
2.75
|
assemble stab. trim pushrod assembly
|
Details
|
|
|
04-21-2020
|
2.00
|
install connector on stab trim servo tray
|
Details
|
|
|
04-19-2020
|
1.00
|
finish bushing on servo trim tray
|
Details
|
|
|
04-18-2020
|
1.50
|
add bushings to servo tray and link
|
Details
|
|
|
04-17-2020
|
2.00
|
prep parts for horiz. stab. trim control and servo
|
Details
|
|
|
04-15-2020
|
1.75
|
separate and deburr F-1294C
|
Details
|
|
|
04-14-2020
|
1.50
|
vert. stab. fiberglass tip trim to match rudder ti
|
Details
|
|
|
04-13-2020
|
2.50
|
vertical stab. fiberglass tip preparation
|
Details
|
|
|
04-12-2020
|
2.00
|
rudder fiberglass tip trim, drill, sand
|
Details
|
|
|
04-11-2020
|
0.75
|
work on rudder fiberglass tip
|
Details
|
|
|
04-10-2020
|
1.25
|
investigate brake line bleed process, etc.
|
Details
|
|
|
04-09-2020
|
1.75
|
make 0.125" spacers for wing install
|
Details
|
|
|
04-06-2020
|
1.25
|
assemble rudder rigging stop, other
|
Details
|
|
|
04-03-2020
|
1.56
|
fabricate one fuel vent tube and start on other
|
Details
|
|
|
04-02-2020
|
2.50
|
Assemble tow bar, work on fuel vent line items
|
Details
|
|
|
04-01-2020
|
1.00
|
Check fuel tank vent instructions, debur part
|
Details
|
|
|
03-31-2020
|
2.00
|
Fabricate temporary spacers and F-1258 parts
|
Details
|
|
|
03-28-2020
|
1.00
|
re-insertion and gluing of stabilator bearings
|
Details
|
|
|
03-27-2020
|
2.50
|
Remove the stabilator bearings per SB 16-08-01
|
Details
|
|
|
03-26-2020
|
2.75
|
Install ADAHRS stiffener to tail cone
|
Details
|
|
|
03-25-2020
|
1.00
|
Finish fabrication of winterization kit parts
|
Details
|
|
|
03-24-2020
|
1.00
|
Finish fabrication of winterization kit, plus more
|
Details
|
|
|
03-24-2020
|
0.50
|
Cut and install flaperon torque tube grommets
|
Details
|
|
|
03-22-2020
|
1.00
|
start fabrication of winterization kit
|
Details
|
|
|
03-21-2020
|
1.25
|
test pivot guides fit of flaperon torque tubes
|
Details
|
|
|
03-11-2020
|
0.50
|
rough cut the wood for the rudder rigging
|
Details
|
|
|
03-09-2020
|
0.75
|
Install rudder trim tab
|
Details
|
|
|
03-05-2020
|
1.00
|
Inspect fuel tank
|
Details
|
|
|
03-04-2020
|
1.50
|
Finish connection of AOA tube on fuselage
|
Details
|
|
|
03-03-2020
|
1.75
|
Routed AOA tube through the fuselage
|
Details
|
|
|
03-02-2020
|
0.50
|
Start rudder trim tab install by deburr tab
|
Details
|
|
|
03-01-2020
|
0.50
|
start routing AOA tube in the fuselage
|
Details
|
|
|
02-27-2020
|
1.25
|
Complete vent handle install
|
Details
|
|
|
02-19-2020
|
2.00
|
Verify all Service Bulletins, ordered nose fork pa
|
Details
|
|
|
02-18-2020
|
0.50
|
start install of fresh air vent handles
|
Details
|
|
|
12-29-2019
|
2.50
|
finish SB 18-02-02, not installed on tale yet
|
Details
|
|
|
12-28-2019
|
1.50
|
finish step 26, top only step 27
|
Details
|
|
|
12-27-2019
|
1.20
|
partial step 26
|
Details
|
|
|
12-22-2019
|
1.30
|
steps 22 - 25 top and bottom
|
Details
|
|
|
12-21-2019
|
0.95
|
partial step 20, 21 and 22
|
Details
|
|
|
12-20-2019
|
0.40
|
finish step 19
|
Details
|
|
|
12-19-2019
|
1.00
|
partial step 19
|
Details
|
|
|
12-18-2019
|
2.00
|
remove stabilator hinges and add doubler
|
Details
|
|
|
12-17-2019
|
1.25
|
finish mods to WD-1208
|
Details
|
|
|
12-16-2019
|
1.50
|
finish modification of WD-1207
|
Details
|
|
|
12-11-2019
|
1.25
|
match drill #30 holes for HS-01232 doubler
|
Details
|
|
|
12-05-2019
|
0.25
|
verify alum. tube fis properly in fitting
|
Details
|
|
|
12-03-2019
|
1.75
|
modify fuselage AOA fittings and attach
|
Details
|
|
|
12-02-2019
|
1.00
|
take down stabilator, update build log
|
Details
|
|
|
12-01-2019
|
1.25
|
attach flaperon on left wing
|
Details
|
|
|
11-30-2019
|
2.00
|
finish AOA in left wing, other mods
|
Details
|
|
|
11-29-2019
|
1.25
|
install tube in fitting and install fitting
|
Details
|
|
|
11-27-2019
|
1.75
|
run AOA tubing, make fitting, RTV
|
Details
|
|
|
11-26-2019
|
2.10
|
Notification 16-12-14 steps 6,7,11
|
Details
|
|
|
11-25-2019
|
0.75
|
Epoxy AOA rivet into left wing
|
Details
|
|
|
11-23-2019
|
2.00
|
Install rivet for AOA in left wing
|
Details
|
|
|
11-22-2019
|
0.40
|
look at AOA install plans
|
Details
|
|
|
11-21-2019
|
2.75
|
installed wing doubler per SB 14-11-03
|
Details
|
|
|
11-20-2019
|
0.75
|
moved completed right wing from table to wing slin
|
Details
|
|
|
11-19-2019
|
1.50
|
Installed flaperon onto the right wing
|
Details
|
|
|
11-18-2019
|
1.40
|
Investigate right wing tip light fit
|
Details
|
|
|
11-17-2019
|
1.75
|
complete SB 14-11-03 mod on right wing
|
Details
|
|
|
11-16-2019
|
4.00
|
SB 14-11-03 right wing doubler
|
Details
|
|
|
11-15-2019
|
1.00
|
install steps with plugs
|
Details
|
|
|
11-14-2019
|
1.00
|
install step plugs per Notification 19-10-16
|
Details
|
|
|
11-13-2019
|
2.40
|
deburr all parts needed
|
Details
|
|
|
11-12-2019
|
1.50
|
further check of interior plus download manuals
|
Details
|
|
|
11-08-2019
|
1.90
|
fuel tank and interior investigation
|
Details
|
|
|
11-07-2019
|
0.50
|
check pre-built fuel tank and note on 37B
|
Details
|
|
|
11-06-2019
|
1.15
|
check vert stab, rudder and trim tabs
|
Details
|
|
|
11-05-2019
|
1.00
|
further review of manual
|
Details
|
|
|
11-03-2019
|
1.75
|
review what is left in the manual so far
|
Details
|
|
|
10-29-2019
|
2.00
|
finish SB 18-02-03
|
Details
|
|
|
10-27-2019
|
2.00
|
start SB 18-02-03 on Anti-servo tabs
|
Details
|
|
|
10-24-2019
|
0.25
|
inspect canopy pivots
|
Details
|
|
|
10-23-2019
|
1.50
|
add epoxy/flox to space fiberglass from fuselage
|
Details
|
|
|
10-22-2019
|
1.00
|
file shop head on wing rivets
|
Details
|
|
|
10-17-2019
|
0.75
|
update KitLog
|
Details
|
|
|
10-16-2019
|
1.50
|
install LED shop lights
|
Details
|
|
|
10-15-2019
|
0.75
|
Install LED lights
|
Details
|
|
|
10-14-2019
|
0.50
|
figure out next construction steps
|
Details
|
|
|
09-25-2019
|
0.33
|
enlarge fiberglass hole at canopy pivot point
|
Details
|
|
|
09-23-2019
|
0.50
|
verify washer used on canopy hinge point
|
Details
|
|
|
09-22-2019
|
0.75
|
search prints for a certain washer reference
|
Details
|
|
|
09-21-2019
|
1.75
|
clean and organize garage shop
|
Details
|
|
|
08-28-2019
|
1.25
|
remove and trim canopy
|
Details
|
|
|
08-09-2019
|
1.25
|
canopy trimming and sanding
|
Details
|
|
|
08-02-2019
|
1.75
|
work on canopy fit
|
Details
|
|
|
08-01-2019
|
1.25
|
work on canopy
|
Details
|
|
|
12-15-2018
|
1.85
|
trim and sand fiberglass with multi-tool
|
Details
|
|
|
12-05-2018
|
1.50
|
redrill holes for canopy scews, trim & sand fiberg
|
Details
|
|
|
11-09-2018
|
2.25
|
34-16
|
Details
|
|
|
11-08-2018
|
1.50
|
Sand canopy fairing w/100 & 150 grit
|
Details
|
|
|
11-05-2018
|
1.25
|
Sand and apply epoxy only
|
Details
|
|
|
11-02-2018
|
1.00
|
sand with 100 and 150 grit, apply epoxy w/balloons
|
Details
|
|
|
11-01-2018
|
2.50
|
sand fairing, apply epoxy
|
Details
|
|
|
10-31-2018
|
1.00
|
sanding canopy fiberglass fairing
|
Details
|
|
|
10-29-2018
|
0.75
|
sand and add more expoxy/microbead layer
|
Details
|
|
|
10-26-2018
|
1.50
|
remove middle pealply, sand and fill gaps
|
Details
|
|
|
10-23-2018
|
2.50
|
epoxy middle 10 plies and pealply
|
Details
|
|
|
10-22-2018
|
1.50
|
remove pealply from right, cut middle plies
|
Details
|
|
|
10-19-2018
|
2.25
|
fiberglass right side of canopy
|
Details
|
|
|
10-18-2018
|
3.00
|
wax left side and apply fiberglass to left side
|
Details
|
|
|
10-17-2018
|
1.50
|
sanded canopy and metal parts for glass bonding
|
Details
|
|
|
10-16-2018
|
3.50
|
cut left and right fiberglass plies 1 - 5
|
Details
|
|
|
10-10-2018
|
4.00
|
finish sanding foam, apply electrical tape to cano
|
Details
|
|
|
10-06-2018
|
0.75
|
More sanding shaping of the foam
|
Details
|
|
|
10-05-2018
|
1.00
|
epoxy left side foam, start shaping foam
|
Details
|
|
|
10-04-2018
|
1.50
|
Scuff and epoxy right side only canopy foam
|
Details
|
|
|
09-24-2018
|
1.75
|
Cut canopy foam and final paint steps
|
Details
|
|
|
09-22-2018
|
0.25
|
Final coat of paint on steps
|
Details
|
|
|
09-21-2018
|
2.50
|
Sand, prime paint steps; finish masking
|
Details
|
|
|
09-17-2018
|
1.25
|
Mask instrument panel
|
Details
|
|
|
05-21-2018
|
3.00
|
Finish wing stands
|
Details
|
|
|
03-14-2018
|
3.25
|
install cockpit light, install POH tray
|
Details
|
|
|
03-13-2018
|
1.50
|
Install noise cancelling capacitor
|
Details
|
|
|
03-09-2018
|
1.50
|
rivet left side F-1237-L
|
Details
|
|
|
03-08-2018
|
3.75
|
deburr parts and rivet cover plates
|
Details
|
|
|
03-07-2018
|
0.75
|
secure poly brake lines with tie wraps
|
Details
|
|
|
03-04-2018
|
1.25
|
Install left main alum brake line, add tie wrap
|
Details
|
|
|
03-02-2018
|
2.00
|
connect brake lines
|
Details
|
|
|
02-28-2018
|
0.25
|
install nose wheel turn stop screw
|
Details
|
|
|
02-22-2018
|
1.25
|
Install nose wheel
|
Details
|
|
|
02-21-2018
|
3.50
|
nose gear mount, install rivnuts, nose fork
|
Details
|
|
|
02-16-2018
|
2.00
|
modify nose wheel fork
|
Details
|
|
|
02-07-2018
|
2.50
|
Bolt on mains axles, attached wheels
|
Details
|
|
|
01-31-2018
|
1.33
|
mount main axles, check allignment
|
Details
|
|
|
01-30-2018
|
3.50
|
Torque all gear leg attach bolts
|
Details
|
|
|
01-22-2018
|
2.00
|
install left and right gear legs, install inbd. pl
|
Details
|
|
|
01-19-2018
|
2.25
|
install outboard gear leg doubler and wear plates
|
Details
|
|
|
01-13-2018
|
0.75
|
grease main wheel bearings, grease steel parts
|
Details
|
|
|
01-12-2018
|
1.25
|
Debur and prime gear plates
|
Details
|
|
|
01-11-2018
|
2.00
|
Finish second main tire and assemble brake conn.
|
Details
|
|
|
01-10-2018
|
2.80
|
Install engine mount, start on wheels and tires
|
Details
|
|
|
01-09-2018
|
1.67
|
Start install of upper engine mount
|
Details
|
|
|
12-12-2017
|
2.00
|
Finish build of saw horses
|
Details
|
|
|
12-09-2017
|
2.00
|
Continue build of saw horses
|
Details
|
|
|
12-06-2017
|
2.00
|
Start build on saw horses to hold fuselage
|
Details
|
|
|
11-29-2017
|
1.75
|
Install canopy catch option
|
Details
|
|
|
11-28-2017
|
2.67
|
Fabricate and install canopy guide blocks
|
Details
|
|
|
11-25-2017
|
4.25
|
add canopy latch safety switch
|
Details
|
|
|
11-20-2017
|
1.25
|
Install canopy latch and latch block
|
Details
|
|
|
11-17-2017
|
2.50
|
rivet canopy skitrts to frame and bolt and rivet
|
Details
|
|
|
11-16-2017
|
1.20
|
Screw canopy to rear bow of frame
|
Details
|
|
|
11-15-2017
|
1.00
|
put canopy on frame, clecoed front bow
|
Details
|
|
|
11-04-2017
|
1.00
|
2nd coat paint and paint canopy skirts
|
Details
|
|
|
11-03-2017
|
1.00
|
paint the canopy frame
|
Details
|
|
|
11-02-2017
|
1.75
|
Prep and prime canopy frame
|
Details
|
|
|
10-26-2017
|
1.50
|
fabricate two canopy lift handles
|
Details
|
|
|
10-19-2017
|
1.40
|
Canopy guide plates and guide blocks
|
Details
|
|
|
10-18-2017
|
0.50
|
Round edges on canopy latch handle
|
Details
|
|
|
10-17-2017
|
3.17
|
Final drill canopy, countersink, start latch handl
|
Details
|
|
|
10-14-2017
|
1.25
|
match drill skirt holes to canopy and frame angles
|
Details
|
|
|
10-12-2017
|
4.85
|
match drill canopy skirts, dimple and bend skirts
|
Details
|
|
|
10-10-2017
|
1.00
|
remove canopy and prep for fit
|
Details
|
|
|
09-29-2017
|
1.50
|
finish drill and cleco canopy front and aft
|
Details
|
|
|
09-28-2017
|
3.25
|
file weld fillet on frame for fit, sand canopy for
|
Details
|
|
|
09-25-2017
|
2.00
|
prep canopy, place on frame
|
Details
|
|
|
09-23-2017
|
1.00
|
prep plastic caps for clecos
|
Details
|
|
|
09-15-2017
|
1.00
|
put cover back on instrument panel, got out canopy
|
Details
|
|
|
09-11-2017
|
0.50
|
apply Boelube and install instrument cover
|
Details
|
|
|
09-07-2017
|
0.50
|
apply Permatex bead on instrument panel doubler
|
Details
|
|
|
09-06-2017
|
0.75
|
remove instrument panel cover
|
Details
|
|
|
09-02-2017
|
1.50
|
Complete right side canopy attach angles
|
Details
|
|
|
08-29-2017
|
1.00
|
Flute and match drill left side canopy attach angl
|
Details
|
|
|
08-29-2017
|
2.25
|
Attach canopy frame
|
Details
|
|
|
08-26-2017
|
0.25
|
Finish right side canopy attach angles
|
Details
|
|
|
08-25-2017
|
1.75
|
finish deburr of canopy frame, drill C-1203A and B
|
Details
|
|
|
08-24-2017
|
1.25
|
attach canopy latch handle stop to canopy frame
|
Details
|
|
|
08-23-2017
|
2.00
|
canopy frame prep
|
Details
|
|
|
08-22-2017
|
2.00
|
prep canopy gas strut
|
Details
|
|
|
08-17-2017
|
1.25
|
deburr and attach rear baggage floor piece
|
Details
|
|
|
08-16-2017
|
1.50
|
assemble rear bulkhead covers and install
|
Details
|
|
|
08-15-2017
|
2.00
|
work on rear bulkhead cover for behind fuel tank
|
Details
|
|
|
08-11-2017
|
3.25
|
attach flap handle cover and front tunnel cover
|
Details
|
|
|
07-07-2017
|
3.00
|
Install/route stabilator cables & pulleys
|
Details
|
|
|
07-04-2017
|
3.00
|
Straighten control sticks
|
Details
|
|
|
06-29-2017
|
3.67
|
finish install of stabilator/rudder cables and sle
|
Details
|
|
|
06-28-2017
|
1.50
|
Install rudder cables and sleeves
|
Details
|
|
|
06-27-2017
|
0.50
|
Epoxy flaperon torque tube spacers
|
Details
|
|
|
06-22-2017
|
1.00
|
Drill flaperon torque tube spacers, grease detent
|
Details
|
|
|
06-20-2017
|
1.50
|
attach flap detent bracket,rivet flap handle knob
|
Details
|
|
|
06-15-2017
|
0.50
|
attach flap handle knob, shorten flap handle sprin
|
Details
|
|
|
06-13-2017
|
2.75
|
Fabricate flap handle parts and detent bracket
|
Details
|
|
|
05-31-2017
|
5.00
|
fabricate and attach flaperon pushrods
|
Details
|
|
|
05-26-2017
|
1.75
|
Attach control stick push rods, wire connector
|
Details
|
|
|
05-24-2017
|
0.50
|
Tried to attach push rods
|
Details
|
|
|
05-19-2017
|
3.00
|
Polish and attach control stick bushings
|
Details
|
|
|
05-18-2017
|
1.50
|
Construct 2 Control Stick Push Rod assemblies
|
Details
|
|
|
05-17-2017
|
1.50
|
Assemble flaperon mixer arms
|
Details
|
|
|
05-16-2017
|
1.67
|
mount flap handle and blocks
|
Details
|
|
|
05-16-2017
|
1.25
|
finish wiring system mount blocks
|
Details
|
|
|
05-12-2017
|
1.50
|
fabricate flap handle blocks
|
Details
|
|
|
05-11-2017
|
1.75
|
deburr parts, mount bearings, assemble flap pushro
|
Details
|
|
|
05-06-2017
|
1.25
|
install brake reservoir
|
Details
|
|
|
05-05-2017
|
2.25
|
Complete SB 16-08-24 replace engine mount rivets
|
Details
|
|
|
04-28-2017
|
1.50
|
install roll bar wiring for cockpit light and latc
|
Details
|
|
|
04-22-2017
|
1.00
|
wire-tie wires to rudder mount wire bracket
|
Details
|
|
|
04-19-2017
|
0.75
|
install over rudder wireway bracket
|
Details
|
|
|
02-17-2017
|
2.00
|
Redo wiring at rudder pedal assembly
|
Details
|
|
|
01-26-2017
|
4.00
|
redo table legs for sturdiness
|
Details
|
|
|
01-25-2017
|
2.75
|
Assemble parts for 31B-25 and move wires
|
Details
|
|
|
01-21-2017
|
3.50
|
install fuel pump elec. filter and wing fuse conne
|
Details
|
|
|
01-16-2017
|
2.00
|
continued wiring
|
Details
|
|
|
01-07-2017
|
1.25
|
deburr and prep parts related to wiring
|
Details
|
|
|
12-29-2016
|
2.00
|
wire wing connectors and pitch servo connector
|
Details
|
|
|
12-29-2016
|
0.50
|
fabricate wing connector extract tool
|
Details
|
|
|
11-30-2016
|
2.00
|
complete wiring and install of comm. connectors
|
Details
|
|
|
11-19-2016
|
1.25
|
Install power port and start on comm. ports
|
Details
|
|
|
10-09-2016
|
0.25
|
route wires along phone cable for ELT
|
Details
|
|
|
10-05-2016
|
0.50
|
finish difficult grommet routing
|
Details
|
|
|
09-28-2016
|
2.67
|
more routing details of WH-00045
|
Details
|
|
|
09-26-2016
|
2.50
|
Install OAT, start routing of optional cable harne
|
Details
|
|
|
09-20-2016
|
1.75
|
push to talk wiring routing
|
Details
|
|
|
09-17-2016
|
1.75
|
modify for proper mount & temp install of control
|
Details
|
|
|
09-16-2016
|
2.00
|
install control stick grips and wiring
|
Details
|
|
|
09-15-2016
|
3.00
|
complete more wiring for fuel pump, GPS, latch sw.
|
Details
|
|
|
09-14-2016
|
1.25
|
finish spar pin switch wiring and switch install
|
Details
|
|
|
09-11-2016
|
1.00
|
continue spar pin switch wiring
|
Details
|
|
|
09-09-2016
|
1.17
|
start spar pin switch wiring
|
Details
|
|
|
09-07-2016
|
1.75
|
install audio jack, wing conn., autopilot conn.
|
Details
|
|
|
09-07-2016
|
0.50
|
finish painting around power and audio connectors
|
Details
|
|
|
09-06-2016
|
2.00
|
route cable harness wires
|
Details
|
|
|
09-04-2016
|
0.25
|
Install left instrument cooling fan
|
Details
|
|
|
09-02-2016
|
1.50
|
Instrument cooling fans insall
|
Details
|
|
|
09-01-2016
|
1.50
|
finish cables install
|
Details
|
|
|
08-31-2016
|
1.00
|
install conduit, start cabling
|
Details
|
|
|
08-24-2016
|
1.33
|
prep plastic conduit
|
Details
|
|
|
08-22-2016
|
1.50
|
install grommet and clamp
|
Details
|
|
|
08-01-2016
|
1.20
|
RV-12 transition training
|
Details
|
|
|
07-06-2016
|
1.75
|
Assemble wing fuselage pins
|
Details
|
|
|
06-30-2016
|
0.75
|
Install screwws in back of map box
|
Details
|
|
|
06-29-2016
|
2.00
|
assemble map box and rivet to right side panel
|
Details
|
|
|
06-28-2016
|
0.75
|
prime and paint map box halves, prime nut plates
|
Details
|
|
|
06-25-2016
|
0.25
|
rivet nutplates to ctr panel, install center panel
|
Details
|
|
|
06-23-2016
|
1.50
|
work on map box door, deburr center panel
|
Details
|
|
|
06-22-2016
|
3.25
|
work on map box and door, left generic panel
|
Details
|
|
|
06-21-2016
|
2.75
|
finish forward fuselage skin, start map box
|
Details
|
|
|
06-20-2016
|
0.50
|
Attach fwd fuse skin dimple nut plates and bracket
|
Details
|
|
|
06-16-2016
|
2.42
|
prep, drill dimple, and deburr Upper Fwd Fuse skin
|
Details
|
|
|
06-01-2016
|
0.50
|
Assemble cover plate and clip
|
Details
|
|
|
05-25-2016
|
3.92
|
Deburr parts and assembly
|
Details
|
|
|
05-24-2016
|
4.92
|
panel base and canopy ribs attachment
|
Details
|
|
|
05-20-2016
|
1.25
|
cleco and match drill Panel Base to longerons
|
Details
|
|
|
05-19-2016
|
2.00
|
deburr F-1202B Panel Base, install nut plates
|
Details
|
|
|
05-16-2016
|
0.45
|
Finish right canopy rib assembly
|
Details
|
|
|
04-20-2016
|
2.75
|
Finish deburr, finish canopy rib L
|
Details
|
|
|
04-19-2016
|
0.33
|
more deburr
|
Details
|
|
|
04-14-2016
|
1.25
|
Prep F-1202H-L&R, deburr edges F-1202A-L&R
|
Details
|
|
|
04-06-2016
|
2.50
|
attach mid-cowl hinges & attach stiffeners
|
Details
|
|
|
04-04-2016
|
4.25
|
finish cowl hinges, complete antenna shelf
|
Details
|
|
|
04-01-2016
|
1.83
|
start to attach cowl hinges
|
Details
|
|
|
03-31-2016
|
3.00
|
install firewall spacers, install upper fuse Doubl
|
Details
|
|
|
03-30-2016
|
2.33
|
fabricate cowl hinges, and stiffeners
|
Details
|
|
|
03-29-2016
|
0.25
|
Fabricate hinges
|
Details
|
|
|
03-28-2016
|
2.25
|
Fabricate and install forward fuel return line
|
Details
|
|
|
03-26-2016
|
2.00
|
construct and install rear return fuel line
|
Details
|
|
|
03-25-2016
|
3.00
|
Redo 3/8" fuel feed lines
|
Details
|
|
|
03-11-2016
|
3.00
|
Testing flares on 3/8 fuel lines, get new tools
|
Details
|
|
|
03-04-2016
|
1.75
|
safety wire and install gascolator
|
Details
|
|
|
02-25-2016
|
0.83
|
install fuel sensor
|
Details
|
|
|
02-08-2016
|
3.00
|
Complete the Finish Kit inventory
|
|
|
|
02-05-2016
|
2.50
|
Finish small hardware inventory
|
Details
|
|
|
02-03-2016
|
2.00
|
continue inventory of small hardware
|
Details
|
|
|
02-02-2016
|
2.00
|
inventory small hardware
|
Details
|
|
|
01-27-2016
|
1.00
|
Inspect finish kit received 1/22/16
|
Details
|
|
|
01-22-2016
|
0.75
|
Receive Finish Kit
|
Details
|
|
|
01-20-2016
|
2.50
|
fabricate and install pump to valve fuel line
|
Details
|
|
|
01-16-2016
|
1.75
|
fabricate and install first fuel line
|
Details
|
|
|
01-15-2016
|
2.33
|
mount fuel pump and fuel shut off valve
|
Details
|
|
|
01-13-2016
|
1.55
|
put fuse on side, run remaining brake lines
|
Details
|
|
|
01-09-2016
|
0.50
|
cut brake lines
|
Details
|
|
|
01-07-2016
|
2.50
|
install brake line fittings and crossover lines
|
Details
|
|
|
12-29-2015
|
2.00
|
mount rudder/brake pedal assembly to fuselage
|
Details
|
|
|
12-28-2015
|
4.40
|
assemble brake pedals and brake cylinders
|
Details
|
|
|
12-22-2015
|
1.75
|
start on rudder pedal assembly
|
Details
|
|
|
12-04-2015
|
4.40
|
finish seat backs and install in fuselage
|
Details
|
|
|
12-02-2015
|
1.75
|
fabricate seat back hinges
|
Details
|
|
|
11-30-2015
|
2.00
|
prep seat back parts
|
Details
|
|
|
11-13-2015
|
0.75
|
install attach angle in baggage area rear bulkhead
|
Details
|
|
|
11-12-2015
|
3.50
|
install rear bulkhead, brace
|
Details
|
|
|
11-11-2015
|
1.00
|
Install rollover assembly
|
Details
|
|
|
11-10-2015
|
0.50
|
move fuselage from basement to garage
|
Details
|
|
|
11-09-2015
|
1.50
|
prep garage for fuse, match drill tailcone Shear C
|
Details
|
|
|
11-06-2015
|
3.00
|
deburr parts
|
Details
|
|
|
09-17-2015
|
1.50
|
match drill and prime rollover arch bases
|
Details
|
|
|
09-16-2015
|
1.70
|
rivet the rollover arch assembly
|
Details
|
|
|
09-15-2015
|
1.75
|
prime rollover arches, deburr other parts
|
Details
|
|
|
09-14-2015
|
0.75
|
finish rollover arch latch parts
|
Details
|
|
|
09-12-2015
|
1.75
|
finish match drilling, deburr all holes
|
Details
|
|
|
09-11-2015
|
2.00
|
cleco parts for rollover arch, start final drillin
|
Details
|
|
|
09-10-2015
|
1.00
|
deburr edges of rollover assembly parts
|
Details
|
|
|
09-09-2015
|
0.75
|
sort out rollover assembly parts, breakdown crate
|
Details
|
|
|
09-09-2015
|
0.75
|
redo left cowl hinge
|
Details
|
|
|
09-08-2015
|
1.50
|
fabricate and install cowl hinges
|
Details
|
|
|
09-07-2015
|
2.75
|
assemble and install vent door assemblies
|
Details
|
|
|
09-06-2015
|
0.83
|
start side vent assemblies
|
Details
|
|
|
09-06-2015
|
1.67
|
left side skin riveted, two stiffeners riveted
|
Details
|
|
|
09-05-2015
|
3.75
|
rivet right side skin
|
Details
|
|
|
09-04-2015
|
1.75
|
deburr left side skin, dimple and nut plates
|
Details
|
|
|
09-03-2015
|
1.75
|
countersink canopy decks, deburr right side skin
|
Details
|
|
|
09-02-2015
|
1.75
|
finish prep of left skin, prime longerons
|
Details
|
|
|
09-01-2015
|
1.83
|
deburr left longeron and other left skins
|
Details
|
|
|
08-31-2015
|
1.67
|
deburr right longeron and other right side skins
|
Details
|
|
|
08-26-2015
|
2.20
|
transition flight training
|
Details
|
|
|
08-25-2015
|
0.90
|
transition flight training
|
Details
|
|
|
08-21-2015
|
2.67
|
finish cleco side skins, match drill longerons
|
Details
|
|
|
08-20-2015
|
2.10
|
finish wing spar cut outs on side skins, & gusset
|
Details
|
|
|
08-17-2015
|
0.75
|
cleco longeron assembly and start side skins
|
Details
|
|
|
08-16-2015
|
2.75
|
complete arm rest and side channel pieces
|
Details
|
|
|
08-15-2015
|
2.00
|
finish roll bar attach plate, start arm rest side
|
Details
|
|
|
08-14-2015
|
2.50
|
deburr longerons, complete roll bar attach plates
|
Details
|
|
|
08-11-2015
|
3.25
|
Bend and drill longerons
|
Details
|
|
|
08-10-2015
|
0.75
|
finish flatten area and bend left longeron
|
Details
|
|
|
08-06-2015
|
1.50
|
Flattened forward end of longerons
|
Details
|
|
|
08-05-2015
|
0.75
|
worked to flat forward end of longerons
|
Details
|
|
|
08-04-2015
|
1.67
|
Cut and marked longerons, deburr templates
|
Details
|
|
|
07-27-2015
|
1.00
|
sort out section 23 parts
|
Details
|
|
|
07-08-2015
|
2.25
|
cleco and rivet fwd lower fuselage to mid fuselage
|
Details
|
|
|
07-07-2015
|
1.00
|
prime and rivet gascolator and rivet fuel flow bra
|
Details
|
|
|
07-06-2015
|
1.00
|
install FF-1204D firewall stiffener and fab F-1201
|
Details
|
|
|
07-05-2015
|
2.20
|
Install firewall shelf
|
Details
|
|
|
07-02-2015
|
1.60
|
rivet cowl attach plates, drill gascolator hole
|
Details
|
|
|
07-01-2015
|
1.10
|
fab firewall spacers and drill in cowl attach plat
|
Details
|
|
|
06-30-2015
|
4.60
|
rivet nut plates and forward fuselage pieces
|
Details
|
|
|
06-29-2015
|
1.20
|
deburr F-1272, F-1217A-L&R, F-1271-L&R
|
Details
|
|
|
06-26-2015
|
2.00
|
deburr F-1288 and prep many others
|
Details
|
|
|
06-25-2015
|
3.33
|
install baggage bulkhead and autopilot brackets
|
Details
|
|
|
06-25-2015
|
1.00
|
install autopilot brackets
|
Details
|
|
|
06-23-2015
|
1.42
|
install step floors
|
Details
|
|
|
06-22-2015
|
1.00
|
install steps, add nut plates and install snap bus
|
Details
|
|
|
06-21-2015
|
0.67
|
rivet nut plate and step attach brackets to fusela
|
Details
|
|
|
06-20-2015
|
3.00
|
match drill steps and brackets and begin riveting
|
Details
|
|
|
06-19-2015
|
1.75
|
fabricate step attach brackets & nut plate bracket
|
Details
|
|
|
06-18-2015
|
2.00
|
rivet the fuselage bottom skin
|
Details
|
|
|
06-17-2015
|
4.10
|
finish prep and deburr F-1276, rivet nut plates, c
|
Details
|
|
|
06-16-2015
|
1.00
|
use soldering pencil to prep bottom skin coating
|
Details
|
|
|
06-15-2015
|
1.50
|
prep and deburr F-1204Z & F-1268A to E
|
Details
|
|
|
06-12-2015
|
3.91
|
prep, deburr and rivet L & R corner skins
|
Details
|
|
|
06-11-2015
|
2.50
|
secure control column, install floor ribs
|
Details
|
|
|
06-08-2015
|
158.00
|
nut plates to seat floors, control column partial
|
Details
|
|
|
06-05-2015
|
2.00
|
bulkhead to seat floor assy, rivet seat floor ramp
|
Details
|
|
|
06-04-2015
|
3.67
|
bulkhead assembly completion
|
Details
|
|
|
06-03-2015
|
1.92
|
prep and rivet stub spar receptacle, doublers
|
Details
|
|
|
06-02-2015
|
3.75
|
prep bulkhead, prep other parts
|
Details
|
|
|
06-01-2015
|
1.75
|
rivet control column mount assembly
|
Details
|
|
|
05-30-2015
|
1.83
|
Install left and right forward bulkhead side assys
|
Details
|
|
|
05-30-2015
|
1.25
|
deburr brackets and parts
|
Details
|
|
|
05-29-2015
|
2.25
|
finalize seat floor assemblies
|
Details
|
|
|
05-27-2015
|
3.93
|
finish left seat floor assembly
|
Details
|
|
|
05-26-2015
|
2.25
|
assemble seat ribs, prep seat hinges
|
Details
|
|
|
05-24-2015
|
2.25
|
find more parts in crate, prep parts
|
Details
|
|
|
05-22-2015
|
2.00
|
autopilot servo brackets install, seat ribs assy
|
Details
|
|
|
05-20-2015
|
2.17
|
install pulley bracket assy and mixer to seat ribs
|
Details
|
|
|
05-19-2015
|
0.75
|
rivet nut plates, final drill #19 and dimple seat
|
Details
|
|
|
05-18-2015
|
2.17
|
finish deburr, continue seat rib assemblies
|
Details
|
|
|
05-15-2015
|
2.00
|
start prep and deburr of seat ribs
|
Details
|
|
|
05-13-2015
|
1.75
|
cotter pin install, prep seat belt attach pieces
|
Details
|
|
|
05-12-2015
|
0.75
|
assemble flaperon mixer assembly
|
Details
|
|
|
05-11-2015
|
0.25
|
install LP4-5 rivets per Vans
|
Details
|
|
|
05-11-2015
|
1.75
|
assemble pulley brackets onto intercostal
|
Details
|
|
|
05-09-2015
|
3.25
|
rivet ribs, nutplates and SB 12-14-06
|
Details
|
|
|
05-06-2015
|
1.75
|
rivet bulkhead to baggage ribs
|
Details
|
|
|
05-05-2015
|
2.00
|
dimple and rivet nut plates plus bearing bracket
|
Details
|
|
|
05-01-2015
|
2.25
|
prepare and install rear spar wing supports
|
Details
|
|
|
04-29-2015
|
1.00
|
dimple and install nut plates
|
Details
|
|
|
04-28-2015
|
2.50
|
dimple and rivet baggage ribs
|
Details
|
|
|
04-22-2015
|
1.20
|
install fuselage baggage floor
|
Details
|
|
|
04-21-2015
|
3.00
|
redo rivet, prep fuselage baggage floor
|
Details
|
|
|
04-20-2015
|
1.25
|
prep rear fuselage ribs
|
Details
|
|
|
04-16-2015
|
0.75
|
redo 2 Cherry rivets
|
Details
|
|
|
04-14-2015
|
2.08
|
finish fuselage center section
|
Details
|
|
|
04-11-2015
|
4.50
|
finish match drill, countersink center fuse assy.
|
Details
|
|
|
04-04-2015
|
1.50
|
match drill half of holes in center section assemb
|
Details
|
|
|
04-03-2015
|
4.00
|
work on fuselage center section assembly
|
Details
|
|
|
04-01-2015
|
1.25
|
prime nut plates
|
Details
|
|
|
03-31-2015
|
1.50
|
organize fuselage hardware
|
|
|
|
03-25-2015
|
3.00
|
organize fuselage hardware
|
|
|
|
03-21-2015
|
1.00
|
organize fuselage hardware
|
|
|
|
03-16-2015
|
0.50
|
hang flaperons for storage
|
Details
|
|
|
03-14-2015
|
2.00
|
complete right flaperon
|
Details
|
|
|
03-13-2015
|
4.25
|
finish left flaperon, work on right
|
Details
|
|
|
03-12-2015
|
2.33
|
finish left flaperon skeleton, start skin riveting
|
Details
|
|
|
03-11-2015
|
2.25
|
deburr all edges on flaperon skins, mount brackets
|
Details
|
|
|
03-10-2015
|
1.33
|
deburr all holes on flaperon skins
|
Details
|
|
|
03-05-2015
|
2.00
|
remove plastic from flaperon skins
|
Details
|
|
|
03-03-2015
|
2.50
|
deburr all ribs
|
Details
|
|
|
02-26-2015
|
1.50
|
flaperon rib and hinge bracket prep
|
Details
|
|
|
02-25-2015
|
2.50
|
manual 18-03 steps 4 - 6
|
Details
|
|
|
02-21-2015
|
4.83
|
manual 18-03 steps 1 - 4, 18-04 step 1
|
Details
|
|
|
02-20-2015
|
1.75
|
manual 18-02 steps 1 - 3
|
Details
|
|
|
02-18-2015
|
0.33
|
work on right wing tip light mount
|
Details
|
|
|
02-18-2015
|
1.25
|
put up straps to hang right wing
|
Details
|
|
|
01-25-2015
|
2.00
|
inventory fuselage hardware
|
Details
|
|
|
01-22-2015
|
2.00
|
inventory fuselage
|
Details
|
|
|
01-21-2015
|
2.00
|
finish right wing tip light, test, right wing fini
|
Details
|
|
|
01-20-2015
|
2.25
|
Further work on right wing tip light
|
Details
|
|
|
01-15-2015
|
2.00
|
prepare right wing tip light fiberglass mount
|
Details
|
|
|
01-14-2015
|
2.30
|
finish right wing, start wing tip light
|
Details
|
|
|
01-13-2015
|
2.00
|
deburr W-1204D-R and begin fit
|
Details
|
|
|
01-09-2015
|
1.75
|
rivet skins and deburr right wing tip pieces
|
Details
|
|
|
01-07-2015
|
1.00
|
deburr W-1204B and W-1204A-R
|
Details
|
|
|
12-29-2014
|
0.10
|
received fuselage kit
|
Details
|
|
|
12-16-2014
|
3.00
|
rivet right wing top skins, add wing hold & rib
|
Details
|
|
|
12-15-2014
|
1.67
|
deburr W-1201C-R, cleco
|
Details
|
|
|
12-12-2014
|
2.00
|
Complete right wing top skins, ready for doubler
|
Details
|
|
|
12-11-2014
|
2.33
|
finish right wing top inboard and outboard skins
|
Details
|
|
|
12-10-2014
|
1.50
|
deburr upper right wing inboard skin, cleco
|
Details
|
|
|
12-06-2014
|
2.00
|
prep right wing top skins
|
Details
|
|
|
12-05-2014
|
1.00
|
install two flaperon hinges on right wing
|
Details
|
|
|
12-04-2014
|
3.75
|
finish landing light lens and mounting light assem
|
Details
|
|
|
11-30-2014
|
3.50
|
mark ldg. light lens,wiring connectors
|
Details
|
|
|
11-21-2014
|
4.33
|
deburr W-1202-L, cleco, rivet, flip wing, rivet
|
Details
|
|
|
11-19-2014
|
2.00
|
finish landing light mounts
|
Details
|
|
|
11-17-2014
|
2.00
|
rivet right bottom out board wing skin
|
Details
|
|
|
11-15-2014
|
4.25
|
Finish wing tip light and landing light holes
|
Details
|
|
|
11-14-2014
|
1.00
|
pneumatic riveter, cut wing tip light hole
|
Details
|
|
|
11-10-2014
|
1.67
|
deburr W-1203-R and prep W-1204D
|
Details
|
|
|
11-08-2014
|
1.95
|
prep the bottom rt wing skins W-1202, W-1203
|
Details
|
|
|
11-07-2014
|
1.75
|
rivet W-1201-R bottom inboard wing skin
|
Details
|
|
|
11-05-2014
|
2.75
|
deburr and cleco right wing skin W-1201-R
|
Details
|
|
|
10-31-2014
|
1.75
|
right wing skin prep
|
Details
|
|
|
10-29-2014
|
1.00
|
Prep right wing skins
|
Details
|
|
|
10-28-2014
|
1.00
|
moved right wing skeleton to basement
|
Details
|
|
|
10-25-2014
|
1.00
|
right wing lighting connector
|
Details
|
|
|
10-24-2014
|
1.25
|
right wing lighting wiring
|
Details
|
|
|
10-23-2014
|
3.25
|
redo rear spar rivets, install front rivets rt win
|
Details
|
|
|
10-21-2014
|
0.50
|
prep and clean partial right wing assy.
|
Details
|
|
|
10-20-2014
|
1.50
|
prep and move left wing to basement storage
|
Details
|
|
|
10-09-2014
|
3.00
|
Finish left wing tip lighting and test
|
Details
|
|
|
10-08-2014
|
2.25
|
Finish epoxy/flox work and wire connector
|
Details
|
|
|
10-07-2014
|
2.00
|
add epoxy/flox to left wingtip light mount
|
Details
|
|
|
10-04-2014
|
1.00
|
Added rivet and install stall switch access door
|
Details
|
|
|
10-03-2014
|
3.00
|
Prepare left wing tip light fiberglass extension
|
Details
|
|
|
09-25-2014
|
1.50
|
Rivet left wing tip close-out
|
Details
|
|
|
09-24-2014
|
3.42
|
flip wing, fit W12-04D-L, cut light hole
|
Details
|
|
|
09-23-2014
|
1.67
|
deburr parts and investigate wing tip light
|
Details
|
|
|
09-22-2014
|
0.40
|
Fabricate bending tool
|
Details
|
|
|
09-21-2014
|
2.00
|
Prep and install top skins left wing tip
|
Details
|
|
|
09-20-2014
|
3.20
|
work on left wing tip
|
Details
|
|
|
09-17-2014
|
3.60
|
close up left wing top skins including wing walk
|
Details
|
|
|
08-12-2014
|
0.50
|
check left wing before closure
|
Details
|
|
|
08-10-2014
|
2.00
|
prepare various parts
|
Details
|
|
|
08-06-2014
|
2.50
|
prepare W-1201C-L, mod rear spar rivets
|
Details
|
|
|
07-24-2014
|
1.58
|
cleco and rivet W-1202B
|
Details
|
|
|
07-23-2014
|
3.08
|
prep, deburr, rivet W-1203B-L, prep W-1202B-L
|
Details
|
|
|
07-22-2014
|
1.25
|
Finish riveting W-1201B-L
|
Details
|
|
|
07-21-2014
|
0.50
|
cleco W-1201B-L
|
Details
|
|
|
07-15-2014
|
1.50
|
prepare W-1201B-L
|
Details
|
|
|
07-11-2014
|
3.00
|
rivet left wing leading edge, flaperon hinges
|
Details
|
|
|
07-11-2014
|
1.92
|
finish rivet and flip left wing
|
Details
|
|
|
07-10-2014
|
2.67
|
Prep and cleco W-1202-L
|
Details
|
|
|
07-09-2014
|
2.00
|
Rivet W-1201-L
|
Details
|
|
|
07-08-2014
|
4.00
|
Finish prep of W-1201-L, deburr, cleco
|
Details
|
|
|
07-07-2014
|
0.50
|
dimple holes, prepare W-1201-L
|
Details
|
|
|
07-06-2014
|
0.25
|
Install stand-off with Loctite 243
|
Details
|
|
|
07-03-2014
|
3.00
|
Finish deburring and cleco W-1203-L
|
Details
|
|
|
07-02-2014
|
2.25
|
Prepare W-1203-L
|
Details
|
|
|
07-02-2014
|
2.00
|
Left wing wiring connector and string light wires
|
Details
|
|
|
07-01-2014
|
2.00
|
Left wing wiring connector
|
Details
|
|
|
06-24-2014
|
3.50
|
Finish stall warning switch install & adjust
|
Details
|
|
|
06-23-2014
|
1.00
|
stall warning switch GND wire
|
Details
|
|
|
06-21-2014
|
1.00
|
transition flight training
|
Details
|
|
|
06-20-2014
|
1.00
|
transition flight training
|
Details
|
|
|
06-17-2014
|
38.00
|
Attend 2014 RV-12 Expo, transition flight training
|
Details
|
|
|
06-14-2014
|
2.00
|
Construct stall warning switch assembly
|
Details
|
|
|
06-13-2014
|
2.00
|
Finish left front wing ribs riveting.
|
Details
|
|
|
06-12-2014
|
1.00
|
Continue prep for left front wing ribs & call Vans
|
Details
|
|
|
06-10-2014
|
0.75
|
Prepare to begin front wing ribs on table
|
Details
|
|
|
05-21-2014
|
2.00
|
Complete right wing rear main ribs
|
Details
|
|
|
05-20-2014
|
1.67
|
Manual 15-04 step 9,15-06 cleco steps 1-7
|
Details
|
|
|
05-17-2014
|
1.75
|
Complete most of left wing rear ribs attachment
|
Details
|
|
|
05-16-2014
|
1.17
|
Finish rear main ribs
|
Details
|
|
|
05-16-2014
|
1.16
|
finish deburring rear wing ribs and flute
|
Details
|
|
|
05-15-2014
|
1.58
|
deburring right rear main wing ribs
|
Details
|
|
|
05-14-2014
|
2.00
|
finished deburring left rear main wing ribs
|
Details
|
|
|
05-13-2014
|
1.58
|
deburring rear main wing ribs
|
Details
|
|
|
05-09-2014
|
2.33
|
Trim rear main ribs and deburr
|
Details
|
|
|
05-08-2014
|
0.50
|
Remove plastic from rear main ribs
|
Details
|
|
|
05-08-2014
|
1.50
|
deconstruct wing spar packaging
|
Details
|
|
|
05-07-2014
|
6.55
|
Finish fwd ribs
|
Details
|
|
|
05-06-2014
|
0.67
|
Deburr fwd ribs large holes
|
Details
|
|
|
05-01-2014
|
1.33
|
Deburr forward wing ribs
|
Details
|
|
|
04-30-2014
|
1.25
|
Deburr forward wing ribs
|
Details
|
|
|
04-24-2014
|
1.20
|
Deburr fwd wing ribs
|
Details
|
|
|
04-23-2014
|
2.00
|
trim forward wing ribs
|
Details
|
|
|
04-16-2014
|
2.58
|
Left and right rear spar assemblies
|
Details
|
|
|
04-14-2014
|
1.00
|
Prep tip attach angles.
|
Details
|
|
|
04-10-2014
|
2.90
|
Rivet stub spars, hinge pieces
|
Details
|
|
|
04-09-2014
|
5.50
|
Prep and countersink stub spars
|
Details
|
|
|
04-02-2014
|
3.50
|
Complete wing main spars
|
Details
|
|
|
04-01-2014
|
1.00
|
Start wing main spars
|
Details
|
|
|
03-31-2014
|
1.50
|
Prep parts and steps 1 & 2
|
Details
|
|
|
03-29-2014
|
1.00
|
Hang tailcone in garage
|
Details
|
|
|
03-18-2014
|
0.83
|
Finish riveting tailcone assembly
|
Details
|
|
|
03-15-2014
|
3.00
|
tailcone fwd skin rib, stiffeners, rivet right
|
Details
|
|
|
03-14-2014
|
2.85
|
Finish rivet tailcone sides, cleco top skin
|
Details
|
|
|
03-13-2014
|
2.00
|
Rivet left half of tailcone sides
|
Details
|
|
|
03-11-2014
|
1.75
|
Install snap bushing brackets and guide strings
|
Details
|
|
|
03-08-2014
|
1.25
|
deburr all holes and edges F-1279-L & R
|
Details
|
|
|
03-07-2014
|
3.50
|
Route elev. trim wiring and static plumbing
|
Details
|
|
|
02-25-2014
|
1.25
|
remove plastic from F-1279-L & R
|
Details
|
|
|
02-24-2014
|
1.00
|
Flip tailcone and install skins
|
Details
|
|
|
02-19-2014
|
5.09
|
Complete manual 10-06 and 10-07
|
Details
|
|
|
02-05-2014
|
2.50
|
Add stiffeners to bottom tailcone skins
|
Details
|
|
|
02-04-2014
|
0.42
|
Start prep of F-1282-L
|
Details
|
|
|
02-04-2014
|
1.00
|
Deburr and break F-1278
|
Details
|
|
|
01-29-2014
|
1.67
|
Deburr and break F-1280-L & R
|
Details
|
|
|
01-22-2014
|
2.25
|
Deburr and break F-1281-L & R
|
Details
|
|
|
01-21-2014
|
1.00
|
Deburr and break F-1282-R
|
Details
|
|
|
01-16-2014
|
2.50
|
remove blue plastic from tail cone skins
|
Details
|
|
|
12-17-2013
|
1.00
|
Finish wing kit inventory
|
Details
|
|
|
12-10-2013
|
2.00
|
Unpack and inventory wing kit
|
Details
|
|
|
12-03-2013
|
0.25
|
Wing kit delivered
|
|
|
|
11-06-2013
|
1.75
|
Figure out and add washers to horz. stab.
|
Details
|
|
|
10-28-2013
|
1.20
|
Finish F-1211 assembly
|
Details
|
|
|
10-25-2013
|
3.20
|
Rivet F-1211 assembly
|
Details
|
|
|
10-18-2013
|
0.00
|
Pictures of basement shop
|
Details
|
|
|
10-18-2013
|
0.70
|
Match drill, final drill, Prime remaining nut plat
|
Details
|
|
|
10-17-2013
|
1.55
|
work on fuselage rear bulkhead
|
Details
|
|
|
10-16-2013
|
2.20
|
Complete manual page 10-03
|
Details
|
|
|
09-25-2013
|
1.75
|
Fabricate Tail Skid bracket
|
Details
|
|
|
09-19-2013
|
2.65
|
Finish F-1210 frame
|
Details
|
|
|
09-13-2013
|
0.50
|
Rivet wear plate and tail cone ribs
|
Details
|
|
|
09-11-2013
|
2.15
|
Deburred ribs F-1208 and F-1209
|
Details
|
|
|
09-09-2013
|
0.60
|
Remove plastic and flute tailcone ribs
|
Details
|
|
|
09-06-2013
|
0.40
|
Ordered wing kit
|
Details
|
|
|
09-05-2013
|
0.70
|
sort parts and 10-02 step 3
|
Details
|
|
|
09-03-2013
|
0.50
|
Hang the finished horizontal stab
|
Details
|
|
|
08-30-2013
|
0.50
|
Add counterbalance weights
|
Details
|
|
|
08-29-2013
|
2.90
|
Installed aft outside skins on stab
|
Details
|
|
|
08-27-2013
|
2.00
|
Rivet hinges and aft ribs on stab.
|
Details
|
|
|
08-27-2013
|
0.55
|
Finish riveting on horz. stabilator skeleton
|
Details
|
|
|
08-26-2013
|
1.55
|
Rivet right main stab skin onto skeleton
|
Details
|
|
|
08-22-2013
|
2.25
|
Rivet left main stab skin top and bottom
|
Details
|
|
|
08-21-2013
|
3.80
|
Deburr main stab skins and cleco on skeleton
|
Details
|
|
|
08-20-2013
|
1.00
|
Deburr inside of stab main skins
|
Details
|
|
|
08-16-2013
|
1.75
|
Drill stab hinges
|
Details
|
|
|
08-07-2013
|
1.00
|
Visited Vans Aircraft at Aurora, OR
|
Details
|
|
|
07-18-2013
|
2.00
|
Install horz stab stops and torque, mark hinges
|
Details
|
|
|
07-16-2013
|
0.75
|
Install horz stab hinges
|
Details
|
|
|
07-11-2013
|
4.50
|
Finish Stabilator Skeleton Assembly
|
Details
|
|
|
07-03-2013
|
1.00
|
Rivet horz spar rib clips, radius ribs
|
Details
|
|
|
06-28-2013
|
2.50
|
Fab hinge stops,rivet spar caps
|
Details
|
|
|
06-27-2013
|
2.50
|
Rivet all nut plates and counterbalance brackets
|
Details
|
|
|
06-26-2013
|
3.25
|
horz stab spar work
|
Details
|
|
|
06-25-2013
|
2.80
|
Cleco attach and drill counterbalance pieces
|
Details
|
|
|
06-21-2013
|
4.00
|
Deburr and rivet stab spar caps
|
Details
|
|
|
06-19-2013
|
1.50
|
Match drill #12, cut and deburr pieces
|
Details
|
|
|
06-15-2013
|
1.50
|
Reread manual section 5, countersink holes
|
Details
|
|
|
06-12-2013
|
2.10
|
Countersink horz stab spar pieces
|
Details
|
|
|
06-06-2013
|
2.50
|
Drilled 2 hinges pieces, finished AST assemblies
|
Details
|
|
|
06-05-2013
|
1.50
|
installed AST spars, cut AST hinges
|
Details
|
|
|
06-03-2013
|
1.00
|
Countersink and rivet AST control horns
|
Details
|
|
|
05-22-2013
|
1.10
|
Debur edges and rivet AST skins
|
Details
|
|
|
05-21-2013
|
1.25
|
Debur HS-1222 ribs and HS-1221-L & R skins
|
Details
|
|
|
05-16-2013
|
1.25
|
Prepare/drill left and right anti-servo tabs
|
Details
|
|
|
05-15-2013
|
3.25
|
Finish rudder
|
Details
|
|
|
05-14-2013
|
3.50
|
Finished Rudder skeleton assembly
|
Details
|
|
|
05-08-2013
|
0.50
|
Screw on vert stab fwd skin & hinges
|
Details
|
|
|
05-08-2013
|
2.00
|
Finish rudder spar assembly
|
Details
|
|
|
04-26-2013
|
1.25
|
Finish riveting vert stab skin
|
Details
|
|
|
04-25-2013
|
2.50
|
Rivet vert stab skin on skeleton
|
Details
|
|
|
04-24-2013
|
3.00
|
Vert Stab main skin
|
Details
|
|
|
04-12-2013
|
1.00
|
Finish riveting nut plates on VS-1201
|
Details
|
|
|
04-11-2013
|
2.25
|
Final drill, dimple & rivet vert stab skins
|
Details
|
|
|
04-10-2013
|
1.00
|
Trim fwd and main vert stab skins
|
Details
|
|
|
04-06-2013
|
2.40
|
Complete V-Stab Skeleton Assembly
|
Details
|
|
|
04-05-2013
|
0.60
|
Rivet two ribs to vert stab front spar
|
Details
|
|
|
04-03-2013
|
1.75
|
Radius vert stab ribs, debur, flute
|
Details
|
|
|
04-02-2013
|
1.30
|
Rivet the nut plates page 06-04
|
Details
|
|
|
03-29-2013
|
0.50
|
Prime nut plates, deburr
|
Details
|
|
|
03-29-2013
|
0.50
|
Finish mini paint booth
|
Details
|
|
|
03-22-2013
|
1.00
|
Rivet spar caps to vert stab rear spar
|
Details
|
|
|
03-20-2013
|
1.50
|
Countersink #40 holes
|
Details
|
|
|
03-16-2013
|
1.25
|
Match drill #40 and #12 holes
|
Details
|
|
|
03-14-2013
|
1.50
|
Finish match drilling #30
|
Details
|
|
|
03-01-2013
|
1.00
|
Finish rudder hinges
|
Details
|
|
|
02-25-2013
|
3.00
|
Match drill #30 holes
|
Details
|
|
|
02-22-2013
|
2.00
|
Prime and work on more rudder pieces
|
Details
|
|
|
02-21-2013
|
2.50
|
Rudder hinges
|
Details
|
|
|
02-16-2013
|
2.00
|
Sort and store misc hardware
|
Details
|
|
|
02-15-2013
|
0.50
|
Setup and test band saw
|
Details
|
|
|
02-09-2013
|
3.00
|
Inventory Empenage
|
Details
|
|
|
02-08-2013
|
1.75
|
Unpack kit from crate
|
Details
|
|
|
02-04-2013
|
1.00
|
Pick-up various tools locally
|
Details
|
|
|
02-01-2013
|
2.50
|
Pick up tools and visit W & C hangar
|
Details
|
|
|
01-29-2013
|
0.50
|
Empennage crate delivered
|
Details
|
|
|
01-26-2013
|
1.00
|
Modify Cleaveland Tool RV-12 spreadsheet
|
Details
|
|
|
01-21-2013
|
0.50
|
Order RV-12 empennage and fastener kit
|
Details
|
|
|
07-26-2012
|
0.50
|
RV-12 demo flight at Oshkosh
|
Details
|
|
|
08-12-2006
|
0.50
|
Flew Gene Larsens RV 9A
|
Details
|
|
|
07-30-2005
|
0.50
|
First ride in a Vans airplane, RV-7A at Oshkosh
|
|
|