Date
|
Hours
|
Work Log Summary
|
Details
|
02-20-2024
|
1.50
|
Replace Flat Nose Tire
|
Details
|
|
|
11-16-2023
|
3.00
|
Re-sealed Right Fuel Transducer
|
Details
|
|
|
05-24-2022
|
3.50
|
Replaced Muffler
|
Details
|
|
|
02-01-2022
|
4.00
|
Secondary Canopy Lock Install
|
Details
|
|
|
12-13-2021
|
4.00
|
Added Wing Root Fairings
|
Details
|
|
|
09-10-2021
|
6.00
|
Painted/Wrapped the Plane
|
Details
|
|
|
05-19-2021
|
1.50
|
Koger Sunshade Install
|
Details
|
|
|
12-20-2020
|
4.00
|
Replaced Regulator/Rectifier
|
Details
|
|
|
11-19-2020
|
4.00
|
Replace Forward Right Brake Line
|
Details
|
|
|
10-22-2020
|
2.00
|
Replace Both Fuel Drains
|
Details
|
|
|
10-08-2020
|
8.00
|
15 Hour Engine Inspection
|
Details
|
|
|
09-20-2020
|
4.00
|
Fix Left Flap Track
|
Details
|
|
|
09-18-2020
|
3.00
|
Rewire Primary Boost Pump
|
Details
|
|
|
09-10-2020
|
4.00
|
Oil Line Tighten / ADAHRS Secure
|
Details
|
|
|
09-08-2020
|
0.90
|
First Flight of N255DK
|
Details
|
|
|
08-27-2020
|
3.00
|
Airworthiness Inspection Day
|
Details
|
|
|
08-26-2020
|
8.00
|
Pre-Airworthiness Inspection Checklist
|
Details
|
|
|
08-06-2020
|
2.00
|
Wing Top Side Polishing 2
|
Details
|
|
|
07-30-2020
|
3.00
|
Wing Top Side Polishing 1
|
Details
|
|
|
07-09-2020
|
4.00
|
Canopy Side Cover Weatherproof Flanges
|
Details
|
|
|
06-12-2020
|
4.00
|
Convert Canopy Side Cover Attachment
|
Details
|
|
|
05-13-2020
|
3.00
|
Secure Outside Air Sceet Duct
|
Details
|
|
|
04-13-2020
|
3.00
|
Trim Motor Clevis Arms Secure
|
Details
|
|
|
02-24-2020
|
3.00
|
Add Naca Vent to Lower Cowl
|
Details
|
|
|
11-27-2019
|
3.00
|
Rudder Cables Re-attach
|
Details
|
|
|
11-25-2019
|
3.00
|
Flap Actuator and Upper Elevator Re-Attach
|
Details
|
|
|
11-22-2019
|
2.50
|
Right Rudder Cable Fairing Replace
|
Details
|
|
|
11-21-2019
|
2.00
|
Left Rudder Cable Fairing Replace 2
|
Details
|
|
|
11-11-2019
|
3.00
|
Left Rudder Cable Fairing Replace 1
|
Details
|
|
|
11-04-2019
|
3.00
|
Aft Wing Spar Attach Bolt Replace
|
Details
|
|
|
10-29-2019
|
3.00
|
Adjust Elevator Down Stops
|
Details
|
|
|
10-24-2019
|
2.50
|
Right Wing Locker Prop
|
Details
|
|
|
10-23-2019
|
2.00
|
Wing Attach Bolt Washer Fit
|
Details
|
|
|
10-21-2019
|
2.50
|
Engine Wiring/Hoses Re-secured 2
|
Details
|
|
|
10-17-2019
|
3.00
|
Engine Wiring/Hoses Re-secured 1
|
Details
|
|
|
10-14-2019
|
2.00
|
GPS Mount Bracket Fix
|
Details
|
|
|
10-11-2019
|
5.00
|
TC Final Inspection
|
Details
|
|
|
10-03-2019
|
1.00
|
ID Plate Obtained
|
Details
|
|
|
10-01-2019
|
4.00
|
Initial Weight and Balance
|
Details
|
|
|
09-18-2019
|
2.50
|
Left Wing Locker Prop
|
Details
|
|
|
09-13-2019
|
2.00
|
Reinstall Cockpit Upholstery
|
Details
|
|
|
09-10-2019
|
2.00
|
Right Wing Walk No Slip Tape
|
Details
|
|
|
08-26-2019
|
4.00
|
Fuel Filler Placards Install
|
Details
|
|
|
08-20-2019
|
2.50
|
Right Side Wing Walk Polishing
|
Details
|
|
|
08-19-2019
|
1.50
|
ULPower Service Bulletin No. 2015-01
|
Details
|
|
|
08-05-2019
|
5.00
|
Transition Training at BuzzAir Academy
|
Details
|
|
|
07-22-2019
|
4.00
|
N-Number Affixed to Rudder Right Side
|
Details
|
|
|
07-18-2019
|
1.00
|
Passenger Safety Placard Installed
|
Details
|
|
|
07-16-2019
|
2.50
|
Elevator Control Cables Safety-Wired
|
Details
|
|
|
07-11-2019
|
2.50
|
Rudder Control Cables Safety-Wired
|
Details
|
|
|
07-08-2019
|
1.50
|
ADS-B Out (2020) GPS Installed
|
Details
|
|
|
07-03-2019
|
3.50
|
Aileron Balance Cable Safety-Wired
|
Details
|
|
|
06-28-2019
|
2.00
|
Left Aileron Control Cable Safety-Wired
|
Details
|
|
|
06-27-2019
|
2.00
|
Right Aileron Control Cable Safety-Wired
|
Details
|
|
|
06-25-2019
|
2.00
|
Left Wing Walk No-SlipTape
|
Details
|
|
|
06-21-2019
|
3.00
|
Left Side Wing Walk Polishing
|
Details
|
|
|
06-20-2019
|
4.00
|
Added N-Number to Rudder Left Side
|
Details
|
|
|
06-18-2019
|
3.00
|
Replaced Battery and Main Solenoid
|
Details
|
|
|
06-13-2019
|
2.00
|
Improve Throttle Cable Routing
|
Details
|
|
|
06-10-2019
|
2.00
|
ULPower Service Bulletin 2016-02
|
Details
|
|
|
05-31-2019
|
3.00
|
Elevator Control Cables Part 3
|
Details
|
|
|
05-27-2019
|
2.00
|
Elevator Control Cables Part 2
|
Details
|
|
|
05-22-2019
|
4.00
|
Elevator Control Cables: Part 1
|
Details
|
|
|
05-21-2019
|
4.00
|
Rudder Cables Installation
|
Details
|
|
|
04-23-2019
|
2.00
|
Final Installation of Aileron Cables: 2
|
Details
|
|
|
04-22-2019
|
2.00
|
Final Installation of Aileron Cables: 1
|
Details
|
|
|
04-18-2019
|
4.00
|
Aileron Bellcranks Change Out
|
Details
|
|
|
04-16-2019
|
4.00
|
Brake Lines Rerouted
|
Details
|
|
|
04-08-2019
|
2.00
|
Pilot Seat Belt Install
|
Details
|
|
|
04-03-2019
|
2.00
|
Passenger Seatbelt Install
|
Details
|
|
|
03-28-2019
|
3.00
|
Aileron Bellcrank Modify
|
Details
|
|
|
03-20-2019
|
2.00
|
Instrument Panel Labels
|
Details
|
|
|
03-12-2019
|
3.00
|
Pilot Seat Pad Velcro Install
|
Details
|
|
|
02-21-2019
|
2.00
|
Cabin Floor Carpeting: Passenger Side
|
Details
|
|
|
02-11-2019
|
2.00
|
Cabin Floor Carpeting: Pilot Side
|
Details
|
|
|
01-31-2019
|
3.00
|
Fuel Flow Test: Nose Low
|
Details
|
|
|
01-15-2019
|
3.00
|
Fuel Flow Test: Nose High
|
Details
|
|
|
01-10-2019
|
6.00
|
Right Fuel Tank Level Calibration
|
Details
|
|
|
01-07-2019
|
4.00
|
Left Fuel Tank Level Calibration
|
Details
|
|
|
12-17-2018
|
1.00
|
Aircraft Registered
|
Details
|
|
|
11-19-2018
|
6.00
|
Cabin Heat 5: Pilot Side Install
|
Details
|
|
|
11-15-2018
|
3.00
|
Cabin Heat 4: Control Cable/Skeet Hose Install
|
Details
|
|
|
11-12-2018
|
4.00
|
Cabin Heat 3: Pass-Thru Install
|
Details
|
|
|
11-07-2018
|
4.00
|
Cabin Heat 2, Siting the Holes
|
Details
|
|
|
10-30-2018
|
4.00
|
Oil Filter Secure, Cabin Heat 1
|
Details
|
|
|
09-28-2018
|
3.00
|
Forward Top Skin Test Installation
|
Details
|
|
|
09-24-2018
|
2.00
|
ELT Test
|
Details
|
|
|
09-18-2018
|
3.00
|
OAT Probe Wiring + Misc
|
Details
|
|
|
09-13-2018
|
3.00
|
Elevator Trim Wire Bundle Install
|
Details
|
|
|
09-11-2018
|
3.00
|
Aileron Control Cables Installation 2
|
Details
|
|
|
09-05-2018
|
3.00
|
Forward Top Skin Finish
|
Details
|
|
|
08-22-2018
|
2.00
|
Static Port Test
|
Details
|
|
|
08-22-2018
|
3.00
|
Aileron Control Cables Installation 1
|
Details
|
|
|
08-06-2018
|
3.00
|
Pitot/Static Hoses Connection Complete
|
Details
|
|
|
07-31-2018
|
2.00
|
Pitot/Static Hoses Connection 1
|
Details
|
|
|
07-25-2018
|
3.00
|
AileronBellcranks Completion Final
|
Details
|
|
|
07-19-2018
|
4.00
|
Right Aileron Stop Adjust
|
Details
|
|
|
07-09-2018
|
2.00
|
Rudder Pedals Center Bearing Bolt Change
|
Details
|
|
|
06-26-2018
|
1.00
|
Reground Aileron Pushrod Fender Washers
|
Details
|
|
|
06-12-2018
|
3.00
|
Aileron Bellcranks Completion Part 1
|
Details
|
|
|
06-06-2018
|
4.00
|
Elevator Trim Wire Bundle Secure 1
|
Details
|
|
|
06-04-2018
|
3.00
|
Miscellaneous Clean Up Tasks
|
Details
|
|
|
05-28-2018
|
2.00
|
Safety Wiring Day
|
Details
|
|
|
05-09-2018
|
2.00
|
Final Assembly Cockpit Interior
|
Details
|
|
|
05-04-2018
|
2.00
|
Center Console Cover Install Complete
|
Details
|
|
|
05-02-2018
|
3.00
|
Center Console Cover Install 1
|
Details
|
|
|
05-01-2018
|
2.00
|
Finish Up forward Interior Panels
|
Details
|
|
|
04-26-2018
|
3.00
|
Right Forward Interior Panel Install
|
Details
|
|
|
04-23-2018
|
2.00
|
Left Forward Interior Panel Install
|
Details
|
|
|
04-18-2018
|
2.00
|
Cockpit Wiring and Interior
|
Details
|
|
|
04-12-2018
|
2.00
|
Engine Baffles Reinstall
|
Details
|
|
|
03-29-2018
|
2.00
|
Canopy Side Covers Riveted
|
Details
|
|
|
03-19-2018
|
2.00
|
Engine Run, Taxi, Brake Test
|
Details
|
|
|
02-27-2018
|
2.50
|
Canopy Seal Installed
|
Details
|
|
|
02-21-2018
|
2.00
|
Right Canopy Side Cover
|
Details
|
|
|
02-20-2018
|
2.00
|
Left Canopy Side Cover
|
Details
|
|
|
02-11-2018
|
2.00
|
Exhaust Pipe Installed
|
Details
|
|
|
01-27-2018
|
2.00
|
Fuel Connections Complete
|
Details
|
|
|
01-22-2018
|
2.00
|
Flap Installation Complete
|
Details
|
|
|
01-10-2018
|
2.50
|
Left Flap Attached to Drive Motor
|
Details
|
|
|
01-01-2018
|
0.00
|
Too Cool for School
|
Details
|
|
|
12-22-2017
|
3.00
|
Left Flap Installed
|
Details
|
|
|
12-07-2017
|
0.50
|
Left Flap Control Tube Trimming
|
Details
|
|
|
12-06-2017
|
2.00
|
Left Flap Install 1
|
Details
|
|
|
12-05-2017
|
3.00
|
Right Flap Installed
|
Details
|
|
|
11-30-2017
|
3.00
|
Wing Aft Spars Bolted
|
Details
|
|
|
11-29-2017
|
2.00
|
Wing Rear Spar Attachment Prep
|
Details
|
|
|
11-27-2017
|
2.00
|
Misc Tasks
|
Details
|
|
|
11-13-2017
|
2.00
|
Left Wing Final Install
|
Details
|
|
|
11-12-2017
|
1.50
|
Left Wing Install Prep 7
|
Details
|
|
|
11-09-2017
|
2.00
|
Miscellaneous Tasks from TC Visit
|
Details
|
|
|
11-06-2017
|
3.00
|
Left Wing Install Prep 6
|
Details
|
|
|
11-02-2017
|
2.00
|
Left Wing Install Prep 5
|
Details
|
|
|
10-12-2017
|
2.00
|
Left Wing Install Prep 4
|
Details
|
|
|
10-11-2017
|
2.50
|
Left Wing Install Prep 3
|
Details
|
|
|
10-09-2017
|
2.00
|
Left Wing Install Prep 2
|
Details
|
|
|
10-06-2017
|
2.00
|
Left Wing Install Prep 1
|
Details
|
|
|
10-04-2017
|
2.00
|
Right Wing Installed
|
Details
|
|
|
10-03-2017
|
4.00
|
Right Wing Install Prep 4
|
Details
|
|
|
09-28-2017
|
2.00
|
Right Wing Install Prep 3
|
Details
|
|
|
09-26-2017
|
3.00
|
Right Wing Preliminary Install
|
Details
|
|
|
09-25-2017
|
3.00
|
Right Wing Install Prep 2
|
Details
|
|
|
09-22-2017
|
1.00
|
Right Wing Install Prep
|
Details
|
|
|
09-21-2017
|
2.00
|
Post Engine Run Cleanup
|
Details
|
|
|
09-20-2017
|
3.00
|
First Engine Run (plus a little more)
|
Details
|
|
|
09-19-2017
|
3.00
|
First Engine Run Prep
|
Details
|
|
|
09-12-2017
|
2.00
|
Internal Fuselage Wiring 1
|
Details
|
|
|
09-07-2017
|
2.00
|
Step Fairings Install
|
Details
|
|
|
09-04-2017
|
2.00
|
Rudder Stops Installed
|
Details
|
|
|
09-01-2017
|
3.00
|
Misc Tail Section Cleanup
|
Details
|
|
|
08-30-2017
|
3.00
|
Tail Section Integration Complete
|
Details
|
|
|
08-28-2017
|
4.00
|
Tail Section Integration 10
|
Details
|
|
|
08-24-2017
|
3.00
|
Tail Section Integration 9
|
Details
|
|
|
08-23-2017
|
4.00
|
Tail Section Integration 8
|
Details
|
|
|
08-22-2017
|
3.00
|
Build Wing Installation Sawhorses
|
Details
|
|
|
08-17-2017
|
3.00
|
Tail Section Integration 7 (Rudder Fairing)
|
Details
|
|
|
08-16-2017
|
2.50
|
Tail Section Integration 6
|
Details
|
|
|
08-11-2017
|
0.00
|
Moved Bad Clown to the Hangar
|
Details
|
|
|
08-10-2017
|
2.00
|
Tail Section Integration 5
|
Details
|
|
|
08-09-2017
|
2.00
|
Rewired Ignition Switch
|
Details
|
|
|
07-21-2017
|
2.00
|
Moved Wings to Hangar
|
Details
|
|
|
06-17-2017
|
2.00
|
Tail Section Integration 4
|
Details
|
|
|
06-11-2017
|
2.00
|
Tail Section Integration 3
|
Details
|
|
|
06-10-2017
|
2.00
|
Tail Section Integration 2
|
Details
|
|
|
05-29-2017
|
4.00
|
Tail Section Integration 1
|
Details
|
|
|
05-27-2017
|
1.50
|
Wing Electrical DSubs
|
Details
|
|
|
05-21-2017
|
1.50
|
Stabilizer Install 5
|
Details
|
|
|
05-20-2017
|
1.00
|
Wing Underside Polish Complete
|
Details
|
|
|
05-19-2017
|
1.50
|
Stabilizer Install 4
|
Details
|
|
|
05-15-2017
|
1.00
|
Stabilizer Install 3
|
Details
|
|
|
04-30-2017
|
2.00
|
Rudder Installation 2
|
Details
|
|
|
04-29-2017
|
2.00
|
Wing Underside Polish 4
|
Details
|
|
|
04-23-2017
|
2.00
|
Wing Underside Polish 3
|
Details
|
|
|
04-18-2017
|
1.50
|
Wing Underside Polish 2
|
Details
|
|
|
04-15-2017
|
2.00
|
Wing Underside Polish 1
|
Details
|
|
|
04-14-2017
|
2.00
|
Wings into The Wing Frame
|
Details
|
|
|
04-10-2017
|
1.50
|
Stabilizer Install 2
|
Details
|
|
|
04-01-2017
|
2.00
|
Wing Frame Complete
|
Details
|
|
|
03-29-2017
|
2.00
|
Wing Frame Construction 2
|
Details
|
|
|
03-26-2017
|
1.00
|
Stabilizer Install 1
|
Details
|
|
|
03-19-2017
|
1.50
|
Wing Frame Construction 1
|
Details
|
|
|
03-16-2017
|
2.00
|
Moved Fuselage to Airport
|
Details
|
|
|
03-10-2017
|
1.50
|
Access Door Installed
|
Details
|
|
|
03-03-2017
|
1.50
|
Rudder Installation 1
|
Details
|
|
|
02-19-2017
|
1.50
|
Right Wing Nav/Strobe Power Cable Secured
|
Details
|
|
|
02-12-2017
|
2.50
|
ADAHRS Mounted
|
Details
|
|
|
02-08-2017
|
1.00
|
ADAHRS Leveling Shims
|
Details
|
|
|
02-07-2017
|
2.50
|
Aft Fuselage Wiring 1
|
Details
|
|
|
11-27-2016
|
1.50
|
Exhaust Pipe Installation
|
Details
|
|
|
11-19-2016
|
1.00
|
Begin Reassembling Fuselage
|
Details
|
|
|
11-18-2016
|
1.00
|
Brake Lines Secure
|
Details
|
|
|
10-24-2016
|
1.00
|
ADS-B Antenna Install
|
Details
|
|
|
10-22-2016
|
0.50
|
Fuel Plumbing Through the Cabin Complete
|
Details
|
|
|
10-17-2016
|
1.00
|
Fuel Plumbing Through the Cabin 8
|
Details
|
|
|
10-16-2016
|
2.50
|
Fuel Plumbing Through the Cabin 7
|
Details
|
|
|
10-15-2016
|
1.50
|
Fuel Plumbing Through the Cabin 6
|
Details
|
|
|
10-12-2016
|
0.50
|
Fuel Plumbing Through the Cabin 5
|
Details
|
|
|
10-11-2016
|
1.00
|
Engine Ignition Switch Troubleshooting 2
|
Details
|
|
|
10-09-2016
|
2.50
|
Engine Ignition Switch Troubleshooting
|
Details
|
|
|
10-08-2016
|
2.50
|
Fuel Plumbing Through the Cabin 4
|
Details
|
|
|
10-05-2016
|
1.50
|
Fuel Plumbing Through the Cabin 3
|
Details
|
|
|
10-03-2016
|
1.00
|
Fuel Plumbing Through the Cabin 2
|
Details
|
|
|
09-30-2016
|
1.00
|
ELT Batteries Installation Complete
|
Details
|
|
|
09-28-2016
|
1.50
|
Replaced Parking Brake Control Cable
|
Details
|
|
|
09-27-2016
|
1.00
|
Fuel Plumbing Through the Cabin 1
|
Details
|
|
|
09-25-2016
|
1.00
|
Wiring Through the Cockpit Complete
|
Details
|
|
|
09-18-2016
|
1.00
|
Wiring Through the Cockpit 4
|
Details
|
|
|
09-16-2016
|
0.00
|
Hangar Clean Up / Set Up
|
Details
|
|
|
09-15-2016
|
1.50
|
Wiring Through the Cockpit 3
|
Details
|
|
|
09-14-2016
|
1.00
|
Transponder Antenna Complete
|
Details
|
|
|
09-13-2016
|
1.00
|
Transponder Antenna
|
Details
|
|
|
09-11-2016
|
2.00
|
Wiring through the Cockpit 2
|
Details
|
|
|
09-09-2016
|
2.00
|
Wiring through the Cockpit 1
|
Details
|
|
|
09-02-2016
|
3.00
|
Finishing Up the Avionics Bay
|
Details
|
|
|
09-01-2016
|
2.50
|
Avionics Bay Wiring Cleanup 8
|
Details
|
|
|
08-30-2016
|
1.50
|
Avionics Bay Wiring Cleanup 7
|
Details
|
|
|
08-28-2016
|
2.00
|
Avionics Bay Wiring Cleanup 6
|
Details
|
|
|
08-27-2016
|
2.00
|
Avionics Bay Wiring Cleanup 5
|
Details
|
|
|
08-25-2016
|
1.00
|
Avionics Bay Wiring Cleanup 4
|
Details
|
|
|
08-24-2016
|
1.00
|
Avionics Bay Wiring Cleanup 3
|
Details
|
|
|
08-23-2016
|
1.00
|
Avionics Bay Wiring Cleanup 2
|
Details
|
|
|
08-22-2016
|
0.50
|
Voltmeter connected
|
Details
|
|
|
08-21-2016
|
2.00
|
Avionics Bay Wiring Cleanup
|
Details
|
|
|
08-20-2016
|
3.00
|
Power Panel Wiring
|
Details
|
|
|
08-19-2016
|
2.00
|
Wiring Prep for Power Panel
|
Details
|
|
|
08-18-2016
|
1.50
|
ECU Power Switch & Warning Light Install
|
Details
|
|
|
08-17-2016
|
2.00
|
Center Console Wiring Completion 1
|
Details
|
|
|
08-15-2016
|
1.00
|
ECU Power Wiring
|
Details
|
|
|
08-14-2016
|
3.00
|
Engine Bay Final Wiring 2
|
Details
|
|
|
08-13-2016
|
2.00
|
Engine Bay Final Wiring 1
|
Details
|
|
|
08-12-2016
|
2.00
|
Fuel Pumps Wiring Complete
|
Details
|
|
|
08-11-2016
|
1.00
|
Fuel Pumps Wiring
|
Details
|
|
|
08-09-2016
|
1.00
|
Regulator/Rectifier Wired up
|
Details
|
|
|
08-08-2016
|
1.00
|
Closed Firewall Break / Fuel Pump Relay
|
Details
|
|
|
08-07-2016
|
2.50
|
Right Nav/Strobe Wiring and Fire Extinguisher
|
Details
|
|
|
08-06-2016
|
2.00
|
Sparl Plug Wire Mount/ Misc
|
Details
|
|
|
08-02-2016
|
1.50
|
Reorganizing Electrical Wiring
|
Details
|
|
|
07-20-2016
|
1.00
|
Left Nav/Strobe/Landing/Taxi Lights Wiring
|
Details
|
|
|
07-19-2016
|
1.00
|
Manifold Pressure Sensor Hose install
|
Details
|
|
|
07-17-2016
|
1.50
|
Elevator Trim Wiring Finished - Begin Aileron
|
Details
|
|
|
07-16-2016
|
1.50
|
Elevator Trim Wiring Connections
|
Details
|
|
|
07-13-2016
|
1.50
|
Trim Servo Relay Installation
|
Details
|
|
|
07-12-2016
|
1.50
|
Elevator Trim Indicator Wiring
|
Details
|
|
|
07-11-2016
|
0.50
|
Re-wired Ignition Switch/GPS
|
Details
|
|
|
07-10-2016
|
1.00
|
Aileron Trim Wiring
|
Details
|
|
|
07-09-2016
|
1.50
|
Control Stick Wiring 2
|
Details
|
|
|
07-06-2016
|
1.00
|
Dynon USB Port Extension Installation
|
Details
|
|
|
07-04-2016
|
1.50
|
Control Stick Wiring and Sizing
|
Details
|
|
|
07-02-2016
|
0.50
|
Center Console Side Panels Painted
|
Details
|
|
|
07-01-2016
|
1.50
|
Ignition Switch Wiring
|
Details
|
|
|
06-30-2016
|
2.00
|
GPS Antenna Mount Bracing
|
Details
|
|
|
06-28-2016
|
1.50
|
Manifold Pressure Sensor Wiring
|
Details
|
|
|
06-27-2016
|
2.00
|
ELT Wiring
|
Details
|
|
|
06-24-2016
|
1.50
|
Ammeter Sensor Wiring
|
Details
|
|
|
06-23-2016
|
1.50
|
Flap Switch Wiring
|
Details
|
|
|
06-22-2016
|
1.50
|
Misc Wiring To-dos
|
Details
|
|
|
06-19-2016
|
1.50
|
Trim Indicators Wiring
|
Details
|
|
|
06-18-2016
|
1.00
|
GPS Wiring
|
Details
|
|
|
06-17-2016
|
1.00
|
USB Charging Port
|
Details
|
|
|
06-16-2016
|
1.00
|
Fuel Selector Switch Wiring
|
Details
|
|
|
06-15-2016
|
1.00
|
Electrical Wiring 8
|
Details
|
|
|
06-14-2016
|
1.50
|
Electrical Wiring 7
|
Details
|
|
|
06-12-2016
|
2.00
|
Electrical Wiring 6
|
Details
|
|
|
06-10-2016
|
1.50
|
Electrical Wiring 5
|
Details
|
|
|
06-07-2016
|
1.00
|
Electrical Wiring 4
|
Details
|
|
|
06-06-2016
|
1.00
|
Electrical Wiring 3
|
Details
|
|
|
06-04-2016
|
3.00
|
Electrical Wiring 2
|
Details
|
|
|
05-29-2016
|
1.00
|
Electrical Wiring 1
|
Details
|
|
|
05-22-2016
|
1.00
|
Initial Engine Monitoring System (EMS) Wiring
|
Details
|
|
|
05-21-2016
|
1.50
|
More Power Cables Plus Fix'ems
|
Details
|
|
|
05-18-2016
|
0.50
|
Dual Throttle Linkage Complete
|
Details
|
|
|
05-13-2016
|
1.00
|
Added Brake Fluid
|
Details
|
|
|
05-11-2016
|
1.00
|
ELT Housing Install 3
|
Details
|
|
|
05-09-2016
|
1.00
|
ELT Housing Install 2
|
Details
|
|
|
05-08-2016
|
1.00
|
ELT Housing Install 1
|
Details
|
|
|
05-07-2016
|
1.00
|
Installed ELT Antenna
|
Details
|
|
|
05-04-2016
|
1.00
|
Continued Wiring Avionics
|
Details
|
|
|
04-30-2016
|
1.00
|
VHF Comm Antenna Install
|
Details
|
|
|
04-29-2016
|
1.50
|
Throttle Installation Part 1
|
Details
|
|
|
04-28-2016
|
0.50
|
ACK (ELT) Control Head Instal
|
Details
|
|
|
04-27-2016
|
1.00
|
Approach Fast-Track Hub Installation
|
Details
|
|
|
04-26-2016
|
0.50
|
Fresh Air Vent Hoses Install
|
Details
|
|
|
04-25-2016
|
2.00
|
Instrument Panel/Avionics Shelf Install
|
Details
|
|
|
04-21-2016
|
1.40
|
Instrument Panel Final Touches
|
Details
|
|
|
04-20-2016
|
1.00
|
Center Console Vinyl Overlay
|
Details
|
|
|
04-18-2016
|
1.00
|
Instrument Panel Vinyl Overlay
|
Details
|
|
|
04-07-2016
|
0.50
|
Center Console 3
|
Details
|
|
|
04-06-2016
|
1.50
|
Center Console 2
|
Details
|
|
|
04-05-2016
|
1.50
|
Center Console Switches, Displays, Controls, Plugs
|
Details
|
|
|
03-31-2016
|
1.00
|
GPS Antenna Mounted
|
Details
|
|
|
03-01-2016
|
0.50
|
Ram Mount Install
|
Details
|
|
|
02-29-2016
|
1.00
|
Control Stick Grip
|
Details
|
|
|
02-28-2016
|
2.00
|
Avionics Install 4
|
Details
|
|
|
02-21-2016
|
2.50
|
Avionics Install 3
|
Details
|
|
|
02-20-2016
|
1.00
|
Avionics Install 2
|
Details
|
|
|
02-14-2016
|
1.00
|
Avionics Install 1
|
Details
|
|
|
01-29-2016
|
2.50
|
Instrument Panel 6 - Glove Box 4
|
Details
|
|
|
01-28-2016
|
1.00
|
InstrumentPanel 5 - Glove Box 3
|
Details
|
|
|
01-27-2016
|
1.00
|
Instrument Panel 4 - Glove Box 2
|
Details
|
|
|
01-26-2016
|
1.00
|
Instrument Panel 3 - Glove Box 1
|
Details
|
|
|
01-23-2016
|
2.00
|
Instrument Panel 2
|
Details
|
|
|
01-16-2016
|
1.00
|
Instrument Panel 1
|
Details
|
|
|
01-10-2016
|
0.50
|
Control Stick Cut
|
Details
|
|
|
01-09-2016
|
1.00
|
GPS Mount Fitting
|
Details
|
|
|
01-03-2016
|
1.50
|
GPS Antenna Mount Fabrication
|
Details
|
|
|
01-02-2016
|
1.50
|
Avionics Shelf 2
|
Details
|
|
|
01-01-2016
|
1.50
|
Avionics Shelf 1
|
Details
|
|
|
12-27-2015
|
1.50
|
ECU Wire Bus Secured
|
Details
|
|
|
12-26-2015
|
1.00
|
Misc Brakes and Landing Gear
|
Details
|
|
|
12-20-2015
|
1.50
|
Engine Control Unit (ECU) Mount
|
Details
|
|
|
12-19-2015
|
1.50
|
Brake Line Attached to Struts
|
Details
|
|
|
12-13-2015
|
1.50
|
Parking Brake Final Installation
|
Details
|
|
|
12-12-2015
|
2.00
|
Parking Brake Control Install
|
Details
|
|
|
12-11-2015
|
1.00
|
Forward fuel Hose Routing - Complete
|
Details
|
|
|
12-06-2015
|
1.00
|
Forward Fuel Hose Routing - Begin
|
Details
|
|
|
12-05-2015
|
1.00
|
Brake Line Routing (cont'd)
|
Details
|
|
|
12-04-2015
|
1.00
|
Brake Line Routing (cont'd)
|
Details
|
|
|
11-29-2015
|
1.00
|
Cowling Paint (Interior) Complete
|
Details
|
|
|
11-28-2015
|
2.00
|
Brake Line Routing (cont'd 2)
|
Details
|
|
|
11-22-2015
|
1.50
|
Brake Line Routing (cont'd)
|
Details
|
|
|
11-21-2015
|
1.50
|
Fuel Feed Line, Cowling Paint
|
Details
|
|
|
11-18-2015
|
1.00
|
Re-Install Brake Lines
|
Details
|
|
|
11-15-2015
|
1.00
|
Nose Gear Safety Wire
|
Details
|
|
|
11-14-2015
|
1.00
|
Baffle Seal Fasteners
|
Details
|
|
|
11-11-2015
|
1.00
|
Parking Brake Fiddling
|
Details
|
|
|
11-01-2015
|
1.50
|
Cowl Paint and Oil Line Tightening
|
Details
|
|
|
09-01-2015
|
1.00
|
Begin Avionics Installation
|
Details
|
|
|
08-29-2015
|
1.50
|
Tow Bar Attach Point
|
Details
|
|
|
08-26-2015
|
1.00
|
Final Cowl Fitting
|
Details
|
|
|
08-25-2015
|
1.00
|
Oil Filler Access Door Complete
|
Details
|
|
|
08-23-2015
|
1.50
|
Begin Oil Filler Access Door
|
Details
|
|
|
08-22-2015
|
1.50
|
Baffle Seals Complete
|
Details
|
|
|
08-12-2015
|
1.50
|
Baffle Seals 2
|
Details
|
|
|
08-11-2015
|
1.50
|
Complete Front Baffles/Start Baffle Seals
|
Details
|
|
|
08-09-2015
|
1.00
|
Front Baffles 3
|
Details
|
|
|
08-07-2015
|
1.00
|
Front Baffles 2
|
Details
|
|
|
08-06-2015
|
0.00
|
EAA Tech Counselor Meeting
|
Details
|
|
|
08-05-2015
|
1.00
|
Front Baffles 1
|
Details
|
|
|
08-03-2015
|
1.50
|
Cowling Install 3
|
Details
|
|
|
08-02-2015
|
0.00
|
Hangar Rental
|
Details
|
|
|
08-01-2015
|
1.00
|
Cowling Install 2
|
Details
|
|
|
07-29-2015
|
1.00
|
Cowling Install 1
|
Details
|
|
|
07-28-2015
|
1.00
|
Cowling Fit 5
|
Details
|
|
|
07-26-2015
|
2.00
|
Cowling Fit 4
|
Details
|
|
|
07-25-2015
|
2.00
|
Cowling Fit 3
|
Details
|
|
|
07-23-2015
|
1.50
|
Cowling Fit 2
|
Details
|
|
|
07-22-2015
|
1.00
|
Cowling Fit 1
|
Details
|
|
|
07-21-2015
|
1.00
|
Propeller - First Fitting
|
Details
|
|
|
07-20-2015
|
1.50
|
Forward Top Skin to Instrument Panel
|
Details
|
|
|
07-18-2015
|
1.00
|
Battery/Starter Cables Installed
|
Details
|
|
|
07-17-2015
|
1.50
|
Spark Plug Leads Complete
|
Details
|
|
|
07-16-2015
|
1.00
|
Final Install Baffles
|
Details
|
|
|
07-14-2015
|
1.00
|
Spark Plug Leads 2
|
Details
|
|
|
07-13-2015
|
1.00
|
Spark Plug Leads 1
|
Details
|
|
|
07-12-2015
|
1.00
|
EGT Probe Installaiton
|
Details
|
|
|
07-10-2015
|
1.00
|
Muffler Installation 2
|
Details
|
|
|
07-09-2015
|
1.00
|
Muffler Installation 1
|
Details
|
|
|
07-08-2015
|
1.50
|
Oil Pressure and CHT Sensors
|
Details
|
|
|
07-06-2015
|
1.00
|
Rectifier Regulator Hose
|
Details
|
|
|
07-05-2015
|
2.00
|
More Fuel Lines / Air Oil Separator Hoses
|
Details
|
|
|
07-04-2015
|
1.00
|
Fuel Line fitting
|
Details
|
|
|
07-03-2015
|
0.50
|
Oil Cooler Fitting 3
|
Details
|
|
|
07-02-2015
|
1.00
|
Oil Cooler Fitting 2
|
Details
|
|
|
07-01-2015
|
0.50
|
Oil Cooler Fitting 1
|
Details
|
|
|
06-30-2015
|
1.00
|
Baffles FItting 3
|
Details
|
|
|
06-29-2015
|
1.50
|
Baffles Fitting 2
|
Details
|
|
|
06-26-2015
|
1.50
|
Baffles Fitting
|
Details
|
|
|
06-25-2015
|
1.50
|
Install Air-Oil Separator and Fine Fuel Filter
|
Details
|
|
|
06-24-2015
|
1.50
|
Battery Box, Fuel Pump Housing Finish
|
Details
|
|
|
06-17-2015
|
2.00
|
Ignition Coil and Regulator/Rectifier
|
Details
|
|
|
06-16-2015
|
1.00
|
Mount Engine
|
Details
|
|
|
06-15-2015
|
1.50
|
Electric Fuel Selector Valve Install
|
Details
|
|
|
06-13-2015
|
2.00
|
Engine Prep for Mountng
|
Details
|
|
|
06-12-2015
|
1.00
|
Battery Box Nut Plates
|
Details
|
|
|
06-11-2015
|
1.50
|
Battery Box Fitting
|
Details
|
|
|
06-07-2015
|
2.00
|
Fuel Pump Setup
|
Details
|
|
|
06-07-2015
|
1.50
|
Engine Mount Cleanup and Paint
|
Details
|
|
|
06-06-2015
|
2.00
|
Engine Mount First Fitting
|
Details
|
|
|
06-04-2015
|
0.00
|
Unpacking New Shipment
|
Details
|
|
|
06-02-2015
|
0.00
|
Engine and Avionics Arrive!
|
Details
|
|
|
05-30-2015
|
2.00
|
Brake Lines 1
|
Details
|
|
|
05-12-2015
|
1.50
|
Center Console Nut Plates 2
|
Details
|
|
|
05-10-2015
|
2.00
|
Center Console Nut Plates 1
|
Details
|
|
|
05-02-2015
|
2.00
|
Parking Brake Mount
|
Details
|
|
|
04-30-2015
|
1.00
|
Brake Lines - Start
|
Details
|
|
|
04-29-2015
|
1.00
|
Center Console 5
|
Details
|
|
|
04-28-2015
|
1.50
|
Center Console 4
|
Details
|
|
|
04-27-2015
|
1.00
|
Center Console 3
|
Details
|
|
|
04-26-2015
|
1.50
|
Center Console 2
|
Details
|
|
|
04-25-2015
|
2.00
|
Center Console Begin
|
Details
|
|
|
04-19-2015
|
1.00
|
Steel Bungee Complete
|
Details
|
|
|
04-18-2015
|
2.00
|
Nosegear Steel Bungee
|
Details
|
|
|
04-11-2015
|
2.50
|
Fuselage Step Fairing Final
|
Details
|
|
|
04-05-2015
|
1.50
|
Fuselage Door Fitting
|
Details
|
|
|
03-29-2015
|
3.00
|
Fuselage Step Faring Begin
|
Details
|
|
|
10-05-2014
|
0.00
|
EAA Electrical Systems Workshop
|
Details
|
|
|
09-08-2014
|
0.00
|
Pausing Build - Extended Travel
|
Details
|
|
|
08-19-2014
|
0.50
|
Cabin Access Step Attach
|
Details
|
|
|
08-18-2014
|
1.50
|
Front Canopy Complete
|
Details
|
|
|
08-17-2014
|
1.00
|
Front Canopy Frame Gusset
|
Details
|
|
|
08-16-2014
|
5.00
|
Even More Polishing
|
Details
|
|
|
08-11-2014
|
3.00
|
More Polishing and Painted Steps
|
Details
|
|
|
08-10-2014
|
2.00
|
Aft Right Fuselage Polish
|
Details
|
|
|
08-03-2014
|
0.00
|
2. Photos with the Grandsons
|
Details
|
|
|
08-03-2014
|
1.50
|
1. Rear Canopy Final Install
|
Details
|
|
|
08-02-2014
|
2.00
|
Rear Top Skin Final Install
|
Details
|
|
|
07-31-2014
|
1.00
|
Cabin Access Step Fitting
|
Details
|
|
|
07-28-2014
|
2.00
|
Rear Top Skin Clean Up
|
Details
|
|
|
07-27-2014
|
1.00
|
Rear Top Skin Doublers
|
Details
|
|
|
07-26-2014
|
1.50
|
Drill Rear Canopy Skins to Bubble
|
Details
|
|
|
07-25-2014
|
1.00
|
Baggage Floor Carpet
|
Details
|
|
|
07-24-2014
|
1.50
|
Landing Gear Nuts and Rear Canopy Skin
|
Details
|
|
|
07-22-2014
|
1.50
|
Rear Canopy Skin Install
|
Details
|
|
|
07-21-2014
|
1.50
|
Reassemble canopy
|
Details
|
|
|
07-19-2014
|
2.00
|
Fuselage and Canopy Finishing
|
Details
|
|
|
07-18-2014
|
2.50
|
Baggage Floor Paint/Rear Frame Cover
|
Details
|
|
|
07-17-2014
|
2.00
|
Baggage Floor Rivet
|
Details
|
|
|
07-16-2014
|
1.50
|
Baggage Floor Final Install 1
|
Details
|
|
|
07-15-2014
|
1.50
|
Canopy Lock Finish & Upper Channel Complete
|
Details
|
|
|
07-14-2014
|
3.00
|
Fit Rear Canopy - Begin Canopy Cleanup
|
Details
|
|
|
07-12-2014
|
2.00
|
Front Canopy Forward Frame Install
|
Details
|
|
|
07-11-2014
|
1.50
|
Front Canopy Trim & Updrill
|
Details
|
|
|
07-09-2014
|
1.50
|
Canopy Cut in Two - Begin Front Canopy
|
Details
|
|
|
07-08-2014
|
1.50
|
Canopy Bubble Fitting 3
|
Details
|
|
|
07-07-2014
|
2.00
|
Canopy Bubble Fitting 2
|
Details
|
|
|
07-06-2014
|
2.50
|
Canopy Bubble Fitting
|
Details
|
|
|
07-04-2014
|
2.00
|
Canopy Frame Updrill
|
Details
|
|
|
07-01-2014
|
1.50
|
Forward Canopy Frame Fitting
|
Details
|
|
|
06-29-2014
|
1.00
|
Canopy Side Frame Handle
|
Details
|
|
|
06-28-2014
|
2.50
|
Forward Rear Canopy Frame Fitting
|
Details
|
|
|
06-27-2014
|
2.00
|
2. Bulkheads Final Installation
|
Details
|
|
|
06-27-2014
|
2.00
|
1. Removable Seat Backs
|
Details
|
|
|
06-26-2014
|
1.00
|
2. Aft Rear Canopy Frame Cut
|
Details
|
|
|
06-26-2014
|
0.25
|
1. Unpack Canopy Bubble
|
Details
|
|
|
06-25-2014
|
1.00
|
Canopy Frame Measure
|
Details
|
|
|
06-24-2014
|
1.00
|
Canopy Frame Start
|
Details
|
|
|
06-23-2014
|
1.00
|
Shoulder Harness Attach Points
|
Details
|
|
|
06-22-2014
|
2.00
|
Forward Top Skin Complete (Mostly)
|
Details
|
|
|
06-21-2014
|
2.00
|
Forward Top Skin 4
|
Details
|
|
|
06-20-2014
|
2.00
|
Forward Top Skin 3
|
Details
|
|
|
06-19-2014
|
2.00
|
Forward Top Skin 2
|
Details
|
|
|
06-17-2014
|
2.00
|
Canopy Locking Mechanism Complete
|
Details
|
|
|
06-16-2014
|
1.50
|
Canopy Locking Mechanism Paint
|
Details
|
|
|
06-14-2014
|
4.00
|
Begin Canpy Locking Mechanism
|
Details
|
|
|
06-13-2014
|
1.00
|
Right Canopy Latch Install
|
Details
|
|
|
06-11-2014
|
1.50
|
Left Canopy Latch Install
|
Details
|
|
|
06-09-2014
|
1.00
|
Canopy Frame Bottom Bracket Install
|
Details
|
|
|
06-08-2014
|
1.00
|
Nosewheel Steering Linkages
|
Details
|
|
|
06-07-2014
|
1.00
|
Landing Gear Complete
|
Details
|
|
|
06-06-2014
|
2.50
|
Start Forward Top Skin
|
Details
|
|
|
06-04-2014
|
1.50
|
Main Wheels/Brakes Attach
|
Details
|
|
|
06-03-2014
|
1.50
|
Lower Elevator Cable Installed
|
Details
|
|
|
06-02-2014
|
0.50
|
Nosegear Shock Cord Install
|
Details
|
|
|
06-01-2014
|
2.00
|
Aileron Fairleads Completed
|
Details
|
|
|
05-31-2014
|
1.00
|
Begin Aileron Fairleads
|
Details
|
|
|
05-30-2014
|
2.50
|
Spring (Main) Gear Test Mount
|
Details
|
|
|
05-28-2014
|
2.00
|
Tech Counselor Visit
|
Details
|
|
|
05-26-2014
|
2.00
|
Main Gear Left Brake Fitting
|
Details
|
|
|
05-25-2014
|
2.00
|
Nose Gear Compete (Mostly)
|
Details
|
|
|
05-24-2014
|
1.50
|
Main Gear Start
|
Details
|
|
|
05-23-2014
|
2.50
|
Nose Gear Progress
|
Details
|
|
|
05-22-2014
|
1.50
|
Nose Gear Bearing Support
|
Details
|
|
|
05-21-2014
|
2.00
|
Nose Gear Strut Assembly
|
Details
|
|
|
05-20-2014
|
1.50
|
Install Cool Air Vent
|
Details
|
|
|
05-19-2014
|
1.50
|
Engine Mounts Complete
|
Details
|
|
|
05-18-2014
|
1.50
|
Upper Engine Mount Updrill
|
Details
|
|
|
05-17-2014
|
1.50
|
Rudder and Elevator Cables Install
|
Details
|
|
|
05-16-2014
|
4.00
|
Finishing Kit Unload and Inventory
|
Details
|
|
|
05-12-2014
|
1.00
|
Saddle Fitting
|
Details
|
|
|
05-11-2014
|
1.50
|
Painting More Steel Parts
|
Details
|
|
|
05-09-2014
|
2.00
|
Rear Top Skin Tail Cut Out
|
Details
|
|
|
05-08-2014
|
1.00
|
Top Skin Trim
|
Details
|
|
|
05-06-2014
|
1.00
|
Horizontal Stabilizer Attach
|
Details
|
|
|
05-05-2014
|
1.00
|
Rear Top Skin Updrill
|
Details
|
|
|
05-05-2014
|
1.50
|
Rear Top Skin Drill Out
|
Details
|
|
|
05-03-2014
|
1.50
|
Rear Top Skin Fitting
|
Details
|
|
|
05-02-2014
|
2.00
|
Begin Rear Top Skin Install
|
Details
|
|
|
05-01-2014
|
1.00
|
Flap Install Complete & Tested
|
Details
|
|
|
04-28-2014
|
2.00
|
Flap Actuator Installation
|
Details
|
|
|
04-27-2014
|
1.50
|
Rear Frame, Upper Longeron Doubler Complete
|
Details
|
|
|
04-26-2014
|
1.00
|
Riveting the Forward Fuselage 7
|
Details
|
|
|
04-25-2014
|
3.00
|
Riveting the Forward Fuselage 6 (Seats)
|
Details
|
|
|
04-24-2014
|
1.50
|
Riveting the Forward Fuselage 5
|
Details
|
|
|
04-23-2014
|
2.00
|
Riveting Forward Fuselage 4 (Gear Attachments)
|
Details
|
|
|
04-22-2014
|
1.50
|
Riveting the Forward Fuselage 3
|
Details
|
|
|
04-21-2014
|
4.00
|
Riveting the Forward Fuselage 2
|
Details
|
|
|
04-20-2014
|
2.00
|
Riveting the Forward Fuselage 1
|
Details
|
|
|
04-19-2014
|
2.00
|
Upper Longeron Doubler, Longeron Splice
|
Details
|
|
|
04-18-2014
|
2.00
|
Forward Skin Drill out, Upper Longeron Doubler
|
Details
|
|
|
04-17-2014
|
1.00
|
Continued Cleanup and Reassembly (4)
|
Details
|
|
|
04-15-2014
|
1.00
|
Continued Cleanup and Reassembly (3)
|
Details
|
|
|
04-14-2014
|
3.00
|
Continued Cleanup and Reassembly (2)
|
Details
|
|
|
04-13-2014
|
5.00
|
Rear Frame Channel, Upper Seat Back
|
Details
|
|
|
04-12-2014
|
2.50
|
Reassembly with Deburring, Filing, Sanding
|
Details
|
|
|
04-11-2014
|
0.00
|
Off the Table - On the Sawhorses
|
Details
|
|
|
04-10-2014
|
1.00
|
Rudder Pedals, Brakes & Fairleads
|
Details
|
|
|
04-08-2014
|
1.50
|
Brakes Install and Flap Actuator Start
|
Details
|
|
|
04-07-2014
|
1.50
|
Cabin Floor Rivet
|
Details
|
|
|
04-06-2014
|
2.00
|
Cabin Floor Final Prep
|
Details
|
|
|
04-05-2014
|
1.50
|
Center Spar Final Prep and Rudder Fairleads
|
Details
|
|
|
04-04-2014
|
2.00
|
Backup Aileron Limiter
|
Details
|
|
|
03-30-2014
|
2.00
|
Begin Final Prep Cabin Floor
|
Details
|
|
|
03-29-2014
|
1.50
|
Firewall Fuselage Skin Drill Out
|
Details
|
|
|
03-28-2014
|
1.50
|
Outboard Seatbelt Attach Points
|
Details
|
|
|
03-27-2014
|
2.00
|
Seat Bottoms and Arm Rest Complete
|
Details
|
|
|
03-24-2014
|
1.50
|
Seat Parts Riveted
|
Details
|
|
|
03-23-2014
|
2.50
|
Seats Updrill & Final Prep
|
Details
|
|
|
03-20-2014
|
1.50
|
Arm Rest Continued
|
Details
|
|
|
03-17-2014
|
2.00
|
Arm Rest Start
|
Details
|
|
|
03-16-2014
|
2.00
|
Forward Seat Panel Reinforcement
|
Details
|
|
|
03-15-2014
|
2.00
|
Install Front Seat Panel
|
Details
|
|
|
03-14-2014
|
1.50
|
Control Stick Torque Tube Install
|
Details
|
|
|
03-12-2014
|
1.50
|
Flap Linear Actuator Mount
|
Details
|
|
|
03-11-2014
|
1.00
|
Flap Actuator Hole Reinforcement
|
Details
|
|
|
03-10-2014
|
1.50
|
Center Seat Back Supports
|
Details
|
|
|
03-09-2014
|
1.50
|
Right Side Forward Fuselage Stiffeners
|
Details
|
|
|
03-08-2014
|
2.00
|
Left & Right Fuselage Stiffeners
|
Details
|
|
|
03-07-2014
|
2.00
|
Left Forward Cockpit Skin Reinforcements
|
Details
|
|
|
03-06-2014
|
1.50
|
Baggage Floor Complete Drillout
|
Details
|
|
|
03-03-2014
|
2.50
|
Forward Skin Match Drill
|
Details
|
|
|
03-02-2014
|
2.00
|
Baggage Floor Initial Drill Out
|
Details
|
|
|
03-01-2014
|
1.50
|
Baggage Floor Fitting
|
Details
|
|
|
02-26-2014
|
2.00
|
Left Side Upright Doubler and Side Doubler
|
Details
|
|
|
02-24-2014
|
2.00
|
Right Side Upright Doubler and Side Doubler
|
Details
|
|
|
02-23-2014
|
2.00
|
Seat Back Side Angle/Flap Gusset
|
Details
|
|
|
02-22-2014
|
1.50
|
Updrill of Cabin Floor
|
Details
|
|
|
02-21-2014
|
1.50
|
Center Seat Back Attached
|
Details
|
|
|
02-20-2014
|
1.00
|
Baggage Compartment Floor
|
Details
|
|
|
02-19-2014
|
2.00
|
Baggage Area Start
|
Details
|
|
|
02-16-2014
|
2.50
|
Wing Uprights, Upright Channels, Instrument Panel
|
Details
|
|
|
02-15-2014
|
3.00
|
Gear Upright Gusset & Wing Uprights
|
Details
|
|
|
02-14-2014
|
3.00
|
Fuselage Side Skin Fitting & Gear Uprights
|
Details
|
|
|
02-12-2014
|
2.00
|
Cockpit Side Skins (Initial)
|
Details
|
|
|
02-11-2014
|
1.00
|
Steering Box Slide Cover & Bungee Support
|
Details
|
|
|
02-10-2014
|
3.00
|
Gear Mount, Rear Frame Channel, Seat Support
|
Details
|
|
|
02-09-2014
|
3.00
|
Engine Mounts & Longerons
|
Details
|
|
|
02-07-2014
|
1.00
|
Upper Engine Mounts and Longerons
|
Details
|
|
|
02-05-2014
|
1.00
|
Attach Firewall to Cabin Floor
|
Details
|
|
|
02-04-2014
|
0.00
|
Moving Back Out of the Basement
|
Details
|
|
|
02-02-2014
|
2.00
|
Firewall Complete
|
Details
|
|
|
02-01-2014
|
3.00
|
Firewall Updrill, Final Prep
|
Details
|
|
|
01-31-2014
|
1.00
|
Bottom Skin Doubler Install
|
Details
|
|
|
01-30-2014
|
1.50
|
Center Spar Drill Out
|
Details
|
|
|
01-27-2014
|
2.00
|
Brake Cylinders, Toe Brakes Install
|
Details
|
|
|
01-25-2014
|
1.00
|
Firewall 3
|
Details
|
|
|
01-24-2014
|
1.50
|
Firewall 2
|
Details
|
|
|
01-23-2014
|
1.00
|
Begin Firewall
|
Details
|
|
|
01-21-2014
|
1.50
|
Upper Rudder Hinge, Gear Channel
|
Details
|
|
|
01-20-2014
|
2.50
|
Rear Fuselage Rivet
|
Details
|
|
|
01-19-2014
|
2.50
|
Finished Final Prep Rear Fuselage
|
Details
|
|
|
01-18-2014
|
1.50
|
Rear Fuselage Begin Final Prep
|
Details
|
|
|
01-17-2014
|
3.00
|
Rear Fuselage Final Updrill & Disassembly
|
Details
|
|
|
01-14-2014
|
1.50
|
Right Side Updrill, Rudder Pedals Install
|
Details
|
|
|
01-13-2014
|
3.00
|
Left Side Updrill, Cabin Floor Initial Fitting
|
Details
|
|
|
01-11-2014
|
1.50
|
Horizontal Tail Mounts, Rudder Cable Fairing
|
Details
|
|
|
01-09-2014
|
1.50
|
Rear Fuselage (Tail Area)
|
Details
|
|
|
01-08-2014
|
1.00
|
Finish Left Rear Skin Fit, Start Rear Top Panel
|
Details
|
|
|
01-06-2014
|
2.00
|
Right Rear Side Skin Fitting
|
Details
|
|
|
01-05-2014
|
2.50
|
Begin Rear Side Skins
|
Details
|
|
|
01-04-2014
|
3.00
|
Fuselage Access Door
|
Details
|
|
|
01-03-2014
|
3.00
|
Fuselage Bottom Skin Rivet
|
Details
|
|
|
01-02-2014
|
1.50
|
Fuselage Rear Bottom Final Prep
|
Details
|
|
|
01-01-2014
|
1.50
|
Lower Rudder Hinge, Rear Bottom Updrill
|
Details
|
|
|
12-31-2013
|
1.50
|
Finish Bottom Cross Braces, Begin Rudder Hinge
|
Details
|
|
|
12-30-2013
|
1.00
|
Bottom Longeron Fit and Match Drill
|
Details
|
|
|
12-29-2013
|
1.50
|
Bottom Skin Cross Braces
|
Details
|
|
|
12-28-2013
|
1.50
|
Wing Lift & Horizontal Tail Frame
|
Details
|
|
|
12-27-2013
|
1.00
|
Right Wing Lift Ceiling Hooks
|
Details
|
|
|
12-26-2013
|
1.50
|
Right Wing Storage Lift Frame
|
Details
|
|
|
12-24-2013
|
2.00
|
Right Wing Complete
|
Details
|
|
|
12-23-2013
|
1.00
|
Right Aileron Final Assembly
|
Details
|
|
|
12-22-2013
|
2.00
|
Right Wing Final Assembly
|
Details
|
|
|
12-21-2013
|
1.50
|
Right Wing Tank Final Installation
|
Details
|
|
|
12-20-2013
|
1.50
|
Right Wing Locker Finish, Wing Root Doubler Finish
|
Details
|
|
|
12-19-2013
|
2.00
|
Right Wing Final Debur and Paint
|
Details
|
|
|
12-18-2013
|
1.50
|
Right Wing Top Skin Debur/Paint
|
Details
|
|
|
12-16-2013
|
1.50
|
Right Wing Final Wiring, Top Skin Debur
|
Details
|
|
|
12-14-2013
|
1.00
|
Right Wing Nav/Strobe Wire Connector
|
Details
|
|
|
12-13-2013
|
1.50
|
Right Fuel Tank Leak Check
|
Details
|
|
|
12-09-2013
|
1.50
|
Fuel Filler Hole, Aileron Balance Weights
|
Details
|
|
|
12-07-2013
|
1.50
|
Right Wingtip Drill Out
|
Details
|
|
|
12-06-2013
|
1.50
|
Wing Locker Fasteners, Flap Gap Stop
|
Details
|
|
|
12-04-2013
|
1.50
|
Wing Locker Dzus Fasteners
|
Details
|
|
|
12-03-2013
|
2.00
|
Right Leading Edge Updrill, Wingtip Start
|
Details
|
|
|
12-02-2013
|
1.50
|
Right Leading Edge Skin Top Side
|
Details
|
|
|
12-01-2013
|
1.50
|
Fuel Sender, Wing Flip
|
Details
|
|
|
11-30-2013
|
2.00
|
Access Panel Covers (Bellcrank, Fuel)
|
Details
|
|
|
11-28-2013
|
2.00
|
Lower Leading Edge Skin Rivet
|
Details
|
|
|
11-27-2013
|
1.50
|
Right Leading Edge Debur, Sand, Paint
|
Details
|
|
|
11-26-2013
|
1.00
|
Paint Aileron Balance Weights, Leading Edge Debur
|
Details
|
|
|
11-25-2013
|
1.50
|
Right Nose Ribs Complete
|
Details
|
|
|
11-24-2013
|
1.00
|
Right Wing Lower Protection Plate
|
Details
|
|
|
11-22-2013
|
2.00
|
Wing Wiring, Aileron Stop, More Wing Locker
|
Details
|
|
|
11-21-2013
|
1.50
|
Right Aileron Control Cables and Pushrod
|
Details
|
|
|
11-20-2013
|
1.50
|
Right Aileron Fit and Drill Out
|
Details
|
|
|
11-18-2013
|
2.00
|
Wing Locker Door
|
Details
|
|
|
11-18-2013
|
2.00
|
Right Wing Top Skin Updrill, Aileron Test Fit
|
Details
|
|
|
11-17-2013
|
1.00
|
Wing Locker Back Wall, Dzus Strips
|
Details
|
|
|
11-16-2013
|
1.50
|
Skin Doubler Drill Out, Wing Locker Hinge
|
Details
|
|
|
11-15-2013
|
2.00
|
Wing Root Skin Doubler
|
Details
|
|
|
11-13-2013
|
2.00
|
Bottom Skin Rivet
|
Details
|
|
|
11-12-2013
|
2.00
|
Right Wing Bottom Skin Debur, Sand, and Paint
|
Details
|
|
|
11-11-2013
|
3.00
|
Install Right Flap, Updrill Leading Edge Skin
|
Details
|
|
|
11-10-2013
|
1.00
|
Rivet Right Wing Skeleton
|
Details
|
|
|
11-09-2013
|
4.00
|
Right Wing Stiffeners and Bellcrank Bracing
|
Details
|
|
|
11-08-2013
|
3.00
|
Start Right Wing Locker
|
Details
|
|
|
11-07-2013
|
2.00
|
Aileron Balance Bar Hole, Wing Tank Install
|
Details
|
|
|
11-06-2013
|
1.00
|
Right Wing Leading Edge Top Side Drill Out
|
Details
|
|
|
11-05-2013
|
2.00
|
Right Wing Bottom Skin Debur, Sand, and Paint
|
Details
|
|
|
11-04-2013
|
3.00
|
Right Wing Leading Edge Skin Attach
|
Details
|
|
|
11-02-2013
|
2.00
|
Right Wing Bottom Skin Drill Out
|
Details
|
|
|
11-01-2013
|
2.50
|
Right Wing Nose Rib Drill Out and Top Skin
|
Details
|
|
|
10-31-2013
|
2.00
|
Rear Channel and Nose Ribs Drill Out
|
Details
|
|
|
10-30-2013
|
2.50
|
Right Wing Rear Ribs Drill Out
|
Details
|
|
|
10-29-2013
|
2.00
|
Right Wing Aft Channel Complete
|
Details
|
|
|
10-28-2013
|
3.00
|
The Big Lift and Right Wing Rear Channel Debur
|
Details
|
|
|
10-27-2013
|
1.00
|
Begin Right Wing: Right Wing Rear Channel
|
Details
|
|
|
10-26-2013
|
2.00
|
Wing Storage Frame
|
Details
|
|
|
10-21-2013
|
4.00
|
Left Wing: Complete
|
Details
|
|
|
10-20-2013
|
6.00
|
Left Wing Final Assembly - Begin Riveting
|
Details
|
|
|
10-19-2013
|
3.00
|
Fuel Line Upgrade, Re-Swage Aileron Cables
|
Details
|
|
|
10-18-2013
|
3.00
|
Misc Tasks Before Left Wing Closing
|
Details
|
|
|
10-15-2013
|
1.00
|
EAA Tech Counselor Visit
|
Details
|
|
|
10-14-2013
|
1.00
|
Left Fuel Tank Install Start
|
Details
|
|
|
10-13-2013
|
1.50
|
Left Wing, Final Deburring/Sanding
|
Details
|
|
|
10-12-2013
|
1.00
|
Left Fuel Tank Leak Test
|
Details
|
|
|
10-11-2013
|
1.00
|
Left Wing Top Skin Final Prep
|
Details
|
|
|
10-04-2013
|
1.00
|
Top Skin Debur (Inside)
|
Details
|
|
|
10-03-2013
|
1.00
|
Top Skin Deburring
|
Details
|
|
|
10-02-2013
|
0.50
|
Pitot Tube Rivet
|
Details
|
|
|
09-28-2013
|
1.50
|
Install Pitot Tube
|
Details
|
|
|
09-27-2013
|
0.50
|
Lights Test
|
Details
|
|
|
09-26-2013
|
1.50
|
Left Wing Cats and Dogs
|
Details
|
|
|
09-25-2013
|
1.00
|
Wing Locker Side Wall Finishing
|
Details
|
|
|
09-24-2013
|
0.50
|
Wing Locker Skin Finishing
|
Details
|
|
|
09-23-2013
|
1.00
|
Wing Flap Gap Stop
|
Details
|
|
|
09-22-2013
|
2.00
|
Aileron Bellcrank Cross Braces and More Wiring
|
Details
|
|
|
09-21-2013
|
0.00
|
Zenith Open Hangar Event
|
Details
|
|
|
09-18-2013
|
1.00
|
Wing Wiring Complete
|
Details
|
|
|
09-16-2013
|
1.00
|
Wing Wiring
|
Details
|
|
|
09-15-2013
|
2.00
|
Landing/Taxi Light Lens Install
|
Details
|
|
|
09-15-2013
|
2.00
|
Bellcrank Channel Braces and More Wiring
|
Details
|
|
|
09-13-2013
|
1.00
|
Wingtip Drillout and Fuel Cap Fitting
|
Details
|
|
|
09-12-2013
|
1.00
|
Wing Locker Hinge Adjust / Aileron Weights Paint
|
Details
|
|
|
09-11-2013
|
1.00
|
Upper Skin Protection Plate
|
Details
|
|
|
09-10-2013
|
1.50
|
Left Wing Dzus Fasteners Complete
|
Details
|
|
|
09-07-2013
|
1.00
|
Left Wing Locker Dzus Fasteners
|
Details
|
|
|
09-05-2013
|
1.00
|
Fuel Cap Fitting
|
Details
|
|
|
09-03-2013
|
1.50
|
Landing Light Install
|
Details
|
|
|
09-02-2013
|
3.00
|
Landing Light Install & Fuel Filler Check
|
Details
|
|
|
09-01-2013
|
2.00
|
Fuel Tank Cork and Filler Hole
|
Details
|
|
|
08-31-2013
|
1.50
|
Install Fuel Senders (Left & Right)
|
Details
|
|
|
08-30-2013
|
1.50
|
Fuel Sender Calibration
|
Details
|
|
|
08-29-2013
|
1.00
|
Fuel Tank Fitting
|
Details
|
|
|
08-28-2013
|
1.50
|
Fuel Tank Access Panel Cover
|
Details
|
|
|
08-27-2013
|
2.00
|
Nose Ribs Rivet, Leading Edge Skin Rivet (Bottom)
|
Details
|
|
|
08-26-2013
|
1.50
|
Aileron Cables and Nose Ribs Final Prep
|
Details
|
|
|
08-23-2013
|
1.50
|
Wing Wiring
|
Details
|
|
|
08-21-2013
|
2.00
|
Aileron Cables
|
Details
|
|
|
08-20-2013
|
2.00
|
Left Wing Wiring, Tubes, and Lights
|
Details
|
|
|
08-17-2013
|
2.00
|
Left Nav/Strobe Light
|
Details
|
|
|
08-15-2013
|
2.00
|
Left Wing Wiring and Aileron Stop
|
Details
|
|
|
08-13-2013
|
1.50
|
Left Wing Locker Back Riveted
|
Details
|
|
|
08-07-2013
|
1.50
|
Aileron Bellcrank Access Port Cover
|
Details
|
|
|
08-06-2013
|
1.00
|
Wing Skin Protection Plate
|
Details
|
|
|
07-13-2013
|
1.50
|
Wing Locker Side Walls
|
Details
|
|
|
07-12-2013
|
1.00
|
Wing TIp Up and Top Skin Removed
|
Details
|
|
|
07-10-2013
|
2.00
|
Left Leading Edge Skin Final Prep
|
Details
|
|
|
07-09-2013
|
2.00
|
Nose Ribs Final Prep
|
Details
|
|
|
07-07-2013
|
2.50
|
Wingtip and Landing Light start
|
Details
|
|
|
07-06-2013
|
2.00
|
Bottom Nose Skin Updrill
|
Details
|
|
|
07-05-2013
|
1.50
|
Upper Nose Skin Drill Out
|
Details
|
|
|
07-04-2013
|
2.00
|
Top Skin Drill Out and Wing Locker Hinge Rivet
|
Details
|
|
|
07-03-2013
|
1.50
|
Wing Locker Cover and Rear Panel Rivet
|
Details
|
|
|
06-17-2013
|
1.00
|
Wing Root Doubler Drill Out
|
Details
|
|
|
06-16-2013
|
1.00
|
Wing Locker Rear Flange Drill Out
|
Details
|
|
|
06-15-2013
|
1.50
|
Nose RIbs and Skin Install
|
Details
|
|
|
06-14-2013
|
1.00
|
Re-re-re-measuring Nose Ribs.
|
Details
|
|
|
06-13-2013
|
1.50
|
Re-Assemble Nose Ribs
|
Details
|
|
|
06-12-2013
|
1.50
|
Wing Locker Door Reinforcement
|
Details
|
|
|
06-12-2013
|
0.00
|
Replacement Nose Skin Arrives
|
Details
|
|
|
06-11-2013
|
1.50
|
Wing Root Reinforcement
|
Details
|
|
|
06-10-2013
|
1.50
|
Wing Locker Hinge
|
Details
|
|
|
06-09-2013
|
2.00
|
Wing Locker Cut Out
|
Details
|
|
|
06-08-2013
|
2.00
|
Bottom Skin Rivet
|
Details
|
|
|
06-08-2013
|
1.50
|
Aileron Drillout and Balance
|
Details
|
|
|
06-07-2013
|
1.50
|
Rear Bottom Skin Clean Up
|
Details
|
|
|
06-06-2013
|
1.00
|
Pitot Tube Backing Plate
|
Details
|
|
|
06-05-2013
|
1.00
|
Bottom Rear Skin Final Updrill
|
Details
|
|
|
06-04-2013
|
1.50
|
Flap Hinge Drill Out, Pitot/Static Tube Install
|
Details
|
|
|
06-03-2013
|
1.50
|
Left Wing Bottom Skin Updrill
|
Details
|
|
|
06-02-2013
|
1.50
|
Left Wing Skeleton Rivet
|
Details
|
|
|
06-01-2013
|
2.50
|
Left Wing Skeleton Cleanup
|
Details
|
|
|
05-31-2013
|
1.00
|
Left Wing Rear Channel - Complete
|
Details
|
|
|
05-30-2013
|
1.50
|
Left Wing Rear Channel, Final Prep
|
Details
|
|
|
05-25-2013
|
4.00
|
Nose Skin, Top Side
|
Details
|
|
|
05-24-2013
|
1.50
|
The Big Flip
|
Details
|
|
|
05-22-2013
|
2.00
|
Nose Skin, Bottom Side
|
Details
|
|
|
05-21-2013
|
1.50
|
Nose Rib Alignment
|
Details
|
|
|
05-20-2013
|
2.00
|
Left Wing Rear Bottom Skin
|
Details
|
|
|
05-19-2013
|
2.00
|
Cross Braces
|
Details
|
|
|
05-16-2013
|
2.00
|
Rear Top Skin, Cross Braces
|
Details
|
|
|
05-15-2013
|
2.00
|
Left Wing, Rear Top Skin
|
Details
|
|
|
05-14-2013
|
2.00
|
Wing Leveling, Templates
|
Details
|
|
|
05-11-2013
|
3.00
|
Left Wing Skeleton Assembled
|
Details
|
|
|
05-10-2013
|
2.00
|
Attach Ribs to Main Spar (Left)
|
Details
|
|
|
05-09-2013
|
2.00
|
Left Wing Rear Channel
|
Details
|
|
|
05-08-2013
|
2.00
|
Bell Crank/Spar Tip Complete, Start Rear Channel
|
Details
|
|
|
05-07-2013
|
2.00
|
Aileron Bellcrank Assembly and Final Prep
|
Details
|
|
|
05-06-2013
|
1.00
|
Attach Spar Tips to Main Spars
|
Details
|
|
|
05-05-2013
|
2.00
|
Bell Crank Channels and Spar Tip L Angles
|
Details
|
|
|
05-03-2013
|
2.00
|
Nose Rib #1 - #3 Prep
|
Details
|
|
|
05-02-2013
|
2.00
|
Aileron Bellcrank Support
|
Details
|
|
|
05-01-2013
|
1.50
|
Ribs #1-#4 Stiffeners Complete
|
Details
|
|
|
04-30-2013
|
2.00
|
Ribs #1-#4 Updrill, Debur, and Paint
|
Details
|
|
|
04-29-2013
|
2.00
|
Assemble Rib Stiffeners
|
Details
|
|
|
04-28-2013
|
2.00
|
Organizing, Sorting Wing Components
|
Details
|
|
|
04-27-2013
|
2.00
|
Moved to Garage - Built New Workbench
|
Details
|
|
|
04-22-2013
|
3.00
|
Right Aileron Balance Bar
|
Details
|
|
|
04-21-2013
|
2.50
|
Right Aileron Piano Hinge
|
Details
|
|
|
04-20-2013
|
3.00
|
Right Aileron Assembly
|
Details
|
|
|
04-19-2013
|
1.50
|
Wired Left Aileron Trim Tab
|
Details
|
|
|
04-17-2013
|
2.00
|
Rivet Left Aileron
|
Details
|
|
|
04-16-2013
|
2.50
|
Left Aileron Debur, Cleanup, Corrosion Control
|
Details
|
|
|
04-15-2013
|
3.00
|
Left Aileron Hinge Mod - Part 2
|
Details
|
|
|
04-14-2013
|
2.00
|
Left Aileron Hinge Mod - Part 1
|
Details
|
|
|
04-13-2013
|
3.00
|
Left Aileron Balance Bar
|
Details
|
|
|
04-04-2013
|
2.00
|
Trim Tab Pushrod
|
Details
|
|
|
04-03-2013
|
2.00
|
Aileron Trim
|
Details
|
|
|
04-02-2013
|
4.00
|
Aileron Trim
|
Details
|
|
|
03-31-2013
|
3.00
|
Aileron Horn and Aileron Balance Arm
|
Details
|
|
|
03-30-2013
|
2.00
|
Start Left Aileron
|
Details
|
|
|
03-29-2013
|
2.00
|
Right Flap: Complete
|
Details
|
|
|
03-28-2013
|
1.00
|
Right Flap Prep
|
Details
|
|
|
03-26-2013
|
1.50
|
Right Flap Hinge
|
Details
|
|
|
03-25-2013
|
1.50
|
Begin Right Flap
|
Details
|
|
|
03-24-2013
|
2.00
|
Finished Left Flap
|
Details
|
|
|
03-23-2013
|
3.00
|
Left Flap Hinge
|
Details
|
|
|
03-22-2013
|
2.00
|
Left Flap Ribs and Skin
|
Details
|
|
|
03-20-2013
|
1.50
|
Wing Kit Arrives
|
Details
|
|
|
03-12-2013
|
2.00
|
Tail Section Polishing: Finished
|
Details
|
|
|
03-11-2013
|
6.00
|
More Polishing
|
Details
|
|
|
03-08-2013
|
8.00
|
Polishing Skin
|
Details
|
|
|
02-24-2013
|
1.00
|
Trim Servo Electrical
|
Details
|
|
|
02-21-2013
|
2.50
|
Trim Servo Access Cover
|
Details
|
|
|
02-18-2013
|
0.50
|
Tail Section Wrap Up
|
Details
|
|
|
02-17-2013
|
5.00
|
Elevator Cleanup, Corrision Control, Reassembly
|
Details
|
|
|
02-16-2013
|
5.00
|
Trim Servo and Elevator Cleanup
|
Details
|
|
|
02-10-2013
|
1.00
|
Trim Tab Assembly
|
Details
|
|
|
02-09-2013
|
2.50
|
Elevator Horns
|
Details
|
|
|
02-08-2013
|
2.00
|
Attach Elevator to Stabilizer
|
Details
|
|
|
02-07-2013
|
2.00
|
Finish Stabilizer, Continue Elevator
|
Details
|
|
|
02-06-2013
|
2.00
|
Final Prep, Elevator Start
|
Details
|
|
|
02-03-2013
|
1.50
|
Tip Ribs and Hinge
|
Details
|
|
|
02-02-2013
|
2.50
|
Top Skin
|
Details
|
|
|
02-02-2013
|
1.00
|
Bottom Skin
|
Details
|
|
|
02-01-2013
|
2.50
|
Bottom Skin
|
Details
|
|
|
01-31-2013
|
2.00
|
Skeleton Assembled
|
Details
|
|
|
01-31-2013
|
0.50
|
Setup for Horizontal Stablilizer Skin
|
Details
|
|
|
01-30-2013
|
1.00
|
Corrosion Control Skeleton
|
Details
|
|
|
01-29-2013
|
1.00
|
Deburr, Delabeling
|
Details
|
|
|
01-28-2013
|
1.00
|
Tip Rib Brackets
|
Details
|
|
|
01-26-2013
|
2.00
|
Spars and Ribs Pre-Assembly
|
Details
|
|
|
01-25-2013
|
1.00
|
Front Spar
|
Details
|
|
|
01-24-2013
|
2.00
|
Rear Spar Attachment
|
Details
|
|
|
01-23-2013
|
2.50
|
Rudder Final Assembly
|
Details
|
|
|
01-22-2013
|
2.00
|
Trimming Rudder Nose Skin
|
Details
|
|
|
01-21-2013
|
2.00
|
Rudder Nose Skin drilled/Cleco-fastened
|
Details
|
|
|
01-21-2013
|
0.50
|
Ordered Wing Kit with Options
|
Details
|
|
|
01-20-2013
|
4.00
|
Rudder Tail Skin Assembled
|
Details
|
|
|
01-19-2013
|
3.00
|
Finished the Rudder Skeleton
|
Details
|
|
|
01-17-2013
|
1.50
|
Started on the Rudder
|
Details
|
|
|
01-15-2013
|
2.00
|
First Big Box Arrives!
|
Details
|
|
|
01-06-2013
|
0.00
|
Built Work Bench
|
Details
|
|