Date
|
Hours
|
Work Log Summary

|
Details

|
05-02-2020
|
7.00
|
Test ELT, Swing compass, calibrate fuel gauges
|
Details
|
|
|
04-30-2020
|
2.00
|
Pitot/static and transponder checks
|
Details
|
 |
|
04-26-2020
|
8.00
|
Inspection prep, compass, prop cycle
|
Details
|
|
|
04-25-2020
|
7.00
|
Inspection prep
|
Details
|
|
|
04-18-2020
|
7.00
|
Boots and Seals
|
Details
|
|
|
04-11-2020
|
7.00
|
Idle circuit adjustments and taxi test
|
Details
|
|
|
04-05-2020
|
6.00
|
Weight and Balance
|
Details
|
|
|
04-04-2020
|
8.00
|
W&B Prep; fuel flow test at injectors
|
Details
|
|
|
03-29-2020
|
5.00
|
First engine start!
|
Details
|
|
|
03-28-2020
|
6.00
|
New fuel level sensors, rudder connections
|
Details
|
|
|
03-22-2020
|
5.00
|
Fuel flow testing
|
Details
|
|
|
03-16-2020
|
4.00
|
Fuel tank flushing
|
Details
|
|
|
03-14-2020
|
7.00
|
Aileron stops, clips, fairing
|
Details
|
|
|
03-12-2020
|
2.00
|
New tailwheel fork
|
Details
|
|
|
03-08-2020
|
4.00
|
Calibrate the electronic compass
|
Details
|
|
|
03-07-2020
|
3.00
|
Torque and safety prop
|
Details
|
|
|
02-23-2020
|
4.00
|
Fit root fairings
|
Details
|
|
|
02-16-2020
|
7.00
|
Wing walk and wingtip tuneup
|
Details
|
|
|
02-15-2020
|
9.00
|
Plumbing and wing tips
|
Details
|
|
|
02-09-2020
|
8.00
|
Wing pushrod and fuel plumbing
|
Details
|
|
|
02-01-2020
|
9.00
|
Wing fitup
|
Details
|
|
|
01-29-2020
|
3.00
|
Wings on!
|
Details
|
|
|
01-25-2020
|
6.00
|
Plumbing and wing install prep
|
Details
|
|
|
01-20-2020
|
8.00
|
Finalize pitot plumbing
|
Details
|
  |
|
01-12-2020
|
7.00
|
Install pitot
|
Details
|
|
|
12-29-2019
|
9.00
|
Rebuild left elevator II
|
Details
|
 |
|
12-27-2019
|
7.00
|
Rebuild left elevator I
|
Details
|
|
|
12-07-2019
|
6.00
|
Fit tailwheel
|
Details
|
|
|
12-02-2019
|
8.00
|
!! Hangar rash !!
|
Details
|
|
|
12-01-2019
|
6.00
|
Rivet on top deck
|
Details
|
|
|
11-30-2019
|
2.00
|
Add N Number
|
Details
|
 |
|
11-27-2019
|
6.00
|
Attach and adjust trim tab
|
Details
|
|
|
11-25-2019
|
6.00
|
Finalize rudder stops
|
Details
|
|
|
11-17-2019
|
8.00
|
Install tail
|
Details
|
|
|
11-07-2019
|
5.00
|
Upgrade hangar lighting
|
Details
|
 |
|
11-01-2019
|
6.00
|
Move to airport!
|
Details
|
|
|
10-20-2019
|
4.00
|
Bleed brakes
|
Details
|
 |
|
10-19-2019
|
4.00
|
Add washer under lower engine mount to raise nose
|
Details
|
|
|
10-12-2019
|
5.00
|
Fit cowl and measure gaps
|
Details
|
|
|
10-05-2019
|
8.00
|
Misc FF tasks
|
Details
|
|
|
09-15-2019
|
5.00
|
Cyl 2 baffle mods
|
Details
|
|
|
09-08-2019
|
8.00
|
Baffle wraps
|
Details
|
|
|
09-07-2019
|
6.00
|
Cowling smooth prime II
|
Details
|
 |
|
09-01-2019
|
7.00
|
Rudder stops; roll servo
|
Details
|
|
|
08-25-2019
|
9.50
|
Baffles IV + brakes
|
Details
|
|
|
08-04-2019
|
8.00
|
Fabricate front baffles III
|
Details
|
|
|
07-28-2019
|
6.00
|
Fabricate front baffles II
|
Details
|
|
|
07-14-2019
|
5.00
|
Add non-slip tape to brake pedals
|
Details
|
|
|
07-13-2019
|
7.00
|
Fab front baffles
|
Details
|
|
|
07-05-2019
|
6.50
|
Fit spinner II
|
Details
|
|
|
07-04-2019
|
8.00
|
Fit spinner I
|
Details
|
|
|
06-30-2019
|
8.60
|
Remove CS plug; start to fit spinner
|
Details
|
|
|
06-29-2019
|
9.00
|
R wingtip, data plate, faap hing pin keepers
|
Details
|
|
|
06-02-2019
|
4.50
|
Install wing tip lighting
|
Details
|
|
|
05-19-2019
|
4.00
|
Fab air filter retainer clip; install oil cooler
|
Details
|
|
|
05-12-2019
|
7.00
|
Add Cyl3 baffle mod
|
Details
|
|
|
04-14-2019
|
6.00
|
Panted inside of cowl
|
Details
|
|
|
04-13-2019
|
3.00
|
Finish snorkel; add alt air intake
|
Details
|
|
|
03-25-2019
|
4.00
|
Complete layup of snorkel mod
|
Details
|
|
|
03-24-2019
|
5.00
|
Shape plug and layup snorkel on engine
|
Details
|
|
|
03-23-2019
|
6.00
|
Rework snorkel for fit to baffle deck
|
Details
|
|
|
03-15-2019
|
7.00
|
Lay up plug flange
|
Details
|
|
|
03-12-2019
|
2.00
|
Seal snorkel plug
|
Details
|
 |
|
03-10-2019
|
6.00
|
Snorkel fitting 1
|
Details
|
|
|
03-09-2019
|
4.00
|
Snorkel fitting - tooling
|
Details
|
|
|
02-14-2019
|
0.10
|
FAA Registration issued!
|
Details
|
  |
|
02-06-2019
|
0.10
|
N430WB registration sent to FAA
|
Details
|
  |
|
01-27-2019
|
6.00
|
Brake lines, gear leg fairings 1
|
Details
|
|
|
01-26-2019
|
4.00
|
Cowl ramp mod 4
|
Details
|
|
|
01-21-2019
|
3.00
|
Cowl ramp mod 3
|
Details
|
|
|
01-20-2019
|
4.00
|
Cowl ramp mod 2
|
Details
|
|
|
01-19-2019
|
4.00
|
Cowl ramp mod 1
|
Details
|
|
|
01-13-2019
|
3.00
|
Sand down oil door rim
|
Details
|
|
|
12-31-2018
|
4.50
|
Fill in rim around oil door
|
Details
|
|
|
12-23-2018
|
5.00
|
Cowl fitting 7 - side joggles
|
Details
|
|
|
12-09-2018
|
6.50
|
Install prop gov linkage; cowl flanges
|
Details
|
|
|
12-02-2018
|
3.50
|
Fit top cowl intake ramps
|
Details
|
|
|
12-02-2018
|
3.00
|
Cowl Fitting 5
|
Details
|
|
|
11-18-2018
|
5.00
|
Fit oil door
|
Details
|
|
|
11-10-2018
|
3.50
|
Cowl fitting 5
|
Details
|
|
|
11-04-2018
|
5.00
|
Hang the prop! + Cowl fitting 4
|
Details
|
|
|
11-03-2018
|
4.00
|
Cowl fitting 3
|
Details
|
|
|
10-21-2018
|
6.50
|
Cowl fitting 2
|
Details
|
|
|
10-20-2018
|
4.00
|
Cowl fitting 1
|
Details
|
|
|
10-13-2018
|
2.00
|
Install rudder cable exit fairings
|
Details
|
 |
|
09-23-2018
|
3.00
|
Baffes 1
|
Details
|
|
|
09-22-2018
|
5.00
|
Manfold pressure, engine vent, ring gear
|
Details
|
|
|
09-09-2018
|
4.00
|
Sensor wire routing
|
Details
|
|
|
09-08-2018
|
2.00
|
Fabricate engine ground straps
|
Details
|
|
|
09-01-2018
|
4.50
|
Route EGT and CHT wiring
|
Details
|
|
|
08-26-2018
|
3.50
|
Modify throttle fitting for clearance
|
Details
|
|
|
08-19-2018
|
4.50
|
Install throttle and mixture brackets
|
Details
|
|
|
08-18-2018
|
6.00
|
Install heat muff and prop gov fitting
|
Details
|
|
|
08-12-2018
|
3.00
|
Initial fit of alternator and fan belt
|
Details
|
|
|
08-05-2018
|
3.50
|
Install EGT and CHT probes
|
Details
|
|
|
08-04-2018
|
5.50
|
Install exhaust stack (first time)
|
Details
|
|
|
07-15-2018
|
6.00
|
Install engine
|
Details
|
|
|
07-14-2018
|
5.00
|
Prep and install prop governer
|
Details
|
|
|
07-08-2018
|
6.00
|
Install wheels on landing gear
|
Details
|
|
|
07-04-2018
|
2.50
|
Prepping throttle bracket
|
Details
|
|
|
06-30-2018
|
4.50
|
Fix up wiring squawks on panel
|
Details
|
  |
|
06-17-2018
|
4.00
|
Install ANL fuses and current shunts 2
|
Details
|
|
|
06-16-2018
|
3.00
|
Install ANL fuses and current shunts 1
|
|
 |
|
06-09-2018
|
3.00
|
Targa strip 2
|
|
|
|
06-03-2018
|
3.00
|
Targa strip 1
|
|
 |
|
05-20-2018
|
8.50
|
Install aft canopy, vents
|
Details
|
|
|
05-19-2018
|
6.00
|
Tunnel cover, aft canopy install prep
|
Details
|
|
|
05-06-2018
|
4.50
|
Flap positioner
|
Details
|
|
|
05-05-2018
|
5.50
|
Coax and pitot routing
|
Details
|
|
|
04-30-2018
|
0.10
|
Engine arrived
|
Details
|
|
|
04-28-2018
|
7.00
|
Aeilron trim, copilot stick connector redux
|
|
|
|
04-22-2018
|
5.50
|
Install pushrods, tailwheel
|
Details
|
|
|
04-15-2018
|
6.50
|
Antenna install
|
Details
|
|
|
04-08-2018
|
6.00
|
Add connector for copilot removable stick
|
Details
|
|
|
04-01-2018
|
4.50
|
Panel smoke test
|
Details
|
 |
|
03-04-2018
|
8.00
|
Terminate panel wiring 2
|
Details
|
|
|
02-25-2018
|
8.00
|
Terminate panel wiring 1
|
Details
|
|
|
02-24-2018
|
7.00
|
Populate panel!
|
Details
|
|
|
02-19-2018
|
2.50
|
Apply lettering to panel
|
Details
|
|
|
02-18-2018
|
5.50
|
Fab and install fuel line from fuel flow to firewa
|
|
|
|
02-11-2018
|
6.00
|
Closeout of tunnel, fuel pump, fuel flow
|
Details
|
|
|
02-10-2018
|
4.50
|
Prime panel and terminate fuse block wiring
|
Details
|
|
|
02-04-2018
|
4.00
|
Terminate cable bundle from tunnel to tray
|
Details
|
|
|
02-03-2018
|
3.00
|
Terminate grounds to forest of tabs
|
Details
|
|
|
01-28-2018
|
4.50
|
Lace wiring in tunnel
|
Details
|
|
|
01-21-2018
|
3.50
|
Completion of subpanel
|
Details
|
  |
|
01-20-2018
|
4.00
|
Tunnel wiring
|
Details
|
  |
|
01-17-2018
|
0.10
|
Ordered engine and prop
|
Details
|
  |
|
01-07-2018
|
6.50
|
Panel fit-up
|
Details
|
 |
|
01-06-2018
|
7.50
|
Fab panel connector bracket and priming
|
Details
|
|
|
01-01-2018
|
8.50
|
Air vent and headseat brackets
|
Details
|
|
|
12-27-2017
|
7.00
|
Power and ground wiring I
|
Details
|
|
|
12-26-2017
|
7.00
|
Tray cable termination
|
Details
|
|
|
12-23-2017
|
6.00
|
Tray cable termination 1
|
Details
|
|
|
12-22-2017
|
7.00
|
Completion of tray electronics install
|
Details
|
 |
|
12-17-2017
|
5.00
|
Battery backup and CO detector
|
Details
|
|
|
12-03-2017
|
7.50
|
Tray wiring
|
Details
|
 |
|
11-26-2017
|
1.00
|
Tray wiring 1
|
Details
|
|
|
11-25-2017
|
9.00
|
Finish GAD27 wiring; start the tray
|
Details
|
|
|
11-22-2017
|
6.00
|
GAD27 wiring
|
Details
|
 |
|
11-21-2017
|
6.00
|
GAD27 wire arrangement
|
Details
|
|
|
11-20-2017
|
4.50
|
GAD27 wiring prep
|
Details
|
 |
|
10-07-2017
|
7.00
|
Tray fit-up and firewall feedthrough
|
Details
|
|
|
09-30-2017
|
6.50
|
GPS20A and pitch servo install
|
Details
|
|
|
09-24-2017
|
6.50
|
GPS20A bracket install
|
Details
|
 |
|
09-23-2017
|
3.00
|
Wing root wire termination - left
|
Details
|
|
|
09-10-2017
|
3.00
|
Wing root wire termination - right
|
Details
|
|
|
09-04-2017
|
6.50
|
Antenna stiffeners and fwd static line
|
Details
|
|
|
09-02-2017
|
4.00
|
Forward wiring runs
|
Details
|
|
|
08-12-2017
|
6.50
|
Fit panel center support
|
Details
|
|
|
03-26-2017
|
5.00
|
GAD27 Mount
|
Details
|
|
|
03-25-2017
|
2.00
|
Wingtip filling 6
|
Details
|
 |
|
03-25-2017
|
1.50
|
Drill GPS antenna mount
|
Details
|
|
|
03-19-2017
|
2.00
|
Wingtip fitting 5
|
Details
|
|
|
03-19-2017
|
3.50
|
Magnetometer shelf
|
Details
|
|
|
03-12-2017
|
2.00
|
Wheel assembly
|
Details
|
|
|
03-12-2017
|
3.50
|
GPS antenna plate
|
Details
|
|
|
03-05-2017
|
3.00
|
Wingtip fitting 4
|
Details
|
|
|
03-05-2017
|
3.00
|
Wingtip fitting 4
|
|
|
|
03-04-2017
|
3.00
|
Wingtip fitting 3
|
Details
|
 |
|
02-26-2017
|
8.00
|
Wingtip fitting 2
|
Details
|
|
|
02-19-2017
|
7.00
|
Wingtip fitting 1
|
Details
|
|
|
02-11-2017
|
6.50
|
Cowling prep - filling 3
|
Details
|
|
|
02-05-2017
|
5.00
|
Cowling prep - filling 2
|
Details
|
 |
|
02-04-2017
|
6.50
|
Cowling prep - filling 1
|
Details
|
|
|
01-28-2017
|
2.00
|
Static tubing clips
|
Details
|
 |
|
01-28-2017
|
3.00
|
Baffle prep - airbox fram
|
Details
|
 |
|
01-16-2017
|
6.00
|
Oil cooler prep
|
Details
|
 |
|
01-15-2017
|
5.00
|
Baffle work 1
|
Details
|
 |
|
01-02-2017
|
7.50
|
Install tailcone top skin 1
|
Details
|
|
|
01-01-2017
|
6.50
|
Install canopy positioner
|
Details
|
|
|
12-30-2016
|
4.00
|
Canopy fairing 4
|
Details
|
 |
|
12-29-2016
|
0.10
|
Canopy in action
|
Details
|
|
|
12-29-2016
|
7.00
|
Canopy fairing 3
|
Details
|
|
|
12-28-2016
|
4.00
|
Canopy fairing 2
|
Details
|
|
|
12-26-2016
|
4.50
|
Canopy fairing 1
|
Details
|
|
|
12-24-2016
|
4.00
|
Firewall prep 1
|
Details
|
|
|
12-18-2016
|
6.50
|
Install battry box and contactors
|
Details
|
|
|
12-18-2016
|
2.00
|
Firewall forward kit arrives
|
Details
|
 |
|
12-11-2016
|
4.00
|
Cabin work
|
Details
|
|
|
12-03-2016
|
5.50
|
Canopy fairing complete
|
Details
|
|
|
11-20-2016
|
5.00
|
Canopy fairing, static port, main gear releif
|
Details
|
|
|
11-19-2016
|
8.50
|
Canopy fairing 6 / engine mount
|
Details
|
|
|
11-13-2016
|
4.50
|
Canopy fairing 5
|
Details
|
|
|
11-06-2016
|
4.00
|
Canopy fairing 4
|
Details
|
|
|
11-01-2016
|
3.50
|
Canopy fairing 3
|
Details
|
|
|
10-29-2016
|
4.50
|
Canopy fairing 2
|
Details
|
|
|
10-23-2016
|
7.00
|
Canopy fairing 1 / latch
|
Details
|
|
|
10-22-2016
|
8.50
|
First canopy lift
|
Details
|
|
|
10-09-2016
|
6.00
|
Install avionics shelf
|
Details
|
|
|
10-08-2016
|
8.50
|
Aft avionics shelf
|
Details
|
|
|
09-25-2016
|
7.00
|
Canopy bonding
|
Details
|
|
|
09-22-2016
|
7.50
|
Prep for canopy bonding
|
Details
|
|
|
09-17-2016
|
6.00
|
Rivet canopy frame
|
Details
|
|
|
09-11-2016
|
3.50
|
Clamps for canopy bonding
|
Details
|
 |
|
09-11-2016
|
4.00
|
Canopy frame fit check
|
Details
|
|
|
09-10-2016
|
3.50
|
Pre-rivet canopy frame gussets
|
Details
|
 |
|
09-05-2016
|
3.50
|
Priming and painting canopy parts
|
Details
|
|
|
09-03-2016
|
3.00
|
Priming canopy frame
|
Details
|
 |
|
08-28-2016
|
7.50
|
Fitting canopy frame gussets
|
Details
|
|
|
08-27-2016
|
5.00
|
Riveting canopy frame and hoop
|
Details
|
|
|
08-21-2016
|
4.50
|
Initial fit of rear canopy
|
Details
|
|
|
08-20-2016
|
7.50
|
Canopy fitup - lexan IV
|
Details
|
|
|
08-14-2016
|
6.00
|
Canopy fitup - lexan III
|
Details
|
|
|
08-13-2016
|
8.00
|
Canopy fitup - lexan II big cut
|
Details
|
|
|
08-11-2016
|
8.00
|
Canopy fitup - lexan I
|
Details
|
|
|
08-07-2016
|
8.00
|
Canopy fitup V - redux
|
Details
|
|
|
07-31-2016
|
7.50
|
Canopy fitup IV - redux
|
Details
|
|
|
07-30-2016
|
8.00
|
Canopy fitup III - redux
|
Details
|
|
|
07-17-2016
|
4.50
|
Canopy hoop joiner plate
|
Details
|
 |
|
07-12-2016
|
5.00
|
Flap arm install
|
Details
|
|
|
07-10-2016
|
5.00
|
Canopy fitup III - redux
|
Details
|
|
|
07-03-2016
|
7.00
|
Canopy fitup II - redux
|
Details
|
|
|
06-26-2016
|
7.50
|
Canopy fitup I - redux
|
Details
|
|
|
05-29-2016
|
6.00
|
Canopy fitup V
|
Details
|
|
|
05-22-2016
|
5.00
|
Canopy fitup IV
|
Details
|
|
|
05-21-2016
|
8.00
|
Gas strut brackets, rear canopy fitup
|
Details
|
|
|
05-15-2016
|
6.00
|
Prep for more canopy work
|
Details
|
|
|
05-14-2016
|
6.00
|
Drill canopy hinge brackets
|
Details
|
|
|
05-08-2016
|
6.70
|
|
|
|
|
05-07-2016
|
7.00
|
Servo, skin, roll bar
|
Details
|
|
|
05-01-2016
|
7.50
|
Avionics tray
|
Details
|
|
|
04-30-2016
|
6.00
|
Canopy fitup III
|
Details
|
|
|
04-10-2016
|
5.00
|
Canopy fitup II
|
Details
|
|
|
04-09-2016
|
6.00
|
Canopy fitup I
|
Details
|
|
|
04-02-2016
|
5.00
|
Install canopy latch connect
|
Details
|
|
|
03-12-2016
|
2.50
|
Wingtip filling 1
|
Details
|
|
|
03-12-2016
|
6.50
|
Rear canopy latch and initial front canopy fit
|
Details
|
|
|
03-06-2016
|
8.50
|
JDAirParts canopy latch 1
|
Details
|
|
|
03-05-2016
|
7.50
|
JDAirParts canopy latch 1
|
Details
|
|
|
02-28-2016
|
8.00
|
Canopy release mechanism 2
|
Details
|
|
|
02-27-2016
|
9.00
|
Pump cover and canopy bearing blocks
|
Details
|
|
|
02-22-2016
|
4.00
|
Storing the finishing kit parts
|
Details
|
 |
|
02-21-2016
|
8.00
|
Fuel line cover bracket and new fuse cart
|
Details
|
|
|
02-14-2016
|
4.50
|
Finishing kit arrives!
|
Details
|
|
|
02-13-2016
|
7.50
|
Roll trim installation
|
Details
|
|
|
02-07-2016
|
6.00
|
Andair fuel filter brackets
|
|
|
|
02-06-2016
|
5.00
|
Priming and painting cabin parts
|
Details
|
 |
|
01-30-2016
|
3.00
|
Roll trim prep
|
Details
|
 |
|
01-23-2016
|
8.50
|
Fuel pump mounting and plumbing
|
Details
|
|
|
01-17-2016
|
8.00
|
Fuel line install 2
|
Details
|
|
|
01-16-2016
|
7.50
|
Fuel line install 1
|
Details
|
|
|
01-10-2016
|
6.00
|
Cabin and fuel valve
|
Details
|
|
|
01-03-2016
|
4.50
|
Fit forward deck
|
Details
|
|
|
12-30-2015
|
5.00
|
Vent brackets
|
Details
|
 |
|
12-28-2015
|
6.00
|
Panel fitup
|
Details
|
|
|
12-26-2015
|
5.00
|
Panel edging 2
|
Details
|
|
|
12-19-2015
|
5.00
|
Panel edging
|
Details
|
 |
|
12-13-2015
|
7.50
|
Canopy frame mount brackets 2
|
Details
|
|
|
12-12-2015
|
7.00
|
Canopy frame mount brackets 2
|
|
|
|
12-06-2015
|
8.00
|
Canopy frame mount brackets
|
Details
|
|
|
12-06-2015
|
1.00
|
Canopy frame assembly
|
Details
|
|
|
11-25-2015
|
1.00
|
Canopy frame cleanup
|
Details
|
 |
|
11-24-2015
|
8.00
|
Fabricate canopy frame
|
Details
|
|
|
11-23-2015
|
0.10
|
Ordered finishing kit
|
Details
|
  |
|
11-23-2015
|
6.00
|
Drilled the lower rudder attach holes
|
Details
|
 |
|
11-22-2015
|
7.00
|
Elevator attach drillings
|
Details
|
|
|
11-07-2015
|
6.00
|
Initial install of elevator pushrod
|
Details
|
|
|
11-01-2015
|
6.00
|
Drilling of elevator horns
|
Details
|
|
|
10-31-2015
|
4.50
|
Elevator pushrod fabrication
|
Details
|
|
|
10-25-2015
|
7.00
|
Install tubing for brake lines
|
Details
|
|
|
10-24-2015
|
6.50
|
Right side tank vent.
|
Details
|
|
|
10-18-2015
|
7.00
|
Install control column
|
Details
|
|
|
10-11-2015
|
0.10
|
Wing aft spar adjuster
|
Details
|
|
|
10-11-2015
|
8.50
|
Install fuel tank brackets; adjust gap between top
|
Details
|
|
|
10-10-2015
|
9.00
|
Wing incidence setting and rear spar drilling
|
Details
|
|
|
10-10-2015
|
0.20
|
Wing incidence jig
|
Details
|
|
|
10-10-2015
|
0.10
|
Aft spar drill jig
|
Details
|
|
|
10-04-2015
|
9.50
|
Left wing flap trimming
|
Details
|
|
|
10-03-2015
|
7.00
|
Left wing control surface alignmnet
|
Details
|
|
|
09-27-2015
|
7.00
|
Right wing control surface alignment
|
Details
|
|
|
09-26-2015
|
5.00
|
Initial install of the ailerons and flaps.
|
Details
|
|
|
09-20-2015
|
6.00
|
Wing aft spar install shim, seat pan cover
|
Details
|
|
|
09-20-2015
|
0.20
|
Drift pins and temporary main bolts
|
Details
|
 |
|
09-13-2015
|
7.00
|
Make fwd cover parts, prime/paint, fit up panel
|
Details
|
|
|
09-12-2015
|
5.00
|
Top skin dimpling 2
|
Details
|
 |
|
09-12-2015
|
7.50
|
First wing install!
|
Details
|
|
|
09-07-2015
|
7.00
|
Top skin dimpling 1
|
Details
|
|
|
09-05-2015
|
6.00
|
Seat pan drilling for hinges (redo)
|
Details
|
 |
|
08-30-2015
|
6.00
|
Baggage floor install
|
Details
|
|
|
08-29-2015
|
7.00
|
Full baggage panel fitup
|
Details
|
|
|
08-23-2015
|
7.60
|
Baggage back panel completion, nutplate install
|
Details
|
|
|
08-22-2015
|
8.00
|
Fit and drill top skins, baggage side panels, bagg
|
Details
|
|
|
08-15-2015
|
7.50
|
Final assembly of flap housing and elevator bellcr
|
Details
|
|
|
07-19-2015
|
6.50
|
Assembly, fit of flap housing
|
Details
|
|
|
07-11-2015
|
6.00
|
Riveting F-705 and canopy deck
|
Details
|
|
|
07-05-2015
|
6.00
|
Seat fabrication and fuse bracket install
|
Details
|
|
|
07-04-2015
|
7.00
|
Priming and painting seast and crotch strap mounts
|
Details
|
|
|
07-01-2015
|
5.00
|
Flap linkage install and flap housing parts
|
Details
|
|
|
06-26-2015
|
7.50
|
Upper firewall gussets canopy deck
|
Details
|
|
|
06-13-2015
|
7.00
|
Drilling the aft deck
|
Details
|
|
|
06-07-2015
|
7.50
|
Rolling the canoe!
|
Details
|
|
|
06-06-2015
|
3.00
|
Rotisserie prep
|
Details
|
  |
|
05-31-2015
|
4.00
|
Final fuse riveting, part 2
|
Details
|
 |
|
05-25-2015
|
7.00
|
SB 14-01-31 Horizontal Stab 3
|
Details
|
|
|
05-24-2015
|
8.00
|
SB 14-01-31 Horizontal Stab 2
|
Details
|
|
|
05-23-2015
|
4.00
|
SB 14-01-31 Horizontal Stab 1
|
Details
|
|
|
05-17-2015
|
5.00
|
Riveting and seat priming
|
Details
|
  |
|
05-09-2015
|
5.00
|
Getting ready for the rotisserie
|
Details
|
|
|
04-26-2015
|
6.00
|
Final fuse riveting, part 1
|
Details
|
|
|
04-25-2015
|
8.00
|
Finishing the seat fit-up
|
Details
|
|
|
04-19-2015
|
8.00
|
Building up the seats
|
Details
|
 |
|
04-12-2015
|
6.50
|
Forward fuse riveting, where I can.
|
Details
|
 |
|
04-11-2015
|
6.00
|
Loading and tapeing rivets
|
Details
|
  |
|
03-29-2015
|
8.00
|
Fuse reassembly2
|
Details
|
|
|
03-28-2015
|
6.00
|
Fuse reassembly1
|
Details
|
|
|
03-21-2015
|
7.50
|
Fuse reassembly prep
|
Details
|
|
|
03-15-2015
|
6.50
|
Misc. cabin painting and prep
|
Details
|
 |
|
03-14-2015
|
8.50
|
Painting the interior cabin surfaces
|
Details
|
|
|
03-07-2015
|
8.50
|
D&D fuse side skins, priming of fwd fuse parts
|
Details
|
|
|
03-01-2015
|
5.50
|
Dimpling, deburring, and prepping fuse skins
|
Details
|
|
|
02-28-2015
|
7.00
|
Fuse disassembly for dimpling, etc
|
Details
|
 |
|
02-21-2015
|
3.00
|
Beginning final drilling prior to dipmling
|
Details
|
 |
|
02-08-2015
|
3.50
|
Fitting up rudder and brake pedals
|
Details
|
|
|
02-01-2015
|
4.00
|
Riveting brake pedals
|
Details
|
|
|
01-31-2015
|
5.00
|
Forward tank mount stiffeners and brake pedals
|
Details
|
 |
|
01-25-2015
|
6.50
|
Drilling firewall to fuse brackets
|
Details
|
|
|
01-24-2015
|
6.00
|
Forward fuse stiffeners and longerons
|
Details
|
|
|
01-11-2015
|
6.00
|
Initial mounting of the firewall
|
Details
|
|
|
01-04-2015
|
5.00
|
Making the conical bends
|
Details
|
|
|
01-02-2015
|
6.00
|
Initial mating of center section and tail cone
|
Details
|
|
|
01-01-2015
|
4.50
|
Drilling crotch strap brackets
|
Details
|
|
|
12-30-2014
|
7.00
|
Riveting tailcone and center section
|
Details
|
|
|
12-29-2014
|
5.00
|
Assembling center section 2
|
Details
|
|
|
12-28-2014
|
5.00
|
Starting to rivet center section
|
Details
|
|
|
12-26-2014
|
5.50
|
Priming center section components
|
Details
|
|
|
12-20-2014
|
4.00
|
Set spacing on passthru spar
|
Details
|
|
|
12-14-2014
|
6.00
|
Began assy of center fuselage
|
Details
|
|
|
12-07-2014
|
4.00
|
Prepping cener seat ribs.
|
Details
|
|
|
12-06-2014
|
4.00
|
Fuselage riveting 2
|
Details
|
  |
|
11-26-2014
|
5.50
|
Fuselage riveting 1
|
Details
|
  |
|
11-25-2014
|
5.00
|
Riveted the tailhweel assy
|
Details
|
|
|
11-23-2014
|
4.00
|
Priming tailcone skins
|
Details
|
|
|
11-22-2014
|
5.50
|
Prepping tailcone for priming
|
Details
|
|
|
11-16-2014
|
6.50
|
Cleco and drill tailcone
|
Details
|
|
|
11-15-2014
|
4.00
|
Fabricate tailwheel assembly 2
|
Details
|
  |
|
11-09-2014
|
6.00
|
Fabricate tailwheel assy
|
Details
|
|
|
11-08-2014
|
6.00
|
Making the big bend
|
Details
|
|
|
11-02-2014
|
2.00
|
Begin initial assembly of tail cone
|
Details
|
|
|
11-01-2014
|
7.00
|
Rearrange shop and fabricate saw horses
|
|
  |
|
10-18-2014
|
8.50
|
Rivet F-704 spar feedthru and firewall
|
Details
|
|
|
10-12-2014
|
6.00
|
Rivet fuselage bulkheads thru F-706
|
Details
|
|
|
10-05-2014
|
6.00
|
Primed fuselage bulkheads
|
Details
|
|
|
10-04-2014
|
3.00
|
Final fuselage bulkhead prep
|
Details
|
  |
|
09-07-2014
|
5.00
|
F-704 and F-705 bulhead work
|
Details
|
  |
|
08-31-2014
|
5.00
|
F-705 bulkhead prep
|
Details
|
  |
|
08-27-2014
|
1.00
|
Co-pilot stick grip prep
|
Details
|
|
|
08-17-2014
|
0.25
|
Loose bars on F-704F
|
Details
|
|
|
08-17-2014
|
6.00
|
Firewall bulkhead assy 2
|
Details
|
|
|
08-16-2014
|
4.00
|
Firewall bulkhead assy 1
|
Details
|
|
|
08-13-2014
|
7.50
|
Assemble flap actuaor, elevator bellcrank
|
Details
|
|
|
07-20-2014
|
3.50
|
Installed right inboard bottom skin
|
Details
|
  |
|
07-19-2014
|
3.50
|
Final prep of right wing for bottom skinning
|
Details
|
  |
|
07-05-2014
|
5.50
|
Rivet on right top skin
|
Details
|
|
|
07-01-2014
|
3.00
|
Parts inventory and sorting
|
Details
|
|
|
06-30-2014
|
3.00
|
Fuse kit arrives!
|
Details
|
|
|
06-22-2014
|
6.50
|
Left outboard bottom skin riveting
|
Details
|
 |
|
06-21-2014
|
6.00
|
Left inboard bottom skin riveting
|
Details
|
|
|
05-31-2014
|
5.00
|
Left wing internals
|
Details
|
|
|
05-05-2014
|
0.10
|
Fuse kit on order
|
Details
|
  |
|
04-05-2014
|
6.00
|
Finished up right aileron .. control surfaces done
|
Details
|
|
|
03-30-2014
|
2.00
|
Right aileron assembly and screw-up
|
Details
|
|
|
03-29-2014
|
6.00
|
Aileron assembly
|
Details
|
|
|
03-23-2014
|
6.50
|
Flaps done; ailerons in work
|
Details
|
|
|
03-22-2014
|
5.50
|
Flap assembly
|
Details
|
|
|
03-20-2014
|
1.50
|
Control surface riveting
|
Details
|
|
|
03-17-2014
|
0.50
|
Aileron and flap rivet prep
|
Details
|
  |
|
03-16-2014
|
4.00
|
Aileron skin dimpling and priming
|
Details
|
  |
|
02-09-2014
|
4.00
|
Finnished flap prep
|
Details
|
|
|
02-08-2014
|
4.00
|
Drilling the flaps
|
Details
|
  |
|
02-02-2014
|
6.00
|
Attaching the flaps
|
Details
|
|
|
01-19-2014
|
6.00
|
L wing skin prep, aileron brackets
|
Details
|
  |
|
01-18-2014
|
2.00
|
Prepping for L wing skin riveting
|
Details
|
  |
|
01-12-2014
|
5.50
|
Finished left top skins; started ailerons
|
Details
|
|
|
01-11-2014
|
4.50
|
L wing top skins
|
Details
|
|
|
12-31-2013
|
4.50
|
Tank fitting and top skins cleco
|
Details
|
|
|
12-30-2013
|
3.00
|
Riveted topside LE to spar
|
Details
|
|
|
12-29-2013
|
3.50
|
Rivet right LE to spar
|
Details
|
|
|
12-28-2013
|
3.00
|
Stall warner and landing lights installed
|
Details
|
|
|
12-27-2013
|
4.50
|
Etch and prime skins
|
Details
|
|
|
12-24-2013
|
3.00
|
Drilling dimple relief countersinks in the spar
|
Details
|
 |
|
12-23-2013
|
2.50
|
Main wing skin prep .. part 3
|
Details
|
  |
|
12-22-2013
|
4.50
|
Main wing skin prep .. part 2
|
Details
|
|
|
12-21-2013
|
3.00
|
Main wing skin prep .. part 1
|
Details
|
 |
|
12-14-2013
|
2.00
|
Leak tested the tanks
|
Details
|
|
|
12-14-2013
|
2.50
|
Assy the leading edges .. pt 2
|
Details
|
  |
|
12-08-2013
|
6.00
|
Assy the leading edges .. pt 1
|
Details
|
|
|
12-07-2013
|
5.00
|
Prepping for LE riviting
|
Details
|
  |
|
12-01-2013
|
1.50
|
Beginning LE dimpling
|
Details
|
  |
|
11-17-2013
|
3.00
|
Install left tank baffle
|
Details
|
|
|
11-16-2013
|
3.50
|
Install right rear baffle
|
Details
|
|
|
11-09-2013
|
4.50
|
Riviting the tanks .. 5
|
Details
|
|
|
11-03-2013
|
4.00
|
Anti hangup fixtures and trap door
|
Details
|
|
|
11-02-2013
|
4.00
|
Capacitaive fuel sender install
|
Details
|
|
|
10-27-2013
|
4.50
|
Riveting the tanks .. 4
|
Details
|
  |
|
10-26-2013
|
5.00
|
Riveting the tanks .. 3
|
Details
|
|
|
10-24-2013
|
1.00
|
Riveting the tanks .. 2
|
Details
|
  |
|
10-20-2013
|
4.00
|
Riveting the tanks .. 1
|
Details
|
|
|
10-19-2013
|
1.00
|
Forward inboard tank bracket (do over)
|
Details
|
 |
|
10-17-2013
|
1.50
|
Prep of inboard tank ribs
|
Details
|
|
|
10-13-2013
|
6.00
|
Sealing right tank inside ribs
|
Details
|
|
|
10-12-2013
|
4.50
|
Sealing left tank inside ribs
|
Details
|
|
|
10-06-2013
|
4.00
|
Stiffener install
|
Details
|
|
|
10-05-2013
|
6.50
|
Final tank prep
|
Details
|
|
|
10-03-2013
|
1.00
|
Dimpled right skin
|
Details
|
 |
|
09-29-2013
|
5.00
|
Caps and drains and senders
|
Details
|
|
|
09-22-2013
|
4.00
|
Fabricate forward attach bracket
|
Details
|
|
|
09-22-2013
|
4.50
|
Drilling the z brackets - left wing
|
Details
|
|
|
09-21-2013
|
5.00
|
Drilling the z-brackets - Right wing
|
Details
|
|
|
09-14-2013
|
1.50
|
Tank cradle
|
Details
|
 |
|
09-14-2013
|
5.50
|
Initial fit of tanks on spars
|
Details
|
|
|
09-13-2013
|
1.50
|
Fabricate tank stiffiners
|
Details
|
 |
|
09-12-2013
|
2.00
|
Initial install of brackets to spars
|
Details
|
|
|
09-10-2013
|
1.00
|
Riveting nutplates onto Z-brackets
|
Details
|
|
|
09-08-2013
|
2.00
|
Drilling brackets to spars
|
Details
|
|
|
09-07-2013
|
2.00
|
Starting the tanks
|
Details
|
  |
|
09-07-2013
|
1.00
|
Drilling the LE and starting the tanks
|
Details
|
  |
|
09-02-2013
|
6.00
|
Left outboard leading edge
|
Details
|
|
|
09-01-2013
|
2.00
|
Fitting the right bottom skins
|
Details
|
  |
|
08-31-2013
|
2.50
|
Fitting the left bottom skins
|
Details
|
  |
|
08-30-2013
|
2.50
|
Fittng the top skins
|
Details
|
|
|
08-24-2013
|
6.50
|
Buildup of wing skeleton
|
Details
|
|
|
08-18-2013
|
6.00
|
Wing rib prep and priming
|
Details
|
|
|
08-17-2013
|
10.00
|
First box assembly
|
Details
|
|
|
08-12-2013
|
2.00
|
Flat ribs!
|
Details
|
|
|
08-11-2013
|
2.00
|
Rear wing spar fitout
|
Details
|
|
|
08-03-2013
|
2.00
|
Wing tiedown hardware install
|
Details
|
|
|
07-31-2013
|
2.00
|
Tiedown mounts
|
Details
|
 |
|
07-28-2013
|
2.00
|
Spar nutplates done
|
Details
|
  |
|
07-27-2013
|
8.00
|
Back to work!
|
Details
|
|
|
07-25-2013
|
2.50
|
Let the wing build begin!
|
Details
|
|
|
07-13-2013
|
6.00
|
Wing stand
|
Details
|
  |
|
07-05-2013
|
5.00
|
Epennage closeout and storage
|
Details
|
|
|
04-30-2013
|
0.00
|
Wing kit on order!
|
Details
|
  |
|
04-24-2013
|
0.50
|
Filling of VS tip and Rudder
|
Details
|
  |
|
04-23-2013
|
1.00
|
VS tip work
|
Details
|
  |
|
04-22-2013
|
0.50
|
VS tip work
|
Details
|
  |
|
04-15-2013
|
1.50
|
Rudder tip fiberglass
|
Details
|
  |
|
04-06-2013
|
0.50
|
Filling end of HS tips
|
Details
|
 |
|
03-31-2013
|
2.50
|
HS tip do-over
|
Details
|
|
|
03-25-2013
|
0.50
|
Elevator tip fill (again)
|
Details
|
 |
|
03-24-2013
|
2.00
|
Elevator tip filling an shaping
|
Details
|
|
|
03-19-2013
|
0.50
|
Elevator tips fill
|
Details
|
|
|
03-17-2013
|
1.50
|
Elevator tip install
|
Details
|
|
|
03-16-2013
|
1.50
|
HS fiberglass
|
Details
|
 |
|
03-12-2013
|
1.00
|
HS fiberglass
|
Details
|
|
|
03-11-2013
|
1.50
|
HS fiberglass
|
Details
|
  |
|
03-04-2013
|
1.00
|
Checking elevator horn alignment
|
Details
|
 |
|
03-03-2013
|
4.00
|
Final fitting of the elevators
|
Details
|
|
|
03-02-2013
|
4.75
|
Rolling the elevator LE
|
Details
|
|
|
02-24-2013
|
3.00
|
Trim tab final assembly
|
Details
|
|
|
02-21-2013
|
2.00
|
Trim tab buildup
|
Details
|
  |
|
02-19-2013
|
2.00
|
Riveting the left skin
|
Details
|
  |
|
02-18-2013
|
2.00
|
Riveting the left elevator
|
Details
|
|
|
02-13-2013
|
2.00
|
Making riblets, part II
|
Details
|
 |
|
02-12-2013
|
2.00
|
Making riblets
|
Details
|
|
|
02-10-2013
|
3.50
|
Starting left elevator
|
Details
|
|
|
02-09-2013
|
5.50
|
Right rudder closeup
|
Details
|
|
|
02-03-2013
|
3.00
|
Right elevator prep
|
Details
|
 |
|
02-02-2013
|
2.00
|
Bending elevator trailing edges
|
Details
|
|
|
01-28-2013
|
1.50
|
Elevator stiffener riveting
|
Details
|
|
|
01-27-2013
|
2.00
|
Elevator skin priing
|
Details
|
  |
|
01-22-2013
|
0.50
|
Elevator stiffener cleaning
|
Details
|
  |
|
01-19-2013
|
6.00
|
Riveted the rudder TE and formed LE
|
Details
|
|
|
01-18-2013
|
1.00
|
Gluing the trailing edge wedge
|
Details
|
|
|
01-15-2013
|
2.50
|
Rudder riveting
|
Details
|
 |
|
01-14-2013
|
1.00
|
Rudder riveting prep
|
Details
|
|
|
01-13-2013
|
1.50
|
Riveting the rudder horn
|
Details
|
|
|
01-12-2013
|
1.00
|
Rudder assembly
|
Details
|
  |
|
01-09-2013
|
1.50
|
Rudder assembly
|
Details
|
  |
|
01-08-2013
|
2.00
|
Fitting the rudder horn
|
Details
|
|
|
01-07-2013
|
1.00
|
Fitting rudder skins
|
Details
|
|
|
01-06-2013
|
1.00
|
Riveting rudder stiffeners
|
Details
|
  |
|
01-05-2013
|
0.50
|
Rudder skin priming
|
Details
|
  |
|
01-01-2013
|
0.50
|
Rudder skin priming
|
Details
|
  |
|
12-31-2012
|
2.00
|
Rudder skin prep
|
Details
|
 |
|
12-30-2012
|
3.50
|
Rudder skin dimpling
|
Details
|
|
|
12-29-2012
|
4.50
|
HS complete
|
Details
|
|
|
12-28-2012
|
3.50
|
Priming notes
|
Details
|
|
|
12-27-2012
|
3.00
|
Priming .. fail!
|
Details
|
  |
|
12-24-2012
|
5.00
|
Starting VS
|
Details
|
|
|
12-23-2012
|
3.50
|
HS completion
|
Details
|
|
|
12-22-2012
|
6.50
|
HS assembly
|
Details
|
|
|
12-20-2012
|
0.50
|
HS assembly
|
Details
|
  |
|
12-19-2012
|
1.00
|
HS spar assembly
|
Details
|
|
|
12-18-2012
|
0.50
|
Priming HS parts
|
Details
|
  |
|
12-16-2012
|
4.00
|
Priming HS parts
|
Details
|
|
|
12-15-2012
|
2.50
|
First primer experience
|
Details
|
 |
|
12-12-2012
|
3.50
|
HS assemby stress
|
Details
|
|
|
12-11-2012
|
1.50
|
Drilling HS skins
|
Details
|
|
|
12-10-2012
|
0.30
|
HS skin fitting
|
Details
|
  |
|
12-09-2012
|
5.00
|
Rib flange straightening tool
|
Details
|
|
|
12-08-2012
|
5.50
|
HS parts prep
|
Details
|
|
|
12-07-2012
|
1.50
|
Shop setup
|
Details
|
  |
|
12-05-2012
|
2.50
|
Empennage has entered the building!
|
Details
|
  |