Date
|
Hours
|
Work Log Summary
|
Details
|
02-13-2013
|
1.50
|
GPS and Autopilot Checks
|
Details
|
|
|
02-10-2013
|
4.00
|
Items Noted on Inspection Review
|
Details
|
|
|
02-09-2013
|
0.00
|
Tech Inspection
|
Details
|
|
|
02-09-2013
|
0.00
|
Tech Advisor Recommendations
|
Details
|
|
|
02-05-2013
|
3.20
|
Trim Indication & GPS Antenna
|
Details
|
|
|
02-05-2013
|
1.00
|
Adjusted Mixture
|
Details
|
|
|
02-04-2013
|
2.60
|
Second Engine Start
|
Details
|
|
|
02-02-2013
|
3.60
|
Electronic Ignition Troubleshooting
|
Details
|
|
|
01-31-2013
|
0.00
|
Tailwheel Training
|
Details
|
|
|
01-17-2013
|
4.00
|
Alternator Field and Download ACS2002 Data
|
Details
|
|
|
01-15-2013
|
1.00
|
Spark Plugs Gapped and Installed
|
Details
|
|
|
01-15-2013
|
0.80
|
Pre Oiled the Engine
|
Details
|
|
|
01-15-2013
|
1.00
|
First Engine Start
|
Details
|
|
|
01-15-2013
|
0.50
|
Engine Oil Added
|
Details
|
|
|
01-14-2013
|
1.60
|
Drained Preservative Oil, Installed Quick Drain
|
Details
|
|
|
01-14-2013
|
1.50
|
Cleaned Windscreen and Installed Access Covers
|
Details
|
|
|
01-12-2013
|
2.40
|
Oil Filter and Oil Purge Line
|
Details
|
|
|
01-12-2013
|
0.30
|
Forward Top Skin Attached
|
Details
|
|
|
01-10-2013
|
1.00
|
Prop Tracking Check
|
Details
|
|
|
01-09-2013
|
2.20
|
Fuel System Checks
|
Details
|
|
|
01-08-2013
|
1.70
|
Fuel Purge System Tests
|
Details
|
|
|
01-07-2013
|
2.50
|
Fuel Flow from Boost Pump Test
|
Details
|
|
|
01-03-2013
|
2.30
|
Fuel System Test
|
Details
|
|
|
12-03-2012
|
3.00
|
Safety Wire Worm Clips
|
Details
|
|
|
11-29-2012
|
2.00
|
ECI Engine Clip SB
|
Details
|
|
|
11-16-2012
|
2.30
|
Compass Mount
|
Details
|
|
|
11-15-2012
|
2.00
|
Instrument Panel Flange and Hangar Cleanup
|
Details
|
|
|
11-14-2012
|
2.00
|
Electrical Schematic
|
Details
|
|
|
11-13-2012
|
1.50
|
Wired Battery Charger
|
Details
|
|
|
11-07-2012
|
2.00
|
Installed the Battery
|
Details
|
|
|
11-02-2012
|
1.50
|
Finished Cowling
|
Details
|
|
|
11-01-2012
|
1.60
|
Engine Oil
|
Details
|
|
|
10-30-2012
|
2.60
|
Prime Cowling and Engine Preservative Oil
|
Details
|
|
|
10-29-2012
|
1.60
|
Installed Boots to Electrical Contacts FWF
|
Details
|
|
|
10-25-2012
|
3.30
|
Prime and Sanding of the Cowling
|
Details
|
|
|
10-23-2012
|
4.00
|
Pilots Operating Handbook
|
Details
|
|
|
10-03-2012
|
2.30
|
Removed Canopy Plastic
|
Details
|
|
|
09-28-2012
|
1.00
|
Cowling Hinge Pin Cover
|
Details
|
|
|
09-27-2012
|
1.30
|
Interior Side Panels
|
Details
|
|
|
09-27-2012
|
2.00
|
Cowel Hinge Pin Cover
|
Details
|
|
|
09-26-2012
|
2.00
|
Cowling Hinge Pin Cover
|
Details
|
|
|
09-25-2012
|
1.80
|
Brake Fluid
|
Details
|
|
|
09-19-2012
|
3.30
|
Side panel and wheel fairings
|
Details
|
|
|
09-18-2012
|
1.90
|
N Number
|
Details
|
|
|
09-18-2012
|
2.00
|
Instrument Panel Placards
|
Details
|
|
|
09-10-2012
|
3.00
|
Landing Gear Fairings
|
Details
|
|
|
09-10-2012
|
1.00
|
Engraved Panel Plackards
|
Details
|
|
|
09-07-2012
|
1.50
|
Rudder Cables Attached
|
Details
|
|
|
09-06-2012
|
1.90
|
Rudder Cables Attached
|
Details
|
|
|
09-05-2012
|
3.60
|
Landing Gear Fairings and Prop
|
Details
|
|
|
09-04-2012
|
3.20
|
Wing Tip Attach
|
Details
|
|
|
09-01-2012
|
4.20
|
Gear Fairings and Wing Tips
|
Details
|
|
|
08-29-2012
|
2.60
|
Confirmed Engine Ignition Timing
|
Details
|
|
|
08-28-2012
|
4.40
|
Wheel Pants and Tire Inflation Access
|
Details
|
|
|
08-27-2012
|
4.80
|
Wheel Pants
|
Details
|
|
|
08-23-2012
|
5.00
|
Wheel pants
|
Details
|
|
|
08-22-2012
|
6.00
|
Gear leg fairings and wheel pants
|
Details
|
|
|
08-21-2012
|
5.10
|
Empennage Fairing
|
Details
|
|
|
08-17-2012
|
4.20
|
Lower gear leg intersection fairing
|
Details
|
|
|
08-16-2012
|
3.00
|
Lower gear leg intersection fairings
|
Details
|
|
|
08-15-2012
|
5.60
|
Upper gear leg fairings
|
Details
|
|
|
08-14-2012
|
3.50
|
Upper gear leg fairing
|
Details
|
|
|
08-13-2012
|
4.50
|
Upper gear fairing nutplates
|
Details
|
|
|
08-08-2012
|
3.80
|
Upper gear leg fairing
|
Details
|
|
|
08-07-2012
|
5.00
|
Installed mounting bracket to wheel pants
|
Details
|
|
|
08-02-2012
|
2.90
|
Wheel Pants
|
Details
|
|
|
08-02-2012
|
3.50
|
Wheel Pant
|
Details
|
|
|
08-01-2012
|
3.00
|
Wheel Fairings Trimmed
|
Details
|
|
|
08-01-2012
|
3.20
|
Fit Wheel Pants
|
Details
|
|
|
07-31-2012
|
1.60
|
Cleaned up Gear Leg Stiffeners
|
Details
|
|
|
07-31-2012
|
3.50
|
Align the Gear Leg Fairings
|
Details
|
|
|
07-30-2012
|
3.00
|
Fiberglassed the Gear Leg Stiffeners
|
Details
|
|
|
07-30-2012
|
0.80
|
Empennage Fairing Rubber Seal
|
Details
|
|
|
07-30-2012
|
1.50
|
Empennage Fairing Repair
|
Details
|
|
|
07-27-2012
|
2.00
|
Wheel Pant Fairings
|
Details
|
|
|
07-27-2012
|
3.00
|
Wheel Fairings
|
Details
|
|
|
07-25-2012
|
2.00
|
Gear Leg Fairing
|
Details
|
|
|
07-25-2012
|
2.00
|
Etching of CB panel, labels and fuel caps
|
Details
|
|
|
07-23-2012
|
1.50
|
GPS antenna, ELT and Lift Table
|
Details
|
|
|
07-23-2012
|
1.50
|
Gear Leg Stiffener Attached
|
Details
|
|
|
07-20-2012
|
3.20
|
Landing Gear Stiffeners
|
Details
|
|
|
07-20-2012
|
2.50
|
Gear Leg Fairings
|
Details
|
|
|
07-19-2012
|
3.00
|
Gear Leg Fairings
|
Details
|
|
|
07-18-2012
|
1.00
|
Removed all fairings
|
Details
|
|
|
07-18-2012
|
1.50
|
Installed Aileron Rod Seal
|
Details
|
|
|
07-18-2012
|
0.50
|
Gear Fairings
|
Details
|
|
|
07-17-2012
|
2.30
|
Wing Root Fairing
|
Details
|
|
|
07-17-2012
|
0.50
|
Wing Fairing
|
Details
|
|
|
07-17-2012
|
2.20
|
Empennage Fairing Final Fit
|
Details
|
|
|
07-16-2012
|
1.00
|
Torqued and Checked Control Stick Connections
|
Details
|
|
|
07-16-2012
|
1.20
|
Installed Tie Down Rings
|
Details
|
|
|
07-16-2012
|
1.00
|
Checked Aileron Control Connections
|
Details
|
|
|
07-14-2012
|
2.00
|
Installed GPS antenna
|
Details
|
|
|
07-13-2012
|
1.80
|
Installed Transponder and Traffic Antennas
|
Details
|
|
|
07-13-2012
|
1.40
|
Installed Com Antennas
|
Details
|
|
|
07-12-2012
|
1.20
|
Checked Flight Control Limits
|
Details
|
|
|
07-11-2012
|
2.50
|
Installed Flaps
|
Details
|
|
|
07-11-2012
|
1.60
|
Flap Position Indicator Calibration
|
Details
|
|
|
07-09-2012
|
2.00
|
Secured Ailerons
|
Details
|
|
|
07-09-2012
|
2.00
|
Adjusted the Aileron Control Push Rods
|
Details
|
|
|
07-06-2012
|
1.00
|
Secured Wiring under the Cockpit Floor
|
Details
|
|
|
07-05-2012
|
1.50
|
Static Line Tested
|
Details
|
|
|
07-05-2012
|
2.30
|
Secured Lower Rudder Tip
|
Details
|
|
|
07-05-2012
|
2.00
|
Installed Tailwheel Steering Link
|
Details
|
|
|
07-03-2012
|
1.00
|
Tested Pitot Line
|
Details
|
|
|
07-03-2012
|
3.50
|
Pitot Tube Connections
|
Details
|
|
|
07-02-2012
|
0.70
|
Wing Cradle Tossed Out
|
Details
|
|
|
07-02-2012
|
1.00
|
Torqued Wing Nuts
|
Details
|
|
|
07-02-2012
|
1.50
|
Aft Wing Spar and Fuel Tank Secured
|
Details
|
|
|
06-29-2012
|
3.00
|
Wings various
|
Details
|
|
|
06-29-2012
|
1.00
|
Installed Wing Attach Bolts
|
Details
|
|
|
06-28-2012
|
2.00
|
Wing connections
|
Details
|
|
|
06-27-2012
|
3.30
|
Wing Attachments
|
Details
|
|
|
06-26-2012
|
3.00
|
Mated the Wings
|
Details
|
|
|
06-22-2012
|
1.30
|
Prepared to mount the wings
|
Details
|
|
|
06-20-2012
|
1.00
|
Re applied torque sealer.
|
Details
|
|
|
06-20-2012
|
1.00
|
Conneted rudder cables
|
Details
|
|
|
06-18-2012
|
1.50
|
Confirmed Elevator and Rudder Travel
|
Details
|
|
|
06-14-2012
|
2.40
|
Rudder Mounted
|
Details
|
|
|
06-12-2012
|
3.00
|
Vertical Stabilizer Mounted
|
Details
|
|
|
06-12-2012
|
1.50
|
Elevator Trim
|
Details
|
|
|
06-11-2012
|
2.20
|
Elevator Trim Connections
|
Details
|
|
|
06-08-2012
|
2.70
|
Mounted the elevator
|
Details
|
|
|
06-07-2012
|
2.50
|
Mounted Horizontal Stabilizer
|
Details
|
|
|
05-30-2012
|
5.20
|
Hangar Set Up
|
Details
|
|
|
04-12-2012
|
2.00
|
Moved into Gig Harbor
|
Details
|
|
|
04-11-2012
|
2.00
|
Moving Day 2
|
Details
|
|
|
04-11-2012
|
2.00
|
Moving Day 1
|
Details
|
|
|
04-11-2012
|
2.00
|
Move Day 4
|
Details
|
|
|
04-11-2012
|
2.00
|
Move Day 3
|
Details
|
|
|
04-10-2012
|
5.00
|
Prepping For Move to Hangar
|
Details
|
|
|
02-02-2012
|
8.00
|
Final Fit of the Empennage Fairing
|
Details
|
|
|
01-30-2012
|
4.10
|
Final Fit of the Rudder Lower Tip
|
Details
|
|
|
01-27-2012
|
3.00
|
Attached Strobe Light to Lower Rudder
|
Details
|
|
|
01-26-2012
|
3.60
|
Drilled and Attached Nutplates to lower Rudder
|
Details
|
|
|
01-23-2012
|
5.50
|
Modified Shape and Fit of the Empennage Fairing
|
Details
|
|
|
12-19-2011
|
1.80
|
Empennage Fairing
|
Details
|
|
|
12-15-2011
|
3.00
|
Lower Rudder Tip
|
Details
|
|
|
12-13-2011
|
2.10
|
Empennage Access Cover
|
Details
|
|
|
11-23-2011
|
2.70
|
Empennage Fairing
|
Details
|
|
|
11-21-2011
|
2.50
|
Reinstalled VS and HS
|
Details
|
|
|
11-20-2011
|
3.00
|
Installed Heat Tape in Lower Cowl
|
Details
|
|
|
11-18-2011
|
2.50
|
New ELT installation
|
Details
|
|
|
11-17-2011
|
3.00
|
Installed New ELT
|
Details
|
|
|
11-04-2011
|
1.50
|
Right Seat Control Stick Pin
|
Details
|
|
|
10-04-2011
|
3.70
|
Starter Test
|
Details
|
|
|
09-06-2011
|
5.00
|
Interior packed away
|
Details
|
|
|
09-01-2011
|
5.10
|
Interior
|
Details
|
|
|
08-30-2011
|
2.90
|
Interior
|
Details
|
|
|
08-19-2011
|
4.00
|
Interior
|
Details
|
|
|
08-16-2011
|
3.90
|
Interior installation
|
Details
|
|
|
08-15-2011
|
4.40
|
Seat Attachment
|
Details
|
|
|
08-15-2011
|
2.00
|
Seat Attachment
|
Details
|
|
|
07-21-2011
|
3.30
|
Insulation
|
Details
|
|
|
07-20-2011
|
6.00
|
Insulation and Sound Proofing
|
Details
|
|
|
07-14-2011
|
5.50
|
Sealed the Firewall
|
Details
|
|
|
07-11-2011
|
3.90
|
Fuel Tank Service Bulletin
|
Details
|
|
|
07-01-2011
|
4.80
|
Fuel Tank Service Bulletin
|
Details
|
|
|
06-30-2011
|
6.60
|
Fuel Tank Service Bulletin
|
Details
|
|
|
06-15-2011
|
3.20
|
Glare Shield
|
Details
|
|
|
06-14-2011
|
1.50
|
Flap drive safety wire.
|
Details
|
|
|
06-14-2011
|
1.50
|
Auto Pilot Service Bulletin
|
Details
|
|
|
06-06-2011
|
4.00
|
Trimming Side Panel
|
Details
|
|
|
06-03-2011
|
5.80
|
Control Cables & Headset Jacks
|
Details
|
|
|
06-02-2011
|
3.30
|
Reinstalling cables
|
Details
|
|
|
05-30-2011
|
5.50
|
Interior Side Panel
|
Details
|
|
|
05-11-2011
|
2.60
|
Fuel Cover and Wiring
|
Details
|
|
|
05-10-2011
|
3.90
|
Fuel Cover
|
Details
|
|
|
05-02-2011
|
2.30
|
Right Seat Stick Pin
|
Details
|
|
|
04-30-2011
|
3.60
|
Seat Belt Crotch Strap
|
Details
|
|
|
04-30-2011
|
3.00
|
Seat Belt Crotch Strap
|
Details
|
|
|
04-29-2011
|
4.60
|
Seat Belt Crotch Strap
|
Details
|
|
|
04-28-2011
|
2.00
|
Sidewall Panel
|
Details
|
|
|
04-28-2011
|
3.00
|
Seat Belt Crotch Strap
|
Details
|
|
|
04-27-2011
|
2.00
|
Fit Sidewall Panel
|
Details
|
|
|
04-18-2011
|
3.20
|
Order the interior
|
Details
|
|
|
03-09-2011
|
3.00
|
Final fit of upper cowling
|
Details
|
|
|
03-09-2011
|
1.00
|
Final fit of cowling
|
Details
|
|
|
03-07-2011
|
3.00
|
Empennage Tips
|
Details
|
|
|
03-04-2011
|
2.40
|
Cowling fit and epoxy interior
|
Details
|
|
|
03-01-2011
|
3.10
|
Right Seat Stick pin
|
Details
|
|
|
02-22-2011
|
4.00
|
Wing Tips final fit
|
Details
|
|
|
02-07-2011
|
3.00
|
Empennage Tips
|
Details
|
|
|
02-02-2011
|
6.00
|
Empennage Tips
|
Details
|
|
|
01-30-2011
|
4.70
|
Empennage Tips
|
Details
|
|
|
01-28-2011
|
3.50
|
Empennage Tips
|
Details
|
|
|
01-25-2011
|
4.10
|
Empennage Tips
|
Details
|
|
|
01-24-2011
|
4.50
|
Empennage Tips
|
Details
|
|
|
01-20-2011
|
4.00
|
Wing Tips
|
Details
|
|
|
12-08-2010
|
3.80
|
Wing Tips - Marker Antenna
|
Details
|
|
|
12-06-2010
|
3.30
|
Wing Tip VOR Antenna
|
Details
|
|
|
12-05-2010
|
4.60
|
Wing Tip Attachment
|
Details
|
|
|
12-02-2010
|
4.20
|
Wing Tips
|
Details
|
|
|
12-01-2010
|
4.00
|
Wing Tips
|
Details
|
|
|
11-23-2010
|
2.50
|
Wing Tips
|
Details
|
|
|
11-22-2010
|
4.50
|
Wing Tips
|
Details
|
|
|
11-17-2010
|
3.70
|
Wing Tips
|
Details
|
|
|
10-29-2010
|
1.50
|
Cowling Attach Pin
|
Details
|
|
|
10-28-2010
|
6.00
|
Cowling Sanding and Primer
|
Details
|
|
|
05-19-2010
|
3.00
|
Prop Spinner Gap Plate
|
Details
|
|
|
05-18-2010
|
2.20
|
Prop Spinner Gap Plate
|
Details
|
|
|
05-14-2010
|
5.00
|
Prop Spinner Gap Plate
|
Details
|
|
|
04-10-2010
|
5.00
|
Prop Spinner
|
Details
|
|
|
04-08-2010
|
6.50
|
Prop Spinner
|
Details
|
|
|
04-05-2010
|
4.00
|
Prop Spinner
|
Details
|
|
|
02-10-2010
|
5.60
|
Canopy Rear Skirt
|
Details
|
|
|
01-26-2010
|
8.00
|
Cowling Hinge Pin
|
Details
|
|
|
01-25-2010
|
3.60
|
Cowl Hinge Pin
|
Details
|
|
|
01-08-2010
|
3.00
|
Cowl Hinge Pin
|
Details
|
|
|
01-06-2010
|
2.00
|
Cowl Hinge Pin
|
Details
|
|
|
01-05-2010
|
3.50
|
Cowling Side Hinge Pin
|
Details
|
|
|
10-25-2009
|
4.60
|
Cowling Air Inlet Work
|
Details
|
|
|
10-23-2009
|
3.80
|
Cowling Attachment Screws
|
Details
|
|
|
10-04-2009
|
4.50
|
Air Inlet Seals
|
Details
|
|
|
10-03-2009
|
3.20
|
Oil Service Door
|
Details
|
|
|
10-02-2009
|
6.80
|
Oil Service Door
|
Details
|
|
|
07-27-2009
|
2.30
|
Oil access door
|
Details
|
|
|
07-23-2009
|
2.00
|
Prop Installed and safety wired
|
Details
|
|
|
07-23-2009
|
1.00
|
Installed air intake
|
Details
|
|
|
07-11-2009
|
1.50
|
Wiring bundles
|
Details
|
|
|
07-08-2009
|
3.30
|
ACS wiring
|
Details
|
|
|
07-07-2009
|
3.70
|
ACS 2002 wiring
|
Details
|
|
|
07-01-2009
|
4.40
|
Panel wiring connections
|
Details
|
|
|
06-23-2009
|
2.90
|
Lightspeed ignition power wiring
|
Details
|
|
|
06-08-2009
|
3.80
|
Engine wiring - firewall access points
|
Details
|
|
|
05-20-2009
|
4.30
|
Engine wiring - wiring bundles
|
Details
|
|
|
05-19-2009
|
3.70
|
Engine wiring - Lightspeed ignition
|
Details
|
|
|
05-11-2009
|
2.60
|
Engine wiring - firewall pass-throughs
|
Details
|
|
|
04-30-2009
|
4.90
|
Engine wiring - right side, starter
|
Details
|
|
|
04-14-2009
|
2.90
|
Engine wiring - magneto
|
Details
|
|
|
03-24-2009
|
3.30
|
Engine wiring - alternator
|
Details
|
|
|
03-11-2009
|
3.00
|
Engine wiring - left side
|
Details
|
|
|
02-28-2009
|
2.00
|
Wiring run from engine to firewall
|
Details
|
|
|
02-27-2009
|
2.00
|
Engine wiring
|
Details
|
|
|
02-27-2009
|
2.00
|
Engine wiring
|
Details
|
|
|
02-26-2009
|
2.50
|
Installed cooling hoses
|
Details
|
|
|
02-25-2009
|
4.00
|
Remade rear baffle fuel line access holes
|
Details
|
|
|
02-24-2009
|
1.30
|
Oil Cooler installed
|
Details
|
|
|
02-24-2009
|
2.00
|
Baffles sealed with RTV
|
Details
|
|
|
02-23-2009
|
2.00
|
Stitched baffle seals
|
Details
|
|
|
02-22-2009
|
3.40
|
Forward baffle bracket
|
Details
|
|
|
02-15-2009
|
2.50
|
Safety wire lower baffles
|
Details
|
|
|
02-14-2009
|
2.20
|
Hose connections, dipstick, heat hose
|
Details
|
|
|
02-13-2009
|
4.00
|
Vacuum system
|
Details
|
|
|
02-12-2009
|
2.00
|
Vacuum System
|
Details
|
|
|
02-12-2009
|
2.00
|
Sniffle valve
|
Details
|
|
|
02-11-2009
|
2.50
|
Vacuum System
|
Details
|
|
|
02-10-2009
|
3.50
|
Vacuum System
|
Details
|
|
|
02-09-2009
|
3.30
|
Vacuum System
|
Details
|
|
|
01-31-2009
|
1.60
|
Vacuum system
|
Details
|
|
|
01-30-2009
|
2.50
|
Oil breather tube
|
Details
|
|
|
01-30-2009
|
1.70
|
Fuel pump overflow
|
Details
|
|
|
01-29-2009
|
2.50
|
Riveted cowling to fuselage hinge
|
Details
|
|
|
01-28-2009
|
2.00
|
Cowl to Fuselage hinge
|
Details
|
|
|
01-27-2009
|
2.00
|
Firesleeve throttle cable
|
Details
|
|
|
01-26-2009
|
1.20
|
Baffle seals
|
Details
|
|
|
01-16-2009
|
3.80
|
Baffle seals
|
Details
|
|
|
01-15-2009
|
4.30
|
Baffle finishing
|
Details
|
|
|
01-14-2009
|
4.00
|
Baffle finishing
|
Details
|
|
|
10-22-2008
|
4.00
|
Oil Coller Support
|
Details
|
|
|
10-20-2008
|
2.50
|
Baffle Seals
|
Details
|
|
|
10-16-2008
|
3.50
|
Baffle Seals at Inlets
|
Details
|
|
|
10-13-2008
|
4.00
|
Fitting Baffle Seals
|
Details
|
|
|
10-09-2008
|
3.40
|
Baffle Seal Drilling
|
Details
|
|
|
10-08-2008
|
3.00
|
Baffle Seals Cut
|
Details
|
|
|
07-09-2008
|
4.00
|
Baffle seal templates
|
Details
|
|
|
07-08-2008
|
3.00
|
Various cooling holes in baffleing
|
Details
|
|
|
07-07-2008
|
3.50
|
Secure fuel lines and heat hose
|
Details
|
|
|
06-18-2008
|
1.50
|
Revise Baffle Fuel Line Hole
|
Details
|
|
|
06-04-2008
|
2.00
|
Fuel lines and baffel pass throughs
|
Details
|
|
|
06-03-2008
|
1.00
|
Installed and ran heater hose
|
Details
|
|
|
06-03-2008
|
1.30
|
Heater hose
|
Details
|
|
|
06-02-2008
|
2.40
|
Heater hose in forward baffel floor
|
Details
|
|
|
05-22-2008
|
3.00
|
Prop oil line
|
Details
|
|
|
05-21-2008
|
4.30
|
OAT sensor and wiring run
|
Details
|
|
|
05-20-2008
|
1.10
|
Oil and fuel pressure sensors
|
Details
|
|
|
05-19-2008
|
4.20
|
CHT, EGT and plug wires
|
Details
|
|
|
05-16-2008
|
3.00
|
Electronic ignition wiring
|
Details
|
|
|
05-15-2008
|
2.60
|
Electronic ignition module
|
Details
|
|
|
05-14-2008
|
5.50
|
Alternate air intake
|
Details
|
|
|
05-13-2008
|
3.50
|
Purge valve cable
|
Details
|
|
|
02-01-2008
|
6.50
|
Alternate air
|
Details
|
|
|
01-31-2008
|
3.90
|
Alternate air
|
Details
|
|
|
01-29-2008
|
5.50
|
Alternate air source
|
Details
|
|
|
01-28-2008
|
4.00
|
Oil cooler spacers and baffel fit
|
Details
|
|
|
01-27-2008
|
5.50
|
Riveted L Rear baffels
|
Details
|
|
|
01-26-2008
|
2.50
|
Oil cooler mounting
|
Details
|
|
|
01-25-2008
|
4.30
|
Oil cooler mounting
|
Details
|
|
|
01-24-2008
|
5.50
|
Left rear baffels built up
|
Details
|
|
|
01-23-2008
|
3.50
|
Riveted left side baffels
|
Details
|
|
|
01-22-2008
|
4.40
|
Heat Risers and Air Intake
|
Details
|
|
|
09-16-2007
|
3.60
|
Right forward baffel
|
Details
|
|
|
09-02-2007
|
4.00
|
Baffel Work
|
Details
|
|
|
09-01-2007
|
5.50
|
Inlet Ducts and Baffels
|
Details
|
|
|
08-31-2007
|
5.00
|
Inlet Ducts
|
Details
|
|
|
08-30-2007
|
2.80
|
Cowl Inlet Ducts
|
Details
|
|
|
08-29-2007
|
4.00
|
Forward Baffels
|
Details
|
|
|
08-28-2007
|
3.50
|
Drilled Froward Baffels
|
Details
|
|
|
01-06-2007
|
6.00
|
Forward Baffles
|
Details
|
|
|
01-04-2007
|
6.80
|
FAB Epoxy Complete. Fwd Baffles
|
Details
|
|
|
01-03-2007
|
3.50
|
FAB and Baffles
|
Details
|
|
|
01-02-2007
|
6.60
|
Filtered Air Intake
|
Details
|
|
|
01-01-2007
|
4.50
|
FAB and Baffle Trimming
|
Details
|
|
|
12-31-2006
|
3.60
|
FAB and Began Baffle Trimming
|
Details
|
|
|
12-30-2006
|
2.00
|
Filtered Air Box
|
Details
|
|
|
12-29-2006
|
2.50
|
FAB and Filter Positioning
|
Details
|
|
|
12-28-2006
|
4.80
|
FAB and Trim Forward Floor and Cowl
|
Details
|
|
|
12-27-2006
|
6.00
|
FAB and Baffle Brackets
|
Details
|
|
|
12-26-2006
|
3.50
|
Forward Baffle Floors and FAB
|
Details
|
|
|
12-23-2006
|
5.00
|
Forward Baffle Floors
|
Details
|
|
|
12-22-2006
|
3.00
|
Right Front Baffle Floor
|
Details
|
|
|
12-21-2006
|
3.00
|
Left Forward Floor
|
Details
|
|
|
12-14-2006
|
4.00
|
Baffeling
|
Details
|
|
|
12-13-2006
|
5.00
|
Baffeling
|
Details
|
|
|
12-12-2006
|
8.00
|
Rivet Cowl Hinges
|
Details
|
|
|
12-12-2006
|
2.00
|
Cowel hinge pin retainers
|
Details
|
|
|
12-11-2006
|
1.00
|
Epoxy the cowel edges
|
Details
|
|
|
12-11-2006
|
2.50
|
Began fitting the engine baffeling
|
Details
|
|
|
12-09-2006
|
4.00
|
Cowl fit and begin Baffels
|
Details
|
|
|
12-08-2006
|
4.80
|
Cowling and Pin work
|
Details
|
|
|
12-07-2006
|
5.00
|
Drilled all hinges
|
Details
|
|
|
12-06-2006
|
4.30
|
Cowl Side Hinges Drilled
|
Details
|
|
|
12-05-2006
|
6.40
|
Cowl and Hinges
|
Details
|
|
|
12-04-2006
|
5.50
|
Lower Cowl and Hinges
|
Details
|
|
|
12-03-2006
|
4.00
|
Cut and Fit Lower Cowl
|
Details
|
|
|
11-05-2006
|
5.00
|
Lower cowl
|
Details
|
|
|
11-04-2006
|
3.30
|
Upper Cowl
|
Details
|
|
|
11-03-2006
|
4.00
|
Upper Cowl and Hinge
|
Details
|
|
|
10-24-2006
|
4.00
|
Upper Cowl Hinge
|
Details
|
|
|
10-23-2006
|
5.00
|
Spinner Fit, Top Cowl Hinge
|
Details
|
|
|
10-22-2006
|
1.50
|
Prop Spinner
|
Details
|
|
|
10-22-2006
|
4.50
|
Installed Prop
|
Details
|
|
|
10-21-2006
|
4.00
|
Prop Spinner Bulkhead
|
Details
|
|
|
09-02-2006
|
2.50
|
Installed the magneto cap and wires.
|
Details
|
|
|
08-31-2006
|
5.00
|
Mounted Exhaust System
|
Details
|
|
|
08-30-2006
|
3.50
|
Electronic Ignition Mount
|
Details
|
|
|
08-10-2006
|
5.50
|
Electronic Ignition module mounted
|
Details
|
|
|
08-09-2006
|
2.00
|
Planning electronic ignition installation.
|
Details
|
|
|
08-08-2006
|
3.00
|
Valve cover gaskets and dipstick gasket.
|
Details
|
|
|
08-07-2006
|
3.50
|
Engine control cables
|
Details
|
|
|
07-09-2006
|
3.00
|
Connected manifold pressure lines.
|
Details
|
|
|
07-08-2006
|
5.50
|
Installed throttle and mixture cable brackets. Se
|
Details
|
|
|
07-07-2006
|
5.00
|
Modify throttle and mixture control cable supports
|
Details
|
|
|
07-06-2006
|
6.00
|
Cut firewall holes for engine control cables
|
Details
|
|
|
07-05-2006
|
2.00
|
Installed support brackets for engine control cabl
|
Details
|
|
|
07-05-2006
|
3.00
|
Installed prop governor and control brackets
|
Details
|
|
|
07-03-2006
|
4.50
|
Engine controls
|
Details
|
|
|
03-17-2006
|
4.00
|
Brakes, engine controls planning
|
Details
|
|
|
03-16-2006
|
6.00
|
Alternator
|
Details
|
|
|
03-15-2006
|
2.00
|
Manifold pressure transducer and line.
|
Details
|
|
|
03-15-2006
|
1.80
|
Breather tube, oil dipstick
|
Details
|
|
|
03-14-2006
|
4.60
|
Oil and fuel pressure sensors
|
Details
|
|
|
03-13-2006
|
2.00
|
Oil temp, RPM sensors
|
Details
|
|
|
03-13-2006
|
3.00
|
CHT and various lines
|
Details
|
|
|
03-12-2006
|
2.00
|
Engine installed
|
Details
|
|
|
03-11-2006
|
2.00
|
Hung the engine
|
Details
|
|
|
03-10-2006
|
3.60
|
Prepared for engine mounting
|
Details
|
|
|
03-08-2006
|
3.00
|
Right brake line
|
Details
|
|
|
02-24-2006
|
0.50
|
Uncratted the engine
|
Details
|
|
|
02-24-2006
|
3.00
|
Moved engine and wings
|
Details
|
|
|
02-24-2006
|
2.00
|
Left brake line
|
Details
|
|
|
02-23-2006
|
4.00
|
Installed tailwheel
|
Details
|
|
|
02-22-2006
|
5.00
|
Landing gear installed
|
Details
|
|
|
02-21-2006
|
3.00
|
Mounted tires, packed bearings
|
Details
|
|
|
02-21-2006
|
2.00
|
Installed engine mount
|
Details
|
|
|
02-20-2006
|
3.00
|
Access Panels
|
Details
|
|
|
02-20-2006
|
2.00
|
Access Panels
|
Details
|
|
|
02-19-2006
|
3.50
|
Forward fuselage access panels
|
Details
|
|
|
02-04-2006
|
1.00
|
Aileron control rod bootie
|
Details
|
|
|
02-04-2006
|
2.50
|
Access Panels
|
Details
|
|
|
02-03-2006
|
4.00
|
Access panel flanges
|
Details
|
|
|
02-02-2006
|
3.00
|
Forward fuselage access panels
|
Details
|
|
|
01-20-2006
|
2.00
|
AOA flap position sensor
|
Details
|
|
|
01-19-2006
|
2.00
|
Riveted aft top skin on
|
Details
|
|
|
01-19-2006
|
4.00
|
Re did brake system connections
|
Details
|
|
|
01-18-2006
|
5.70
|
Panel Removal Test; Compass Light
|
Details
|
|
|
01-18-2006
|
0.50
|
Engine delivered
|
Details
|
|
|
01-17-2006
|
6.00
|
Wiring clean-up
|
Details
|
|
|
01-16-2006
|
5.50
|
Reconfigured Bus Bars
|
Details
|
|
|
01-15-2006
|
4.00
|
Circuit Breaker Panel
|
Details
|
|
|
01-02-2006
|
6.00
|
AOA flap sensor
|
Details
|
|
|
01-01-2006
|
5.50
|
AOA Display and Wiring
|
Details
|
|
|
12-31-2005
|
4.30
|
AOA pressure line
|
Details
|
|
|
12-30-2005
|
4.00
|
AOA pressure lines
|
Details
|
|
|
12-27-2005
|
6.00
|
AOA display and sensors
|
Details
|
|
|
12-26-2005
|
2.50
|
AOA pitot static lines
|
Details
|
|
|
12-24-2005
|
1.00
|
AOA box installed
|
Details
|
|
|
12-23-2005
|
6.20
|
AOA mounting
|
Details
|
|
|
12-22-2005
|
3.00
|
Test Left Fuel Tank
|
Details
|
|
|
11-23-2005
|
3.00
|
Tieing wire bundles
|
Details
|
|
|
11-22-2005
|
2.50
|
Map Light Wiring
|
Details
|
|
|
10-21-2005
|
5.00
|
Antenna Connections
|
Details
|
|
|
10-20-2005
|
4.00
|
Antenna wiring
|
Details
|
|
|
10-20-2005
|
5.00
|
Antenna wiring
|
Details
|
|
|
10-20-2005
|
3.00
|
Antenna Mounts
|
Details
|
|
|
10-19-2005
|
6.00
|
Sealed fuel Tanks
|
Details
|
|
|
10-18-2005
|
3.60
|
Installed nutplates for empenage fairings
|
Details
|
|
|
10-18-2005
|
4.00
|
Aft cockpit skin drilled
|
Details
|
|
|
10-17-2005
|
4.00
|
Replaced Elevator Trim Hinge
|
Details
|
|
|
10-16-2005
|
5.50
|
Flight Control Bushings
|
Details
|
|
|
10-14-2005
|
6.00
|
Finished wiring pilot stick and trim
|
Details
|
|
|
10-13-2005
|
6.70
|
Rewiring the trim and pilot stick
|
Details
|
|
|
10-12-2005
|
5.00
|
Rewired the pilot stick and trim.
|
Details
|
|
|
10-11-2005
|
3.00
|
Replaced the Heat Valve on Firewall
|
Details
|
|
|
10-08-2005
|
3.60
|
Installed Map Lights & Panel Support
|
Details
|
|
|
10-07-2005
|
4.00
|
Map Lights & Panel Support
|
Details
|
|
|
09-29-2005
|
3.00
|
Wiring
|
Details
|
|
|
09-27-2005
|
5.00
|
Panel troubleshooting
|
Details
|
|
|
09-25-2005
|
4.00
|
Electrical Troubleshooting
|
Details
|
|
|
09-02-2005
|
3.50
|
Panel troubleshooting
|
Details
|
|
|
08-31-2005
|
5.00
|
Panel troubleshooting
|
Details
|
|
|
08-30-2005
|
3.00
|
Panel Audio Checks
|
Details
|
|
|
08-29-2005
|
4.00
|
ACS 2002 connections
|
Details
|
|
|
08-27-2005
|
3.30
|
Wired Relays
|
Details
|
|
|
08-26-2005
|
4.50
|
Wired Relays
|
Details
|
|
|
07-25-2005
|
3.00
|
Defog Vent
|
Details
|
|
|
07-24-2005
|
3.60
|
Defog vent
|
Details
|
|
|
07-20-2005
|
2.50
|
ACS 2002
|
Details
|
|
|
07-19-2005
|
4.00
|
Amp sensor
|
Details
|
|
|
07-05-2005
|
4.00
|
Heat and Fan Control Cables
|
Details
|
|
|
07-04-2005
|
2.80
|
Parking Brake Cable
|
Details
|
|
|
07-03-2005
|
3.00
|
Pitot Static connections
|
Details
|
|
|
07-02-2005
|
3.60
|
Avionics Cooling Fan
|
Details
|
|
|
07-01-2005
|
4.20
|
Avionics Coolong Fan
|
Details
|
|
|
06-20-2005
|
6.30
|
Avionics Cooling Fan
|
Details
|
|
|
06-17-2005
|
4.20
|
Avionics Cooling Fan
|
Details
|
|
|
06-15-2005
|
4.80
|
Headset/Mic Jacks
|
Details
|
|
|
06-14-2005
|
4.50
|
Headset/Mic Jacks
|
Details
|
|
|
06-13-2005
|
5.00
|
Installed armrest support
|
Details
|
|
|
06-11-2005
|
7.30
|
Wired Autopilot wiring connectors
|
Details
|
|
|
03-07-2005
|
6.30
|
Auto Pilot Roll Servo Wiring
|
Details
|
|
|
03-06-2005
|
4.00
|
Auro Pilot Pitch Harness
|
Details
|
|
|
03-05-2005
|
4.50
|
VHF #2 Installed
|
Details
|
|
|
02-24-2005
|
4.00
|
Wiring tail lights
|
Details
|
|
|
02-24-2005
|
3.50
|
Mounted map lights
|
Details
|
|
|
02-23-2005
|
5.00
|
Wiring auto pilot and mounted relays
|
Details
|
|
|
02-22-2005
|
6.00
|
Wiring from panel to wings
|
Details
|
|
|
02-21-2005
|
6.30
|
Wired trim and position indicators
|
Details
|
|
|
02-20-2005
|
5.30
|
Flap Position Indicator
|
Details
|
|
|
02-19-2005
|
3.00
|
Stick Trim Wiring
|
Details
|
|
|
02-18-2005
|
4.60
|
Elevator Trim Wiring
|
Details
|
|
|
02-17-2005
|
4.00
|
Wiring harness for com 2
|
Details
|
|
|
02-16-2005
|
3.50
|
Added Second Com Radio
|
Details
|
|
|
01-20-2005
|
6.00
|
Control Stick Wiring
|
Details
|
|
|
01-19-2005
|
2.00
|
Wiring runs
|
Details
|
|
|
01-19-2005
|
5.00
|
ELT Antenna
|
Details
|
|
|
01-18-2005
|
7.30
|
Strobe and ELT wiring
|
Details
|
|
|
01-17-2005
|
5.00
|
Wiring conduit
|
Details
|
|
|
01-05-2005
|
4.00
|
Wiring conduits added
|
Details
|
|
|
01-04-2005
|
3.50
|
Ran Static Line
|
Details
|
|
|
01-03-2005
|
4.00
|
Mounted ELT and Strobe power pack
|
Details
|
|
|
01-02-2005
|
3.00
|
Made mounts for ELT and Strobe
|
Details
|
|
|
01-01-2005
|
3.50
|
Wired the fuel pump and FF
|
Details
|
|
|
12-30-2004
|
3.00
|
Switched Circuit Breakers
|
Details
|
|
|
12-28-2004
|
2.00
|
Installed wiring conduit below panel
|
Details
|
|
|
12-27-2004
|
3.50
|
Modify center floor cover
|
Details
|
|
|
11-28-2004
|
4.00
|
Attached poser feeds to the busses
|
Details
|
|
|
11-26-2004
|
4.50
|
Electrical buss power feeds
|
Details
|
|
|
10-17-2004
|
4.00
|
Avionics Soledoid and ground block
|
Details
|
|
|
10-10-2004
|
3.00
|
Mounted ACS 2002 Control box
|
Details
|
|
|
10-09-2004
|
4.00
|
Installed dimmer transformer and encoder
|
Details
|
|
|
10-08-2004
|
6.00
|
Attached Diodes, organized shop
|
Details
|
|
|
10-07-2004
|
2.00
|
Assembled Diodes for relays.
|
Details
|
|
|
10-06-2004
|
4.00
|
Planning electrical connections
|
Details
|
|
|
10-05-2004
|
2.30
|
Mounted the instruments into the panel
|
Details
|
|
|
10-04-2004
|
4.00
|
Connected Bettery and Starter relays.
|
Details
|
|
|
09-08-2004
|
4.50
|
Engine controls sub panel
|
Details
|
|
|
09-07-2004
|
2.00
|
Installed air vent hose
|
Details
|
|
|
09-06-2004
|
8.60
|
Sub Panels
|
Details
|
|
|
09-03-2004
|
4.50
|
Panel frame, fuel line
|
Details
|
|
|
09-02-2004
|
5.50
|
Canopy finish work
|
Details
|
|
|
09-01-2004
|
6.30
|
Canopy finish work
|
Details
|
|
|
08-31-2004
|
7.50
|
Riveted the canopy to the frame
|
Details
|
|
|
08-30-2004
|
7.00
|
Mounted Soledoids to the Firewall
|
Details
|
|
|
08-29-2004
|
6.20
|
Installed the battery box
|
Details
|
|
|
08-28-2004
|
4.50
|
Canopy Frame and Battery Box
|
Details
|
|
|
08-24-2004
|
4.50
|
Fuel and purge lines
|
Details
|
|
|
07-18-2004
|
6.50
|
Heat box and fuel flow sensor
|
Details
|
|
|
07-17-2004
|
4.00
|
Made new side skirts
|
Details
|
|
|
07-16-2004
|
3.50
|
Panel support
|
Details
|
|
|
07-14-2004
|
3.00
|
Instrument panel installation
|
Details
|
|
|
07-13-2004
|
1.00
|
Painted canopy frame
|
Details
|
|
|
07-13-2004
|
2.50
|
Installed the instrument panel frame
|
Details
|
|
|
07-11-2004
|
1.00
|
Rear canopy skirt
|
Details
|
|
|
07-11-2004
|
1.00
|
Brake pedals and lines
|
Details
|
|
|
07-08-2004
|
10.00
|
Canopy fit and rear skirts
|
Details
|
|
|
07-07-2004
|
3.50
|
Canopy slide rails
|
Details
|
|
|
07-06-2004
|
9.00
|
Canopy and side skirts
|
Details
|
|
|
07-05-2004
|
4.80
|
Canopy fit
|
Details
|
|
|
06-26-2004
|
8.00
|
Canopy fit and plexiglass finishing
|
Details
|
|
|
06-25-2004
|
3.50
|
Canopy side skirts and frame
|
Details
|
|
|
06-24-2004
|
7.00
|
Canopy side skirts
|
Details
|
|
|
06-23-2004
|
2.50
|
Canopy rear blocks
|
Details
|
|
|
06-23-2004
|
3.20
|
Canopy Latch
|
Details
|
|
|
06-22-2004
|
4.40
|
Trimmed Windscreen
|
Details
|
|
|
05-26-2004
|
4.00
|
Canopy
|
Details
|
|
|
05-24-2004
|
3.50
|
Canopy cover strip
|
Details
|
|
|
05-23-2004
|
5.80
|
Drilled the Canopy
|
Details
|
|
|
05-22-2004
|
6.30
|
Cut the Canopy
|
Details
|
|
|
05-21-2004
|
4.50
|
Canopy plexiglass
|
Details
|
|
|
05-18-2004
|
6.50
|
Canopy Frame
|
Details
|
|
|
05-17-2004
|
5.50
|
Canopy Frame
|
Details
|
|
|
05-16-2004
|
4.80
|
Auto pilot servos
|
Details
|
|
|
05-12-2004
|
3.90
|
Canopy slide
|
Details
|
|
|
05-11-2004
|
4.60
|
Canopy roll bar
|
Details
|
|
|
05-10-2004
|
3.60
|
Elevator auto pilot servo bracket
|
Details
|
|
|
05-09-2004
|
4.50
|
Completed airleron trim
|
Details
|
|
|
05-08-2004
|
3.80
|
Installed aileron trim servo
|
Details
|
|
|
05-07-2004
|
5.00
|
Aileron trim
|
Details
|
|
|
05-06-2004
|
6.50
|
Reassembled the forward cockpit area
|
Details
|
|
|
05-05-2004
|
6.00
|
Forward cockpit assembly
|
Details
|
|
|
05-04-2004
|
3.60
|
Prepared the air vents
|
Details
|
|
|
04-23-2004
|
3.50
|
Drilled Engine Mount
|
Details
|
|
|
04-01-2004
|
3.50
|
Made pattern templates for the interior.
|
Details
|
|
|
03-31-2004
|
5.60
|
Installed the brake lines.
|
Details
|
|
|
02-20-2004
|
4.70
|
Parking Brake Valve
|
Details
|
|
|
01-18-2004
|
2.50
|
Side panel and brake plate fitting.
|
Details
|
|
|
01-16-2004
|
6.00
|
HP fuel pump lines
|
Details
|
|
|
01-15-2004
|
4.60
|
HP fuel pump lines
|
Details
|
|
|
01-13-2004
|
2.50
|
Fuel vent fittings
|
Details
|
|
|
01-12-2004
|
4.00
|
Fuel vent line
|
Details
|
|
|
01-03-2004
|
3.50
|
Fuel pump and selector valve
|
Details
|
|
|
01-02-2004
|
2.80
|
Fuel pump housing
|
Details
|
|
|
12-17-2003
|
5.50
|
Fitted Empennage fairings
|
Details
|
|
|
12-16-2003
|
1.50
|
Installed rudder stops
|
Details
|
|
|
12-15-2003
|
1.60
|
Manufactured new rudder stop
|
Details
|
|
|
11-26-2003
|
2.50
|
Wired the flap motor
|
Details
|
|
|
11-26-2003
|
2.00
|
Riveted the seats together
|
Details
|
|
|
11-25-2003
|
2.30
|
Rudder Cable Fairings
|
Details
|
|
|
11-25-2003
|
1.50
|
Installed Flap control
|
Details
|
|
|
11-24-2003
|
3.00
|
Routed the Rudder Cable
|
Details
|
|
|
11-23-2003
|
2.50
|
Completed New Rudder
|
Details
|
|
|
11-13-2003
|
3.50
|
Riveted Seats
|
Details
|
|
|
11-13-2003
|
5.00
|
Painted the interior
|
Details
|
|
|
11-12-2003
|
4.50
|
Primed the interior
|
Details
|
|
|
11-11-2003
|
3.00
|
Masked fuselage for interior painting
|
Details
|
|
|
11-10-2003
|
3.00
|
Pro Sealed the new rudder trailing edge
|
Details
|
|
|
11-09-2003
|
5.30
|
Mounted the Vertical Stabilizer
|
Details
|
|
|
11-06-2003
|
2.50
|
Constructed elevator control rods
|
Details
|
|
|
11-05-2003
|
4.30
|
Mounted the HS
|
Details
|
|
|
11-04-2003
|
3.50
|
Installed the Horizontal Stabilizer
|
Details
|
|
|
11-03-2003
|
2.30
|
Various fuselage items
|
Details
|
|
|
11-02-2003
|
4.00
|
Various wing items
|
Details
|
|
|
11-02-2003
|
3.50
|
Removed Wings
|
Details
|
|
|
10-24-2003
|
5.80
|
Altered Flap Hinge
|
Details
|
|
|
10-23-2003
|
4.50
|
Installed flap position switch
|
Details
|
|
|
10-22-2003
|
5.50
|
Fuel lines from wing to fuselage
|
Details
|
|
|
09-23-2003
|
2.00
|
Finalized Instrument Panel Plan
|
Details
|
|
|
08-23-2003
|
14.00
|
Electrical Workshop
|
Details
|
|
|
08-19-2003
|
10.00
|
Planning Instrument Panel
|
Details
|
|
|
07-31-2003
|
6.50
|
Rigged Ailerons and Flaps
|
Details
|
|
|
07-30-2003
|
5.30
|
Installed flap rod and control links
|
Details
|
|
|
07-28-2003
|
2.50
|
Hung Ailerons and Flaps
|
Details
|
|
|
07-23-2003
|
5.30
|
Completed wing attachment
|
Details
|
|
|
07-22-2003
|
2.50
|
Trimmed rear wing spar
|
Details
|
|
|
07-21-2003
|
2.00
|
Checked wing position
|
Details
|
|
|
07-08-2003
|
2.50
|
Mated the wings
|
Details
|
|
|
07-07-2003
|
7.50
|
Prepared to mate the wings
|
Details
|
|
|
07-06-2003
|
4.00
|
Riveted the new rudder
|
Details
|
|
|
07-05-2003
|
5.30
|
Began the rudder frame
|
Details
|
|
|
06-28-2003
|
4.50
|
Began building the new rudder.
|
Details
|
|
|
06-27-2003
|
3.40
|
Finished riveting lower OB rt wing skin
|
Details
|
|
|
06-26-2003
|
3.00
|
Riveted the lower rt wing skin
|
Details
|
|
|
06-25-2003
|
3.50
|
Drilled and dimpled lower rt wing skin
|
Details
|
|
|
06-04-2003
|
2.50
|
Inventory finish kit
|
Details
|
|
|
06-03-2003
|
5.50
|
Rivet the left lower outer wing skin
|
Details
|
|
|
06-02-2003
|
0.30
|
Primered the lower outer wing skins
|
Details
|
|
|
04-23-2003
|
1.50
|
Installed Static Port
|
Details
|
|
|
04-01-2003
|
1.00
|
EAA Inspection
|
Details
|
|
|
01-09-2003
|
4.00
|
Assembled Flap Actuator
|
Details
|
|
|
01-08-2003
|
5.50
|
Flap Actuator
|
Details
|
|
|
01-07-2003
|
1.00
|
Lightening holes in seat support
|
Details
|
|
|
01-07-2003
|
4.50
|
Flap actuator
|
Details
|
|
|
01-06-2003
|
2.60
|
Cockpit floor panels
|
Details
|
|
|
01-05-2003
|
5.00
|
Preparing interior panels
|
Details
|
|
|
01-04-2003
|
2.60
|
Preparing cockpit floor panels
|
Details
|
|
|
12-31-2002
|
2.50
|
Installed seat frames
|
Details
|
|
|
12-23-2002
|
4.50
|
Cockpit seats
|
Details
|
|
|
12-20-2002
|
4.20
|
Baggage compartment
|
Details
|
|
|
12-17-2002
|
5.50
|
Fuselage top skin and access covers
|
Details
|
|
|
12-16-2002
|
2.30
|
Fuselage and wing access panels
|
Details
|
|
|
11-15-2002
|
4.30
|
Tailspring
|
Details
|
|
|
11-03-2002
|
2.20
|
Rudder Pedal Assembly
|
Details
|
|
|
10-28-2002
|
1.00
|
Rudder pedals
|
Details
|
|
|
10-27-2002
|
3.20
|
Rudder Pedal
|
Details
|
|
|
10-24-2002
|
2.30
|
Flight control assembly
|
Details
|
|
|
09-22-2002
|
1.50
|
Fiberglass Wing Tips
|
Details
|
|
|
08-24-2002
|
1.40
|
Fiberglass wing tips
|
Details
|
|
|
08-22-2002
|
1.50
|
Fiberglass Wing Tips
|
Details
|
|
|
08-21-2002
|
1.60
|
Fiberglass Wing Tips
|
Details
|
|
|
08-21-2002
|
4.00
|
Fiberglass Tips
|
Details
|
|
|
08-20-2002
|
3.60
|
Fiberglass Tips
|
Details
|
|
|
08-19-2002
|
3.00
|
Fiberglass Tips
|
Details
|
|
|
08-18-2002
|
2.30
|
Fiberglass tips
|
Details
|
|
|
08-10-2002
|
1.00
|
Wingtip lights and lenses.
|
Details
|
|
|
08-10-2002
|
2.00
|
Began fitting fiberglass tips
|
Details
|
|
|
07-14-2002
|
1.50
|
Adjusted elevator counterweights
|
Details
|
|
|
07-10-2002
|
3.50
|
Electrical wiring in left wing
|
Details
|
|
|
07-04-2002
|
2.50
|
Electrical wiring in right wing
|
Details
|
|
|
07-03-2002
|
5.00
|
Installed landing light into right wing
|
Details
|
|
|
07-02-2002
|
4.30
|
Electircal conduit into right wing
|
Details
|
|
|
07-01-2002
|
5.50
|
Flap and ailerons to wings
|
Details
|
|
|
06-30-2002
|
4.30
|
Aileron attached to the left wing
|
Details
|
|
|
06-29-2002
|
3.50
|
Flap and Aileron attachment
|
Details
|
|
|
05-27-2002
|
3.40
|
Install conduit in left wing
|
Details
|
|
|
05-26-2002
|
6.00
|
Assembled the aileron control rods
|
Details
|
|
|
05-25-2002
|
2.70
|
Landing light
|
Details
|
|
|
05-24-2002
|
3.00
|
Landing light
|
Details
|
|
|
05-23-2002
|
2.50
|
Pitot tube and landing lights
|
Details
|
|
|
05-21-2002
|
4.00
|
Pitot tube mounting bracket
|
Details
|
|
|
05-18-2002
|
2.00
|
Fit rudder to VS and elevator to HS
|
Details
|
|
|
04-03-2002
|
2.50
|
Attach the trim tab to the elevator
|
Details
|
|
|
04-02-2002
|
4.50
|
Assemble electric elevator trim system
|
Details
|
|
|
04-01-2002
|
4.50
|
Fabricate the elevator trim tab
|
Details
|
|
|
03-26-2002
|
2.45
|
Roll the elevator leading edge
|
Details
|
|
|
03-24-2002
|
2.00
|
Rivet elevator skins to the frame
|
Details
|
|
|
03-23-2002
|
1.50
|
Prepare elevator counterbalence
|
Details
|
|
|
03-22-2002
|
2.00
|
Rivet the elevator frame
|
Details
|
|
|
03-21-2002
|
2.00
|
Drill and prime the elevator frame
|
Details
|
|
|
02-21-2002
|
1.40
|
Rivet stiffeners to elevator skins
|
Details
|
|
|
02-04-2002
|
2.00
|
Prime the elevator skins and stiffeners
|
Details
|
|
|
02-02-2002
|
1.50
|
Debur and dimple the elevators
|
Details
|
|
|
02-01-2002
|
3.00
|
Drill elevator stiffeners
|
Details
|
|
|
01-31-2002
|
6.20
|
Fabricate the elevator stiffeners
|
Details
|
|
|
01-30-2002
|
1.50
|
Drill skins to spar
|
Details
|
|
|
01-16-2002
|
2.00
|
Rivet leading edge of the rudder
|
Details
|
|
|
01-14-2002
|
4.20
|
Assemble the rudder
|
Details
|
|
|
01-13-2002
|
3.50
|
Built V-Jig and drilled the skin
|
Details
|
|
|
01-12-2002
|
3.30
|
Rivet the rudder structure
|
Details
|
|
|
01-11-2002
|
2.00
|
Primed the rudder structure
|
Details
|
|
|
01-10-2002
|
3.00
|
Assembled the rudder structure
|
Details
|
|
|
01-01-2002
|
3.00
|
Rivet rudder stiffeners
|
Details
|
|
|
12-30-2001
|
4.00
|
Drill, debur, dimple and prime rudder
|
Details
|
|
|
12-28-2001
|
1.50
|
Cut the rudder stiffeners
|
Details
|
|
|
12-27-2001
|
4.50
|
Inventory QB kit
|
Details
|
|
|
12-20-2001
|
5.00
|
Built wing storage cradle
|
Details
|
|
|
12-19-2001
|
3.00
|
Picked up the QB kit
|
Details
|
|
|
11-04-2001
|
5.50
|
Rivet VS skin
|
Details
|
|
|
11-03-2001
|
4.00
|
Rivet VS spars and ribs
|
Details
|
|
|
11-02-2001
|
6.00
|
Debur and prime VS
|
Details
|
|
|
11-01-2001
|
4.00
|
Drill the VS skeleton and skins
|
Details
|
|
|
10-31-2001
|
1.50
|
VS808 & VS803
|
Details
|
|
|
10-30-2001
|
5.00
|
Rivet HS601 skins
|
Details
|
|
|
10-26-2001
|
4.00
|
Rivet HS ribs to spars
|
Details
|
|
|
10-25-2001
|
2.00
|
Prime the HS skins
|
Details
|
|
|
10-24-2001
|
4.50
|
Dimpled the HS
|
Details
|
|
|
10-23-2001
|
2.00
|
Deburr the HS
|
Details
|
|
|
10-22-2001
|
4.00
|
Drill HS skins
|
Details
|
|
|
10-16-2001
|
2.50
|
Assembled the HS on the jig
|
Details
|
|
|
10-12-2001
|
3.00
|
Rivet the spars
|
Details
|
|
|
10-09-2001
|
2.50
|
Prime HS ribs and spars
|
Details
|
|
|
10-08-2001
|
2.20
|
HS610, HS614 and HS602
|
Details
|
|
|
10-02-2001
|
2.20
|
Fabricate the HS610 and HS614
|
Details
|
|
|
10-01-2001
|
2.50
|
Fabricate the HS610 and HS614
|
Details
|
|
|
09-03-2001
|
1.00
|
HS rear spar
|
Details
|
|
|
09-02-2001
|
4.00
|
HS rear spar
|
Details
|
|
|
08-27-2001
|
2.50
|
HS603
|
Details
|
|
|
08-21-2001
|
5.00
|
Build jig
|
Details
|
|
|
08-19-2001
|
4.00
|
Build work bench
|
Details
|
|
|
07-25-2001
|
1.50
|
Inventory empennage kit
|
|
|
|
07-20-2001
|
0.10
|
Empennage kit received
|
|
|
|
07-16-2001
|
0.10
|
Ordered RV7 kit
|
Details
|
|
|
05-11-2001
|
16.00
|
Builder's Class
|
Details
|
|