KitLog pro

Powered By Kitlog Pro v2.0

Bobs RV7 Site
Work Logs Found: 663
Category Work Time: 2285 Hours
 Date
Hours
Work Log Summary

Details

 02-13-2013
1.50
GPS and Autopilot Checks
Details
       

 02-10-2013
4.00
Items Noted on Inspection Review
Details
       

 02-09-2013
0.00
Tech Inspection
Details
       

 02-09-2013
0.00
Tech Advisor Recommendations
Details
       

 02-05-2013
3.20
Trim Indication & GPS Antenna
Details
       

 02-05-2013
1.00
Adjusted Mixture
Details
       

 02-04-2013
2.60
Second Engine Start
Details
       

 02-02-2013
3.60
Electronic Ignition Troubleshooting
Details
       

 01-31-2013
0.00
Tailwheel Training
Details
       

 01-17-2013
4.00
Alternator Field and Download ACS2002 Data
Details
       

 01-15-2013
1.00
Spark Plugs Gapped and Installed
Details
       

 01-15-2013
0.80
Pre Oiled the Engine
Details
       

 01-15-2013
1.00
First Engine Start
Details
       

 01-15-2013
0.50
Engine Oil Added
Details
       

 01-14-2013
1.60
Drained Preservative Oil, Installed Quick Drain
Details
       

 01-14-2013
1.50
Cleaned Windscreen and Installed Access Covers
Details
       

 01-12-2013
2.40
Oil Filter and Oil Purge Line
Details
       

 01-12-2013
0.30
Forward Top Skin Attached
Details
       

 01-10-2013
1.00
Prop Tracking Check
Details
       

 01-09-2013
2.20
Fuel System Checks
Details
       

 01-08-2013
1.70
Fuel Purge System Tests
Details
       

 01-07-2013
2.50
Fuel Flow from Boost Pump Test
Details
       

 01-03-2013
2.30
Fuel System Test
Details
       

 12-03-2012
3.00
Safety Wire Worm Clips
Details
       

 11-29-2012
2.00
ECI Engine Clip SB
Details
       

 11-16-2012
2.30
Compass Mount
Details
       

 11-15-2012
2.00
Instrument Panel Flange and Hangar Cleanup
Details
       

 11-14-2012
2.00
Electrical Schematic
Details
       

 11-13-2012
1.50
Wired Battery Charger
Details
       

 11-07-2012
2.00
Installed the Battery
Details
       

 11-02-2012
1.50
Finished Cowling
Details
       

 11-01-2012
1.60
Engine Oil
Details
       

 10-30-2012
2.60
Prime Cowling and Engine Preservative Oil
Details
       

 10-29-2012
1.60
Installed Boots to Electrical Contacts FWF
Details
       

 10-25-2012
3.30
Prime and Sanding of the Cowling
Details
       

 10-23-2012
4.00
Pilots Operating Handbook
Details
     

 10-03-2012
2.30
Removed Canopy Plastic
Details
       

 09-28-2012
1.00
Cowling Hinge Pin Cover
Details
       

 09-27-2012
1.30
Interior Side Panels
Details
       

 09-27-2012
2.00
Cowel Hinge Pin Cover
Details
       

 09-26-2012
2.00
Cowling Hinge Pin Cover
Details
       

 09-25-2012
1.80
Brake Fluid
Details
       

 09-19-2012
3.30
Side panel and wheel fairings
Details
       

 09-18-2012
1.90
N Number
Details
       

 09-18-2012
2.00
Instrument Panel Placards
Details
       

 09-10-2012
3.00
Landing Gear Fairings
Details
       

 09-10-2012
1.00
Engraved Panel Plackards
Details
       

 09-07-2012
1.50
Rudder Cables Attached
Details
       

 09-06-2012
1.90
Rudder Cables Attached
Details
       

 09-05-2012
3.60
Landing Gear Fairings and Prop
Details
       

 09-04-2012
3.20
Wing Tip Attach
Details
       

 09-01-2012
4.20
Gear Fairings and Wing Tips
Details
       

 08-29-2012
2.60
Confirmed Engine Ignition Timing
Details
       

 08-28-2012
4.40
Wheel Pants and Tire Inflation Access
Details
       

 08-27-2012
4.80
Wheel Pants
Details
       

 08-23-2012
5.00
Wheel pants
Details
       

 08-22-2012
6.00
Gear leg fairings and wheel pants
Details
       

 08-21-2012
5.10
Empennage Fairing
Details
       

 08-17-2012
4.20
Lower gear leg intersection fairing
Details
       

 08-16-2012
3.00
Lower gear leg intersection fairings
Details
       

 08-15-2012
5.60
Upper gear leg fairings
Details
       

 08-14-2012
3.50
Upper gear leg fairing
Details
       

 08-13-2012
4.50
Upper gear fairing nutplates
Details
       

 08-08-2012
3.80
Upper gear leg fairing
Details
       

 08-07-2012
5.00
Installed mounting bracket to wheel pants
Details
       

 08-02-2012
2.90
Wheel Pants
Details
       

 08-02-2012
3.50
Wheel Pant
Details
       

 08-01-2012
3.00
Wheel Fairings Trimmed
Details
       

 08-01-2012
3.20
Fit Wheel Pants
Details
       

 07-31-2012
1.60
Cleaned up Gear Leg Stiffeners
Details
       

 07-31-2012
3.50
Align the Gear Leg Fairings
Details
       

 07-30-2012
3.00
Fiberglassed the Gear Leg Stiffeners
Details
       

 07-30-2012
0.80
Empennage Fairing Rubber Seal
Details
       

 07-30-2012
1.50
Empennage Fairing Repair
Details
       

 07-27-2012
2.00
Wheel Pant Fairings
Details
       

 07-27-2012
3.00
Wheel Fairings
Details
       

 07-25-2012
2.00
Gear Leg Fairing
Details
       

 07-25-2012
2.00
Etching of CB panel, labels and fuel caps
Details
       

 07-23-2012
1.50
GPS antenna, ELT and Lift Table
Details
       

 07-23-2012
1.50
Gear Leg Stiffener Attached
Details
       

 07-20-2012
3.20
Landing Gear Stiffeners
Details
       

 07-20-2012
2.50
Gear Leg Fairings
Details
       

 07-19-2012
3.00
Gear Leg Fairings
Details
       

 07-18-2012
1.00
Removed all fairings
Details
     

 07-18-2012
1.50
Installed Aileron Rod Seal
Details
       

 07-18-2012
0.50
Gear Fairings
Details
     

 07-17-2012
2.30
Wing Root Fairing
Details
       

 07-17-2012
0.50
Wing Fairing
Details
       

 07-17-2012
2.20
Empennage Fairing Final Fit
Details
       

 07-16-2012
1.00
Torqued and Checked Control Stick Connections
Details
       

 07-16-2012
1.20
Installed Tie Down Rings
Details
       

 07-16-2012
1.00
Checked Aileron Control Connections
Details
       

 07-14-2012
2.00
Installed GPS antenna
Details
       

 07-13-2012
1.80
Installed Transponder and Traffic Antennas
Details
       

 07-13-2012
1.40
Installed Com Antennas
Details
       

 07-12-2012
1.20
Checked Flight Control Limits
Details
       

 07-11-2012
2.50
Installed Flaps
Details
       

 07-11-2012
1.60
Flap Position Indicator Calibration
Details
       

 07-09-2012
2.00
Secured Ailerons
Details
       

 07-09-2012
2.00
Adjusted the Aileron Control Push Rods
Details
       

 07-06-2012
1.00
Secured Wiring under the Cockpit Floor
Details
       

 07-05-2012
1.50
Static Line Tested
Details
       

 07-05-2012
2.30
Secured Lower Rudder Tip
Details
       

 07-05-2012
2.00
Installed Tailwheel Steering Link
Details
       

 07-03-2012
1.00
Tested Pitot Line
Details
       

 07-03-2012
3.50
Pitot Tube Connections
Details
       

 07-02-2012
0.70
Wing Cradle Tossed Out
Details
       

 07-02-2012
1.00
Torqued Wing Nuts
Details
       

 07-02-2012
1.50
Aft Wing Spar and Fuel Tank Secured
Details
       

 06-29-2012
3.00
Wings various
Details
       

 06-29-2012
1.00
Installed Wing Attach Bolts
Details
       

 06-28-2012
2.00
Wing connections
Details
       

 06-27-2012
3.30
Wing Attachments
Details
       

 06-26-2012
3.00
Mated the Wings
Details
       

 06-22-2012
1.30
Prepared to mount the wings
Details
       

 06-20-2012
1.00
Re applied torque sealer.
Details
       

 06-20-2012
1.00
Conneted rudder cables
Details
       

 06-18-2012
1.50
Confirmed Elevator and Rudder Travel
Details
       

 06-14-2012
2.40
Rudder Mounted
Details
       

 06-12-2012
3.00
Vertical Stabilizer Mounted
Details
       

 06-12-2012
1.50
Elevator Trim
Details
       

 06-11-2012
2.20
Elevator Trim Connections
Details
       

 06-08-2012
2.70
Mounted the elevator
Details
       

 06-07-2012
2.50
Mounted Horizontal Stabilizer
Details
       

 05-30-2012
5.20
Hangar Set Up
Details
       

 04-12-2012
2.00
Moved into Gig Harbor
Details
       

 04-11-2012
2.00
Moving Day 2
Details
       

 04-11-2012
2.00
Moving Day 1
Details
       

 04-11-2012
2.00
Move Day 4
Details
       

 04-11-2012
2.00
Move Day 3
Details
       

 04-10-2012
5.00
Prepping For Move to Hangar
Details
     

 02-02-2012
8.00
Final Fit of the Empennage Fairing
Details
       

 01-30-2012
4.10
Final Fit of the Rudder Lower Tip
Details
       

 01-27-2012
3.00
Attached Strobe Light to Lower Rudder
Details
       

 01-26-2012
3.60
Drilled and Attached Nutplates to lower Rudder
Details
       

 01-23-2012
5.50
Modified Shape and Fit of the Empennage Fairing
Details
       

 12-19-2011
1.80
Empennage Fairing
Details
       

 12-15-2011
3.00
Lower Rudder Tip
Details
       

 12-13-2011
2.10
Empennage Access Cover
Details
       

 11-23-2011
2.70
Empennage Fairing
Details
       

 11-21-2011
2.50
Reinstalled VS and HS
Details
       

 11-20-2011
3.00
Installed Heat Tape in Lower Cowl
Details
       

 11-18-2011
2.50
New ELT installation
Details
       

 11-17-2011
3.00
Installed New ELT
Details
       

 11-04-2011
1.50
Right Seat Control Stick Pin
Details
       

 10-04-2011
3.70
Starter Test
Details
       

 09-06-2011
5.00
Interior packed away
Details
       

 09-01-2011
5.10
Interior
Details
       

 08-30-2011
2.90
Interior
Details
       

 08-19-2011
4.00
Interior
Details
       

 08-16-2011
3.90
Interior installation
Details
       

 08-15-2011
4.40
Seat Attachment
Details
       

 08-15-2011
2.00
Seat Attachment
Details
       

 07-21-2011
3.30
Insulation
Details
       

 07-20-2011
6.00
Insulation and Sound Proofing
Details
       

 07-14-2011
5.50
Sealed the Firewall
Details
       

 07-11-2011
3.90
Fuel Tank Service Bulletin
Details
       

 07-01-2011
4.80
Fuel Tank Service Bulletin
Details
       

 06-30-2011
6.60
Fuel Tank Service Bulletin
Details
       

 06-15-2011
3.20
Glare Shield
Details
       

 06-14-2011
1.50
Flap drive safety wire.
Details
       

 06-14-2011
1.50
Auto Pilot Service Bulletin
Details
       

 06-06-2011
4.00
Trimming Side Panel
Details
       

 06-03-2011
5.80
Control Cables & Headset Jacks
Details
       

 06-02-2011
3.30
Reinstalling cables
Details
       

 05-30-2011
5.50
Interior Side Panel
Details
       

 05-11-2011
2.60
Fuel Cover and Wiring
Details
       

 05-10-2011
3.90
Fuel Cover
Details
       

 05-02-2011
2.30
Right Seat Stick Pin
Details
       

 04-30-2011
3.60
Seat Belt Crotch Strap
Details
       

 04-30-2011
3.00
Seat Belt Crotch Strap
Details
       

 04-29-2011
4.60
Seat Belt Crotch Strap
Details
       

 04-28-2011
2.00
Sidewall Panel
Details
       

 04-28-2011
3.00
Seat Belt Crotch Strap
Details
       

 04-27-2011
2.00
Fit Sidewall Panel
Details
       

 04-18-2011
3.20
Order the interior
Details
       

 03-09-2011
3.00
Final fit of upper cowling
Details
       

 03-09-2011
1.00
Final fit of cowling
Details
       

 03-07-2011
3.00
Empennage Tips
Details
       

 03-04-2011
2.40
Cowling fit and epoxy interior
Details
       

 03-01-2011
3.10
Right Seat Stick pin
Details
       

 02-22-2011
4.00
Wing Tips final fit
Details
       

 02-07-2011
3.00
Empennage Tips
Details
       

 02-02-2011
6.00
Empennage Tips
Details
       

 01-30-2011
4.70
Empennage Tips
Details
       

 01-28-2011
3.50
Empennage Tips
Details
       

 01-25-2011
4.10
Empennage Tips
Details
       

 01-24-2011
4.50
Empennage Tips
Details
       

 01-20-2011
4.00
Wing Tips
Details
       

 12-08-2010
3.80
Wing Tips - Marker Antenna
Details
       

 12-06-2010
3.30
Wing Tip VOR Antenna
Details
       

 12-05-2010
4.60
Wing Tip Attachment
Details
       

 12-02-2010
4.20
Wing Tips
Details
       

 12-01-2010
4.00
Wing Tips
Details
       

 11-23-2010
2.50
Wing Tips
Details
       

 11-22-2010
4.50
Wing Tips
Details
       

 11-17-2010
3.70
Wing Tips
Details
       

 10-29-2010
1.50
Cowling Attach Pin
Details
       

 10-28-2010
6.00
Cowling Sanding and Primer
Details
       

 05-19-2010
3.00
Prop Spinner Gap Plate
Details
       

 05-18-2010
2.20
Prop Spinner Gap Plate
Details
       

 05-14-2010
5.00
Prop Spinner Gap Plate
Details
       

 04-10-2010
5.00
Prop Spinner
Details
     

 04-08-2010
6.50
Prop Spinner
Details
       

 04-05-2010
4.00
Prop Spinner
Details
       

 02-10-2010
5.60
Canopy Rear Skirt
Details
       

 01-26-2010
8.00
Cowling Hinge Pin
Details
       

 01-25-2010
3.60
Cowl Hinge Pin
Details
       

 01-08-2010
3.00
Cowl Hinge Pin
Details
       

 01-06-2010
2.00
Cowl Hinge Pin
Details
       

 01-05-2010
3.50
Cowling Side Hinge Pin
Details
       

 10-25-2009
4.60
Cowling Air Inlet Work
Details
       

 10-23-2009
3.80
Cowling Attachment Screws
Details
       

 10-04-2009
4.50
Air Inlet Seals
Details
       

 10-03-2009
3.20
Oil Service Door
Details
       

 10-02-2009
6.80
Oil Service Door
Details
       

 07-27-2009
2.30
Oil access door
Details
       

 07-23-2009
2.00
Prop Installed and safety wired
Details
       

 07-23-2009
1.00
Installed air intake
Details
       

 07-11-2009
1.50
Wiring bundles
Details
       

 07-08-2009
3.30
ACS wiring
Details
       

 07-07-2009
3.70
ACS 2002 wiring
Details
       

 07-01-2009
4.40
Panel wiring connections
Details
       

 06-23-2009
2.90
Lightspeed ignition power wiring
Details
       

 06-08-2009
3.80
Engine wiring - firewall access points
Details
       

 05-20-2009
4.30
Engine wiring - wiring bundles
Details
       

 05-19-2009
3.70
Engine wiring - Lightspeed ignition
Details
       

 05-11-2009
2.60
Engine wiring - firewall pass-throughs
Details
       

 04-30-2009
4.90
Engine wiring - right side, starter
Details
       

 04-14-2009
2.90
Engine wiring - magneto
Details
       

 03-24-2009
3.30
Engine wiring - alternator
Details
       

 03-11-2009
3.00
Engine wiring - left side
Details
       

 02-28-2009
2.00
Wiring run from engine to firewall
Details
       

 02-27-2009
2.00
Engine wiring
Details
       

 02-27-2009
2.00
Engine wiring
Details
       

 02-26-2009
2.50
Installed cooling hoses
Details
       

 02-25-2009
4.00
Remade rear baffle fuel line access holes
Details
       

 02-24-2009
1.30
Oil Cooler installed
Details
       

 02-24-2009
2.00
Baffles sealed with RTV
Details
       

 02-23-2009
2.00
Stitched baffle seals
Details
       

 02-22-2009
3.40
Forward baffle bracket
Details
       

 02-15-2009
2.50
Safety wire lower baffles
Details
       

 02-14-2009
2.20
Hose connections, dipstick, heat hose
Details
       

 02-13-2009
4.00
Vacuum system
Details
       

 02-12-2009
2.00
Vacuum System
Details
       

 02-12-2009
2.00
Sniffle valve
Details
       

 02-11-2009
2.50
Vacuum System
Details
       

 02-10-2009
3.50
Vacuum System
Details
       

 02-09-2009
3.30
Vacuum System
Details
       

 01-31-2009
1.60
Vacuum system
Details
       

 01-30-2009
2.50
Oil breather tube
Details
       

 01-30-2009
1.70
Fuel pump overflow
Details
       

 01-29-2009
2.50
Riveted cowling to fuselage hinge
Details
       

 01-28-2009
2.00
Cowl to Fuselage hinge
Details
       

 01-27-2009
2.00
Firesleeve throttle cable
Details
       

 01-26-2009
1.20
Baffle seals
Details
       

 01-16-2009
3.80
Baffle seals
Details
       

 01-15-2009
4.30
Baffle finishing
Details
       

 01-14-2009
4.00
Baffle finishing
Details
       

 10-22-2008
4.00
Oil Coller Support
Details
       

 10-20-2008
2.50
Baffle Seals
Details
       

 10-16-2008
3.50
Baffle Seals at Inlets
Details
       

 10-13-2008
4.00
Fitting Baffle Seals
Details
       

 10-09-2008
3.40
Baffle Seal Drilling
Details
       

 10-08-2008
3.00
Baffle Seals Cut
Details
       

 07-09-2008
4.00
Baffle seal templates
Details
       

 07-08-2008
3.00
Various cooling holes in baffleing
Details
       

 07-07-2008
3.50
Secure fuel lines and heat hose
Details
       

 06-18-2008
1.50
Revise Baffle Fuel Line Hole
Details
       

 06-04-2008
2.00
Fuel lines and baffel pass throughs
Details
       

 06-03-2008
1.00
Installed and ran heater hose
Details
       

 06-03-2008
1.30
Heater hose
Details
       

 06-02-2008
2.40
Heater hose in forward baffel floor
Details
       

 05-22-2008
3.00
Prop oil line
Details
       

 05-21-2008
4.30
OAT sensor and wiring run
Details
       

 05-20-2008
1.10
Oil and fuel pressure sensors
Details
       

 05-19-2008
4.20
CHT, EGT and plug wires
Details
       

 05-16-2008
3.00
Electronic ignition wiring
Details
       

 05-15-2008
2.60
Electronic ignition module
Details
       

 05-14-2008
5.50
Alternate air intake
Details
       

 05-13-2008
3.50
Purge valve cable
Details
       

 02-01-2008
6.50
Alternate air
Details
       

 01-31-2008
3.90
Alternate air
Details
       

 01-29-2008
5.50
Alternate air source
Details
       

 01-28-2008
4.00
Oil cooler spacers and baffel fit
Details
       

 01-27-2008
5.50
Riveted L Rear baffels
Details
       

 01-26-2008
2.50
Oil cooler mounting
Details
       

 01-25-2008
4.30
Oil cooler mounting
Details
       

 01-24-2008
5.50
Left rear baffels built up
Details
       

 01-23-2008
3.50
Riveted left side baffels
Details
       

 01-22-2008
4.40
Heat Risers and Air Intake
Details
       

 09-16-2007
3.60
Right forward baffel
Details
       

 09-02-2007
4.00
Baffel Work
Details
       

 09-01-2007
5.50
Inlet Ducts and Baffels
Details
       

 08-31-2007
5.00
Inlet Ducts
Details
       

 08-30-2007
2.80
Cowl Inlet Ducts
Details
       

 08-29-2007
4.00
Forward Baffels
Details
       

 08-28-2007
3.50
Drilled Froward Baffels
Details
       

 01-06-2007
6.00
Forward Baffles
Details
       

 01-04-2007
6.80
FAB Epoxy Complete. Fwd Baffles
Details
       

 01-03-2007
3.50
FAB and Baffles
Details
       

 01-02-2007
6.60
Filtered Air Intake
Details
       

 01-01-2007
4.50
FAB and Baffle Trimming
Details
       

 12-31-2006
3.60
FAB and Began Baffle Trimming
Details
       

 12-30-2006
2.00
Filtered Air Box
Details
       

 12-29-2006
2.50
FAB and Filter Positioning
Details
       

 12-28-2006
4.80
FAB and Trim Forward Floor and Cowl
Details
       

 12-27-2006
6.00
FAB and Baffle Brackets
Details
       

 12-26-2006
3.50
Forward Baffle Floors and FAB
Details
       

 12-23-2006
5.00
Forward Baffle Floors
Details
       

 12-22-2006
3.00
Right Front Baffle Floor
Details
       

 12-21-2006
3.00
Left Forward Floor
Details
       

 12-14-2006
4.00
Baffeling
Details
       

 12-13-2006
5.00
Baffeling
Details
       

 12-12-2006
8.00
Rivet Cowl Hinges
Details
       

 12-12-2006
2.00
Cowel hinge pin retainers
Details
       

 12-11-2006
1.00
Epoxy the cowel edges
Details
     

 12-11-2006
2.50
Began fitting the engine baffeling
Details
       

 12-09-2006
4.00
Cowl fit and begin Baffels
Details
       

 12-08-2006
4.80
Cowling and Pin work
Details
       

 12-07-2006
5.00
Drilled all hinges
Details
       

 12-06-2006
4.30
Cowl Side Hinges Drilled
Details
       

 12-05-2006
6.40
Cowl and Hinges
Details
       

 12-04-2006
5.50
Lower Cowl and Hinges
Details
       

 12-03-2006
4.00
Cut and Fit Lower Cowl
Details
       

 11-05-2006
5.00
Lower cowl
Details
       

 11-04-2006
3.30
Upper Cowl
Details
       

 11-03-2006
4.00
Upper Cowl and Hinge
Details
       

 10-24-2006
4.00
Upper Cowl Hinge
Details
       

 10-23-2006
5.00
Spinner Fit, Top Cowl Hinge
Details
       

 10-22-2006
1.50
Prop Spinner
Details
       

 10-22-2006
4.50
Installed Prop
Details
       

 10-21-2006
4.00
Prop Spinner Bulkhead
Details
       

 09-02-2006
2.50
Installed the magneto cap and wires.
Details
     

 08-31-2006
5.00
Mounted Exhaust System
Details
       

 08-30-2006
3.50
Electronic Ignition Mount
Details
       

 08-10-2006
5.50
Electronic Ignition module mounted
Details
       

 08-09-2006
2.00
Planning electronic ignition installation.
Details
     

 08-08-2006
3.00
Valve cover gaskets and dipstick gasket.
Details
       

 08-07-2006
3.50
Engine control cables
Details
       

 07-09-2006
3.00
Connected manifold pressure lines.
Details
       

 07-08-2006
5.50
Installed throttle and mixture cable brackets. Se
Details
       

 07-07-2006
5.00
Modify throttle and mixture control cable supports
Details
       

 07-06-2006
6.00
Cut firewall holes for engine control cables
Details
       

 07-05-2006
2.00
Installed support brackets for engine control cabl
Details
       

 07-05-2006
3.00
Installed prop governor and control brackets
Details
       

 07-03-2006
4.50
Engine controls
Details
       

 03-17-2006
4.00
Brakes, engine controls planning
Details
       

 03-16-2006
6.00
Alternator
Details
       

 03-15-2006
2.00
Manifold pressure transducer and line.
Details
       

 03-15-2006
1.80
Breather tube, oil dipstick
Details
       

 03-14-2006
4.60
Oil and fuel pressure sensors
Details
       

 03-13-2006
2.00
Oil temp, RPM sensors
Details
       

 03-13-2006
3.00
CHT and various lines
Details
       

 03-12-2006
2.00
Engine installed
Details
       

 03-11-2006
2.00
Hung the engine
Details
       

 03-10-2006
3.60
Prepared for engine mounting
Details
       

 03-08-2006
3.00
Right brake line
Details
       

 02-24-2006
0.50
Uncratted the engine
Details
       

 02-24-2006
3.00
Moved engine and wings
Details
       

 02-24-2006
2.00
Left brake line
Details
       

 02-23-2006
4.00
Installed tailwheel
Details
       

 02-22-2006
5.00
Landing gear installed
Details
       

 02-21-2006
3.00
Mounted tires, packed bearings
Details
       

 02-21-2006
2.00
Installed engine mount
Details
     

 02-20-2006
3.00
Access Panels
Details
       

 02-20-2006
2.00
Access Panels
Details
       

 02-19-2006
3.50
Forward fuselage access panels
Details
       

 02-04-2006
1.00
Aileron control rod bootie
Details
     

 02-04-2006
2.50
Access Panels
Details
       

 02-03-2006
4.00
Access panel flanges
Details
       

 02-02-2006
3.00
Forward fuselage access panels
Details
       

 01-20-2006
2.00
AOA flap position sensor
Details
       

 01-19-2006
2.00
Riveted aft top skin on
Details
       

 01-19-2006
4.00
Re did brake system connections
Details
       

 01-18-2006
5.70
Panel Removal Test; Compass Light
Details
       

 01-18-2006
0.50
Engine delivered
Details
       

 01-17-2006
6.00
Wiring clean-up
Details
       

 01-16-2006
5.50
Reconfigured Bus Bars
Details
       

 01-15-2006
4.00
Circuit Breaker Panel
Details
       

 01-02-2006
6.00
AOA flap sensor
Details
       

 01-01-2006
5.50
AOA Display and Wiring
Details
       

 12-31-2005
4.30
AOA pressure line
Details
       

 12-30-2005
4.00
AOA pressure lines
Details
       

 12-27-2005
6.00
AOA display and sensors
Details
       

 12-26-2005
2.50
AOA pitot static lines
Details
       

 12-24-2005
1.00
AOA box installed
Details
     

 12-23-2005
6.20
AOA mounting
Details
       

 12-22-2005
3.00
Test Left Fuel Tank
Details
       

 11-23-2005
3.00
Tieing wire bundles
Details
       

 11-22-2005
2.50
Map Light Wiring
Details
       

 10-21-2005
5.00
Antenna Connections
Details
       

 10-20-2005
4.00
Antenna wiring
Details
       

 10-20-2005
5.00
Antenna wiring
Details
       

 10-20-2005
3.00
Antenna Mounts
Details
       

 10-19-2005
6.00
Sealed fuel Tanks
Details
       

 10-18-2005
3.60
Installed nutplates for empenage fairings
Details
       

 10-18-2005
4.00
Aft cockpit skin drilled
Details
       

 10-17-2005
4.00
Replaced Elevator Trim Hinge
Details
       

 10-16-2005
5.50
Flight Control Bushings
Details
       

 10-14-2005
6.00
Finished wiring pilot stick and trim
Details
       

 10-13-2005
6.70
Rewiring the trim and pilot stick
Details
       

 10-12-2005
5.00
Rewired the pilot stick and trim.
Details
       

 10-11-2005
3.00
Replaced the Heat Valve on Firewall
Details
       

 10-08-2005
3.60
Installed Map Lights & Panel Support
Details
       

 10-07-2005
4.00
Map Lights & Panel Support
Details
       

 09-29-2005
3.00
Wiring
Details
       

 09-27-2005
5.00
Panel troubleshooting
Details
     

 09-25-2005
4.00
Electrical Troubleshooting
Details
       

 09-02-2005
3.50
Panel troubleshooting
Details
     

 08-31-2005
5.00
Panel troubleshooting
Details
       

 08-30-2005
3.00
Panel Audio Checks
Details
     

 08-29-2005
4.00
ACS 2002 connections
Details
     

 08-27-2005
3.30
Wired Relays
Details
     

 08-26-2005
4.50
Wired Relays
Details
     

 07-25-2005
3.00
Defog Vent
Details
       

 07-24-2005
3.60
Defog vent
Details
     

 07-20-2005
2.50
ACS 2002
Details
       

 07-19-2005
4.00
Amp sensor
Details
       

 07-05-2005
4.00
Heat and Fan Control Cables
Details
       

 07-04-2005
2.80
Parking Brake Cable
Details
       

 07-03-2005
3.00
Pitot Static connections
Details
       

 07-02-2005
3.60
Avionics Cooling Fan
Details
       

 07-01-2005
4.20
Avionics Coolong Fan
Details
       

 06-20-2005
6.30
Avionics Cooling Fan
Details
       

 06-17-2005
4.20
Avionics Cooling Fan
Details
       

 06-15-2005
4.80
Headset/Mic Jacks
Details
       

 06-14-2005
4.50
Headset/Mic Jacks
Details
       

 06-13-2005
5.00
Installed armrest support
Details
       

 06-11-2005
7.30
Wired Autopilot wiring connectors
Details
       

 03-07-2005
6.30
Auto Pilot Roll Servo Wiring
Details
       

 03-06-2005
4.00
Auro Pilot Pitch Harness
Details
       

 03-05-2005
4.50
VHF #2 Installed
Details
       

 02-24-2005
4.00
Wiring tail lights
Details
       

 02-24-2005
3.50
Mounted map lights
Details
       

 02-23-2005
5.00
Wiring auto pilot and mounted relays
Details
       

 02-22-2005
6.00
Wiring from panel to wings
Details
       

 02-21-2005
6.30
Wired trim and position indicators
Details
       

 02-20-2005
5.30
Flap Position Indicator
Details
       

 02-19-2005
3.00
Stick Trim Wiring
Details
     

 02-18-2005
4.60
Elevator Trim Wiring
Details
       

 02-17-2005
4.00
Wiring harness for com 2
Details
     

 02-16-2005
3.50
Added Second Com Radio
Details
       

 01-20-2005
6.00
Control Stick Wiring
Details
       

 01-19-2005
2.00
Wiring runs
Details
       

 01-19-2005
5.00
ELT Antenna
Details
       

 01-18-2005
7.30
Strobe and ELT wiring
Details
       

 01-17-2005
5.00
Wiring conduit
Details
       

 01-05-2005
4.00
Wiring conduits added
Details
       

 01-04-2005
3.50
Ran Static Line
Details
       

 01-03-2005
4.00
Mounted ELT and Strobe power pack
Details
       

 01-02-2005
3.00
Made mounts for ELT and Strobe
Details
     

 01-01-2005
3.50
Wired the fuel pump and FF
Details
       

 12-30-2004
3.00
Switched Circuit Breakers
Details

 12-28-2004
2.00
Installed wiring conduit below panel
Details
       

 12-27-2004
3.50
Modify center floor cover
Details
       

 11-28-2004
4.00
Attached poser feeds to the busses
Details
       

 11-26-2004
4.50
Electrical buss power feeds
Details
       

 10-17-2004
4.00
Avionics Soledoid and ground block
Details
       

 10-10-2004
3.00
Mounted ACS 2002 Control box
Details
       

 10-09-2004
4.00
Installed dimmer transformer and encoder
Details
       

 10-08-2004
6.00
Attached Diodes, organized shop
Details
       

 10-07-2004
2.00
Assembled Diodes for relays.
Details
     

 10-06-2004
4.00
Planning electrical connections
Details

 10-05-2004
2.30
Mounted the instruments into the panel
Details
       

 10-04-2004
4.00
Connected Bettery and Starter relays.
Details
     

 09-08-2004
4.50
Engine controls sub panel
Details
     

 09-07-2004
2.00
Installed air vent hose
Details
       

 09-06-2004
8.60
Sub Panels
Details
       

 09-03-2004
4.50
Panel frame, fuel line
Details
       

 09-02-2004
5.50
Canopy finish work
Details
       

 09-01-2004
6.30
Canopy finish work
Details
       

 08-31-2004
7.50
Riveted the canopy to the frame
Details
       

 08-30-2004
7.00
Mounted Soledoids to the Firewall
Details
       

 08-29-2004
6.20
Installed the battery box
Details
       

 08-28-2004
4.50
Canopy Frame and Battery Box
Details
       

 08-24-2004
4.50
Fuel and purge lines
Details
       

 07-18-2004
6.50
Heat box and fuel flow sensor
Details
       

 07-17-2004
4.00
Made new side skirts
Details
       

 07-16-2004
3.50
Panel support
Details
       

 07-14-2004
3.00
Instrument panel installation
Details
       

 07-13-2004
1.00
Painted canopy frame
Details
       

 07-13-2004
2.50
Installed the instrument panel frame
Details
       

 07-11-2004
1.00
Rear canopy skirt
Details
     

 07-11-2004
1.00
Brake pedals and lines
Details
       

 07-08-2004
10.00
Canopy fit and rear skirts
Details
       

 07-07-2004
3.50
Canopy slide rails
Details
       

 07-06-2004
9.00
Canopy and side skirts
Details
       

 07-05-2004
4.80
Canopy fit
Details
       

 06-26-2004
8.00
Canopy fit and plexiglass finishing
Details
       

 06-25-2004
3.50
Canopy side skirts and frame
Details
       

 06-24-2004
7.00
Canopy side skirts
Details
       

 06-23-2004
2.50
Canopy rear blocks
Details
       

 06-23-2004
3.20
Canopy Latch
Details
       

 06-22-2004
4.40
Trimmed Windscreen
Details
       

 05-26-2004
4.00
Canopy
Details
       

 05-24-2004
3.50
Canopy cover strip
Details
       

 05-23-2004
5.80
Drilled the Canopy
Details
       

 05-22-2004
6.30
Cut the Canopy
Details
       

 05-21-2004
4.50
Canopy plexiglass
Details
       

 05-18-2004
6.50
Canopy Frame
Details
       

 05-17-2004
5.50
Canopy Frame
Details
       

 05-16-2004
4.80
Auto pilot servos
Details
       

 05-12-2004
3.90
Canopy slide
Details
       

 05-11-2004
4.60
Canopy roll bar
Details
       

 05-10-2004
3.60
Elevator auto pilot servo bracket
Details
     

 05-09-2004
4.50
Completed airleron trim
Details
       

 05-08-2004
3.80
Installed aileron trim servo
Details
       

 05-07-2004
5.00
Aileron trim
Details
       

 05-06-2004
6.50
Reassembled the forward cockpit area
Details
       

 05-05-2004
6.00
Forward cockpit assembly
Details
       

 05-04-2004
3.60
Prepared the air vents
Details
       

 04-23-2004
3.50
Drilled Engine Mount
Details
       

 04-01-2004
3.50
Made pattern templates for the interior.
Details
       

 03-31-2004
5.60
Installed the brake lines.
Details
       

 02-20-2004
4.70
Parking Brake Valve
Details
       

 01-18-2004
2.50
Side panel and brake plate fitting.
Details
       

 01-16-2004
6.00
HP fuel pump lines
Details
       

 01-15-2004
4.60
HP fuel pump lines
Details
       

 01-13-2004
2.50
Fuel vent fittings
Details
       

 01-12-2004
4.00
Fuel vent line
Details
       

 01-03-2004
3.50
Fuel pump and selector valve
Details
       

 01-02-2004
2.80
Fuel pump housing
Details
       

 12-17-2003
5.50
Fitted Empennage fairings
Details
       

 12-16-2003
1.50
Installed rudder stops
Details
     

 12-15-2003
1.60
Manufactured new rudder stop
Details
       

 11-26-2003
2.50
Wired the flap motor
Details
       

 11-26-2003
2.00
Riveted the seats together
Details
       

 11-25-2003
2.30
Rudder Cable Fairings
Details
       

 11-25-2003
1.50
Installed Flap control
Details
     

 11-24-2003
3.00
Routed the Rudder Cable
Details
       

 11-23-2003
2.50
Completed New Rudder
Details
       

 11-13-2003
3.50
Riveted Seats
Details
       

 11-13-2003
5.00
Painted the interior
Details
       

 11-12-2003
4.50
Primed the interior
Details
       

 11-11-2003
3.00
Masked fuselage for interior painting
Details
       

 11-10-2003
3.00
Pro Sealed the new rudder trailing edge
Details
       

 11-09-2003
5.30
Mounted the Vertical Stabilizer
Details
       

 11-06-2003
2.50
Constructed elevator control rods
Details
       

 11-05-2003
4.30
Mounted the HS
Details
       

 11-04-2003
3.50
Installed the Horizontal Stabilizer
Details
       

 11-03-2003
2.30
Various fuselage items
Details
       

 11-02-2003
4.00
Various wing items
Details
       

 11-02-2003
3.50
Removed Wings
Details

 10-24-2003
5.80
Altered Flap Hinge
Details
       

 10-23-2003
4.50
Installed flap position switch
Details
       

 10-22-2003
5.50
Fuel lines from wing to fuselage
Details
       

 09-23-2003
2.00
Finalized Instrument Panel Plan
Details

 08-23-2003
14.00
Electrical Workshop
Details

 08-19-2003
10.00
Planning Instrument Panel
Details

 07-31-2003
6.50
Rigged Ailerons and Flaps
Details
       

 07-30-2003
5.30
Installed flap rod and control links
Details
       

 07-28-2003
2.50
Hung Ailerons and Flaps
Details
     

 07-23-2003
5.30
Completed wing attachment
Details
       

 07-22-2003
2.50
Trimmed rear wing spar
Details
       

 07-21-2003
2.00
Checked wing position
Details
     

 07-08-2003
2.50
Mated the wings
Details
       

 07-07-2003
7.50
Prepared to mate the wings
Details
       

 07-06-2003
4.00
Riveted the new rudder
Details
       

 07-05-2003
5.30
Began the rudder frame
Details
       

 06-28-2003
4.50
Began building the new rudder.
Details
       

 06-27-2003
3.40
Finished riveting lower OB rt wing skin
Details

 06-26-2003
3.00
Riveted the lower rt wing skin
Details

 06-25-2003
3.50
Drilled and dimpled lower rt wing skin
Details

 06-04-2003
2.50
Inventory finish kit
Details
       

 06-03-2003
5.50
Rivet the left lower outer wing skin
Details
       

 06-02-2003
0.30
Primered the lower outer wing skins
Details

 04-23-2003
1.50
Installed Static Port
Details
       

 04-01-2003
1.00
EAA Inspection
Details

 01-09-2003
4.00
Assembled Flap Actuator
Details
       

 01-08-2003
5.50
Flap Actuator
Details
       

 01-07-2003
1.00
Lightening holes in seat support
Details
       

 01-07-2003
4.50
Flap actuator
Details
       

 01-06-2003
2.60
Cockpit floor panels
Details
       

 01-05-2003
5.00
Preparing interior panels
Details
       

 01-04-2003
2.60
Preparing cockpit floor panels
Details
     

 12-31-2002
2.50
Installed seat frames
Details
       

 12-23-2002
4.50
Cockpit seats
Details
       

 12-20-2002
4.20
Baggage compartment
Details
       

 12-17-2002
5.50
Fuselage top skin and access covers
Details
       

 12-16-2002
2.30
Fuselage and wing access panels
Details
       

 11-15-2002
4.30
Tailspring
Details
       

 11-03-2002
2.20
Rudder Pedal Assembly
Details
       

 10-28-2002
1.00
Rudder pedals
Details
     

 10-27-2002
3.20
Rudder Pedal
Details
     

 10-24-2002
2.30
Flight control assembly
Details
       

 09-22-2002
1.50
Fiberglass Wing Tips
Details
       

 08-24-2002
1.40
Fiberglass wing tips
Details
     

 08-22-2002
1.50
Fiberglass Wing Tips
Details
       

 08-21-2002
1.60
Fiberglass Wing Tips
Details

 08-21-2002
4.00
Fiberglass Tips
Details
       

 08-20-2002
3.60
Fiberglass Tips
Details
       

 08-19-2002
3.00
Fiberglass Tips
Details
     

 08-18-2002
2.30
Fiberglass tips
Details
     

 08-10-2002
1.00
Wingtip lights and lenses.
Details

 08-10-2002
2.00
Began fitting fiberglass tips
Details
     

 07-14-2002
1.50
Adjusted elevator counterweights
Details
       

 07-10-2002
3.50
Electrical wiring in left wing
Details
     

 07-04-2002
2.50
Electrical wiring in right wing
Details
     

 07-03-2002
5.00
Installed landing light into right wing
Details
       

 07-02-2002
4.30
Electircal conduit into right wing
Details
     

 07-01-2002
5.50
Flap and ailerons to wings
Details
     

 06-30-2002
4.30
Aileron attached to the left wing
Details
       

 06-29-2002
3.50
Flap and Aileron attachment
Details
       

 05-27-2002
3.40
Install conduit in left wing
Details
     

 05-26-2002
6.00
Assembled the aileron control rods
Details
     

 05-25-2002
2.70
Landing light
Details
       

 05-24-2002
3.00
Landing light
Details
     

 05-23-2002
2.50
Pitot tube and landing lights
Details
     

 05-21-2002
4.00
Pitot tube mounting bracket
Details
       

 05-18-2002
2.00
Fit rudder to VS and elevator to HS
Details
       

 04-03-2002
2.50
Attach the trim tab to the elevator
Details
       

 04-02-2002
4.50
Assemble electric elevator trim system
Details
     

 04-01-2002
4.50
Fabricate the elevator trim tab
Details
       

 03-26-2002
2.45
Roll the elevator leading edge
Details

 03-24-2002
2.00
Rivet elevator skins to the frame
Details
       

 03-23-2002
1.50
Prepare elevator counterbalence
Details
     

 03-22-2002
2.00
Rivet the elevator frame
Details
     

 03-21-2002
2.00
Drill and prime the elevator frame
Details

 02-21-2002
1.40
Rivet stiffeners to elevator skins
Details
     

 02-04-2002
2.00
Prime the elevator skins and stiffeners
Details

 02-02-2002
1.50
Debur and dimple the elevators
Details

 02-01-2002
3.00
Drill elevator stiffeners
Details

 01-31-2002
6.20
Fabricate the elevator stiffeners
Details
       

 01-30-2002
1.50
Drill skins to spar
Details

 01-16-2002
2.00
Rivet leading edge of the rudder
Details

 01-14-2002
4.20
Assemble the rudder
Details

 01-13-2002
3.50
Built V-Jig and drilled the skin
Details
       

 01-12-2002
3.30
Rivet the rudder structure
Details
       

 01-11-2002
2.00
Primed the rudder structure
Details

 01-10-2002
3.00
Assembled the rudder structure
Details

 01-01-2002
3.00
Rivet rudder stiffeners
Details

 12-30-2001
4.00
Drill, debur, dimple and prime rudder
Details
       

 12-28-2001
1.50
Cut the rudder stiffeners
Details
       

 12-27-2001
4.50
Inventory QB kit
Details
     

 12-20-2001
5.00
Built wing storage cradle
Details
     

 12-19-2001
3.00
Picked up the QB kit
Details
       

 11-04-2001
5.50
Rivet VS skin
Details
       

 11-03-2001
4.00
Rivet VS spars and ribs
Details

 11-02-2001
6.00
Debur and prime VS
Details

 11-01-2001
4.00
Drill the VS skeleton and skins
Details
       

 10-31-2001
1.50
VS808 & VS803
Details

 10-30-2001
5.00
Rivet HS601 skins
Details
     

 10-26-2001
4.00
Rivet HS ribs to spars
Details
     

 10-25-2001
2.00
Prime the HS skins
Details

 10-24-2001
4.50
Dimpled the HS
Details

 10-23-2001
2.00
Deburr the HS
Details

 10-22-2001
4.00
Drill HS skins
Details
       

 10-16-2001
2.50
Assembled the HS on the jig
Details
       

 10-12-2001
3.00
Rivet the spars
Details

 10-09-2001
2.50
Prime HS ribs and spars
Details
     

 10-08-2001
2.20
HS610, HS614 and HS602
Details
     

 10-02-2001
2.20
Fabricate the HS610 and HS614
Details
     

 10-01-2001
2.50
Fabricate the HS610 and HS614
Details

 09-03-2001
1.00
HS rear spar
Details

 09-02-2001
4.00
HS rear spar
Details
     

 08-27-2001
2.50
HS603
Details
     

 08-21-2001
5.00
Build jig
Details

 08-19-2001
4.00
Build work bench
Details
       

 07-25-2001
1.50
Inventory empennage kit
       

 07-20-2001
0.10
Empennage kit received
       

 07-16-2001
0.10
Ordered RV7 kit
Details

 05-11-2001
16.00
Builder's Class
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.