Date
|
Hours
|
Work Log Summary
|
Details
|
11-27-2020
|
1.00
|
General Update
|
Details
|
|
|
05-16-2016
|
8.00
|
AERO LED Rework wiring
|
Details
|
|
|
05-11-2016
|
3.00
|
Lower Fairings
|
Details
|
|
|
05-10-2016
|
8.00
|
Service Bulletin SB 16-03-28
|
Details
|
|
|
05-06-2016
|
8.00
|
Second Test Flight Adjust
|
Details
|
|
|
05-05-2016
|
8.00
|
Air Dam Trim
|
Details
|
|
|
05-03-2016
|
2.00
|
First Flight
|
Details
|
|
|
05-01-2016
|
3.00
|
Cargo Tie Down
|
Details
|
|
|
04-27-2016
|
4.00
|
Bose
|
Details
|
|
|
04-26-2016
|
2.00
|
Mini X
|
Details
|
|
|
04-26-2016
|
8.00
|
ADAHRS Work
|
Details
|
|
|
04-23-2016
|
8.00
|
Post DAR Review
|
Details
|
|
|
04-22-2016
|
8.00
|
Misc cover install
|
Details
|
|
|
04-21-2016
|
8.00
|
Post DAR Review
|
Details
|
|
|
04-20-2016
|
4.00
|
DAR Review
|
Details
|
|
|
04-19-2016
|
3.00
|
IFR Certification
|
Details
|
|
|
04-15-2016
|
10.00
|
Transition Training
|
Details
|
|
|
04-06-2016
|
6.00
|
Data Plate
|
Details
|
|
|
04-04-2016
|
5.00
|
Test
|
Details
|
|
|
03-31-2016
|
9.00
|
Hanger Final Inspection
|
Details
|
|
|
03-30-2016
|
0.50
|
Reiff Wattage
|
Details
|
|
|
03-30-2016
|
8.00
|
Plugs pulled
|
Details
|
|
|
03-29-2016
|
8.00
|
Fuel Calibrate
|
Details
|
|
|
03-28-2016
|
7.00
|
Fuel Calibrate
|
Details
|
|
|
03-24-2016
|
6.00
|
Fuel Test 3 - Plane at 11.5 degree climb
|
Details
|
|
|
03-24-2016
|
6.00
|
Fuel Test 2 - Plane level
|
Details
|
|
|
03-24-2016
|
4.00
|
Fuel Test 1 - Usuable Fuel - Gravity
|
Details
|
|
|
03-22-2016
|
8.00
|
Weighing the plane
|
Details
|
|
|
03-21-2016
|
4.00
|
Prop Install
|
Details
|
|
|
03-21-2016
|
2.00
|
N Number and misc prep for weight
|
Details
|
|
|
03-20-2016
|
4.00
|
Lower fairings
|
Details
|
|
|
03-19-2016
|
8.00
|
Plastic removed, prop ready
|
Details
|
|
|
03-18-2016
|
8.00
|
Tail electrical and sun tail
|
Details
|
|
|
03-17-2016
|
8.00
|
Vertical Stabilizer/Rudder install
|
Details
|
|
|
03-16-2016
|
8.00
|
Elevator adjust
|
Details
|
|
|
03-15-2016
|
8.00
|
H. Stabilizer and elevator install
|
Details
|
|
|
03-14-2016
|
5.00
|
Aileron Adjustment
|
Details
|
|
|
03-13-2016
|
8.00
|
Flap install
|
Details
|
|
|
03-12-2016
|
10.00
|
Wing Attach
|
Details
|
|
|
03-03-2016
|
5.00
|
Prime fairings
|
Details
|
|
|
03-03-2016
|
3.00
|
Engine oil
|
Details
|
|
|
02-17-2016
|
5.00
|
Fuel line install
|
Details
|
|
|
02-16-2016
|
8.00
|
Main brakes bled
|
Details
|
|
|
02-01-2016
|
4.00
|
Mini X USB connection manutacture
|
Details
|
|
|
01-02-2016
|
3.00
|
Mini X data update
|
Details
|
|
|
12-30-2015
|
6.00
|
Pitot pressure test and V speeds programmed
|
Details
|
|
|
12-22-2015
|
7.00
|
Baffle extension
|
Details
|
|
|
12-21-2015
|
6.00
|
#5 Cly Baffle rework
|
Details
|
|
|
12-17-2015
|
3.00
|
Retest fuel tanks
|
Details
|
|
|
12-16-2015
|
6.00
|
Panel Programming
|
Details
|
|
|
12-15-2015
|
2.00
|
EAA Technical Advisor Review #6
|
Details
|
|
|
12-14-2015
|
7.00
|
Reinstalled Avionics
|
Details
|
|
|
12-10-2015
|
5.00
|
Tail wiring and MiniX antenna work
|
Details
|
|
|
12-09-2015
|
6.00
|
MiniX antenna wire and antenna installed
|
Details
|
|
|
12-08-2015
|
4.00
|
Tail fairing fit up
|
Details
|
|
|
12-08-2015
|
7.00
|
Fuel Selector work
|
Details
|
|
|
12-07-2015
|
8.00
|
Tail fairing fit up
|
Details
|
|
|
12-05-2015
|
3.00
|
Tail Fairing work
|
Details
|
|
|
11-30-2015
|
7.00
|
Tail fitting fit up
|
Details
|
|
|
11-28-2015
|
6.00
|
Seat belts installed
|
Details
|
|
|
11-27-2015
|
8.00
|
Front panel and seatbelt holder
|
Details
|
|
|
11-24-2015
|
6.50
|
Overhead panels
|
Details
|
|
|
11-23-2015
|
8.50
|
Interior panel
|
Details
|
|
|
11-19-2015
|
8.00
|
Magnetomer install
|
Details
|
|
|
11-18-2015
|
6.00
|
Ground Power
|
Details
|
|
|
11-17-2015
|
7.50
|
Ground Power
|
Details
|
|
|
11-14-2015
|
3.60
|
Ground Power (GP)
|
Details
|
|
|
11-14-2015
|
3.00
|
Ground Power
|
Details
|
|
|
11-13-2015
|
8.00
|
Ground Power
|
Details
|
|
|
11-12-2015
|
8.00
|
Ground Power Unit
|
Details
|
|
|
11-11-2015
|
8.00
|
Ground Power fit up
|
Details
|
|
|
11-10-2015
|
8.00
|
GP access door
|
Details
|
|
|
11-09-2015
|
4.40
|
GP access door opening
|
Details
|
|
|
11-05-2015
|
6.50
|
Mixture arm reset/reflective material install
|
Details
|
|
|
11-04-2015
|
6.50
|
Sun Visor Install
|
Details
|
|
|
11-03-2015
|
7.50
|
Door pin switches installed
|
Details
|
|
|
11-02-2015
|
7.50
|
Upper cowling paint
|
Details
|
|
|
10-30-2015
|
9.00
|
Door Lift Cylinder - replace
|
Details
|
|
|
10-28-2015
|
8.00
|
Door Locks
|
Details
|
|
|
10-28-2015
|
4.00
|
Cowling prime
|
Details
|
|
|
10-26-2015
|
8.00
|
Block Sand to remove holes
|
Details
|
|
|
10-22-2015
|
3.00
|
Headset ports in arm rest
|
Details
|
|
|
10-20-2015
|
9.00
|
Cowling prep for paint
|
Details
|
|
|
10-19-2015
|
8.50
|
Pin hole filling - first coat
|
Details
|
|
|
10-19-2015
|
8.50
|
Block sanding
|
Details
|
|
|
10-16-2015
|
3.50
|
Door cylinder bracket / insulation
|
Details
|
|
|
10-15-2015
|
3.00
|
Pass through capped
|
Details
|
|
|
10-14-2015
|
5.00
|
Prop install for cowling fit up
|
Details
|
|
|
10-12-2015
|
7.00
|
Interior parts/doors painted
|
Details
|
|
|
10-10-2015
|
5.00
|
Post Cabin Paint
|
Details
|
|
|
10-09-2015
|
8.50
|
Cabin door jamb painting
|
Details
|
|
|
10-08-2015
|
8.50
|
Filling cabin radius
|
Details
|
|
|
10-05-2015
|
7.00
|
Sanding doors
|
Details
|
|
|
10-03-2015
|
3.50
|
Door sanding pin filling
|
Details
|
|
|
10-02-2015
|
6.50
|
Door sanding
|
Details
|
|
|
10-01-2015
|
7.00
|
Exterior door work
|
Details
|
|
|
09-30-2015
|
6.00
|
Pin hole filling
|
Details
|
|
|
09-29-2015
|
9.00
|
Jim Priming the cabin
|
Details
|
|
|
09-28-2015
|
7.00
|
Prep cabin for Prime Paint
|
Details
|
|
|
09-25-2015
|
7.00
|
Rough sanding cabin
|
Details
|
|
|
09-24-2015
|
7.00
|
Pin hole filling
|
Details
|
|
|
09-22-2015
|
6.50
|
Pin hole filling
|
Details
|
|
|
09-21-2015
|
6.00
|
Prep for prime paint
|
Details
|
|
|
09-18-2015
|
6.00
|
Rough sanding cabin cover
|
Details
|
|
|
09-17-2015
|
5.50
|
Cabin fairing work
|
Details
|
|
|
09-16-2015
|
3.00
|
Cabin Fairing
|
Details
|
|
|
09-14-2015
|
4.50
|
Cabin Fairing
|
Details
|
|
|
09-11-2015
|
8.00
|
Cabin Fairing
|
Details
|
|
|
09-10-2015
|
3.50
|
Cabin Fairing
|
Details
|
|
|
09-09-2015
|
6.00
|
Cabin Fairing
|
Details
|
|
|
09-08-2015
|
2.50
|
Cabin Fairing
|
Details
|
|
|
09-07-2015
|
7.50
|
Cabin Fairing
|
Details
|
|
|
09-01-2015
|
5.00
|
Cabin Fairing
|
Details
|
|
|
08-31-2015
|
5.50
|
Cabin Fairing
|
Details
|
|
|
08-30-2015
|
5.50
|
Cabin Fairing
|
Details
|
|
|
08-29-2015
|
5.50
|
Cabin Fairing
|
Details
|
|
|
08-28-2015
|
7.00
|
Cabin Fairing
|
Details
|
|
|
08-27-2015
|
6.00
|
Cabin Fairing
|
Details
|
|
|
08-25-2015
|
8.00
|
Cabin Fairing
|
Details
|
|
|
08-24-2015
|
5.00
|
Cabin/Fuselage joint treatment
|
Details
|
|
|
08-23-2015
|
2.00
|
Cabin Fairing
|
Details
|
|
|
08-22-2015
|
10.00
|
Cabin Fairing
|
Details
|
|
|
08-19-2015
|
7.20
|
Window joint work
|
Details
|
|
|
08-18-2015
|
6.00
|
Window joint work
|
Details
|
|
|
08-17-2015
|
6.50
|
Window joint work
|
Details
|
|
|
08-15-2015
|
3.00
|
Window joint treatment
|
Details
|
|
|
08-14-2015
|
7.00
|
Window joint work
|
Details
|
|
|
08-13-2015
|
5.00
|
Window joint treatment
|
Details
|
|
|
08-10-2015
|
7.00
|
Windscreen fairing
|
Details
|
|
|
08-07-2015
|
6.00
|
Windscreen sanding
|
Details
|
|
|
07-31-2015
|
2.00
|
Fairing final void filling
|
Details
|
|
|
07-30-2015
|
4.00
|
Fairing work
|
Details
|
|
|
07-28-2015
|
10.00
|
Fairing work
|
Details
|
|
|
07-25-2015
|
6.00
|
Fairing work
|
Details
|
|
|
07-23-2015
|
8.00
|
Aft window install
|
Details
|
|
|
07-21-2015
|
8.00
|
Windscreen sanding and fillet
|
Details
|
|
|
07-18-2015
|
8.00
|
Installing windscreen
|
Details
|
|
|
07-17-2015
|
8.00
|
Windscreen work
|
Details
|
|
|
07-16-2015
|
8.00
|
Windscreen prep
|
Details
|
|
|
07-14-2015
|
8.00
|
Windscreen prep
|
Details
|
|
|
07-13-2015
|
8.00
|
Door windows
|
Details
|
|
|
07-13-2015
|
5.00
|
Cabin install prework
|
Details
|
|
|
07-08-2015
|
2.00
|
Window install
|
Details
|
|
|
07-07-2015
|
9.00
|
Window work
|
Details
|
|
|
07-06-2015
|
8.00
|
Window work
|
Details
|
|
|
07-03-2015
|
7.00
|
Aft section riveting
|
Details
|
|
|
07-01-2015
|
7.50
|
Aft cargo bay work
|
Details
|
|
|
06-30-2015
|
7.50
|
Air vents
|
Details
|
|
|
06-29-2015
|
8.50
|
Plane Around door latch
|
Details
|
|
|
06-27-2015
|
7.00
|
Rework doors to install locks
|
Details
|
|
|
06-26-2015
|
7.50
|
Door lock upgrade
|
Details
|
|
|
06-25-2015
|
4.50
|
Side vents
|
Details
|
|
|
06-24-2015
|
9.00
|
Aft side panel work
|
Details
|
|
|
06-23-2015
|
8.80
|
Forward side panels
|
Details
|
|
|
06-22-2015
|
8.00
|
Aerosport leather inserts
|
Details
|
|
|
06-19-2015
|
8.00
|
Panel wire final routing
|
Details
|
|
|
06-18-2015
|
5.00
|
Rear air vent SCAT tube
|
Details
|
|
|
06-17-2015
|
9.00
|
Cabin install
|
Details
|
|
|
06-16-2015
|
7.00
|
Headliner Install
|
Details
|
|
|
06-15-2015
|
7.00
|
Cabin Install prework
|
Details
|
|
|
06-12-2015
|
8.00
|
Internal covers installed
|
Details
|
|
|
06-09-2015
|
7.00
|
Prep interior cabin for final paint
|
Details
|
|
|
06-06-2015
|
8.00
|
Fuel line upgrad
|
Details
|
|
|
05-30-2015
|
6.00
|
Cargo bay door wiring
|
Details
|
|
|
05-29-2015
|
7.00
|
Testing for fuel leak
|
Details
|
|
|
05-27-2015
|
8.00
|
Roll servo install
|
Details
|
|
|
05-26-2015
|
8.00
|
Wing CPC wiring
|
Details
|
|
|
05-25-2015
|
8.00
|
Fuel pressure test
|
Details
|
|
|
05-22-2015
|
7.00
|
Reiff preheat plug installed
|
Details
|
|
|
05-21-2015
|
7.00
|
Reiff preheat install
|
Details
|
|
|
05-19-2015
|
4.00
|
Air controller
|
Details
|
|
|
05-16-2015
|
7.00
|
Main panel components install
|
Details
|
|
|
05-15-2015
|
8.00
|
Cargo bay door switch and cylinder mount
|
Details
|
|
|
05-14-2015
|
8.00
|
Wing root wiring
|
Details
|
|
|
05-12-2015
|
3.00
|
Tunnel SCAT tube install
|
Details
|
|
|
05-12-2015
|
4.00
|
Pitot and AOA bulkhead fitting install
|
Details
|
|
|
05-11-2015
|
8.00
|
XM/GPS, GPS Antenna mounting
|
Details
|
|
|
05-09-2015
|
2.00
|
Doubler layout and drill
|
Details
|
|
|
05-09-2015
|
3.00
|
Antenna doublers
|
Details
|
|
|
05-08-2015
|
5.00
|
Panel flood light install
|
Details
|
|
|
05-07-2015
|
8.00
|
P5 CPC wired, AUX 12V installed
|
Details
|
|
|
05-06-2015
|
8.50
|
Cargo bay switch, boost pump wiring
|
Details
|
|
|
05-05-2015
|
8.00
|
Show Planes switches located on wrong side
|
Details
|
|
|
05-04-2015
|
8.00
|
AOA Data Switch Cam install
|
Details
|
|
|
05-03-2015
|
4.50
|
Control Stick D-Sub pins/sockets
|
Details
|
|
|
05-02-2015
|
4.00
|
Seat modification. Control Stick D-Sub
|
Details
|
|
|
04-30-2015
|
6.50
|
Fitting Infinity grip
|
Details
|
|
|
04-28-2015
|
6.00
|
AOA Data Switch Cam
|
Details
|
|
|
04-27-2015
|
7.00
|
Flap position sensor install
|
Details
|
|
|
04-25-2015
|
4.00
|
Flap controller work
|
Details
|
|
|
04-24-2015
|
7.00
|
Battery and pitch autopilot
|
Details
|
|
|
04-23-2015
|
8.00
|
Battery mounting / pitch trim wiring
|
Details
|
|
|
04-22-2015
|
8.00
|
Rear overhead air controller motor wiring
|
Details
|
|
|
04-21-2015
|
7.50
|
Min-X shelf and GMU22 bracket
|
Details
|
|
|
04-20-2015
|
7.70
|
Mini-X shelf manufacture
|
Details
|
|
|
04-18-2015
|
6.00
|
More wiring
|
Details
|
|
|
04-18-2015
|
6.00
|
GMU 22 Bracket fit up
|
Details
|
|
|
04-17-2015
|
5.00
|
Drill center console, COM 1 BNC
|
Details
|
|
|
04-16-2015
|
9.00
|
Wing root holes and connector fit up
|
Details
|
|
|
04-14-2015
|
9.00
|
Garmin 650 GPS wiring
|
Details
|
|
|
04-13-2015
|
8.00
|
Blast tube install
|
Details
|
|
|
04-10-2015
|
4.00
|
Firewall Pass Through Complete
|
Details
|
|
|
04-09-2015
|
8.00
|
EGTs and GHTs Install
|
Details
|
|
|
04-08-2015
|
8.00
|
Oil, Fuel and Manifold Sensor Install
|
Details
|
|
|
04-07-2015
|
3.50
|
Oil Cooler Butterfly Valve Cable Install
|
Details
|
|
|
04-06-2015
|
8.00
|
Auxiliary Air Inlet Cable Install
|
Details
|
|
|
04-03-2015
|
6.50
|
Slick Mag Booster Wire
|
Details
|
|
|
04-02-2015
|
6.50
|
Research and Misc Harness work
|
Details
|
|
|
04-01-2015
|
4.00
|
Slick Mag Booster Harness
|
Details
|
|
|
03-31-2015
|
7.50
|
Firewall Foreward Wiring
|
Details
|
|
|
03-30-2015
|
6.00
|
Panel Wire Secured
|
Details
|
|
|
03-30-2015
|
1.00
|
Install Panel
|
Details
|
|
|
03-29-2015
|
4.00
|
Glare Screen Fan Doublers
|
Details
|
|
|
03-26-2015
|
8.00
|
Mag Pinned, Alt 2 Installed
|
Details
|
|
|
03-26-2015
|
1.00
|
Engine Timing
|
Details
|
|
|
03-25-2015
|
6.80
|
Upper Forward Fuselage Install
|
Details
|
|
|
03-24-2015
|
7.50
|
Panel Static/Pitot Lines Secure
|
Details
|
|
|
03-23-2015
|
7.50
|
Brake Cable Installed
|
Details
|
|
|
03-19-2015
|
2.00
|
EAA Tech Inspection
|
Details
|
|
|
03-18-2015
|
4.00
|
ELT Assembly
|
Details
|
|
|
03-17-2015
|
8.00
|
Panel Wire Pass Through Doublers
|
Details
|
|
|
03-13-2015
|
7.50
|
Sub Panel Work
|
Details
|
|
|
03-12-2015
|
8.50
|
SCAT Tube Installed
|
Details
|
|
|
03-10-2015
|
8.00
|
Boost Pump Rework
|
Details
|
|
|
03-09-2015
|
6.00
|
Glare Screen Primed
|
Details
|
|
|
03-03-2015
|
8.00
|
Misc Forward Work
|
Details
|
|
|
03-02-2015
|
8.00
|
Fuel Flow Transducer Install
|
Details
|
|
|
02-26-2015
|
8.00
|
Install EGT CHT
|
Details
|
|
|
02-25-2015
|
5.00
|
CHT and EGT install
|
Details
|
|
|
02-23-2015
|
8.00
|
Transponder/ADS-b antenna doubler install
|
Details
|
|
|
02-21-2015
|
6.00
|
EGT Drill Exhaust
|
Details
|
|
|
02-20-2015
|
7.00
|
Cutting avionics fan openings
|
Details
|
|
|
02-19-2015
|
7.50
|
Oil cooler vent and control cable work up
|
Details
|
|
|
02-18-2015
|
7.50
|
Mag booster / shunt install
|
Details
|
|
|
02-17-2015
|
8.00
|
Firewall pass throughs
|
Details
|
|
|
02-16-2015
|
8.00
|
Heat cables installed and trimmed
|
Details
|
|
|
02-14-2015
|
3.50
|
Paint airbox
|
Details
|
|
|
02-13-2015
|
8.50
|
Sub Panel Reinforce
|
Details
|
|
|
02-12-2015
|
6.50
|
Avionics component location
|
Details
|
|
|
02-11-2015
|
8.00
|
Avionics component location
|
Details
|
|
|
02-09-2015
|
7.50
|
Fuel lines - establish length
|
Details
|
|
|
02-07-2015
|
8.00
|
Glare screen fit up
|
Details
|
|
|
02-05-2015
|
8.00
|
Sub panel relief cuts
|
Details
|
|
|
02-04-2015
|
8.00
|
Start Panel work
|
Details
|
|
|
01-29-2015
|
4.00
|
Tach cover and AP bracket
|
Details
|
|
|
01-26-2015
|
7.00
|
Static line reworked
|
Details
|
|
|
01-21-2015
|
8.00
|
Aerotronics Trip
|
Details
|
|
|
01-12-2015
|
4.00
|
Fumes Disposal and SCAT Tubes
|
Details
|
|
|
01-09-2015
|
8.00
|
Fuel Transducer Bracket
|
Details
|
|
|
01-07-2015
|
8.00
|
Exhaust Install
|
Details
|
|
|
01-06-2015
|
8.00
|
Engine Oil Screen Service
|
Details
|
|
|
01-05-2015
|
5.00
|
Exhaust System Bench Assembly
|
Details
|
|
|
01-03-2015
|
5.00
|
Seats
|
Details
|
|
|
01-02-2015
|
2.00
|
Cowlilng Stretch, Rough Fit and Finish Fit
|
Details
|
|
|
01-01-2015
|
5.00
|
Oil Service Door Safety and MISC
|
Details
|
|
|
12-30-2014
|
4.00
|
Cowling stretching
|
Details
|
|
|
12-29-2014
|
4.00
|
Stretching the cowling
|
Details
|
|
|
12-20-2014
|
3.00
|
Alternator Installed
|
Details
|
|
|
12-18-2014
|
6.00
|
Air Box Fuel Drain Tube
|
Details
|
|
|
12-16-2014
|
6.00
|
Aux Air Inlet proseal with nut plates
|
Details
|
|
|
12-15-2014
|
9.00
|
Air box aux air
|
Details
|
|
|
12-12-2014
|
6.00
|
Air box seal install
|
Details
|
|
|
12-11-2014
|
6.00
|
Air inlet balloon removal
|
Details
|
|
|
12-10-2014
|
4.00
|
Air inlet, balloon install
|
Details
|
|
|
12-08-2014
|
8.00
|
Air inlet, foam block
|
Details
|
|
|
12-05-2014
|
8.00
|
Air box, air cleaner clips install
|
Details
|
|
|
12-04-2014
|
6.00
|
Fuel injector throttle body
|
Details
|
|
|
12-02-2014
|
5.00
|
Desiccant added to cylinders
|
Details
|
|
|
12-01-2014
|
4.00
|
Oil service door, baffle rods
|
Details
|
|
|
11-21-2014
|
6.00
|
Oil service door
|
Details
|
|
|
11-20-2014
|
5.00
|
Oil service door
|
Details
|
|
|
11-19-2014
|
6.00
|
Oil service door
|
Details
|
|
|
11-18-2014
|
6.00
|
Oil service door
|
Details
|
|
|
11-13-2014
|
8.00
|
Baffle air seal fabric
|
Details
|
|
|
11-12-2014
|
0.10
|
Aerotronics panel being wired
|
Details
|
|
|
11-11-2014
|
3.00
|
Baffle paint
|
Details
|
|
|
11-03-2014
|
6.00
|
Air seal fabric final install
|
Details
|
|
|
11-01-2014
|
4.00
|
Air shield fabric - air inlet
|
Details
|
|
|
10-31-2014
|
7.50
|
More air seal fabric on baffles
|
Details
|
|
|
10-30-2014
|
9.00
|
More baffles and blast tube holes
|
Details
|
|
|
10-29-2014
|
7.20
|
Adding air fabric
|
Details
|
|
|
10-28-2014
|
7.50
|
Air fabric templates
|
Details
|
|
|
10-25-2014
|
7.00
|
Carbon fiber engine mount covers
|
Details
|
|
|
10-23-2014
|
7.20
|
Rough fit carbon engine mount covers
|
Details
|
|
|
10-21-2014
|
7.00
|
Baffle height adjustment
|
Details
|
|
|
10-20-2014
|
7.00
|
Baffle - air inlet
|
Details
|
|
|
10-19-2014
|
3.00
|
Left air inlet
|
Details
|
|
|
10-18-2014
|
2.50
|
Right inlet air ramp
|
Details
|
|
|
10-17-2014
|
8.00
|
Transition gap
|
Details
|
|
|
10-16-2014
|
6.00
|
Prop governor baffle
|
Details
|
|
|
10-15-2014
|
5.00
|
Front air ramps
|
Details
|
|
|
10-13-2014
|
9.00
|
Prop governor cable baffle hole
|
Details
|
|
|
10-09-2014
|
7.00
|
Right side baffles
|
Details
|
|
|
10-08-2014
|
8.00
|
Fitting baffles
|
Details
|
|
|
10-07-2014
|
7.00
|
Assembling baffles
|
Details
|
|
|
10-06-2014
|
7.00
|
Engine baffles
|
Details
|
|
|
10-04-2014
|
4.00
|
Completed lower fairings
|
Details
|
|
|
10-03-2014
|
4.00
|
Sanded right wheel fairing
|
Details
|
|
|
10-02-2014
|
4.00
|
Nose fairing work
|
Details
|
|
|
10-01-2014
|
6.00
|
Transition pieces
|
Details
|
|
|
09-29-2014
|
6.00
|
Transition fairing work
|
Details
|
|
|
09-26-2014
|
3.00
|
Fairing fiberglass work
|
Details
|
|
|
09-25-2014
|
7.00
|
Fairing and seat work
|
Details
|
|
|
09-24-2014
|
3.00
|
Fairing landing work
|
Details
|
|
|
09-23-2014
|
8.00
|
Front leg fairing
|
Details
|
|
|
09-17-2014
|
2.00
|
SB 14-08-29 "RV-10 ENGINE MOUNT
|
Details
|
|
|
09-12-2014
|
6.00
|
Nose wheel fairing
|
Details
|
|
|
09-11-2014
|
3.50
|
Front fairing fiberglass reinforcement
|
Details
|
|
|
09-10-2014
|
5.00
|
Front fairing work and panel review
|
Details
|
|
|
09-09-2014
|
8.00
|
Main wheel transistion pieces
|
Details
|
|
|
09-08-2014
|
7.00
|
Transistion pieces
|
Details
|
|
|
09-06-2014
|
4.00
|
Upper fairing transistion
|
Details
|
|
|
09-05-2014
|
6.00
|
Upper fairing transition
|
Details
|
|
|
09-04-2014
|
4.00
|
Leg fairings
|
Details
|
|
|
09-03-2014
|
6.00
|
Leg fairings
|
Details
|
|
|
09-02-2014
|
7.00
|
Main fairing work. Leg fairing
|
Details
|
|
|
09-01-2014
|
4.50
|
Wheel fairing
|
Details
|
|
|
08-29-2014
|
6.00
|
Main gear fairing
|
Details
|
|
|
08-28-2014
|
7.00
|
Main wheel fairing work
|
Details
|
|
|
08-27-2014
|
7.00
|
Main gear fairing
|
Details
|
|
|
08-26-2014
|
7.00
|
Main wheel fairings
|
Details
|
|
|
08-25-2014
|
7.00
|
Lower gear fairings
|
Details
|
|
|
08-24-2014
|
3.00
|
Cowling pin covers
|
Details
|
|
|
08-21-2014
|
6.00
|
Cowling pin / Fuel pump heat shield
|
Details
|
|
|
08-20-2014
|
6.00
|
Cowling hinge
|
Details
|
|
|
08-19-2014
|
8.00
|
Cowling
|
Details
|
|
|
08-18-2014
|
8.00
|
Cowling vent
|
Details
|
|
|
08-16-2014
|
1.50
|
Air inlet ramps attach
|
Details
|
|
|
08-14-2014
|
8.00
|
Lower cowling work
|
Details
|
|
|
08-13-2014
|
4.00
|
Lower cowl riveting
|
Details
|
|
|
08-12-2014
|
8.00
|
Lower cowling hinge reworked
|
Details
|
|
|
08-11-2014
|
8.00
|
Lower cowling work
|
Details
|
|
|
08-10-2014
|
3.00
|
Air inlet ramps
|
Details
|
|
|
08-09-2014
|
6.00
|
Air inlet ramp work
|
Details
|
|
|
08-08-2014
|
7.00
|
Cowl air inlet ramps
|
Details
|
|
|
08-07-2014
|
8.00
|
EAA Inspection and upper cowl fit
|
Details
|
|
|
08-06-2014
|
6.00
|
Cowling Install
|
Details
|
|
|
08-05-2014
|
8.00
|
Prop Installed
|
Details
|
|
|
08-04-2014
|
1.00
|
Wingman
|
Details
|
|
|
07-24-2014
|
2.00
|
Prop governor installed
|
Details
|
|
|
07-22-2014
|
2.00
|
Engine installation
|
Details
|
|
|
07-19-2014
|
8.00
|
Heat duct controls and misc installed
|
Details
|
|
|
07-18-2014
|
2.00
|
Oil galley plug removal
|
Details
|
|
|
07-17-2014
|
8.00
|
Engine prep for installation
|
Details
|
|
|
07-16-2014
|
8.00
|
Front wheel installed
|
Details
|
|
|
07-15-2014
|
8.00
|
Michelin tires mounted
|
Details
|
|
|
07-14-2014
|
5.00
|
MATCO brakes
|
Details
|
|
|
07-14-2014
|
3.00
|
Lower gear install
|
Details
|
|
|
07-12-2014
|
8.00
|
Rudder pedal final install
|
Details
|
|
|
07-09-2014
|
4.00
|
Fuselage paint
|
Details
|
|
|
06-20-2014
|
4.00
|
Spinner final assembly and clearance check
|
Details
|
|
|
06-19-2014
|
7.00
|
Spinner prime and nut plates added
|
Details
|
|
|
06-18-2014
|
8.00
|
Spinner backplate drill
|
Details
|
|
|
06-17-2014
|
8.00
|
Propeller blade articulation
|
Details
|
|
|
06-16-2014
|
6.00
|
Spinner manufacture
|
Details
|
|
|
06-16-2014
|
2.00
|
Spinner assembly
|
Details
|
|
|
06-14-2014
|
3.00
|
Prime inside cabin and doors
|
Details
|
|
|
06-12-2014
|
5.00
|
Nose wheel gear assembly
|
Details
|
|
|
06-11-2014
|
2.00
|
Engine Arrives
|
Details
|
|
|
06-10-2014
|
6.00
|
Spinner back initial manufacture
|
Details
|
|
|
06-09-2014
|
5.00
|
Paint caster wheel and fairing brackets
|
Details
|
|
|
06-06-2014
|
8.00
|
Poly Fill interior cabin doors
|
Details
|
|
|
06-05-2014
|
6.00
|
More Poly Fill
|
Details
|
|
|
06-04-2014
|
7.00
|
Poly Fill cabin interior
|
Details
|
|
|
06-03-2014
|
7.00
|
Overhead console wiring and venting
|
Details
|
|
|
06-01-2014
|
2.00
|
Clear coat console
|
Details
|
|
|
05-31-2014
|
3.00
|
Caster wheel upgrade
|
Details
|
|
|
05-30-2014
|
6.00
|
Prep overhead console
|
Details
|
|
|
05-28-2014
|
5.00
|
Wet sanding the overhead console
|
Details
|
|
|
05-27-2014
|
6.00
|
Forming wheel fairing
|
Details
|
|
|
05-23-2014
|
8.00
|
Prep fuselage
|
Details
|
|
|
05-21-2014
|
5.00
|
Balance Wheels
|
Details
|
|
|
05-19-2014
|
5.00
|
Engine mount
|
Details
|
|
|
05-16-2014
|
5.00
|
Forward Insulation
|
Details
|
|
|
05-15-2014
|
1.00
|
Overhead console aft edge replace
|
Details
|
|
|
05-05-2014
|
8.00
|
Fitting the headliner
|
Details
|
|
|
05-04-2014
|
5.00
|
Oil cooler bracket install
|
Details
|
|
|
04-30-2014
|
7.00
|
|
Details
|
|
|
04-29-2014
|
5.00
|
Overhead console install
|
Details
|
|
|
04-28-2014
|
8.00
|
Cabin console work
|
Details
|
|
|
04-18-2014
|
5.00
|
Door panels
|
Details
|
|
|
04-17-2014
|
8.00
|
Door panel lay up with fiberglass
|
Details
|
|
|
04-16-2014
|
6.00
|
Door panel start lay up
|
Details
|
|
|
04-14-2014
|
7.00
|
Firewall forward inventory
|
Details
|
|
|
04-09-2014
|
7.00
|
Hinge covers
|
Details
|
|
|
04-08-2014
|
5.00
|
Aluminum hinge covers
|
Details
|
|
|
04-07-2014
|
4.00
|
Hinge pockets
|
Details
|
|
|
04-02-2014
|
4.00
|
Door seal
|
Details
|
|
|
03-31-2014
|
5.00
|
Door seal work
|
Details
|
|
|
03-31-2014
|
6.00
|
Door seal and duct opening
|
Details
|
|
|
03-30-2014
|
2.00
|
Cutting cabin for door seal
|
Details
|
|
|
03-29-2014
|
4.00
|
Door ledge
|
Details
|
|
|
03-28-2014
|
3.00
|
Door ledge moving
|
Details
|
|
|
03-27-2014
|
7.00
|
Door seal work
|
Details
|
|
|
03-26-2014
|
2.50
|
Master Carr door seal
|
Details
|
|
|
03-25-2014
|
8.00
|
Master Carr door seal
|
Details
|
|
|
03-24-2014
|
8.00
|
Door mechanism
|
Details
|
|
|
03-22-2014
|
7.00
|
Door mechanism
|
Details
|
|
|
03-21-2014
|
8.00
|
Door mechanism and pin locator switch
|
Details
|
|
|
03-20-2014
|
4.00
|
Door mechanism locator pins
|
Details
|
|
|
03-20-2014
|
4.00
|
Door mechanism
|
Details
|
|
|
03-19-2014
|
8.00
|
Cabin door mechanism
|
Details
|
|
|
03-18-2014
|
8.00
|
Cabin door mechanism
|
Details
|
|
|
03-17-2014
|
2.00
|
Making brackets to cover door hinges inside
|
Details
|
|
|
03-13-2014
|
8.00
|
Door mechanism
|
Details
|
|
|
03-06-2014
|
8.00
|
Cabin door hinge shims
|
Details
|
|
|
03-05-2014
|
4.00
|
Installing right cabin door
|
Details
|
|
|
03-05-2014
|
3.00
|
Cabin Hinges
|
Details
|
|
|
02-28-2014
|
6.00
|
Door skin voids filled
|
Details
|
|
|
02-27-2014
|
7.00
|
Cabin door rough fit up completed
|
Details
|
|
|
02-26-2014
|
7.00
|
Cabin door fit up
|
Details
|
|
|
02-25-2014
|
7.00
|
Cabin door rough fit
|
Details
|
|
|
02-24-2014
|
7.00
|
Cabin door fit up
|
Details
|
|
|
02-21-2014
|
4.00
|
Left door glue up
|
Details
|
|
|
02-20-2014
|
7.00
|
Cabin door hinge pins
|
Details
|
|
|
02-19-2014
|
5.00
|
Door skin glue
|
Details
|
|
|
02-13-2014
|
4.00
|
Strut doubler
|
Details
|
|
|
02-12-2014
|
6.00
|
Door skin drilled
|
Details
|
|
|
02-10-2014
|
3.00
|
Tires and Wheels
|
Details
|
|
|
02-10-2014
|
3.00
|
Main tires and wheels
|
Details
|
|
|
02-07-2014
|
6.00
|
Prep for cabin door work
|
Details
|
|
|
02-06-2014
|
5.00
|
Cabin doors - cont
|
Details
|
|
|
02-05-2014
|
2.00
|
Cowling attach hinges & tools
|
Details
|
|
|
02-05-2014
|
5.00
|
Cabin doors
|
Details
|
|
|
02-04-2014
|
6.00
|
Left wing fairing brackets
|
Details
|
|
|
01-30-2014
|
8.00
|
Left wing fairings initial attach
|
Details
|
|
|
01-29-2014
|
7.00
|
Left wing initial fit up
|
Details
|
|
|
01-26-2014
|
3.00
|
Installed Garmin autopilot brackets
|
Details
|
|
|
01-23-2014
|
6.00
|
Finished Right wing initial fit up
|
Details
|
|
|
01-22-2014
|
7.00
|
Wing fairing support angles attach
|
Details
|
|
|
01-21-2014
|
8.00
|
Right wing initial fit
|
Details
|
|
|
01-20-2014
|
8.00
|
Right wing fit up
|
Details
|
|
|
01-16-2014
|
8.00
|
Wing/fuselage attach angle & nut plates
|
Details
|
|
|
01-11-2014
|
6.00
|
Cowl attach spacers and hinges
|
Details
|
|
|
01-10-2014
|
4.00
|
Tunnel fuel line connections & control connections
|
Details
|
|
|
01-09-2014
|
4.00
|
Boost pump platform paint, boost pump attach
|
Details
|
|
|
01-08-2014
|
6.00
|
FT60 transducer & boost pump platform
|
Details
|
|
|
01-07-2014
|
1.00
|
FT60 Fuel Transducer
|
Details
|
|
|
12-18-2013
|
7.00
|
Andair fuel selector
|
Details
|
|
|
12-16-2013
|
8.00
|
Andair fuel selector install
|
Details
|
|
|
11-26-2013
|
8.00
|
Overhead Console
|
Details
|
|
|
11-19-2013
|
8.00
|
Cabin Cover forward brace
|
Details
|
|
|
11-18-2013
|
7.00
|
Cabin Cover - fasten
|
Details
|
|
|
11-12-2013
|
8.00
|
Cabin Cover
|
Details
|
|
|
11-06-2013
|
8.00
|
Cabin Cover
|
Details
|
|
|
11-04-2013
|
7.00
|
Cabin Cover fit up
|
Details
|
|
|
11-03-2013
|
8.00
|
Cabin Cover
|
Details
|
|
|
10-28-2013
|
3.00
|
Assemble and install rear seat backs
|
|
|
|
10-26-2013
|
3.00
|
Primed rear seat backs
|
Details
|
|
|
10-25-2013
|
5.00
|
Rear seat back assembly
|
Details
|
|
|
10-23-2013
|
7.00
|
Flap motor install
|
Details
|
|
|
10-22-2013
|
5.00
|
Flap torque tube assembly
|
Details
|
|
|
10-21-2013
|
8.00
|
Control Stick Install
|
Details
|
|
|
10-18-2013
|
3.00
|
Paint push tubes
|
Details
|
|
|
10-17-2013
|
7.00
|
Elevator push tubes before paint
|
Details
|
|
|
10-16-2013
|
6.00
|
Rudder cable and push tube
|
Details
|
|
|
10-15-2013
|
1.00
|
Avionics Thoughts
|
Details
|
|
|
10-11-2013
|
8.00
|
Brake lines / Rudder cables
|
Details
|
|
|
10-10-2013
|
5.00
|
Brake / rudder pedal assembly
|
Details
|
|
|
10-09-2013
|
6.00
|
Installing brake lines
|
Details
|
|
|
10-08-2013
|
4.00
|
Panel covers prep and paint
|
Details
|
|
|
10-07-2013
|
8.00
|
Misc covers and floor panels manufacture
|
Details
|
|
|
10-04-2013
|
7.00
|
Floor pan installed
|
Details
|
|
|
10-03-2013
|
7.00
|
Cargo bay door install
|
Details
|
|
|
10-02-2013
|
6.00
|
Floor panels and insulation
|
Details
|
|
|
10-01-2013
|
4.00
|
NAV1 Cable and static tube support
|
Details
|
|
|
10-01-2013
|
5.00
|
Assemble cargo bay door
|
Details
|
|
|
09-30-2013
|
8.00
|
Cargo bay door assembly
|
Details
|
|
|
09-27-2013
|
8.00
|
Static line, RG400 NAV1 run
|
Details
|
|
|
09-26-2013
|
8.00
|
Pitot line run and conduit
|
Details
|
|
|
09-25-2013
|
8.00
|
Floor insulate and conduit runs
|
Details
|
|
|
09-24-2013
|
7.00
|
Right side wire cover
|
Details
|
|
|
09-23-2013
|
6.00
|
RG400 wire run
|
Details
|
|
|
09-20-2013
|
6.00
|
Aux battery, conduit runs and insulation install
|
Details
|
|
|
09-19-2013
|
8.00
|
Install step, prime paint floor panels
|
Details
|
|
|
09-18-2013
|
8.00
|
Conduit under floor start
|
Details
|
|
|
09-17-2013
|
8.00
|
Cargo bay floor fit up
|
Details
|
|
|
09-16-2013
|
8.00
|
Finish empennage attach, build tail support
|
Details
|
|
|
09-14-2013
|
7.00
|
Empennage attach
|
Details
|
|
|
09-13-2013
|
8.00
|
NAV1 VOR/GS dipole antenna installed
|
Details
|
|
|
09-12-2013
|
7.00
|
Joining the empennage and aft mid section
|
Details
|
|
|
09-10-2013
|
5.00
|
NAV1 Antenna install prep
|
Details
|
|
|
09-09-2013
|
7.00
|
Begin empennage connection to mid section
|
Details
|
|
|
09-06-2013
|
8.00
|
Prime fuselage skin, assemble upper forward fusela
|
Details
|
|
|
09-05-2013
|
8.00
|
Fuselage side vent assembly and install
|
Details
|
|
|
09-04-2013
|
8.00
|
Skin fit up on upper forward fuselage
|
Details
|
|
|
09-03-2013
|
8.00
|
Forward upper fuselage assembly
|
Details
|
|
|
09-02-2013
|
4.00
|
Step Installation
|
Details
|
|
|
08-30-2013
|
8.00
|
Forward floor pans and lower gear installed
|
Details
|
|
|
08-29-2013
|
6.00
|
Forward insulation and floor pans install
|
Details
|
|
|
08-28-2013
|
7.00
|
Step bolt access covers
|
Details
|
|
|
08-28-2013
|
2.00
|
EAA Technical Advisor Review
|
Details
|
|
|
08-27-2013
|
12.00
|
Forward skin rivet & mid cabin deck attach
|
Details
|
|
|
08-26-2013
|
7.00
|
Forward skin and insulation
|
Details
|
|
|
08-23-2013
|
8.00
|
R Side, mid section skin attach
|
Details
|
|
|
08-22-2013
|
7.00
|
Mid section skin install
|
Details
|
|
|
08-21-2013
|
10.00
|
Midsection sub structure assemble
|
Details
|
|
|
08-19-2013
|
3.00
|
Epoxy paint midsection parts
|
Details
|
|
|
08-16-2013
|
7.00
|
More prep for paint
|
Details
|
|
|
08-15-2013
|
8.00
|
Fuse substructure and skin prep for prime paint
|
Details
|
|
|
08-14-2013
|
9.00
|
Fuselage skin substructure
|
Details
|
|
|
08-13-2013
|
10.00
|
Form tool, form forward skins
|
Details
|
|
|
08-12-2013
|
9.00
|
Forming skin on midsection aft
|
Details
|
|
|
08-09-2013
|
8.00
|
Shape longerons and roll mid section lower skin
|
Details
|
|
|
08-08-2013
|
8.50
|
Attaching gear mount and shaping longerons
|
Details
|
|
|
08-07-2013
|
8.00
|
Seat structure and gear mount fit up
|
Details
|
|
|
08-06-2013
|
11.00
|
Forward and middle sections joined
|
Details
|
|
|
08-05-2013
|
7.00
|
Assemble forward fuselage
|
Details
|
|
|
07-26-2013
|
5.00
|
Insulation patterns and forward sub assemblies
|
Details
|
|
|
07-25-2013
|
4.00
|
Forward section alumiprep, alodine and primed
|
Details
|
|
|
07-24-2013
|
8.00
|
Final fitup and disassembly
|
Details
|
|
|
07-23-2013
|
9.00
|
First bolt up of forward and middle sections
|
Details
|
|
|
07-22-2013
|
7.00
|
Forward fuse sub assembly
|
Details
|
|
|
07-21-2013
|
4.00
|
Misc Fabrication
|
Details
|
|
|
07-20-2013
|
4.00
|
Firewall sub assembly
|
Details
|
|
|
07-19-2013
|
5.00
|
Brake lines in tunnel
|
Details
|
|
|
07-18-2013
|
4.00
|
Tunnel side... left and right rib assembly
|
Details
|
|
|
07-17-2013
|
1.00
|
Flange duct install
|
Details
|
|
|
07-13-2013
|
5.00
|
Firewall Polish
|
Details
|
|
|
07-12-2013
|
7.00
|
Firewall Assemble
|
Details
|
|
|
07-10-2013
|
4.00
|
Conduit run... prepping the ribs
|
Details
|
|
|
07-10-2013
|
4.00
|
Conduit run - lightening hole preparation
|
Details
|
|
|
07-09-2013
|
3.00
|
Firewall fitup
|
Details
|
|
|
07-07-2013
|
4.00
|
COMM Antenna Base Mounting
|
Details
|
|
|
06-29-2013
|
4.00
|
COM Antenna doubler
|
Details
|
|
|
06-28-2013
|
8.00
|
Fuselage lower skin.
|
Details
|
|
|
06-27-2013
|
8.00
|
Fuse rib attach
|
Details
|
|
|
06-25-2013
|
8.00
|
Rib attach to rear spar
|
Details
|
|
|
06-24-2013
|
7.00
|
Inboard seat rib subassembly
|
Details
|
|
|
06-20-2013
|
4.00
|
Mid Fuse Bulkhead
|
Details
|
|
|
06-20-2013
|
5.00
|
Mid Fuse Bulkhead
|
Details
|
|
|
06-19-2013
|
8.00
|
Mid Fuse Bulkhead Assembly
|
Details
|
|
|
06-18-2013
|
7.00
|
Mid Fuse Bulkhead Assembly
|
Details
|
|
|
06-17-2013
|
8.00
|
Fuse Inventory
|
Details
|
|
|
06-13-2013
|
4.00
|
Kit arrives
|
Details
|
|
|
06-12-2013
|
5.00
|
Built Fuse Dolley
|
Details
|
|
|
05-10-2013
|
2.00
|
Wings Complete and Stored
|
Details
|
|
|
05-09-2013
|
8.00
|
Wing Harness, Antenna Connection
|
Details
|
|
|
05-08-2013
|
8.00
|
NS90 plates, harness connections and ground lug
|
Details
|
|
|
05-07-2013
|
7.00
|
Angle of Attack Sensors, Aileron Bias Spring Insta
|
Details
|
|
|
05-04-2013
|
5.00
|
Duckworth Lights Install
|
Details
|
|
|
05-03-2013
|
8.00
|
Duckwork HID Lights Install
|
Details
|
|
|
05-02-2013
|
8.00
|
Duckworth HID Landing Lights Install
|
Details
|
|
|
05-01-2013
|
8.00
|
Duckworth Lights Install
|
Details
|
|
|
04-30-2013
|
8.00
|
Wing Fairing Rib Install
|
Details
|
|
|
04-29-2013
|
8.00
|
Left wing fairing and NAV 2 Antenna
|
Details
|
|
|
04-25-2013
|
6.00
|
Right wing fairing
|
Details
|
|
|
04-24-2013
|
4.00
|
Wing fairing prework
|
Details
|
|
|
04-23-2013
|
6.00
|
Complete left wing bottom skin install
|
Details
|
|
|
04-22-2013
|
8.00
|
Aileron trim install and bottom skin start
|
Details
|
|
|
04-21-2013
|
2.00
|
Aileron Trim Assembly
|
Details
|
|
|
04-18-2013
|
8.00
|
Bottom Skin
|
Details
|
|
|
04-17-2013
|
8.00
|
Solder sleeve and labels
|
Details
|
|
|
04-16-2013
|
8.00
|
Left bottom skin and pitot tube
|
Details
|
|
|
04-15-2013
|
2.00
|
EAA Tech Advisor Review
|
Details
|
|
|
04-15-2013
|
2.00
|
Conduit Seal
|
Details
|
|
|
04-12-2013
|
8.00
|
Wiring Left Wing
|
Details
|
|
|
04-11-2013
|
5.00
|
Bottom skin dimple and prime
|
Details
|
|
|
04-10-2013
|
8.00
|
Pitot controller plate / Bottom Skin
|
Details
|
|
|
04-09-2013
|
5.00
|
Pitot tube rough in
|
Details
|
|
|
04-08-2013
|
7.00
|
Misc wiring
|
Details
|
|
|
04-05-2013
|
1.00
|
Autopilot Wiring Harness Manufacture
|
|
|
|
04-05-2013
|
6.00
|
Auto pilot wiring harness build and install
|
Details
|
|
|
04-04-2013
|
8.00
|
Finish Aileron Push Rods
|
Details
|
|
|
04-03-2013
|
3.00
|
Working on the wing push tubes
|
Details
|
|
|
04-03-2013
|
4.00
|
Bellcrank assembly and mount
|
Details
|
|
|
04-02-2013
|
6.00
|
Wing Control Rods
|
Details
|
|
|
04-01-2013
|
8.00
|
Fuel tank test and install
|
Details
|
|
|
03-29-2013
|
6.00
|
Right Flap Complete
|
Details
|
|
|
03-28-2013
|
8.00
|
Left flap complete
|
Details
|
|
|
03-27-2013
|
6.00
|
Begin Flap final assembly
|
Details
|
|
|
03-26-2013
|
9.50
|
Paint Flaps
|
Details
|
|
|
03-25-2013
|
9.00
|
Left Flap Manufacture
|
Details
|
|
|
03-22-2013
|
6.00
|
Initial Flap Assembly
|
Details
|
|
|
03-21-2013
|
6.00
|
Flaps
|
Details
|
|
|
03-20-2013
|
8.00
|
Aileron / Flap Gap Fairing
|
Details
|
|
|
03-19-2013
|
7.00
|
Aileron/Flap Gap Fairing
|
Details
|
|
|
03-18-2013
|
8.00
|
Final assembly of fuel tanks
|
Details
|
|
|
03-14-2013
|
7.00
|
Aileron assembly
|
Details
|
|
|
03-13-2013
|
7.00
|
Prep and paint aileron components
|
Details
|
|
|
03-11-2013
|
8.00
|
Backrivet aileron skin and preassemble
|
Details
|
|
|
03-09-2013
|
5.00
|
Fuel level sending unit, ailerons
|
Details
|
|
|
03-08-2013
|
8.00
|
Finished fit up of aileron leading edge and start
|
Details
|
|
|
03-07-2013
|
7.00
|
Left aileron initial fit up and jigs manufactured.
|
Details
|
|
|
03-06-2013
|
12.00
|
Proseal right wing tank leading edge
|
Details
|
|
|
03-04-2013
|
8.00
|
Misc proseal
|
Details
|
|
|
03-02-2013
|
6.00
|
Final test fit prior to final assembly
|
Details
|
|
|
03-01-2013
|
5.00
|
Finish right wing fit up
|
Details
|
|
|
02-27-2013
|
8.00
|
Starting right wing fuel tank
|
Details
|
|
|
02-26-2013
|
16.00
|
Sealed 80% of left wing fuel tank
|
Details
|
|
|
02-23-2013
|
3.00
|
Left wing tank nose rib proseal
|
Details
|
|
|
02-22-2013
|
4.00
|
Prosealed left fuel tank stiffeners and back rivet
|
Details
|
|
|
02-21-2013
|
4.00
|
Sealing the manufacture holes in the fuel tank
|
Details
|
|
|
02-21-2013
|
4.00
|
Left fuel tank build underway
|
Details
|
|
|
02-20-2013
|
3.00
|
Final prep for tank assembly
|
Details
|
|
|
02-19-2013
|
8.00
|
Dimpled, alumipreped and alodined the left tank
|
Details
|
|
|
02-18-2013
|
5.00
|
Left Wing Fuel Tank
|
Details
|
|
|
02-18-2013
|
5.00
|
Install Right Wing Leading Edge
|
Details
|
|
|
02-16-2013
|
7.00
|
Left fuel tank first assembly
|
Details
|
|
|
02-15-2013
|
8.00
|
Right leading edge
|
Details
|
|
|
02-14-2013
|
5.00
|
Right leading edge prep and paint
|
Details
|
|
|
02-13-2013
|
13.00
|
Left leading edge installed on wing
|
Details
|
|
|
02-12-2013
|
9.00
|
Left wing leading edge with stall horn switch
|
Details
|
|
|
02-11-2013
|
7.00
|
Left Leading Mfg
|
Details
|
|
|
02-07-2013
|
6.00
|
Left leading edge first assembly
|
Details
|
|
|
02-06-2013
|
11.00
|
Finished top wing skin riveting
|
Details
|
|
|
02-05-2013
|
15.00
|
Rivet top skins
|
Details
|
|
|
02-04-2013
|
6.00
|
Cleco top wing skins
|
Details
|
|
|
02-04-2013
|
4.00
|
AM - Prime and Square
|
Details
|
|
|
02-02-2013
|
14.00
|
Top wing skins
|
Details
|
|
|
02-01-2013
|
9.00
|
Top Skin
|
Details
|
|
|
01-31-2013
|
8.00
|
Rear spar detail
|
Details
|
|
|
01-25-2013
|
8.00
|
Wing spar reassemble
|
Details
|
|
|
01-22-2013
|
8.00
|
Wing Rib Manufacture
|
Details
|
|
|
01-17-2013
|
8.00
|
Main spar extension & start tank nut plates
|
Details
|
|
|
01-16-2013
|
5.00
|
Base paint on fairings
|
Details
|
|
|
01-11-2013
|
1.00
|
522 lbs of aircraft aluminum arrived today
|
|
|
|
01-09-2013
|
2.00
|
Poly Fiber Smooth Prime. UV protection
|
Details
|
|
|
01-08-2013
|
0.20
|
Verification holes added in push tubes
|
|
|
|
12-22-2012
|
0.10
|
05---673 Grommet added to protect elevator trim c
|
|
|
|
12-20-2012
|
7.00
|
Ray Allen 7A installed in Rudder Trim
|
|
|
|
12-20-2012
|
1.00
|
Done except fiberglass on wing tips
|
|
|
|
12-19-2012
|
2.00
|
EAA Tech Advisor Review
|
Details
|
|
|
12-05-2012
|
8.00
|
Installed H.Stab
|
Details
|
|
|
11-29-2012
|
1.00
|
Working on the bottom skin
|
Details
|
|
|
11-05-2012
|
8.00
|
Called in reinforcements
|
Details
|
|
|
10-29-2012
|
8.00
|
HStab initial fit up
|
Details
|
|
|
10-27-2012
|
8.00
|
HStab work
|
Details
|
|
|
10-26-2012
|
8.00
|
Work on rudder
|
Details
|
|
|
10-25-2012
|
8.00
|
Wiring the rudder trim
|
Details
|
|
|
10-24-2012
|
8.00
|
Rudder work
|
Details
|
|
|
10-23-2012
|
8.00
|
Rudder
|
Details
|
|
|
10-22-2012
|
8.00
|
Vertical Stabilizer
|
Details
|
|
|
10-20-2012
|
1.00
|
Setting Up Shop
|
|
|
|
10-19-2012
|
10.00
|
|
Details
|
|
|
10-13-2012
|
10.00
|
Vertical Stabilizer
|
Details
|
|
|
09-29-2012
|
1.00
|
Flight Demo
|
Details
|
|