KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
Work Logs Found: 1023
Category Work Time: 2706 Hours
 Date
Hours
Work Log Summary

Details

 06-28-2024
1.00
Upsize Holes in Canopy Frame
Details
       

 06-27-2024
1.50
Deburr the Side Skirt Braces
Details
       

 06-25-2024
1.50
Drill C-791 to Side Skirts
Details
       

 06-24-2024
2.50
Drill C-791 Skirt Brace to Canopy Frame
Details
       

 06-18-2024
1.00
Trim C-666 Aft Skirts
Details
       

 06-06-2024
1.50
Rough Cut Aft Skirts, Shape Side Skirt
Details
       

 05-31-2024
1.00
Prep Canopy Side Skirts
Details
       

 05-20-2024
2.00
Throttle Cable, Prop Governor
Details
       

 05-07-2024
1.50
More Baffle Work
Details
       

 05-06-2024
2.00
Test Fit Prop Cable, Begin Baffles
Details
       

 05-02-2024
1.00
Test Fit Mixture Cable
Details
       

 04-11-2024
2.50
Prop Governor, Throttle Cable
Details
       

 04-09-2024
2.00
Check Exhaust Fit, Clock Arm on Prop Governor
Details
       

 04-08-2024
1.50
Mock Up Exhaust Hangers
Details
       

 04-05-2024
1.50
Make SCAT Tube Standoff Clamp
Details
       

 04-04-2024
3.00
Clock Control Arms, Install Exhaust
Details
       

 03-29-2024
2.00
Install Components on Engine
Details
       

 03-28-2024
2.50
Re-install Engine on Fuselage
Details
       

 03-05-2024
2.00
Move Wings to Airport
Details
       

 03-01-2024
2.50
Prep Wings for Move to Airport
Details
       

 02-26-2024
2.00
Drill Canopy Latch Handle
Details
       

 02-23-2024
3.00
Trim Roll Bar Brace, Begin Canopy Latch
Details
       

 02-22-2024
2.00
New SS Heat Box
Details
       

 02-19-2024
1.50
Final Install Roll Bar
Details
       

 02-15-2024
2.50
Prepare to Final Install Roll Bar
Details
       

 02-13-2024
2.50
Install F-636, Rivet Lower Cowl Mounts
Details
       

 02-12-2024
1.00
Swap Oil Cooler Fittings
Details
       

 02-12-2024
2.00
Replace Seat Back Capture
Details
       

 02-06-2024
2.50
Finish Prop Control, Fittings on Fuel Pump
Details
       

 02-06-2024
1.50
Cut Flap Actuator Opening
Details
     

 02-05-2024
1.00
Install Prop Controller Bracket
Details
       

 02-05-2024
1.50
Install Alt Air Cable Pass Through
Details
       

 02-02-2024
0.50
Oil Cooler Fittings
Details
       

 01-30-2024
2.50
Complete Firewall Wire Pass Thrus
Details
       

 01-29-2024
2.00
Begin Firewall Wire Pass Thrus
Details
       

 01-25-2024
1.00
Prep Engine
Details
       

 01-16-2024
1.00
Assemble Mixture Control Bracket
Details
       

 01-12-2024
2.00
Make New F-00098 for Ground Power Plug
Details
       

 01-11-2024
2.50
Drill for Prop Pass Thru, Insulate Buss Bar
Details
       

 01-09-2024
2.00
Drill for Cable Pass Thru
Details
       

 01-08-2024
2.50
Engine On Mount
Details
       

 01-04-2024
1.00
Finish Drilling Engine Mount to Firewall
Details
       

 01-02-2024
3.50
Drill Engine Mount to Firewall
Details
       

 01-01-2024
1.75
Drill Guide, Rivet F-6118
Details
       

 12-30-2023
1.50
Remove Engine From Crate
Details
       

 12-26-2023
2.50
Begin Throttle Control Cable
Details
       

 12-21-2023
1.00
Continue Uncrating Engine
Details
       

 12-19-2023
1.25
Begin Uncrating Engine
Details
       

 12-01-2023
1.50
Drill Lower Cowl Mounts
Details
       

 11-17-2023
3.25
Rivet Hinges for Lower Cowl
Details
       

 11-16-2023
2.50
Right Hinge, Engine Mount Fitting
Details
       

 11-14-2023
2.50
Prep Left Cowl Hinge
Details
       

 11-13-2023
1.00
Right Lower Cowl Hinge
Details
       

 11-10-2023
3.00
Drill Heater Control, Make Hinges
Details
       

 11-07-2023
1.75
Rivet Fuel Line Doubler; Engine Mount
Details
       

 11-06-2023
2.50
Polish Firewall, Paint Doubler
Details
       

 10-31-2023
3.00
More Transducer, Rivet Doubler
Details
       

 10-27-2023
1.50
Begin Transducer Manifold
Details
       

 10-17-2023
2.00
Prepare Fuel Line Doubler
Details
       

 09-29-2023
2.25
Finish Contactor Doubler
Details
       

 09-28-2023
1.50
Drill F-7127D Doubler to Firewall
Details
       

 09-26-2023
3.50
Begin Platenuts for Contactors
Details
       

 09-25-2023
1.00
Drill Mounting Holes for Cabin Heat Valve
Details
       

 09-18-2023
3.00
Oil Breather, Cabin Heat Valve
Details
       

 09-15-2023
1.50
Paint Hold Down, Begin Contactors
Details
       

 09-12-2023
1.50
Battery Hold Dwn
Details
       

 09-11-2023
1.75
Rivet Battery Box
Details
       

 08-22-2023
4.00
Continue Battery Box
Details
       

 08-21-2023
2.50
Drill Battery Box for Hinges
Details
       

 08-18-2023
4.25
Battery Hold Down
Details
       

 08-17-2023
3.00
Begin Battery Box
Details
       

 08-15-2023
0.50
Hardware Clean Up
Details
       

 08-14-2023
3.75
Install Rudder Shim, Torque Bolts
Details
       

 08-11-2023
1.25
Prime Aft Fuselage
Details
       

 08-10-2023
1.75
Prepare to Touch Up Primer
Details
       

 08-08-2023
4.50
Finish Rudder Stop
Details
       

 08-07-2023
3.50
New Internal Rudder Stop
Details
       

 08-04-2023
1.50
More Rudder Adjustments
Details
       

 08-03-2023
2.00
Rudder Adjustments
Details
       

 07-18-2023
1.00
Finish Rudder Links
Details
       

 07-17-2023
1.50
Drill Rudder Links
Details
       

 07-15-2023
2.10
Drill Rudder Stop to Hinge
Details
       

 07-13-2023
1.00
Make Shims for Rudder Stop
Details
     

 07-11-2023
3.00
F-6119 and Rudder Blocks
Details
       

 07-10-2023
1.00
Assemble Tailwheel Fork
Details
       

 07-07-2023
4.00
Begin Fitting Rudder
Details
       

 06-29-2023
2.00
Upsize Holes for Bolts
Details
       

 06-27-2023
2.25
Drill Lower End of Vert Stab Rear Spar
Details
       

 06-26-2023
4.50
Drill Vertical Stab to Fuselage
Details
       

 06-23-2023
3.20
Finish Trim Motor, Begin Vertical Stab
Details
       

 06-22-2023
3.00
Install ElevatorTrim Actuator
Details
       

 06-20-2023
2.75
Begin Trim Motor Install
Details
       

 06-19-2023
2.30
Adjust Elevator Stops
Details
       

 06-12-2023
2.25
Drill F-719D
Details
       

 05-19-2023
2.75
More F-712D Work
Details
       

 05-18-2023
1.00
Start F-712D Elevator Upstop
Details
       

 05-16-2023
4.00
Finish Drilling Horiz Stab
Details
       

 05-15-2023
3.50
Continue Drilling Horiz Stab
Details
       

 05-12-2023
2.25
Drill Elevator Horns, Drill for Stab
Details
       

 05-11-2023
2.50
Prepare to Drill Horizontal Stab
Details
       

 05-09-2023
1.50
Begin Horizontal Stab Install
Details
       

 05-08-2023
2.50
Install Elevator Tubes, Reset Shop
Details
       

 05-02-2023
2.00
Make Pass Throughs in Main Spar
Details
       

 05-01-2023
2.50
Rivet F-790, Begin Holes in Spar
Details
       

 04-29-2023
1.00
Prime F-790
Details
       

 04-28-2023
4.25
Drill F-790, Rivet F-789
Details
       

 04-25-2023
2.50
Prime F-789, Begin F-790
Details
       

 04-24-2023
1.50
Upsize Holes in F-789
Details
     

 04-14-2023
1.00
Drill F-789
Details
       

 04-13-2023
2.75
Begin F-789 Pushrod
Details
       

 04-11-2023
1.50
Finish Anchor Blocks
Details
       

 04-10-2023
5.00
More Work on Anchor Blocks
Details
       

 04-07-2023
3.75
Drill New Anchor Blocks
Details
       

 04-06-2023
2.00
Make More Canopy Blocks
Details
       

 04-04-2023
4.50
Drill New C-677 Brackets
Details
       

 03-31-2023
2.50
Rivet F-7108 Rib Supports
Details
       

 03-30-2023
2.00
Drill New Canopy Blocks
Details
       

 03-27-2023
1.50
Clean Up Fillets
Details
       

 03-04-2023
2.00
Complete Sika Fillets II
Details
       

 03-03-2023
1.00
Begin Sikaflex Fillets II
Details
       

 02-28-2023
0.75
Remove and Inspect Canopy
Details
       

 02-27-2023
0.50
Open the Canopy
Details
     

 02-23-2023
1.50
Sikaflex Canopy II
Details
       

 02-21-2023
4.75
Prepare Canopy for Sikaflex II
Details
       

 02-20-2023
2.50
Bending the Canopy Frame
Details
       

 02-17-2023
2.00
Bend Canopy Frame
Details
       

 02-16-2023
4.00
Remove Canopy from Frame
Details
       

 02-14-2023
2.50
Adjust Pushrod, Make New Aft Blocks
Details
       

 02-06-2023
3.00
Begin Installing Flight Controls
Details
       

 02-03-2023
2.00
More Impossible
Details
     

 02-02-2023
4.00
Attempting the Impossible
Details
       

 01-31-2023
3.50
Aft Super Tracks Braces
Details
       

 01-30-2023
3.00
Drilling Supertracks
Details
       

 01-27-2023
2.50
Continue fitting Super Tracks
Details
       

 01-24-2023
1.50
Prepare to Drill SuperTracks
Details
       

 01-23-2023
4.50
Install Nutplates for Canopy Rail
Details
       

 01-20-2023
1.50
Locate Supertracks, Drill Canopy Slide Rail
Details
       

 01-17-2023
4.50
Finish Rear Blocks, Start Super Tracks
Details
       

 01-16-2023
2.50
Mark and Drill Canopy Blocks
Details
       

 01-13-2023
1.00
Continue Anchor Blocks
Details
       

 01-12-2023
2.00
Begin Canopy Rear Anchor Blocks
Details
       

 12-12-2022
4.75
Drill Crossbar, Install Nutplates
Details
       

 12-09-2022
2.50
More Fitting Crossbar
Details
       

 12-08-2022
1.75
Begin Fitting Almost a 14 Mod
Details
       

 12-06-2022
3.00
New Threaded Rod, Drill Slide Track
Details
       

 10-31-2022
2.50
More Canopy Fitting
Details
       

 10-27-2022
2.00
Canopy Fitting
Details
       

 10-03-2022
4.00
Prep for Canopy Track Install
Details
       

 09-13-2022
3.00
Finish Riveting Aft Canopy Rails
Details
       

 09-12-2022
4.50
Rivet Aft Canopy Rails
Details
       

 09-08-2022
1.75
Rivet Nutplates on Aft Canopy Rails
Details
       

 09-06-2022
0.50
Finish Paint Canopy Rails
Details
       

 09-04-2022
1.50
Prime Aft Canopy Rails
Details
       

 09-03-2022
4.50
Drill Aft Canopy Rails for Nutplates
Details
       

 08-30-2022
0.50
Test Fit Canopy
Details
       

 08-29-2022
3.50
Clean Up Canopy Frame
Details
       

 08-26-2022
0.50
Remove Side Clamps
Details
       

 08-23-2022
2.50
Assemble Canopy Latch
Details
       

 08-22-2022
2.00
Apply Sika Fillets
Details
       

 08-20-2022
0.50
Remove Spacers
Details
       

 08-19-2022
4.00
Sikaflex Application
Details
       

 08-18-2022
3.50
More Sika Prep
Details
       

 08-16-2022
5.00
Continue Sika Prep
Details
       

 08-15-2022
3.00
Begin Prep for Sikaflex
Details
       

 08-12-2022
2.50
Final Trim Aft Canopy
Details
       

 08-11-2022
2.00
Prep for Final Trim on Aft Canopy
Details
       

 08-09-2022
3.25
Final Trim Canopy Sides
Details
       

 08-08-2022
1.00
Check Final Trim Lines
Details
       

 07-15-2022
3.00
Begin Final Trim on Canopy Sides
Details
       

 07-08-2022
3.50
Drill Canopy Skirt to Frame
Details
       

 07-05-2022
1.50
Big Cut Part II
Details
       

 07-01-2022
4.25
The Big Cut
Details
       

 06-30-2022
2.00
Final Preparations for Big Cut
Details
       

 06-28-2022
5.00
Finish C-791
Details
       

 06-27-2022
0.50
C-791 Layout
Details
     

 06-24-2022
2.00
Continue Canopy Skirts
Details
       

 06-23-2022
2.50
Begin Canopy Skirts
Details
       

 06-21-2022
1.75
Check Frame Fit
Details
       

 06-20-2022
4.50
Trim Forward and Aft Flange
Details
       

 06-16-2022
2.25
Trim Off Molding Flange
Details
       

 06-14-2022
1.50
Correct Canopy Hole
Details
       

 06-13-2022
3.00
Drill Hole for Canopy Latch
Details
       

 06-10-2022
2.50
Trim Second Edge of Canopy
Details
       

 06-09-2022
2.00
Trim One Edge of Canopy
Details
       

 06-07-2022
2.00
Prep Canopy for First Cut
Details
       

 06-06-2022
1.50
Begin Canopy Bubble
Details
       

 06-02-2022
2.00
More Canopy Frame Work
Details
       

 05-24-2022
3.00
Bending Aft Canopy Bow
Details
       

 05-17-2022
1.00
Shop Visit EAA Chapter 156
Details
       

 05-16-2022
3.50
Install Threaded Rod and Pitot Lines
Details
       

 05-13-2022
3.00
More Canopy Frame Bending
Details
       

 05-12-2022
4.00
Rivet Canopy Rail, Begin Bending Frame
Details
       

 05-11-2022
1.00
Prep Canopy Rail for Primer
Details
       

 05-10-2022
3.50
Canopy Slide Rail
Details
       

 04-28-2022
1.50
Drill Canopy Frame for Slide Block
Details
       

 04-26-2022
2.00
First Fit of Canopy Frame
Details
       

 04-25-2022
2.00
Begin Canopy Tracks
Details
       

 04-22-2022
1.50
Roll Bar Shims
Details
       

 04-12-2022
3.50
Drill Roll Bar
Details
       

 04-11-2022
2.50
Prepare to Drill Roll Bar
Details
       

 04-08-2022
3.50
Continue Roll Bar Install
Details
       

 04-07-2022
2.50
Drill Initial Holes for Rollbar
Details
       

 04-04-2022
1.50
Begin Canopy Install
Details
       

 04-01-2022
2.50
More Brake Assembly Work
Details
       

 03-29-2022
2.00
Begin Brake Lines
Details
       

 03-28-2022
3.00
Brake Assembly
Details
       

 03-25-2022
6.00
Rudder Cable Fairing, Install Nutplates
Details
       

 03-24-2022
3.50
Finish Fuel Lines
Details
       

 03-17-2022
4.00
Right Fuel Line and Fuel Pump Line
Details
       

 03-08-2022
1.25
Drill and Finish Firewall Doubler
Details
       

 03-07-2022
3.50
Fuel Lines and Firewall Doubler
Details
       

 03-05-2022
0.50
Shop Visit by Grandkids
Details
     

 03-01-2022
1.00
Remove Right Fuel Line
Details
       

 02-28-2022
4.75
More Fuel Line Bending
Details
       

 02-25-2022
3.50
Bending Fuel Lines
Details
       

 02-24-2022
2.50
Rudder Cable Fairings
Details
       

 02-18-2022
1.50
Fitting Fuel Pump
Details
       

 02-05-2022
1.00
Second Fuel Line
Details
     

 02-04-2022
3.50
Assemble Fuel Pump
Details
       

 02-03-2022
2.25
Doghouse Nutplates
Details
       

 02-01-2022
2.00
More Fuel Pump Doghouse
Details
       

 01-31-2022
1.00
Begin Fuel Pump Doghouse
Details
       

 01-28-2022
2.25
Begin Fuel Pump Install
Details
       

 01-27-2022
1.25
Fuel Valve Install
Details
       

 01-21-2022
2.00
Seat and Rudder Location Trial
Details
       

 01-20-2022
3.00
Finish NACA Ducts
Details
       

 01-17-2022
2.00
More NACA Duct Install
Details
       

 01-14-2022
3.25
Continue NACA Duct Install
Details
       

 01-13-2022
2.50
Begin NACA Duct Install
Details
       

 01-11-2022
2.00
Add Nutplates to Firewall
Details
       

 01-10-2022
2.00
Rivet Nutplates for Brake Resevoir
Details
       

 01-07-2022
1.25
Finish Left Fuel Vent
Details
       

 01-06-2022
2.75
Finish Right Fuel Vent, Start Left
Details
       

 01-04-2022
3.00
Begin Fuel Vent Lines
Details
       

 01-03-2022
2.50
Rivet Nutplates and F-7109
Details
       

 12-30-2021
4.00
Install Air Vents
Details
       

 12-28-2021
1.00
Begin Air Vents
Details
     

 12-27-2021
3.50
Drill F-721D
Details
       

 12-23-2021
2.50
Drill F-721C
Details
       

 12-17-2021
1.00
Prime Front Structure
Details
     

 12-16-2021
2.50
Drill F-7108C
Details
       

 12-14-2021
1.50
Dimple Forward Skin
Details
       

 12-13-2021
3.00
More Deburring and Scuffing
Details
       

 12-10-2021
2.50
Deburr and Scuff Forward Structure
Details
       

 12-07-2021
2.00
Deburr Forward Skin
Details
       

 12-06-2021
2.00
Finish Drilling Forward Skin
Details
       

 12-02-2021
2.50
Begin Drilling Forward Skin
Details
       

 11-15-2021
3.00
Final Skin Bending
Details
       

 11-14-2021
1.00
More Skin Bending
Details
       

 11-12-2021
2.50
Begin Fitting Forward Skin
Details
       

 11-11-2021
4.00
Finish Drilling Rib to Firewall
Details
       

 11-08-2021
2.50
Drill Center Rib to Firewall
Details
       

 11-05-2021
4.00
Final Turtledeck Riveting
Details
       

 11-02-2021
3.00
Prep for Final Turtledeck Riveting
Details
       

 10-29-2021
3.50
Continue Riveting Turtledeck
Details
       

 10-28-2021
2.00
More Turtledeck Rivets
Details
       

 10-26-2021
5.00
Begin Riveting Turtledeck
Details
       

 10-25-2021
4.50
Final Prep for Skin Riveting
Details
       

 10-19-2021
2.00
Tech Counselor Visit
Details

 10-14-2021
1.00
Prep for Tech Visit
Details
     

 10-12-2021
3.50
More Bracket Work
Details
       

 10-11-2021
4.00
Brackets for Pitot/Static Tubes
Details
       

 10-08-2021
2.00
Make F-7103Cs
Details
       

 10-07-2021
4.00
Instrument Panel Brackets
Details
       

 10-05-2021
3.00
More Instrument Panel Supports
Details
       

 10-04-2021
1.50
Continue with Instrument Panel Supports
Details
       

 10-01-2021
2.50
Final Size Pitot and AoA Holes
Details
       

 09-30-2021
1.00
Paint Parts
Details
       

 09-28-2021
2.50
Install Nutplates, Prep for Paint
Details
       

 09-27-2021
3.50
Route Pitot and AoA Lines
Details
       

 09-13-2021
2.25
Finalize Static Tubing
Details
       

 09-09-2021
1.50
Mount Static Ports
Details
       

 09-07-2021
3.25
Finalize Static Tubing Location
Details
       

 09-02-2021
3.00
Wire Bracket for Pitot Heat Controller
Details
       

 08-31-2021
5.00
Mount Pitot Heat Controller
Details
       

 08-30-2021
2.00
Drill and Tap Pitot Tube
Details
       

 08-27-2021
4.50
Continue Pitch Servo, Start Roll Servo
Details
       

 08-24-2021
2.00
Begin Pitch Servo Install
Details
       

 08-23-2021
4.50
Assemble Aileron Trim
Details
       

 08-20-2021
1.00
Continue Aileron Trim
Details
       

 08-19-2021
2.50
Begin Aileron Trim Install
Details
       

 08-16-2021
4.00
Install Rudder Cables, Start Aileron Trim
Details
       

 08-13-2021
4.50
Drill ADAHRS Bracket
Details
       

 08-12-2021
3.00
Begin ADAHRS Bracket, Run Conduit
Details
       

 08-10-2021
1.00
Paint Parts, Prep for Conduit in Fuselage
Details
       

 08-09-2021
1.50
Prep Parts for Paint
Details
       

 08-05-2021
2.50
Finish Flap Motor Housing
Details
       

 07-20-2021
2.50
Drill F-766B Bracket, Drill Backrest Brace
Details
       

 07-19-2021
3.00
Rivet Console, Nutplates on Backrest Brace
Details
       

 07-16-2021
3.75
Drill F-785, Begin Aircraft Extras Console
Details
       

 07-15-2021
3.00
Trim F-760 L & R, Drill F-767 Angle
Details
       

 07-13-2021
2.50
Prime Flap Parts, Rivet Platenuts
Details
       

 07-09-2021
3.50
Continue Flap Parts
Details
       

 07-08-2021
3.50
Make More Flap Parts
Details
       

 07-06-2021
4.50
Drill Flap Block, Make Flap Parts
Details
       

 07-02-2021
3.00
Rivet Left Cover Support, Adjust Flap Block
Details
       

 06-24-2021
1.75
Bolt Gussets, Rivet Right Cover Support
Details
       

 06-22-2021
2.00
Begin Flap Mechanism
Details
       

 06-21-2021
4.25
Make F-7110 Stick Boot Rings
Details
       

 06-18-2021
3.50
Drill Left F-782 Cover
Details
       

 06-17-2021
4.50
Drill F-7114 Gussets, Drill Right F-782 Cover
Details
       

 06-14-2021
5.75
Drill F-782C to Fuselage
Details
       

 06-11-2021
2.50
Rivet Nutplates on F-782C
Details
       

 06-10-2021
4.50
Begin F-983 Fuel Valve Cover
Details
       

 06-08-2021
5.25
F-782 Center Cabin Cover
Details
       

 06-07-2021
2.50
Rivet Left Side Floor
Details
       

 06-04-2021
3.50
Rivet Left Seat Back
Details
       

 06-02-2021
4.00
Rivet Right Seat Back
Details
       

 05-26-2021
1.00
Finish Painting Seats
Details
     

 05-25-2021
5.50
Install Bolts, Paint Seats
Details
       

 05-24-2021
1.50
Prime Seat Parts
Details
       

 05-21-2021
1.00
Scuff F-741
Details
       

 05-20-2021
3.50
Finish Drilling Left Seat
Details
       

 05-18-2021
1.00
Finish Drilling Right Seat
Details
       

 05-14-2021
3.25
Drill Top of Right Seat Back
Details
       

 05-13-2021
6.00
Drill Left F-638 Seat Back
Details
       

 05-10-2021
3.50
Drill Right F-638 Seat Back
Details
       

 05-07-2021
2.50
Prep F-638 Seat Back Braces
Details
       

 05-06-2021
3.50
Finish Drilling F-741, Start Seat Angles
Details
       

 05-04-2021
2.00
Drill F-741
Details
       

 05-03-2021
6.00
Drill Hinges to Left Seat Floor
Details
       

 04-30-2021
3.00
Drill Hinges to Right Seat Floor
Details
       

 04-29-2021
2.00
Make F-637 Hinges
Details
       

 04-28-2021
1.00
Rivet Wear Blocks and Nutplates
Details
       

 04-27-2021
3.00
Fit Baggage Side Covers, Paint Parts
Details
       

 04-26-2021
2.00
Prime Baggage Bulkhead
Details
       

 04-21-2021
1.50
Scuff F-751
Details
       

 04-09-2021
2.50
Drill Wear Blocks
Details
       

 04-08-2021
1.50
Prep F-6114 Wear Blocks
Details
       

 04-06-2021
2.50
Install F-652 Nutplates
Details
       

 04-02-2021
4.50
Prep and Drill F-652
Details
       

 04-01-2021
4.50
Drill F-751 and Install Nutplates
Details
       

 03-31-2021
1.50
Begin F-751 Baggage Bulkhead
Details
       

 03-26-2021
3.50
Move Gusset
Details
       

 03-25-2021
3.00
Rivet F-709 and Stringer Supports
Details
       

 03-24-2021
1.50
Rivet Doubler, Rivet F-656 Gussets
Details
       

 03-23-2021
4.00
Make Doubler, Prime Skin
Details
       

 03-22-2021
3.00
Dimple Forward Top Skin
Details
       

 03-19-2021
3.50
F-6111 Ribs
Details
       

 03-18-2021
1.00
Prime Aft Skin and Parts
Details
       

 03-10-2021
3.00
Drill Stringer, Prep Parts
Details
       

 03-09-2021
4.50
Dimple Aft Skin, Make Extra J-stringer
Details
       

 03-08-2021
1.00
Deburr and Dimple Forward Top Skin
Details
       

 03-06-2021
1.50
Dimple Bulkheads and Parts
Details
       

 03-05-2021
1.00
Drill Doubles, Scuff Parts
Details
       

 03-04-2021
1.50
Drill F-656 Gusset Plates
Details
       

 03-03-2021
2.00
Drill Forward Top Skin
Details
       

 03-02-2021
3.00
Adjust J-Channels
Details
       

 03-01-2021
4.50
Fitting Forward Top Skin
Details
       

 02-26-2021
2.50
Continue Working Top Skins
Details
       

 02-25-2021
3.50
Response from Van's
Details
       

 02-22-2021
1.00
Try Spare Skin, Take Measurements
Details
       

 02-19-2021
3.00
Tried Dimpling the Aft Top Skin
Details
       

 02-17-2021
3.00
Additional Attempts at Aft Top Skin
Details
       

 02-16-2021
3.00
More Fitting of Aft Skin
Details
       

 02-13-2021
1.50
More work on Aft Top Skin
Details
       

 02-12-2021
4.50
Work Fit of Aft Top Skin
Details
       

 02-11-2021
1.50
Make F-707B Angle, Trim F-786A J-Stringers
Details
       

 02-10-2021
2.50
Remove Plastic, Cleco F-788 and F-787
Details
       

 02-09-2021
1.75
Drill F-705 Bulkhead Caps
Details
       

 02-08-2021
2.00
First Test Fit of F-775 Rear Top Skin
Details
       

 02-05-2021
2.50
Prep for Almost a 14 Mod
Details
       

 02-04-2021
2.00
Rivet F-721 A & B, Fit Bulkhead Caps
Details
       

 02-02-2021
2.50
Rivet F-635 Bellcrank and F-695 Gussets
Details
       

 02-01-2021
4.00
Drill F-635 and F-636
Details
       

 01-29-2021
3.50
Drill F-695, Deburr Parts, C/S Longerons
Details
       

 01-28-2021
3.00
Prep F-695 Gussets, Drill F-721A
Details
       

 01-27-2021
3.00
Test Fit Almost a 14 Mod, File F-721B
Details
       

 01-26-2021
5.00
Drill F-721B to Longerons
Details
       

 01-25-2021
5.00
Finish SL-00014, Rivet F-714
Details
       

 01-22-2021
3.00
Deburr F-714, Begin SL-00014
Details
       

 01-21-2021
6.50
Drill F-714 Aft Deck
Details
       

 01-20-2021
2.00
Rivet Aft Skin to Longerons
Details
       

 01-19-2021
2.50
Roll the Canoe
Details
       

 01-18-2021
2.50
Prepare to Roll Canoe
Details
       

 01-18-2021
2.00
Finish Fuselage Cart
Details
       

 01-13-2021
5.00
Begin Fuselage Cart
Details
       

 01-11-2021
5.00
Rivet F-772 Skin
Details
       

 01-06-2021
2.50
Finsh Baggage Area Rivets, Seal Firewall
Details
       

 01-04-2021
2.00
Rivet F-728B Angle, Prep F-635
Details
       

 01-03-2021
1.50
Remove and Replace Rivets
Details
       

 12-31-2020
1.75
Finish Riveting F-623 and F-729
Details
       

 12-30-2020
2.00
Finish Rivet F-715
Details
       

 12-28-2020
1.50
Rivet Left F-623
Details
       

 12-24-2020
2.50
Rivet F-705 Bulkhead
Details
       

 12-23-2020
1.00
Replace Rivets
Details
     

 12-22-2020
1.00
Remove Bad Rivets
Details
       

 12-21-2020
4.00
More Side Skin Riveting
Details
       

 12-18-2020
3.00
More Riveting on Side Skins
Details
       

 12-17-2020
4.00
Continue Riveting Side Skins
Details
       

 12-16-2020
4.50
Begin Riveting F-770 Skins to Fuselage
Details
       

 12-14-2020
3.00
Reinforce Arm rests
Details
       

 12-11-2020
3.50
Rejoin Aft and Center Fuselage
Details
       

 12-10-2020
2.00
Rivet Right F-704F, Prep F-757 and F-795
Details
       

 12-09-2020
2.50
Finish Prep on Right Side Skin, Rivet Left F-704H
Details
       

 12-08-2020
1.50
Rivet F-684 Gussets and F-719 Angle Clip
Details
       

 12-07-2020
3.50
Rivet Platenuts and Parts
Details
       

 12-04-2020
5.50
Trim and Countersink Longerons
Details
       

 12-03-2020
2.00
Longeron Prep
Details
       

 12-02-2020
4.00
Continue Aft Fuselage Prep
Details
       

 11-30-2020
1.50
Begin Prep Aft Fuselage
Details
       

 11-27-2020
3.50
Prep Fuselage Center Section
Details
       

 11-26-2020
0.50
Separate Aft and Center Fuselage
Details
       

 11-25-2020
5.50
Dimple and Prime Left Side Skin
Details
       

 11-24-2020
2.50
Drill Flap Hole, Deburr Left Side Skin
Details
       

 11-21-2020
4.00
Prep F-713, F-717 and F-722 for Primer
Details
       

 11-19-2020
0.50
Deburr F-713s
Details
     

 11-16-2020
1.00
Prime Forwad Fuselage Parts
Details
       

 11-13-2020
4.00
Deburr and Countersink Forward Fuselage Parts
Details
       

 11-09-2020
4.00
Prep/Prime F-902 and F-796B, C, D
Details
       

 11-08-2020
1.50
Match Drill F-796, C/S F-772
Details
       

 11-07-2020
1.00
Prime Baggage Area Parts
Details
     

 11-05-2020
4.00
Dimple Baggage Ribs
Details
       

 11-04-2020
5.50
Drill Brake Master Cylinders to Pedals
Details
       

 11-03-2020
1.00
Prep Baggage Panels
Details
     

 11-02-2020
4.00
Drill Baggage Ribs and Conical Bend
Details
       

 10-30-2020
2.00
Rivet Brake Pedals
Details
       

 10-29-2020
6.00
Drill Baggage Ribs
Details
       

 10-28-2020
4.50
Match Drill Forward Fuselage
Details
       

 10-27-2020
5.50
Drill F-772 Floor Stiffeners
Details
       

 10-26-2020
4.00
Drill and Finish F-6118
Details
       

 10-23-2020
4.50
Drill Rudder Pedal Mounts to F-719
Details
       

 10-22-2020
2.50
Prep Rudder Pedal Mounts
Details
       

 10-21-2020
4.20
Prep Brake Pedals for Priming
Details
       

 10-16-2020
2.50
Right Brake Pedal Assemblies
Details
       

 10-06-2020
5.50
Begin Brake Pedal Assembly
Details
       

 10-01-2020
2.50
Drill F-796 Spacers and Angle
Details
       

 09-30-2020
3.50
Make F-796B Angles
Details
       

 09-29-2020
3.00
Drill F-902, Make F-796 C and D Spacers
Details
       

 09-28-2020
3.50
Fit and Drill F-7101 Gear Attach Webs
Details
       

 09-25-2020
5.50
Fit Right F-684, Prep F-902s
Details
       

 09-24-2020
5.00
Fit Left F-684, Make Right F-684
Details
       

 09-23-2020
4.00
Fit F-717s, Make F-684 Gusset
Details
       

 09-22-2020
2.00
Make F-717 Lower Longerons
Details
       

 09-09-2020
7.00
Drill F-719 to Skin
Details
       

 09-08-2020
1.00
Layout F-719B Angle Clips
Details
     

 09-03-2020
5.50
Finish Drilling Firewall, Aux Longerons F-713
Details
       

 09-02-2020
5.00
Drill Firewall to Skin
Details
       

 09-01-2020
3.50
Finish Drilling Longerons, Hang Firewall
Details
       

 08-31-2020
6.00
Continue Drilling Longerons
Details
       

 08-28-2020
4.00
Begin Drilling Longerons to Skin
Details
       

 08-27-2020
7.50
Adjust Longerons, Second Conical Bend
Details
       

 08-26-2020
6.50
Drill Armrests, First Conical Bend
Details
       

 08-25-2020
1.00
Adjust Longeron
Details
     

 08-24-2020
2.50
Fit F-720 Armrests
Details
       

 08-21-2020
4.50
Drill F-770 and F-776
Details
       

 08-20-2020
2.00
Cleco F-770 Side Skins
Details
       

 08-19-2020
2.50
Begin Attaching F-770 Skins
Details
       

 08-18-2020
1.25
Complete prep on F-770
Details
       

 08-17-2020
3.00
Roll Skins, Begin Prep F-770
Details
       

 08-12-2020
1.50
Join Aft and Center Fuselage
Details
       

 08-10-2020
4.50
Notch Longerons
Details
       

 08-07-2020
4.50
Trim Longeron, Practice Notch
Details
       

 08-06-2020
2.00
Prep Baggage Floors
Details
       

 08-03-2020
5.50
Rivet F-715s, Layout Longeron Cuts
Details
       

 08-02-2020
2.00
Paint Seat Floors
Details
     

 07-31-2020
1.50
Prime Seat Floors
Details
       

 07-30-2020
5.50
Prime Parts, Install Crotch Strap Brackets
Details
       

 07-29-2020
4.00
Deburr, Dimple F-715s
Details
       

 07-28-2020
6.50
Drill F-715R, Prep and Drill F-715L
Details
       

 07-27-2020
5.00
Install F-705, 706 Platenuts; Prep F-715R
Details
       

 07-24-2020
2.00
Drill F-705 for Platenuts
Details
       

 07-23-2020
1.75
More Baggage Platenuts
Details
       

 07-21-2020
2.50
Install Baggage Platenuts
Details
       

 07-20-2020
3.50
Install Platenuts, Drill Baggage Floors
Details
       

 07-17-2020
3.00
Deburr, Dimple, Prep for Platenuts
Details
       

 07-16-2020
4.00
Drill Ribs for Platenuts
Details
       

 07-15-2020
1.50
Begin Drilling for Platenuts
Details
       

 07-14-2020
1.50
Platenuts for Removable Floors
Details
       

 07-10-2020
2.50
Drill F-715 Ribs to Skin
Details
       

 07-09-2020
4.00
Drill Crotch Bracket and Center Ribs
Details
       

 07-08-2020
1.00
Begin Right Side Crotch Strap Brackets
Details
       

 07-07-2020
4.00
Begin Installing Crotch Strap Brackets
Details
       

 07-06-2020
4.50
Prep and Drill Baggage Floors
Details
       

 07-02-2020
4.00
Finish Riveting Bottom Skin on Center Section
Details
       

 07-01-2020
2.00
Begin Riveting Bottom Skin on Center Section
Details
       

 06-30-2020
2.00
Finish F-705 Ribs, Cleco Bottom Skin
Details
       

 06-29-2020
3.50
Begin Riveting F-705 to Seat Ribs
Details
       

 06-26-2020
2.50
Finish Seat Ribs, Prep F-705
Details
       

 06-25-2020
4.00
Finish Platenuts, Begin Riveting Seat Ribs to F-70
Details
       

 06-24-2020
7.50
Prime Skin, Rivet F-704, Rivet Platenuts
Details
       

 06-23-2020
7.50
Prime Baggage Ribs, Prep Bottom Skin
Details
       

 06-22-2020
5.00
Prep Baggage Ribs
Details
       

 06-11-2020
1.00
Prime Seat Ribs
Details
     

 06-10-2020
1.00
Finish Seat Rib Prep
Details
       

 06-09-2020
1.00
Begin Dimpling Seat Ribs
Details
       

 06-07-2020
3.00
Scuff and Prep Seat Ribs
Details
       

 06-06-2020
1.00
Deburr and Scuff Seat Ribs
Details
       

 06-02-2020
1.00
Remove and Deburr Seat Ribs
Details
       

 05-27-2020
1.00
Deburr Floors and Baggage Ribs
Details
       

 05-26-2020
1.00
Drill Seat Floors
Details
       

 05-25-2020
1.50
Prep Seat Pans for Drilling
Details
       

 05-21-2020
1.50
Drill Ribs to F-704
Details
       

 05-19-2020
1.00
Begin Disassemble and Deburr
Details
       

 05-18-2020
1.00
Drill Ribs to F-705A
Details
       

 05-17-2020
2.00
Drill F-704A, Fit F-715
Details
       

 05-16-2020
3.00
Finish New F-623 Attach Straps
Details
       

 05-14-2020
1.50
Revise F-623 Aft Strap
Details
       

 05-13-2020
1.50
Drill F-623 Left and Right
Details
       

 05-11-2020
1.00
Make Second F-623 Attach Strap
Details
       

 05-06-2020
1.50
F-623 Attach Straps
Details
       

 05-05-2020
1.50
Prep F-623L Rib
Details
       

 05-04-2020
1.50
Prep F-623R Rib
Details
       

 05-02-2020
1.00
Finish Drill F-776
Details
       

 05-01-2020
2.00
Drill F-776 to Skeleton Part 1
Details
       

 04-30-2020
0.75
Prep F-776 for Drilling
Details
       

 04-29-2020
1.50
Cleco F-776 Skin to Skeleton
Details
       

 04-28-2020
1.50
Flute Seat Ribs
Details
       

 04-27-2020
1.50
First Attempt to Cleco F-776
Details
       

 04-26-2020
2.50
Modify Seat Belt Anchors
Details
       

 04-24-2020
2.00
Prepare F-776 Skin
Details
       

 04-18-2020
2.00
Assemble Center Fuselage
Details
       

 04-16-2020
1.50
Cleco Seat Ribs in Center Fuselage
Details
       

 04-14-2020
2.00
Continue Seat Rib Prep
Details
       

 04-11-2020
1.50
Modify 2 More F-716 Ribs
Details
       

 04-09-2020
1.00
Continue Rib Mods
Details
     

 04-08-2020
2.00
Modify F-716 Seat Ribs
Details
       

 04-07-2020
1.50
Start Center Fuselage
Details
     

 04-04-2020
2.00
Finish Riveting Lower Aft Fuselage
Details
       

 04-01-2020
1.00
Aft Fuselage Riveting
Details
       

 03-30-2020
1.00
Remove Bad Rivets
Details
       

 03-29-2020
1.00
Rivet Side Skins to Bottom Skin
Details
       

 03-28-2020
4.00
Shim and Aft Fuselage Riveting
Details
       

 03-22-2020
1.50
Bolt in WD-409
Details
       

 03-15-2020
3.00
More Riveting Aft Fuselage
Details
       

 02-18-2020
2.00
Continue Riveting Aft Fuselage
Details
       

 02-01-2020
3.50
Rivet F-779
Details
       

 01-26-2020
2.00
Continue Riveting F-779
Details
       

 01-19-2020
2.00
Begin Riveting Aft Fuselage
Details
       

 01-11-2020
1.00
Cleco Aft Fuselage
Details
       

 01-10-2020
1.00
Prime Aft Fuselage
Details
       

 01-09-2020
1.00
Wash Parts for Prime
Details
       

 01-05-2020
4.00
Finish Dimpling Skins, J-channels, Bulkheads
Details
       

 01-04-2020
1.50
Begin Dimpling Side Skins
Details
       

 01-01-2020
1.50
Dimple Bottom Aft Skin
Details
       

 12-31-2019
2.50
Deburr Left and Bottom Skin
Details
       

 12-29-2019
1.50
Deburr J-Channels, Right Skin
Details
       

 12-28-2019
2.50
Drill Bottom of Aft Fuselage, Begin Deburring
Details
       

 12-27-2019
3.00
Drill Aft Fuselage Skins to Bulkheads
Details
       

 11-23-2019
2.00
Add Rivet Holes, Roll Tailcone
Details
       

 08-30-2019
4.00
Finish Drilling J-Channels
Details
       

 08-04-2019
1.00
Adjust Tail cone
Details
       

 07-07-2019
2.50
Begin Drilling J-Channels
Details
       

 07-05-2019
3.00
Trim Aft Ends of J-Channels
Details
       

 07-03-2019
2.00
Deburr Tailcone, Cleco F-706
Details
       

 06-30-2019
1.50
Drill F-712 for Keeper Rivets
Details
       

 06-29-2019
1.50
Drill F-711 and WD-409
Details
       

 06-26-2019
1.50
More Aft Fuselage
Details
       

 06-23-2019
2.00
Cleco Aft Fuselage
Details
       

 06-17-2019
4.00
Finish Bending F-779
Details
       

 06-15-2019
1.50
More F-779 Work
Details
       

 06-14-2019
4.00
Prepare F-779
Details
       

 06-09-2019
2.00
Finish One End of J-channel
Details
       

 06-01-2019
1.50
Cut F-786 J-channels to Length
Details
       

 05-28-2019
1.50
Trim F-721B
Details
       

 05-12-2019
2.00
Bending the Longerons Part 2
Details
       

 05-11-2019
2.00
Bending Longerons Part 1
Details
       

 05-10-2019
1.00
Rivet F-710 and F-712
Details
       

 04-28-2019
2.50
Prep F-712 A and B
Details
       

 04-22-2019
1.50
Fit and Drill F-710B
Details
       

 04-19-2019
2.00
Prep F-709 and F-710
Details
       

 04-14-2019
2.50
Rivet F-711 Bulkhead
Details
       

 04-13-2019
3.50
Prep F-711 Bulkhead
Details
       

 03-24-2019
2.00
Rivet F-707 and F-708
Details
       

 03-23-2019
3.50
Prep and Prime F-707 and F-708
Details
       

 03-17-2019
2.50
Rivet F-729 and F-706
Details
       

 03-10-2019
2.00
Begin Assembly F-706 Bulkhead
Details
       

 02-24-2019
2.50
Prep F-707 Bulkhead, Prime F-706
Details
       

 02-23-2019
3.00
Drill F-729C and Prep Parts for Prime
Details
       

 02-18-2019
2.00
Continue F-706 Drilling
Details
       

 02-17-2019
2.00
Drill F-706 Holes
Details
       

 02-03-2019
1.50
Edge Finish F-706
Details
     

 02-02-2019
1.00
Begin F-706 Bulkhead
Details
       

 01-28-2019
2.50
Complete F-705
Details
       

 01-27-2019
4.00
Begin riveting F-705
Details
       

 01-13-2019
3.50
Drill and Prep F-705 Bulkhead
Details
       

 01-12-2019
2.50
Drill Seat Belt Anchors
Details
       

 01-06-2019
3.00
Continue F-705 Bulkhead
Details
       

 01-05-2019
2.00
Prep Parts for F-705 Bulkhead
Details
       

 01-01-2019
2.00
Assemble F-704 Bulkhead
Details
       

 12-31-2018
2.00
Rivet Parts to F-704 Bulkhead
Details
       

 12-30-2018
1.00
Scuff and Dimple Parts
Details
       

 12-29-2018
1.50
Make F-704M Web Stiffeners
Details
       

 12-24-2018
3.00
Countersink and Rivet Nutplates on Center Section
Details
       

 11-21-2018
2.00
Mount Control Column Base
Details
       

 11-14-2018
1.00
Repair Drilling Mistake
Details

 11-04-2018
2.00
Work F-633
Details
       

 11-03-2018
1.50
Prep F-633 Mounts
Details
       

 10-27-2018
2.00
Drill F-704 C and D to Bulkhead
Details
       

 10-09-2018
2.00
Drill F-704 parts
Details
       

 10-08-2018
4.50
Begin F-704 Bulkhead
Details
       

 09-29-2018
5.00
Finish Riveting Firewall
Details
       

 09-16-2018
4.00
Begin Riveting Firewall
Details
       

 09-15-2018
4.00
Prime Firewall Stiffeners
Details
       

 09-14-2018
2.00
Countersink Firewall Stiffeners
Details
       

 09-13-2018
4.00
Fitting Firewall Recess
Details
       

 09-03-2018
3.00
Prep F-601TD
Details
       

 09-02-2018
2.50
Continue Firewall Prep
Details
       

 08-31-2018
2.50
Prepare Firewall Parts
Details
       

 08-26-2018
1.00
Edge Finish Firewall
Details
     

 08-25-2018
2.00
Begin Firewall
Details
       

 07-22-2018
5.00
Finish SB
Details
       

 07-21-2018
6.00
Prepare Ribs for Re-install
Details
       

 07-19-2018
1.00
Install Support Bracket
Details
       

 07-15-2018
2.50
Continue Riveting SB
Details
       

 07-14-2018
2.50
Rivet SB Plates
Details
       

 07-12-2018
0.50
Prime SB Parts
Details
     

 07-12-2018
1.00
Install Bellcrank Bracket
Details
       

 07-11-2018
2.00
Deburr SB holes
Details
       

 07-08-2018
2.00
Drill SB Plates to Spar
Details
       

 07-07-2018
1.50
Drill Stab for Nutplates
Details
       

 07-06-2018
2.00
Trim Front Spar for SB
Details
       

 07-05-2018
2.00
Remove Angle Brackets for SB
Details
       

 07-03-2018
3.00
Remove Ribs for SB
Details
       

 07-02-2018
1.00
Continue SB Rivet Removal
Details
       

 07-01-2018
1.00
Prime Brackets
Details
       

 07-01-2018
2.00
Begin SB 2014-01-31
Details
       

 06-30-2018
4.00
Pitot and AoA Mounting Brackets
Details
       

 06-27-2018
1.00
Rivet parts for Gretz
Details
       

 06-24-2018
2.00
Prep and Prime Gretz Parts
Details
       

 06-03-2018
2.50
Continue Gretz Install
Details
       

 06-02-2018
1.50
Begin Gretz Pitot Tube Mount
Details
       

 05-28-2018
3.00
Drill Right Flap
Details
       

 05-27-2018
4.50
Drill Left Flap Hinge
Details
       

 05-26-2018
4.00
Initial Set Up for Aileron Tubes
Details
       

 05-21-2018
2.00
Aileron Bellcrank
Details
       

 05-16-2018
3.50
Wash, Prime and Rivet Aileron Tubes
Details
       

 05-08-2018
1.50
Finish W-716s
Details
       

 04-21-2018
1.50
Drill Second W-716
Details
       

 04-18-2018
1.00
Begin Drilling W-716
Details
       

 04-17-2018
0.00
EAA Chapter 156 Shop Visit
Details
       

 04-16-2018
1.00
Complete Drilling W-818s
Details
       

 04-15-2018
0.75
Drill W-818
Details
       

 04-14-2018
3.50
Begin Aileron Control Tubes
Details
       

 03-30-2018
3.00
Finish Left Flap
Details
       

 03-28-2018
1.50
Continue to Rivet Left Flap
Details
       

 03-27-2018
1.50
Rivet End Ribs on Left Flap
Details
       

 03-26-2018
2.00
Continue Riveting Flap
Details
       

 03-24-2018
2.50
Begin Riveting Left Flap
Details
       

 03-23-2018
1.50
Wash and Prime Parts
Details
       

 03-21-2018
1.50
Drill FL-706A and B
Details
       

 03-17-2018
4.00
Deburr and Dimple Top Skin
Details
       

 03-16-2018
2.50
Make FL-706A, Countersink Spar
Details
       

 03-14-2018
1.00
Deburr Left Flap Lower Skin
Details
       

 03-11-2018
4.00
Drill Left Flap Lower Skin
Details
       

 03-05-2018
1.00
Make FL 708 Spacers
Details
       

 03-04-2018
1.00
Drill Left Flap Skeleton
Details
       

 02-21-2018
1.50
Begin Left Flap
Details
       

 02-19-2018
4.00
Finish Right Flap
Details
       

 02-18-2018
1.50
Rivet End Rib on Right Flap
Details
       

 02-17-2018
4.00
Begin Riveting Right Flap
Details
       

 02-11-2018
2.00
Dimple, Wash and Prime Right Flap
Details
       

 02-10-2018
3.50
Drill FL-706A, Dimple Right Flap Ribs and Skins
Details
       

 02-04-2018
2.00
Fabricate FL 706 A
Details
       

 02-03-2018
2.50
Countersink Flap Spar, Drill Top Skin
Details
       

 01-29-2018
1.00
Deburr Right Flap Skeleton and Bottom Skin
Details
       

 01-28-2018
2.50
Drill Bottom Skin and Hinge Right Flap
Details
       

 01-27-2018
1.50
Drill Right Flap Ribs to Spar
Details
       

 01-22-2018
3.00
Assemble Right Flap Skeleton
Details
       

 01-21-2018
3.00
Rivet Bottom of Left Aileron
Details
       

 01-20-2018
3.00
Rivet Top of Left Aileron
Details
       

 01-07-2018
1.00
Begin Right Flap
Details
       

 01-06-2018
1.00
Close Right Aileron
Details
       

 01-05-2018
3.00
Repair "Snowman" Hole in Right Aileron
Details
       

 01-04-2018
1.50
Begin Riveting Left Aileron
Details
       

 12-30-2017
2.50
Dimple Skin, Wash Parts, Prime
Details
       

 12-29-2017
4.50
Drill, Deburr and Countersink Left Aileron
Details
       

 12-28-2017
2.00
Continue Left Aileron
Details
       

 12-26-2017
3.00
Rivet Left Aileron Stiffeners and Prep Spar
Details
       

 12-24-2017
2.00
Dimple Skin and Stiffeners
Details
       

 12-23-2017
1.50
Drill Stiffeners to Left Aileron
Details
       

 12-21-2017
1.00
Clean Stiffeners and Prep Skin
Details
       

 12-20-2017
1.50
Begin Left Aileron
Details
       

 12-11-2017
2.00
Rivet Counterweight and Bottom of Aileron
Details
       

 12-09-2017
3.50
Replace Rivets on Right Aileron
Details
       

 12-03-2017
1.50
Drill Bad Rivets Right Aileron
Details
       

 11-22-2017
0.50
Finish Rivets on Top of Right Aileron
Details
       

 11-21-2017
2.50
Rivet Right Aileron Skin
Details
       

 11-19-2017
3.00
Prime Right Aileron Parts
Details
       

 11-18-2017
3.50
Deburr, Dimple, Countersink Rt Aileron
Details
       

 11-17-2017
1.50
Deburr Right Aileron Trailing Edge
Details
       

 11-15-2017
1.50
Drill Right Aileron Skins to Skeleton
Details
       

 11-14-2017
1.00
Edge Finish, Deburr Leading Edge Parts
Details
       

 11-10-2017
4.00
Bend Right Aileron, Drill and Deburr
Details
       

 11-09-2017
1.00
Re-build Bending Brake
Details
       

 11-05-2017
3.00
Prime and Rivet Right Aileron Stiffeners
Details
       

 11-03-2017
0.50
Wash Aileron Skin and Stiffeners
Details
       

 11-01-2017
1.00
Right Aileron Work
Details
       

 10-29-2017
3.00
Drill, Deburr, Dimple Right Aileron Skin
Details
       

 10-25-2017
4.00
Rivet Left Wing Aileron Gap Seal and Flap Brace
Details
       

 10-25-2017
4.00
Prep Left Wing Flap Brace and Aileron Gap Seal
Details
       

 10-24-2017
1.00
Drill Left Aileron Seal and Flap Bracket
Details
       

 10-22-2017
1.00
Rivet Left Wing Outboard Aileron Bracket
Details
       

 10-15-2017
0.50
Rivet Left Wing Aileron Bracket, SB 16-03-28
Details
       

 10-14-2017
1.50
Prep Left Wing Aileron Bracket
Details
       

 09-05-2017
0.50
Rivet Aileron Gap Seal to Top Skin, Right Wing
Details
       

 09-04-2017
3.00
Rivet Aileron Gap Seal and Flap Brace
Details
       

 09-03-2017
1.50
Finish Aileron Stiffeners
Details
     

 08-29-2017
1.00
Trim Right Aileron Stiffeners
Details
       

 08-28-2017
2.00
Prime Parts, Cut Aileron Stiffeners
Details
       

 08-14-2017
4.00
Drill and Deburr Right Wing Aileron Gap Seal and F
Details
       

 08-11-2017
1.00
Prep Right Wing Aileron Gap Seal
Details
     

 08-09-2017
1.00
Prep Right Wing Flap Brace
Details
       

 08-06-2017
1.00
Finish Riveting Left Wing Top Skins
Details
       

 08-05-2017
3.00
Continue Riveting Outboard Top Skin
Details
       

 07-29-2017
2.00
Rivet Outboard Top Skin, Left Wing
Details
       

 07-16-2017
1.00
Finish Riveting Aileron Brackets
Details
       

 07-14-2017
4.00
Rivet Aileron Brackets Right Wing, SB 16-03-28
Details
       

 07-08-2017
1.50
Continue Left Wing Top Skin
Details
       

 07-05-2017
1.00
Continue to Rivet Left Wing Top Skin
Details
       

 06-12-2017
1.00
Begin Riveting Left Wing Top Inboard Skin
Details
       

 06-11-2017
4.00
Rivet Left Leading Edge, Install Tank
Details
       

 06-09-2017
2.50
Rivet Aileron Brackets
Details
       

 06-08-2017
1.00
Rivet Left Wing Leading Edge
Details
       

 06-05-2017
2.00
Begin Skins on Left Wing
Details
       

 06-03-2017
1.00
Wing Stand and Prime Aileron Brackets
Details
       

 06-02-2017
1.50
Prep Aileron Brackets
Details
       

 06-01-2017
1.00
Countersink Aileron Brackets
Details
       

 05-28-2017
2.00
Finish Top Skin Riveting, Begin Aileron Brackets
Details
       

 05-26-2017
2.50
More Riveting on Right Wing Top Skin
Details
       

 05-25-2017
1.50
Continue to Rivet Right Wing Top Skin
Details
       

 05-24-2017
2.00
Rivet Right Wing Top Skin Outboard
Details
       

 04-30-2017
2.00
Rivet Inboard Top Skin Right Wing
Details
       

 04-28-2017
2.00
Attach Fuel Tank Right Wing
Details
       

 04-23-2017
4.00
Rivet Right Wing Leading Edge
Details
       

 04-22-2017
2.00
Level and Square Right Wing Skeleton
Details
       

 04-15-2017
6.00
Deburr Skeleton, Prime Skins Right Wing
Details
       

 04-14-2017
6.00
Countersink Right Wing Spar
Details
       

 04-09-2017
3.00
Edge Finish and Scuff Right Top Skins
Details
       

 03-19-2017
3.50
Edge Finish and Deburr Right Wing Top Skin
Details
       

 03-18-2017
3.00
Dimple and Prime Right Bottom Skins
Details
       

 03-17-2017
1.50
Prep Inboard, Dimple Outboard Bottom Skin Right Wi
Details
       

 03-15-2017
1.50
Scuff and Dimple Right Wing Inboard Bottom Skin
Details
       

 03-14-2017
1.00
Edge Finish Right Inboard Bottom Skin
Details
       

 03-13-2017
1.00
Bottom Inboard Skin on Right Wing
Details
     

 03-12-2017
2.00
Deburr and Edge Finish Right Wing Bottom Skin
Details
       

 03-10-2017
3.00
Dimple Left Bottom Skins
Details
       

 02-25-2017
2.00
Edge Finish and Scuff Left Outboard Bottom Skin
Details
       

 02-20-2017
2.00
Scuff Left Inboard Bottom Skin
Details
       

 02-19-2017
2.50
Prime Left Spar and Edge Finish Skin
Details
       

 02-18-2017
5.00
Prime Spar, Set Mystery Rivets and Re-Countersink
Details
       

 02-17-2017
2.00
Prime Left WingTop Skins and Countersink Spar
Details
       

 02-12-2017
5.00
Dimple Top Skins Left Wing
Details
       

 02-11-2017
3.00
Scarf Joint and Deburr Left Wing
Details
       

 02-05-2017
2.00
Scarf Joint Left Wing
Details
       

 02-04-2017
3.00
Continue Deburring Left Wing
Details
       

 01-29-2017
1.50
Deburr Left Wing Skeleton Outboard
Details
       

 01-28-2017
2.50
Rivet Left Wing Leading Edge
Details
       

 01-26-2017
4.50
Install Stall Warn, Begin Riveting Leading Edge
Details
       

 01-22-2017
4.00
Begin Assembly of Left Leading Edge
Details
       

 01-21-2017
4.00
Prep Left Wing leading Edge
Details
       

 01-09-2017
4.00
Dimple Left Leading Edge Parts
Details
       

 01-08-2017
3.00
Drill and Rivet New Tabs
Details
       

 01-07-2017
7.00
Begin Work on Left Leading Edge
Details
       

 01-02-2017
2.00
Finish Riveting Right Leading Edge
Details
       

 12-31-2016
2.50
Begin Riveting Right Leading Edge
Details
       

 12-30-2016
1.50
Prep Right Wing W-423
Details
       

 12-29-2016
1.00
Prime Right Wing Leading Edge Parts
Details
       

 12-28-2016
3.00
Dimple Right Leading Edge Parts
Details
       

 12-27-2016
1.00
Pressure Test Left Tank
Details
       

 12-23-2016
1.50
Prep Right Wing Leading Edge
Details
       

 12-20-2016
1.50
Install T-708 and Fuel Level Sender Left Tank
Details
       

 12-18-2016
2.00
Finish Riveting Left Tank
Details
       

 12-15-2016
1.00
Continue Skin to Baffle Riveting
Details
       

 12-14-2016
1.00
Continue Riveting Skin to Baffle Left Tank
Details
       

 12-12-2016
1.50
Begin Riveting Left Tank Skin to Baffle
Details
       

 12-11-2016
3.00
Pressure Test Right Tank
Details
       

 12-05-2016
3.00
Rivet Z Brackets on End Ribs Left Tank
Details
       

 11-28-2016
1.00
Blind Rivet Baffle on Left Tank
Details
       

 11-27-2016
3.00
Install Baffle on Left Tank
Details
       

 11-25-2016
2.50
Install T-708 and Fuel Level Sender Right Tank
Details
       

 11-23-2016
2.00
Finish Riveting Skin to Baffle
Details
       

 11-20-2016
5.00
Rivet Baffle on Right Tank
Details
       

 11-19-2016
3.00
Clean Rivet Holes
Details

 11-14-2016
1.00
Blind Rivets in Tank Baffle
Details
       

 11-13-2016
2.50
Install Right Tank Rear Baffle
Details
       

 11-12-2016
2.50
Prepare Right Tank for Rear Baffle
Details
       

 11-11-2016
2.00
Replace Rivets on Left Tank
Details
       

 10-25-2016
0.50
Drill Bad Rivets
Details
       

 10-23-2016
1.50
Rivet T-410s and Tank Bracket
Details
       

 10-22-2016
2.00
Prep for Riveting
Details
       

 10-16-2016
2.50
Install T-410s and Tank Bracket with Sealant
Details
       

 09-11-2016
1.50
Rivet Outboard Rib
Details
       

 09-10-2016
3.50
Rivet Inboard Rib, Prep Outboard
Details
       

 09-01-2016
1.00
Clean Sealant from Rivet holes
Details
       

 08-28-2016
3.00
Install Inboard Rib with Sealant
Details
       

 08-27-2016
3.00
Seal Shop Heads on 5 Ribs
Details
       

 08-26-2016
2.50
Make Vent Line, Prep T-708
Details
       

 08-22-2016
1.00
Finish Riveting 5 Center ribs Left Tank
Details
       

 08-20-2016
3.50
Rivet Ribs on Bottom of Left Tank
Details
       

 08-19-2016
2.50
Continue Riveting Top of Left Tank
Details
       

 08-14-2016
3.00
Continue to Rivet Left Tank
Details
       

 08-13-2016
2.50
Begin Riveting Left Tank
Details
       

 08-12-2016
7.00
Clean Dimples and Rivet Holes
Details
       

 08-07-2016
4.00
Install Left Tank Ribs with Sealant
Details
       

 08-06-2016
3.00
Rivet Tank Drain Flange and Fuel Cap Flange
Details
       

 07-30-2016
2.00
Drain and Fuel Cap Flanges
Details
       

 07-10-2016
5.00
Rivet Left Tank Stiffeners
Details
       

 07-05-2016
6.50
Rivet T-410, Begin Left Tank
Details
       

 07-04-2016
3.00
Rivet T-410 and Fuel Pickup
Details
       

 06-25-2016
2.50
Install T-410 and Fuel Pick Up
Details
       

 06-22-2016
1.00
Scotchbrite parts
Details
       

 06-15-2016
2.00
Countersink and Rivet Platenuts for Fuel Sender
Details
       

 06-12-2016
4.00
Fit T-410 Reinforcement Plates
Details
       

 06-05-2016
3.50
Fit T-410s to End Ribs
Details
       

 05-21-2016
1.00
Dry Assemble Tank Access Plate
Details
       

 05-14-2016
5.50
Rivet End Ribs on Right Tank
Details
       

 05-06-2016
1.50
Prepare End Ribs for Riveting
Details
       

 04-15-2016
2.50
Seal End Ribs on Right Tank
Details
       

 04-13-2016
1.00
Install Vent Line
Details
       

 04-10-2016
3.50
Seal Rivets, Start Vent Line
Details
       

 03-26-2016
2.00
Finish Riveting Ribs on Right Tank
Details
       

 03-20-2016
3.50
Continue Riveting Right Tank
Details
       

 03-09-2016
2.00
Continue Riveting Right Tank
Details

 03-07-2016
2.50
Continue Riveting Right Tank
Details
       

 03-05-2016
4.00
Begin Riveting Right Tank Ribs
Details
       

 03-02-2016
3.00
Install 5 Ribs with Sealant
Details
       

 02-28-2016
3.00
Rivet Cap Flange and Drain Flange
Details
       

 02-27-2016
5.00
Continue to Rivet Stiffeners
Details
       

 02-22-2016
1.00
Remove Bad Rivets
Details
       

 02-21-2016
5.00
Rivet Stiffeners in Right Tank
Details
       

 02-20-2016
2.00
Begin Right Fuel Tank Assembly
Details
       

 02-19-2016
2.50
Prep Right Tank Parts
Details
       

 02-09-2016
1.00
Calculate Rivet Lengths
Details
     

 02-07-2016
3.00
Dimple RightTank Skin, Drill Fuel Cap Flange
Details
       

 02-06-2016
1.50
Vent Line Clips
Details
       

 02-06-2016
3.00
Drill Left Tank Fuel Cap Flange
Details
       

 01-31-2016
1.00
More Dimples for Left Tank
Details
       

 01-30-2016
1.50
Dimple Left Tank Skin
Details
       

 01-24-2016
4.00
Make Tank Flapper Valves
Details
       

 01-23-2016
2.50
RIvet T-407 to T-703
Details
       

 01-10-2016
3.00
Continue Tank Prep
Details
       

 11-01-2015
3.00
Scuff Tank Parts
Details
       

 10-04-2015
2.00
T-407 Reinforcing Rings
Details
       

 07-19-2015
3.50
Prepare Inborad Tank Ribs and T-708
Details
       

 07-19-2015
1.50
Fly Cut Holes in Inboard Tank Ribs
Details
       

 07-05-2015
1.50
Drill T-405 and T-410
Details
       

 06-21-2015
3.00
Prepare Left T-405 Bracket
Details
       

 06-07-2015
1.00
Deburr Left Tank Skin
Details
       

 06-06-2015
3.50
Drill and Deburr Bottom of Left Tank
Details
       

 05-06-2015
1.00
Drill Left Tank
Details
       

 04-29-2015
1.00
Match Drill W-423 to Tank Skin
Details
       

 04-26-2015
3.50
Left Tank Stiffeners
Details
       

 04-25-2015
5.00
Assemble Left Tank and Drill Z Brackets
Details
       

 04-19-2015
2.00
Prep Left Tank Skin
Details
       

 04-15-2015
1.50
Finish Ribs, Prep Skin
Details
       

 04-14-2015
1.00
Continue Tank Rib Prep
Details
     

 03-29-2015
4.00
Prep Tank Ribs
Details
       

 03-28-2015
5.00
Left Wing Tank Brackets
Details
       

 03-22-2015
3.50
Complete T-405 and T-410
Details
       

 03-09-2015
2.00
T-405 Bracket
Details
       

 03-08-2015
2.50
Right Tank Rib Reinforcement
Details
       

 03-07-2015
2.50
Deburr Right Tank
Details
       

 03-05-2015
3.00
Drill and Countersink Right Tank
Details
       

 03-01-2015
3.50
Drill Right Wing Tank
Details
       

 02-28-2015
4.50
Right Tank Stiffeners
Details
       

 02-27-2015
4.50
Complete Right Tank Z-brackets
Details
       

 02-26-2015
1.50
Re-make Z-brackets
Details
       

 02-22-2015
4.00
Drill Z-Brackets Right Wing
Details
       

 02-21-2015
3.50
Tank Rib Prep and Cleco Right Tank
Details
       

 02-18-2015
2.00
Continue Tank Rib Preparation
Details
       

 02-17-2015
2.50
Begin Tank Preparation
Details
       

 02-16-2015
5.00
Continue Tank Attach Brackets
Details
       

 02-15-2015
3.00
Prepare T-712 Attach Brackets
Details
       

 02-14-2015
5.00
Drill Right Wing Leading Edge
Details
       

 02-09-2015
1.00
W-408 Rib and Right Wing Leading Edge
Details
       

 02-08-2015
3.00
Right Wing Leade Edge Assembly
Details
       

 02-07-2015
6.00
Left Wing Leading Edge
Details
       

 02-02-2015
2.00
Left Outboard Leading Edge
Details
       

 02-01-2015
2.50
Left Wing Leading Edge Prep
Details
       

 01-31-2015
2.50
Left Wing Bottom Skins
Details
       

 01-25-2015
1.50
Drill and Deburr Left Wing Skin
Details
       

 01-24-2015
2.50
Drill Right Wing Skin
Details
       

 01-11-2015
3.00
Skin Bottom of Right Wing
Details
       

 01-02-2015
4.00
Drill Right Wing Top Skin
Details
       

 12-30-2014
4.50
Rivet Rear Spar on Right Wing
Details
       

 12-29-2014
2.50
Rivet Ribs to Right Wing Main Spar
Details
       

 12-27-2014
4.00
Remove Blue Plastic
Details
     

 12-26-2014
3.00
Right Wing Skeleton Assembly
Details
       

 12-23-2014
4.00
Wash and Prime Right Wing Ribs
Details
       

 12-20-2014
4.00
Prep Right Wing Ribs
Details
       

 12-14-2014
3.00
Rivet Rear Spar on Left Wing
Details
       

 12-09-2014
1.50
Left Wing Ribs to Spars
Details
       

 12-07-2014
3.50
Prime Rear Spar, More Ribs Riveted
Details
       

 12-06-2014
1.00
Begin Riveting Ribs to Spar
Details
       

 12-02-2014
1.00
Add Nutplates to Left Spar
Details
       

 11-30-2014
2.50
Wash and Prime Left Wing Ribs
Details
       

 11-28-2014
4.00
Deburr Left Wing Ribs
Details
       

 11-16-2014
3.00
Drill Wing Spars to Ribs
Details
       

 11-15-2014
3.00
Right Wing Skeleton
Details
       

 11-11-2014
7.00
Ribs: Drill, Deburr, Repeat
Details
       

 11-10-2014
7.00
Rib Preparation Continued
Details
       

 11-09-2014
4.00
Rib Preparation
Details
       

 10-29-2014
2.00
More Rib Work
Details

 09-28-2014
5.00
Rib Flange Tool
Details
       

 09-13-2014
8.00
Continue to Edge Finish Ribs
Details
       

 09-04-2014
1.50
Deburring Ribs
Details

 09-01-2014
3.00
Complete Right Rear Spar
Details
       

 08-31-2014
5.00
Install Tiedown Assemblies, Rivet Right Rear Spar
Details
       

 08-29-2014
6.00
FabricateTie Down Assembly
Details
       

 08-28-2014
1.00
Rivet Reinforcing Fork Left Rear Spar
Details
       

 08-25-2014
2.50
Prime Parts and Begin Riveting Rear Spar
Details
       

 08-23-2014
4.00
Finish Rear Spar Prep
Details
       

 08-17-2014
3.00
Continue Rear Spar Prep
Details
       

 08-12-2014
2.50
Rear Spar Parts Prep
Details
       

 08-10-2014
2.50
Begin Rear Spars
Details
       

 08-09-2014
2.50
Make Tie Down Spacers
Details
       

 08-07-2014
1.00
Center Section Attach Nutplates
Details
       

 07-20-2014
1.50
Right Wing Spar Inspection Cover Platenuts
Details
       

 07-14-2014
1.00
Left Spar Inspection Plate Nutplates
Details
       

 07-10-2014
1.50
Finish Fuel Tank Nutplates Right Spar
Details
       

 07-07-2014
3.00
Begin Right Wing Spar
Details
       

 06-20-2014
2.00
Countersink the Left Spar Flange
Details
       

 06-16-2014
1.00
Nutplates on Left Spar
Details
       

 06-15-2014
2.50
Begin the Wings
Details
       

 06-12-2014
2.00
Drill Elevator Control Horns
Details
       

 06-04-2014
2.50
Trim Horizontal Stab Rear Spar
Details
       

 05-20-2014
0.00
EAA Chapter 156 Shop Visist
Details
       

 05-18-2014
4.00
Trim Horizontal Stab
Details
       

 04-06-2014
2.50
Finish Right Elevator
Details
       

 03-30-2014
4.00
Finishing the Elevators
Details
       

 03-29-2014
4.00
Rivet Trim Tab Part II
Details
       

 03-23-2014
4.00
Rivet Trim Tab Part I
Details
       

 03-16-2014
1.50
Debur and Dimple Trim Tab
Details
       

 03-15-2014
1.50
Drilling Trim Tab
Details
       

 03-11-2014
1.50
Trim Tab Bending Part II
Details
       

 03-10-2014
3.00
Bending Ends of Trim Tab
Details
       

 03-03-2014
8.00
Skin on Left Elevator
Details
       

 03-02-2014
5.00
Rivet Left Elevator Skeleton
Details
       

 03-01-2014
6.00
Install Trim Motor, Bend Elevator Tabs
Details
       

 02-16-2014
3.00
Modify Tail Jig
Details
     

 02-15-2014
4.00
Skin Storage
Details
       

 02-09-2014
6.00
Wing Parts Storage
Details
       

 02-02-2014
4.00
Wash and Prime Skeleton
Details
       

 02-01-2014
4.00
Debur and Dimple Left Elevator Parts
Details
       

 01-29-2014
2.50
Left Elevator Drilling
Details
       

 01-26-2014
8.00
Wing Kit Inventory
Details
       

 01-15-2014
1.00
Wings Arrive
Details
       

 01-12-2014
2.00
Begin Left Elevator
Details
       

 01-05-2014
3.50
Rivet Right Elevator
Details
       

 01-03-2014
2.00
Right Elevator Fiberglass Tip
Details
       

 01-02-2014
3.00
Rivet Right Elevator Skeleton
Details
       

 01-01-2014
1.50
Prime Right Elevator Skeleton
Details
       

 12-31-2013
2.50
Dimple Right Elevator
Details
       

 12-30-2013
2.50
Deburr Right Elevator Skeleton
Details

 12-29-2013
3.00
Continue Right Elevator Prep
Details
       

 12-28-2013
4.00
Bending Elevator Trailing Edges
Details
       

 12-26-2013
4.50
Rivet Stiffeners to Elevators
Details
       

 12-24-2013
3.00
Priming Elevator Parts
Details
       

 12-22-2013
2.00
Dimpling Elevator Parts
Details
       

 12-18-2013
4.00
Drill Left Elevator
Details

 12-08-2013
4.00
Right Elevator Drilling
Details
       

 11-29-2013
5.50
Left Elevator Parts
Details
       

 11-27-2013
2.50
Begin Elevator
Details
       

 11-24-2013
5.50
Roll Rudder Leading Edge
Details
       

 11-21-2013
2.50
Rivet Rudder Trailing Edge
Details
       

 11-17-2013
1.50
Prepare for Riveting
Details
       

 11-02-2013
4.50
Riveting Rudder
Details
       

 10-27-2013
4.50
Rudder Assembly
Details
       

 10-19-2013
2.00
Rudder Tip Part 3
Details

 10-09-2013
1.00
Rudder Tip Part 2
Details
       

 10-08-2013
2.00
Rudder Tip
Details
       

 10-06-2013
2.50
Continue Riveting Rudder
Details
       

 10-04-2013
3.00
Begin Riveting Rudder
Details
       

 10-03-2013
6.50
Final Prep and Prime for Rudder Parts
Details
       

 10-02-2013
8.00
Deburr and Dimple Rudder Parts
Details
       

 09-29-2013
3.50
Rudder deburring
Details
       

 09-28-2013
3.00
Rudder Construction
Details
       

 09-22-2013
3.50
Build Rudder Skeleton
Details
       

 09-15-2013
4.00
Rivet Stiffeners
Details
       

 09-14-2013
5.00
Left side rudder
Details
       

 09-08-2013
2.00
Rudder stiffeners
Details
       

 08-23-2013
2.00
Finish Vertical Stab
Details
       

 08-19-2013
8.00
Begin work on the Rudder
Details
       

 08-17-2013
2.50
Nearly Finish Vertical Stab
Details
       

 08-12-2013
8.00
Vertical Stab Assembly
Details
       

 08-05-2013
8.00
Verical Stab Spar and Skeleton
Details
       

 08-03-2013
2.50
Vertical Stab Rear Spar
Details
       

 07-29-2013
3.50
Prime Parts for Vertical Stab
Details
       

 07-28-2013
2.00
Prepare Vertical Stab Parts
Details
       

 07-23-2013
8.50
Vertical Stab Preparation
Details
       

 07-15-2013
5.50
Complete Horizontal Stab, Start Vertical Stab
Details
       

 07-10-2013
8.50
Complete Horizontal Stab (almost)
Details
       

 07-07-2013
1.50
Continue to rivet skin on Horizontal Stab
Details
       

 06-29-2013
5.00
Right Horizontal Stabilizer
Details
       

 06-24-2013
2.50
Complete Rivet Bottom Skin on Stab
Details
       

 06-22-2013
3.50
Riveting Left Horizontal Stabilizer
Details
       

 06-09-2013
2.00
Riveting Skeleton
Details
       

 06-08-2013
4.00
Rivet elevator brackets and forward spar
Details
       

 05-05-2013
2.50
Rivet Horizontal Stab Rear Spar
Details
       

 04-28-2013
3.00
Final Prep and Prime Left
Details
       

 04-27-2013
3.00
Final Prep and Primer
Details
       

 04-21-2013
3.00
Debur and Dimple
Details

 03-29-2013
3.00
Prepare Right Horizontal Stabilizer
Details
       

 03-22-2013
1.00
Dimple Left Horizontal Stab
Details
       

 03-05-2013
5.00
Prepare Horizontal Stab
Details
       

 02-24-2013
3.00
Set up for final drill right stabilizer
Details
     

 02-23-2013
4.00
Drill left stabilizer to final size
Details
       

 02-21-2013
3.00
Re-make Front Spar Reinforcing Angles
Details
       

 02-10-2013
0.00
Paint Booth
Details
       

 02-03-2013
0.00
Painting Table continued
Details
       

 02-02-2013
0.00
Downdraft Painting Table
Details
       

 01-27-2013
2.00
Drilling the Right Stab Part 1
Details
       

 01-26-2013
2.00
Right Horizontal Stabilizer
Details
       

 01-25-2013
3.00
Drilling Horizontal Stab Part 1
Details
       

 01-21-2013
4.50
Left Horizontal Stabilizer
Details
       

 01-21-2013
4.50
Left Horizontal Stabilizer
Details
       

 01-20-2013
2.50
Preparing the Ribs
Details
       

 01-19-2013
4.00
Front Spar Assembly Day 2
Details
       

 01-13-2013
3.00
Begin Front Spar Assembly
Details
       

 01-06-2013
1.00
Rear Spar Assembly
Details
       

 01-06-2013
2.00
Complete Rear Spar Assembly
Details
       

 01-06-2013
3.00
Build HS-411 assembly
Details
       

 01-03-2013
1.00
Match drill the spar stiffeners
Details
       

 01-01-2013
1.00
First Sub-Assembly
Details
     

 12-31-2012
3.00
Step 1 deburring edges
Details
       

 12-29-2012
4.00
Buiding Jig for empennage spars day 2
Details
       

 12-28-2012
6.00
Buiding Jig for empennage spars
Details
       

 12-26-2012
0.00
Inventory
Details
       

 10-13-2012
0.00
Workbench Modification
Details
       

 10-03-2012
0.00
Cleaveland Airframe Tool Package
Details
       

 09-03-2012
0.00
Workbench Details
Details
       

 09-01-2012
0.00
Preparing the workspace
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.