KitLog pro

Powered By Kitlog Pro v2.0

Sarah's Personal Cruiser
Work Logs Found: 74
Category Work Time: 932 Hours
 Date
Hours
Work Log Summary

Details

 08-21-2023
10.00
I'm Back !!!
Details
       

 11-30-2019
5.00
Ventral Strake
Details
       

 09-01-2019
10.00
Vertical Tail Surface
Details
       

 09-01-2019
10.00
Horizontal Tail Surface
Details
       

 08-30-2019
10.00
Tail Sizing and Placement
Details
       

 05-06-2019
4.00
Stratux Do-It-Yourself ABS-B Receiver/AHRS
Details
     

 05-02-2019
1.00
Fuel/Air Sensor System for Engine Exhaust
Details
       

 04-18-2019
1.00
Another Move But to Better Facilities
Details
       

 04-28-2018
1.00
Main Electrical Panel 3D Mockup
Details
     

 02-24-2018
1.00
Canopy Transparency Details
Details
       

 02-11-2018
5.00
Canopy Redesign Pt 2
Details
       

 02-11-2018
4.00
Canopy Frame Detail Design Overview Pt 2
Details
       

 02-11-2018
4.00
Canopy Frame Detail Design Overview Pt 1
Details
       

 01-27-2018
20.00
Canopy Redesign Pt 1
Details
       

 09-17-2017
5.00
A New Home for the Project
Details
       

 01-17-2017
5.00
Elevator and Aileron Fuselage Detailed Design
Details
       

 09-01-2016
4.00
Fuselage Systems Mockup - Part 1
Details
       

 05-23-2016
20.00
Revised Wing Design
Details
       

 08-23-2015
2.00
Rear Alternator Install 1
Details
     

 08-23-2015
2.00
Fabrication and Install of Rear Alternator Pulley
Details
     

 08-05-2015
2.00
Oil Cooler Placement Part 1
Details
       

 07-26-2015
1.00
Engine Cooling Baffles Design Part 1
Details
       

 07-25-2015
2.00
Mounting Fuel Flow Divider
Details
     

 07-24-2015
5.00
Induction System Planning
Details
       

 07-24-2015
5.00
Fuel Injection System Components
Details
       

 07-22-2015
2.00
Mounting of Gasocotator
Details
     

 07-21-2015
4.00
Engine Intake Air Inlet Design
Details
     

 05-21-2015
10.00
Rear Alternator Design 1
Details
       

 03-08-2015
2.00
Construction of Nosebowl Locater
Details
       

 02-24-2015
2.00
Mount Engine to FWF Mockup Stand #2
Details
     

 02-22-2015
6.00
Design of the Firewall Forward Installation #1
Details
       

 02-22-2015
5.00
Cowling Construction Part 1
Details
       

 07-26-2014
10.00
Fuel Instrumentation
Details
       

 06-23-2014
5.00
Mid Avionics Shelf Layout
Details
     

 06-23-2014
10.00
Aft Avionics Compartment
Details
       

 06-22-2014
10.00
Wing Planform and Structure
Details
       

 04-05-2014
8.00
Engine Assembly Part 3
Details
       

 04-04-2014
10.00
Engine First Run
Details
       

 04-02-2014
10.00
Engine Assembly Part 2
Details
       

 04-01-2014
15.00
Engine Assembly Part 1
Details
       

 01-18-2014
5.00
Basic Design of Brake System
Details
       

 11-11-2013
2.00
Mount Engine to FWF Mockup Stand #1
Details
       

 11-10-2013
15.00
Firewall Forward Mockup Basic Construction
Details
       

 11-03-2013
15.00
Engine Head Paint
Details
       

 11-02-2013
10.00
Engine Case Painting II
Details
       

 10-26-2013
5.00
Stock Steel Pushrod Tube Painting
Details
       

 10-20-2013
20.00
Engine Case Painting I
Details
       

 10-19-2013
20.00
Painting Engine Part II
Details
       

 09-28-2013
10.00
Painting Engine Parts I
Details
       

 09-22-2013
6.00
Pushrod Tube Painting
Details
       

 08-20-2013
30.00
Rudder Control System Design
Details
       

 08-20-2013
20.00
Fwd Equipment Placement Design
Details
       

 08-20-2013
50.00
Fuel System Design
Details
       

 08-20-2013
30.00
Baggage Compartment Design
Details
       

 08-04-2013
1.00
Refurbished Components
Details
       

 08-04-2013
20.00
Hardware Components
Details
     

 12-23-2012
40.00
Fwd Cockpit Component Layout Design
Details
       

 12-23-2012
40.00
Elevator Control System Design
Details
       

 12-23-2012
40.00
Aileron Control System Design
Details
       

 12-22-2012
40.00
Wing Flaps Design
Details
       

 12-22-2012
30.00
Speed Brake Design
Details
       

 12-22-2012
20.00
Pitot / Static System Design
Details
       

 12-22-2012
5.00
Paint Concepts
Details
       

 12-22-2012
0.00
Instrument Panel Concept
Details
       

 12-22-2012
40.00
Fwd Equipment Mounting
Details
       

 12-22-2012
30.00
Fuselage Formers Design
Details
       

 12-22-2012
40.00
Fuselage Componenet Layout Design
Details
       

 12-22-2012
20.00
Flight Control SurfaceTrim
Details
       

 12-22-2012
40.00
Electrical System Overview
Details
       

 12-22-2012
10.00
Audio Switching and Av Cooling Design
Details
       

 12-22-2012
20.00
Aircraft Lighting Design
Details
       

 06-02-2011
0.00
Kit A Arrives
Details
     

 11-14-2010
10.00
Engine Teardown
Details
       

 09-19-2010
0.00
Core Engine
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.