Hamiltons RV Website
RV-10
All
Work Logs Found:
173
Category Work Time:
354 Hours
Date
Hours
Work Log Summary
Details
03-11-2013
1.00
Technical inspection of the Elevators.
Details
03-10-2013
2.00
Tie Down Bar
Details
03-10-2013
1.00
Rudder Cable Angle
Details
03-10-2013
1.00
F-1011 Parts
Details
03-10-2013
0.25
1011 Bulkhead Stiffener
Details
03-08-2013
0.50
HS Attachment Bars
Details
03-06-2013
0.50
Trim Cable Attachments
Details
03-06-2013
2.00
Rivet trailing edges.
Details
03-06-2013
1.00
Rivet the Counterbalance Rib aft of the Rear Spar
Details
03-06-2013
1.50
Cutting and preparing Lead Counterbalances
Details
03-06-2013
0.25
Blind Rivet Closetout Tabs
Details
03-03-2013
2.50
Proseal the Trailing Edge
Details
03-01-2013
2.50
Tip Rib Attachment
Details
02-26-2013
2.00
Rivet Front Spar to Skin (Most of it)
Details
02-26-2013
2.25
Attach Root Ribs
Details
02-26-2013
0.50
Attach Forward Spars
Details
02-25-2013
0.50
Clecoed Front spars to the Elevators
Details
02-24-2013
1.00
Right Elevator Second Skin
Details
02-24-2013
1.00
Right Elevator - Blind Riveting Ribs
Details
02-19-2013
0.20
Prepare the Foam trailing Edge Ribs
Details
02-17-2013
1.50
Riveting the second skin Left Elevator
Details
02-17-2013
2.00
Riveting the Rear spar to the skin
Details
02-17-2013
1.50
Blind Rivet Ribs
Details
02-16-2013
0.75
Rivet Static Wick attachment points
Details
02-16-2013
0.50
Adding the Gussets
Details
02-16-2013
1.50
Adding rear spars and shear clips
Details
02-12-2013
1.00
Attach Trim Reinforcements to Skins
Details
02-12-2013
1.50
Attach ribs to skins
Details
02-10-2013
4.00
Skin Priming and Spray Painting
Details
02-10-2013
1.50
Riveting Trim Reinforcement Nutplates
Details
02-10-2013
1.75
Riveting the Tip Ribs
Details
02-10-2013
1.00
Riveting the Spar Doublers
Details
02-10-2013
0.75
Elevator Horn Attachment
Details
02-10-2013
0.85
Attaching the Root Ribs and Snap Bushings
Details
02-09-2013
3.00
Priming Spars and skins
Details
02-08-2013
2.00
Priming Smaller Parts
Details
02-03-2013
3.10
Dimple Tips and countersink TE wedge - Then Static
Details
02-02-2013
0.60
Spar Flange Angles and Further Dimpling
Details
02-01-2013
1.50
Dimpling Substructure
Details
02-01-2013
6.00
Deburring and Dimpling
Details
01-31-2013
8.50
Final Drilling the Horns, Trim Cable Anchor bracke
Details
01-30-2013
2.00
Trim Access Reinforcement, Tip Ribs and Top Skins
Details
01-30-2013
4.00
Close Out Tabs and Elevator Horns
Details
01-30-2013
0.75
Adding Spars and Shear Clips.
Details
01-29-2013
0.75
Skin Close Out Tabs
Details
01-29-2013
1.25
Preparation of the Tip Subassemblies
Details
01-29-2013
1.00
Preparation of the Front Spars & Static Bonding
Details
01-29-2013
4.00
Ouch More Deburring - Skins
Details
01-29-2013
0.50
Clecoed the Ribs to the skins
Details
01-28-2013
3.00
More deburring
Details
01-27-2013
0.50
Preparation of the shear clips.
Details
01-26-2013
2.00
Deburing The Elevator Parts
Details
01-23-2013
2.00
Attachment of Skins to the Rear Spar Flanges
Details
01-22-2013
2.00
Completion of the Inspar Ribs and Attachment of Re
01-20-2013
7.50
Completed Inspar Rib Flanges
Details
01-19-2013
2.00
Rivet Skins to Inspar Rib Flanges
Details
01-18-2013
0.00
New Compressor Arrived
Details
01-17-2013
1.00
Reviewed HS Nose Ribs
Details
01-17-2013
1.50
Deburring Elevator Parts
Details
01-16-2013
1.50
Continued riveting the HS Front Spar Flange
Details
01-16-2013
1.00
Commenced Elevators
Details
01-15-2013
2.00
Continued on the HS Nose Rivets
Details
01-15-2013
1.00
Added Ribs and Commenced Riveting Spar
Details
01-14-2013
2.00
Commenced Riveting the HS Skins
Details
01-13-2013
3.00
Priming the HS Skins
Details
01-11-2013
2.00
Reworked HS Front Attachment Points
Details
01-10-2013
3.00
Dimpling Skins
Details
01-09-2013
3.00
Preparation to Prime Ribs
Details
01-08-2013
2.00
Finished Countersinking Spars
Details
12-26-2012
3.00
Further Countersinking
Details
12-25-2012
3.00
Countersinking Spars and Stringers
Details
12-24-2012
2.50
Finished Drilling Skins
Details
12-23-2012
3.00
Continued Drilling the HS Skins
Details
12-22-2012
3.00
HS Prep and Drilling of the HS
Details
12-20-2012
2.00
Preparing the HS Forward Spar
Details
12-13-2012
2.00
Drilling out the Attachment Rivets
Details
12-09-2012
2.00
Modify Inspar Ribs and Nose Ribs
Details
12-08-2012
0.00
Second Stage of Priming
Details
12-08-2012
1.00
Riveting HS Rear Spar
Details
12-08-2012
4.00
Priming Rear Spar.
Details
12-08-2012
1.50
HS Riveting Front Spar
Details
12-08-2012
1.50
Disassemble Front spar and prime it. (See photos f
Details
12-08-2012
1.00
Attaching the Inboard Hinge Bracket
Details
12-07-2012
2.00
Trimming Rib Flaneges
Details
12-05-2012
2.00
Preparing for Priming
Details
12-04-2012
2.00
HS Front Spar Doubler and Attachments
Details
12-03-2012
3.00
Fabricated Front Spar Attachment Brackets
Details
12-02-2012
1.00
Rudder Counterbalance
Details
12-02-2012
1.50
HS Cradles
Details
12-02-2012
3.00
Finish Rudder Counterbalance
Details
12-02-2012
1.50
Constructed Nose Rib Cradles
Details
12-01-2012
2.00
Rolled Rudder Leading Edges
Details
12-01-2012
1.00
Initial Counter Balance Installation
Details
11-30-2012
0.50
Tech Consultant Examination of the Rudder
Details
11-29-2012
2.00
Rivet Rudder Trailing Edge
Details
11-29-2012
3.25
Preparing to rivet the Rudder Trailing Edge
Details
11-24-2012
1.00
Removed TE Clecos then replaced them!!
Details
11-24-2012
2.00
Drill HS Rear Spar
Details
11-24-2012
4.00
Deburring Forward Spar
Details
11-23-2012
4.00
Spar Caps and Stringers
Details
11-22-2012
1.50
Completed Deburring HS Rear Spar
Details
11-21-2012
1.00
Commenced Deburing the HS Rear spar
Details
11-20-2012
2.00
MC-236-B1(Proseal) Rudder TE & Rivet Stiffeners
Details
11-19-2012
1.00
Static Wick Attachments
Details
11-19-2012
1.00
Constructed Sample Static Wick Attachment Point
Details
11-18-2012
0.25
Top Rib Attachment
Details
11-18-2012
1.00
Rudder Spar Doublers
Details
11-18-2012
1.50
Riveting Stiffeners
Details
11-18-2012
2.50
Primed Rudder Skins
Details
11-18-2012
0.75
Bottom Rib and Horn
Details
11-18-2012
1.00
Attach the Bottom Rib to the Right Skin
Details
11-18-2012
0.50
Add Shear Clips
Details
11-17-2012
2.00
Riveted the lower inspar rib then the Rear Spar
Details
11-17-2012
2.50
Primed Rudder Skeleton
Details
11-17-2012
1.25
Middle Inspar Rib Riveting
Details
11-16-2012
0.50
Tech Review - VS
Details
11-16-2012
1.50
Rivet Lower Spar
Details
11-13-2012
1.50
VS Upper Front Spar Rivets
Details
11-13-2012
1.25
VS Lower Front Spar Rivets
Details
11-12-2012
0.25
Preparation for Forward Spar Riveting
Details
11-11-2012
2.50
Riveting VS from LE to Front Spar
Details
11-11-2012
6.00
Finished preparation for Priming
Details
11-10-2012
0.50
Tip Rib Modifications
Details
11-10-2012
0.50
Spray paint frame
Details
11-10-2012
3.00
Deburing and Dimpling
Details
11-08-2012
2.00
Riveting VS Skeleton
Details
11-08-2012
3.00
Primed and Riveted the Rudder Top Rib
Details
11-08-2012
0.50
Added Cable Attachment points for the VOR Antenna
Details
11-05-2012
2.00
Replaced the VS Top Rib
Details
11-04-2012
4.00
Final Drill Rudder Skins
Details
10-29-2012
2.00
Rudder Static Bonding Strap
Details
10-28-2012
2.50
VS Static Bonding Strap
Details
10-28-2012
1.50
Replaced R-607PP and R-608PP
Details
10-27-2012
5.00
Debur the Rudder Skins
Details
10-26-2012
1.00
Rudder Counterbalance work
Details
10-26-2012
1.50
Completed Riveting of the VS Rear Spar
Details
10-25-2012
1.00
Rivetted Front Spar and Doubler
Details
10-25-2012
3.00
Riveting VS Rear Spar
10-25-2012
1.00
Final Drill the Rudder Spar Web and shear clips
Details
10-24-2012
3.00
Priming - Stewart Systems - Vertical Stabiliser
Details
10-23-2012
3.00
Priming - Alodine
Details
10-22-2012
4.00
Rudder Stiffener and Shear Clips
Details
10-21-2012
3.00
Prepared R1005 Rudder Horn
Details
10-20-2012
3.50
Prepare Rudder Ribs and Stiffeners
Details
10-17-2012
2.00
Rudder Stop Final Drilling
Details
10-16-2012
1.50
Front Spar Preparation and Rudder Stops
Details
10-14-2012
9.00
Completed VS skin Preparation
Details
10-13-2012
4.00
VS Skeleton
Details
10-13-2012
2.00
Added VS Skin and Commenced Match Drilling
Details
10-12-2012
4.00
Snow and VS Work
Details
10-11-2012
2.00
Constructed VS Spar Caps
Details
10-09-2012
4.00
Empennage Inventory Time
Details
10-09-2012
1.00
Empennage Arrives
Details
10-07-2012
2.00
Completed a Second Vans Training Kit.
Details
10-06-2012
2.00
Air Connection and more riveting practice
Details
09-29-2012
3.00
Commenced Second Training Kit
Details
09-18-2012
2.00
Rebuilt Composite Vacuum Pump
Details
09-18-2012
0.00
First Part Arrives - AeroLeds SunTail
Details
09-16-2012
4.00
Retractable Compressor Hose & Back Rivet Plate
Details
09-16-2012
2.00
Constructed Vans Tool Box
Details
09-09-2012
4.00
Completed Floating Work Tables and Sorted Garage C
Details
09-05-2012
1.50
Continued Work on the Floating Work Tables
09-04-2012
2.00
More Tools from Avery and the Pneumatic Squeezer
Details
09-02-2012
3.00
Completed Floating Workstation
Details
09-01-2012
5.00
Finished Painting and Commenced Floating Work Tabl
Details
08-31-2012
1.00
Painting Second Coat on the Garage Floor
Details
08-26-2012
2.00
Commenced Painting the Floor of the Workshop
Details
08-25-2012
2.00
Painting the Workshop
Details
08-24-2012
2.00
First Shipment of Avery Tools
Details
08-23-2012
1.00
Ordered Empennage Kit and Arranged Freight
Details
08-22-2012
1.00
Completed SAAA Startup activities
Details
08-20-2012
0.00
Commenced Painting the Workshop
Details
08-08-2012
12.00
Attended SAAA Metalworking Workshop At Narromine
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
173
355
Elevator
48
85
Empenage
1
1
Horizontal Stabilise
38
87
Lighting
1
Miscellaneous
3
17
Rudder
31
67
Tail Cone
5
5
Tech Review
4
3
Tools
2
2
Training
4
8
Vertical Stabiliser
23
51
Workshop
13
29