KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 407
Category Work Time: 641 Hours
 Date
Hours
Work Log Summary

Details

 04-07-2018
0.00
Sold kit to Brian Foster or Murphy, NC
Details

 05-09-2016
3.50
6 BID layups for cowl flanges
       

 05-02-2016
6.25
trim inside of cowlings
Details
       

 04-11-2016
2.00
sand cowling blisters again
Details

 04-11-2016
0.00
left side cowling addition
       

 04-11-2016
1.50
Filling out lower cowl section 2 BID to outside
       

 04-11-2016
1.25
cut top and bottom cowlings apart
Details
       

 04-04-2016
2.75
sand, prep & more micro to blisters
       

 04-04-2016
2.50
round # ???
Details

 04-04-2016
3.50
prep blisters again, trim cowl edge; micro
       

 04-04-2016
1.00
fix light, clean & fill epoxy pump
Details

 03-15-2016
0.50
tension compr belt; source & order new belt

 03-15-2016
3.00
prep and micro both blisters
Details
       

 03-15-2016
1.00
micro to foam on L blister
       

 03-15-2016
1.50
2 BID to L blister foam
       

 03-07-2016
0.00
secure VS & xponder antennae
       

 03-07-2016
1.50
fix HF scale, remove clecos, clean epoxy pump

 03-07-2016
2.75
fish wires in both wings; NAV,strobe, lights
Details

 03-07-2016
0.50
Dynicell foam to R blister
Details
       

 03-07-2016
0.00
cowl fit, trim blister 3
       

 03-07-2016
0.00
cowl fit, trim blister 2
       

 03-07-2016
0.00
cowl fit, trim blister 4
       

 03-07-2016
6.00
cowl fit, trim blister 1
       

 03-07-2016
2.75
Bond AAE-5T antenna to VS
Details
       

 09-15-2015
2.50
route brake lines and bleed
Details
       

 09-15-2015
2.00
clean up brake stuff, run RG400 for transponder
Details
       

 09-15-2015
2.00
brake lines at main wheels
Details

 08-11-2015
2.50
modify brake res. for overflow fitting & tube
       

 08-11-2015
0.75
Mark MG fairings for brake line cut-out
       

 08-11-2015
1.00
flox in AAE transponder
Details
       

 08-04-2015
5.00
mount brake res. and run all brakes lines
Details

 07-26-2015
2.00
measure and finish fab of long aileron tubes
Details
       

 07-26-2015
2.00
aileron tubes cont'd
Details
       

 07-20-2015
3.00
wire up regulator
Details
       

 07-20-2015
0.00
fuel relay posts
Details
       

 07-20-2015
3.25
begin stick mixer/controls install
Details
       

 07-13-2015
2.00
FW pass thru grommet for UL ECU harness
Details
       

 07-13-2015
2.00
fab big cables
       

 06-30-2015
0.75
rivnuts - floor to underlying AL angle braces

 06-30-2015
0.50
research, locate and grind holes for seatbelts in
       

 06-30-2015
2.25
baggage floor, back and misc
Details
       

 06-15-2015
0.50
wiring planning

 06-15-2015
0.25
test fit prop blade to check for ground clearance;

 06-15-2015
1.50
re-do fuel hose FW bulkhead to gascolator; +3"
       

 06-15-2015
2.50
plan & layout baggae area supports
Details
       

 06-15-2015
1.50
fuel hoses cont'd
       

 06-08-2015
1.50
think through wiring needs/strategy
Details
       

 06-08-2015
1.00
move supply bulkhead fitting #2
       

 06-08-2015
1.00
move fuel supply bulkheads fitting
       

 06-08-2015
0.50
mount master realy to FW
Details
       

 06-01-2015
0.50
reclock wing supply fittings; add 2 FtoF 90 degree
       

 06-01-2015
0.50
re-org shop and put away new parts/supplies

 06-01-2015
2.00
fuel system work cont'd
Details
       

 06-01-2015
2.00
fuel system cont'd
       

 05-12-2015
1.50
fuel system continued - bulkhead fittings
       

 05-12-2015
1.00
fuel lines cont'd - wing sump drains
Details
       

 05-12-2015
3.50
fab SS fuel hoses
Details
       

 05-12-2015
1.50
begin running final fuel lines
Details
       

 05-04-2015
4.00
plan, engineer fuel system; res parts and place AC
Details
       

 05-04-2015
3.00
finish fitting L MG fairing; final trim on all pan
Details
       

 04-14-2015
1.00
fit hinge pin access from inside of fuselage; R si
Details
       

 04-14-2015
1.00
continue fitting R leg fairing
Details
       

 04-14-2015
2.25
begin cutting/fitting L fairing to pant

 04-12-2015
3.25
trim, fit and hinge on
       

 04-12-2015
1.50
fit, cut repair nose fairing
Details
       

 04-12-2015
2.25
fit and fab R main gear faring; cut L side
       

 04-12-2015
2.25
fab and install R main fairing
Details
       

 04-12-2015
1.25
add hinge closure to nose fairing
Details
       

 04-06-2015
4.25
work on nose gear
       

 04-06-2015
2.00
nose pant on
Details
       

 04-06-2015
4.00
mount nose wheel on nose gear
       

 04-06-2015
1.50
fit, fab and install nose pant & brackets, etc
       

 04-06-2015
1.50

       

 03-30-2015
2.50
main gear rivnuts
Details
       

 03-30-2015
1.75
inside view after mounting engine
       

 03-30-2015
2.00
hang engine-torque mount AN4 bolts to 120 #/in.
       

 03-30-2015
2.00
hang engine
       

 03-30-2015
4.75
finalize FW and attach to fuselage
       

 02-15-2015
2.00
install all nutplates on both MG pants
Details

 02-15-2015
3.00
fit, trim and install L MG pant
Details

 02-09-2015
1.50
repair cracks at alignment tabs
Details
       

 02-09-2015
3.00
MG pants; fit & trim halves
       

 02-09-2015
2.00
fit right pant to axle/leg
Details
       

 02-09-2015
1.50
fit pant to R axle; fab brackets TEDIOUS
       

 02-09-2015
1.50
detail of R pant brackets, etc
Details
       

 02-02-2015
2.50
set toe in and drill/bolt gear legs
Details
       

 02-02-2015
0.50
figure out displacemnt for 1 degree toe in
Details
       

 01-26-2015
2.50
super fill to canopy - pull off
Details
     

 01-26-2015
1.50
mount all 3 tires
Details
       

 01-26-2015
1.50
main gear to fuselage - loose
Details
       

 01-26-2015
7.00
fab gear legs, brakes and axles
Details
       

 01-26-2015
1.00
adhere front canopy seal with silicon adhesive
       

 01-19-2015
2.00
prep for micro to canopy flange
       

 01-19-2015
2.25
micro to canopy flange - pass #1
Details
       

 01-19-2015
0.00
gaps before bodywork - for reference
Details
       

 12-24-2014
2.00
prep canopy for bodywork needed
Details
       

 12-24-2014
3.00
2 BID applied; fill thickness measured
       

 11-03-2014
2.00
prep foam and canopy frame
Details
       

 11-03-2014
2.75
add 2 BID skirt around canopy frame
Details
       

 10-06-2014
2.50
trim foam and add superfill; cut FG BID various si
Details
       

 10-06-2014
1.50
replug exhaust pipes and top off oil
Details

 09-29-2014
4.50
prep and prime top wing skins
Details
       

 09-29-2014
6.00
prep and prime lower wing skins
Details
       

 09-08-2014
0.50
trim foam with hacksaw blade
Details
     

 09-08-2014
10.25
sand & prep all control surfaces; prime
Details
       

 09-08-2014
0.00
primer part 2
     

 08-25-2014
2.00
sand/prep all control surfaces
Details

 08-25-2014
3.25
sand & prepl all control surfaces

 08-25-2014
1.00
prep and superfill wing tips

 08-25-2014
1.50
prep and bond canopy
Details
       

 08-25-2014
1.50
canopy pics (cont'd)
       

 08-25-2014
0.50
add expanding foam to channel in canopy frame
Details
       

 08-18-2014
1.25
sand i/s edge of canopy for bonding
Details

 08-18-2014
2.75
sand and superfill #1
Details
       

 08-18-2014
2.50
prep & superfill HS, ailerons & flaps
       

 08-18-2014
0.50
clean out epoxy pump and load new resin & hardnene

 08-11-2014
1.50
tape off inside and outside edges
Details
       

 08-11-2014
1.00
pull outside 3" of plastic, inside and out
Details

 08-11-2014
1.00
latch handle; nyloc nuts for struts
       

 08-11-2014
0.50
grind out clearance for latch; super glue latch in
Details
       

 08-11-2014
2.50
fit, mark, trim cut and repeat
Details
       

 08-11-2014
0.75
drill latch hole; fit handle to fuselage
       

 08-04-2014
0.00
strut info Suspa CI6-24200 15#
       

 08-04-2014
1.00
secure canopy frame to fuse with 3 self tapping sm
       

 08-04-2014
2.00
fit, cut and fine tune access hole in glare shield
       

 08-04-2014
1.00
fine tune back of hinge to fit at fuselage - took
       

 08-04-2014
1.25
fab and install strike plates
       

 08-04-2014
1.00
fab and fit canopy hinge hardware
       

 08-04-2014
1.50
drill and fit latch block; flox in
       

 08-04-2014
2.00
cont'd canopy hinge through glareshield
       

 08-04-2014
1.50
canopy struts to frame and fuselage
Details
       

 07-21-2014
0.00
flox in canopy hinge backing plates
       

 07-21-2014
3.00
fab and install hinges to canopy frame
Details
       

 07-21-2014
0.00
canopy frame fit .. getting there
       

 07-21-2014
2.50
canopy fit cont'd

 07-21-2014
5.25
canopy fit and research
Details
       

 07-14-2014
0.00
Zolatone interior cont'd
       

 07-14-2014
0.00
Zolatone interior cont'd
       

 07-14-2014
3.25
prep for inside paint; clean and prep paint guns
Details
       

 07-14-2014
3.25
final prep and spray Zolatone to inside of fuselag
Details
       

 07-14-2014
2.50
Cowl off, remove eninge & FW; tape I/S misc.
Details
       

 07-07-2014
2.50
prep clay to right side for layup
Details
       

 07-07-2014
1.00
prep 25x25 2 BID for left side, fix epoxy pump

 07-07-2014
0.00
popped 2 BID off of left side
       

 07-07-2014
2.00
clean, prep and wrap interior in prep for Zolatone

 07-07-2014
1.50
apply 29x25 2 BID to right side
       

 07-07-2014
1.50
25x25 2 BID layup to left side
       

 06-30-2014
3.00
mold out bubbles
Details
       

 06-30-2014
3.00
cowling mods continued
Details
       

 05-18-2014
1.50
rivit R side hinges with new. shorter grip SS rivi
Details
       

 05-18-2014
0.50
redo o/s L hinge with shorter grip 3/16" SS rivits
Details
       

 05-12-2014
0.50
drill out o/s L hinge; flox holes for redo
Details
       

 05-11-2014
0.50
unpack prop, spinner. record #'s
       

 05-11-2014
0.00
prop serial #'s
       

 05-11-2014
3.00
L side elevators to HS
       

 05-11-2014
2.50
hinges rivited in
Details
       

 05-05-2014
3.00
square TE of HS
       

 05-05-2014
3.00
elevators hinges - continued
       

 04-14-2014
0.25
test fit R bafffles beofre getting too far ahead o
       

 04-14-2014
0.25
pull off hose from fuel pump to add firesleeve & c
     

 04-14-2014
1.50
move air/oil sep. and R coil
Details
       

 04-14-2014
1.25
drill rest of firewall holes - from insode & outsi
Details
       

 04-13-2014
1.00
install both coils on engine mount with adels
       

 04-13-2014
1.00
firesleeve fuel lines
       

 04-13-2014
1.25
fab bracket, standoffs, install air/oil seporator
     

 04-06-2014
1.00
install adels for loom and fuel hose
Details
       

 04-06-2014
1.00
fuel relay spec and rough install
       

 04-06-2014
1.00
fab and install mounting plates for coils
Details
       

 03-31-2014
0.00
install air box
Details
       

 03-31-2014
1.50
batt box; hole for loom; mount ECU inside FW
Details
       

 03-30-2014
1.50
mount fuel pump, filters; fabbed hoses
       

 03-30-2014
2.50
figure out & fabbed battery box
Details
       

 03-30-2014
2.00
ECU loom hole through FW
Details
       

 03-30-2014
1.00
drill 1/4" mounting holes for 2 coils
       

 03-30-2014
0.00
coil and ECU parts
       

 03-24-2014
0.50
run rear (short) cable and attach turnbuckle to fw
Details

 03-24-2014
1.50
e-mail Ryan; undocumented factory mod
Details
       

 03-24-2014
1.50
begin placing FWF equipment
       

 03-24-2014
0.75
attempt to attach rudder cable bracket
Details
       

 03-16-2014
2.00
set up rudder, set bearings
Details
       

 03-16-2014
3.00
hang rudder and mount both brackets - tight quarte
Details
       

 03-03-2014
4.50
fit and trim cowling
Details
       

 03-01-2014
3.00
1 BID to top and bottom cowls
       

 02-09-2014
1.25
prep & micro top side of top cowling
Details
       

 02-09-2014
2.00
2 BID to inside of lower cowl extension
       

 02-03-2014
1.50
prep and 2 BID to inside of top cowl at 4 BID exte
       

 02-03-2014
1.25
flox lower cowl extensions to lower cowl
Details
       

 01-26-2014
1.50
prep lower cowling for 3 BID cowling extension
       

 01-26-2014
1.00
pop top cowling BID; align & cleco
Details
       

 01-26-2014
1.00
pop lower cowl 3 BID layup; fit to lower cowl
Details
       

 01-26-2014
1.75
make up 35" jig & epoxy top cowl extension to top
       

 01-26-2014
1.25
3 BID to lower cowl for cowling extensions
       

 12-24-2013
2.00
4 BID layup for cowl extension - top
Details
       

 12-22-2013
2.00
trial & error fitting and cutting of cowling
Details
       

 12-22-2013
0.75
re-plug exhaust pipes and refill oil to cylinders
Details

 12-22-2013
2.00
continuing fitting cowl
Details
       

 12-15-2013
3.50
hang engine; pickle
Details
       

 12-09-2013
3.50
attempt to hang engine for cowl fitting
Details
       

 12-08-2013
1.50
temp. install firewall and engine mount
Details
       

 12-08-2013
3.00
sand and prep top inside fuse. superfill #2, sand
Details

 12-08-2013
3.75
final fit and bolt mount on (temp for cowl fitting
Details
       

 11-25-2013
2.00
super-fill pass #1, #3 overall top i/s fuselage
       

 11-25-2013
1.75
fuel return - drill & c/s flange, prep and Hysol i
       

 11-25-2013
0.75
begin FW layout plan
Details
       

 11-24-2013
1.50
sand and prep for micro pass #2 on top inside of f

 11-24-2013
0.50
misc. shop; measure spinner backplate
Details
       

 11-24-2013
2.50
map out & begin work on fuel system
       

 11-24-2013
0.00
fuel selector cont'd
Details
       

 11-24-2013
0.00
assemble fuel pumps/filters/etc
Details
       

 11-17-2013
2.50
sand-prep-micro i/s fuse top
Details
       

 11-17-2013
1.50
console/fuel selector
Details
       

 11-11-2013
2.00
uncrate and inventory UL 350IS engine crate
Details
       

 11-11-2013
2.00
sand i/s fuse and roll upside down to to top
       

 11-11-2013
0.00
finish crating up Jab mount and accessories
Details
     

 11-11-2013
1.00
crate up old mount and uneeded Jab accessories
Details
       

 10-13-2013
1.00
super-fill to new console and last pass to inside
Details
       

 10-13-2013
1.00
fuel console install 4/4
       

 10-13-2013
1.00
fuel console 3/4
Details
       

 10-13-2013
1.00
fuel console 2/4
       

 10-13-2013
1.00
fuel console 1/4
       

 10-07-2013
1.00
sand interior of fuselage - cont'd
Details
       

 10-07-2013
1.25
interior sanding cont'd
       

 10-07-2013
1.00
fuel console attach tabs
       

 10-07-2013
1.75
fab center console - 3 BID
Details
       

 09-30-2013
1.00
sand/prep HS and rudder
     

 09-30-2013
1.00
sand wings, stow in cradles for now
       

 09-30-2013
2.00
sand ailerons & flaps; continue sanding IS fuselag
Details
       

 09-30-2013
1.00
prep ailerons and flaps for micro
       

 09-30-2013
1.00
micro ailerons and flaps
       

 09-23-2013
1.00
sanding con'td; prep rudder

 09-23-2013
1.00
sand inside fuleage
       

 09-23-2013
2.00
sand & prep wings and HS for superfill
     

 09-23-2013
3.75
prep and superifll fuse., HS, rudder
Details
       

 09-23-2013
0.25
misc shop and clean/refill epoxy pump; order anoth

 09-23-2013
0.00
add'l HS and rudder fill pics
       

 09-09-2013
3.25
prep and micro inside of fuselage
Details
       

 09-09-2013
0.25
clean up flox release at seat pans
       

 09-02-2013
0.50
super fill wing joggle and lower wing fairings #2
       

 09-02-2013
0.50
sand bottom of wing surfaces, super-fill fairings
       

 09-02-2013
1.50
prep top of HS and S/F
     

 09-02-2013
1.50
flox release seat pans; 2 BID to top seat back
       

 09-01-2013
0.75
SF lower wing and HW fairings
       

 09-01-2013
0.75
sand SF on top of wing fairings; flip over
     

 09-01-2013
1.00
prep lower wing fairings and misc spots
     

 09-01-2013
1.25
prep flanges for SF; grind HS bolt holes open a bi
     

 09-01-2013
0.25
open up delrin rudder cable guides; lay in cables
Details
       

 09-01-2013
1.50
HS off, clean up release, mark for trim
Details

 08-26-2013
1.00
prep and S/F to top of both wing fairings
       

 08-26-2013
0.00
HS fairings cont'd
       

 08-26-2013
1.50
2 BID fairings applied top & bottom
       

 08-12-2013
1.00
sand belly seam - last pass
       

 08-12-2013
1.50
re-install HS and prep for fairing release
Details
       

 08-12-2013
1.25
prep top seam and S/F #3

 08-12-2013
0.50
flip fuselage back right side up
Details
       

 08-05-2013
0.00
secure rudder support tube to bushing
Details
     

 08-05-2013
4.50
rudder pedals, pulleys, cables
Details
       

 08-05-2013
1.25
clean up SS firewall; fit and cleco to fusleage -
Details
     

 08-05-2013
0.00
add'l rudder control pics
       

 07-29-2013
0.75
rudder guide wheel brackets
Details

 07-29-2013
1.25
fit up rudder pedals; tighten all bolts. No pics-
Details

 07-28-2013
0.75
prep and S/F #2 to bottom fuselage seam

 07-28-2013
1.25
fit rudder pedals; flute tube truss
Details
       

 07-28-2013
2.00
fabricate flute tube truss supports
Details
       

 07-22-2013
0.50
tested flap motor
Details

 07-22-2013
1.50
test & flox in R fuel probe
Details
       

 07-22-2013
1.00
super-fill pass #1 to belly - mostly the fuse seam
Details
       

 07-22-2013
0.00
rudder pedal bushings floxed in
     

 07-22-2013
2.25
fitted up rudder pedal rod and bushings
Details
       

 07-14-2013
2.25
rudder pdeal flute tubes and rough up supports
       

 07-14-2013
1.50
Grind rudder cable holes in seat back & flip fuse
       

 07-14-2013
2.25
fabricate rudder pedal brackets
Details
       

 07-08-2013
3.75
rivnuts & trim to seat pans & rails
Details
       

 07-08-2013
3.00
build rudder/brake controls
Details
       

 07-07-2013
4.00
fab and flox in seats rails & center console
Details
       

 07-01-2013
0.75
install Thomson flap motor
Details
       

 07-01-2013
3.50
fuel probes
Details
       

 07-01-2013
1.00
flox in L fuel probe
       

 07-01-2013
6.50
finish flap hinges, stow wings and clean up
       

 07-01-2013
1.75
center console fit & trim
Details
       

 06-30-2013
0.00
install flap brackets after jigging
Details
     

 06-30-2013
0.00
flap bracket install
       

 06-30-2013
0.00
flap bracket cont'd
       

 06-30-2013
1.50
aileron brackets and flap travel
Details
       

 06-24-2013
2.25
right aileron brackets
       

 06-24-2013
2.00
rig and fab aileron brackets
       

 06-24-2013
1.25
other misc. wing tasks
       

 06-24-2013
1.25
alieron brackets cont'd
Details
       

 06-23-2013
2.25
tap AOI holes; lay up 3 bid for wing fairing
Details
       

 06-15-2013
3.50
cut wing flap access; cut & prep BIDS for wing fai
Details
       

 05-13-2013
0.75
seat panels & grind out leg holes
       

 05-13-2013
1.00
install shoulder harness and lap belts-buckle side

 05-13-2013
1.00
grind aft R hardpoint; install both R side AOI pla
Details
       

 05-13-2013
0.00
flap torsional supports cont'd
       

 05-13-2013
2.50
flap torque tube and torsional supports
       

 05-12-2013
0.75
set wings in spar box cont'd
Details
       

 05-12-2013
1.50
install L side AOI plates to hardpoints
Details
       

 05-12-2013
1.00
grind 2 5/8" pins for spar; grind R root; knock in
Details
       

 05-12-2013
0.50
check/adjust AOI & sweep
Details
       

 05-12-2013
0.00
check sweep of wings; AOI cont'd
Details
       

 05-06-2013
0.00
wing fit continued
       

 05-06-2013
2.25
spar box installation continued
Details
       

 05-06-2013
2.25
spar box install
Details
       

 05-06-2013
1.00
rig fuselage for spar box/wing install
       

 05-06-2013
1.50
hang wings for angle/sweep fitting
Details
       

 05-06-2013
1.00
fab wing incidence jig & misc. shop
       

 04-29-2013
3.00
modify trim tab hinge; prep and s/f elev. and ligh
Details
       

 04-29-2013
0.25
measurements for canopy hinges - to fit AFS 5500
Details
       

 04-29-2013
1.25
install canopy hinges; AN3 A's various lenghts
       

 04-29-2013
1.25
fabricate hinge brackets; research placement
Details
       

 04-21-2013
0.75
Super-fill #2 to top light pockets
       

 04-21-2013
0.75
sand light pockets in prep for s/f #2

 04-21-2013
0.75
sand and superf-fill #1 top fusealge joint
Details
       

 04-21-2013
0.50
modify hinge for trim tab
Details
       

 04-21-2013
2.50
micro to close out elev and trim tab
       

 04-21-2013
2.50
grind and sand micro on tabs and around hinge
Details
       

 04-21-2013
0.25
fit servo and cover after c/s cover holes
       

 04-08-2013
2.50
trim motor fit, nutplates, rivnuts & cover
       

 04-08-2013
0.00
fit and match drill servo cover; install rivnuts
Details
       

 04-07-2013
0.00
trim to fit
       

 04-07-2013
2.50
fab, fit and flox in trim tab horn
       

 04-07-2013
2.50
clean up hinges at trim tab, clean out pins
Details
       

 04-01-2013
1.50
take clecos out of tips and sand/cleanuo

 04-01-2013
1.75
grind out, prep and flox in trim tab hinges
       

 04-01-2013
2.00
elev trim
Details
       

 04-01-2013
1.75
design flange and flox in
Details
       

 03-26-2013
1.25
under side wing light pockets; measure panel openi
Details
       

 03-26-2013
2.00
sand, prep and super-fil light pockets & fuel caps
       

 03-26-2013
2.50
prep and flox close wing tips
Details
       

 03-26-2013
2.00
install nav/strobe light brackets
Details
       

 03-26-2013
0.00
ground wire to nav light bracket
Details
       

 03-26-2013
2.00
fit & trim panel blank
       

 03-26-2013
1.25

Details
       

 03-18-2013
0.00
panel blank as supplied by Arion
     

 03-18-2013
1.50
fit, drill, c/s, rivnut light lenses
Details
       

 03-18-2013
1.00
drill and c/s panel attach holes
Details
       

 03-17-2013
1.00
place and drill for rivnust in panel brackets
Details
       

 03-17-2013
0.75
fit and grind panel vent parts to fit panel/bracke
Details
       

 03-11-2013
1.50
trim light lenses to fit; drill, c/s; add rivnuts
Details
       

 03-11-2013
1.00
redrill vent 2.5" holes in panel
       

 03-11-2013
0.75
2 BID to alum. panel support brackets
     

 03-10-2013
0.25
flox in canopy strut brackets
       

 03-10-2013
1.25
fab, prep and flox in panel attach brackets
Details
       

 03-10-2013
3.00
BID in light pockets
       

 03-04-2013
1.25
wing light conduit
Details
       

 03-04-2013
0.50
vent hole not in right position
Details
       

 03-04-2013
0.50
flox in vent hole cut-out for do over
Details
       

 03-04-2013
1.50
fit and mount canopy mount bracket
Details
       

 03-04-2013
1.75
canopy strut brackets part 1 and part 2
Details
       

 03-03-2013
1.75
start fabbing gas strut/mounting brackets
Details
       

 03-03-2013
0.00
panel fit to fuselage
       

 03-03-2013
1.00
mask, prep & superfill fuel cap openings
Details
       

 03-03-2013
0.10
level point on pilot's side
     

 03-03-2013
1.00
fit and cleco panel to fuselage
Details
       

 03-03-2013
0.50
2 BID on top of ground plane copper plate
     

 02-18-2013
2.00
add nutplates to light pockets; both L & R
Details
       

 02-17-2013
0.75
misc shop and fab ext cord for N144GP preheat

 02-17-2013
2.50
L&R fuel fill cpas
Details
       

 02-17-2013
0.75
flox in 6x6 copper plate for ground plane
     

 02-17-2013
1.25
cut in L side light pocket; trail & error for fit
       

 02-17-2013
0.75
cut in L & R light pockets for Aeroleds Aerosuns
Details
       

 01-28-2013
0.50
mark fuel cap location - bad marks from factory
Details
       

 01-28-2013
1.00
mark and cut opening for R wing light
       

 01-28-2013
0.00
manual page for fuel cap positioning
     

 01-28-2013
1.50
jockey wings around; make dolly for JD bucket

 01-28-2013
2.50
install VHF COM ground plane
       

 01-28-2013
0.75
finish & fit lite pocket
       

 01-27-2013
1.75
trial fit spar box - count spacer washers, note
Details
       

 01-27-2013
0.00
rudder cable guides
       

 01-27-2013
1.00
move shop around so wings can be put on

 01-27-2013
2.00
install mid elev bell crank
       

 01-27-2013
0.25
finish fuel vents in wing ends
     

 01-27-2013
1.00
com1 ground plane & rudder cable guides
       

 01-21-2013
4.50
c/s and nutplates to wing tips
       

 01-21-2013
1.50
bond fuel vents to wing; install check valve
       

 01-20-2013
1.75
redo and finish access panels
       

 01-20-2013
1.00
prep HS and micro
       

 01-20-2013
0.00
micro HS leadding edges
       

 01-19-2013
1.00
inventory and stow ACS drop ship hardware

 12-29-2012
1.00
put 5 boxes of parts from Arion away
Details

 12-29-2012
1.00
prep install of wing tips
Details
       

 12-29-2012
1.00
hang flaps; install 3 bronze bushings each side
Details
       

 12-29-2012
1.25
hang flaps; figure out which side of hinge to atta
       

 12-29-2012
0.50
add nutplates for wing access covers; c/s covers
       

 12-29-2012
1.50
Add 3 BID to top & bootom of wing tips - for nutpl
       

 12-29-2012
1.50

       

 12-26-2012
3.00
Inventory 5 boxes of parts from Arion
Details

 12-24-2012
1.25
start wing access covers
Details
       

 12-24-2012
1.75
cut, fit, match drill for nutplates
Details
       

 12-24-2012
0.00
continue work on fitting HS
Details
       

 12-24-2012
0.00
check stab hole spacing
Details
       

 12-24-2012
2.00
check alignment of HS
Details
       

 12-23-2012
1.00
tail stand and parts/tools from KCXY
     

 12-23-2012
1.25
pretty good fit of HS to fuselage
Details
       

 12-23-2012
1.25
fit HS spars
Details
       

 12-23-2012
1.25
correct HS bracket install
Details
       

 12-17-2012
1.50
Res., drill, enlarge, dress cable & access holes i
Details
       

 12-17-2012
0.75
repair aft fuselage damaged in delivery/unloading
Details
       

 12-17-2012
1.00
Fit and match drilled HS brackets
Details
       

 12-16-2012
1.00
prep and micro voids in top fuselage seam
       

 12-16-2012
2.50
made cutouts for HS in aft fuselage
Details
       

 12-16-2012
0.50
Elev bellcrank slot
Details
       

 12-16-2012
1.00
cut opening in naca scoops; scuff firewall
       

 12-15-2012
1.25
spar/wing cut-outs
       

 12-15-2012
2.25
cut out windows, prep flange
Details
       

 12-14-2012
6.00
receive part of kit; stow parts
Details
       

 12-14-2012
0.00
add'l pics of parts received
       

 10-08-2012
0.00
demo flight; ordered kit
       










Copyright © 2001-2024 Matronics. All Rights Reserved.