Date
|
Hours
|
Work Log Summary
|
Details
|
03-11-2024
|
4.00
|
ZOLATON PAINT APOLLO GRAY to replace the vinyl
|
Details
|
|
|
03-10-2024
|
2.00
|
Painted front landing gear and touch up.
|
Details
|
|
|
03-08-2024
|
4.00
|
Back brakes are done.
|
Details
|
|
|
03-07-2024
|
2.00
|
Lines are down to the calibers
|
Details
|
|
|
03-02-2024
|
4.00
|
Finally getting to doing the brakes.
|
Details
|
|
|
02-19-2024
|
4.00
|
Main gear axles and brakes.
|
Details
|
|
|
02-15-2024
|
4.00
|
Remove vinyl and prime interior.
|
Details
|
|
|
02-08-2024
|
5.00
|
Installed main landing gear.
|
Details
|
|
|
02-04-2024
|
6.00
|
Paint main landing grear.
|
Details
|
|
|
04-26-2020
|
4.00
|
Install door panels and key lock.
|
Details
|
|
|
04-25-2020
|
4.00
|
Door locking rods and assembly.
|
Details
|
|
|
04-19-2020
|
2.00
|
Sand primer and paint doors
|
Details
|
|
|
04-17-2020
|
3.00
|
Doors are ready for Smooth prime.
|
Details
|
|
|
04-12-2020
|
4.00
|
Fill and Sand on doors
|
Details
|
|
|
04-26-2019
|
3.00
|
Window trim in the making.
|
Details
|
|
|
04-25-2019
|
1.00
|
Sand able micro around windows with peel-ply
|
Details
|
|
|
04-24-2019
|
3.00
|
Pilot side door window installation.
|
Details
|
|
|
04-21-2019
|
4.00
|
Prep for window and glue in place.
|
Details
|
|
|
04-20-2019
|
3.00
|
Installing windows in doors
|
Details
|
|
|
04-17-2019
|
3.00
|
Static port made and installed.
|
Details
|
|
|
04-16-2019
|
2.00
|
Made side panels to cover cables and wires.
|
Details
|
|
|
04-15-2019
|
3.00
|
Door panels got vinyl.
|
Details
|
|
|
03-22-2019
|
4.00
|
Pitot tube was installed with structural T88 resin
|
Details
|
|
|
03-13-2019
|
4.00
|
I finished the vinyl and installed the vanity pane
|
Details
|
|
|
03-12-2019
|
4.00
|
All the vanity pieces are done and ready to go in.
|
Details
|
|
|
03-10-2019
|
1.00
|
Worked on installing the Pitot tube.
|
Details
|
|
|
03-09-2019
|
4.00
|
Armrest had the USB’s installed.
|
Details
|
|
|
03-08-2019
|
3.00
|
Painted window trim and touch up in the fuselage.
|
Details
|
|
|
03-07-2019
|
6.00
|
More vinyl on the fuselage sides.
|
Details
|
|
|
03-06-2019
|
8.00
|
Armrest done and fuselage side gets vinyl.
|
Details
|
|
|
03-05-2019
|
1.00
|
Pitot tube showed up and it will work perfectly
|
Details
|
|
|
03-04-2019
|
5.00
|
Vinyl on vanity panel and prep fuselage
|
Details
|
|
|
03-03-2019
|
2.00
|
It was time to clean the resin dispenser.
|
Details
|
|
|
03-01-2019
|
10.00
|
Vinyl on Pilot side strake baggage area done.
|
Details
|
|
|
02-26-2019
|
4.00
|
Sanded and primed armrest. Vinyl on strake baggage
|
Details
|
|
|
02-25-2019
|
7.00
|
Trim box finished. Headliner was installed.
|
Details
|
|
|
02-25-2019
|
0.00
|
Interior paint on trim box.
|
Details
|
|
|
02-24-2019
|
5.00
|
Trim box has primer and armrest in place for flang
|
Details
|
|
|
02-21-2019
|
3.00
|
Template for arm rest, cardboard was used to form
|
Details
|
|
|
02-20-2019
|
3.00
|
Trim box trimmed and 2 bids on it for mounting fla
|
Details
|
|
|
02-19-2019
|
5.00
|
The push pull cables were finally attached to the
|
Details
|
|
|
02-18-2019
|
2.00
|
Time to make a box for the roll trim motor.
|
Details
|
|
|
02-18-2019
|
2.00
|
Installed the low fuel warning sensor in the heade
|
Details
|
|
|
02-17-2019
|
5.00
|
Fuel probes get wired in.
|
Details
|
|
|
02-16-2019
|
5.00
|
Alternator and regulator wiring
|
Details
|
|
|
02-08-2019
|
4.00
|
More wiring done on the plane.
|
Details
|
|
|
02-07-2019
|
2.00
|
Sanded, painted and clear coated instrument panel
|
Details
|
|
|
02-04-2019
|
4.00
|
Working on the electrical system.
|
Details
|
|
|
02-01-2019
|
4.00
|
Sand fill and prime
|
Details
|
|
|
06-24-2018
|
2.00
|
Rudder are stop.
|
Details
|
|
|
06-21-2018
|
2.00
|
Finish working on the rudder cable system.
|
Details
|
|
|
06-20-2018
|
6.00
|
Rigging the roll system to operate the ailerons.
|
Details
|
|
|
06-19-2018
|
8.00
|
Heat protection done. Cable wheels in place.
|
Details
|
|
|
06-18-2018
|
2.00
|
Out flow cowling work.
|
Details
|
|
|
05-31-2018
|
6.00
|
Worked on cowling. Prime, sand and fill 4 bids on
|
Details
|
|
|
05-09-2018
|
3.00
|
Sand and gap on cowlings
|
Details
|
|
|
04-26-2018
|
3.00
|
Rivet on hinges to lower cowling.
|
Details
|
|
|
04-24-2018
|
1.00
|
Sand upper cowling.
|
Details
|
|
|
04-19-2018
|
1.00
|
Micro on upper cowling
|
|
|
|
04-18-2018
|
2.00
|
3 bids on lower wing for cowling hinge
|
Details
|
|
|
04-17-2018
|
2.00
|
Heat cowling to fit hinges.
|
Details
|
|
|
04-16-2018
|
3.00
|
Bus bar for fire wall side.
|
Details
|
|
|
04-15-2018
|
3.00
|
Mount hinges to cowling and wing flange.
|
Details
|
|
|
04-14-2018
|
2.00
|
Upper and lower cowling hinge.
|
Details
|
|
|
04-13-2018
|
4.00
|
3 bids on wing for hinges to mount too.
|
Details
|
|
|
04-12-2018
|
2.00
|
Micro on strake was sanded gapped and primed.
|
Details
|
|
|
04-11-2018
|
2.00
|
Fill in lower cowling gap.
|
Details
|
|
|
04-10-2018
|
3.00
|
Cowling is ready to be joined.
|
Details
|
|
|
04-08-2018
|
2.00
|
Added micro to sanded areas on the strake and wing
|
Details
|
|
|
04-07-2018
|
4.00
|
Gap wing and cut cowling for fitting.
|
Details
|
|
|
03-29-2018
|
4.00
|
Co-pilot wing cut out on cowling
|
Details
|
|
|
03-26-2018
|
3.00
|
Wired in jumper and charger wires from the out sid
|
Details
|
|
|
03-24-2018
|
2.00
|
Worked on the shifter boot for the stick.
|
Details
|
|
|
03-23-2018
|
4.00
|
Wire in starter relay and starter.
|
Details
|
|
|
03-15-2018
|
6.00
|
Working on wiring in battery and main power.
|
Details
|
|
|
03-15-2018
|
0.00
|
More on the wire work.
|
Details
|
|
|
03-13-2018
|
8.00
|
Running more wire for defrost and power bars.
|
Details
|
|
|
03-05-2018
|
4.00
|
Finished defrost on glare shield.
|
Details
|
|
|
03-01-2018
|
4.00
|
Made power bar for positive and negative.
|
Details
|
|
|
02-27-2018
|
3.00
|
Defrost out lets for glare shield.
|
Details
|
|
|
02-25-2018
|
2.00
|
3 bids lay-up for stick and rod to elevators boots
|
Details
|
|
|
02-22-2018
|
4.00
|
Made landing rear switch panel
|
Details
|
|
|
02-20-2018
|
3.00
|
Had to move avionics tray.
|
Details
|
|
|
02-15-2018
|
3.00
|
Remove wing and move fuselage in shop.
|
Details
|
|
|
02-13-2018
|
8.00
|
Worked on getting the rudder on the Pilot side.
|
Details
|
|
|
02-13-2018
|
0.00
|
Clean up mess and make petal stop.
|
Details
|
|
|
02-12-2018
|
5.00
|
I gaped parts for paint.
|
Details
|
|
|
02-07-2018
|
4.00
|
Wiring the overhead lights and switches in.
|
Details
|
|
|
02-06-2018
|
3.00
|
Overhead air vents installed.
|
Details
|
|
|
02-01-2018
|
6.00
|
Rudder cable pulleys installation.
|
Details
|
|
|
01-25-2018
|
0.00
|
Aileron torque tube.
|
Details
|
|
|
01-25-2018
|
6.00
|
Aileron torque tube installation.
|
Details
|
|
|
01-22-2018
|
4.00
|
Stainless was cut and riveted into place.
|
Details
|
|
|
12-07-2017
|
2.00
|
Time to work on the rudder cables.
|
Details
|
|
|
12-05-2017
|
2.00
|
Sand the filler one more time thrn spray primer.
|
Details
|
|
|
11-29-2017
|
8.00
|
Fill and sand over days to get to primer.
|
Details
|
|
|
11-27-2017
|
2.00
|
2 bids on outside cowling center section.
|
Details
|
|
|
11-24-2017
|
2.00
|
Work on center cowling to fit bottom and top
|
Details
|
|
|
11-23-2017
|
2.00
|
Hinges at end of cowling.
|
Details
|
|
|
11-21-2017
|
1.00
|
The heat lights to the rescue.
|
Details
|
|
|
11-21-2017
|
2.00
|
Sand and fill. Ready for primer.
|
Details
|
|
|
11-19-2017
|
3.00
|
Installed cowling and gapped for clearance.
|
Details
|
|
|
11-19-2017
|
1.00
|
Fill and sand on cowling
|
Details
|
|
|
11-17-2017
|
1.00
|
Tig welded hinge pins to handle
|
Details
|
|
|
11-16-2017
|
3.00
|
Sand and fill on wings to strake
|
Details
|
|
|
11-13-2017
|
5.00
|
Upper and lower wing hinges installed on flange an
|
Details
|
|
|
11-13-2017
|
2.00
|
Hing for upper and lower cowling
|
Details
|
|
|
11-12-2017
|
3.00
|
Blending the strake to the wing. Sand and fill.
|
Details
|
|
|
11-12-2017
|
3.00
|
3 bids on upper wing for cowling hinge.
|
Details
|
|
|
11-09-2017
|
2.00
|
Cut cowling and 1 bids on outside
|
Details
|
|
|
11-08-2017
|
2.00
|
Bid the bottom to the top cowling
|
Details
|
|
|
11-05-2017
|
3.00
|
3 bids onto bottom wing for cowling to attach too.
|
Details
|
|
|
10-28-2017
|
2.00
|
Reinstall Nose gear guides
|
Details
|
|
|
10-28-2017
|
2.00
|
Add cut peace back onto cowling.
|
Details
|
|
|
09-10-2017
|
3.00
|
Gapping wing to strake
|
Details
|
|
|
07-05-2017
|
4.00
|
Fit wing to cowling for cutting.
|
Details
|
|
|
06-04-2017
|
6.00
|
Paint some of the interior.
|
Details
|
|
|
06-01-2017
|
3.00
|
Made covers for door micro switches.
|
Details
|
|
|
05-25-2017
|
2.00
|
Prep and paint canard bulk head.
|
Details
|
|
|
05-25-2017
|
6.00
|
Install park brake block and handle.
|
Details
|
|
|
05-18-2017
|
3.00
|
Work on installing nose gear micro switch
|
Details
|
|
|
05-16-2017
|
2.00
|
Move recirculation fan bracket
|
Details
|
|
|
05-07-2017
|
6.00
|
Install micro switch for throttle (gear up warning
|
Details
|
|
|
04-20-2017
|
1.00
|
Wire from nose gear micro switch
|
Details
|
|
|
04-20-2017
|
5.00
|
Install micro switches on nose and main gear
|
Details
|
|
|
04-18-2017
|
5.00
|
Worked on securing cables and finished alternate a
|
Details
|
|
|
04-13-2017
|
5.00
|
I worked on the governor today.
|
Details
|
|
|
04-12-2017
|
4.00
|
Governor was put into place and making bracket for
|
Details
|
|
|
04-11-2017
|
3.00
|
Mounted throttle and mixture cables.
|
Details
|
|
|
04-10-2017
|
3.00
|
Mounts to hold the throttle and mixture cables.
|
Details
|
|
|
04-10-2017
|
2.00
|
Finish fuel lines with Tees and fire shield
|
Details
|
|
|
04-10-2017
|
3.00
|
Cover plates for bolt holes or access holes.
|
Details
|
|
|
04-09-2017
|
2.00
|
Latch mounting for oil cowling door.
|
Details
|
|
|
04-07-2017
|
3.00
|
Run and mount Tee handle for alternate air source
|
Details
|
|
|
03-31-2017
|
4.00
|
Worked on defrost, alternate air and interior
|
Details
|
|
|
03-30-2017
|
2.00
|
Worked on alternate air source
|
Details
|
|
|
03-29-2017
|
5.00
|
Made plate for Throttle, Mixture, Prop for cable c
|
Details
|
|
|
03-26-2017
|
2.00
|
Prep for throat, mixture and propeller cables at i
|
Details
|
|
|
03-19-2017
|
4.00
|
Trim duct and made a new one for other side
|
Details
|
|
|
03-18-2017
|
5.00
|
Working on defrost for glare shield.
|
|
|
|
03-17-2017
|
3.00
|
Trim on fuel hatch door. Remove handle bases
|
Details
|
|
|
03-17-2017
|
2.00
|
Micro bottom of doors to get ready for paint.
|
|
|
|
03-16-2017
|
2.00
|
Worked on oil hatch door.
|
Details
|
|
|
03-15-2017
|
5.00
|
Made alternate air source for fuel servo.
|
Details
|
|
|
03-14-2017
|
3.00
|
Worked on the oil access door today.
|
Details
|
|
|
03-13-2017
|
4.00
|
Worked on cabin air return
|
Details
|
|
|
03-12-2017
|
4.00
|
Worked on cabin heat system.
|
Details
|
|
|
03-11-2017
|
1.00
|
Structurally glued the front Naca door tab on
|
Details
|
|
|
03-11-2017
|
5.00
|
More fuel line work and heat shield for back cylin
|
Details
|
|
|
03-10-2017
|
2.00
|
Worked on Naca door
|
Details
|
|
|
03-10-2017
|
2.00
|
Worked on fuel lines from servo to spider
|
Details
|
|
|
03-09-2017
|
3.00
|
Made naca door @ oil cooler.
|
Details
|
|
|
03-08-2017
|
4.00
|
Fill and sand pinholes and primer.
|
Details
|
|
|
03-07-2017
|
3.00
|
Glassed in air return duct for oil cooler
|
Details
|
|
|
03-06-2017
|
2.00
|
More work on cabin air return through oil cooler
|
Details
|
|
|
03-06-2017
|
3.00
|
Fill and sand with another shot of K2 primer.
|
Details
|
|
|
03-05-2017
|
5.00
|
Sand and fill on lower cowling. Exhaust tubes.
|
Details
|
|
|
03-05-2017
|
3.00
|
Anchor nuts for winter cover mounted.
|
Details
|
|
|
03-03-2017
|
3.00
|
Worked on cabin return air
|
Details
|
|
|
03-02-2017
|
4.00
|
Sand and prime lower cowling
|
Details
|
|
|
03-01-2017
|
4.00
|
Making cabin return air fir heater
|
Details
|
|
|
02-28-2017
|
4.00
|
Time to sand the micro that was on the cowling.
|
Details
|
|
|
02-27-2017
|
4.00
|
Time to micro the exhaust tubes on the cowling.
|
Details
|
|
|
02-26-2017
|
4.00
|
More fuel line work on plane
|
Details
|
|
|
02-25-2017
|
3.00
|
Clean up & 2 bid on inside of cowling for exhaust
|
Details
|
|
|
02-24-2017
|
2.00
|
Installed alternator and fuel servo line bumbs.
|
Details
|
|
|
02-23-2017
|
8.00
|
Fitted exhaust cowling tubes for exhaust pips.
|
Details
|
|
|
02-22-2017
|
4.00
|
Had to make room for alternator and made 4” tube
|
Details
|
|
|
02-21-2017
|
4.00
|
Cut cowling for exhaust and made 4” tube.
|
Details
|
|
|
02-20-2017
|
4.00
|
Fuel servo, fuel lines, and cowling cutouts
|
Details
|
|
|
02-15-2017
|
2.00
|
Ran more fuel lines.
|
Details
|
|
|
02-15-2017
|
1.00
|
Finished mounting the back panels with all the scr
|
Details
|
|
|
02-03-2017
|
4.00
|
Oil lines, fuel fiitings Throttle, mixture, govern
|
Details
|
|
|
02-01-2017
|
4.00
|
Tabs, anchor nuts, and mount panel. 3 bid on holes
|
Details
|
|
|
01-31-2017
|
4.00
|
Clean up edges and add aluminum tabs
|
Details
|
|
|
01-30-2017
|
4.00
|
Trim and add 1 bid on all the sides of the panel p
|
Details
|
|
|
01-27-2017
|
5.00
|
Anchor nuts and 3 bids on vertical panel
|
Details
|
|
|
01-26-2017
|
6.00
|
Fit vertical back panel and anchor nuts
|
Details
|
|
|
01-25-2017
|
7.00
|
Clean up peaces, make and flox in mounting bracket
|
Details
|
|
|
01-24-2017
|
6.00
|
Glass vertical sides and load brace for luggage sh
|
Details
|
|
|
01-23-2017
|
5.00
|
Glass in Vanity side panels
|
Details
|
|
|
01-22-2017
|
4.00
|
Working on sides to back Vanity panel
|
Details
|
|
|
01-20-2017
|
3.00
|
Glassed in back rear cover panel bottom (Vanity)
|
Details
|
|
|
01-19-2017
|
3.00
|
Work on the bottom part of the back cover panel
|
Details
|
|
|
01-18-2017
|
3.00
|
Run more fuel lines
|
Details
|
|
|
01-17-2017
|
4.00
|
Modified exhaust manifold to fit plane.
|
Details
|
|
|
01-17-2017
|
1.00
|
Lay-up on rear cover panel items
|
Details
|
|
|
01-16-2017
|
2.00
|
Bid on foam for rear cover panel
|
Details
|
|
|
01-14-2017
|
4.00
|
Trim, sand, drill, and mount window frames.
|
Details
|
|
|
01-13-2017
|
2.00
|
Mount door micro switches and spring pin actuator
|
Details
|
|
|
01-11-2017
|
4.00
|
Install door open micro switch
|
Details
|
|
|
01-10-2017
|
6.00
|
Made window frames with 4 bids of fiber glass
|
Details
|
|
|
01-05-2017
|
1.00
|
Install welding receptacles for charging and jumpi
|
Details
|
|
|
01-04-2017
|
1.00
|
Working on window frames
|
Details
|
|
|
01-04-2017
|
6.00
|
Running fuel lines and ordering fittings and stuff
|
Details
|
|
|
01-03-2017
|
2.00
|
Welding plugs for external charging and jumping.
|
Details
|
|
|
01-02-2017
|
2.00
|
Installed fuel boost pump regulator
|
Details
|
|
|
01-01-2017
|
5.00
|
Installed gascolator, fuel filter and fuel pump to
|
Details
|
|
|
12-29-2016
|
2.00
|
Painted the back and front sliding seat rails.
|
Details
|
|
|
12-22-2016
|
4.00
|
Install back seats and clean up
|
Details
|
|
|
12-21-2016
|
4.00
|
Clean up and 2 bids on hard pionts for back seats
|
Details
|
|
|
12-20-2016
|
1.00
|
Flanged for oil cooler installed, Scat added.
|
Details
|
|
|
12-19-2016
|
4.00
|
Moved hard points for back seats
|
Details
|
|
|
12-18-2016
|
3.00
|
Back seat slide rails were mounted to seats
|
Details
|
|
|
12-16-2016
|
3.00
|
Cut and weld back seat rails for height
|
Details
|
|
|
12-15-2016
|
3.00
|
Co-Pilot seat in place now
|
Details
|
|
|
12-13-2016
|
3.00
|
Pilot seat in place.
|
Details
|
|
|
12-08-2016
|
1.00
|
Scat was installed for air intake
|
Details
|
|
|
12-08-2016
|
2.00
|
2 bid on Co-Piot seat hard pionts
|
Details
|
|
|
12-07-2016
|
4.00
|
Installing the Co-pilot side seat hard points and
|
Details
|
|
|
11-28-2016
|
6.00
|
Work on installing seats
|
Details
|
|
|
11-27-2016
|
2.00
|
Remove Pilot side kick plate
|
Details
|
|
|
11-27-2016
|
6.00
|
Make and install oil cooler shroud and radiator
|
Details
|
|
|
11-26-2016
|
2.00
|
2 bid on hard pionts
|
Details
|
|
|
11-25-2016
|
3.00
|
Hard pionts going in.
|
Details
|
|
|
11-24-2016
|
1.00
|
Seat mounting slides need work
|
Details
|
|
|
11-24-2016
|
1.00
|
Install my new seats after changing stuff.
|
Details
|
|
|
11-24-2016
|
2.00
|
Hard points need to be sunken to level seats.
|
Details
|
|
|
11-23-2016
|
2.00
|
Smooth prime landing gear doors and fuselage area.
|
Details
|
|
|
11-23-2016
|
2.00
|
Install fuel servo (carburetor)
|
Details
|
|
|
11-22-2016
|
2.00
|
Sand and fill on fuselage and main gear doors.
|
Details
|
|
|
11-22-2016
|
2.00
|
Finish the install on the avionics shelf.
|
Details
|
|
|
11-22-2016
|
2.00
|
Extend heat shield on landing gear booties.
|
Details
|
|
|
11-21-2016
|
4.00
|
Work on installing seats
|
Details
|
|
|
11-21-2016
|
3.00
|
Sand and prime main grear leg doors and fuselage
|
Details
|
|
|
11-21-2016
|
3.00
|
Installed avionics shelf.
|
Details
|
|
|
11-20-2016
|
3.00
|
Bent avionics shelf and triax ends to hold up.
|
Details
|
|
|
11-18-2016
|
2.00
|
Fill in at grear leg doors
|
Details
|
|
|
11-18-2016
|
2.00
|
Avionics shelf ready for bending
|
Details
|
|
|
11-17-2016
|
5.00
|
Coffee can air-filter in new spot
|
Details
|
|
|
11-16-2016
|
3.00
|
Coffee can air filter work & retracts
|
Details
|
|
|
11-15-2016
|
5.00
|
More work on coffee air cleaner can
|
Details
|
|
|
11-14-2016
|
3.00
|
Making coffee can air filter can
|
Details
|
|
|
11-11-2016
|
3.00
|
Cleaned up side flange and make air cleaner flange
|
Details
|
|
|
11-03-2016
|
2.00
|
Staring to make the air cleaner can
|
Details
|
|
|
11-02-2016
|
2.00
|
Fine tuning on glare shield
|
Details
|
|
|
11-01-2016
|
2.00
|
Tie down hard pionts
|
Details
|
|
|
10-31-2016
|
3.00
|
Instrument glare shield attachment
|
Details
|
|
|
10-28-2016
|
2.00
|
Nut plates for bootie bump cover
|
Details
|
|
|
10-26-2016
|
3.00
|
Pinhole hunting and then prime
|
Details
|
|
|
10-25-2016
|
3.00
|
Sand and spray sealer on
|
Details
|
|
|
10-25-2016
|
3.00
|
Instrument panel adjusting
|
Details
|
|
|
10-24-2016
|
4.00
|
Fill and sand on gear leg bumps
|
Details
|
|
|
10-18-2016
|
5.00
|
Worked on cutting bottom of doors and glass work
|
Details
|
|
|
10-14-2016
|
4.00
|
Bracket and sanded gap on landing gear doors
|
Details
|
|
|
10-13-2016
|
6.00
|
Brackets for main gear doors
|
Details
|
|
|
10-07-2016
|
5.00
|
Work on fitting Co-Pilot retract door
|
Details
|
|
|
10-06-2016
|
5.00
|
Sanded brackets and sized doors to fit fuselage.
|
Details
|
|
|
10-05-2016
|
5.00
|
Worked on spindles, brackets, foam reinforcement o
|
Details
|
|
|
10-04-2016
|
5.00
|
Boxed in over gear leg and behind leg socket.
|
Details
|
|
|
09-30-2016
|
2.00
|
More bid work in the gear leg socket area.
|
Details
|
|
|
09-27-2016
|
2.00
|
Glass in gear leg sockets
|
Details
|
|
|
07-26-2016
|
5.00
|
Get fuselage ready for leg sockets
|
Details
|
|
|
07-22-2016
|
2.00
|
Sand, assemble and paint air box with truck liner
|
Details
|
|
|
07-14-2016
|
2.00
|
Flange was cured and now to trim and bolt on
|
Details
|
|
|
07-13-2016
|
2.00
|
Work on the oil filler access trough plenum
|
Details
|
|
|
07-11-2016
|
3.00
|
Bolt on baffles to stop air from escaping
|
Details
|
|
|
07-06-2016
|
4.00
|
More work on air plenum
|
Details
|
|
|
06-28-2016
|
4.00
|
Riveted nut plates on, trimmed plug caps, and prim
|
Details
|
|
|
06-27-2016
|
3.00
|
Drill and fit caps over spark plug holes
|
Details
|
|
|
06-26-2016
|
4.00
|
Sand & prime main grear. 3" spark plug holes made.
|
Details
|
|
|
06-24-2016
|
4.00
|
Clean up bid, sand micro and add, sand fill prime
|
Details
|
|
|
06-23-2016
|
3.00
|
Trimmed glass, added to ends to stiffen, micro on
|
Details
|
|
|
06-20-2016
|
3.00
|
Glass inside of air box
|
Details
|
|
|
06-19-2016
|
5.00
|
Worked on plenum opening for air flow
|
Details
|
|
|
06-18-2016
|
6.00
|
Worked on intake to air box (plenum)
|
Details
|
|
|
06-14-2016
|
5.00
|
Work on air box and NACA runners
|
Details
|
|
|
05-23-2016
|
5.00
|
Worked on air plenum
|
Details
|
|
|
05-22-2016
|
1.00
|
Micro on the main gear legs
|
Details
|
|
|
05-22-2016
|
3.00
|
Lay-up triax and now fitting to top of air plenum
|
Details
|
|
|
05-21-2016
|
5.00
|
Worked on Cleveland brakes and make axel support b
|
Details
|
|
|
05-19-2016
|
2.00
|
New leg sockets had to be made.
|
Details
|
|
|
05-17-2016
|
4.00
|
Finish box and fit air plenum to cowling
|
Details
|
|
|
05-01-2016
|
5.00
|
Working on cooling plenum
|
Details
|
|
|
03-20-2016
|
3.00
|
Cut and fit plenum over cylinder heads
|
Details
|
|
|
03-15-2016
|
2.00
|
Glass up triax for plenum
|
Details
|
|
|
03-10-2016
|
2.00
|
Cut triax for air plenum
|
Details
|
|
|
03-03-2016
|
3.00
|
Making templates for cooling air plenum
|
Details
|
|
|
02-29-2016
|
3.00
|
Cylinder head plenum prep 4 bid
|
Details
|
|
|
02-28-2016
|
5.00
|
Header tank reinstalled, engine bolted on.
|
Details
|
|
|
02-27-2016
|
3.00
|
NACA outlet to fire wall
|
Details
|
|
|
02-22-2016
|
3.00
|
Engine mount back on engine
|
Details
|
|
|
02-21-2016
|
10.00
|
Engine work and prep for mounting
|
Details
|
|
|
02-16-2016
|
3.00
|
Triax added at bolt hole locations
|
Details
|
|
|
02-13-2016
|
3.00
|
Bolt engine to fire wall
|
Details
|
|
|
02-12-2016
|
3.00
|
Get engine out of crate and flox firewall stainles
|
Details
|
|
|
02-04-2016
|
3.00
|
Cowling on and engine brought home from hanger
|
Details
|
|
|
02-02-2016
|
4.00
|
Install fiberfrax and 1/16” stainless steel to fir
|
Details
|
|
|
01-31-2016
|
2.00
|
Getting things ready for mounting the glare shield
|
Details
|
|
|
01-31-2016
|
3.00
|
Floxed on lower cowling flange and clean up
|
Details
|
|
|
01-30-2016
|
3.00
|
Lower cowling flange for no screws
|
Details
|
|
|
01-29-2016
|
2.00
|
Floxed on cowling flange to firewall
|
Details
|
|
|
01-28-2016
|
3.00
|
Cut bid and did a 3 bid lay-up for upper cowling
|
Details
|
|
|
01-26-2016
|
3.00
|
Hang up canard, move plane, cleco cowling on.
|
Details
|
|
|
01-25-2016
|
2.00
|
Reassemble elevators onto canard
|
Details
|
|
|
01-24-2016
|
8.00
|
Sand, prime, fill, sand prime
|
Details
|
|
|
01-21-2016
|
4.00
|
Sand on dog house and hatch, then fill at canard
|
Details
|
|
|
01-19-2016
|
0.00
|
Cynthia and I went to Theory of a dead man in Trai
|
Details
|
|
|
01-18-2016
|
3.00
|
More sand and fill on dog house and hatch
|
Details
|
|
|
01-17-2016
|
2.00
|
Other side of back cover panel
|
Details
|
|
|
01-17-2016
|
3.00
|
Dog housed sanded, micro on, front hatch filled
|
Details
|
|
|
01-16-2016
|
2.00
|
Interior rear cover panel
|
Details
|
|
|
01-16-2016
|
2.00
|
Filled in dog house low spots with micro
|
Details
|
|
|
01-15-2016
|
2.00
|
Soldered eyelets on the ends of the rods
|
Details
|
|
|
01-14-2016
|
5.00
|
Holding hinges for Dog house were installed
|
Details
|
|
|
01-13-2016
|
2.00
|
Got some areas primed and built wing 4x4 jacks
|
Details
|
|
|
01-12-2016
|
1.00
|
Trace out firewall stainless
|
Details
|
|
|
01-12-2016
|
2.00
|
Elevator torque tube hole cleaning up and level
|
Details
|
|
|
01-11-2016
|
2.00
|
Sand NACA funnels and make template for firewall s
|
Details
|
|
|
01-11-2016
|
1.00
|
Fill and sand on elevator torque tube holes
|
Details
|
|
|
01-10-2016
|
1.00
|
Worked on glare shield,1 bid on elevator tube hole
|
Details
|
|
|
01-10-2016
|
2.00
|
Sand on fuselage in a few areas
|
Details
|
|
|
01-10-2016
|
2.00
|
Removed NACA outflow funnels and trimmed
|
Details
|
|
|
01-09-2016
|
2.00
|
More sanding and priming on the plane and panel
|
Details
|
|
|
01-09-2016
|
2.00
|
Installed instrument panel
|
Details
|
|
|
01-09-2016
|
2.00
|
3 bid on the foam from the NACA outlet
|
Details
|
|
|
01-07-2016
|
2.00
|
Sand and fill on instrument panel and plane
|
Details
|
|
|
01-07-2016
|
2.00
|
NACA plenum cooling part of engine
|
Details
|
|
|
01-05-2016
|
1.00
|
More work on the dog house hinges
|
Details
|
|
|
01-05-2016
|
1.00
|
Micro pinholes on instrument panel
|
Details
|
|
|
01-05-2016
|
1.00
|
Engine cooling plenum chamber
|
Details
|
|
|
01-03-2016
|
2.00
|
Sanded instrument panel and control surfaces then
|
Details
|
|
|
01-03-2016
|
3.00
|
Sand level dog house area for hinges then cut free
|
Details
|
|
|
01-02-2016
|
2.00
|
Sand and apply one more coat of micro
|
Details
|
|
|
01-02-2016
|
1.00
|
Sand and add micro to panel
|
Details
|
|
|
01-01-2016
|
4.00
|
Worked on filling gaps and dog house
|
Details
|
|
|
12-31-2015
|
2.00
|
Cleaned up instrument panel and micro
|
Details
|
|
|
12-30-2015
|
2.00
|
Filled in ends on instrument panel
|
Details
|
|
|
12-27-2015
|
4.00
|
Modify instrument panel so it is 20 degrees and fa
|
Details
|
|
|
12-26-2015
|
3.00
|
Clean up bid and sand clean
|
Details
|
|
|
12-25-2015
|
2.00
|
One bid on elevator end and dog house bottom
|
Details
|
|
|
12-24-2015
|
2.00
|
2 bid on inside of dog house @ canard.
|
Details
|
|
|
12-22-2015
|
2.00
|
Dog house is to wide at canard and needs to come i
|
Details
|
|
|
12-21-2015
|
2.00
|
Fitting dog house
|
Details
|
|
|
12-19-2015
|
4.00
|
Clean up bid and fit over elevator torque tubes
|
Details
|
|
|
12-17-2015
|
4.00
|
Fill in gap (hole) over elevator torque tube.
|
Details
|
|
|
12-13-2015
|
8.00
|
Fit canard to plane, reinstall speed brake, work o
|
Details
|
|
|
12-12-2015
|
6.00
|
Fit torque tubes into fuselage, install stick push
|
Details
|
|
|
12-10-2015
|
3.00
|
Level elevators and drill weight holes. Set up pla
|
Details
|
|
|
12-08-2015
|
4.00
|
Assembled elevators to canard
|
Details
|
|
|
12-07-2015
|
2.00
|
Finish blocking and spray 4 coats of smooth prime
|
Details
|
|
|
12-06-2015
|
5.00
|
Sand and fill to prime day on the Canard
|
Details
|
|
|
12-05-2015
|
4.00
|
Sanded the 2 applications of micro, primed and fil
|
Details
|
|
|
12-01-2015
|
1.00
|
Micro on the canard tips
|
Details
|
|
|
12-01-2015
|
3.00
|
I got the trim actuator set up and bolted
|
Details
|
|
|
11-30-2015
|
1.00
|
Trim base bolted up
|
Details
|
|
|
11-30-2015
|
1.00
|
Glass in canard top tip
|
Details
|
|
|
11-29-2015
|
6.00
|
Boxed in canard tip weight well and clean up
|
Details
|
|
|
11-28-2015
|
1.00
|
Trim base
|
Details
|
|
|
11-28-2015
|
3.00
|
Canard tip installation
|
Details
|
|
|
11-26-2015
|
2.00
|
Weight wells and elevator end clean up
|
Details
|
|
|
11-26-2015
|
1.00
|
Elevator trim base
|
Details
|
|
|
11-24-2015
|
3.00
|
Weight wells and elevator ends
|
Details
|
|
|
11-22-2015
|
4.00
|
Sand around hinge arms and install torque tubes
|
Details
|
|
|
11-21-2015
|
2.00
|
Positioning torque / Counter weight Arm
|
Details
|
|
|
11-20-2015
|
3.00
|
Micro in hinge arms tonight
|
Details
|
|
|
11-19-2015
|
4.00
|
Hinge arm installation and set up
|
Details
|
|
|
11-17-2015
|
2.00
|
Elevator hinge installation
|
Details
|
|
|
11-16-2015
|
4.00
|
Hinge work from elevator to Canard
|
Details
|
|
|
11-15-2015
|
3.00
|
Fill and sand then fill and sand then Smooth Prime
|
Details
|
|
|
11-13-2015
|
1.00
|
Dave came over after work and moved my wings
|
Details
|
|
|
11-12-2015
|
2.00
|
Prime canard and get wings ready to move out.
|
Details
|
|
|
11-11-2015
|
4.00
|
Sand, prime, fill, sand Canard
|
Details
|
|
|
11-09-2015
|
2.00
|
Micro on bottom of Canard
|
Details
|
|
|
11-08-2015
|
4.00
|
Fill and prime day
|
Details
|
|
|
11-07-2015
|
2.00
|
One bid on strake to wing at wing spar
|
Details
|
|
|
11-07-2015
|
3.00
|
More of the fill and prime stuff
|
Details
|
|
|
11-04-2015
|
1.00
|
Smooth Prime winglet bottoms and canard.
|
Details
|
|
|
11-03-2015
|
4.00
|
Prime, sand , fill one more time
|
Details
|
|
|
11-01-2015
|
2.00
|
Rudder return springs
|
Details
|
|
|
11-01-2015
|
4.00
|
More sand and fill on winglets and canard
|
Details
|
|
|
10-29-2015
|
2.00
|
Got some primer on and did some pinhole work
|
Details
|
|
|
10-25-2015
|
7.00
|
Fill and sand with Spot-lite in low areas
|
Details
|
|
|
10-19-2015
|
2.00
|
I met my goal tonight spraying primer
|
Details
|
|
|
10-18-2015
|
6.00
|
More sanding on the wings and Canard
|
Details
|
|
|
10-17-2015
|
4.00
|
More sanding and filling of the winglet bottom & C
|
Details
|
|
|
10-15-2015
|
2.00
|
Sand and fill winglet bottom
|
Details
|
|
|
10-13-2015
|
3.00
|
Sand and fill on Canard. Sand on bottom winglet.
|
Details
|
|
|
10-12-2015
|
5.00
|
Sand and prime Canard. Fill winglet bottoms
|
Details
|
|
|
10-10-2015
|
3.00
|
One bid over foam to increase strength and get rea
|
Details
|
|
|
10-06-2015
|
2.00
|
Add foam to winlet bottom to match rudder width.
|
Details
|
|
|
09-20-2015
|
3.00
|
Cut out winglet bottom for rudder and add micro
|
Details
|
|
|
09-15-2015
|
2.00
|
Time to apply level coat of icing on canard
|
Details
|
|
|
09-14-2015
|
2.00
|
Used heat gun to round front winglet bottom
|
Details
|
|
|
09-13-2015
|
4.00
|
Ribs installed and winglet bottoms floxed on to wi
|
Details
|
|
|
09-12-2015
|
2.00
|
Working on winglet bottom
|
Details
|
|
|
09-11-2015
|
3.00
|
Sand, fill, sand, fill, on Canard
|
Details
|
|
|
08-04-2015
|
3.00
|
Time to install the rudder horn.
|
Details
|
|
|
08-02-2015
|
2.00
|
Nut platting rudder hinges
|
Details
|
|
|
08-01-2015
|
4.00
|
Aileron fitting and installed the nut plates on hi
|
Details
|
|
|
07-31-2015
|
2.00
|
Mounting rudders after hings cut outs
|
Details
|
|
|
07-31-2015
|
3.00
|
More fitting on the ailerons
|
Details
|
|
|
07-30-2015
|
2.00
|
Mounted the rudders hinges to the rudder with T88
|
Details
|
|
|
07-29-2015
|
1.50
|
Rivet the hinges onto the ailerons
|
Details
|
|
|
07-29-2015
|
1.50
|
Hang rudders and get hinges in place
|
Details
|
|
|
07-28-2015
|
2.00
|
T88 structural with milled fiber and flox on hinge
|
Details
|
|
|
07-27-2015
|
8.00
|
Wing prep for ailerons and hinges
|
Details
|
|
|
07-21-2015
|
3.00
|
Sand all the wells and hand paint on primer. Bid w
|
Details
|
|
|
07-19-2015
|
6.00
|
Block sand and fill to Smooth Prime
|
Details
|
|
|
07-05-2015
|
6.00
|
More sanding and filling Primer was sprayed on
|
Details
|
|
|
07-04-2015
|
4.00
|
Fill and sanding on the control surfaces
|
Details
|
|
|
07-03-2015
|
3.00
|
Sanded the micro and primed the control surfaces
|
Details
|
|
|
06-28-2015
|
2.00
|
Trim rudder wells, sand and micro
|
Details
|
|
|
06-25-2015
|
2.00
|
Trim winglet wells and rudder wells. Glass rudder
|
Details
|
|
|
06-21-2015
|
3.00
|
Glass in winglet wells
|
Details
|
|
|
06-20-2015
|
4.00
|
Glassed in rudder wells and elevator ends
|
Details
|
|
|
06-19-2015
|
2.00
|
Sanded rudder wells and added were needed
|
Details
|
|
|
06-18-2015
|
2.00
|
I sanded the ailerons at the top edge
|
Details
|
|
|
06-14-2015
|
3.00
|
It was time to cut out the rudders
|
Details
|
|
|
06-13-2015
|
3.00
|
Sand elevators and ailerons then add Alpha-poxy
|
Details
|
|
|
06-08-2015
|
3.00
|
Sand elevators and ailerons were the glass butted
|
Details
|
|
|
06-02-2015
|
1.00
|
Sand Alpha poxy micro on elevators
|
Details
|
|
|
06-02-2015
|
2.00
|
Glass ends of ailerons and cut hinges
|
Details
|
|
|
05-31-2015
|
3.00
|
Time to glass up the ailerons with one bid
|
Details
|
|
|
05-31-2015
|
3.00
|
Prep ailerons for the one bid that goes on
|
Details
|
|
|
05-30-2015
|
0.00
|
Resin in torque tube and backing plate
|
Details
|
|
|
05-30-2015
|
5.00
|
Prep and install torque tube and hinge backing pla
|
Details
|
|
|
05-28-2015
|
3.00
|
Aileron construction & counterweights
|
Details
|
|
|
05-26-2015
|
1.00
|
Trim bid at the edge of the Aileron well
|
Details
|
|
|
05-26-2015
|
2.00
|
Sand and apply Alpha poxy micro to elevators
|
Details
|
|
|
05-25-2015
|
6.00
|
Glassed in Aileron wells tonight
|
Details
|
|
|
05-22-2015
|
3.00
|
Sand more on aileron wells
|
Details
|
|
|
05-22-2015
|
3.00
|
Aileron well grind out and sand to shape.
|
Details
|
|
|
05-21-2015
|
2.00
|
Set up for aileron cut out and then cut
|
Details
|
|
|
05-20-2015
|
5.00
|
Filled last low spot and Smooth primed wings
|
Details
|
|
|
05-17-2015
|
1.00
|
Resin work on trailing edge of elevators
|
Details
|
|
|
05-17-2015
|
4.00
|
Fill the last low areas and prime them
|
Details
|
|
|
05-16-2015
|
6.00
|
I got the filling and sanding to priming today
|
Details
|
|
|
05-16-2015
|
2.00
|
Fix air voids and delaminating in elevator
|
Details
|
|
|
05-15-2015
|
6.00
|
Spar work needed
|
Details
|
|
|
05-14-2015
|
4.00
|
Block out K2 primer and add Spot-Lite bondo
|
Details
|
|
|
05-12-2015
|
3.00
|
Sand and fill on speed brake
|
Details
|
|
|
05-11-2015
|
3.00
|
Prep for K2 primer and sprayed out 2 coats
|
Details
|
|
|
05-10-2015
|
6.00
|
More fill and sanding bondo
|
Details
|
|
|
05-09-2015
|
5.00
|
More of that fill and sand
|
Details
|
|
|
05-07-2015
|
2.00
|
More sanding and filling
|
Details
|
|
|
05-05-2015
|
3.00
|
Sand and add Spot-Lite bondo
|
Details
|
|
|
05-03-2015
|
4.00
|
Spot-Lite bondo is the tool to use for me
|
Details
|
|
|
04-28-2015
|
2.00
|
Sand sealer primer and add Z Grip bondo
|
Details
|
|
|
04-27-2015
|
2.00
|
Sand micro and seal prime top wings
|
Details
|
|
|
04-26-2015
|
5.00
|
Sand wings add micro. Sand speed brake & prime
|
Details
|
|
|
04-25-2015
|
4.00
|
Filling and sanding on the wings and speed brake
|
Details
|
|
|
04-23-2015
|
3.00
|
We got the wings top side up again
|
Details
|
|
|
04-19-2015
|
4.00
|
Primed bottom wing one more time
|
Details
|
|
|
04-16-2015
|
2.00
|
Sanding the bottom fueslage and hach
|
Details
|
|
|
04-15-2015
|
2.00
|
Time to clean the place up
|
Details
|
|
|
04-14-2015
|
3.00
|
Finished the bigger spots and now ready for primer
|
Details
|
|
|
04-07-2015
|
3.00
|
Found a few bigger areas needing work
|
Details
|
|
|
04-03-2015
|
5.00
|
More of that fun sanding and filling stuff
|
Details
|
|
|
03-28-2015
|
4.00
|
Sand primer and Spot-Lite fill
|
Details
|
|
|
03-19-2015
|
2.00
|
Prime wings and fuselage
|
Details
|
|
|
03-16-2015
|
1.00
|
Fuselage and dog house clean up
|
Details
|
|
|
03-16-2015
|
2.00
|
Fill and sand in Canard- Fuselage area.
|
Details
|
|
|
03-15-2015
|
3.00
|
More filling and sanding
|
Details
|
|
|
03-15-2015
|
2.00
|
Lay-ups for Instrument panel
|
Details
|
|
|
03-14-2015
|
4.00
|
Getting the dog house sanded to clearances
|
Details
|
|
|
03-10-2015
|
3.00
|
More sanding on the NACA inlets
|
Details
|
|
|
03-10-2015
|
2.00
|
Change dog house clearances
|
Details
|
|
|
03-08-2015
|
5.00
|
Taped windows and did bondo work
|
Details
|
|
|
03-07-2015
|
5.00
|
Working on fuselage now with Spot-Lite bondo
|
Details
|
|
|
03-03-2015
|
2.00
|
Sand Spot -Lite and micro added
|
Details
|
|
|
03-02-2015
|
2.00
|
Block sand Pilot strake and spot fill
|
Details
|
|
|
03-01-2015
|
4.00
|
Co-Pilot strake sanding and filling
|
Details
|
|
|
02-28-2015
|
5.00
|
Blocked out the wings today with the air board 180
|
Details
|
|
|
02-26-2015
|
2.00
|
Sand and get ready for primer
|
Details
|
|
|
02-24-2015
|
2.00
|
Sand big area tonight and small stuff got work
|
Details
|
|
|
02-23-2015
|
4.00
|
More filling in not happy areas
|
Details
|
|
|
02-22-2015
|
8.00
|
Filling and sanding low areas on strakes
|
Details
|
|
|
02-15-2015
|
4.00
|
Block out strake and add filler were needed
|
Details
|
|
|
02-09-2015
|
5.00
|
Sanding and blocking to get the primer on.
|
Details
|
|
|
02-08-2015
|
4.00
|
More of the same. Primer on primer off and fill
|
Details
|
|
|
02-07-2015
|
5.00
|
More sanding and putty filling
|
Details
|
|
|
02-07-2015
|
1.00
|
Door lock was removed and trashed
|
Details
|
|
|
02-05-2015
|
4.00
|
Still filling and sanding
|
Details
|
|
|
01-31-2015
|
4.00
|
Blocked out primer with 3’ and then air board
|
Details
|
|
|
01-30-2015
|
3.00
|
Sand and fill winglet filet. Heat wing ends to sha
|
Details
|
|
|
01-29-2015
|
6.00
|
More sanding and primer on strakes Happy
|
Details
|
|
|
01-28-2015
|
4.00
|
Sanding and filling today again
|
Details
|
|
|
01-27-2015
|
4.00
|
Sanding filling and more sanding
|
Details
|
|
|
01-26-2015
|
3.00
|
Sand off primer for low areas and pinholes
|
Details
|
|
|
01-25-2015
|
6.00
|
More sand and fill to priming
|
Details
|
|
|
01-23-2015
|
4.00
|
Time to use the bondo in low areas
|
Details
|
|
|
01-22-2015
|
0.00
|
Next on the list
|
Details
|
|
|
01-22-2015
|
5.00
|
Added micro to low areas on winglet
|
Details
|
|
|
01-21-2015
|
5.00
|
Pinhole sanding and blocking out the primer
|
Details
|
|
|
01-20-2015
|
2.00
|
Working on fuselage stakes and fuselage radius
|
Details
|
|
|
01-20-2015
|
2.00
|
Sanding the strakes and pin hole patrol
|
Details
|
|
|
01-19-2015
|
5.00
|
Getting ready for priming
|
Details
|
|
|
01-18-2015
|
2.00
|
Working on fuselage strakes
|
Details
|
|
|
01-17-2015
|
5.00
|
Finish blending wings and now onto the strakes
|
Details
|
|
|
01-16-2015
|
2.00
|
Again sand and fill wings. This may go on for some
|
Details
|
|
|
01-15-2015
|
5.00
|
Sand and fill wings & Fuselage
|
Details
|
|
|
01-13-2015
|
6.00
|
Sand wings and add micro Fuselage work too
|
Details
|
|
|
01-12-2015
|
2.00
|
Sand fuselage. Add micro to wing
|
Details
|
|
|
01-12-2015
|
2.00
|
Sand and fill in low areas on wings
|
Details
|
|
|
01-11-2015
|
3.00
|
Co-Pilot side sand an icing
|
Details
|
|
|
01-10-2015
|
3.00
|
Fill in the strake areas with micro
|
Details
|
|
|
01-09-2015
|
2.00
|
Sand and fill low areas on wings
|
Details
|
|
|
01-08-2015
|
4.00
|
Fill and sand
|
Details
|
|
|
01-07-2015
|
4.00
|
Fill low spots on wings
|
Details
|
|
|
01-05-2015
|
0.00
|
We got some snow
|
Details
|
|
|
01-04-2015
|
4.00
|
Sand wings
|
Details
|
|
|
01-03-2015
|
4.00
|
Fill and sand on Fuselage
|
Details
|
|
|
12-29-2014
|
6.00
|
Fill bottom of wings with sandable micro
|
Details
|
|
|
12-16-2014
|
4.00
|
Sand and micro wings
|
Details
|
|
|
12-09-2014
|
3.00
|
Sand and flip wings to night
|
Details
|
|
|
12-08-2014
|
4.00
|
Sand and fill wings
|
Details
|
|
|
12-04-2014
|
4.00
|
Sand wings and winglets
|
Details
|
|
|
11-30-2014
|
6.00
|
Filling Wings and Winglets with Micro
|
Details
|
|
|
11-29-2014
|
6.00
|
Filling wings and winglets with VelociPoxy and Mic
|
Details
|
|
|
11-20-2014
|
4.00
|
Micro balloons and Alpha poxy on main wing spar
|
Details
|
|
|
11-16-2014
|
4.00
|
Glass wing voids
|
Details
|
|
|
11-14-2014
|
3.00
|
Moved shop around again and sand door ends
|
Details
|
|
|
11-09-2014
|
3.00
|
Worked on door. Strake end.& Gear legs.
|
Details
|
|
|
11-08-2014
|
2.00
|
Finishing the door panels
|
Details
|
|
|
11-08-2014
|
2.00
|
Brake line prep
|
Details
|
|
|
11-07-2014
|
2.00
|
Interior door cover
|
Details
|
|
|
11-06-2014
|
1.50
|
Door panel pull handle
|
Details
|
|
|
11-06-2014
|
2.00
|
Carbon bid on main gear legs
|
Details
|
|
|
11-03-2014
|
4.00
|
Glassed up other side of main gear
|
Details
|
|
|
11-02-2014
|
3.00
|
I going too carbon bid the main landing gear
|
Details
|
|
|
10-26-2014
|
3.00
|
Stake door handle and bid on main spare
|
Details
|
|
|
10-23-2014
|
3.00
|
Micro and bid in arm rest on doors
|
Details
|
|
|
10-19-2014
|
0.00
|
Wing and strake front end
|
Details
|
|
|
10-19-2014
|
3.00
|
Strake arm rest
|
Details
|
|
|
10-16-2014
|
3.00
|
Finish up strakes at door and baggage
|
Details
|
|
|
10-07-2014
|
3.50
|
Finish door area and front strake storage
|
Details
|
|
|
10-07-2014
|
0.00
|
Continued
|
Details
|
|
|
10-05-2014
|
4.50
|
UNI and Bid in front baggage bulkheads
|
Details
|
|
|
10-04-2014
|
3.00
|
Prep baggage front bulkhead
|
Details
|
|
|
09-24-2014
|
4.50
|
Triax Strake ends
|
Details
|
|
|
09-22-2014
|
3.00
|
Back strake ribs from main spar
|
Details
|
|
|
09-15-2014
|
3.00
|
Hell hole done on Co-pilot side
|
Details
|
|
|
09-11-2014
|
0.00
|
Bike ride
|
Details
|
|
|
09-09-2014
|
3.00
|
Strake ribs to main spare
|
Details
|
|
|
08-09-2014
|
0.00
|
New friends from Vernon
|
Details
|
|
|
08-07-2014
|
0.00
|
Abbotsford Air show was the place to be
|
Details
|
|
|
08-05-2014
|
6.00
|
More work on the baggage area and Hell hole
|
Details
|
|
|
08-03-2014
|
4.00
|
More strake work
|
Details
|
|
|
07-29-2014
|
2.00
|
Had to clean Sticky stuff Dispenser
|
Details
|
|
|
07-28-2014
|
4.00
|
Glass in top strake to fuselage
|
Details
|
|
|
07-27-2014
|
4.00
|
Install top Co-Pilot strake
|
Details
|
|
|
07-17-2014
|
3.00
|
Prep for Co-Pilot strake
|
Details
|
|
|
07-06-2014
|
0.00
|
Working on strake
|
Details
|
|
|
07-06-2014
|
4.00
|
Working on finishing Pilot strake
|
Details
|
|
|
06-30-2014
|
4.50
|
Glassed in top strake to fuselage
|
Details
|
|
|
06-26-2014
|
4.50
|
Top strake went on tonight
|
Details
|
|
|
06-21-2014
|
2.00
|
Get plane ready for Pilot strake top
|
Details
|
|
|
06-19-2014
|
2.00
|
Sanded Canard and fill in low area
|
Details
|
|
|
06-17-2014
|
2.00
|
Fill in spar depression and skim canard
|
Details
|
|
|
06-13-2014
|
2.00
|
Canard TRAX repair sanded and resin injection.
|
Details
|
|
|
06-12-2014
|
2.00
|
Install toe brake cylinders
|
Details
|
|
|
06-09-2014
|
2.50
|
Canard Lay-up C air bubbles removed
|
Details
|
|
|
06-08-2014
|
1.00
|
Safety wiring of fuel gages
|
Details
|
|
|
06-05-2014
|
3.00
|
Cut and fit front window trim
|
Details
|
|
|
06-05-2014
|
3.00
|
Cut and fit front window trim
|
Details
|
|
|
05-31-2014
|
1.00
|
Pre-cover Inspection
|
Details
|
|
|
05-26-2014
|
1.00
|
Toe brake cylinders are in
|
Details
|
|
|
05-26-2014
|
1.00
|
Remove back panel and work on gas fittings
|
Details
|
|
|
05-20-2014
|
4.50
|
Front wind shield trim
|
Details
|
|
|
05-17-2014
|
4.00
|
Templates for back panel.
|
Details
|
|
|
05-14-2014
|
3.00
|
Assemble rudder pedals with push pull bell crank
|
Details
|
|
|
05-13-2014
|
1.00
|
Interior back panel
|
Details
|
|
|
05-13-2014
|
1.00
|
Fill in master cylinder hole
|
Details
|
|
|
05-11-2014
|
2.00
|
Mount toe brake rail
|
Details
|
|
|
05-10-2014
|
3.00
|
Worked on rudder and toe brake pedals
|
Details
|
|
|
05-06-2014
|
2.00
|
Work on insturument panel
|
Details
|
|
|
04-24-2014
|
3.00
|
Wing strake cut out and fuel proofing top strakes
|
Details
|
|
|
04-16-2014
|
2.00
|
Relief in upper strake for tire clearance
|
Details
|
|
|
04-13-2014
|
2.00
|
Bid in sight gage
|
Details
|
|
|
04-12-2014
|
3.00
|
Fuel sight gage and fuel probes
|
Details
|
|
|
04-10-2014
|
3.00
|
Fuel proofing strake with 3 coats of resin.
|
Details
|
|
|
04-07-2014
|
3.00
|
Fuel cap ground wire & prep for fuel proofing
|
Details
|
|
|
04-05-2014
|
3.00
|
Relocate Pilot fuel flange and then 3 bid
|
Details
|
|
|
04-04-2014
|
3.00
|
Fule probes
|
Details
|
|
|
03-31-2014
|
5.00
|
Sanding and prep for top of flanges
|
Details
|
|
|
03-30-2014
|
3.00
|
Clean up and flanges
|
Details
|
|
|
03-29-2014
|
2.50
|
Bolt hole, screen bid, micro upper strake
|
Details
|
|
|
03-27-2014
|
3.00
|
Out-let screens & Fuel cap
|
Details
|
|
|
03-25-2014
|
2.00
|
Sand mouse holes and install flanges on baffles
|
Details
|
|
|
03-24-2014
|
3.50
|
Strake baffles and clean up -02
|
Details
|
|
|
03-24-2014
|
3.50
|
Strake baffles and clean up -01
|
Details
|
|
|
03-23-2014
|
4.00
|
Wheel well & gear leg well- 02
|
Details
|
|
|
03-23-2014
|
4.00
|
Wheel well & gear leg well- 01
|
Details
|
|
|
03-22-2014
|
5.00
|
Vent line, mouse holes, gear leg baffle.
|
Details
|
|
|
03-21-2014
|
4.50
|
Flanges, fit baffles , mouse holes Friday night
|
Details
|
|
|
03-20-2014
|
3.00
|
Install flanges, fit baffles and fuel line made.
|
Details
|
|
|
03-19-2014
|
1.50
|
Clean up trough hole and install fuel line
|
Details
|
|
|
03-18-2014
|
2.50
|
Clean up hard points, made line,triax & bid @ hole
|
Details
|
|
|
03-17-2014
|
3.50
|
Installed fuel hard points, flange work
|
Details
|
|
|
03-16-2014
|
5.00
|
Clean up, prep for flanges, fill in over leg well
|
Details
|
|
|
03-15-2014
|
5.50
|
2 bids on baggage bulkhead and outer bulkhead
|
Details
|
|
|
03-14-2014
|
3.50
|
Fuel line and back, outside bulkhead 2 bids
|
Details
|
|
|
03-13-2014
|
2.00
|
Worked on fuel bulkhead and back line pic-up
|
Details
|
|
|
03-12-2014
|
1.50
|
Fit fuel bulkheads
|
Details
|
|
|
03-11-2014
|
3.50
|
Wheel well flange clean up and fit Fuel bulkhead
|
Details
|
|
|
03-09-2014
|
1.50
|
Measurements and bondo well. 1
|
Details
|
|
|
03-09-2014
|
2.50
|
Do wheel well flange on top strake. 2
|
Details
|
|
|
03-09-2014
|
1.00
|
Bulkhead glass and flange. 3
|
Details
|
|
|
03-08-2014
|
2.50
|
Second layer of bid cloth on bulkheads
|
Details
|
|
|
03-04-2014
|
1.00
|
Glass wing bolt holes with UNI cloth
|
Details
|
|
|
03-03-2014
|
1.50
|
Cut relief for wheel when retracted.
|
Details
|
|
|
03-02-2014
|
3.00
|
Fit and glass in section on wheel well
|
Details
|
|
|
02-24-2014
|
0.50
|
Micro fillets on main spar
|
Details
|
|
|
02-24-2014
|
2.50
|
Glass in gear leg well
|
Details
|
|
|
02-23-2014
|
5.50
|
Removed wing and started on wheel well.
|
Details
|
|
|
02-22-2014
|
4.00
|
Glass lower strake to fueslage
|
Details
|
|
|
02-21-2014
|
2.00
|
Prep for lower strake to fuselage lay-ups
|
Details
|
|
|
02-21-2014
|
0.75
|
Cut out baggage access area
|
Details
|
|
|
02-20-2014
|
4.00
|
Lower strake half glassing to main spar
|
Details
|
|
|
02-19-2014
|
1.50
|
2 bid lay up on upper strake
|
Details
|
|
|
02-18-2014
|
2.50
|
Cut and fit upper stake Pilot side
|
Details
|
|
|
02-17-2014
|
1.50
|
2 bid on back of strake
|
Details
|
|
|
02-16-2014
|
7.00
|
Cut end of wing and cut in lower strake
|
Details
|
|
|
02-15-2014
|
4.00
|
Prep for lower Strake
|
Details
|
|
|
02-13-2014
|
1.50
|
Wing strake cutout
|
Details
|
|
|
02-11-2014
|
1.00
|
Paint resin on strake one more time
|
Details
|
|
|
02-10-2014
|
2.00
|
Vent and Fuel line from Strake
|
Details
|
|
|
02-09-2014
|
3.00
|
2 bid on fuel sight gauge
|
Details
|
|
|
02-06-2014
|
2.00
|
Fuel sight gauge
|
Details
|
|
|
02-05-2014
|
2.50
|
Fuel cap installation
|
Details
|
|
|
02-02-2014
|
4.00
|
Micro ,1 bid, & paint resin
|
Details
|
|
|
02-01-2014
|
3.00
|
Grooved out bulkheads and baffles. Add resin to st
|
Details
|
|
|
01-31-2014
|
1.00
|
Videoed the strake baffle for proper clearance
|
Details
|
|
|
01-31-2014
|
1.00
|
Added more TRIAX and bid to panel
|
Details
|
|
|
01-30-2014
|
1.00
|
Add Flange to baffle
|
Details
|
|
|
01-28-2014
|
1.50
|
Make instrument panel
|
Details
|
|
|
01-28-2014
|
1.50
|
Install flange on baggage bulkhead
|
Details
|
|
|
01-27-2014
|
2.50
|
Cleaned up mouse holes and gear socket
|
Details
|
|
|
01-26-2014
|
4.00
|
Added more bid to out side fuel bulkhead
|
Details
|
|
|
01-25-2014
|
4.50
|
Strake baffels bid applyed
|
Details
|
|
|
01-23-2014
|
2.00
|
Bondo Strake baffles in place
|
Details
|
|
|
01-22-2014
|
6.00
|
Installed the wheel well tonight
|
Details
|
|
|
01-19-2014
|
2.00
|
Install flange on gear leg baffle and resin mouse
|
Details
|
|
|
01-18-2014
|
4.00
|
Gear leg baffle install.
|
Details
|
|
|
01-16-2014
|
4.00
|
Fuel screens, bid on flanges, add micro-flox to bu
|
Details
|
|
|
01-14-2014
|
3.50
|
Bid and flange work on bulkheads
|
Details
|
|
|
01-12-2014
|
3.00
|
Fuel vent hard piont installed
|
Details
|
|
|
01-12-2014
|
4.00
|
Bid in the other side of fuel bulkhead
|
Details
|
|
|
01-11-2014
|
7.00
|
Bid in bulkheads and fuel out let
|
Details
|
|
|
01-10-2014
|
2.00
|
Bulkhead hard piont for fitting
|
Details
|
|
|
01-06-2014
|
2.50
|
Floxed on 1.5" flange for rear bulkhead
|
Details
|
|
|
01-02-2014
|
1.50
|
More I beam lay-ups
|
Details
|
|
|
01-01-2014
|
2.00
|
Floxed on angle pices to baffles
|
Details
|
|
|
12-31-2013
|
3.00
|
Lay-up and cut to size 1" angle
|
Details
|
|
|
12-30-2013
|
4.00
|
Sand bulkheads and fill in over leg cover
|
Details
|
|
|
12-29-2013
|
3.50
|
90 degree flanges and moues holes
|
Details
|
|
|
12-28-2013
|
6.00
|
Fit more baffles and lay-ups on bulkheads.
|
Details
|
|
|
12-27-2013
|
5.50
|
Fit bulkheads and baffles
|
Details
|
|
|
12-26-2013
|
5.00
|
Lay-ups for wheel well flange.
|
Details
|
|
|
12-26-2013
|
1.50
|
Cut out more baggage opening
|
Details
|
|
|
12-25-2013
|
4.00
|
Prep top strake for wheel well flange
|
Details
|
|
|
12-24-2013
|
1.50
|
Cut bid for baffles and bulkheads
|
Details
|
|
|
12-23-2013
|
3.50
|
Bid in leg cover and added to wheel well
|
Details
|
|
|
12-22-2013
|
5.00
|
Cut out strake for tire and prep for leg cover
|
Details
|
|
|
12-21-2013
|
3.00
|
Cut out strake for gear leg
|
Details
|
|
|
12-20-2013
|
3.00
|
Wing support cradle
|
Details
|
|
|
12-17-2013
|
1.50
|
Trace out bulkheads and baffles for fuel tank
|
Details
|
|
|
12-15-2013
|
3.50
|
Glass strake to fueslage
|
Details
|
|
|
12-14-2013
|
4.00
|
Lower strake glassing to main spar
|
Details
|
|
|
12-14-2013
|
2.50
|
Glass the 4x8 Dyvinicel foam for baffels
|
Details
|
|
|
12-10-2013
|
1.50
|
Wing attach bolt hole reinforcment
|
Details
|
|
|
12-10-2013
|
1.50
|
2 bid on upper Co-Pilot strake
|
Details
|
|
|
12-08-2013
|
2.50
|
Cut out baggage area in the strake
|
Details
|
|
|
12-04-2013
|
1.50
|
Lay - up on bottom strake
|
Details
|
|
|
12-03-2013
|
1.50
|
Fit upper strake on Co-Pilot side
|
Details
|
|
|
12-02-2013
|
2.00
|
Fit the lower Co-Pilot strake
|
Details
|
|
|
12-01-2013
|
3.00
|
Got the Co-Pilot wing on
|
Details
|
|
|
11-30-2013
|
2.00
|
Lower strake alignment
|
Details
|
|
|
11-28-2013
|
1.00
|
TRIAX on dog house for hold down hinges
|
Details
|
|
|
11-26-2013
|
1.00
|
Sand Dog houes face and fuselage face
|
Details
|
|
|
11-24-2013
|
3.00
|
1 bid on dog house and fuselage face's
|
Details
|
|
|
11-23-2013
|
4.00
|
Sand and prime doors again.
|
Details
|
|
|
11-22-2013
|
1.50
|
Fill the under side gap.
|
Details
|
|
|
11-20-2013
|
3.50
|
Cut and prep tabs for nut plates and then install
|
Details
|
|
|
11-17-2013
|
1.50
|
Cut backing boards off and remove Canard for clean
|
Details
|
|
|
11-16-2013
|
4.00
|
Make front and back fusalage Canard tabs
|
Details
|
|
|
11-15-2013
|
1.00
|
Dog house is off
|
Details
|
|
|
11-14-2013
|
3.50
|
Lay - up the dog house
|
Details
|
|
|
11-11-2013
|
3.00
|
Fit dog house for TRIAX lup-ups
|
Details
|
|
|
11-10-2013
|
2.00
|
Structurally resin in the hard point to the bulk h
|
Details
|
|
|
11-10-2013
|
1.00
|
Remove foam from dog house
|
Details
|
|
|
11-09-2013
|
4.00
|
Drill holes in bulk head for attachment points.
|
Details
|
|
|
11-05-2013
|
1.00
|
Fit Canard
|
Details
|
|
|
11-04-2013
|
1.00
|
Time to fit the canard onto the fuselage
|
Details
|
|
|
10-27-2013
|
0.50
|
Peel-ply added
|
Details
|
|
|
10-27-2013
|
4.50
|
Canard Attachment Reinforcment
|
Details
|
|
|
10-20-2013
|
4.00
|
Prime doors and NACA scoop
|
Details
|
|
|
10-10-2013
|
0.00
|
This shower installation has taken from the build
|
Details
|
|
|
07-12-2013
|
0.00
|
Other planes
|
Details
|
|
|
07-11-2013
|
0.00
|
Arlington Air Show
|
Details
|
|
|
06-30-2013
|
0.00
|
Car is back together and ready to go home to Victo
|
Details
|
|
|
06-28-2013
|
0.00
|
Time to paint the fenders and runners
|
Details
|
|
|
06-27-2013
|
0.00
|
Time for Dad to spray the Car
|
Details
|
|
|
06-25-2013
|
0.00
|
Cameron working long hours on his Car
|
Details
|
|
|
06-16-2013
|
0.00
|
Strip down Acura Integra for paint
|
Details
|
|
|
06-11-2013
|
2.00
|
Fresh air water drain tubes.
|
Details
|
|
|
06-06-2013
|
1.50
|
Rivet in overhead fresh air
|
Details
|
|
|
06-05-2013
|
1.00
|
Pushed in switches and bolted in place.
|
Details
|
|
|
06-01-2013
|
2.50
|
Floxed in over head fresh air .
|
Details
|
|
|
06-01-2013
|
1.50
|
Cut panel for swiches
|
Details
|
|
|
05-31-2013
|
1.50
|
Ran wire for over head lights
|
Details
|
|
|
05-30-2013
|
3.00
|
Removed fuselage over light swiches
|
Details
|
|
|
05-26-2013
|
2.00
|
Bondo for air vents
|
Details
|
|
|
05-22-2013
|
1.00
|
Swiches to make things brighter
|
Details
|
|
|
05-21-2013
|
3.50
|
Overhead fresh air and lights
|
Details
|
|
|
05-20-2013
|
1.50
|
Tap seat belt hard points
|
Details
|
|
|
05-20-2013
|
1.00
|
Fit aluminum carpet stip in place.
|
Details
|
|
|
05-18-2013
|
4.00
|
Glass up kick plate foam
|
Details
|
|
|
05-18-2013
|
2.00
|
Dowels for kick plate aluminum strip.
|
Details
|
|
|
05-12-2013
|
1.75
|
Foam for door kick plate
|
Details
|
|
|
05-11-2013
|
3.50
|
Milled fiber in hard points with 3 bid
|
Details
|
|
|
05-09-2013
|
2.50
|
Prep hard points for seat belts
|
Details
|
|
|
05-05-2013
|
4.00
|
Move tubing to out side of keel for cable
|
Details
|
|
|
05-05-2013
|
3.00
|
Intalled fuel shut off cable
|
Details
|
|
|
05-03-2013
|
4.00
|
Fit fuel shut off holder in place
|
Details
|
|
|
04-30-2013
|
3.50
|
Time to make fuel knob holder
|
Details
|
|
|
04-28-2013
|
4.50
|
Tubing was installed for fuel shut off cable.
|
Details
|
|
|
04-27-2013
|
4.50
|
Sump tank go back in
|
Details
|
|
|
04-14-2013
|
4.00
|
TRIAX Mid engine mount
|
Details
|
|
|
04-07-2013
|
4.00
|
TRIAX for engine mount
|
Details
|
|
|
04-05-2013
|
1.00
|
Working on the fuel venting
|
Details
|
|
|
04-05-2013
|
4.00
|
Fuel line work
|
Details
|
|
|
04-04-2013
|
2.00
|
Work on back seats
|
Details
|
|
|
03-31-2013
|
0.00
|
Heading North
|
Details
|
|
|
03-27-2013
|
0.00
|
New Mexico is a great place to visit
|
Details
|
|
|
03-26-2013
|
0.00
|
Phoenix Arizona area
|
Details
|
|
|
03-14-2013
|
0.00
|
Bryson Canyon, Grand Canyon
|
Details
|
|
|
03-10-2013
|
1.50
|
Drilled back seat rail
|
Details
|
|
|
03-10-2013
|
2.50
|
Bolts for front seat
|
Details
|
|
|
03-10-2013
|
3.50
|
Back seat hard points
|
Details
|
|
|
03-09-2013
|
1.00
|
Installed the pilot seat
|
Details
|
|
|
03-09-2013
|
4.00
|
Installed side plates for seats
|
Details
|
|
|
03-08-2013
|
2.50
|
Sand and apply top coat
|
Details
|
|
|
03-03-2013
|
4.00
|
Fuel and vent lines
|
Details
|
|
|
03-02-2013
|
4.00
|
Vent lines
|
Details
|
|
|
03-01-2013
|
2.00
|
Sunp tank instllation
|
Details
|
|
|
02-26-2013
|
2.50
|
Cut for weather strip
|
Details
|
|
|
02-24-2013
|
2.00
|
Canard needs some work
|
Details
|
|
|
02-23-2013
|
5.00
|
Fill Latch pin tube area
|
Details
|
|
|
02-19-2013
|
1.50
|
More door work
|
Details
|
|
|
02-18-2013
|
1.50
|
Fitting the fuselage to the door
|
Details
|
|
|
02-17-2013
|
3.50
|
Working on overhead fresh air duct
|
Details
|
|
|
02-17-2013
|
3.50
|
Over Head fresh air duct
|
Details
|
|
|
02-17-2013
|
2.50
|
Door cut out re-sizing for even spacing.
|
Details
|
|
|
02-16-2013
|
2.50
|
Fill and sand door hinge tabs
|
Details
|
|
|
02-15-2013
|
2.50
|
Time to set up level for door springs
|
Details
|
|
|
02-14-2013
|
2.50
|
Install door gas springs
|
Details
|
|
|
02-12-2013
|
4.00
|
Bid in over head swich panle and work on handles
|
Details
|
|
|
02-11-2013
|
5.00
|
Over head switch panel
|
Details
|
|
|
02-08-2013
|
2.00
|
2 bid on door spring hard pionts
|
Details
|
|
|
02-07-2013
|
2.50
|
Hold handles need some filling
|
Details
|
|
|
02-06-2013
|
1.50
|
Fill and sand hinge areas
|
Details
|
|
|
02-05-2013
|
2.50
|
Installed the hard points for the door spring
|
Details
|
|
|
02-04-2013
|
1.50
|
Hard points for door spring
|
Details
|
|
|
02-03-2013
|
1.50
|
Hinge pockets
|
Details
|
|
|
02-03-2013
|
5.00
|
2 bid in the cabon beams
|
Details
|
|
|
02-02-2013
|
4.00
|
Sand beams for lay-ups
|
Details
|
|
|
02-01-2013
|
2.50
|
Clean up shop
|
Details
|
|
|
01-31-2013
|
3.50
|
Install front carbon beams
|
Details
|
|
|
01-30-2013
|
2.50
|
Fit front carbon beams
|
Details
|
|
|
01-29-2013
|
2.00
|
Installed center section of the Carbon Beam
|
Details
|
|
|
01-28-2013
|
3.50
|
Carbon Beams installed
|
Details
|
|
|
01-27-2013
|
3.00
|
Inside the fuselage at hinge area.
|
Details
|
|
|
01-27-2013
|
2.50
|
Fit and install hard pionts in beam.
|
Details
|
|
|
01-26-2013
|
1.50
|
Tabs for sump tank
|
Details
|
|
|
01-26-2013
|
2.00
|
Bid on open face of fuselage hinge area
|
Details
|
|
|
01-25-2013
|
1.50
|
Worked on door hinge area
|
Details
|
|
|
01-25-2013
|
1.50
|
More resin on header tank
|
Details
|
|
|
01-25-2013
|
0.50
|
Heat up door one more time
|
Details
|
|
|
01-24-2013
|
1.50
|
Last fuselage door receiver tube
|
Details
|
|
|
01-23-2013
|
1.50
|
Fix door tube
|
Details
|
|
|
01-22-2013
|
1.00
|
Time to cut bid
|
Details
|
|
|
01-22-2013
|
2.00
|
Pilot door receivers
|
Details
|
|
|
01-21-2013
|
2.00
|
Install lach pin tubes in fueslage
|
Details
|
|
|
01-20-2013
|
1.50
|
Heat door to fit
|
Details
|
|
|
01-20-2013
|
3.00
|
Door locking rods
|
Details
|
|
|
01-20-2013
|
2.00
|
Door lock
|
Details
|
|
|
01-19-2013
|
1.00
|
Sump tank lid
|
Details
|
|
|
01-17-2013
|
1.50
|
Receiver tubes for the fuselage
|
Details
|
|
|
01-17-2013
|
2.50
|
Hard points for fuel inlets
|
Details
|
|
|
01-15-2013
|
1.50
|
Sump tank prep
|
Details
|
|
|
01-15-2013
|
1.50
|
Door guide for rod
|
Details
|
|
|
01-12-2013
|
3.50
|
Nose gear guides
|
Details
|
|
|
01-11-2013
|
2.00
|
Fill and sand the door.
|
Details
|
|
|
01-10-2013
|
1.00
|
Lock mechanism
|
Details
|
|
|
01-06-2013
|
3.00
|
Time to work on the latching system
|
Details
|
|
|
01-05-2013
|
3.00
|
Time to heat the doors to fit
|
Details
|
|
|
01-01-2013
|
2.00
|
More heater work
|
Details
|
|
|
12-29-2012
|
3.00
|
Time to finish the heater to the cabin
|
Details
|
|
|
12-28-2012
|
3.50
|
Heater cable time
|
Details
|
|
|
12-27-2012
|
1.50
|
Sanded heater/cooler out flow
|
Details
|
|
|
12-26-2012
|
2.00
|
Hinge beds on fuselage
|
Details
|
|
|
12-25-2012
|
1.50
|
TRIAX and bid on top of hinge tabs
|
Details
|
|
|
12-24-2012
|
3.00
|
Time to hang the doors
|
Details
|
|
|
12-24-2012
|
3.00
|
Oil lines get a place to be
|
Details
|
|
|
12-23-2012
|
4.00
|
Sanded doors for 3 bid lay-up Then did lay-up
|
Details
|
|
|
12-23-2012
|
1.50
|
Jack Brace was here to help !!!!
|
Details
|
|
|
12-20-2012
|
3.00
|
Close in door hinge pieces
|
Details
|
|
|
12-18-2012
|
3.00
|
Heater/Cooler work
|
Details
|
|
|
12-16-2012
|
1.00
|
More door work.
|
Details
|
|
|
12-16-2012
|
1.50
|
Heater duct gets 1 bid lay-up
|
Details
|
|
|
12-15-2012
|
1.00
|
Heat shrinked oil lines.
|
Details
|
|
|
12-15-2012
|
3.00
|
Bolted on heater and lay-upped the out flow
|
Details
|
|
|
12-15-2012
|
1.00
|
2 bid on head lamp
|
Details
|
|
|
12-15-2012
|
0.50
|
2 bib on doors
|
Details
|
|
|
12-10-2012
|
1.00
|
Sand and attached foam
|
Details
|
|
|
12-10-2012
|
1.00
|
Glued on pilot hinge
|
Details
|
|
|
12-09-2012
|
1.50
|
Refit out-let ducting
|
Details
|
|
|
12-09-2012
|
1.00
|
Glue on hinge
|
Details
|
|
|
12-09-2012
|
2.50
|
Cut fuselage for hinges
|
Details
|
|
|
12-08-2012
|
2.00
|
Hinge pionts attached
|
Details
|
|
|
12-08-2012
|
1.50
|
Heater tubes for cabin
|
Details
|
|
|
12-08-2012
|
1.50
|
Floxed in bed for weather stripping
|
Details
|
|
|
12-07-2012
|
1.00
|
Sanded cabin heater intake
|
Details
|
|
|
12-04-2012
|
2.50
|
More work on heater
|
Details
|
|
|
12-04-2012
|
1.00
|
Hinge lay-up
|
Details
|
|
|
12-02-2012
|
3.50
|
More heater work
|
Details
|
|
|
12-01-2012
|
3.50
|
Sand the NACA scoop for the engine cooling
|
Details
|
|
|
11-30-2012
|
3.50
|
Bid in Heater/cooler scoop
|
Details
|
|
|
11-29-2012
|
2.50
|
Nose Mounted Cooler
|
Details
|
|
|
11-27-2012
|
3.50
|
Hinge placement
|
Details
|
|
|
11-23-2012
|
0.00
|
Skiing at Sun Peaks
|
Details
|
|
|
11-19-2012
|
1.50
|
Sand the filler on the NACA scoop
|
Details
|
|
|
11-19-2012
|
0.50
|
Sand filler on main legs
|
Details
|
|
|
11-19-2012
|
1.50
|
Finished door opening
|
Details
|
|
|
11-17-2012
|
3.50
|
Fuselagde door hole treatment
|
Details
|
|
|
11-16-2012
|
2.00
|
Door weather strip prep.
|
Details
|
|
|
11-15-2012
|
3.00
|
NACA Scoop has 2 bid on top
|
Details
|
|
|
11-14-2012
|
1.00
|
Trim nose wheel gides
|
Details
|
|
|
11-13-2012
|
4.00
|
Molding TRIAX in place
|
Details
|
|
|
11-10-2012
|
2.00
|
Install brake line sheild
|
Details
|
|
|
11-09-2012
|
3.00
|
NACA Scoop has 2 bib in place
|
Details
|
|
|
11-06-2012
|
4.00
|
In stalled NACA scoop
|
Details
|
|
|
11-04-2012
|
1.50
|
NACA scoop
|
Details
|
|
|
11-04-2012
|
3.00
|
Gear sockets
|
Details
|
|
|
11-01-2012
|
3.00
|
Door cut out
|
Details
|
|
|
10-31-2012
|
1.50
|
Speed brake
|
Details
|
|
|
10-30-2012
|
3.00
|
Cut away back out side landing gear doors
|
Details
|
|
|
10-29-2012
|
1.00
|
Nose gear doors
|
Details
|
|
|
10-26-2012
|
3.00
|
Nose wheel back together
|
Details
|
|
|
10-18-2012
|
1.00
|
Axle holes
|
Details
|
|
|
10-16-2012
|
4.00
|
Tire mounting
|
Details
|
|
|
09-27-2012
|
6.00
|
Plane was placed into shop
|
Details
|
|
|
09-25-2012
|
10.00
|
Resin hot cabinet
|
Details
|
|
|
03-23-2012
|
20.00
|
Picked up the Kit
|
Details
|
|
|
03-15-2012
|
0.00
|
A place to work is good
|
Details
|
|