KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
Work Logs Found: 847
Category Work Time: 2528 Hours
 Date
Hours
Work Log Summary

Details

 03-11-2024
4.00
ZOLATON PAINT APOLLO GRAY to replace the vinyl
Details
       

 03-10-2024
2.00
Painted front landing gear and touch up.
Details
     

 03-08-2024
4.00
Back brakes are done.
Details
       

 03-07-2024
2.00
Lines are down to the calibers
Details
       

 03-02-2024
4.00
Finally getting to doing the brakes.
Details
       

 02-19-2024
4.00
Main gear axles and brakes.
Details
       

 02-15-2024
4.00
Remove vinyl and prime interior.
Details
       

 02-08-2024
5.00
Installed main landing gear.
Details
       

 02-04-2024
6.00
Paint main landing grear.
Details
       

 04-26-2020
4.00
Install door panels and key lock.
Details
       

 04-25-2020
4.00
Door locking rods and assembly.
Details
       

 04-19-2020
2.00
Sand primer and paint doors
Details
       

 04-17-2020
3.00
Doors are ready for Smooth prime.
Details
     

 04-12-2020
4.00
Fill and Sand on doors
Details
       

 04-26-2019
3.00
Window trim in the making.
Details
       

 04-25-2019
1.00
Sand able micro around windows with peel-ply
Details
       

 04-24-2019
3.00
Pilot side door window installation.
Details
       

 04-21-2019
4.00
Prep for window and glue in place.
Details
       

 04-20-2019
3.00
Installing windows in doors
Details
       

 04-17-2019
3.00
Static port made and installed.
Details
     

 04-16-2019
2.00
Made side panels to cover cables and wires.
Details
     

 04-15-2019
3.00
Door panels got vinyl.
Details
       

 03-22-2019
4.00
Pitot tube was installed with structural T88 resin
Details
       

 03-13-2019
4.00
I finished the vinyl and installed the vanity pane
Details
     

 03-12-2019
4.00
All the vanity pieces are done and ready to go in.
Details
       

 03-10-2019
1.00
Worked on installing the Pitot tube.
Details
     

 03-09-2019
4.00
Armrest had the USB’s installed.
Details
       

 03-08-2019
3.00
Painted window trim and touch up in the fuselage.
Details
       

 03-07-2019
6.00
More vinyl on the fuselage sides.
Details
       

 03-06-2019
8.00
Armrest done and fuselage side gets vinyl.
Details
       

 03-05-2019
1.00
Pitot tube showed up and it will work perfectly
Details
     

 03-04-2019
5.00
Vinyl on vanity panel and prep fuselage
Details
       

 03-03-2019
2.00
It was time to clean the resin dispenser.
Details
     

 03-01-2019
10.00
Vinyl on Pilot side strake baggage area done.
Details
       

 02-26-2019
4.00
Sanded and primed armrest. Vinyl on strake baggage
Details
       

 02-25-2019
7.00
Trim box finished. Headliner was installed.
Details
       

 02-25-2019
0.00
Interior paint on trim box.
Details
     

 02-24-2019
5.00
Trim box has primer and armrest in place for flang
Details
       

 02-21-2019
3.00
Template for arm rest, cardboard was used to form
Details
       

 02-20-2019
3.00
Trim box trimmed and 2 bids on it for mounting fla
Details
       

 02-19-2019
5.00
The push pull cables were finally attached to the
Details
       

 02-18-2019
2.00
Time to make a box for the roll trim motor.
Details
       

 02-18-2019
2.00
Installed the low fuel warning sensor in the heade
Details
     

 02-17-2019
5.00
Fuel probes get wired in.
Details
       

 02-16-2019
5.00
Alternator and regulator wiring
Details
       

 02-08-2019
4.00
More wiring done on the plane.
Details
       

 02-07-2019
2.00
Sanded, painted and clear coated instrument panel
Details
     

 02-04-2019
4.00
Working on the electrical system.
Details
       

 02-01-2019
4.00
Sand fill and prime
Details
       

 06-24-2018
2.00
Rudder are stop.
Details
       

 06-21-2018
2.00
Finish working on the rudder cable system.
Details
     

 06-20-2018
6.00
Rigging the roll system to operate the ailerons.
Details
       

 06-19-2018
8.00
Heat protection done. Cable wheels in place.
Details
       

 06-18-2018
2.00
Out flow cowling work.
Details
     

 05-31-2018
6.00
Worked on cowling. Prime, sand and fill 4 bids on
Details
       

 05-09-2018
3.00
Sand and gap on cowlings
Details
       

 04-26-2018
3.00
Rivet on hinges to lower cowling.
Details
       

 04-24-2018
1.00
Sand upper cowling.
Details
       

 04-19-2018
1.00
Micro on upper cowling
       

 04-18-2018
2.00
3 bids on lower wing for cowling hinge
Details
       

 04-17-2018
2.00
Heat cowling to fit hinges.
Details
       

 04-16-2018
3.00
Bus bar for fire wall side.
Details
       

 04-15-2018
3.00
Mount hinges to cowling and wing flange.
Details
       

 04-14-2018
2.00
Upper and lower cowling hinge.
Details
     

 04-13-2018
4.00
3 bids on wing for hinges to mount too.
Details
       

 04-12-2018
2.00
Micro on strake was sanded gapped and primed.
Details
       

 04-11-2018
2.00
Fill in lower cowling gap.
Details
       

 04-10-2018
3.00
Cowling is ready to be joined.
Details
       

 04-08-2018
2.00
Added micro to sanded areas on the strake and wing
Details
     

 04-07-2018
4.00
Gap wing and cut cowling for fitting.
Details
       

 03-29-2018
4.00
Co-pilot wing cut out on cowling
Details
       

 03-26-2018
3.00
Wired in jumper and charger wires from the out sid
Details
       

 03-24-2018
2.00
Worked on the shifter boot for the stick.
Details
     

 03-23-2018
4.00
Wire in starter relay and starter.
Details
       

 03-15-2018
6.00
Working on wiring in battery and main power.
Details
       

 03-15-2018
0.00
More on the wire work.
Details
       

 03-13-2018
8.00
Running more wire for defrost and power bars.
Details
       

 03-05-2018
4.00
Finished defrost on glare shield.
Details
       

 03-01-2018
4.00
Made power bar for positive and negative.
Details
       

 02-27-2018
3.00
Defrost out lets for glare shield.
Details
       

 02-25-2018
2.00
3 bids lay-up for stick and rod to elevators boots
Details
       

 02-22-2018
4.00
Made landing rear switch panel
Details
     

 02-20-2018
3.00
Had to move avionics tray.
Details
       

 02-15-2018
3.00
Remove wing and move fuselage in shop.
Details
       

 02-13-2018
8.00
Worked on getting the rudder on the Pilot side.
Details
       

 02-13-2018
0.00
Clean up mess and make petal stop.
Details
       

 02-12-2018
5.00
I gaped parts for paint.
Details
       

 02-07-2018
4.00
Wiring the overhead lights and switches in.
Details
       

 02-06-2018
3.00
Overhead air vents installed.
Details
     

 02-01-2018
6.00
Rudder cable pulleys installation.
Details
       

 01-25-2018
0.00
Aileron torque tube.
Details
       

 01-25-2018
6.00
Aileron torque tube installation.
Details
       

 01-22-2018
4.00
Stainless was cut and riveted into place.
Details
     

 12-07-2017
2.00
Time to work on the rudder cables.
Details
       

 12-05-2017
2.00
Sand the filler one more time thrn spray primer.
Details
       

 11-29-2017
8.00
Fill and sand over days to get to primer.
Details
       

 11-27-2017
2.00
2 bids on outside cowling center section.
Details
     

 11-24-2017
2.00
Work on center cowling to fit bottom and top
Details
       

 11-23-2017
2.00
Hinges at end of cowling.
Details
       

 11-21-2017
1.00
The heat lights to the rescue.
Details
     

 11-21-2017
2.00
Sand and fill. Ready for primer.
Details
       

 11-19-2017
3.00
Installed cowling and gapped for clearance.
Details
       

 11-19-2017
1.00
Fill and sand on cowling
Details
     

 11-17-2017
1.00
Tig welded hinge pins to handle
Details
     

 11-16-2017
3.00
Sand and fill on wings to strake
Details
       

 11-13-2017
5.00
Upper and lower wing hinges installed on flange an
Details
       

 11-13-2017
2.00
Hing for upper and lower cowling
Details
       

 11-12-2017
3.00
Blending the strake to the wing. Sand and fill.
Details
       

 11-12-2017
3.00
3 bids on upper wing for cowling hinge.
Details
       

 11-09-2017
2.00
Cut cowling and 1 bids on outside
Details
       

 11-08-2017
2.00
Bid the bottom to the top cowling
Details
       

 11-05-2017
3.00
3 bids onto bottom wing for cowling to attach too.
Details
       

 10-28-2017
2.00
Reinstall Nose gear guides
Details
       

 10-28-2017
2.00
Add cut peace back onto cowling.
Details
       

 09-10-2017
3.00
Gapping wing to strake
Details
       

 07-05-2017
4.00
Fit wing to cowling for cutting.
Details
     

 06-04-2017
6.00
Paint some of the interior.
Details
       

 06-01-2017
3.00
Made covers for door micro switches.
Details
       

 05-25-2017
2.00
Prep and paint canard bulk head.
Details
       

 05-25-2017
6.00
Install park brake block and handle.
Details
       

 05-18-2017
3.00
Work on installing nose gear micro switch
Details
       

 05-16-2017
2.00
Move recirculation fan bracket
Details
       

 05-07-2017
6.00
Install micro switch for throttle (gear up warning
Details
       

 04-20-2017
1.00
Wire from nose gear micro switch
Details
     

 04-20-2017
5.00
Install micro switches on nose and main gear
Details
       

 04-18-2017
5.00
Worked on securing cables and finished alternate a
Details
       

 04-13-2017
5.00
I worked on the governor today.
Details
       

 04-12-2017
4.00
Governor was put into place and making bracket for
Details
       

 04-11-2017
3.00
Mounted throttle and mixture cables.
Details
       

 04-10-2017
3.00
Mounts to hold the throttle and mixture cables.
Details
       

 04-10-2017
2.00
Finish fuel lines with Tees and fire shield
Details
       

 04-10-2017
3.00
Cover plates for bolt holes or access holes.
Details
       

 04-09-2017
2.00
Latch mounting for oil cowling door.
Details
       

 04-07-2017
3.00
Run and mount Tee handle for alternate air source
Details
     

 03-31-2017
4.00
Worked on defrost, alternate air and interior
Details
       

 03-30-2017
2.00
Worked on alternate air source
Details
     

 03-29-2017
5.00
Made plate for Throttle, Mixture, Prop for cable c
Details
       

 03-26-2017
2.00
Prep for throat, mixture and propeller cables at i
Details
       

 03-19-2017
4.00
Trim duct and made a new one for other side
Details
       

 03-18-2017
5.00
Working on defrost for glare shield.
       

 03-17-2017
3.00
Trim on fuel hatch door. Remove handle bases
Details
       

 03-17-2017
2.00
Micro bottom of doors to get ready for paint.
       

 03-16-2017
2.00
Worked on oil hatch door.
Details
     

 03-15-2017
5.00
Made alternate air source for fuel servo.
Details
       

 03-14-2017
3.00
Worked on the oil access door today.
Details
       

 03-13-2017
4.00
Worked on cabin air return
Details
       

 03-12-2017
4.00
Worked on cabin heat system.
Details
       

 03-11-2017
1.00
Structurally glued the front Naca door tab on
Details
     

 03-11-2017
5.00
More fuel line work and heat shield for back cylin
Details
       

 03-10-2017
2.00
Worked on Naca door
Details
       

 03-10-2017
2.00
Worked on fuel lines from servo to spider
Details
       

 03-09-2017
3.00
Made naca door @ oil cooler.
Details
       

 03-08-2017
4.00
Fill and sand pinholes and primer.
Details
       

 03-07-2017
3.00
Glassed in air return duct for oil cooler
Details
       

 03-06-2017
2.00
More work on cabin air return through oil cooler
Details
       

 03-06-2017
3.00
Fill and sand with another shot of K2 primer.
Details
       

 03-05-2017
5.00
Sand and fill on lower cowling. Exhaust tubes.
Details
       

 03-05-2017
3.00
Anchor nuts for winter cover mounted.
Details
       

 03-03-2017
3.00
Worked on cabin return air
Details
       

 03-02-2017
4.00
Sand and prime lower cowling
Details
       

 03-01-2017
4.00
Making cabin return air fir heater
Details
       

 02-28-2017
4.00
Time to sand the micro that was on the cowling.
Details
       

 02-27-2017
4.00
Time to micro the exhaust tubes on the cowling.
Details
       

 02-26-2017
4.00
More fuel line work on plane
Details
       

 02-25-2017
3.00
Clean up & 2 bid on inside of cowling for exhaust
Details
       

 02-24-2017
2.00
Installed alternator and fuel servo line bumbs.
Details
     

 02-23-2017
8.00
Fitted exhaust cowling tubes for exhaust pips.
Details
       

 02-22-2017
4.00
Had to make room for alternator and made 4” tube
Details
       

 02-21-2017
4.00
Cut cowling for exhaust and made 4” tube.
Details
       

 02-20-2017
4.00
Fuel servo, fuel lines, and cowling cutouts
Details
       

 02-15-2017
2.00
Ran more fuel lines.
Details
       

 02-15-2017
1.00
Finished mounting the back panels with all the scr
Details
     

 02-03-2017
4.00
Oil lines, fuel fiitings Throttle, mixture, govern
Details
       

 02-01-2017
4.00
Tabs, anchor nuts, and mount panel. 3 bid on holes
Details
       

 01-31-2017
4.00
Clean up edges and add aluminum tabs
Details
       

 01-30-2017
4.00
Trim and add 1 bid on all the sides of the panel p
Details
       

 01-27-2017
5.00
Anchor nuts and 3 bids on vertical panel
Details
       

 01-26-2017
6.00
Fit vertical back panel and anchor nuts
Details
       

 01-25-2017
7.00
Clean up peaces, make and flox in mounting bracket
Details
       

 01-24-2017
6.00
Glass vertical sides and load brace for luggage sh
Details
       

 01-23-2017
5.00
Glass in Vanity side panels
Details
       

 01-22-2017
4.00
Working on sides to back Vanity panel
Details
       

 01-20-2017
3.00
Glassed in back rear cover panel bottom (Vanity)
Details
     

 01-19-2017
3.00
Work on the bottom part of the back cover panel
Details
       

 01-18-2017
3.00
Run more fuel lines
Details
       

 01-17-2017
4.00
Modified exhaust manifold to fit plane.
Details
       

 01-17-2017
1.00
Lay-up on rear cover panel items
Details
     

 01-16-2017
2.00
Bid on foam for rear cover panel
Details
     

 01-14-2017
4.00
Trim, sand, drill, and mount window frames.
Details
       

 01-13-2017
2.00
Mount door micro switches and spring pin actuator
Details
       

 01-11-2017
4.00
Install door open micro switch
Details
       

 01-10-2017
6.00
Made window frames with 4 bids of fiber glass
Details
       

 01-05-2017
1.00
Install welding receptacles for charging and jumpi
Details
     

 01-04-2017
1.00
Working on window frames
Details
       

 01-04-2017
6.00
Running fuel lines and ordering fittings and stuff
Details
     

 01-03-2017
2.00
Welding plugs for external charging and jumping.
Details
       

 01-02-2017
2.00
Installed fuel boost pump regulator
Details
       

 01-01-2017
5.00
Installed gascolator, fuel filter and fuel pump to
Details
       

 12-29-2016
2.00
Painted the back and front sliding seat rails.
Details
       

 12-22-2016
4.00
Install back seats and clean up
Details
       

 12-21-2016
4.00
Clean up and 2 bids on hard pionts for back seats
Details
       

 12-20-2016
1.00
Flanged for oil cooler installed, Scat added.
Details
     

 12-19-2016
4.00
Moved hard points for back seats
Details
       

 12-18-2016
3.00
Back seat slide rails were mounted to seats
Details
       

 12-16-2016
3.00
Cut and weld back seat rails for height
Details
       

 12-15-2016
3.00
Co-Pilot seat in place now
Details
       

 12-13-2016
3.00
Pilot seat in place.
Details
       

 12-08-2016
1.00
Scat was installed for air intake
Details
     

 12-08-2016
2.00
2 bid on Co-Piot seat hard pionts
Details
     

 12-07-2016
4.00
Installing the Co-pilot side seat hard points and
Details
       

 11-28-2016
6.00
Work on installing seats
Details
       

 11-27-2016
2.00
Remove Pilot side kick plate
Details
       

 11-27-2016
6.00
Make and install oil cooler shroud and radiator
Details
       

 11-26-2016
2.00
2 bid on hard pionts
Details
       

 11-25-2016
3.00
Hard pionts going in.
Details
       

 11-24-2016
1.00
Seat mounting slides need work
Details
       

 11-24-2016
1.00
Install my new seats after changing stuff.
Details
       

 11-24-2016
2.00
Hard points need to be sunken to level seats.
Details
       

 11-23-2016
2.00
Smooth prime landing gear doors and fuselage area.
Details
       

 11-23-2016
2.00
Install fuel servo (carburetor)
Details
     

 11-22-2016
2.00
Sand and fill on fuselage and main gear doors.
Details
       

 11-22-2016
2.00
Finish the install on the avionics shelf.
Details
     

 11-22-2016
2.00
Extend heat shield on landing gear booties.
Details
       

 11-21-2016
4.00
Work on installing seats
Details
       

 11-21-2016
3.00
Sand and prime main grear leg doors and fuselage
Details
       

 11-21-2016
3.00
Installed avionics shelf.
Details
       

 11-20-2016
3.00
Bent avionics shelf and triax ends to hold up.
Details
     

 11-18-2016
2.00
Fill in at grear leg doors
Details
       

 11-18-2016
2.00
Avionics shelf ready for bending
Details
     

 11-17-2016
5.00
Coffee can air-filter in new spot
Details
       

 11-16-2016
3.00
Coffee can air filter work & retracts
Details
       

 11-15-2016
5.00
More work on coffee air cleaner can
Details
       

 11-14-2016
3.00
Making coffee can air filter can
Details
       

 11-11-2016
3.00
Cleaned up side flange and make air cleaner flange
Details
       

 11-03-2016
2.00
Staring to make the air cleaner can
Details
       

 11-02-2016
2.00
Fine tuning on glare shield
Details
     

 11-01-2016
2.00
Tie down hard pionts
Details
       

 10-31-2016
3.00
Instrument glare shield attachment
Details
       

 10-28-2016
2.00
Nut plates for bootie bump cover
Details
       

 10-26-2016
3.00
Pinhole hunting and then prime
Details
       

 10-25-2016
3.00
Sand and spray sealer on
Details
       

 10-25-2016
3.00
Instrument panel adjusting
Details
       

 10-24-2016
4.00
Fill and sand on gear leg bumps
Details
       

 10-18-2016
5.00
Worked on cutting bottom of doors and glass work
Details
       

 10-14-2016
4.00
Bracket and sanded gap on landing gear doors
Details
       

 10-13-2016
6.00
Brackets for main gear doors
Details
       

 10-07-2016
5.00
Work on fitting Co-Pilot retract door
Details
       

 10-06-2016
5.00
Sanded brackets and sized doors to fit fuselage.
Details
       

 10-05-2016
5.00
Worked on spindles, brackets, foam reinforcement o
Details
       

 10-04-2016
5.00
Boxed in over gear leg and behind leg socket.
Details
       

 09-30-2016
2.00
More bid work in the gear leg socket area.
Details
       

 09-27-2016
2.00
Glass in gear leg sockets
Details
       

 07-26-2016
5.00
Get fuselage ready for leg sockets
Details
       

 07-22-2016
2.00
Sand, assemble and paint air box with truck liner
Details
     

 07-14-2016
2.00
Flange was cured and now to trim and bolt on
Details
       

 07-13-2016
2.00
Work on the oil filler access trough plenum
Details
       

 07-11-2016
3.00
Bolt on baffles to stop air from escaping
Details
       

 07-06-2016
4.00
More work on air plenum
Details
       

 06-28-2016
4.00
Riveted nut plates on, trimmed plug caps, and prim
Details
       

 06-27-2016
3.00
Drill and fit caps over spark plug holes
Details
       

 06-26-2016
4.00
Sand & prime main grear. 3" spark plug holes made.
Details
       

 06-24-2016
4.00
Clean up bid, sand micro and add, sand fill prime
Details
       

 06-23-2016
3.00
Trimmed glass, added to ends to stiffen, micro on
Details
       

 06-20-2016
3.00
Glass inside of air box
Details
       

 06-19-2016
5.00
Worked on plenum opening for air flow
Details
       

 06-18-2016
6.00
Worked on intake to air box (plenum)
Details
       

 06-14-2016
5.00
Work on air box and NACA runners
Details
       

 05-23-2016
5.00
Worked on air plenum
Details
       

 05-22-2016
1.00
Micro on the main gear legs
Details
     

 05-22-2016
3.00
Lay-up triax and now fitting to top of air plenum
Details
     

 05-21-2016
5.00
Worked on Cleveland brakes and make axel support b
Details
       

 05-19-2016
2.00
New leg sockets had to be made.
Details
       

 05-17-2016
4.00
Finish box and fit air plenum to cowling
Details
       

 05-01-2016
5.00
Working on cooling plenum
Details
       

 03-20-2016
3.00
Cut and fit plenum over cylinder heads
Details
       

 03-15-2016
2.00
Glass up triax for plenum
Details
       

 03-10-2016
2.00
Cut triax for air plenum
Details
     

 03-03-2016
3.00
Making templates for cooling air plenum
Details
       

 02-29-2016
3.00
Cylinder head plenum prep 4 bid
Details
       

 02-28-2016
5.00
Header tank reinstalled, engine bolted on.
Details
       

 02-27-2016
3.00
NACA outlet to fire wall
Details
     

 02-22-2016
3.00
Engine mount back on engine
Details
       

 02-21-2016
10.00
Engine work and prep for mounting
Details
       

 02-16-2016
3.00
Triax added at bolt hole locations
Details
     

 02-13-2016
3.00
Bolt engine to fire wall
Details
       

 02-12-2016
3.00
Get engine out of crate and flox firewall stainles
Details
       

 02-04-2016
3.00
Cowling on and engine brought home from hanger
Details
       

 02-02-2016
4.00
Install fiberfrax and 1/16” stainless steel to fir
Details
       

 01-31-2016
2.00
Getting things ready for mounting the glare shield
Details
       

 01-31-2016
3.00
Floxed on lower cowling flange and clean up
Details
       

 01-30-2016
3.00
Lower cowling flange for no screws
Details
       

 01-29-2016
2.00
Floxed on cowling flange to firewall
Details
       

 01-28-2016
3.00
Cut bid and did a 3 bid lay-up for upper cowling
Details
       

 01-26-2016
3.00
Hang up canard, move plane, cleco cowling on.
Details
       

 01-25-2016
2.00
Reassemble elevators onto canard
Details
       

 01-24-2016
8.00
Sand, prime, fill, sand prime
Details
       

 01-21-2016
4.00
Sand on dog house and hatch, then fill at canard
Details
       

 01-19-2016
0.00
Cynthia and I went to Theory of a dead man in Trai
Details
       

 01-18-2016
3.00
More sand and fill on dog house and hatch
Details
       

 01-17-2016
2.00
Other side of back cover panel
Details
     

 01-17-2016
3.00
Dog housed sanded, micro on, front hatch filled
Details
       

 01-16-2016
2.00
Interior rear cover panel
Details
     

 01-16-2016
2.00
Filled in dog house low spots with micro
Details
     

 01-15-2016
2.00
Soldered eyelets on the ends of the rods
Details
     

 01-14-2016
5.00
Holding hinges for Dog house were installed
Details
       

 01-13-2016
2.00
Got some areas primed and built wing 4x4 jacks
Details
       

 01-12-2016
1.00
Trace out firewall stainless
Details
       

 01-12-2016
2.00
Elevator torque tube hole cleaning up and level
Details
       

 01-11-2016
2.00
Sand NACA funnels and make template for firewall s
Details
       

 01-11-2016
1.00
Fill and sand on elevator torque tube holes
Details
       

 01-10-2016
1.00
Worked on glare shield,1 bid on elevator tube hole
Details
     

 01-10-2016
2.00
Sand on fuselage in a few areas
Details
     

 01-10-2016
2.00
Removed NACA outflow funnels and trimmed
Details
     

 01-09-2016
2.00
More sanding and priming on the plane and panel
Details
       

 01-09-2016
2.00
Installed instrument panel
Details
       

 01-09-2016
2.00
3 bid on the foam from the NACA outlet
Details
       

 01-07-2016
2.00
Sand and fill on instrument panel and plane
Details
       

 01-07-2016
2.00
NACA plenum cooling part of engine
Details
       

 01-05-2016
1.00
More work on the dog house hinges
Details
     

 01-05-2016
1.00
Micro pinholes on instrument panel
Details
     

 01-05-2016
1.00
Engine cooling plenum chamber
Details
     

 01-03-2016
2.00
Sanded instrument panel and control surfaces then
Details
       

 01-03-2016
3.00
Sand level dog house area for hinges then cut free
Details
       

 01-02-2016
2.00
Sand and apply one more coat of micro
Details
       

 01-02-2016
1.00
Sand and add micro to panel
Details
     

 01-01-2016
4.00
Worked on filling gaps and dog house
Details
       

 12-31-2015
2.00
Cleaned up instrument panel and micro
Details
     

 12-30-2015
2.00
Filled in ends on instrument panel
Details
       

 12-27-2015
4.00
Modify instrument panel so it is 20 degrees and fa
Details
       

 12-26-2015
3.00
Clean up bid and sand clean
Details
       

 12-25-2015
2.00
One bid on elevator end and dog house bottom
Details
       

 12-24-2015
2.00
2 bid on inside of dog house @ canard.
Details
       

 12-22-2015
2.00
Dog house is to wide at canard and needs to come i
Details
       

 12-21-2015
2.00
Fitting dog house
Details
       

 12-19-2015
4.00
Clean up bid and fit over elevator torque tubes
Details
       

 12-17-2015
4.00
Fill in gap (hole) over elevator torque tube.
Details
       

 12-13-2015
8.00
Fit canard to plane, reinstall speed brake, work o
Details
       

 12-12-2015
6.00
Fit torque tubes into fuselage, install stick push
Details
       

 12-10-2015
3.00
Level elevators and drill weight holes. Set up pla
Details
       

 12-08-2015
4.00
Assembled elevators to canard
Details
       

 12-07-2015
2.00
Finish blocking and spray 4 coats of smooth prime
Details
       

 12-06-2015
5.00
Sand and fill to prime day on the Canard
Details
       

 12-05-2015
4.00
Sanded the 2 applications of micro, primed and fil
Details
       

 12-01-2015
1.00
Micro on the canard tips
Details
       

 12-01-2015
3.00
I got the trim actuator set up and bolted
Details
       

 11-30-2015
1.00
Trim base bolted up
Details
     

 11-30-2015
1.00
Glass in canard top tip
Details
       

 11-29-2015
6.00
Boxed in canard tip weight well and clean up
Details
       

 11-28-2015
1.00
Trim base
Details
       

 11-28-2015
3.00
Canard tip installation
Details
       

 11-26-2015
2.00
Weight wells and elevator end clean up
Details
       

 11-26-2015
1.00
Elevator trim base
Details
     

 11-24-2015
3.00
Weight wells and elevator ends
Details
       

 11-22-2015
4.00
Sand around hinge arms and install torque tubes
Details
       

 11-21-2015
2.00
Positioning torque / Counter weight Arm
Details
       

 11-20-2015
3.00
Micro in hinge arms tonight
Details
       

 11-19-2015
4.00
Hinge arm installation and set up
Details
       

 11-17-2015
2.00
Elevator hinge installation
Details
       

 11-16-2015
4.00
Hinge work from elevator to Canard
Details
       

 11-15-2015
3.00
Fill and sand then fill and sand then Smooth Prime
Details
       

 11-13-2015
1.00
Dave came over after work and moved my wings
Details
       

 11-12-2015
2.00
Prime canard and get wings ready to move out.
Details
       

 11-11-2015
4.00
Sand, prime, fill, sand Canard
Details
       

 11-09-2015
2.00
Micro on bottom of Canard
Details
       

 11-08-2015
4.00
Fill and prime day
Details
       

 11-07-2015
2.00
One bid on strake to wing at wing spar
Details
       

 11-07-2015
3.00
More of the fill and prime stuff
Details
       

 11-04-2015
1.00
Smooth Prime winglet bottoms and canard.
Details
       

 11-03-2015
4.00
Prime, sand , fill one more time
Details
       

 11-01-2015
2.00
Rudder return springs
Details
       

 11-01-2015
4.00
More sand and fill on winglets and canard
Details
       

 10-29-2015
2.00
Got some primer on and did some pinhole work
Details
       

 10-25-2015
7.00
Fill and sand with Spot-lite in low areas
Details
       

 10-19-2015
2.00
I met my goal tonight spraying primer
Details
       

 10-18-2015
6.00
More sanding on the wings and Canard
Details
       

 10-17-2015
4.00
More sanding and filling of the winglet bottom & C
Details
       

 10-15-2015
2.00
Sand and fill winglet bottom
Details
       

 10-13-2015
3.00
Sand and fill on Canard. Sand on bottom winglet.
Details
       

 10-12-2015
5.00
Sand and prime Canard. Fill winglet bottoms
Details
       

 10-10-2015
3.00
One bid over foam to increase strength and get rea
Details
     

 10-06-2015
2.00
Add foam to winlet bottom to match rudder width.
Details
       

 09-20-2015
3.00
Cut out winglet bottom for rudder and add micro
Details
       

 09-15-2015
2.00
Time to apply level coat of icing on canard
Details
       

 09-14-2015
2.00
Used heat gun to round front winglet bottom
Details
       

 09-13-2015
4.00
Ribs installed and winglet bottoms floxed on to wi
Details
       

 09-12-2015
2.00
Working on winglet bottom
Details
       

 09-11-2015
3.00
Sand, fill, sand, fill, on Canard
Details
       

 08-04-2015
3.00
Time to install the rudder horn.
Details
       

 08-02-2015
2.00
Nut platting rudder hinges
Details
       

 08-01-2015
4.00
Aileron fitting and installed the nut plates on hi
Details
       

 07-31-2015
2.00
Mounting rudders after hings cut outs
Details
       

 07-31-2015
3.00
More fitting on the ailerons
Details
       

 07-30-2015
2.00
Mounted the rudders hinges to the rudder with T88
Details
       

 07-29-2015
1.50
Rivet the hinges onto the ailerons
Details
       

 07-29-2015
1.50
Hang rudders and get hinges in place
Details
       

 07-28-2015
2.00
T88 structural with milled fiber and flox on hinge
Details
       

 07-27-2015
8.00
Wing prep for ailerons and hinges
Details
       

 07-21-2015
3.00
Sand all the wells and hand paint on primer. Bid w
Details
       

 07-19-2015
6.00
Block sand and fill to Smooth Prime
Details
       

 07-05-2015
6.00
More sanding and filling Primer was sprayed on
Details
       

 07-04-2015
4.00
Fill and sanding on the control surfaces
Details
       

 07-03-2015
3.00
Sanded the micro and primed the control surfaces
Details
       

 06-28-2015
2.00
Trim rudder wells, sand and micro
Details
     

 06-25-2015
2.00
Trim winglet wells and rudder wells. Glass rudder
Details
       

 06-21-2015
3.00
Glass in winglet wells
Details
       

 06-20-2015
4.00
Glassed in rudder wells and elevator ends
Details
       

 06-19-2015
2.00
Sanded rudder wells and added were needed
Details
       

 06-18-2015
2.00
I sanded the ailerons at the top edge
Details
       

 06-14-2015
3.00
It was time to cut out the rudders
Details
       

 06-13-2015
3.00
Sand elevators and ailerons then add Alpha-poxy
Details
     

 06-08-2015
3.00
Sand elevators and ailerons were the glass butted
Details
       

 06-02-2015
1.00
Sand Alpha poxy micro on elevators
Details
     

 06-02-2015
2.00
Glass ends of ailerons and cut hinges
Details
       

 05-31-2015
3.00
Time to glass up the ailerons with one bid
Details
       

 05-31-2015
3.00
Prep ailerons for the one bid that goes on
Details
       

 05-30-2015
0.00
Resin in torque tube and backing plate
Details
       

 05-30-2015
5.00
Prep and install torque tube and hinge backing pla
Details
       

 05-28-2015
3.00
Aileron construction & counterweights
Details
       

 05-26-2015
1.00
Trim bid at the edge of the Aileron well
Details
       

 05-26-2015
2.00
Sand and apply Alpha poxy micro to elevators
Details
     

 05-25-2015
6.00
Glassed in Aileron wells tonight
Details
       

 05-22-2015
3.00
Sand more on aileron wells
Details
       

 05-22-2015
3.00
Aileron well grind out and sand to shape.
Details
       

 05-21-2015
2.00
Set up for aileron cut out and then cut
Details
       

 05-20-2015
5.00
Filled last low spot and Smooth primed wings
Details
       

 05-17-2015
1.00
Resin work on trailing edge of elevators
Details
     

 05-17-2015
4.00
Fill the last low areas and prime them
Details
       

 05-16-2015
6.00
I got the filling and sanding to priming today
Details
     

 05-16-2015
2.00
Fix air voids and delaminating in elevator
Details
       

 05-15-2015
6.00
Spar work needed
Details
       

 05-14-2015
4.00
Block out K2 primer and add Spot-Lite bondo
Details
       

 05-12-2015
3.00
Sand and fill on speed brake
Details
       

 05-11-2015
3.00
Prep for K2 primer and sprayed out 2 coats
Details
       

 05-10-2015
6.00
More fill and sanding bondo
Details
       

 05-09-2015
5.00
More of that fill and sand
Details
       

 05-07-2015
2.00
More sanding and filling
Details
     

 05-05-2015
3.00
Sand and add Spot-Lite bondo
Details
       

 05-03-2015
4.00
Spot-Lite bondo is the tool to use for me
Details
       

 04-28-2015
2.00
Sand sealer primer and add Z Grip bondo
Details
       

 04-27-2015
2.00
Sand micro and seal prime top wings
Details
       

 04-26-2015
5.00
Sand wings add micro. Sand speed brake & prime
Details
       

 04-25-2015
4.00
Filling and sanding on the wings and speed brake
Details
       

 04-23-2015
3.00
We got the wings top side up again
Details
       

 04-19-2015
4.00
Primed bottom wing one more time
Details
       

 04-16-2015
2.00
Sanding the bottom fueslage and hach
Details
     

 04-15-2015
2.00
Time to clean the place up
Details
       

 04-14-2015
3.00
Finished the bigger spots and now ready for primer
Details
       

 04-07-2015
3.00
Found a few bigger areas needing work
Details
       

 04-03-2015
5.00
More of that fun sanding and filling stuff
Details
       

 03-28-2015
4.00
Sand primer and Spot-Lite fill
Details
       

 03-19-2015
2.00
Prime wings and fuselage
Details
       

 03-16-2015
1.00
Fuselage and dog house clean up
Details
       

 03-16-2015
2.00
Fill and sand in Canard- Fuselage area.
Details
       

 03-15-2015
3.00
More filling and sanding
Details
       

 03-15-2015
2.00
Lay-ups for Instrument panel
Details
       

 03-14-2015
4.00
Getting the dog house sanded to clearances
Details
       

 03-10-2015
3.00
More sanding on the NACA inlets
Details
       

 03-10-2015
2.00
Change dog house clearances
Details
       

 03-08-2015
5.00
Taped windows and did bondo work
Details
       

 03-07-2015
5.00
Working on fuselage now with Spot-Lite bondo
Details
       

 03-03-2015
2.00
Sand Spot -Lite and micro added
Details
       

 03-02-2015
2.00
Block sand Pilot strake and spot fill
Details
       

 03-01-2015
4.00
Co-Pilot strake sanding and filling
Details
       

 02-28-2015
5.00
Blocked out the wings today with the air board 180
Details
       

 02-26-2015
2.00
Sand and get ready for primer
Details
       

 02-24-2015
2.00
Sand big area tonight and small stuff got work
Details
       

 02-23-2015
4.00
More filling in not happy areas
Details
       

 02-22-2015
8.00
Filling and sanding low areas on strakes
Details
       

 02-15-2015
4.00
Block out strake and add filler were needed
Details
       

 02-09-2015
5.00
Sanding and blocking to get the primer on.
Details
       

 02-08-2015
4.00
More of the same. Primer on primer off and fill
Details
       

 02-07-2015
5.00
More sanding and putty filling
Details
       

 02-07-2015
1.00
Door lock was removed and trashed
Details
       

 02-05-2015
4.00
Still filling and sanding
Details
       

 01-31-2015
4.00
Blocked out primer with 3’ and then air board
Details
       

 01-30-2015
3.00
Sand and fill winglet filet. Heat wing ends to sha
Details
       

 01-29-2015
6.00
More sanding and primer on strakes Happy
Details
       

 01-28-2015
4.00
Sanding and filling today again
Details
       

 01-27-2015
4.00
Sanding filling and more sanding
Details
       

 01-26-2015
3.00
Sand off primer for low areas and pinholes
Details
       

 01-25-2015
6.00
More sand and fill to priming
Details
       

 01-23-2015
4.00
Time to use the bondo in low areas
Details
       

 01-22-2015
0.00
Next on the list
Details
       

 01-22-2015
5.00
Added micro to low areas on winglet
Details
       

 01-21-2015
5.00
Pinhole sanding and blocking out the primer
Details
       

 01-20-2015
2.00
Working on fuselage stakes and fuselage radius
Details
       

 01-20-2015
2.00
Sanding the strakes and pin hole patrol
Details
       

 01-19-2015
5.00
Getting ready for priming
Details
       

 01-18-2015
2.00
Working on fuselage strakes
Details
       

 01-17-2015
5.00
Finish blending wings and now onto the strakes
Details
       

 01-16-2015
2.00
Again sand and fill wings. This may go on for some
Details
       

 01-15-2015
5.00
Sand and fill wings & Fuselage
Details
       

 01-13-2015
6.00
Sand wings and add micro Fuselage work too
Details
       

 01-12-2015
2.00
Sand fuselage. Add micro to wing
Details
       

 01-12-2015
2.00
Sand and fill in low areas on wings
Details
       

 01-11-2015
3.00
Co-Pilot side sand an icing
Details
       

 01-10-2015
3.00
Fill in the strake areas with micro
Details
     

 01-09-2015
2.00
Sand and fill low areas on wings
Details
       

 01-08-2015
4.00
Fill and sand
Details
     

 01-07-2015
4.00
Fill low spots on wings
Details
       

 01-05-2015
0.00
We got some snow
Details
     

 01-04-2015
4.00
Sand wings
Details
     

 01-03-2015
4.00
Fill and sand on Fuselage
Details
       

 12-29-2014
6.00
Fill bottom of wings with sandable micro
Details
       

 12-16-2014
4.00
Sand and micro wings
Details
       

 12-09-2014
3.00
Sand and flip wings to night
Details
       

 12-08-2014
4.00
Sand and fill wings
Details
       

 12-04-2014
4.00
Sand wings and winglets
Details
       

 11-30-2014
6.00
Filling Wings and Winglets with Micro
Details
       

 11-29-2014
6.00
Filling wings and winglets with VelociPoxy and Mic
Details
       

 11-20-2014
4.00
Micro balloons and Alpha poxy on main wing spar
Details
       

 11-16-2014
4.00
Glass wing voids
Details
       

 11-14-2014
3.00
Moved shop around again and sand door ends
Details
       

 11-09-2014
3.00
Worked on door. Strake end.& Gear legs.
Details
       

 11-08-2014
2.00
Finishing the door panels
Details
       

 11-08-2014
2.00
Brake line prep
Details
       

 11-07-2014
2.00
Interior door cover
Details
       

 11-06-2014
1.50
Door panel pull handle
Details
       

 11-06-2014
2.00
Carbon bid on main gear legs
Details
     

 11-03-2014
4.00
Glassed up other side of main gear
Details
       

 11-02-2014
3.00
I going too carbon bid the main landing gear
Details
       

 10-26-2014
3.00
Stake door handle and bid on main spare
Details
       

 10-23-2014
3.00
Micro and bid in arm rest on doors
Details
       

 10-19-2014
0.00
Wing and strake front end
Details
       

 10-19-2014
3.00
Strake arm rest
Details
       

 10-16-2014
3.00
Finish up strakes at door and baggage
Details
       

 10-07-2014
3.50
Finish door area and front strake storage
Details
       

 10-07-2014
0.00
Continued
Details
       

 10-05-2014
4.50
UNI and Bid in front baggage bulkheads
Details
       

 10-04-2014
3.00
Prep baggage front bulkhead
Details
       

 09-24-2014
4.50
Triax Strake ends
Details
       

 09-22-2014
3.00
Back strake ribs from main spar
Details
       

 09-15-2014
3.00
Hell hole done on Co-pilot side
Details
       

 09-11-2014
0.00
Bike ride
Details
       

 09-09-2014
3.00
Strake ribs to main spare
Details
     

 08-09-2014
0.00
New friends from Vernon
Details
       

 08-07-2014
0.00
Abbotsford Air show was the place to be
Details
       

 08-05-2014
6.00
More work on the baggage area and Hell hole
Details
       

 08-03-2014
4.00
More strake work
Details
       

 07-29-2014
2.00
Had to clean Sticky stuff Dispenser
Details
       

 07-28-2014
4.00
Glass in top strake to fuselage
Details
     

 07-27-2014
4.00
Install top Co-Pilot strake
Details
       

 07-17-2014
3.00
Prep for Co-Pilot strake
Details
       

 07-06-2014
0.00
Working on strake
Details
       

 07-06-2014
4.00
Working on finishing Pilot strake
Details
     

 06-30-2014
4.50
Glassed in top strake to fuselage
Details
       

 06-26-2014
4.50
Top strake went on tonight
Details
       

 06-21-2014
2.00
Get plane ready for Pilot strake top
Details
       

 06-19-2014
2.00
Sanded Canard and fill in low area
Details
       

 06-17-2014
2.00
Fill in spar depression and skim canard
Details
       

 06-13-2014
2.00
Canard TRAX repair sanded and resin injection.
Details
       

 06-12-2014
2.00
Install toe brake cylinders
Details
       

 06-09-2014
2.50
Canard Lay-up C air bubbles removed
Details
       

 06-08-2014
1.00
Safety wiring of fuel gages
Details
     

 06-05-2014
3.00
Cut and fit front window trim
Details
       

 06-05-2014
3.00
Cut and fit front window trim
Details
       

 05-31-2014
1.00
Pre-cover Inspection
Details
       

 05-26-2014
1.00
Toe brake cylinders are in
Details
     

 05-26-2014
1.00
Remove back panel and work on gas fittings
Details
     

 05-20-2014
4.50
Front wind shield trim
Details
       

 05-17-2014
4.00
Templates for back panel.
Details
       

 05-14-2014
3.00
Assemble rudder pedals with push pull bell crank
Details
       

 05-13-2014
1.00
Interior back panel
Details
     

 05-13-2014
1.00
Fill in master cylinder hole
Details
       

 05-11-2014
2.00
Mount toe brake rail
Details
       

 05-10-2014
3.00
Worked on rudder and toe brake pedals
Details
       

 05-06-2014
2.00
Work on insturument panel
Details
       

 04-24-2014
3.00
Wing strake cut out and fuel proofing top strakes
Details
       

 04-16-2014
2.00
Relief in upper strake for tire clearance
Details
     

 04-13-2014
2.00
Bid in sight gage
Details
       

 04-12-2014
3.00
Fuel sight gage and fuel probes
Details
       

 04-10-2014
3.00
Fuel proofing strake with 3 coats of resin.
Details
     

 04-07-2014
3.00
Fuel cap ground wire & prep for fuel proofing
Details
       

 04-05-2014
3.00
Relocate Pilot fuel flange and then 3 bid
Details
       

 04-04-2014
3.00
Fule probes
Details
       

 03-31-2014
5.00
Sanding and prep for top of flanges
Details
       

 03-30-2014
3.00
Clean up and flanges
Details
       

 03-29-2014
2.50
Bolt hole, screen bid, micro upper strake
Details
       

 03-27-2014
3.00
Out-let screens & Fuel cap
Details
       

 03-25-2014
2.00
Sand mouse holes and install flanges on baffles
Details
       

 03-24-2014
3.50
Strake baffles and clean up -02
Details
       

 03-24-2014
3.50
Strake baffles and clean up -01
Details
       

 03-23-2014
4.00
Wheel well & gear leg well- 02
Details
       

 03-23-2014
4.00
Wheel well & gear leg well- 01
Details
       

 03-22-2014
5.00
Vent line, mouse holes, gear leg baffle.
Details
       

 03-21-2014
4.50
Flanges, fit baffles , mouse holes Friday night
Details
       

 03-20-2014
3.00
Install flanges, fit baffles and fuel line made.
Details
       

 03-19-2014
1.50
Clean up trough hole and install fuel line
Details
       

 03-18-2014
2.50
Clean up hard points, made line,triax & bid @ hole
Details
       

 03-17-2014
3.50
Installed fuel hard points, flange work
Details
       

 03-16-2014
5.00
Clean up, prep for flanges, fill in over leg well
Details
       

 03-15-2014
5.50
2 bids on baggage bulkhead and outer bulkhead
Details
       

 03-14-2014
3.50
Fuel line and back, outside bulkhead 2 bids
Details
       

 03-13-2014
2.00
Worked on fuel bulkhead and back line pic-up
Details
       

 03-12-2014
1.50
Fit fuel bulkheads
Details
       

 03-11-2014
3.50
Wheel well flange clean up and fit Fuel bulkhead
Details
       

 03-09-2014
1.50
Measurements and bondo well. 1
Details
       

 03-09-2014
2.50
Do wheel well flange on top strake. 2
Details
       

 03-09-2014
1.00
Bulkhead glass and flange. 3
Details
       

 03-08-2014
2.50
Second layer of bid cloth on bulkheads
Details
       

 03-04-2014
1.00
Glass wing bolt holes with UNI cloth
Details
     

 03-03-2014
1.50
Cut relief for wheel when retracted.
Details
     

 03-02-2014
3.00
Fit and glass in section on wheel well
Details
       

 02-24-2014
0.50
Micro fillets on main spar
Details
       

 02-24-2014
2.50
Glass in gear leg well
Details
       

 02-23-2014
5.50
Removed wing and started on wheel well.
Details
       

 02-22-2014
4.00
Glass lower strake to fueslage
Details
       

 02-21-2014
2.00
Prep for lower strake to fuselage lay-ups
Details
       

 02-21-2014
0.75
Cut out baggage access area
Details
     

 02-20-2014
4.00
Lower strake half glassing to main spar
Details
       

 02-19-2014
1.50
2 bid lay up on upper strake
Details
       

 02-18-2014
2.50
Cut and fit upper stake Pilot side
Details
       

 02-17-2014
1.50
2 bid on back of strake
Details
     

 02-16-2014
7.00
Cut end of wing and cut in lower strake
Details
       

 02-15-2014
4.00
Prep for lower Strake
Details
       

 02-13-2014
1.50
Wing strake cutout
Details
       

 02-11-2014
1.00
Paint resin on strake one more time
Details
     

 02-10-2014
2.00
Vent and Fuel line from Strake
Details
       

 02-09-2014
3.00
2 bid on fuel sight gauge
Details
       

 02-06-2014
2.00
Fuel sight gauge
Details
       

 02-05-2014
2.50
Fuel cap installation
Details
       

 02-02-2014
4.00
Micro ,1 bid, & paint resin
Details
       

 02-01-2014
3.00
Grooved out bulkheads and baffles. Add resin to st
Details
       

 01-31-2014
1.00
Videoed the strake baffle for proper clearance
Details
     

 01-31-2014
1.00
Added more TRIAX and bid to panel
Details
     

 01-30-2014
1.00
Add Flange to baffle
Details
     

 01-28-2014
1.50
Make instrument panel
Details
     

 01-28-2014
1.50
Install flange on baggage bulkhead
Details
       

 01-27-2014
2.50
Cleaned up mouse holes and gear socket
Details
       

 01-26-2014
4.00
Added more bid to out side fuel bulkhead
Details
       

 01-25-2014
4.50
Strake baffels bid applyed
Details
       

 01-23-2014
2.00
Bondo Strake baffles in place
Details
     

 01-22-2014
6.00
Installed the wheel well tonight
Details
       

 01-19-2014
2.00
Install flange on gear leg baffle and resin mouse
Details
       

 01-18-2014
4.00
Gear leg baffle install.
Details
       

 01-16-2014
4.00
Fuel screens, bid on flanges, add micro-flox to bu
Details
       

 01-14-2014
3.50
Bid and flange work on bulkheads
Details
       

 01-12-2014
3.00
Fuel vent hard piont installed
Details
       

 01-12-2014
4.00
Bid in the other side of fuel bulkhead
Details
       

 01-11-2014
7.00
Bid in bulkheads and fuel out let
Details
       

 01-10-2014
2.00
Bulkhead hard piont for fitting
Details
       

 01-06-2014
2.50
Floxed on 1.5" flange for rear bulkhead
Details
       

 01-02-2014
1.50
More I beam lay-ups
Details
     

 01-01-2014
2.00
Floxed on angle pices to baffles
Details
       

 12-31-2013
3.00
Lay-up and cut to size 1" angle
Details
       

 12-30-2013
4.00
Sand bulkheads and fill in over leg cover
Details
       

 12-29-2013
3.50
90 degree flanges and moues holes
Details
       

 12-28-2013
6.00
Fit more baffles and lay-ups on bulkheads.
Details
       

 12-27-2013
5.50
Fit bulkheads and baffles
Details
       

 12-26-2013
5.00
Lay-ups for wheel well flange.
Details
     

 12-26-2013
1.50
Cut out more baggage opening
Details
       

 12-25-2013
4.00
Prep top strake for wheel well flange
Details
       

 12-24-2013
1.50
Cut bid for baffles and bulkheads
Details
     

 12-23-2013
3.50
Bid in leg cover and added to wheel well
Details
     

 12-22-2013
5.00
Cut out strake for tire and prep for leg cover
Details
       

 12-21-2013
3.00
Cut out strake for gear leg
Details
       

 12-20-2013
3.00
Wing support cradle
Details
     

 12-17-2013
1.50
Trace out bulkheads and baffles for fuel tank
Details
       

 12-15-2013
3.50
Glass strake to fueslage
Details
       

 12-14-2013
4.00
Lower strake glassing to main spar
Details
       

 12-14-2013
2.50
Glass the 4x8 Dyvinicel foam for baffels
Details
       

 12-10-2013
1.50
Wing attach bolt hole reinforcment
Details
       

 12-10-2013
1.50
2 bid on upper Co-Pilot strake
Details
     

 12-08-2013
2.50
Cut out baggage area in the strake
Details
     

 12-04-2013
1.50
Lay - up on bottom strake
Details
     

 12-03-2013
1.50
Fit upper strake on Co-Pilot side
Details
     

 12-02-2013
2.00
Fit the lower Co-Pilot strake
Details
       

 12-01-2013
3.00
Got the Co-Pilot wing on
Details
       

 11-30-2013
2.00
Lower strake alignment
Details
       

 11-28-2013
1.00
TRIAX on dog house for hold down hinges
Details
       

 11-26-2013
1.00
Sand Dog houes face and fuselage face
Details
       

 11-24-2013
3.00
1 bid on dog house and fuselage face's
Details
       

 11-23-2013
4.00
Sand and prime doors again.
Details
       

 11-22-2013
1.50
Fill the under side gap.
Details
       

 11-20-2013
3.50
Cut and prep tabs for nut plates and then install
Details
       

 11-17-2013
1.50
Cut backing boards off and remove Canard for clean
Details
       

 11-16-2013
4.00
Make front and back fusalage Canard tabs
Details
       

 11-15-2013
1.00
Dog house is off
Details
       

 11-14-2013
3.50
Lay - up the dog house
Details
       

 11-11-2013
3.00
Fit dog house for TRIAX lup-ups
Details
       

 11-10-2013
2.00
Structurally resin in the hard point to the bulk h
Details
       

 11-10-2013
1.00
Remove foam from dog house
Details
       

 11-09-2013
4.00
Drill holes in bulk head for attachment points.
Details
       

 11-05-2013
1.00
Fit Canard
Details
       

 11-04-2013
1.00
Time to fit the canard onto the fuselage
Details
       

 10-27-2013
0.50
Peel-ply added
Details
       

 10-27-2013
4.50
Canard Attachment Reinforcment
Details
       

 10-20-2013
4.00
Prime doors and NACA scoop
Details
       

 10-10-2013
0.00
This shower installation has taken from the build
Details
     

 07-12-2013
0.00
Other planes
Details
       

 07-11-2013
0.00
Arlington Air Show
Details
       

 06-30-2013
0.00
Car is back together and ready to go home to Victo
Details
       

 06-28-2013
0.00
Time to paint the fenders and runners
Details
       

 06-27-2013
0.00
Time for Dad to spray the Car
Details
       

 06-25-2013
0.00
Cameron working long hours on his Car
Details
       

 06-16-2013
0.00
Strip down Acura Integra for paint
Details
       

 06-11-2013
2.00
Fresh air water drain tubes.
Details
       

 06-06-2013
1.50
Rivet in overhead fresh air
Details
       

 06-05-2013
1.00
Pushed in switches and bolted in place.
Details
     

 06-01-2013
2.50
Floxed in over head fresh air .
Details
     

 06-01-2013
1.50
Cut panel for swiches
Details
     

 05-31-2013
1.50
Ran wire for over head lights
Details
     

 05-30-2013
3.00
Removed fuselage over light swiches
Details
       

 05-26-2013
2.00
Bondo for air vents
Details
     

 05-22-2013
1.00
Swiches to make things brighter
Details
       

 05-21-2013
3.50
Overhead fresh air and lights
Details
       

 05-20-2013
1.50
Tap seat belt hard points
Details
       

 05-20-2013
1.00
Fit aluminum carpet stip in place.
Details
       

 05-18-2013
4.00
Glass up kick plate foam
Details
       

 05-18-2013
2.00
Dowels for kick plate aluminum strip.
Details
       

 05-12-2013
1.75
Foam for door kick plate
Details
       

 05-11-2013
3.50
Milled fiber in hard points with 3 bid
Details
       

 05-09-2013
2.50
Prep hard points for seat belts
Details
       

 05-05-2013
4.00
Move tubing to out side of keel for cable
Details
       

 05-05-2013
3.00
Intalled fuel shut off cable
Details
       

 05-03-2013
4.00
Fit fuel shut off holder in place
Details
     

 04-30-2013
3.50
Time to make fuel knob holder
Details
       

 04-28-2013
4.50
Tubing was installed for fuel shut off cable.
Details
       

 04-27-2013
4.50
Sump tank go back in
Details
       

 04-14-2013
4.00
TRIAX Mid engine mount
Details
       

 04-07-2013
4.00
TRIAX for engine mount
Details
       

 04-05-2013
1.00
Working on the fuel venting
Details
     

 04-05-2013
4.00
Fuel line work
Details
       

 04-04-2013
2.00
Work on back seats
Details
       

 03-31-2013
0.00
Heading North
Details
       

 03-27-2013
0.00
New Mexico is a great place to visit
Details
       

 03-26-2013
0.00
Phoenix Arizona area
Details
       

 03-14-2013
0.00
Bryson Canyon, Grand Canyon
Details
       

 03-10-2013
1.50
Drilled back seat rail
Details
     

 03-10-2013
2.50
Bolts for front seat
Details
       

 03-10-2013
3.50
Back seat hard points
Details
       

 03-09-2013
1.00
Installed the pilot seat
Details
       

 03-09-2013
4.00
Installed side plates for seats
Details
       

 03-08-2013
2.50
Sand and apply top coat
Details
       

 03-03-2013
4.00
Fuel and vent lines
Details
       

 03-02-2013
4.00
Vent lines
Details
       

 03-01-2013
2.00
Sunp tank instllation
Details
     

 02-26-2013
2.50
Cut for weather strip
Details
       

 02-24-2013
2.00
Canard needs some work
Details
       

 02-23-2013
5.00
Fill Latch pin tube area
Details
       

 02-19-2013
1.50
More door work
Details
     

 02-18-2013
1.50
Fitting the fuselage to the door
Details
       

 02-17-2013
3.50
Working on overhead fresh air duct
Details
       

 02-17-2013
3.50
Over Head fresh air duct
Details
     

 02-17-2013
2.50
Door cut out re-sizing for even spacing.
Details
       

 02-16-2013
2.50
Fill and sand door hinge tabs
Details
       

 02-15-2013
2.50
Time to set up level for door springs
Details
       

 02-14-2013
2.50
Install door gas springs
Details
       

 02-12-2013
4.00
Bid in over head swich panle and work on handles
Details
       

 02-11-2013
5.00
Over head switch panel
Details
       

 02-08-2013
2.00
2 bid on door spring hard pionts
Details
       

 02-07-2013
2.50
Hold handles need some filling
Details
     

 02-06-2013
1.50
Fill and sand hinge areas
Details
     

 02-05-2013
2.50
Installed the hard points for the door spring
Details
       

 02-04-2013
1.50
Hard points for door spring
Details
     

 02-03-2013
1.50
Hinge pockets
Details
       

 02-03-2013
5.00
2 bid in the cabon beams
Details
       

 02-02-2013
4.00
Sand beams for lay-ups
Details
     

 02-01-2013
2.50
Clean up shop
Details
       

 01-31-2013
3.50
Install front carbon beams
Details
       

 01-30-2013
2.50
Fit front carbon beams
Details
       

 01-29-2013
2.00
Installed center section of the Carbon Beam
Details
       

 01-28-2013
3.50
Carbon Beams installed
Details
       

 01-27-2013
3.00
Inside the fuselage at hinge area.
Details
       

 01-27-2013
2.50
Fit and install hard pionts in beam.
Details
       

 01-26-2013
1.50
Tabs for sump tank
Details
     

 01-26-2013
2.00
Bid on open face of fuselage hinge area
Details
       

 01-25-2013
1.50
Worked on door hinge area
Details
     

 01-25-2013
1.50
More resin on header tank
Details
     

 01-25-2013
0.50
Heat up door one more time
Details
     

 01-24-2013
1.50
Last fuselage door receiver tube
Details
     

 01-23-2013
1.50
Fix door tube
Details
     

 01-22-2013
1.00
Time to cut bid
Details
     

 01-22-2013
2.00
Pilot door receivers
Details
     

 01-21-2013
2.00
Install lach pin tubes in fueslage
Details
     

 01-20-2013
1.50
Heat door to fit
Details
       

 01-20-2013
3.00
Door locking rods
Details
       

 01-20-2013
2.00
Door lock
Details
     

 01-19-2013
1.00
Sump tank lid
Details
     

 01-17-2013
1.50
Receiver tubes for the fuselage
Details
     

 01-17-2013
2.50
Hard points for fuel inlets
Details
     

 01-15-2013
1.50
Sump tank prep
Details
     

 01-15-2013
1.50
Door guide for rod
Details
     

 01-12-2013
3.50
Nose gear guides
Details
       

 01-11-2013
2.00
Fill and sand the door.
Details
     

 01-10-2013
1.00
Lock mechanism
Details
       

 01-06-2013
3.00
Time to work on the latching system
Details
       

 01-05-2013
3.00
Time to heat the doors to fit
Details
       

 01-01-2013
2.00
More heater work
Details
     

 12-29-2012
3.00
Time to finish the heater to the cabin
Details
       

 12-28-2012
3.50
Heater cable time
Details
       

 12-27-2012
1.50
Sanded heater/cooler out flow
Details
     

 12-26-2012
2.00
Hinge beds on fuselage
Details
     

 12-25-2012
1.50
TRIAX and bid on top of hinge tabs
Details
       

 12-24-2012
3.00
Time to hang the doors
Details
       

 12-24-2012
3.00
Oil lines get a place to be
Details
       

 12-23-2012
4.00
Sanded doors for 3 bid lay-up Then did lay-up
Details
       

 12-23-2012
1.50
Jack Brace was here to help !!!!
Details
       

 12-20-2012
3.00
Close in door hinge pieces
Details
       

 12-18-2012
3.00
Heater/Cooler work
Details
       

 12-16-2012
1.00
More door work.
Details
     

 12-16-2012
1.50
Heater duct gets 1 bid lay-up
Details
       

 12-15-2012
1.00
Heat shrinked oil lines.
Details
     

 12-15-2012
3.00
Bolted on heater and lay-upped the out flow
Details
     

 12-15-2012
1.00
2 bid on head lamp
Details
     

 12-15-2012
0.50
2 bib on doors
Details
       

 12-10-2012
1.00
Sand and attached foam
Details
     

 12-10-2012
1.00
Glued on pilot hinge
Details
     

 12-09-2012
1.50
Refit out-let ducting
Details
       

 12-09-2012
1.00
Glue on hinge
Details
     

 12-09-2012
2.50
Cut fuselage for hinges
Details
       

 12-08-2012
2.00
Hinge pionts attached
Details
       

 12-08-2012
1.50
Heater tubes for cabin
Details
       

 12-08-2012
1.50
Floxed in bed for weather stripping
Details
       

 12-07-2012
1.00
Sanded cabin heater intake
Details
       

 12-04-2012
2.50
More work on heater
Details
       

 12-04-2012
1.00
Hinge lay-up
Details
     

 12-02-2012
3.50
More heater work
Details
       

 12-01-2012
3.50
Sand the NACA scoop for the engine cooling
Details
       

 11-30-2012
3.50
Bid in Heater/cooler scoop
Details
       

 11-29-2012
2.50
Nose Mounted Cooler
Details
       

 11-27-2012
3.50
Hinge placement
Details
       

 11-23-2012
0.00
Skiing at Sun Peaks
Details
       

 11-19-2012
1.50
Sand the filler on the NACA scoop
Details
     

 11-19-2012
0.50
Sand filler on main legs
Details
     

 11-19-2012
1.50
Finished door opening
Details
     

 11-17-2012
3.50
Fuselagde door hole treatment
Details
       

 11-16-2012
2.00
Door weather strip prep.
Details
       

 11-15-2012
3.00
NACA Scoop has 2 bid on top
Details
     

 11-14-2012
1.00
Trim nose wheel gides
Details
     

 11-13-2012
4.00
Molding TRIAX in place
Details
     

 11-10-2012
2.00
Install brake line sheild
Details
       

 11-09-2012
3.00
NACA Scoop has 2 bib in place
Details
       

 11-06-2012
4.00
In stalled NACA scoop
Details
       

 11-04-2012
1.50
NACA scoop
Details
     

 11-04-2012
3.00
Gear sockets
Details
       

 11-01-2012
3.00
Door cut out
Details
     

 10-31-2012
1.50
Speed brake
Details
       

 10-30-2012
3.00
Cut away back out side landing gear doors
Details
       

 10-29-2012
1.00
Nose gear doors
Details
       

 10-26-2012
3.00
Nose wheel back together
Details
       

 10-18-2012
1.00
Axle holes
Details
     

 10-16-2012
4.00
Tire mounting
Details
       

 09-27-2012
6.00
Plane was placed into shop
Details
       

 09-25-2012
10.00
Resin hot cabinet
Details
     

 03-23-2012
20.00
Picked up the Kit
Details
       

 03-15-2012
0.00
A place to work is good
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.