KitLog pro

Powered By Kitlog Pro v2.0

Patricks Web Site
Work Logs Found: 86
Category Work Time: 292 Hours
 Date
Hours
Work Log Summary

Details

 08-14-2013
4.50
Rudder cables
Details
       

 08-05-2013
3.00
Fuel and Oil Press
Details
       

 07-30-2013
8.00
Fire Wall
Details
       

 07-29-2013
3.00
Mounted rudder peddals and rudder cable.
Details
       

 07-24-2013
5.00
Brake lines and electric fuel pump.
Details
       

 07-23-2013
4.50
Rudder stops and VS bolts
Details
       

 07-22-2013
5.00
Elevator attatchment
Details
       

 07-09-2013
9.00
Tail Feathers
Details
       

 07-01-2013
4.00
Installed Wheels and brake pads
Details
       

 06-18-2013
3.00
Replaced fuel selector valve
Details
       

 06-17-2013
3.00
Rudder control cables
Details
     

 06-11-2013
3.00
Seat belt harnes
Details
       

 06-03-2013
2.00
Elevator control rod
Details
       

 05-29-2013
5.00
Remanufacturing Brackets
Details
       

 05-28-2013
8.00
Roll Cage
Details
       

 05-21-2013
0.50
Prop
Details
     

 05-14-2013
3.00
Roll Cage Prep
Details
     

 04-21-2013
4.00
Fuel selector Valve
Details
       

 04-15-2013
3.00
Arts and Crafts
Details
       

 03-02-2013
2.00
Landing Gear
Details
       

 03-01-2013
1.00
Props Inc
Details
     

 02-27-2013
2.00
Wing wiring
Details

 02-16-2013
2.50
Engine Mount
Details
       

 02-16-2013
0.50
brake resevoir
Details
       

 02-15-2013
1.00
Finishing kit
Details
       

 02-13-2013
3.50
Turtle Deck
Details
       

 02-12-2013
1.50
Fresh air vents
Details
       

 02-06-2013
5.00
Rudder peds
Details
       

 02-05-2013
2.00
Test Mounted HS
Details
       

 01-31-2013
3.00
mounted Elevator to stabalizer
Details
       

 01-30-2013
4.00
Crotch belt
Details
       

 01-23-2013
5.00
Tail Wheel
Details
       

 01-11-2013
7.00
Electric Flaps
Details
     

 01-04-2013
4.00
Electric Flaps
Details
       

 12-29-2012
4.50
control bell crank and Flaps
Details
       

 12-28-2012
4.00
manufactured Tunnle cover
Details

 12-27-2012
3.00
Seats, cabin floor removal
Details
       

 12-25-2012
2.00
Finished wiring and Fuel tank sealed
Details
       

 12-13-2012
4.50
Seat Frame Manufacturing
Details
       

 12-12-2012
1.00
pro sealed tank cover
Details
       

 12-06-2012
3.50
Stall Warning
Details
       

 12-05-2012
4.00
Wing underskin
Details
       

 12-04-2012
1.50
Fuel Guage and float
Details

 12-04-2012
2.00
Aileron Control rod
Details
       

 12-03-2012
2.00
wing holder
Details
       

 12-03-2012
3.00
Pitot Tube
Details
       

 11-26-2012
4.50
Installed Flaps and Ailerons
Details
       

 11-24-2012
4.00
Flap gap and Aileron Gap Fairings
Details
       

 11-21-2012
3.50
Aileron Brackets
Details
       

 11-19-2012
3.00
push rods
Details
       

 11-14-2012
3.00
Bell cranks and Tanks
Details
       

 11-13-2012
3.00
Wings Gap spacers
Details

 11-05-2012
4.00
Finished empanage
Details
       

 10-31-2012
2.50
Finished up Trailing edge
Details
       

 10-29-2012
10.00
Rebuilt left Elevator
Details

 10-25-2012
3.00
Rudder
Details
       

 10-24-2012
6.50
Rudder
Details
       

 10-23-2012
4.00
Rudder skins
Details
       

 10-22-2012
4.50
Finished Left elevator and trim tab, Started Rudde
Details
     

 10-18-2012
4.00
Left Elevator
Details

 10-17-2012
3.50
Left Elevator
Details

 10-07-2012
5.50
Left Elevator
Details

 09-26-2012
3.50
finished Right Elevator
Details

 09-25-2012
3.00
Right Elevator
Details

 09-20-2012
4.00
Manufactured E908 Siffners
Details
       

 09-19-2012
1.00
E908 Cutting
Details

 09-11-2012
4.00
Assembly of VS
Details
       

 09-10-2012
5.50
Preping VS parts
Details

 08-30-2012
4.00
HS Completed
Details

 08-29-2012
3.00
Left HS
Details

 08-23-2012
4.50
Riveting
Details

 08-21-2012
2.50
Ailerons Flaps
Details

 08-16-2012
2.00
Right HS Skin
Details

 08-08-2012
2.50
Arrival of Quick build Wings and fuselage
Details
       

 08-07-2012
1.50
Right half of HS
Details
       

 07-25-2012
2.50
remanufactured HS 907 Priming
Details
       

 07-24-2012
2.00
Manufactured HS 908
Details
       

 07-23-2012
4.00
HS
Details
       

 07-19-2012
1.00
disassembled HS
Details
     

 07-17-2012
2.00
Drilling and first assemble of HS frame
Details
       

 07-12-2012
1.00
Manufactured hs909
Details

 07-11-2012
2.00
HS907,908
Details

 07-09-2012
4.00
Sanding deburring HS
Details

 07-06-2012
1.00
HS904
Details

 07-04-2012
2.50
Tape removal
Details

 07-03-2012
1.00
Picked up Empennage
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.