Date
|
Hours
|
Work Log Summary
|
Details
|
04-02-2014
|
0.00
|
It is born
|
Details
|
|
|
03-26-2014
|
2.00
|
Aircraft data plate
|
Details
|
|
|
03-25-2014
|
2.00
|
Fire extinguisher
|
Details
|
|
|
03-23-2014
|
5.00
|
More interior upholstery work
|
Details
|
|
|
03-22-2014
|
6.00
|
Labelling the panel
|
Details
|
|
|
03-21-2014
|
1.00
|
Paddles
|
Details
|
|
|
03-16-2014
|
2.00
|
Control lock
|
Details
|
|
|
03-15-2014
|
1.00
|
Weigh-in
|
Details
|
|
|
03-14-2014
|
4.00
|
Adding vortices generators
|
Details
|
|
|
03-12-2014
|
2.00
|
Placards
|
Details
|
|
|
03-10-2014
|
0.00
|
Building a ramp
|
Details
|
|
|
03-09-2014
|
4.00
|
Pitot tube install
|
Details
|
|
|
03-06-2014
|
0.00
|
Seaplane rating
|
Details
|
|
|
03-03-2014
|
3.00
|
Section 34, nose/windshield trim
|
Details
|
|
|
02-23-2014
|
0.00
|
Pictures
|
Details
|
|
|
02-22-2014
|
5.00
|
Section 34, Antennas
|
Details
|
|
|
02-21-2014
|
3.00
|
Landing lights, part 2
|
Details
|
|
|
02-20-2014
|
4.00
|
Installing the landing lights
|
Details
|
|
|
02-19-2014
|
3.00
|
Section 34, upper gap seal, part 2
|
Details
|
|
|
02-18-2014
|
6.00
|
Section 34, install uppper gap seal, part 1
|
Details
|
|
|
02-17-2014
|
4.00
|
Section 34, lower wing gap seals
|
Details
|
|
|
02-16-2014
|
2.00
|
Section 34, installing the wing/tail cables
|
Details
|
|
|
02-15-2014
|
3.00
|
Section 34, connecting jury struts & flaps
|
|
|
|
02-14-2014
|
4.00
|
Section 34, wing floats
|
Details
|
|
|
02-13-2014
|
6.00
|
Section 34, putting on the wings
|
Details
|
|
|
02-12-2014
|
6.00
|
Putting the panel back in
|
Details
|
|
|
02-11-2014
|
4.00
|
Section 33, cockpit side panels
|
Details
|
|
|
02-10-2014
|
6.00
|
Section 32, windows FINAL!
|
Details
|
|
|
02-09-2014
|
4.00
|
Section 32, rear windows, part 2
|
Details
|
|
|
02-08-2014
|
5.00
|
Section 32, rear windows, part 1
|
Details
|
|
|
02-07-2014
|
4.00
|
Section 32, canopies, part 5
|
Details
|
|
|
02-06-2014
|
4.00
|
Section 32, canopies, part 4
|
Details
|
|
|
02-05-2014
|
6.00
|
Section 32, canopies, part 3
|
Details
|
|
|
02-04-2014
|
5.00
|
Section 32, canopies, part 2
|
Details
|
|
|
02-03-2014
|
4.00
|
Section 32, canopies, part 1
|
Details
|
|
|
02-02-2014
|
3.00
|
Section 32, windshield, part 7
|
Details
|
|
|
02-01-2014
|
3.00
|
Section 32, windshield, part 6
|
Details
|
|
|
01-31-2014
|
5.00
|
Section 32, windshield, part 5
|
Details
|
|
|
01-30-2014
|
4.00
|
Section 32, windshield part 4
|
Details
|
|
|
01-29-2014
|
2.00
|
Section 32, windshield, part 3
|
Details
|
|
|
01-28-2014
|
3.00
|
Section 33, windshield part 2
|
Details
|
|
|
01-27-2014
|
5.00
|
Section 32, windshield, part 1
|
Details
|
|
|
01-26-2014
|
4.00
|
Control stick boots
|
Details
|
|
|
01-25-2014
|
8.00
|
Section 32, Lower canopy track
|
Details
|
|
|
01-24-2014
|
8.00
|
Section 32, Final install of the nose deck
|
Details
|
|
|
01-21-2014
|
3.00
|
Section 29, strut assembly
|
Details
|
|
|
01-20-2014
|
2.00
|
Section 32, beginning to secure the nose
|
Details
|
|
|
01-19-2014
|
3.00
|
Engine compression test
|
Details
|
|
|
01-18-2014
|
3.00
|
Section 30, sponson assembly
|
Details
|
|
|
01-13-2014
|
8.00
|
Fabricating the panel plates, final
|
Details
|
|
|
01-10-2014
|
6.00
|
Fabricating the panel plates, part 4
|
Details
|
|
|
01-09-2014
|
4.00
|
Fabricating the panel plates, part 3
|
Details
|
|
|
01-08-2014
|
5.00
|
Fabricating the panel plates, part 2
|
Details
|
|
|
01-07-2014
|
7.00
|
Fabricating the panel plates, part 1
|
Details
|
|
|
01-06-2014
|
5.00
|
Wiring completed!
|
Details
|
|
|
01-05-2014
|
3.00
|
Completed wing wiring
|
Details
|
|
|
01-04-2014
|
6.00
|
Headset jack mount, part 2
|
Details
|
|
|
01-03-2014
|
4.00
|
Creating headset jack mount, part 1
|
Details
|
|
|
01-02-2014
|
6.00
|
Securing turtle deck wiring and upholstrey trim
|
Details
|
|
|
01-01-2014
|
5.00
|
Finalized wiring in the fuel pump area
|
Details
|
|
|
12-18-2013
|
3.00
|
ADAHRS, pitot, static, AOA
|
Details
|
|
|
12-17-2013
|
3.00
|
Seatbelts, final
|
Details
|
|
|
12-15-2013
|
4.00
|
Seatbelts, part 3
|
Details
|
|
|
12-14-2013
|
5.00
|
Seatbelts, part 2
|
Details
|
|
|
12-13-2013
|
6.00
|
Seatbelts, part 1
|
Details
|
|
|
12-07-2013
|
2.00
|
Landing gear test
|
Details
|
|
|
12-06-2013
|
10.00
|
Wiring the radio and intercom
|
Details
|
|
|
12-05-2013
|
5.00
|
Wiring headphone jacks
|
Details
|
|
|
12-04-2013
|
6.00
|
Wiring transponder & ADS-B
|
Details
|
|
|
12-03-2013
|
5.00
|
Finishing the antenna connections
|
Details
|
|
|
12-02-2013
|
4.00
|
Antenna wiring for Xponder & ADS-B
|
Details
|
|
|
12-01-2013
|
10.00
|
Wiring all EMS sensors, part 2
|
Details
|
|
|
11-25-2013
|
8.00
|
Wiring all EMS sensors, part 1
|
Details
|
|
|
11-24-2013
|
4.00
|
Wired the Air/Fuel Ratio meter
|
Details
|
|
|
11-23-2013
|
14.00
|
Wiring up my real switches
|
Details
|
|
|
11-17-2013
|
0.00
|
First engine start (2min video)
|
Details
|
|
|
11-16-2013
|
6.00
|
Ignition relays
|
Details
|
|
|
11-15-2013
|
5.00
|
Mounting/connecting the engine ECUs
|
Details
|
|
|
11-13-2013
|
6.00
|
Pitching the prop
|
Details
|
|
|
10-14-2013
|
0.00
|
Just pictures
|
Details
|
|
|
10-06-2013
|
7.00
|
Completed temporary panel component layout
|
Details
|
|
|
10-05-2013
|
6.00
|
Building out the temporary panel
|
Details
|
|
|
10-04-2013
|
3.00
|
Front baggage trunk complete
|
Details
|
|
|
10-02-2013
|
2.00
|
Wiring the iFly 720 GPS
|
Details
|
|
|
09-30-2013
|
4.00
|
Wired the flaps controller with the actuator
|
Details
|
|
|
09-29-2013
|
10.00
|
Wiring the avionics panel
|
Details
|
|
|
09-28-2013
|
9.00
|
Wiring switches
|
Details
|
|
|
09-22-2013
|
4.00
|
Finished the wiring around the batteries
|
Details
|
|
|
09-21-2013
|
4.00
|
Wiring the starter and alternator
|
Details
|
|
|
09-19-2013
|
4.00
|
Radio is here!
|
Details
|
|
|
09-18-2013
|
4.00
|
Wired and installed the center console
|
Details
|
|
|
09-15-2013
|
8.00
|
Building a fuel pumps mount
|
Details
|
|
|
09-09-2013
|
1.00
|
A look at the center console with the throttle
|
Details
|
|
|
09-08-2013
|
4.00
|
Throttle cable (finishing cockpit connection)
|
Details
|
|
|
09-07-2013
|
6.00
|
Throttle cable lever (beginning)
|
Details
|
|
|
09-06-2013
|
3.00
|
Throttle cable (top of engine)
|
Details
|
|
|
09-04-2013
|
3.00
|
Finished grounding, coolant overflow
|
Details
|
|
|
09-03-2013
|
4.00
|
Grounding the engine
|
Details
|
|
|
09-02-2013
|
5.00
|
Heater connections to the engine
|
Details
|
|
|
09-01-2013
|
4.00
|
Installing cowling "horns"
|
Details
|
|
|
08-31-2013
|
7.00
|
Finished fitting the cowling
|
Details
|
|
|
08-30-2013
|
5.00
|
Installing cowling hinges
|
Details
|
|
|
08-29-2013
|
3.00
|
Beginning of fitting the cowling
|
Details
|
|
|
08-28-2013
|
1.00
|
Prop spinner installed
|
Details
|
|
|
08-27-2013
|
2.00
|
Installing the prop
|
Details
|
|
|
08-26-2013
|
4.00
|
Installing the engine, part two, lock it down
|
Details
|
|
|
08-25-2013
|
4.00
|
Installing the engine, part one, the lift
|
Details
|
|
|
08-24-2013
|
4.00
|
Installed prop extension, engine sensors
|
Details
|
|
|
08-23-2013
|
0.00
|
The engine is here
|
Details
|
|
|
08-18-2013
|
8.00
|
Avionics tray complete... for now
|
Details
|
|
|
08-17-2013
|
4.00
|
Flying, it's in my blood
|
Details
|
|
|
08-16-2013
|
4.00
|
Wiring, adding avionics, ELT
|
Details
|
|
|
08-10-2013
|
6.00
|
Wiring, still hooking things up
|
Details
|
|
|
08-04-2013
|
5.00
|
Wiring, continued
|
Details
|
|
|
08-03-2013
|
0.00
|
AMC Brake Bleeder
|
Details
|
|
|
08-02-2013
|
4.00
|
Brakes... they work!
|
Details
|
|
|
08-01-2013
|
6.00
|
Parking brake
|
Details
|
|
|
07-31-2013
|
5.00
|
Finished the center console
|
Details
|
|
|
07-30-2013
|
3.00
|
Seatback stops
|
Details
|
|
|
07-29-2013
|
1.00
|
Temporary panel
|
Details
|
|
|
07-28-2013
|
2.00
|
Landing lights wiring
|
Details
|
|
|
07-27-2013
|
2.00
|
Bulkhead ground
|
Details
|
|
|
07-26-2013
|
4.00
|
Installed and wired the gear control board
|
Details
|
|
|
07-25-2013
|
6.00
|
Landing gear microswitches
|
Details
|
|
|
07-24-2013
|
4.00
|
Building front luggage area
|
Details
|
|
|
07-22-2013
|
0.00
|
Label maker: Epson LW-400
|
Details
|
|
|
07-21-2013
|
5.00
|
Wiring, continued...
|
Details
|
|
|
07-20-2013
|
6.00
|
Installed the batteries
|
Details
|
|
|
07-19-2013
|
3.00
|
Flaps position sensor
|
Details
|
|
|
07-14-2013
|
4.00
|
Wiring, center console
|
Details
|
|
|
07-13-2013
|
8.00
|
Wiring, installing into plane
|
Details
|
|
|
07-12-2013
|
2.00
|
Panel planning, part 2
|
Details
|
|
|
07-07-2013
|
0.00
|
Just pictures, cleaning up the build hanger
|
Details
|
|
|
07-06-2013
|
20.00
|
Wiring, continued, big progress
|
Details
|
|
|
07-02-2013
|
3.00
|
Wiring, continued, combined avionics trays
|
Details
|
|
|
06-30-2013
|
8.00
|
Wiring, continued, landing gear area
|
Details
|
|
|
06-29-2013
|
8.00
|
Wiring, continued, control sticks area
|
Details
|
|
|
06-23-2013
|
8.00
|
Wiring, continued
|
Details
|
|
|
06-22-2013
|
3.00
|
Front hatch
|
Details
|
|
|
06-21-2013
|
3.00
|
Avionics tray
|
Details
|
|
|
06-16-2013
|
4.00
|
Decals
|
Details
|
|
|
06-15-2013
|
12.00
|
Wiring, continued
|
Details
|
|
|
06-10-2013
|
10.00
|
Beginning of panel wiring
|
Details
|
|
|
05-13-2013
|
0.00
|
test
|
Details
|
|
|
05-05-2013
|
3.00
|
Section 31, motor assembly, fuel sump
|
Details
|
|
|
05-04-2013
|
2.00
|
Attempting to weather proof the front hatch
|
Details
|
|
|
05-03-2013
|
1.00
|
Planning the panel
|
Details
|
|
|
04-29-2013
|
4.00
|
Section 33, carpeting baggage deck
|
Details
|
|
|
04-28-2013
|
6.00
|
Section 31, fuel vent
|
Details
|
|
|
04-27-2013
|
10.00
|
Section 31, finishing fuel connections
|
Details
|
|
|
04-26-2013
|
8.00
|
Section 33, interior assembly
|
Details
|
|
|
04-21-2013
|
6.00
|
Section 33, installed more carpet, plus heater
|
Details
|
|
|
04-20-2013
|
5.00
|
Section 33, interior, center console continued
|
Details
|
|
|
04-19-2013
|
4.00
|
Section 33, interior assembly, center console
|
Details
|
|
|
04-15-2013
|
0.00
|
Just pictures
|
Details
|
|
|
04-14-2013
|
5.00
|
Creating a locking hatch
|
Details
|
|
|
04-13-2013
|
5.00
|
Section 33, cockpit interior, installing seats
|
Details
|
|
|
04-07-2013
|
5.00
|
Completed section 20, turtle deck final assembly
|
Details
|
|
|
04-06-2013
|
9.00
|
Working section 20, turtle deck arch
|
Details
|
|
|
04-05-2013
|
3.00
|
Working section 20, bow eye
|
Details
|
|
|
04-03-2013
|
4.00
|
Began section 20, turtle deck final assembly
|
Details
|
|
|
03-31-2013
|
7.00
|
Completed section 24, stabilizers final finishes
|
Details
|
|
|
03-30-2013
|
8.00
|
Completed section 22, vertical fin final finishes
|
Details
|
|
|
03-29-2013
|
8.00
|
Completed section 23, rudder final finishes
|
Details
|
|
|
03-28-2013
|
1.00
|
Back in business
|
Details
|
|
|
03-27-2013
|
8.00
|
Completed section 25, still working 24, tailfeathe
|
Details
|
|
|
03-23-2013
|
8.00
|
Completed sections 26, 27, 28, main wings
|
Details
|
|
|
03-22-2013
|
8.00
|
Working sections 26, 27, 28, main wings
|
Details
|
|
|
03-20-2013
|
8.00
|
Section 28, installed nav/strobe lights
|
Details
|
|
|
03-17-2013
|
10.00
|
Section 28, finishing main wings
|
Details
|
|
|
03-15-2013
|
0.00
|
Back from the paintshop
|
Details
|
|
|
03-13-2013
|
0.00
|
Cleaned, organized build hanger
|
Details
|
|
|
03-11-2013
|
5.00
|
Connected rudder
|
Details
|
|
|
03-10-2013
|
6.00
|
Connecting the elevators to the stabilizers
|
Details
|
|
|
03-09-2013
|
8.00
|
Connecting ailerons to wings
|
Details
|
|
|
02-20-2013
|
16.00
|
Off to the paintshop.
|
Details
|
|
|
02-17-2013
|
25.00
|
Section 13, 18: building, covering elevators
|
Details
|
|
|
02-15-2013
|
26.00
|
Sections 11, 12, 18: build, cover stabilizers, rud
|
Details
|
|
|
02-10-2013
|
4.00
|
Finished section 17, fuselage ready for paintshop!
|
Details
|
|
|
02-09-2013
|
4.00
|
Section 21, installed brake line, installed wheels
|
Details
|
|
|
02-08-2013
|
2.00
|
Section 17, installing the hull side angles
|
Details
|
|
|
02-07-2013
|
1.00
|
Testing controls, modifying around elevator horn
|
Details
|
|
|
02-07-2013
|
5.00
|
Section 17, installing pylon covers
|
Details
|
|
|
02-06-2013
|
8.00
|
Section 17, installed spash guard
|
Details
|
|
|
02-03-2013
|
8.00
|
Section 17, installed boom tube covers
|
Details
|
|
|
02-02-2013
|
3.00
|
Section 17, wasting more time with the pylon cover
|
Details
|
|
|
02-02-2013
|
4.00
|
Section 17, aileron torque tube
|
Details
|
|
|
02-01-2013
|
3.00
|
Section 17, continuing work on pylon covers
|
Details
|
|
|
01-31-2013
|
3.00
|
Section 17, fitting the pylon side panels
|
Details
|
|
|
01-27-2013
|
4.00
|
Section 17, root tube and electric flaps
|
Details
|
|
|
01-26-2013
|
4.00
|
Section 17, turtle deck install part 2
|
Details
|
|
|
01-25-2013
|
5.00
|
Section 17, attaching the turtle deck
|
Details
|
|
|
01-24-2013
|
3.00
|
Trim position sensor installed
|
Details
|
|
|
01-24-2013
|
2.00
|
Adding more castle nuts under the turtle deck
|
Details
|
|
|
01-23-2013
|
7.00
|
Sections 6 + 18G, build, cover vert stabilizer
|
Details
|
|
|
01-22-2013
|
3.00
|
Section 5, completing landing gear
|
Details
|
|
|
01-21-2013
|
1.00
|
Section 17, still fitting the turtle deck
|
Details
|
|
|
01-20-2013
|
4.00
|
Section 17, fitting the turtle deck
|
Details
|
|
|
01-19-2013
|
4.00
|
Section 33, baggage compartment
|
Details
|
|
|
01-18-2013
|
1.00
|
Mod- Securing the elevator trim spings
|
Details
|
|
|
01-17-2013
|
4.00
|
Section 17, carpeting the turtle deck
|
Details
|
|
|
01-14-2013
|
4.00
|
Secton 17, fitting and cutting turtle deck
|
Details
|
|
|
01-13-2013
|
5.00
|
Completed section 10, rudder/throttle assembly
|
Details
|
|
|
01-12-2013
|
3.00
|
Section 10, installing rudder pedal pads
|
Details
|
|
|
01-12-2013
|
8.00
|
Completed section 8, landing gear
|
Details
|
|
|
01-11-2013
|
4.00
|
Section 10, rudder pedals
|
Details
|
|
|
01-11-2013
|
2.00
|
Section 10, rudder forward pulley
|
Details
|
|
|
01-11-2013
|
3.00
|
Section 10, aileron control- tie rod to bell crank
|
Details
|
|
|
01-10-2013
|
3.00
|
Continuing section 10, installed control sticks
|
Details
|
|
|
01-09-2013
|
4.00
|
Began section 10, rudder/throttle assembly
|
Details
|
|
|
01-08-2013
|
1.00
|
Castle lock nuts
|
Details
|
|
|
01-07-2013
|
4.00
|
Section 8, finished except still waiting on a part
|
Details
|
|
|
01-06-2013
|
2.00
|
Section 5: Install landing gear boot
|
Details
|
|
|
01-05-2013
|
4.00
|
Began section 8, electric landing gear
|
Details
|
|
|
01-04-2013
|
4.00
|
Section 5: Finished locking down the airframe to t
|
Details
|
|
|
01-03-2013
|
4.00
|
Section 6: Finished tailwheel landing gear
|
Details
|
|
|
01-02-2013
|
4.00
|
Section 5, final fitting airframe to the hull
|
Details
|
|
|
01-01-2013
|
8.00
|
Section 7, aft cockpit, began and completed
|
Details
|
|
|
12-31-2012
|
3.00
|
Section 17, turtle deck test fit
|
Details
|
|
|
12-30-2012
|
1.00
|
Section 5, installing bilge thru-hull
|
Details
|
|
|
12-30-2012
|
3.00
|
Section 5, installed elevator tube boot, rudder an
|
Details
|
|
|
12-30-2012
|
2.00
|
Section 5, hull to gear boots
|
Details
|
|
|
12-30-2012
|
2.00
|
Section 5, cut the landing gear holes in the hull
|
Details
|
|
|
12-29-2012
|
6.00
|
Section 5, frame finally in place
|
Details
|
|
|
12-28-2012
|
4.00
|
Section 5, making bulkhead cross tube cutout
|
Details
|
|
|
12-28-2012
|
3.00
|
Made brackets to help secure the airframe to the h
|
Details
|
|
|
12-28-2012
|
2.00
|
Installed bilge pump
|
Details
|
|
|
12-27-2012
|
4.00
|
Finished cutting transom
|
Details
|
|
|
12-26-2012
|
3.00
|
Section 5, cutting the hull
|
Details
|
|
|
12-26-2012
|
6.00
|
Beginning section 5, installation of airframe into
|
Details
|
|
|
12-25-2012
|
2.00
|
Installed sound proofing
|
Details
|
|
|
12-24-2012
|
2.00
|
Installed hull drain plug
|
Details
|
|
|
12-24-2012
|
4.00
|
Completed section 3, fuselage aft assembly
|
Details
|
|
|
12-24-2012
|
2.00
|
Built cabin heater bracket and ran heater hose
|
Details
|
|
|
12-24-2012
|
2.00
|
Began, completed section 4, fuel system
|
Details
|
|
|
12-23-2012
|
3.00
|
Created cradle for the hull
|
Details
|
|
|
12-22-2012
|
3.00
|
Installed keel guard
|
Details
|
|
|
12-21-2012
|
1.00
|
Picked up rest of the kit, positioned fuel tank
|
Details
|
|
|
12-19-2012
|
3.00
|
Tail wheel assembled
|
Details
|
|
|
12-17-2012
|
7.00
|
Completed section 9, wheel assembly
|
Details
|
|
|
12-15-2012
|
7.00
|
Beginning section 9, wheel assembly
|
Details
|
|
|
12-14-2012
|
2.00
|
Finished boom tube install
|
Details
|
|
|
12-13-2012
|
3.00
|
Working on fuselage boom tube
|
Details
|
|
|
12-12-2012
|
1.00
|
Beginning section 3, fuselage aft assembly
|
Details
|
|
|
12-11-2012
|
7.00
|
Section 2, forward cockpit complete
|
Details
|
|
|
12-11-2012
|
2.00
|
Section 1, bulkhead complete
|
Details
|
|
|
12-10-2012
|
8.00
|
The build has begun... bulkhead almost complete
|
Details
|
|
|
12-08-2012
|
13.00
|
Inventory complete, beginning anti-corrosion treat
|
Details
|
|
|
12-07-2012
|
2.00
|
Picked up kit (well, some of it), inventory begins
|
Details
|
|
|
12-04-2012
|
0.00
|
Tools: Dremel and angle grinder
|
Details
|
|
|
12-04-2012
|
0.00
|
Tools: ACDelco digital torque adapter
|
Details
|
|
|
12-03-2012
|
0.00
|
Tools: Harbor Freight- Compressor and rivet gun
|
Details
|
|
|
12-03-2012
|
0.00
|
Tools: Harbor Freight- 74 Bin Mobile Double-Sided
|
Details
|
|
|
11-26-2012
|
0.00
|
Kit #582 purchased
|
Details
|
|
|
10-21-2012
|
0.00
|
Build hanger complete!
|
Details
|
|
|
10-12-2012
|
0.00
|
Deposit paid!
|
Details
|
|