Work Logs Found:
190
Category Work Time:
628 Hours
Date
Hours
Work Log Summary
Details
03-14-2008
1.00
apply decal
03-13-2008
2.00
repair rib #4 right wing
03-13-2008
4.00
repair bent rib #4 right wing
Details
03-04-2008
1.00
apply decal
03-02-2008
1.00
apply decals
02-20-2008
4.00
paint stripes
02-08-2008
2.00
strobe
01-31-2008
5.00
southco fittings
01-30-2008
3.00
fit doors
01-28-2008
4.00
fit doors
01-27-2008
4.00
windshield trim fitting
01-17-2008
3.50
fit wing tips
01-15-2008
4.50
fit windscreen
01-14-2008
3.50
fit windscreen
01-12-2008
5.00
mount wings
12-29-2007
2.00
DOOR FITTING
12-26-2007
4.50
Build Right Door
12-21-2007
6.00
Build Left Door
12-10-2007
3.00
fit wing to t bone
12-09-2007
4.00
build struts
12-06-2007
2.00
move gascolator
12-06-2007
2.00
move fuel pump
12-06-2007
1.00
installed wing rear spar mount
12-05-2007
2.00
move brake master cylinder
12-04-2007
4.00
build strut
11-27-2007
4.00
install cowl fastners
11-26-2007
2.00
fit cowl
11-25-2007
3.00
fit boot cowl
11-24-2007
4.50
fit boot cowl
11-24-2007
3.00
fit boot cowl
11-12-2007
2.00
paint wing
11-03-2007
3.50
paint
10-28-2007
4.00
paint wing and doors
10-27-2007
3.00
paint wing
10-14-2007
2.00
finish color wing
10-13-2007
2.00
wiring
10-13-2007
2.00
poly spray wing
09-16-2007
2.50
fabric rivits
09-15-2007
2.00
poly brush left wing top
06-10-2007
6.00
wiring
06-10-2007
4.00
wiring
04-25-2007
1.25
finish oil cooler installation
04-25-2007
4.00
balance
04-24-2007
2.00
balance left horizontal stab
04-22-2007
3.50
install rudder and horizonal stabilizers
04-21-2007
2.50
final coat
04-21-2007
1.00
bleed brake lines
04-20-2007
2.00
install new master cylinder
04-20-2007
1.00
finish floor board
04-17-2007
3.50
oil cooler installation
04-14-2007
2.50
paint
04-13-2007
4.00
paint empendages
04-13-2007
2.00
floor board installation
04-11-2007
5.00
wiring
04-09-2007
2.50
brakes
04-07-2007
4.00
brakes
04-06-2007
4.00
brakes
04-05-2007
5.00
brakes
04-01-2007
5.00
install engine wiring
03-31-2007
6.00
install engine cooling cowl
03-30-2007
5.00
install engine
03-29-2007
5.00
install engine
03-23-2007
3.50
install hard fuel lines and fittings
03-21-2007
2.50
tail wheel installation
03-21-2007
3.00
install aft fuel lines, mixer valve and stand offs
03-20-2007
5.00
main wheel installation
03-19-2007
4.50
main gear installation
03-18-2007
3.00
main gear installation
03-17-2007
2.75
painting
03-15-2007
2.00
paint engine mount
03-14-2007
2.00
prime and paint engine mount
03-13-2007
4.75
color coat
03-12-2007
2.50
prime struts
03-11-2007
5.00
ploy spray
03-10-2007
6.50
ploy spray
03-09-2007
4.50
ploy spray
03-08-2007
5.50
ploy spray
03-06-2007
4.00
paint prep
03-03-2007
5.00
sanding and paint prep
03-01-2007
4.50
cover rudder
02-28-2007
4.00
stab cover
02-26-2007
16.00
covering
02-22-2007
5.50
flap construction and covering
02-20-2007
4.50
door covering
02-19-2007
1.50
flap construction
02-18-2007
6.50
cover side
02-17-2007
5.25
cover bottom
02-12-2007
4.50
cover doors
02-10-2007
5.50
panel wiring
02-09-2007
6.00
wiring
02-09-2007
4.00
aileron
02-08-2007
2.00
wiring
02-07-2007
2.00
wiring
02-02-2007
5.00
panel wiring
02-01-2007
6.50
panel wiring
01-31-2007
4.00
panel wiring
01-30-2007
3.50
panel wiring to buss
01-27-2007
4.00
throttle installation
01-27-2007
3.00
panel nut plate installation
01-25-2007
2.50
strobe light installation
01-25-2007
1.50
elt installation
01-24-2007
1.50
flap cable installation left wing
01-21-2007
3.50
PANEL WIRING
01-20-2007
4.50
PANEL WIRING
01-17-2007
2.00
wiring
01-16-2007
1.50
circuit breaker wiring
01-14-2007
1.50
PTT wiring
01-14-2007
1.50
panel fitting
01-14-2007
1.50
master buss wiring
01-13-2007
4.00
panel cutout
01-12-2007
4.50
panel cutpout
01-11-2007
2.50
radio stack bracket
01-11-2007
2.00
gascolator
12-27-2006
2.50
grip wiring
12-17-2006
5.00
wiring
12-16-2006
5.00
wiring
12-06-2006
6.00
panel layout
11-25-2006
1.50
installed tank brakets and vent tube
11-25-2006
1.00
install cables
11-24-2006
2.50
installed regulator, oil collection bottle
11-23-2006
1.50
brake hyd fittings
11-19-2006
2.00
transponder and vhf cabling
11-11-2006
3.50
battery box
11-04-2006
1.50
structure
11-04-2006
2.50
left wing rib riviting
11-01-2006
2.00
left wing structure
10-28-2006
4.00
wing structure
10-24-2006
2.50
left wing structure
10-20-2006
1.00
spray poly primer
10-15-2006
1.50
spray poly primer
10-14-2006
5.00
poly brush elevator
10-13-2006
2.50
right wing tube exit install
10-12-2006
3.00
right wing inspection plate install
10-09-2006
2.50
right wing covering
10-08-2006
5.00
right wing covering
10-07-2006
6.00
right wing covering
10-06-2006
2.50
right wing covering
10-01-2006
2.00
wing rivit
09-30-2006
2.50
wing rivit
09-24-2006
2.00
rib rivits
09-17-2006
2.00
edge tape
09-13-2006
2.50
rib riviting
09-10-2006
3.50
wing covering
09-04-2006
6.50
right wing covering
09-03-2006
5.50
support tubes
09-02-2006
1.50
leading edge metal
08-20-2006
2.50
fuel vent pipe
08-20-2006
2.50
flap cable installation
08-17-2006
2.50
tip bow installation
08-13-2006
5.50
wing structure
08-13-2006
3.50
bell crank
08-08-2006
2.00
right wing rib layout
08-07-2006
2.50
baggage
08-05-2006
2.00
door framebattery access panel
08-02-2006
3.50
flap lever assembly
07-29-2006
2.50
rudder petal
07-29-2006
2.50
mounting plates
07-29-2006
4.50
floor boardfitting
07-27-2006
3.50
seat fitup
07-26-2006
3.50
drill ribs
07-22-2006
3.00
rudder cable guides and pulleys
07-19-2006
2.00
horz stab attach tang fab
07-15-2006
5.00
torque tube
07-15-2006
2.00
elevator push pull tube
07-14-2006
3.50
torque tube final assembly
07-13-2006
1.00
door upcatch
07-12-2006
3.00
torque tube fitup
07-11-2006
2.50
trim tab fab and fitup
07-10-2006
4.50
trim tab fab
07-10-2006
1.00
main gear fairing fitup
07-10-2006
1.50
horz stab ribs
07-09-2006
1.50
horz stab fitup
07-09-2006
1.50
elevator nut plates
07-08-2006
3.50
strut attach plate
07-08-2006
5.50
main gear fitup
07-06-2006
5.50
strut attach plates
07-06-2006
2.50
leading edge spar doubler
07-05-2006
3.00
left wing leading edge spar doubler
07-04-2006
5.00
right wing leading edge spar root doubler
07-04-2006
3.00
leading edge spar doubler
07-04-2006
7.50
10 ribs
07-03-2006
2.00
wing ribs
07-01-2006
8.00
9 ribs
06-30-2006
3.00
rib jig fab
06-29-2006
2.00
vert stab rib
06-29-2006
1.50
bottom former
06-28-2006
1.50
fuselage side formers
06-27-2006
1.00
Vert stab former
06-26-2006
2.50
fuselage side former
06-11-2006
0.00
kit arrival
SITE NAVIGATION
Contact Builder
S7S Home
Category
# Logs
# Hours
All
190
628
aircraft kit
1
Avionics
7
20
Brakes and wheels
6
18
control
10
32
electrical
18
66
Empennage
15
44
Engine
7
31
Firewall
4
8
FUEL SYSTEM
6
14
Fuselage
38
138
instruments
5
18
Miscellaneous
1
4
Painting and Finish
24
78
Wing
1
2
Wings
47
155