KitLog pro

Powered By Kitlog Pro v2.0

JOHN'S WEB SITE
Work Logs Found: 190
Category Work Time: 628 Hours
 Date
Hours
Work Log Summary

Details

 03-14-2008
1.00
apply decal

 03-13-2008
2.00
repair rib #4 right wing

 03-13-2008
4.00
repair bent rib #4 right wing
Details

 03-04-2008
1.00
apply decal

 03-02-2008
1.00
apply decals

 02-20-2008
4.00
paint stripes

 02-08-2008
2.00
strobe

 01-31-2008
5.00
southco fittings

 01-30-2008
3.00
fit doors

 01-28-2008
4.00
fit doors

 01-27-2008
4.00
windshield trim fitting

 01-17-2008
3.50
fit wing tips

 01-15-2008
4.50
fit windscreen

 01-14-2008
3.50
fit windscreen

 01-12-2008
5.00
mount wings

 12-29-2007
2.00
DOOR FITTING

 12-26-2007
4.50
Build Right Door

 12-21-2007
6.00
Build Left Door
     

 12-10-2007
3.00
fit wing to t bone
     

 12-09-2007
4.00
build struts
       

 12-06-2007
2.00
move gascolator
     

 12-06-2007
2.00
move fuel pump
     

 12-06-2007
1.00
installed wing rear spar mount
     

 12-05-2007
2.00
move brake master cylinder
     

 12-04-2007
4.00
build strut

 11-27-2007
4.00
install cowl fastners

 11-26-2007
2.00
fit cowl

 11-25-2007
3.00
fit boot cowl

 11-24-2007
4.50
fit boot cowl

 11-24-2007
3.00
fit boot cowl

 11-12-2007
2.00
paint wing

 11-03-2007
3.50
paint

 10-28-2007
4.00
paint wing and doors

 10-27-2007
3.00
paint wing

 10-14-2007
2.00
finish color wing

 10-13-2007
2.00
wiring

 10-13-2007
2.00
poly spray wing

 09-16-2007
2.50
fabric rivits
       

 09-15-2007
2.00
poly brush left wing top

 06-10-2007
6.00
wiring

 06-10-2007
4.00
wiring

 04-25-2007
1.25
finish oil cooler installation

 04-25-2007
4.00
balance

 04-24-2007
2.00
balance left horizontal stab

 04-22-2007
3.50
install rudder and horizonal stabilizers
       

 04-21-2007
2.50
final coat

 04-21-2007
1.00
bleed brake lines

 04-20-2007
2.00
install new master cylinder
     

 04-20-2007
1.00
finish floor board
     

 04-17-2007
3.50
oil cooler installation
       

 04-14-2007
2.50
paint

 04-13-2007
4.00
paint empendages

 04-13-2007
2.00
floor board installation

 04-11-2007
5.00
wiring

 04-09-2007
2.50
brakes

 04-07-2007
4.00
brakes

 04-06-2007
4.00
brakes

 04-05-2007
5.00
brakes
     

 04-01-2007
5.00
install engine wiring

 03-31-2007
6.00
install engine cooling cowl
     

 03-30-2007
5.00
install engine

 03-29-2007
5.00
install engine
       

 03-23-2007
3.50
install hard fuel lines and fittings

 03-21-2007
2.50
tail wheel installation
     

 03-21-2007
3.00
install aft fuel lines, mixer valve and stand offs

 03-20-2007
5.00
main wheel installation
       

 03-19-2007
4.50
main gear installation

 03-18-2007
3.00
main gear installation

 03-17-2007
2.75
painting
       

 03-15-2007
2.00
paint engine mount

 03-14-2007
2.00
prime and paint engine mount

 03-13-2007
4.75
color coat

 03-12-2007
2.50
prime struts

 03-11-2007
5.00
ploy spray

 03-10-2007
6.50
ploy spray

 03-09-2007
4.50
ploy spray

 03-08-2007
5.50
ploy spray

 03-06-2007
4.00
paint prep

 03-03-2007
5.00
sanding and paint prep

 03-01-2007
4.50
cover rudder

 02-28-2007
4.00
stab cover
       

 02-26-2007
16.00
covering
       

 02-22-2007
5.50
flap construction and covering
       

 02-20-2007
4.50
door covering

 02-19-2007
1.50
flap construction
     

 02-18-2007
6.50
cover side
     

 02-17-2007
5.25
cover bottom
       

 02-12-2007
4.50
cover doors

 02-10-2007
5.50
panel wiring
     

 02-09-2007
6.00
wiring

 02-09-2007
4.00
aileron
     

 02-08-2007
2.00
wiring

 02-07-2007
2.00
wiring

 02-02-2007
5.00
panel wiring

 02-01-2007
6.50
panel wiring

 01-31-2007
4.00
panel wiring

 01-30-2007
3.50
panel wiring to buss

 01-27-2007
4.00
throttle installation
     

 01-27-2007
3.00
panel nut plate installation
     

 01-25-2007
2.50
strobe light installation
     

 01-25-2007
1.50
elt installation
       

 01-24-2007
1.50
flap cable installation left wing
       

 01-21-2007
3.50
PANEL WIRING
       

 01-20-2007
4.50
PANEL WIRING

 01-17-2007
2.00
wiring

 01-16-2007
1.50
circuit breaker wiring

 01-14-2007
1.50
PTT wiring

 01-14-2007
1.50
panel fitting

 01-14-2007
1.50
master buss wiring

 01-13-2007
4.00
panel cutout

 01-12-2007
4.50
panel cutpout

 01-11-2007
2.50
radio stack bracket
       

 01-11-2007
2.00
gascolator
     

 12-27-2006
2.50
grip wiring

 12-17-2006
5.00
wiring
     

 12-16-2006
5.00
wiring
     

 12-06-2006
6.00
panel layout
     

 11-25-2006
1.50
installed tank brakets and vent tube
     

 11-25-2006
1.00
install cables
       

 11-24-2006
2.50
installed regulator, oil collection bottle
     

 11-23-2006
1.50
brake hyd fittings
     

 11-19-2006
2.00
transponder and vhf cabling
       

 11-11-2006
3.50
battery box
     

 11-04-2006
1.50
structure
     

 11-04-2006
2.50
left wing rib riviting

 11-01-2006
2.00
left wing structure
       

 10-28-2006
4.00
wing structure
       

 10-24-2006
2.50
left wing structure
       

 10-20-2006
1.00
spray poly primer

 10-15-2006
1.50
spray poly primer

 10-14-2006
5.00
poly brush elevator
     

 10-13-2006
2.50
right wing tube exit install
     

 10-12-2006
3.00
right wing inspection plate install
     

 10-09-2006
2.50
right wing covering
       

 10-08-2006
5.00
right wing covering

 10-07-2006
6.00
right wing covering

 10-06-2006
2.50
right wing covering

 10-01-2006
2.00
wing rivit

 09-30-2006
2.50
wing rivit

 09-24-2006
2.00
rib rivits

 09-17-2006
2.00
edge tape

 09-13-2006
2.50
rib riviting

 09-10-2006
3.50
wing covering
     

 09-04-2006
6.50
right wing covering
       

 09-03-2006
5.50
support tubes
     

 09-02-2006
1.50
leading edge metal
     

 08-20-2006
2.50
fuel vent pipe
       

 08-20-2006
2.50
flap cable installation
     

 08-17-2006
2.50
tip bow installation
     

 08-13-2006
5.50
wing structure
       

 08-13-2006
3.50
bell crank
       

 08-08-2006
2.00
right wing rib layout

 08-07-2006
2.50
baggage
     

 08-05-2006
2.00
door framebattery access panel
     

 08-02-2006
3.50
flap lever assembly
     

 07-29-2006
2.50
rudder petal
     

 07-29-2006
2.50
mounting plates
     

 07-29-2006
4.50
floor boardfitting
       

 07-27-2006
3.50
seat fitup
     

 07-26-2006
3.50
drill ribs

 07-22-2006
3.00
rudder cable guides and pulleys
     

 07-19-2006
2.00
horz stab attach tang fab

 07-15-2006
5.00
torque tube
       

 07-15-2006
2.00
elevator push pull tube
     

 07-14-2006
3.50
torque tube final assembly

 07-13-2006
1.00
door upcatch

 07-12-2006
3.00
torque tube fitup
       

 07-11-2006
2.50
trim tab fab and fitup

 07-10-2006
4.50
trim tab fab

 07-10-2006
1.00
main gear fairing fitup

 07-10-2006
1.50
horz stab ribs

 07-09-2006
1.50
horz stab fitup

 07-09-2006
1.50
elevator nut plates

 07-08-2006
3.50
strut attach plate

 07-08-2006
5.50
main gear fitup

 07-06-2006
5.50
strut attach plates

 07-06-2006
2.50
leading edge spar doubler

 07-05-2006
3.00
left wing leading edge spar doubler

 07-04-2006
5.00
right wing leading edge spar root doubler

 07-04-2006
3.00
leading edge spar doubler

 07-04-2006
7.50
10 ribs

 07-03-2006
2.00
wing ribs
     

 07-01-2006
8.00
9 ribs

 06-30-2006
3.00
rib jig fab

 06-29-2006
2.00
vert stab rib

 06-29-2006
1.50
bottom former

 06-28-2006
1.50
fuselage side formers

 06-27-2006
1.00
Vert stab former
     

 06-26-2006
2.50
fuselage side former
     

 06-11-2006
0.00
kit arrival
     










Copyright © 2001-2024 Matronics. All Rights Reserved.