Date
|
Hours
|
Work Log Summary
|
Details
|
05-30-2013
|
0.00
|
Project abandoned for lack of funds
|
|
|
|
05-29-2013
|
0.75
|
Root Ribs-trimmed outside & inside
|
Details
|
|
|
05-19-2013
|
0.50
|
Root Ribs-epoxied inner sheeting both
|
Details
|
|
|
05-18-2013
|
1.00
|
Root Ribs-outer sheeting
|
Details
|
|
|
05-11-2013
|
8.00
|
Set-up Airport Shop
|
Details
|
|
|
05-10-2013
|
0.30
|
Wood for fuselage/wing bench2
|
Details
|
|
|
05-03-2013
|
0.10
|
Ordered plywood sheeting for root ribs
|
Details
|
|
|
04-30-2013
|
2.00
|
Airport Workshop
|
Details
|
|
|
04-11-2013
|
0.50
|
Root Ribs-beveled shims on sander
|
Details
|
|
|
04-10-2013
|
0.40
|
Sanded Root Ribs (both sides)
|
Details
|
|
|
04-09-2013
|
0.60
|
Doublers for Root Rib-Rear Spar sticks
|
Details
|
|
|
04-08-2013
|
0.40
|
Root Ribs-bottom shims epoxied
|
Details
|
|
|
04-07-2013
|
0.50
|
Root Ribs-top shims epoxied
|
Details
|
|
|
04-06-2013
|
0.20
|
Prebent shims for root ribs
|
Details
|
|
|
04-06-2013
|
1.25
|
Looked-over Gary Finchley's O&O and W-8
|
Details
|
|
|
04-05-2013
|
1.00
|
Bench for Wing
|
Details
|
|
|
04-04-2013
|
0.70
|
Designed workbench for wings
|
Details
|
|
|
03-31-2013
|
0.50
|
A&P Inspection of Wing Ribs
|
Details
|
|
|
03-25-2013
|
0.20
|
Set-up Airport Workshop
|
Details
|
|
|
03-24-2013
|
0.30
|
Compression Ribs 22&23 (filed spar openings square
|
Details
|
|
|
03-23-2013
|
0.50
|
Stole T-Bird paint scheme from Team RV
|
Details
|
|
|
03-23-2013
|
0.10
|
Root Ribs (sanded pass-thru blocks flush)
|
Details
|
|
|
03-23-2013
|
0.10
|
Root Ribs (doubled verticals and solid nose block)
|
Details
|
|
|
03-23-2013
|
0.40
|
Compression Ribs 22&23 (trimmed)
|
Details
|
|
|
03-23-2013
|
0.50
|
Compression Ribs 21&24 (trimmed on router)
|
Details
|
|
|
03-23-2013
|
0.40
|
Compression Rib-23 (sheeting side 2)
|
Details
|
|
|
03-23-2013
|
0.40
|
Compression Rib-22 (sheeting-side2)
|
Details
|
|
|
03-22-2013
|
0.20
|
Root Ribs-sanded joints flush
|
Details
|
|
|
03-22-2013
|
0.40
|
Root Ribs-pass thru blocks
|
Details
|
|
|
03-22-2013
|
0.20
|
Root Ribs (pass thru blocks epoxied in place)
|
Details
|
|
|
03-22-2013
|
0.30
|
Compression Rib-24 (sheeting side-2)
|
Details
|
|
|
03-22-2013
|
0.30
|
Compression Rib #21-epoxied sheeting side#2
|
Details
|
|
|
03-21-2013
|
1.50
|
Touched-up all glue joints on main ribs
|
Details
|
|
|
03-21-2013
|
0.30
|
Root Ribs-sanded glue joints both sides
|
Details
|
|
|
03-20-2013
|
0.30
|
Root Rib-2 (final fit & epoxied in jig)
|
Details
|
|
|
03-20-2013
|
0.30
|
Root Rib-1 (removed from jig & sanded)
|
Details
|
|
|
03-19-2013
|
0.60
|
Tested Joint-2 to failure
|
Details
|
|
|
03-19-2013
|
0.30
|
Root Rib-1 (epoxied in jig)
|
Details
|
|
|
03-19-2013
|
0.10
|
Drilled pass-thru holes in compression ribs (side-
|
Details
|
|
|
03-19-2013
|
1.50
|
Cut & fit sticks for both root ribs
|
Details
|
|
|
03-18-2013
|
0.40
|
Sanded side-2 of compression ribs
|
Details
|
|
|
03-18-2013
|
0.50
|
Filed Spar openings in compression ribs
|
Details
|
|
|
03-17-2013
|
0.20
|
Test Joint-spruce-gusseted
|
Details
|
|
|
03-17-2013
|
1.50
|
Root Rib Jig
|
Details
|
|
|
03-17-2013
|
0.30
|
Ribs-Capstrips-fixed gouged capstrips with epoxy
|
Details
|
|
|
03-17-2013
|
0.50
|
Compression Rib-pass thru blocks
|
Details
|
|
|
03-16-2013
|
0.30
|
Rear Spar Cutouts on router (side-1)
|
Details
|
|
|
03-16-2013
|
0.10
|
Rear Spar Cutouts (Side-1 complete)
|
Details
|
|
|
03-15-2013
|
0.75
|
Trimmed LE & TE of all ribs
|
Details
|
|
|
03-15-2013
|
0.50
|
Made SW drawing from revised Root Rib part
|
Details
|
|
|
03-15-2013
|
0.10
|
All Ribs Trimmed!
|
Details
|
|
|
03-14-2013
|
1.00
|
Trimmed Ribs 6-13 on router with pattern bit
|
Details
|
|
|
03-14-2013
|
0.50
|
Trimmed main spar opening with pattern bit
|
Details
|
|
|
03-14-2013
|
0.30
|
Trimmed Compression ribs with pattern bit
|
Details
|
|
|
03-14-2013
|
1.50
|
Re-designed Root Rib per Jim Stanton's comments
|
Details
|
|
|
03-13-2013
|
1.00
|
Trimmed Ribs#14-20 with router pattern bit
|
Details
|
|
|
03-13-2013
|
0.20
|
Researched printing full-size plans from SW
|
Details
|
|
|
03-13-2013
|
0.60
|
Printout at Office Max-too small
|
Details
|
|
|
03-13-2013
|
1.25
|
Modeled Root Rib (JimC-revised) completely
|
Details
|
|
|
03-12-2013
|
1.00
|
Root Rib by Jim C.-revised to smooth curve
|
Details
|
|
|
03-12-2013
|
0.50
|
Filed spar openings to fit on final 3 main ribs
|
Details
|
|
|
03-11-2013
|
0.20
|
Ordered 1/16" plywood to finish compression ribs
|
Details
|
|
|
03-10-2013
|
0.50
|
Researched accurate plans for root ribs
|
Details
|
|
|
03-10-2013
|
0.10
|
Prebent other 2 top capstrips for root ribs
|
Details
|
|
|
03-10-2013
|
3.50
|
Filed spar openings in main ribs to fit stub
|
Details
|
|
|
03-10-2013
|
0.60
|
Drilled & countersunk jig blocks for root rib
|
Details
|
|
|
03-09-2013
|
0.10
|
Pre-bent 2 top capstrips for root ribs
|
Details
|
|
|
03-09-2013
|
0.50
|
Cut & sanded jig blocks for Root Rib Jig
|
Details
|
|
|
03-07-2013
|
0.30
|
Picked-up Root Rib Drawing-reduced,size need 100%
|
Details
|
|
|
03-06-2013
|
0.10
|
Ordered D-Print of Root Rib Drawing for Jig
|
Details
|
|
|
03-04-2013
|
0.50
|
Purchased wood for Root Rib Jig
|
Details
|
|
|
03-04-2013
|
0.10
|
Printed .pdf of Root Rib drawing for D-size print
|
Details
|
|
|
03-04-2013
|
0.50
|
Designed compression rib pass-thru block
|
Details
|
|
|
03-03-2013
|
0.50
|
Rib-24(bottom sheet, reglued nose & TE block)
|
Details
|
|
|
03-03-2013
|
0.10
|
Rib-24 (rough-trimmed bottom sheet)
|
Details
|
|
|
03-03-2013
|
0.10
|
Rib-23(rough-trimmed bottom sheet)
|
Details
|
|
|
03-03-2013
|
0.10
|
Main Ribs Constructed
|
|
|
|
03-03-2013
|
0.20
|
Compression Ribs (drilled pilot holes)
|
Details
|
|
|
03-02-2013
|
0.70
|
Rib-23(bottom sheet) & Rib-24(jig)
|
Details
|
|
|
03-02-2013
|
0.50
|
Rib-23 (jig)
|
Details
|
|
|
03-02-2013
|
0.50
|
Rib-22(bottom sheet) & Rib-21(rough-trimmed sheeti
|
Details
|
|
|
03-02-2013
|
0.10
|
Rib-22 (rough-trimmed bottom sheet)
|
Details
|
|
|
03-02-2013
|
0.50
|
Researched Heated Pitot/AOA mounting
|
Details
|
|
|
03-02-2013
|
0.50
|
Made extra set of rib sticks as patterns
|
Details
|
|
|
03-01-2013
|
0.60
|
Rib-21(reinforced inside seams) & Rib-22(jig)
|
Details
|
|
|
03-01-2013
|
0.80
|
Rib-21 (sanded-full sheeted bottom)
|
Details
|
|
|
02-28-2013
|
0.40
|
Rib-20(bottom gussets)
|
Details
|
|
|
02-27-2013
|
0.60
|
Rib-20(top gussets) & Rib-21(jig)
|
Details
|
|
|
02-26-2013
|
0.60
|
Rib-19(bottom gusset) & Rib-20(jig)
|
Details
|
|
|
02-25-2013
|
0.60
|
Rib-18(bottom gussets) & Rib-19(top gussets)
|
Details
|
|
|
02-24-2013
|
0.60
|
Rib-18(top gussets) & Rib-19(jig)
|
Details
|
|
|
02-24-2013
|
0.60
|
Rib-17(bottom gussets) & Rib-18(jig)
|
Details
|
|
|
02-23-2013
|
0.60
|
Rib-16(top gussets) & Rib-17(jig)
|
Details
|
|
|
02-23-2013
|
0.50
|
Rib-16(bottom gussets) + Rib-17(top gussets)
|
Details
|
|
|
02-22-2013
|
0.60
|
Rib-15(bottom gussets) & Rib-16(jig)
|
Details
|
|
|
02-21-2013
|
0.60
|
Rib-14(bottom gussets) & Rib-15(top gussets)
|
Details
|
|
|
02-20-2013
|
0.70
|
Rib-14(top gussets) + Rib-15(jig)
|
Details
|
|
|
02-19-2013
|
0.60
|
Rib-13(bottom gussets) & Rib-14(jig)
|
Details
|
|
|
02-18-2013
|
0.60
|
Rib-12(top gussets)+Rib-13(top gussets)
|
Details
|
|
|
02-18-2013
|
0.60
|
Rib-12(bottom gussets) & Rib-13(jig)
|
Details
|
|
|
02-17-2013
|
0.60
|
Rib-11(bottom gussets) & Rib-12(jig)
|
Details
|
|
|
02-17-2013
|
0.60
|
Rib-10(bottom gussets) & Rib-11(top gussets)
|
Details
|
|
|
02-16-2013
|
0.70
|
Rib-10(top gussets) + Rib-11(jig)
|
Details
|
|
|
02-15-2013
|
0.70
|
Rib-9(bottom gussets) + Rib-10(jig)
|
Details
|
|
|
02-14-2013
|
0.70
|
Rib-8(bottom gussets) + Rib-9(top gussets)
|
Details
|
|
|
02-13-2013
|
0.70
|
Rib-8(top gussets) + Rib-9(jig)
|
Details
|
|
|
02-12-2013
|
0.60
|
Rib-7(bottom gussets) + Rib-8(jig)
|
Details
|
|
|
02-11-2013
|
0.60
|
Rib-6(bottom gussets) & Rib-7(top gussets)
|
Details
|
|
|
02-10-2013
|
0.20
|
Set-up Duplicate Rib-1
|
Details
|
|
|
02-10-2013
|
0.20
|
Router Set-up for duplicating ribs with pattern bi
|
Details
|
|
|
02-10-2013
|
0.50
|
Rib-6(top gussets) & Rib-7(jig)
|
Details
|
|
|
02-10-2013
|
0.50
|
Rear Spar Stub
|
Details
|
|
|
02-10-2013
|
0.70
|
Main Spar stub
|
Details
|
|
|
02-10-2013
|
1.00
|
Duplicated 1st 5 Ribs with pattern bit
|
Details
|
|
|
02-10-2013
|
0.10
|
Duplicate Ribs 1-5 completed
|
Details
|
|
|
02-10-2013
|
0.70
|
1st duplicate rib (router pattern bit)
|
Details
|
|
|
02-09-2013
|
0.60
|
Spruce-5(bottom gussets) + Spruce-6(jig)
|
Details
|
|
|
02-08-2013
|
1.40
|
SW: Modeled tip tank
|
Details
|
|
|
02-08-2013
|
1.00
|
SW: Modeled Integral Wingtip fuel tanks (7.5 gal)
|
Details
|
|
|
02-08-2013
|
0.60
|
Spruce-4(bottom gussets) & Spruce-5(top gussets)
|
Details
|
|
|
02-08-2013
|
0.30
|
Sanded rib joints flush, use sawdust as thickener
|
Details
|
|
|
02-07-2013
|
0.50
|
Spruce-4(top gussets) & Spruce-5(jig)
|
Details
|
|
|
02-06-2013
|
0.60
|
Spruce-3(top gussets)+Spruce-4(jig)
|
Details
|
|
|
02-06-2013
|
0.30
|
Destructive Test #2
|
Details
|
|
|
02-05-2013
|
0.30
|
Spruce Rib-3 (top gussets)
|
Details
|
|
|
02-05-2013
|
0.30
|
Router Table completed
|
Details
|
|
|
02-04-2013
|
0.20
|
Tested sample glue joint to failure
|
Details
|
|
|
02-04-2013
|
0.70
|
Spruce-2(back gussets), Spruce-3-epoxied in jig
|
Details
|
|
|
02-04-2013
|
0.80
|
Router Table
|
Details
|
|
|
02-03-2013
|
0.20
|
Spruce-2 (top gussets)
|
Details
|
|
|
02-03-2013
|
0.40
|
Spruce Rib-2 epoxied in jig
|
Details
|
|
|
02-03-2013
|
0.50
|
Master Rib: sanded gussets flush, labelled
|
Details
|
|
|
02-03-2013
|
0.10
|
Master Rib (complete)
|
Details
|
|
|
02-03-2013
|
0.30
|
Gussets epoxied to 1st side of Spruce Rib-1
|
Details
|
|
|
02-02-2013
|
0.40
|
Gussets on 2nd side of master rib
|
Details
|
|
|
02-02-2013
|
0.40
|
Gussets on 1st side of master rib
|
Details
|
|
|
02-02-2013
|
0.20
|
Epoxied test Tee to verify bond
|
Details
|
|
|
02-02-2013
|
0.60
|
Epoxied Master Rib as test
|
Details
|
|
|
02-02-2013
|
0.40
|
Epoxied 1st spruce rib in rib jig
|
Details
|
|
|
01-31-2013
|
0.20
|
Bought brushes,sticks & mixing cups for epoxy
|
Details
|
|
|
01-23-2013
|
0.60
|
Sanded rib jig blocks
|
Details
|
|
|
01-21-2013
|
0.30
|
Ripped Ply into strips for gussets
|
Details
|
|
|
01-21-2013
|
0.60
|
Cut ply gusset-F
|
Details
|
|
|
01-21-2013
|
0.30
|
Cut Ply for Compression Ribs
|
Details
|
|
|
01-21-2013
|
0.50
|
Cut Gussets-C&D
|
Details
|
|
|
01-21-2013
|
0.40
|
Cut Gussets-B&G
|
Details
|
|
|
01-21-2013
|
0.30
|
Cut Gusset-I
|
Details
|
|
|
01-21-2013
|
0.25
|
Cut Gusset-H
|
Details
|
|
|
01-21-2013
|
0.25
|
Cut Gusset-A
|
Details
|
|
|
01-21-2013
|
0.50
|
Cut Gusset E
|
Details
|
|
|
01-21-2013
|
0.10
|
ALL RIB COMPONENTS PREPARED!
|
Details
|
|
|
01-20-2013
|
0.10
|
Top Capstrips are ALL pre-bent
|
Details
|
|
|
01-19-2013
|
0.10
|
Pre-bent last 2 top capstrips
|
Details
|
|
|
01-18-2013
|
0.10
|
Soaked LAST 2 top capstrips!
|
Details
|
|
|
01-18-2013
|
0.10
|
Prebent 2 more top capstrips
|
Details
|
|
|
01-17-2013
|
0.10
|
Soaked 2 more top capstrips
|
Details
|
|
|
01-17-2013
|
0.10
|
Pre-bent 2 more top capstrips
|
Details
|
|
|
01-17-2013
|
0.50
|
Gusset layout in SolidWorks (triangles)
|
Details
|
|
|
01-16-2013
|
0.10
|
Soaked 2 more top capstrips
|
Details
|
|
|
01-16-2013
|
0.10
|
Prebent 2 more top capstrips
|
Details
|
|
|
01-15-2013
|
0.10
|
Soaked 2 more top capstrips
|
Details
|
|
|
01-15-2013
|
0.10
|
Prebent 2 more top capstrips
|
Details
|
|
|
01-14-2013
|
0.10
|
Soaked 2 more top capstrips
|
Details
|
|
|
01-13-2013
|
0.10
|
Prebent 2 more top capstrips
|
Details
|
|
|
01-13-2013
|
1.00
|
Cut & Sanded TE Blocks (#14)
|
Details
|
|
|
01-12-2013
|
0.10
|
Soaked 2 more top capstrips
|
Details
|
|
|
01-12-2013
|
0.10
|
Pre-bent 2 more top capstrips
|
Details
|
|
|
01-12-2013
|
1.00
|
Cut LE Blocks
|
Details
|
|
|
01-11-2013
|
0.10
|
Soaked 2 more top capstrips
|
Details
|
|
|
01-11-2013
|
0.10
|
Prebent 2 more top capstrips
|
Details
|
|
|
01-11-2013
|
0.75
|
Cut & Sanded Diagonal-4
|
Details
|
|
|
01-11-2013
|
0.50
|
Cut & sanded Diagonal-2
|
Details
|
|
|
01-10-2013
|
0.10
|
Soaked 2 more top capstrips
|
Details
|
|
|
01-10-2013
|
0.10
|
Prebent 2 more top capstrips
|
Details
|
|
|
01-10-2013
|
0.50
|
Cut & sanded Diagonal 7
|
Details
|
|
|
01-10-2013
|
0.75
|
Cut & sanded Diagonal 11
|
Details
|
|
|
01-09-2013
|
0.10
|
Soaked 2 more top capstrips for prebending
|
Details
|
|
|
01-09-2013
|
0.10
|
Pre-bent next 2 top capstrips
|
Details
|
|
|
01-09-2013
|
1.00
|
Cut & Sanded Diagonal-9 (all)
|
Details
|
|
|
01-08-2013
|
0.75
|
Cut Uprights 3,8,10,12 & 13
|
Details
|
|
|
12-19-2012
|
0.10
|
Bent first 2 top capstrips
|
Details
|
|
|
12-18-2012
|
0.50
|
Cut Rib Top Capstrips & Stick 5's
|
Details
|
|
|
12-18-2012
|
0.25
|
Cut bottom capstrips & Sticks #6
|
Details
|
|
|
12-14-2012
|
0.10
|
Goodies Arrive! (spruce & epoxy)
|
Details
|
|
|
12-01-2012
|
0.30
|
Ordered Spruce & Epoxy
|
|
|
|
11-25-2012
|
1.50
|
Aircraft Welding Video #2
|
Details
|
|
|
11-22-2012
|
1.50
|
Aircraft Welding Video #1
|
Details
|
|
|
11-04-2012
|
1.00
|
Made opposite wing
|
Details
|
|
|
10-22-2012
|
1.50
|
Fuselage-weldment trims
|
Details
|
|
|
10-22-2012
|
0.60
|
Doors-gullwing geometry
|
Details
|
|
|
10-19-2012
|
1.50
|
Fuselage Tubing Trims
|
Details
|
|
|
10-19-2012
|
2.00
|
Fuselage Tubing
|
Details
|
|
|
10-18-2012
|
3.00
|
Fuselage Geometry
|
Details
|
|
|
10-18-2012
|
0.30
|
Doors-Brainstormed
|
Details
|
|
|
10-17-2012
|
2.00
|
Rudder Pedal Assy (complete)
|
Details
|
|
|
10-17-2012
|
0.50
|
Fuselage-Stations
|
Details
|
|
|
10-17-2012
|
0.20
|
Fuselage-Station 78
|
Details
|
|
|
10-17-2012
|
0.50
|
Fuselage-Station 48
|
Details
|
|
|
10-17-2012
|
0.20
|
Fuselage-Station 24
|
Details
|
|
|
10-17-2012
|
0.30
|
Fuselage-Station 18
|
Details
|
|
|
10-17-2012
|
0.40
|
Fuselage-Station 111
|
Details
|
|
|
10-17-2012
|
0.50
|
Fuselage-Station -2
|
Details
|
|
|
10-17-2012
|
0.30
|
Fuselage Stations-All
|
Details
|
|
|
10-17-2012
|
0.20
|
Fuselage Station 144
|
Details
|
|
|
10-16-2012
|
1.50
|
Rudder Pedals
|
Details
|
|
|
10-16-2012
|
0.20
|
Flap Torque Tube
|
Details
|
|
|
10-16-2012
|
0.50
|
Flap Horns
|
Details
|
|
|
10-16-2012
|
1.00
|
Control Stick-Trim Spring Bar
|
Details
|
|
|
10-16-2012
|
0.50
|
Control Stick-Assembly
|
Details
|
|
|
10-15-2012
|
0.70
|
Trim Lever
|
Details
|
|
|
10-15-2012
|
1.00
|
Control-pushrod
|
Details
|
|
|
10-15-2012
|
1.00
|
Control Stick-Yoke
|
Details
|
|
|
10-15-2012
|
1.00
|
Control Stick Sub-Assembly
|
Details
|
|
|
10-15-2012
|
0.40
|
Control Stick (complete assembly)
|
Details
|
|
|
10-14-2012
|
2.00
|
Wing-Right (with all ribs)
|
Details
|
|
|
10-14-2012
|
0.30
|
Rib-Aileron Balance Stub
|
Details
|
|
|
10-14-2012
|
0.50
|
Rib#14
|
Details
|
|
|
10-14-2012
|
1.00
|
Control Stick
|
Details
|
|
|
10-13-2012
|
1.00
|
Wing-Right (assembly)
|
Details
|
|
|
10-13-2012
|
0.60
|
Wing Assembly with Root Rib
|
Details
|
|
|
10-13-2012
|
1.50
|
Rib-Root
|
Details
|
|
|
10-12-2012
|
2.50
|
Wing-Right
|
Details
|
|
|
10-12-2012
|
1.00
|
Tailwheel
|
Details
|
|
|
10-12-2012
|
1.00
|
Ribs-Compression
|
Details
|
|
|
10-11-2012
|
0.50
|
Flap-Quadrant
|
Details
|
|
|
10-11-2012
|
0.60
|
Flap-Controls (lever & quadrant)
|
Details
|
|
|
10-11-2012
|
1.50
|
Flap-Controls
|
Details
|
|
|
10-10-2012
|
2.50
|
Flap Lever Assembly
|
Details
|
|
|
10-10-2012
|
2.00
|
Flap Horns L&R
|
Details
|
|
|
10-09-2012
|
0.50
|
Flap-Torque Tube Pushrod Assembly
|
Details
|
|
|
10-09-2012
|
2.00
|
Flap-Torque Tube (SW)
|
Details
|
|
|
10-09-2012
|
0.50
|
Flap-Horn Pushrod (SW)
|
Details
|
|
|
10-09-2012
|
1.00
|
AN481-4 Clevis (SW)
|
Details
|
|
|
10-08-2012
|
0.60
|
Wing-LE (lexan)
|
Details
|
|
|
10-08-2012
|
0.70
|
Wing Strut Attach Fitting (SW)
|
Details
|
|
|
10-08-2012
|
0.50
|
Spar-Rear-Attach Fitting (SW)
|
Details
|
|
|
10-08-2012
|
0.30
|
Spar-Rear (geometry)
|
Details
|
|
|
10-08-2012
|
0.40
|
Spar-LE (geometry)
|
Details
|
|
|
10-08-2012
|
0.50
|
Spar-Front-Attach (SW)
|
Details
|
|
|
10-08-2012
|
0.40
|
Spar-Front (geometry)
|
Details
|
|
|
10-08-2012
|
0.25
|
Rudder-Tailwheel Lever (SW)
|
Details
|
|
|
10-08-2012
|
0.30
|
Rudder-Horn (SW)
|
Details
|
|
|
10-08-2012
|
0.50
|
RIbs-Spar Blocks
|
Details
|
|
|
10-08-2012
|
0.20
|
Ribs-Blocks-Nose&TE (sanded)
|
Details
|
|
|
10-08-2012
|
0.30
|
Ribs-Blocks-Nose&TE (fit)
|
Details
|
|
|
10-08-2012
|
0.10
|
Rib-Spar Blocks (relief)
|
Details
|
|
|
10-08-2012
|
0.30
|
Rib-Block-TE (SW)
|
Details
|
|
|
10-08-2012
|
0.20
|
Rib-Block-Nose (SW)
|
Details
|
|
|
10-08-2012
|
1.00
|
Plans Arrived!
|
Details
|
|
|
10-07-2012
|
0.10
|
Spar opening dimension check
|
Details
|
|
|
10-07-2012
|
0.80
|
Seat Frame (SW)
|
Details
|
|
|
10-07-2012
|
0.40
|
Master Rib-Capstrips-sanding
|
Details
|
|
|
10-07-2012
|
1.00
|
Capstrips for Rib
|
Details
|
|
|
10-06-2012
|
0.70
|
Table Saw & Strips
|
Details
|
|
|
10-06-2012
|
1.00
|
Rib Jig Blocks secured
|
Details
|
|
|
10-06-2012
|
0.10
|
Capstrips-Bending
|
Details
|
|
|
10-06-2012
|
0.20
|
Capstrip Bending Soaker
|
Details
|
|
|
10-06-2012
|
0.50
|
Bending Form
|
Details
|
|
|
10-05-2012
|
0.10
|
Wing-Stut Attach Spar Bushing (SW)
|
Details
|
|
|
10-05-2012
|
0.30
|
Wing-Strut Attach Fitting (SW)
|
Details
|
|
|
10-05-2012
|
0.40
|
Seat-Adjuster Components (SW)
|
Details
|
|
|
10-05-2012
|
0.20
|
Elevator-Idler Fitting (SW)
|
Details
|
|
|
10-05-2012
|
0.20
|
Elevator-Idler Components (SW)
|
Details
|
|
|
10-05-2012
|
0.50
|
Elevator Idler Assembly (SW)
|
Details
|
|
|
10-04-2012
|
0.20
|
RIb Jib Blocks-ends squared
|
Details
|
|
|
10-04-2012
|
0.50
|
Rib Jib (setup)
|
Details
|
|
|
10-03-2012
|
1.00
|
Plywood Cutsheet
|
Details
|
|
|
10-02-2012
|
0.30
|
Rib-Tip (SW)
|
Details
|
|
|
10-02-2012
|
0.30
|
Rib-Stub (SW)
|
Details
|
|
|
10-02-2012
|
1.00
|
Rib-15 (SW)
|
Details
|
|
|
10-02-2012
|
1.50
|
Rib-14 (SW)
|
Details
|
|
|
10-02-2012
|
0.10
|
Plans (OK Ship)
|
Details
|
|
|
10-02-2012
|
0.75
|
Gusset Spreadsheet
|
Details
|
|
|
10-01-2012
|
0.20
|
Plans Ordered!
|
Details
|
|
|
10-01-2012
|
2.00
|
Materials List
|
Details
|
|
|
09-30-2012
|
2.00
|
Rib-Main (SW)
|
Details
|
|
|
09-30-2012
|
4.00
|
Gussets-Cut Plan
|
Details
|
|
|
09-29-2012
|
4.00
|
Gussets (layout)
|
Details
|
|
|
09-28-2012
|
1.00
|
Rib Jib Blocks (sanded)
|
Details
|
|
|
09-27-2012
|
0.20
|
Rib Jig Blocks (positioned)
|
Details
|
|
|
09-27-2012
|
1.00
|
Rib Jig Blocks (cut)
|
Details
|
|
|
09-27-2012
|
0.60
|
Jig Blocks (drilled)
|
Details
|
|
|
09-27-2012
|
0.30
|
Jig Block strip
|
Details
|
|
|
09-27-2012
|
1.00
|
Fuel Tank-Wing-Aft (SW)
|
Details
|
|
|
09-26-2012
|
1.00
|
Rib Layout Drawing (SW)
|
Details
|
|
|
09-26-2012
|
0.40
|
Measured Capstrips-Ribs
|
Details
|
|
|
09-26-2012
|
0.50
|
Jig board, screws, blocking (Lowes)
|
Details
|
|
|
09-26-2012
|
2.00
|
Fuselage Sides (SW)
|
Details
|
|
|
09-26-2012
|
0.20
|
1" Belt Sander
|
Details
|
|
|
09-24-2012
|
1.00
|
Main Rib-Full Size Plan
|
Details
|
|
|
09-24-2012
|
1.50
|
Main RIb
|
Details
|
|
|
09-23-2012
|
1.50
|
Spruce Parts List
|
Details
|
|
|
09-23-2012
|
0.40
|
Spar-Front-SW
|
Details
|
|
|
09-23-2012
|
4.00
|
Ribs-Main (SolidWorks)
|
Details
|
|
|
09-23-2012
|
2.50
|
Rib Pattern
|
Details
|
|
|
09-22-2012
|
3.50
|
Stanton Manual
|
Details
|
|
|
09-18-2012
|
1.00
|
Lycoming O-320 manuals
|
Details
|
|
|
09-18-2012
|
1.50
|
Lightspeed CDI Ignition
|
Details
|
|
|
09-18-2012
|
0.10
|
Jim Stanton Email
|
Details
|
|
|
09-17-2012
|
1.00
|
Tailwind Times, misc. drawings & articles
|
Details
|
|
|
09-17-2012
|
1.50
|
Reviewed misc. articles & drawings
|
Details
|
|
|
09-17-2012
|
3.50
|
Compendium 2011
|
Details
|
|
|
09-11-2012
|
1.00
|
ACS Info Packet
|
Details
|
|
|
09-07-2012
|
0.20
|
Reviewed ACS Tailwind info packet
|
Details
|
|
|
09-07-2012
|
0.10
|
Ordered Tailwind Construction Manual
|
Details
|
|
|
09-07-2012
|
1.00
|
Downloaded construction photos
|
Details
|
|
|
09-05-2012
|
3.00
|
Forum Files
|
Details
|
|
|
09-04-2012
|
0.30
|
Forum signups
|
Details
|
|
|
09-04-2012
|
0.10
|
Email from VR3
|
Details
|
|
|
09-03-2012
|
1.00
|
Avionics Options
|
Details
|
|
|
09-02-2012
|
1.00
|
Aircraft Spruce Kits
|
Details
|
|
|
09-01-2012
|
0.50
|
EAA Building Tube & Fabric
|
Details
|
|
|
09-01-2012
|
1.00
|
EAA Articles on Welding
|
Details
|
|
|
08-01-2012
|
0.50
|
Sport Aviation Article Aug.2012
|
Details
|
|